croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Saturday, August 15, 2026· Aug 15, 2026
Source-linkedCorrections welcomed
Documents

HSRG and LI Zoning Amd FEAF Part 1 2022.08.31 signed

resolution 15 pages
Meeting: portal event 795 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider scheduling a Public Hearing for September 19, 2022, at 7 PM, in the Georgianna Grant Meeting Room of the Stanley H. Kellerhouse Municipal Building to consider Local Law Introductory No. 11 of 2022 and Local Law Introductory No. 12 of 2022 to amend Chapter 230 of the Village Code, Zoning, determining that the Proposed Action is a Type 1 Action under SEQRA, declaring the Village Board to be Lead Agency under SEQRA, issuing the EAF and CAF and referring the necessary documents to the Village Planning Board, Waterfront Advisory Committee and Westchester County Planning Board as required by law.
Resolution, 15 pages. Attached to agenda item: “Proposed Resolutions — Consider scheduling a Public Hearing for September 19, 2022, at 7 PM, in the Georgianna Grant Meeting Room of the Stanley H. Kellerhouse Municipal Building to consider Local Law Introductory No. 11”
Retrieved 2026-07-31 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Appendix A - Proposed Local Laws Appendix B - FEAF Part 2 to come Appendix C - Village CAF 1 Appendix D - Buildout Backup Tables 1 Appendix E - Rutgers CUPR Multipliers 1 Appendix F - Full Traffic Study 1 HSRG and LI Zoning Amd FEAF Supplemental Narrative 2022.08.31 Res 129-2022 LL 11 12 of 2022
Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the DSSOLFDQWRUproject sponsor to verify that the information contained in Part 1is accurate and complete. A. Project and $SSOLFDQWSponsor Information. Project Location (describe, and attach a general location map): Brief Description of Proposed Action (include purpose or need): E-Mail: State: Project Contact (if not same as sponsor; give name and title/role): E-Mail: State: E-Mail: State: Harmon/South Riverside Gateway Overlay and LI District Zoning Amendments 50 tax parcels generally located along South Riverside Avenue, Croton Point Avenue, Clinton Street, and Wayne Street (the "Project Area") - see Figure 1 The Village of Croton-on-Hudson (the "Village") Board of Trustees is proposing to adopt new Local Laws to amend the Zoning Map and provisions of the Zoning Code related to the Harmon/South Riverside Gateway (HSRG) Overlay and Light Industrial (LI) zoning districts (the "Proposed Action"), including: 1) An expansion of the HSRG Overlay district parcels as defined by the district's portion of the Zoning Code (Attachment E of Chapter 230); 2) A change to the underlying zoning of one of the parcels being added to the HSRG Overlay (79.13-2-91) from a split-zone of C-2/RA-5 to C-2; 3) New zoning text to allow multifamily residential development as a special permit use within the existing/expanded HSRG Overlay district; and 4) New zoning text to allow multifamily residential and mixed-use (multifamily residential and commercial) Transit-Oriented Development (TOD) as a special permit use within specified portions of the LI district along Croton Point Avenue. Refer to the EAF Part 3 Report for a detailed description. see below Municipal Building, 1 Van Wyck Street Croton-on-Hudson NY Bryan T. Healy, M.P.A., Village Manager 914-271-4848 bhealy@crotononhudson-ny.gov Municipal Building, 1 Van Wyck Street Croton-on-Hudson NY N/A B. Government Approvals B. Government Approvals Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) a. City&RXQVHOTown%RDUG, Yes No or Village Board of Trustees b. City, Town or Village Yes No Planning Board or Commission c. City Town or Yes No Village Zoning Board of Appeals d. Other local agencies Yes No e. County agencies Yes No f. Regional agencies Yes No g. State agencies Yes No h. Federal agencies Yes No i. Coastal Resources. i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway? Yes No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? Yes No iii. Is the project site within a Coastal Erosion Hazard Area? Yes No C. Planning and Zoning C.1. Planning and zoning actions. Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the Yes No only approval(s) which must be granted to enable the proposed action to proceed? x If Yes, complete sections C, F and G. x If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans. a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site Yes No where the proposed action would be located? If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action Yes No would be located? b.Is the site of the proposed action within any local or regional special planning district (for example: Greenway Yes No Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, Yes No or an adopted municipal farmland protection plan? ✔ Village Board of Trustees - zoning amendments 2022-2023 ✔ Village Planning Board - referral and review 2022-2023 ✔ ✔ Waterfront Advisory Committee - consistency review 2022-2023 ✔ Westchester County Planning Board - GML-239m referral and review 2022-2023 ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ The Project Area is within the Local Waterfront Revitalization Program (LWRP) Coastal Area. The LWRP Coastal Area in Croton-on-Hudson encompasses the entire Village. ✔ C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. Yes No If Yes, what is the zoning classification(s) including any applicable overlay district? b. Is the use permitted or allowed by a special or conditional use permit? Yes No c. Is a zoning change requested as part of the proposed action? Yes No If Yes, i. What is the proposed new zoning for the site? ___________________________________________________________________ C.4. Existing community services. a. In what school district is the project site located? ________________________________________________________________ b. What police or other public protection forces serve the project site? c. Which fire protection and emergency medical services serve the project site? a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? b. a. Total acreage of the site of the proposed action? c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? c. Is the proposed action an expansion of an existing project or use? Yes No i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % ____________________ Units: ____________________ d. Is the proposed action a subdivision, or does it include a subdivision? Yes No If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) Yes No iii. Number of lots proposed? ________ iv. Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________ Yes No _____ months _____ _____ month _____ year H Will WKHproposed action be constructed in multiple phases? L If No, anticipated period of construction: LL If Yes: x Total number of phases anticipated x Anticipated commencement date of phase 1 (including demolition) x Anticipated completion date of final phase _____ month _____year x Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: _______________________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ *Existing HSRG Overlay, HSRG Overlay expansion area, and LI TOD parcels combined **Project Area parcels 43, p/o 48, & 50 owned by the Village, all others private [NOTE: The Proposed Action involves a zoning amendment, not a construction project; therefore many responses are not applicable (N/A)] N/A N/A 2.67 ac HSRG Overlay district expansion ✔ C-2, C-2 / HSRG Overlay, LI ✔ ✔ C-2/HSRG Overlay for select Project Area parcels located north of Route 9 (see Figure 1) Village of Croton-on-Hudson Police Department Village of Croton-on-Hudson Volunteer Fire Department, Village of Croton-on-Hudson Emergency Medical Services The Village of Croton-on-Hudson is served by a network of parks, open spaces, and recreational facilities. The closest parks to the Project Area are Duck Pond Park, Senasqua Park, and Croton Point Park. +/- 13.28* N/A +/- 1.89** ✔ ✔ ✔ Amendments to the Zoning Code to allow (by special permit) multifamily residential uses within the HSRG Overlay, and mixed-use within a specific portion of the LI district. The boundaries of the HSRG Overlay would also be expanded. f. Does the project include new residential uses? Yes No If Yes, show numbers of units proposed. g. Does the proposed action include new non-residential construction (including expansions)? Yes No If Yes, i. Total number of structures ___________ ii. Dimensions (in feet) of largest proposed structure: ________height; ________width; and _______ length iii. Approximate extent of building space to be heated or cooled: ______________________ square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any Yes No liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: ________________________________________________________________________________ ii. If a water impoundment, the principal source of the water: Ground water Surface water streams Other specify: iii. If other than water, identify the type of impounded/contained liquids and their source. Volume: ____________ million gallons; surface area: ____________ acres v. Dimensions of the proposed dam or impounding structure: ________ height; _______ length vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? Yes No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i .What is the purpose of the excavation or dredging? _______________________________________________________________ ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site? x Volume (specify tons or cubic yards): ____________________________________________ x Over what duration of time? ____________________________________________________ iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? Yes No If yes, describe. ___________________________________________________________________________________________ ________________________________________________________________________________________________________ v. What is the total area to be dredged or excavated? _____________________________________acres vi. What is the maximum area to be worked at any one time? _______________________________ acres vii. What would be the maximum depth of excavation or dredging? __________________________ feet viii. Will the excavation require blasting? Yes No ix. Summarize site reclamation goals and plan: _____________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ______________________________________________________________________________________________ _________________________________________________________________________________________________________ N/A N/A N/A N/A N/A N/A N/A ii. iii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ Will WKHproposed action cause or result in disturbance to bottom sediments? Yes No If Yes, describe: __________________________________________________________________________________________ iv. Will WKHproposed action cause or result in the destruction or removal of aquatic vegetation? Yes No If Yes: x aFUHV of DTXDWLFvegetation proposed to be removed ___________________________________________________________ x H[SHFWHG acreage of aquatic vegetation remaining after project completion ________________________________________ x purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________ ____________________________________________________________________________________________________ x proposed method of plant removal: ________________________________________________________________________ x if chemical/herbicide treatment will be used, specify product(s): _________________________________________________ v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________ _________________________________________________________________________________________________________ c. Will the proposed action use, or create a new demand for water? Yes No If Yes: i. Total anticipated water usage/demand per day: __________________________ gallons/day ii. Will the proposed action obtain water from an existing public water supply? Yes No If Yes: x Name of district or service area: _________________________________________________________________________ x Does the existing public water supply have capacity to serve the