Memo from AKRF dated November 4%2C 2024
application
9 pages
Meeting: portal event 1005 (no meeting page on file)
Agenda item: Continued review of the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.
Application, 9 pages. Attached to agenda item: “Continued review of the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
1 Croton Point Neg Dec DRAFT Reasons in Support 2024.11.20
10152024 Response Letter
1CrotonPoint Fiscal 20241016
1CrotonPoint PSAC 20241016
1CrotonPoint Part 2 FEAF 20241120
1CrotonPoint Part 3 FEAF 20241120
AKRF Memo 1 Croton Point SUP Conditions 20241202
Draft Phase II Environmental Site Assessment Report
Environmental Noise Study and Facade Glazing...
Insite Preliminary Wastewater Engineering Report dated...
Insite Preliminary Water Engineering Report dated July...
Insite Stormwater Pollution Prevention Plan dated July...
Extracted text
34 South Broadway, Suite 300
White Plains, NY 10601
tel: 914.949.7336
www.akrf.com
Memorandum
To:
Bryan Healy, Village Manager, Village of Croton-on-Hudson
Mayor Brian Pugh, Village of Croton-on-Hudson
Village of Croton-on-Hudson Board of Trustees
From:
AKRF, Inc.
Date:
November 4, 2024
Re:
WBP Development LLC - 1 Croton Point (aka Lot A)
cc:
WBP Development LLC (Applicant)
Linda Whitehead (Village Attorney)
Dan O’Connor, P.E. (Village Engineer)
As requested, AKRF, Inc. has reviewed the following newly submitted documents and plans for the above
referenced application. This memorandum provides our comments on those materials.
•
Overall Plan drawing prepared by Insite Engineering, Surveying, and Landscape Architecture, P.C.,
submitted October 9, 2024 (showing revised entrance concept).
•
Information on children residing at Chappaqua Crossings development, submitted October 9, 2024.
•
Memorandum on Public School-Aged children (PSAC) Analysis prepared by KSCJ Consulting, revised
October 16, 2024.
•
Memorandum on Fiscal Analysis prepared by KSCJ Consulting, revised October 16, 2024.
•
Traffic Comment Response Letter prepared by Kimley Horn, dated October 15, 2024.
•
Traffic Impact Study prepared by Kimley Horn, dated October 21, 2024.
•
Fire Apparatus Access Study drawing prepared by Insite Engineering, Surveying, and Landscape
Architecture, P.C., submitted October 17, 2024.
•
Preliminary Water Engineering Report prepared by Insite Engineering, Surveying, and Landscape
Architecture, P.C., revised October 30, 2024.
•
Site Cross Sections prepared by Insite Engineering, Surveying, and Landscape Architecture, P.C.,
revised October 30, 2024.
A. BACKGROUND / PROJECT DESCRIPTION
The Applicant, WBP Development, LLC, is seeking special use permit approval from the Village of Croton-
on-Hudson (the “Village”) Board of Trustees to construct a proposed 5-story, 100-unit affordable
homeownership project with amenity space and on-site parking (the “proposed project”) at the intersection
of Croton Point Avenue and Veterans Plaza. The proposed project involves an assemblage of three existing
tax parcels totaling approximately 1.76 acres (the “project site”): 79-17-1-3 (aka Lot 3), 79-17-1-4 (aka Lot
4) and 79-17-1-5 (aka Lot 5). Village-owned Lot 5, fronting on Croton Point Avenue, was most recently
utilized as a parking lot for the Metro-North Railroad (MNR) Croton-Harmon station (commonly referred to
as the “parking lot A”). Lot 4 is currently owned by Croton Point Realty, Inc., has frontage along Croton
Point Avenue and contains portions of a two-story commercial building currently occupied by a law office.
11.4.24
Village-owned Lot 3 is located to the rear of Lot 4 and contains portions of the two-story commercial building
noted above, and a parking lot. The owner of Lot 4, Croton Point Realty, Inc. has had a long-term land
lease with the Village for the uses on Village-owned Lot 3. The Applicant has been selected by the Village
as the purchaser of Lots 3 and 5 currently owned by the Village, and is in contract to purchase Lot 4 from
Croton Point Realty, Inc.
