Res 110-22 LWRP - Grand Street
resolution
2 pages
From the meeting:
Board Of Trustees — 2022-07-05
Agenda item: Proposed Resolutions — Consider adoption of a finding of consistency with the Village's LWRP to replace a one hundred foot retaining wall at 25 and 33 Grand Street.
Resolution, 2 pages. Attached to agenda item: “Proposed Resolutions — Consider adoption of a finding of consistency with the Village's LWRP to replace a one hundred foot retaining wall at 25 and 33 Grand Street.”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Grand Street LWRP Letter from Westchester County
LWRP Grand Street Retaining Wall
NYS DOS LWRP Memo
WAC Memo Grand St Retaining Wall
Extracted text
On motion of TRUSTEE _______ seconded by TRUSTEE ______ the following
resolution was adopted by the Board of Trustees of the Village of Croton-on-
Hudson, New York:
Resolution #110-2022
WHEREAS, the Village received a request for a Local Waterfront Revitalization
Program (LWRP) Consistency Review from the New York State Department of
State and the Westchester County Department of Planning for the Grand Street
Retaining Wall Project; and
WHEREAS, the Village Board has received a recommendation of consistency from
the Waterfront Advisory Committee with the Village’s Local Waterfront
Revitalization Program; and
WHEREAS, the Village Board must make its own determination of consistency
with the LWRP policy standards and conditions; and
WHEREAS on July 5, 2022, the Village Board of Trustees undertook the process
of LWRP Consistency Review for the Grand Street Retaining Wall Project
attached hereto, and
NOW, THEREFORE, BE IT RESOLVED, as follows:
The Village Board of Trustees makes the following findings regarding the
applicability of the LWRP policies and the consistency of the Proposed Action with
those policies and conditions of the LWRP which it found applicable:
Policy 1A: Existing planning and zoning documents should be reviewed and
amended where necessary to ensure development within the community is
consistent with adopted goals and policies.
Policy 7F: Construction activity of any kind must not cause a measurable increase
in erosion or flooding at the site of such activity, or impact other locations.
Construction activity shall be timed so that spawning of anadromous fish species
and shellfish will not be adversely affected.
Policy 11A: Erosion and sediment control measures shall be undertaken in order
to safeguard persons, protect property, prevent damage to the environment, and
promote the public welfare by guiding, regulating and controlling the design,
construction, use and maintenance of any development or other activity which
disturbs or breaks the topsoil or results in earth movement.
Policy 37A: Standards and specifications for the control of non-point source
discharge as set forth in Westchester County’s Best Management Practice Manual
or other recognized reference shall be utilized during development of any site.
Policy 13: The construction or reconstruction of erosion protection structures
shall be undertaken only if they have a reasonable probability of controlling
erosion for at least thirty years as demonstrated in design and construction
standards and/or assured maintenance or replacement programs.
The remaining policies and conditions of the LWRP not specifically discussed
above were reviewed and found to not be applicable;
AND, BE IT FURTHER RESOLVED, as follows:
Based upon the above, the Village Board of Trustees confirms its determination that
the Proposed Action, a project to replace a one hundred foot retaining wall at 25 and
33 Grand Street in the Village of Croton-on-Hudson, complies with the policy
standards and conditions set forth in the Village’s LWRP.
Dated: July 5, 2022
Machine-extracted for search and reference — the original PDF is the authoritative version.