SEQRA Resolution for the Energy Performance Contract
resolution
From the meeting:
Board of Education — 2026-08-27
· our coverage →
Agenda item: SEQRA Resolution for the Energy Performance Contract
Resolution. Attached to agenda item: “SEQRA Resolution for the Energy Performance Contract”
Retrieved 2026-09-08 from the village's meeting portal.
View the original PDF ↗
Extracted text
Previous
Next
Close
Print
Share Menu
Share on Twitter
Share on Facebook
Copy link to clipboard
Agenda Item Details
Meeting
Aug 27, 2026 - Work Session
Category
3. New Business
Subject
3.1 SEQRA Resolution for the Energy Performance Contract
Type
Action
Recommended Action
RESOLVED: That the Board of Education hereby approves the SEQRA resolution as presented.
WHEREAS, the Board of Education of the Croton-Harmon UFSD desires to embark upon a District-wide Energy Performance Contract consisting of the supply and installation of the following energy conservation measures at the District’s facilities as follows: (1) Roof Solar PV Systems on all three school buildings; (2) Carport Solar PV Systems at Pierre Van Cortlandt Middle and Croton-Harmon High School; and (3) Unit Ventilator Replacements at Pierre Van Cortlandt Middle School; and
WHEREAS, said improvements are subject to classification under the State Environmental Quality Review Act (SEQRA); and
WHEREAS, “replacement, rehabilitation, or reconstruction of a structure or a facility, in kind, on the same site, including upgrading buildings to meet building, energy, or fire codes, unless such action meets or exceeds any of the thresholds in section 617.4”; “retrofit of an existing structure and its appurtenant areas to incorporate green infrastructure”; installation of solar energy arrays where such installation involves 25 acres or less of physical alteration on the following sites … (vi) parking lots or parking garages;” and “installation of solar energy arrays on an existing structure …” are classified as Type II Actions under the current Department of Environmental Conservation SEQRA Regulations (Section 6 NYCRR 617.5 (c)(2), (3), (14), and (15); and
WHEREAS, the SEQRA Regulations declare Type II Actions to be actions that have no significant impact on the environment and require no further review under SEQRA; and
WHEREAS, the Board of Education has examined all information related to the Energy Performance Project;
NOW, THEREFORE, BE IT RESOLVED that the Board of Education of the Croton-Harmon UFSD hereby determines that the Energy Performance Project is a Type II Action pursuant to Sections 617.5 (c )(2), (3), (14), and (15) of the SEQRA Regulations and as such requires no further review under SEQRA.
Motion & Voting
RESOLVED: That the Board of Education hereby approves the SEQRA resolution as presented.
Motion by Omar Mayyasi, second by Elizabeth Laird.
Final Resolution: Motion Carried
Yes: Anamika Bhatnagar, Omar Mayyasi, Theo Oshiro, Allison Samuels, Ana Teague, Elizabeth Laird
§
Machine-extracted for search and reference — the original PDF is the authoritative version.