MTA Signal Upgrade LWRP Responsespdf
6 pages
Scanned/OCR — text may contain errors
From the meeting:
Waterfront Advisory Committee (WAC) — 2026-08-25
· our coverage →
Agenda item: Referral from Village Board of Trustees to review correspondence from the Metropolitan Transportation Authority (MTA) for a Local Waterfront Revitalization Program (LWRP) Consistency review for the MNR Harmon to Poughkeepsie Signal System Upgrade Project
Retrieved 2026-08-20 from the village's meeting portal.
Also attached to this agenda item:
Cover Letter from MTA re Signal Upgrades
LWRP
MTA Signal Upgrade CAF
MTA Signal Upgrade Maps
MTA Signal Upgrade Resolution
Extracted text
Machine-extracted for search and reference — the original PDF is the authoritative version.