croton.news
Croton-on-Hudson, NY · Thursday, November 19, 2026· Nov 19, 2026 Independent, AI-assisted local reporting from public records Source-linked·Corrections welcomed
Documents › Waterfront Advisory Committee (WAC), 2026-08-25

Cover Letter from MTA re Signal Upgrades

correspondence 2 pages Scanned/OCR — text may contain errors
From the meeting: Waterfront Advisory Committee (WAC) — 2026-08-25 · our coverage →
Agenda item: Referral from Village Board of Trustees to review correspondence from the Metropolitan Transportation Authority (MTA) for a Local Waterfront Revitalization Program (LWRP) Consistency review for the MNR Harmon to Poughkeepsie Signal System Upgrade Project
Correspondence, 2 pages. Attached to agenda item: “Referral from Village Board of Trustees to review correspondence from the Metropolitan Transportation Authority (MTA) for a Local Waterfront Revitalization Program (LWRP) Consistency review for the MNR Harmon to Poughkee” (Text recovered by OCR — may contain errors.)
Retrieved 2026-08-20 from the original source. View the original file ↗
Also attached to this agenda item: LWRP MTA Signal Upgrade CAF MTA Signal Upgrade LWRP Responsespdf MTA Signal Upgrade Maps MTA Signal Upgrade Resolution
MTA Construction & Development July 21, 2026 Village of Croton-on-Hudson Waterfront Advisory Committee 1 Van Wyck Street Croton-on-Hudson, NY 10520 RE: Hudson Line, Croton-Harmon to Poughkeepsie Signal System Phase II Dear Sir/Madam: Metropolitan Transportation Authority (MTA) Construction & Development (C&D) is currently in the design stages of the MNR Harmon to Poughkeepsie Signal System Upgrade Project (the “Project”), which aims to upgrade and replace signal and communications equipment along the northern portion of the MNR Hudson Line. Once complete, the Project will improve reliability and enable increased capacity for trains running between the Croton-Harmon and Poughkeepsie stations. The proposed project will install and upgrade signal equipment along the right-of-way (ROW) spanning the 43-mile stretch between Croton-Harmon and Poughkeepsie. At this time, MTA had requested a Local Waterfront Revitalization Program (LWRP) review from the Village of Croton-on-Hudson in connection with a Determination of Significance under the State Environmental Quality Review Act (SEQRA). The Project is located within the Coastal Area Boundary of the Hudson River, and a portion is subject to the Village of Croton-on-Hudson’s LWRP. Dewberry Engineers Inc. (Dewberry) conducted a review of the Project’s consistency with applicable Village of Croton-on-Hudson’s LWRP policies. As described in the attached materials, the Project is consistent with these policies. Please feel free to contact me at conor.devaney@mtacd.org if you have comments or questions. Sincerely, [signature] Conor Devaney MTA/MNR Project Manager 525 North Broadway White Plains, NY 10603 347-480-0078 cc: L. Marinescu, MTA C&D, S. Gianazza, MNR Attachments: Coastal Assessment Form Coastal Consistency Assessment Figure — Coastal Area, Significant Coastal Fish & Wildlife Habitats, and LWRPs Project Plans

Machine-extracted for search and reference — the original file is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.