MTA Signal Upgrade LWRP Responsespdf
correspondence
6 pages
Scanned/OCR — text may contain errors
From the meeting:
Waterfront Advisory Committee (WAC) — 2026-08-25
· our coverage →
Agenda item: Referral from Village Board of Trustees to review correspondence from the Metropolitan Transportation Authority (MTA) for a Local Waterfront Revitalization Program (LWRP) Consistency review for the MNR Harmon to Poughkeepsie Signal System Upgrade Project
Correspondence, 6 pages. Attached to agenda item: “Referral from Village Board of Trustees to review correspondence from the Metropolitan Transportation Authority (MTA) for a Local Waterfront Revitalization Program (LWRP) Consistency review for the MNR Harmon to Poughkee” (Text recovered by OCR — may contain errors.)
Retrieved 2026-08-20 from the original source.
View the original file ↗
Also attached to this agenda item:
Cover Letter from MTA re Signal Upgrades
LWRP
MTA Signal Upgrade CAF
MTA Signal Upgrade Maps
MTA Signal Upgrade Resolution
Extracted text
Croton-on-Hudson LWRP | June 2026
MTA Task Order 11: Hudson Line Signal Improvements
Croton-Harmon to Poughkeepsie Signal System II Project
Westchester, Putnam, and Dutchess Counties
Croton-on-Hudson Local Waterfront Revitalization Program (LWRP)
Metropolitan Transportation Authority Construction & Development (MTA C&D) and Metro-
North Railroad (MNR) are proposing to implement a Signal Systems Project (the Project), which
would involve replacing the existing signal system with a high-capacity vital cab signaling system
with centralized traffic control (CTC) between Croton-Harmon and Poughkeepsie, encompassing
approximately 43 miles (the Project site or Project corridor). The Project involves performing
improvements at 148 locations within the existing railroad right-of-way (ROW), with some
locations requiring temporary or permanent easements. Work would be performed within
Westchester, Putnam, and Dutchess Counties.
A portion of the project site would be located within the Village of Croton-on-Hudson and is
subject to its LWRP, as shown in Figure 7A. An assessment of the Project’s consistency with the
applicable policies of the LWRP is provided below. As described below, the Project is consistent
with LWRP policies. Figures 7A-7D show the Coastal Area Boundary, Significant Coastal Fish &
Wildlife Habitats, and LWRPs throughout the Project corridor. Project plans showing the
proposed work within Croton-on-Hudson are attached.
Policy 1: Restore, revitalize, and redevelop deteriorated and underutilized waterfront areas for
commercial, industrial, cultural, recreational and other compatible uses.
Policy 1A: Encourage integrated development of Village property to assure fulfillment of
requirements relating to parking and accessory uses of Metro-North train station, while
facilitating public access to the bay area and recreational use.
Policy 1B: Encourage restoration of deteriorating structures related to railroad use and assure
appropriate maintenance and screening to reduce visual impact.
The Village-owned land adjacent to the parking lots at the Croton-Harmon MNR station is an
important recreational resource for the Village. The Project would not affect this resource, and
it would not affect the public’s access to the bay area. Additionally, the Project directly supports
Policy 1B by updating the components of the MNR signal system, which has reached its useful
life and is in need of replacement to ensure continued reliable service in the future. The Project
would not add any additional visual intrusions to the viewsheds of the Hudson River from the
Village. Thus, the Project is consistent with Policies 1, 1A, and 1B.
Policy 7: Significant coastal fish and wildlife habitats will be protected, preserved, and, where
practical, restored so as to maintain their viability as habitats.
Dewberry 1
Croton-on-Hudson LWRP | June 2026
Policy 7A: The quality of the Croton River and Bay Significant Coastal Fish and Wildlife Habitat
and Haverstraw Bay Significant Fish and Wildlife Habitat shall be protected and improved for
conservation, economic, aesthetic, recreational, and other public uses and values. Its resources
shall be protected from the threat of pollution, misuse, and mismanagement.
Policy 7B: Materials that can degrade water quality and degrade or destroy the ecological
system of the Croton River and Bay Significant Fish and Wildlife Habitat and the Haverstraw Bay
Significant Fish and Wildlife Habitat shall not be disposed of or allowed to drain in, or on land
within, the area of influence in the significant fish and wildlife habitats.
Policy 7C: Storage of materials that can degrade water quality and degrade or destroy the
ecological system of the Croton River and Bay Significant Fish and Wildlife Habitat or Haverstraw
Bay Significant Fish and Wildlife Habitat shall not be permitted within the area of influence of
the habitat unless best available technology is used to prevent adverse impacts to the habitat.
Policy 7D: Restoration of degraded ecological elements of the Croton River and Bay and
Haverstraw Bay Significant Fish and Wildlife Habitats and shorelands shall be included in any
programs for cleanup of any adjacent toxic and hazardous waste sites.
