Community Gardens Site Work Estimate

document 1 page
Meeting: portal event 809 (no meeting page on file)
Agenda item: Continued discussion on development of Gouveia Park.
Document, 1 page. Attached to agenda item: “Continued discussion on development of Gouveia Park.”
Retrieved 2026-07-31 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Letter from Trustee Horowitz re%3A proposals for Gouveia Letter from Village Manager re%3A Community Gardens Expansion
Category Items Quantity UOM Cost Per Total Estimated Cost Main Driveway Excavation and Subgrade Sq/ft $3.00 $75,000 Main Driveway Removals of existing Asphalt /Curb Sq/ft $3.00 $45,000 Main Driveway Installation of Item 4 Subbase Yds $60.00 $21,000 Main Driveway Asphalt ( 2" binder, 2" wear course) Tons $130.00 $65,000 Main Driveway Asphalt Curb Lf $10.00 $35,000 Main Driveway Installation of Metal Guide Rail Lf $75.00 $45,000 Site Drainage Replace culvert under main driveway Feet $60.00 $2,400 Site Drainage two new head walls Ea $4,000.00 $8,000 Site Drainage Regrading of Existing Swales Lf $50.00 $10,000 Driveway Total $306,400 Site Lighting Installation of site lights Ea $2,000.00 $6,000 Site Lighting Installation of Site light Conduits Lf $8.00 $1,600 Lighting Total $7,600 Garden Parking Lot Excavation and Subgrade Sq/ft $4.00 $4,800 Garden Parking Lot Installation of Item 4 Subbase Yds $60.00 $1,200 Garden Parking Lot Asphalt ( 2" binder, 2" wear course) Tons $200.00 $6,000 Community Garden disposal of existing material/installation of new topsoil Yds $60.00 $600 Community Garden new water connection for community garden (with meter) LF $50.00 $2,500 Community Garden Rent larger machine to excavate/regrade LS $5,000.00 $5,000 Community Garden fencing for community garden (with gate) LF $100.00 $18,000 Community Garden Replace Existing Pond Overflow Pipe LF $40.00 $4,800 Community Garden Total $42,900 Gouveia Site Work Cost Estimate

Machine-extracted for search and reference — the original PDF is the authoritative version.