KG+D Bid Recommendation - PVC MS HVAC - Alternates.pdf (430 KB)
bid
2 pages
From the meeting:
Board of Education — 2026-08-06
· our coverage →
Agenda item: Phase 2-PVC HVAC Bid Alternate #1 and #3 Award (Project # 02-032) Amendment
Bid / RFP, 2 pages. Attached to agenda item: “Phase 2-PVC HVAC Bid Alternate #1 and #3 Award (Project # 02-032) Amendment”
Retrieved 2026-09-08 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Phase 2-PVC HVAC Bid Alternate #1 and #3 Award...
Extracted text
June 25, 2026
Croton-Harmon Union Free School District
10 Gerstein Street
Croton-on-Hudson, NY 10520
Attn: Denise Harrington-Cohen, Assist. Superintendent for Business
Re:
Recommendation for Bid Award: Base Bid + Alternates 1 and 2
District-Wide Capital Improvements Phase 2
SED Project Number: 66-02-02-03-0-002-032
In consideration of available project funding and completion of the competitive bid process for all Phase 2 projects,
KG+D Architects recommends that the District consider award of Alternate #1 and Alternate #3 for the HVAC
improvement project at Pierre Van Cortlandt Middle School. Alternate #1 is for the installation of a direct expansion
(DX) cooling coil in an existing air handler to provide additional air conditioning. Alternate #3 is upgrade of the
electrical power on the fourth floor to provide the necessary infrastructure for HVAC improvements in the future.
KG+D Architects previously completed post-bid review of this work with Clean Air Quality Services, Inc. as outlined in
our award recommendation letter of June 10. 2026. Clean Air Quality Services, Inc. remains the apparent low-bidder
with the inclusion of Alternates #1 and #3. The revised recommended contract award is as follows:
Awarded
June 11, 2026
#
Contract
Contractor
Base Bid
(2nd Fl. Classroom
AC)
Alternate #1
(Addition of DX
Coil to Existing
AHU)
Alternate #3
(4th Fl Electrical
Upgrades)
Amended
Total Contract
Award
1
Single Prime
Clean Air Quality
Services, Inc.
$584,230
$149,320
$72,250
$805,800
We are pleased to recommend the inclusion of this additional work and maximize the District benefit through the
available funding.
Sincerely:
KG+D Architects, PC
Walter Hauser, AIA
Principal
Encl:
Bid Tabulation
9 June 2026
2:00 PM, District Office
DW CAPITAL IMPROVEMENTS PHASE 2: PVC MS HVAC Upgrades
Croton-Harmon Union Free School District
Bid Bond
Addendum
Non-
Collusive
Iran
Divestment
Alternate 1
Alternate 2
Alternate 3
Sub-Total
Unit Price 1
Unit Price 2
√
√
√
√
Base Bid
DX Coil in Existing
AHU
Fourth Floor
Fourth Floor
Electrical Upgrade
Only
Base Bid + Alt 1 + Alt 2
Plaster Abatement
10sf
Exterior Condensate
Penetration
1
ACS
√
√
√
√
$715,000
$155,000
$570,000
$55,000
$1,440,000
N/A
N/A
1
Bertussi
√
√
√
√
$1,082,820
$48,000
$252,000
$40,000
$1,382,820
$12,000
$800
1
Clean Air Quality Service
√
√
√
√
$584,230
$149,320
$684,230
$72,250
$1,417,780
$12,850
$9,200
Contract
Contractor
Bid Tabulation
Page 1 of 1
Machine-extracted for search and reference — the original PDF is the authoritative version.