Fire Apparatus Access Study Drawing from Insite Engineering dated September 24%2C 2024
map survey
1 page
Meeting: portal event 987 (no meeting page on file)
Agenda item: Review of the Environment Assessment Form Part II related to the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.
Map / plans, 1 page. Attached to agenda item: “Review of the Environment Assessment Form Part II related to the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Draft Phase II Environmental Site Assessment Report
Environmental Noise Study and Facade Glazing...
FEAF Part II - to be completed September 25%2C 2024
Insite Preliminary Wastewater Engineering Report dated...
Insite Preliminary Water Engineering Report dated July...
Insite Stormwater Pollution Prevention Plan dated July...
Insite engineering and landscape architecture plans...
Letter from Insite Engineering regarding revised Site...
Letter from Kimley Horn dated September 16%2C 2024...
Letter from NYSDOT consenting to the Board of Trustees...
Letter from the Division for Historic Preservation...
Memorandum by Longman Lindsey dated September 10%2C 2024
No machine-readable text could be extracted from this document — view the original PDF.