Policy 7E: Runoff from public and private parking lots and from storm sewer overflows shall be
effectively managed so as to prevent oil, grease, and other contaminants from polluting surface
and ground water and impact to the significant fish and wildlife habitats.
Policy 7F: Construction activity of any kind must not cause a measurable increase in erosion or
flooding at the site of such activity, or impact other locations. Construction activity in the Croton
River and Hudson River spawning areas shall be timed so that spawning of anadromous fish
species and shellfish will not be adversely affected.
Policy 7G: Construction activity of any kind must not cause significant degradation of water
quality or impact identified significant fish and wildlife habitats.
The proposed work within the Village of Croton-on-Hudson will include the installation and
maintenance of existing and proposed signal equipment and fences at various locations north
of, south of, and at the Croton-Harmon MNR Station. Permanent easements and temporary
staging areas are required for the proposed work. Work will occur adjacent to the Croton River
and Bay and Haverstraw Bay Significant Fish and Wildlife Habitats (Figure 7A). The work will
occur within an active rail corridor that is already disturbed, and land disturbance will be
minimal. It will require minor in-water work at several locations for the placement of footings
for platforms within the Hudson River. Work will adhere to any in-water work restrictions
Dewberry 2
Croton-on-Hudson LWRP | June 2026
recommended by NYSDEC and USACE.¹ Soil erosion and sediment control measures
implemented prior to construction, including silt fences, erosion protection matting, inlet
sediment control bags, hay bales, filter socks, turbidity curtains, and sediment filter bags, will
reduce the amount of sediment entering the Hudson River and nearby wetlands. The proposed
work will not impair the viability of either area or affect these habitats by changing their
physical, biological, or chemical parameters. Thus, the Project is consistent with Policies 7 and
7A-7G.
Policy 8: Protect fish and wildlife resources in the coastal area from the introduction of
hazardous wastes and other pollutants which bio-accumulate in the food chain or which cause
significant sub-lethal or lethal effect on those resources.
This Project will not result in the release of pollutants or hazardous wastes into coastal waters.
Soil and construction debris generated as a result of construction activities will be properly
managed (e.g., handled, tested, transported, and disposed of) in accordance with all applicable
regulations and MTA C&D’s standard waste management practices. Pesticides, herbicides,
insecticides, and fertilizers are not anticipated to be used during operation or construction. The
chosen contractor will utilize removal methods and containment systems that eliminate or
minimize the risk of degradation of natural resources, including turbidity curtains and filter socks.
Thus, the Project is consistent with Policy 8.
Policy 11: Buildings and other structures will be sited in the coastal area so as to minimize damage
to property and the endangering of human lives caused by flooding and erosion.
Policy 12: Activities or development in the coastal area will be undertaken so as to minimize
damage to natural resources and property from flooding and erosion by protecting natural
protective features including beaches, dunes, barrier islands and bluffs.
Policy 12A: Every effort should be made to protect Croton Point, a natural protective barrier to
Croton Bay from activities or development that would increase erosion of or flooding of the
point.
Portions of the project corridor within the Village are mapped within a 100-year floodplain (Zone
AE or Zone A) and 500-year floodplain. No coastal erosion hazard areas are designated within
Croton-on-Hudson. The Project will require very minor in-water work at several locations for the
placement of footings for platforms within the Hudson River. Land disturbance will be minimal,
and the overall use of the land will remain the same, as an active rail line. Flood and waterproofing
measures will be incorporated into the design where appropriate. These efforts will be made to
minimize damage to property and damage to natural resources. Work will not occur on Croton
¹ Pursuant to PAL Section 1266(11), MTA MNR is not subject to ECL Articles 24 (FWW) and 25 (TW) and pursuant to ECL Section
15-0501(5) is exempt from Protection of Waters permits. If MTA MNR invokes any or all of these exemptions, MTA MNR will still
adhere to NYSDEC guidance and standards.
Dewberry 3
Croton-on-Hudson LWRP | June 2026
Point, and the activities will not increase erosion or flooding. Thus, the Project is consistent with
Policies 11, 12 and 12A.
Policy 19: Protect, maintain, and increase the level and types of access to public water-related
recreation resources and facilities.
Policy 19A: Encourage the linkage of open space from upland areas to and along the Hudson and
Croton Rivers in the form of a trail or walkway system.
Policy 19B: Increase public access to areas that offer physical and visual connection to the
Hudson River or Croton River and Bay.
Policy 19C: Encourage the improvement of public transportation, when feasible, where water-
dependent and water-enhanced recreation activities are located.
Policy 19D: Improve and maintain access to Croton River and Bay at the Village-owned Echo
Canoe Launch south of the Village parking lots at the Croton-Harmon Station.