In November 2022, the Village adopted Local Law No. 14 of 2022 to amend the provisions of the Zoning
Code to allow for transit-oriented mixed-use and multifamily residential buildings in a specific portion of the
LI zoning district including the project site. Local Law No. 14 of 2022 permits the project site to be
redeveloped (through issuance of a special permit from the Village Board of Trustees) with transit-oriented
multifamily housing or multifamily housing over ground floor commercial uses at a maximum Floor Area
Ratio (FAR) of 1.2, a maximum height of up to 5-stories, and a parking ratio of 1 space per residential unit
and 1 space per 400 square feet of commercial floor area. Following the adoption of Local Law 14 of 2022,
the Village released a Request for Proposals (RFP) for Village-owned Lot 5, which in addition to requesting
mixed-use development proposals with affordable housing solely for Lot 5, indicated that the Village was
also willing to review alternative schemes that assume a larger land assemblage by incorporating adjacent
lots 3 and 4.
The proposed project is a 5-story building with cellar level for parking below grade. It offers 100 residential
units consisting of 46 one-bedroom and 54 two-bedroom units; the proposed FAR is 1.10, where 1.20 is
the maximum allowed. The design includes 105 parking spaces (approx. 1 space per unit), provided via a
combination of surface and below-building parking. No ground floor commercial space is proposed.
Amenities within the building include a community room, fitness center, coworking lounge, bike storage
room, and a rooftop deck. According to the Applicant, the exterior façade combines brick and metal panels
for cladding. Sustainable building design features include full electrification, solar readiness, high efficiency
HVAC equipment (cold climate air source heat pumps) and appliances (Energy Star Multifamily New
Construction Program), Level 2 EV charging stations (1 per 20 parking spaces) and low-flow water fixtures.
In addition to approval of a special permit from the Village Board of Trustees, other local approvals for the
proposed project include site plan approval from the Village Planning Board, Local Waterfront Revitalization
Program (LWRP) consistency review by the Village Waterfront Advisory Committee, and visual/aesthetics
review and comment by the Village Advisory Board on Visual Environment (following a referral by the
Planning Board). The Village Board of Trustees is serving as the Lead Agency for the proposed project’s
environmental review pursuant to the State Environmental Quality Review Act (SEQRA).
B. COMMENTS
Newly submitted material, listed above, was reviewed in the context of our October 4, 2024 memorandum
to the Village Board of Trustees, and discussions held during the October 16, 2024 Village Board of
Trustees work session.
In an effort to focus on outstanding comments only, prior comments from our August 19, 2024 and
September 23, 2024 memoranda that have been adequately addressed have been removed from this
memorandum.
Comments shown in italicized text are from AKRF’s 10/4/2024 memorandum and have been re-
numbered/consolidated within this memorandum for ease of reference. Any new, or follow-up, comments
are presented in bold text with the review date of 11/4/2024.
WATER / SEWER SERVICE
1. 10/4/24: The Applicant should provide an update with its next submission. The update should reference
the results of any recent investigations and any recommended next steps from the Village Engineer.
11/4/24: Water Service: According to the Applicant’s updated Water Engineering Report,
hydrant flow tests were completed on October 15, 2024. Three hydrant flow tests were
performed including Wayne Street, and two locations on Croton Point Avenue. Based on this
testing the existing 6” water main in Croton Point Avenue can supply the domestic needs for
the project. However, for the fire flow, the 6-inch water main that feeds the 6-inch line in Croton
Point Avenue provides less than 500 gpm at 20 psi thus not meeting the project fire flow
Village of Croton-on-Hudson Board of Trustees
11.4.24
demand. Improvements would be required to provide the 750 gpm sprinkler demand. Two
alternatives to mitigate this potential impact are presented by the Applicant’s engineer:
1) Improvements to the distribution system via a connection between the existing Croton Point
Avenue Water Main and the Wayne Street Water Main. While this connection has long been
envisioned and desired by the Village, the Wayne Street extension requires an easement from
a private property owner.
2) On-site water storage and pump system. Should the easement not be able to be secured, and
the Wayne Street extension cannot be completed, an on-site water storage tank and pump
system would be used to supplement the available flows from the existing 6” watermain in
Croton Point Avenue to meet the fire sprinkler requirements. The MEP engineer has determined
that a 60-minute duration is required for the 750 gpm sprinkler flow. For this flow rate and
duration, a water use of 45,000 gallons is calculated. This water volume would be provided by
a combination of the available flows from the existing system, the ability to supply the proposed
hydrant, and a supplemental onsite storage tank that would be buried below grade. Pump(s)
would be required to deliver water to the sprinkler system and such pumps would be provided
with a backup generator.
