Agenda item: HVAC Bid Award for Phase 2 of the Capital Project
Bid / RFP, 2 pages. Attached to agenda item: “HVAC Bid Award for Phase 2 of the Capital Project”
Retrieved 2026-09-08 from the village's meeting portal.
View the original file ↗
Also attached to this agenda item:
HVAC Bid Award for Phase 2 of the Capital Project
Extracted text
June 10, 2026
Croton-Harmon Union Free School District
10 Gerstein Street
Croton-on-Hudson, NY 10520
Attn: Denise Harrington-Cohen, Assit. Superintendent for Business
Re:
Recommendation for Bid Award
District-Wide Capital Improvements Phase 2
SED Project Number: 66-02-02-03-0-002-032
KG+D Architects is in receipt of the bids for the above-referenced project and recommends the District move forward
with award of Contracts 1 (single-prime). To assist the District with determination of the lowest responsible bidder,
KG+D Architects has performed the following services and tasks for the apparent low bidder for this project:
•
Administrative review of contractor bid submissions to confirm required bid documents have been furnished
and completed by the contractor.
•
Compared apparent low-bid amounts to the estimated contract values.
•
Reviewed post-bid information and contractor qualifications included in the bid submission.
•
Participated in ‘scope review’ meeting with the apparent low bidders to review the technical scope of work.
Based on KG+D Architects’ review of the bidders as outlined above, we see no reason to deem the apparent low-
bidder non-responsible. At this time, we recommend award of the Base Bid, which includes adding air conditioning to
the second floor of Pierre Van Cortlandt Middle School. Additional alternates may be recommended in the future,
pending availability of remaining funds. The apparent low bidder is as follows:
#
Contract
Contractor
Base Bid
(2nd Fl. Classroom AC)
1
Single Prime
Clean Air Quality Services, Inc.
$584,230
KG+D Architects’ review of bidder qualifications and responsibility is limited to the information furnished by the
bidder. Our review does not include supplemental investigation or assessment of the following:
•
Information regarding past and current projects not furnished by the bidder.
•
Financial standing and capacity of the bidder beyond acknowledgment of surety-backed bonds.
•
Current and future project obligations of the bidder not furnished by the bidder.
•
Undisclosed legal proceedings, history, claims, defaults, terminations, or the like.
•
Past relationships with other business entities including undisclosed ‘dba’s.’
We are pleased to report a successful bid phase and look forward to commencing construction.
Sincerely:
KG+D Architects, PC
Walter Hauser, AIA
Principal
Encl:
Bid Tabulation
9 June 2026
2:00 PM, District Office
DW CAPITAL IMPROVEMENTS PHASE 2: PVC MS HVAC Upgrades
Croton-Harmon Union Free School District
Bid Bond
Addendum
Non-
Collusive
Iran
Divestment
Alternate 1
Alternate 2
Alternate 3
Sub-Total
Unit Price 1
Unit Price 2
√
√
√
√
Base Bid
DX Coil in Existing
AHU
Fourth Floor
Fourth Floor
Electrical Upgrade
Only
Base Bid + Alt 1 + Alt 2
Plaster Abatement
10sf
Exterior Condensate
Penetration
1
ACS
√
√
√
√
$715,000
$155,000
$570,000
$55,000
$1,440,000
N/A
N/A
1
Bertussi
√
√
√
√
$1,082,820
$48,000
$252,000
$40,000
$1,382,820
$12,000
$800
1
Clean Air Quality Service
√
√
√
√
$584,230
$149,320
$684,230
$72,250
$1,417,780
$12,850
$9,200
Contract
Contractor
Bid Tabulation
Page 1 of 1