proposal? Yes No x Is the project site in the existing district? Yes No x Is expansion of the district needed? Yes No x Do existing lines serve the project site? Yes No iii. Will line extension within an existing district be necessary to supply the project? Yes No If Yes: x Describe extensions or capacity expansions proposed to serve this project: ________________________________________ ____________________________________________________________________________________________________ x Source(s) of supply for the district: ________________________________________________________________________ iv. Is a new water supply district or service area proposed to be formed to serve the project site? Yes No If, Yes: x Applicant/sponsor for new district: ________________________________________________________________________ x Date application submitted or anticipated: __________________________________________________________________ x Proposed source(s) of supply for new district: _______________________________________________________________ v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________ _________________________________________________________________________________________________________ vi. If water supply will be from wells (public or private), ZKDWLVWKHmaximum pumping capacity: _______ gallons/minute. d. Will the proposed action generate liquid wastes? Yes No If Yes: i. Total anticipated liquid waste generation per day: _______________ gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): __________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ iii. Will the proposed action use any existing public wastewater treatment facilities? Yes No If Yes: x Name of wastewater treatment plant to be used: _____________________________________________________________ x Name of district: ______________________________________________________________________________________ x Does the existing wastewater treatment plant have capacity to serve the project? Yes No x Is the project site in the existing district? Yes No x Is expansion of the district needed? Yes No N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Yes No x Do existing sewer lines serve the project site? x Will Dline extension within an existing district be necessary to serve the project? Yes No If Yes: x Describe extensions or capacity expansions proposed to serve this project: ____________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? Yes No If Yes: x Applicant/sponsor for new district: ____________________________________________________________________ x Date application submitted or anticipated: _______________________________________________________________ x What is the receiving water for the wastewater discharge? __________________________________________________ v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e. sheet flow) during construction or post construction? If Yes: i. How much impervious surface will the project create in relation to total size of project parcel? _____ Square feet or _____ acres (impervious surface) _____ Square feet or _____ acres (parcel size) ii. Describe types of new point sources. __________________________________________________________________________ _________________________________________________________________________________________________________ iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water or off-site surface waters)? x If to surface waters, identify receiving water bodies or wetlands: ________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ x Will stormwater runoff flow to adjacent properties? Yes No iv. Does WKHproposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? Yes No f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes No combustion, waste incineration, or other processes or operations? i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation) g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit, Yes No or Federal Clean Air Act Title IV or Title V Permit? If Yes: i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet Yes No ambient air quality standards for all or some parts of the year) ii. In addition to emissions as calculated in the application, the project will generate: x ___________Tons/year (VKRUWWRQV) of Carbon Dioxide (CO2) x ___________Tons/year (VKRUWWRQV) of Nitrous Oxide (N22) x ___________Tons/year (VKRUWWRQV) of Perfluorocarbons (PFCs) x ___________Tons/year (VKRUWWRQV) of Sulfur Hexafluoride (SF6) x ___________Tons/year (VKRUWWRQV) of Carbon Dioxide equivalent of HydrofloXrocarbons (H)&V) x ___________Tons/year (VKRUWWRQV) of Hazardous Air Pollutants (HAPs) N/A N/A N/A N/A N/A h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants, Yes No landfills, composting facilities)? If Yes: i. Estimate methane generation in tons/year (metric): ________________________________________________________________ ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or electricity, flaring): ________________________________________________________________________________________ _________________________________________________________________________________________________________ i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes No quarry or landfill operations? If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial Yes No new demand for transportation facilities or services? If Yes: i. When is the peak traffic expected (Check all that apply): † Randomly between hours of __________ to ________. ii. For commercial activities only, projected number of truck trips/dayDQGW\SH HJVHPLWUDLOHUVDQGGXPSWUXFNV BBBBBBBBBBBBB LLL LY v. Existing _____________BBBBBBProposed ___________ Net increase/decrease _____________BBBBBBBB 'RHVWKHSURSRVHGDFWLRQLQFOXGHDQ\VKDUHGXVHSDUNLQJ"<HV1R Yes No vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric Yes No or other alternative fueled vehicles? viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing Yes No pedestrian or bicycle routes? k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand Yes No for energy? If Yes: i. Estimate annual electricity demand during