Letter from Insite Engineering regarding revised Site Plan Drawing Sets dated September 24%2C 2024
map survey
2 pages
Meeting: portal event 987 (no meeting page on file)
Agenda item: Review of the Environment Assessment Form Part II related to the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.
Map / plans, 2 pages. Attached to agenda item: “Review of the Environment Assessment Form Part II related to the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Draft Phase II Environmental Site Assessment Report
Environmental Noise Study and Facade Glazing...
FEAF Part II - to be completed September 25%2C 2024
Fire Apparatus Access Study Drawing from Insite...
Insite Preliminary Wastewater Engineering Report dated...
Insite Preliminary Water Engineering Report dated July...
Insite Stormwater Pollution Prevention Plan dated July...
Insite engineering and landscape architecture plans...
Letter from Kimley Horn dated September 16%2C 2024...
Letter from NYSDOT consenting to the Board of Trustees...
Letter from the Division for Historic Preservation...
Memorandum by Longman Lindsey dated September 10%2C 2024
Extracted text
3 Garrett Place, Carmel, New York 10512 (845) 225-9690 Fax (845) 225-9717
www.insite-eng.com
Z:\E\24154100 WBP Croton Point Ave\Correspondence\2024\092424jb.doc
September 24, 2024
Mr. John Bainlardi
WBP Development, LLC
480 Bedford Road
Chappaqua, NY 10514
RE:
Dear Mr. Bainlardi:
Enclosed please find the following:
•
Site Plan Drawing Set (10 Sheets), dated last revised September 24, 2024.
•
Drawing FA-1, Fire Apparatus Access Study, last revised September 24, 2024.
In response to comments received in the September 23, 2024 memorandum from AKRF, Inc., we
offer the following. Please note that this letter only addresses specific comments, and is not a full
response letter as other members of the team are responding to other comments in the memorandum.
LWRP CONSISTENCY REVIEW:
Response 5A: Our office has examined the existing capacity of the water and sewer systems.
Regarding water there are two options to service the proposed project. The first, which has been
accounted for in the Water Engineering Report and illustrated on the project plans is the Village preferred
option of extending the Wayne Street water main to the existing stub on Croton Point Ave. The second
option would be to provide onsite water storage for domestic / fire use which would be fed from the
existing water system. Relative to sewer the project ultimately is tributary to the Ossining Sanitary Sewer
District, where it was previously written in email to the Village from Westchester County that there was
flow available for the project at the receiving wastewater treatment plant. The project is currently
contemplating a sewer service connection to the forcemain directly in front of the project site and has
reached out to the county to discuss same.
SEQRA:
Response 1B: Refer to Response 5A above regarding the proposed Wayne Street water system
connection. It is our understanding that this is the Village’s preferred method for servicing the project.
Preliminary calculations based on previous hydrant flow testing showing the flows and pressures
associated with the Wayne Street connection have been provided in the Water Engineering Report.
Response 7:
•
Our office has reviewed the suggested elimination of the eastern one-way site driveway. In
reaching out to the Croton Harmon Union Free School District Transportation Director, the
School District indicated they would like the opportunity to come onto the site to pick up
children and use the traffic light to turn around. We believe the eastern one-way driveway
should remain to satisfy the request of the School District, as well as provide an additional
Letter to Mr. John Bainlardi
RE: 1Croton Point, Croton Point Ave, Croton-on-Hudson, NY
September 24, 2024
092424jb.doc
Insite Engineering, Surveying & Landscape Architecture, P.C.
emergency access point. We can further discuss this entrance and potentially limiting access
to just emergency and school bus traffic via signage during the site plan review process.
•
The proposed tree at the southeast corner of the building has not been relocated in order to
remain compliant with §230-52E(1(b)), which states at least one tree not less than 2 ½ inches
caliper shall be provided within off-street parking areas for every (10) ten parking spaces.
We believe the location of this tree in this island is consistent with the above stated
requirement to provide trees in landscape islands throughout parking areas. We can work
with the Planning Board during site plan review to select a tree species that will leaf out
above line of sight to minimize its potential impact on motorists while capitalizing on
landscaping benefits.
•
The surface parking space adjacent to the garage entrance has been relocated to the
northern parking lot as requested.
•
The trash room is going to be located inside the building. A call out indicating same has been
added to the project drawings.
•
Refer to Drawing FA-1 which illustrates how a fire truck can access the project site. We have
reached out to the Village Engineer to further discussions with the Fire Department and
provide the Village’s specific turning templates. Drawing FA-1 will be updated with the
Village’s templates once received but in the meantime has conservatively been based on a
100 foot aerial ladder truck.
INSITE ENGINEERING, SURVEYING & LANDSCAPE ARCHITECTURE, P.C.
By:
Richard D. Williams, Jr., PE
Senior Principal Engineer
RDW/dlm
Enclosures
Insite File No. 24154.100