Memo to VEB - Bridge Colors
memo
1 page
From the meeting:
Advisory Board on the Visual Environment — 2026-08-11
· our coverage →
Agenda item: Review of Village Projects — Half Moon Bay Bridge Color Sample
Memo, 1 page. Attached to agenda item: “Review of Village Projects — Half Moon Bay Bridge Color Sample”
Retrieved 2026-08-07 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Half Moon Bay Bridge Color Samples
Extracted text
To:
Advisory Board on the Visual Environment Members
From:
Date:
August 7, 2026
Re:
Half Moon Bay Bridge
As you may be aware, the Village of Croton-on-Hudson is undertaking a rehabilitation project on the
Half Moon Bay Bridge that connects the Village to the riverfront. While the existing bridge footprint
is not changing, the components of the existing bridge will be rehabilitated or replaced during the
project.
As part of the project, the Village has the opportunity to choose a color for the steel girders underneath
the bridge. These will be visible from the Metro-North railroad tracks and the Half Moon Bay multi-
use path.
Three color options have been provided for the consideration of the VEB. As the project is on a tight
timeline, I respectfully request that a recommendation be given at this meeting.
Mayor
Brian Pugh
Trustees
Stacey Nachtaler
Nora Moriarty Nicholson
Len Simon
Maria F. Slippen
Village Manager
Bryan T. Healy
Village Treasurer
Genette Toone
Village Clerk
Pauline DiSanto
Village Engineer
Vincent Salanitro, P.E.
Machine-extracted for search and reference — the original PDF is the authoritative version.