operation of the proposed action: ____________________________________________ _________________________________________________________________________________________________________ ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other): iii. Will the proposed action require a new, or an upgrade to an existing substation? Yes No l. Hours of operation. Answer all items which apply. x Monday - Friday: _________________________ x Monday - Friday: ____________________________ x Saturday: ________________________________ x Saturday: ___________________________________ x Sunday: _________________________________ x Sunday: ____________________________________ x Holidays: ________________________________ x Holidays: ___________________________________ ,IWKHSURSRVHGDFWLRQLQFOXGHVDQ\PRGLILFDWLRQRIH[LVWLQJURDGVFUHDWLRQRIQHZURDGVRUFKDQJHLQH[LVWLQJDFFHVVGHVFULEH BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB N/A N/A N/A N/A Traffic Impact Study included in Appendix F of FEAF Part 3 Supplemental Narrative ✔ n/a 725* 725* ✔ *Refer to FEAF Part 3 Supplemental Narrative. ✔ ✔ ✔ m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes No operation, or both? If yes: i. Provide details including sources, time of day and duration: ii. Will WKHproposed action remove existing natural barriers that could act as a noise barrier or screen? Yes No Describe: _________________________________________________________________________________________________ _________________________________________________________________________________________________________ n.W th ill prop e os actio ed hav n eoutd ligh oor ting? Yes No If yes: i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes No Describe: _________________________________________________________________________________________________ _________________________________________________________________________________________________________ o. Does the proposed action have the potential to produce odors for more than one hour per day? Yes No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: ______________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ p. Yes No Will the proposed action include any bulk storage of petroleum (FRPELQHGFDSDFLW\RIover 1,100 gallons) or chemical productsJDOORQVLQDERYHJURXQGVWRUDJHRUDQ\DPRXQWLQXQGHUJURXQGVWRUDJH? If Yes: L Product(s) to be stored ______________________________________________________________________________________ LL Volume(s) ______ per unit time ___________ (e.g., month, year) LLL Generally describe WKHproposed storage facilities ________________________________________________________________ ________________________________________________________________________________________________________ q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides, Yes No insecticides) during construction or operation? If Yes: ii. Will the proposed action use Integrated Pest Management Practices? Yes No r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes No of solid waste (excluding hazardous materials)? If Yes: i. Describe any solid waste(s) to be generated during construction or operation of the facility: x Construction: ____________________ tons per ________________ (unit of time) x Operation : ____________________ tons per ________________ (unit of time) ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste: x Construction: ________________________________________________________________________________________ ____________________________________________________________________________________________________ x Operation: __________________________________________________________________________________________ ____________________________________________________________________________________________________ iii. Proposed disposal methods/facilities for solid waste generated on-site: x Construction: ________________________________________________________________________________________ ____________________________________________________________________________________________________ x Operation: __________________________________________________________________________________________ ____________________________________________________________________________________________________ N/A N/A N/A N/A N/A N/A s. Does the proposed action include construction or modification of a solid waste management facility? Yes No If Yes: i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or other disposal activities): ___________________________________________________________________________________ ii. Anticipated rate of disposal/processing: x ________ Tons/month, if transfer or other non-combustion/thermal treatment, or x ________ Tons/hour, if combustion or thermal treatment iii. If landfill, anticipated site life: ________________________________ years t.Will WKHproposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes No waste? If Yes: i. Name(s) of all hazardous wastes or constituents to be generated, handled or managed at facility: ___________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ ii. Generally describe processes or activities involving hazardous wastes or constituents: ___________________________________ _________________________________________________________________________________________________________ ________________________________________________________________________________________________________ iii. Specify amount to be handled or generated _____ tons/month iv. Describe any proposals for on-site minimization, recycling or reuse of hazardous constituents: ____________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? Yes No If Yes: provide name and location of facility: _______________________________________________________________________ ________________________________________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: E.1. Land uses on and surrounding the project site a. Existing land uses. i. Check all uses that occur on, adjoining and near the project site. Urban Industrial Commercial Residential (suburban) Rural (non-farm) Forest Agriculture