11/4/24: Sewer Service: As documented in the Applicant’s Wastewater Engineering Report, the
project will connect to the existing Westchester County Department of Environmental Facilities
sewer system, as follows: A gravity sewage collection and conveyance system consisting of 8-
inch diameter PVC SDR 35 sewer mains and precast concrete manholes will be installed onsite
and will connect the building to the proposed pump station. The sewage collection and
conveyance system will flow by gravity to an onsite pump station. A duplex pump station is
proposed to be installed and will connect to the 8-inch forcemain with a proposed connection
manhole. A backup generator will be provided to power the pumps in the event of power failure.
The water and sewer service information above (and related reports) should be reviewed by the
Village Engineer and input provided to the Village Board of Trustees, as necessary
FISCAL ANALYSIS
1. 10/4/24: The existing tax revenue table continues to present the estimated market value from the 2023
town tax roll ($1,034,836); this should be updated to reflect the 2024 market value from the town tax
roll ($1,069,915) for the town, county, county refuse, Ossining sanitary, school, and library columns. It
appears that calculations in the table are using the 2023 market value and equalization rate, please
re-check the calculations, and their potential “ripple effect” when presenting net tax revenue estimates
with the project.
11/4/24: The table in question was corrected as part of the Applicant’s revised Fiscal Analysis
dated October 16, 2024. No further comment.
2. 10/4/24: The Applicant should provide an update to the Board on the outcome of any recent
correspondence and/or meetings held with emergency service providers (police, fire, EMS).
11/4/24: Based on discussions held at the October 16, 2024 Village Board of Trustees review
session, the only EMS comment received was about the sizing of the elevators to accommodate
a stretcher, which has been confirmed to be adequate. No concerns were provided by the Police
Department. Regarding the Fire Department’s review, the Village Manager has stated that email
correspondence from the Fire Department was provided prior to a meeting that occurred with
the Village Manager, the Applicant, and Fire Department representatives, at which that
correspondence was discussed. The Village Manager intends to provide a written summary of
meeting held with the Fire Department for the record.
11.4.24
PUBLIC SCHOOLS
1. 10/4/24: The PSAC memorandum now states on page 3 that the updated 2023-2025 CHUFSD local
multifamily study resulted in a multiplier of 0.25 students per unit, but the table on top of page 4
continues to present the 0.20 rate and resulting 20 students. This table should be updated to match
the text.
11/4/24: The table in question was corrected to match the text as part of the Applicant’s revised
PSAC Analysis dated October 16, 2024. No further comment.
2. 10/4/24: If possible, the Applicant should examine one of their previously completed multifamily
projects within desirable school district and provide the number of school-aged children residing in that
building.
11/4/24: In response to this request, the Applicant has provided enrollment data from one of its
own projects located outside of the Village of Croton-on-Hudson. The Chappaqua Crossings
development, located in the Town of New Castle, Westchester County, New York, is a 63-unit
mixed income rental development. Upon review of enrollment data collected, this development
currently includes 12 students within grades K-12, or 0.19 students per unit. This per unit
multiplier is comparable to the multiplier generated from the analysis of existing Village
properties.
VISUAL IMPACTS
1. 11/4/24: At the request of the Village Board of Trustees, the Applicant has provided a revised
version of the previously reviewed cross section depicting line of sight from points east/uphill
from the project site, including public rights of way, such as Wayne Street and Young Avenue.
The cross section was updated to address the Village Board’s request to include the
approximate massing of the building within the MNR yard to the west. The drawing shows that
the MNR building tops out at an elevation below the proposed project due to the grade change
that exists within the MNR yard. AKRF’s conclusions on visual impacts from prior memoranda
remain.
TRAFFIC
The following traffic-related comments (in italics) were included in AKRF’s October 4, 2024 memorandum
under separate headings. For ease of reference, all prior comments requiring a response from the applicant
and have been re-numbered and consolidated below. Applicant responses have been provided beneath
each prior comment in underlined text, and all follow-up/new comments are presented in bold text with the
review date of 11/4/2024.
11.4.24
1. AKRF 10/4/24: The Traffic Impact Study (“TIS”) prepared by Kimley Horn (“KH”), dated September 25,
2024 states that updated traffic counts were conducted in September 2024 for the intersections of
Croton Point Avenue & Veterans Plaza, Croton Point Avenue & Route 9/9A Northbound Ramps, and
Croton Point Avenue & Route 9/9A Southbound Ramps as requested. However, the collected traffic
count data should be included as part of the appendix of TIS so that the peak hours and traffic volumes
presented in the TIS can be verified.