Policy 20: Access to the publicly owned foreshore and to lands immediately adjacent to the
foreshore or the water's edge that are publicly-owned shall be provided and it should be
provided in a manner compatible with adjoining uses.
The Project improves public transportation by upgrading MNR’s existing signal system, which
has reached the end of its useful life. While the Project is not increasing public access, it will
maintain the level of access to public water-related recreation resources and facilities in the
Village, as well as publicly owned land adjacent to the water’s edge. Existing and future access
to these resources will not be reduced or eliminated by the Project, which will maintain access
to these resources via safe and reliable MNR service. Access south of the Village parking lots at
the Croton-Harmon Station will be maintained. Thus, the Project is consistent with Policies 19,
19A-19D, and 20.
Policy 24: Prevent impairment of scenic resources of statewide significance.
Policy 25: Protect, restore or enhance natural and manmade resources which are not identified
as being of statewide significance, but which contribute to the overall scenic quality of the
coastal area.
While there are no scenic resources of statewide significance located within Croton-on-Hudson,
the Hudson Highlands SASS is located adjacent to the City’s waterfront on the Hudson River. The
Project will not affect the beauty of this important scenic resource, reduce identified views to
the resource, or diminish the scenic quality of the resource. Further, pursuant to Policy 25, none
of the natural or manmade resources in the Village would be affected by the proposed work.
None of the proposed signal structures, fences, or signage would reduce identified views or
diminish the scenic quality of the coastal area. Thus, the Project is consistent with Policies 24
and 25.
Dewberry 4
Croton-on-Hudson LWRP | June 2026
Policy 30: Municipal, industrial, and commercial discharge of pollutants, including but not
limited to, toxic and hazardous substances, into coastal waters will conform to State and
National water quality standards.
Policy 30A: Existing rail services and transportation-related facilities shall not dispose of any
regulated materials in coastal waters until all such regulated materials have been tested by the
State for conformance with water quality standards.
The Project will not result in the release of pollutants into coastal waters. Soil and construction
debris generated as a result of construction activities will be properly managed (e.g., handled,
tested, transported, and disposed of) in accordance with all applicable regulations and MTA C&D’s
standard waste management practices. Pesticides, herbicides, insecticides, and fertilizers are not
anticipated to be used during operation or construction. Construction materials and equipment
will be stored in locations that do not create risks to public health or the environment. Material
transport off-site for disposal will be conducted in accordance with Federal, State, and local
requirements. This includes properly licensed haulers and trucks, required placarding, approved
truck routes, and manifesting. The chosen contractor will utilize removal methods and
containment systems that eliminate or minimize the risk of human exposure to contaminants,
dust, hazardous materials, and/or debris generated from construction, as well as potential
degradation of natural resources, as required. The contractor will also abide by MTA C&D’s waste
disposal requirements. Thus, the Project is consistent with Policies 30 and 30A.
Policy 35: Dredging and filling in coastal waters and disposal of dredged material will be
undertaken in a manner that meets existing State permit requirements, and protects significant
fish and wildlife habitats, scenic resources, natural protective features, important agricultural
lands, and wetlands.
The Project will require minor in-water work at several locations for the placement of footings for
platforms within the Hudson River. No dredging is required. The work will be undertaken in a
manner that meets existing New York State permitting requirements, including adherence to any
in-water work restrictions during construction. Thus, the Project is consistent with Policy 35.
Policy 44: Preserve and protect tidal and freshwater wetlands and preserve the benefits derived
from these areas.
Policy 44A: Wetlands, water bodies and watercourses shall be protected by preventing damage
from erosion or siltation, minimizing disturbance, preserving natural habitats and protecting
against flood and pollution.
Based on use of the NYSDEC Environmental Resource Mapper, the USFWS NWI Mapper, and high-
resolution aerial imagery of the Project site, the limited in-water work for the installation of signal
platforms and upgrades with the Project work areas is anticipated to have temporary minor
impacts to open water areas and wetlands. Soil erosion and sediment control measures will be
implemented prior to construction to reduce the amount of sediment entering the Hudson River
Dewberry 5
Croton-on-Hudson LWRP | June 2026
and nearby wetlands. Permits for in-water work will be obtained from NYSDEC and USACE, and
the Project will comply with all permit conditions.² Thus, the Project is consistent with Policies 44
and 44A.
² Pursuant to PAL Section 1266(11), MTA-MNR is not subject to ECL Articles 24 (FWW) and 25 (TW) and pursuant to ECL Section
15-0501(5) is exempt from Protection of Waters permits. If MTA-MNR invokes any or all of these exemptions, MTA MNR will still
adhere to NYSDEC guidance and standards.
Dewberry 6
Machine-extracted for search and reference — the original file is the authoritative version.