Aquatic Other (specify): ____________________________________ ii. If mix of uses, generally describe: b. Land uses and covertypes on the project site. Current Acreage Acreage After Project Completion Change (Acres +/-) x Roads, buildings, and other paved or impervious surfaces x Forested x Meadows, grasslands or brushlands (non- agricultural, including abandoned agricultural) x Agricultural (includes active orchards, field, greenhouse etc.) x Surface water features (lakes, ponds, streams, rivers, etc.) x Wetlands (freshwater or tidal) x Non-vegetated (bare rock, earth or fill) x Other Describe: _______________________________ ________________________________________ N/A N/A *Project Ara totals 13.28 acres and includes existing HSRG Overlay, HSRG Overlay expansion area, and LI TOD parcels combined. Project Area parcels 1, 2, and 3 are currently vacant/forested. Remaining parcels are developed and in addition to impervious surfaces, contain small areas of landscaping, lawns, street trees, planted islands, etc. ✔ ✔ ✔ ✔ Office, retail, automotive related and services businesses 13.23* 13.23* 0.05* 0.05* c. Is the project site presently used by members of the community for public recreation? Yes No i. If Yes: explain: __________________________________________________________________________________________ d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed Yes No day care centers, or group homes) within 1500 feet of the project site? If Yes, i. Identify Facilities: e. Does the project site contain an existing dam? Yes No If Yes: x Dam height: x Dam length: x Surface area: x Volume impounded: _______________________________ gallons OR acre-feet ii. Dam=s existing hazard classification: _________________________________________________________________________ iii. Provide date and summarize results of last inspection: f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, Yes No or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility? If Yes: Yes No x If yes, cite sources/documentation: _______________________________________________________________________ ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: iii. Describe any development constraints due to the prior solid waste activities: __________________________________________ _______________________________________________________________________________________________________ g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin Yes No property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred: h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any Yes No remedial actions been conducted at or adjacent to the proposed site? If Yes: i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site Yes No Remediation database? Check all that apply: Yes – Spills Incidents database Provide DEC ID number(s): ________________________________ Yes – Environmental Site Remediation database Provide DEC ID number(s): ________________________________ Neither database ii. If site has been subject of RCRA corrective activities, describe control measures:_______________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? Yes No If yes, provide DEC ID number(s): ______________________________________________________________________________ iv. If yes to (i), (ii) or (iii) above, describe current status of site(s): NOTE: Future redevelopment projects within the Project Area would be subject to site-specific review under SEQRA with review/permits from local, state and federal agencies as required. N/A ✔ ✔ Project Area parcel 11 includes a licensed day care center (see Figure 1) ✔ ✔ ✔ Resolution adopted by Village Board dated 1/27/2003 The former Metro Environmental construction and demolition (C&D) debris processing and transfer facility was located at 1A Croton Point Avenue (~1,000 feet north of Parcel 50) from the 1970s to ~2005. Subject land was acquired by the Metro North Railroad in 2017. Unknown at this time. Future redevelopment of the LI-zoned parcels within the Project Area would be subject to site-specific review under SEQRA. ✔ ✔ 360010, 546031 360010: Harmon Railroad Yard Waste Water Area - Active State Superfund - Remedial efforts ongoing - off-site impacts not a concern 546031: Hudson River PCB Sediments - Active State Superfund - Remediation efforts ongoing - no impact on Project Area v. Is the project site subject to an institutional control limiting property uses? Yes No x If yes, DEC site ID number: ____________________________________________________________________________ x Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________ x Describe any use limitations: ___________________________________________________________________________ x Describe any engineering controls: _______________________________________________________________________ x Will the project affect the institutional or engineering controls in place? Yes No x Explain: ____________________________________________________________________________________________ ___________________________________________________________________________________________________ ___________________________________________________________________________________________________ E.2. Natural Resources On or Near Project Site a. What is the average depth to bedrock on the project site? b. Are there bedrock outcroppings on the project site? Yes No If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________% c. Predominant soil type(s) present on project site: d. What is the average depth to the water table on the project site? Average: _________ feet e. Drainage status of project site soils: Well Drained: _____% of Vite Moderately Well Drained: Poorly Drained _____% of Vite f. Approximate proportion of proposed action site with slopes: 0-10%: 10-15%: 15% or greater: g. Are there any unique geologic features on the project site? Yes No If Yes, describe: _____________________________________________________________________________________________ ________________________________________________________________________________________________________ h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, Yes No ponds or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? Yes No If Yes to either i or ii, continue. If No, skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, Yes No state or local agency? iv. For each identified UHJXODWHGwetland and waterbody on the project site, provide the following information x Streams: Name ____________________________________________ Classification _______________________ ‡ Lakes or Ponds: t Wetlands: Name ____________________________________________ Approximate Size ___________________ ‡ Wetland No. (if regulated by DEC) _____________________________ v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired Yes No waterbodies? If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________ ___________________________________________________________________________________________________________ i. Is the project site in a designatedFloodway? Yes No j. Is the project site in the 100year Floodplain? Yes No k. Is the project site in the 500year Floodplain? Yes No l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? Yes No If Yes: Hudson River to the west and Croton River to the east ✔ 5+ ✔ UvB (Urban land - Riverhead) 6+ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ None (surface drainage) None None ✔ ✔ ✔ ✔ ✔ Principal Aquifer, Primary Aquifer m. Identify the predominant wildlife species that occupy or use the project site: n. Does the project site contain a designated significant natural community? Yes No If Yes: i. Describe the habitat/community (composition, function, and basis for designation): _____________________________________ ________________________________________________________________________________________________________ ii. Source(s) of description or evaluation: ________________________________________________________________________ iii. Extent of community/habitat: x Currently: x Following completion of project as proposed: _____________________ acres x Gain or loss (indicate + or -): o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as Yes No endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of Yes No special concern? q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? Yes No If yes, give a brief description of how the proposed action may affect that use: ___________________________________________ ________________________________________________________________________________________________________ E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to Yes No Agriculture and Markets Law, Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: _________________________________________________________________ b. Are agricultural lands consisting of highly productive soils present? Yes No i. If Yes: acreage(s) on project site? ___________________________________________________________________________ ii. Source(s) of soil rating(s): _________________________________________________________________________________ c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National Yes No Natural Landmark? If Yes: Biological Community Geological Feature ii. Provide brief description of landmark, including values behind designation and approximate size/extent: ___________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? Yes No If Yes: ,I<HV  L 6SHFLHVDQGOLVWLQJ HQGDQJHUHGRUWKUHDWHQHG BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB ,I<HV  L 6SHFLHVDQGOLVWLQJ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB NOTE: Species below generated by EAF Mapper. Sturgeon are confined to the Hudson River. Future redevelopment projects within the Project Area would be subject to site-specific review under SEQRA. Typical suburban wildlife ✔ ✔ Shortnose Sturgeon, Northern Harrier, Short-eared Owl, Bald Eagle, Atlantic Sturgeon ✔ ✔ ✔ ✔ ✔ Hudson River Exceptional or unique character Agency:Westchester County, Date:1-31-90 ✔ EAF Mapper Summary Report Friday, August 6, 2021 2:32 PM Disclaimer: The EAF Mapper is a screening tool intended to assist project sponsors and reviewing agencies in preparing an environmental assessment form (EAF). Not all questions asked in the EAF are answered by the EAF Mapper. Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC, you may also need to contact local or other data sources in order to obtain data not provided by the Mapper. Digital data is not a substitute for agency determinations. Yes B.i.ii [Local Waterfront Revitalization Area] Yes C.2.b. [Special Planning District] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. Digital mapping data are not available or are incomplete. Refer to EAF Workbook. Listed] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. Digital mapping data are not available or are incomplete. Refer to EAF Workbook. Site] Yes E.1.h.iii [Within 2,000' of DEC Remediation Site - DEC ID] 360010, 546031 E.2.g [Unique Geologic Features] No E.2.h.i [Surface Water Features] No E.2.h.ii [Surface Water Features] Yes E.2.h.iii [Surface Water Features] Yes - Digital mapping information on local and federal wetlands and waterbodies is known to be incomplete. Refer to EAF Workbook. No E.2.i. [Floodway] No E.2.j. [100 Year Floodplain] No E.2.k. [500 Year Floodplain] No E.2.l. [Aquifers] Yes E.2.l. [Aquifer Names] No Full Environmental Assessment Form - EAF Mapper Summary Report E.2.o. [Endangered or Threatened Species] Yes E.2.o. [Endangered or Threatened Species - Name] Shortnose Sturgeon, Northern Harrier, Short-eared Owl, Bald Eagle, Atlantic Sturgeon E.2.p. [Rare Plants or Animals] No E.3.a. [Agricultural District] No E.3.c. [National Natural Landmark] No E.3.d [Critical Environmental Area] Yes E.3.d [Critical Environmental Area - Name] Reason] Yes - Digital mapping data for archaeological site boundaries are not available. Refer to EAF Workbook. E.3.e.ii [National or State Register of Historic Places or State Eligible Sites - Name] Van Cortlandt Manor E.3.f. [Archeological Sites] Yes E.3.i. [Designated River Corridor] No Full Environmental Assessment Form - EAF Mapper Summary Report

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.