croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Sunday, September 20, 2026· Sep 20, 2026
Source-linkedCorrections welcomed
DocumentsBoard of Education, 2026-08-06

KG+D Bid Recommendation - PVC MS HVAC - Alternates.pdf (430 KB)

bid 2 pages
From the meeting: Board of Education — 2026-08-06 · our coverage →
Agenda item: Phase 2-PVC HVAC Bid Alternate #1 and #3 Award (Project # 02-032) Amendment
Bid / RFP, 2 pages. Attached to agenda item: “Phase 2-PVC HVAC Bid Alternate #1 and #3 Award (Project # 02-032) Amendment”
Retrieved 2026-09-08 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Phase 2-PVC HVAC Bid Alternate #1 and #3 Award...
June 25, 2026 Croton-Harmon Union Free School District 10 Gerstein Street Croton-on-Hudson, NY 10520 Attn: Denise Harrington-Cohen, Assist. Superintendent for Business Re: Recommendation for Bid Award: Base Bid + Alternates 1 and 2 District-Wide Capital Improvements Phase 2 SED Project Number: 66-02-02-03-0-002-032 In consideration of available project funding and completion of the competitive bid process for all Phase 2 projects, KG+D Architects recommends that the District consider award of Alternate #1 and Alternate #3 for the HVAC improvement project at Pierre Van Cortlandt Middle School. Alternate #1 is for the installation of a direct expansion (DX) cooling coil in an existing air handler to provide additional air conditioning. Alternate #3 is upgrade of the electrical power on the fourth floor to provide the necessary infrastructure for HVAC improvements in the future. KG+D Architects previously completed post-bid review of this work with Clean Air Quality Services, Inc. as outlined in our award recommendation letter of June 10. 2026. Clean Air Quality Services, Inc. remains the apparent low-bidder with the inclusion of Alternates #1 and #3. The revised recommended contract award is as follows: Awarded June 11, 2026 # Contract Contractor Base Bid (2nd Fl. Classroom AC) Alternate #1 (Addition of DX Coil to Existing AHU) Alternate #3 (4th Fl Electrical Upgrades) Amended Total Contract Award 1 Single Prime Clean Air Quality Services, Inc. $584,230 $149,320 $72,250 $805,800 We are pleased to recommend the inclusion of this additional work and maximize the District benefit through the available funding. Sincerely: KG+D Architects, PC Walter Hauser, AIA Principal Encl: Bid Tabulation 9 June 2026 2:00 PM, District Office DW CAPITAL IMPROVEMENTS PHASE 2: PVC MS HVAC Upgrades Croton-Harmon Union Free School District Bid Bond Addendum Non- Collusive Iran Divestment Alternate 1 Alternate 2 Alternate 3 Sub-Total Unit Price 1 Unit Price 2 √ √ √ √ Base Bid DX Coil in Existing AHU Fourth Floor Fourth Floor Electrical Upgrade Only Base Bid + Alt 1 + Alt 2 Plaster Abatement 10sf Exterior Condensate Penetration 1 ACS √ √ √ √ $715,000 $155,000 $570,000 $55,000 $1,440,000 N/A N/A 1 Bertussi √ √ √ √ $1,082,820 $48,000 $252,000 $40,000 $1,382,820 $12,000 $800 1 Clean Air Quality Service √ √ √ √ $584,230 $149,320 $684,230 $72,250 $1,417,780 $12,850 $9,200 Contract Contractor Bid Tabulation Page 1 of 1

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.