Applicant Response: All traffic counts have been provided.
AKRF 11/4/24: Comment addressed.
2. AKRF 10/4/24: The Applicant has not eliminated the eastern one-way site driveway along Croton Point
Avenue as recommended based on input from the Croton Harmon Union Free School District
Transportation Director. The School District indicated that they would like the opportunity to have
school buses come onto the site to pick up/drop off children and use the traffic light at the main
driveway to turn around. In addition, the Applicant would prefer to maintain this driveway as an
emergency access point. The fire truck turning movement template drawing provided by the Applicant
also shows fire trucks navigating entry to the site utilizing this driveway. The TIS has conservatively
assumed that all project-generated traffic would only utilize the main central driveway (and not the
eastern one-way site driveway) to enter and exit the site. However, it is recommended that the
Applicant develop a comprehensive plan to demonstrate how limiting access to just emergency and
school bus traffic at the eastern one-way driveway would function. While the Applicant has indicated
that they will discuss this further during site plan review, it is AKRF’s position that the status of this
driveway should be established prior to site plan review as it plays a significant role in vehicular
circulation on-site. For example, the August 13, 2024 Traffic Impact Assessment (“TIA”) by KH shows
this driveway being utilized by delivery vehicles and auto (taxi) drop-offs/pick-ups (which do not qualify
as school buses or emergency vehicles).
Applicant Response: The Applicant is working through this concept as a part of the site plan review to
confirm the best configuration.
AKRF 11/4/24: Comment partially addressed. AKRF will review any further modifications to the
site plan layout as they are developed.
3. AKRF 10/4/24: The Applicant has indicated that the proposed tree at the southeast corner of the
building has not been relocated in order to remain compliant with the Village Code (230-52E(1(b)).
However, the Applicant has indicated that they will work with the Planning Board during site plan review
to ensure that a tree species for this location is selected that will leaf out above line of sight to minimize
its potential impact on motorists. This criteria for tree species should apply to all trees on-site adjacent
to any parking spaces and/or parking aisles where sight lines may be impeded by trees.
Applicant Response: Comment noted. This criterion will apply to all trees on-site where sight lines may
be impeded by said trees.
AKRF 11/4/24: Comment addressed.
4. AKRF 10/4/24: The Applicant has relocated the surface parking space adjacent to the garage entrance
to the northern parking lot as requested.
Applicant Response: No further response.
AKRF 11/4/24: Comment addressed.
11.4.24
5. AKRF 10/4/24: The Applicant has provided a set of truck turning path analysis (“AutoTURN”) drawings
that demonstrate how the largest anticipated fire, garbage, and delivery vehicles would enter, exit, and
navigate the project site. The Applicant has indicated that the provided fire truck turning path analysis
drawing has been conservatively based on a 100-foot aerial ladder truck but will be updated with the
Village’s fire truck templates once received. As trash would be picked up from the trash room (and not
an outdoor dumpster) the turning path analysis drawing for the garbage truck (Figure 1 of the TIA by
KH) should be modified to show how the garbage truck would maneuver to and from the loading
dock/trash room door so that the truck’s rear is facing the loading dock. Similarly, the turning path
analysis drawing for the SU-40 truck (Figure 2 of the TIA by KH) should show how the truck would
maneuver to and from the loading dock door so that the truck’s rear is facing the loading dock. Figure
3 of the TIA by KH shows the turning paths of delivery vehicles and auto (taxi) drop-off and pick-up
maneuvers, which utilize the eastern driveway that is proposed to be utilized for emergency and school
bus traffic only. The revised plan set should include updated versions of each of these drawings once
completed.
Applicant Response: The garbage and delivery trucks cannot reverse fully to the loading dock/trash
room door without eliminating parking. The garbage and delivery trucks are available only a few days
a week. The garbage dumpster will be rolled out of the building on wheels and turned so it can be
emptied into garbage truck. Deliveries will be taken off the back of delivery trucks, turned and brought
into the building, where they will have to be turned again multiple times to be delivered to their
destination. See revised truck turning.
AKRF 11/4/24: AKRF understands that the Fire Chief reviewed the turning path analysis and
agreed with the methodology.
AKRF would assist the Village in reviewing these movements during site plan review if material
changes to the site plan were to occur.
6. AKRF 10/4/24: The turning path analysis drawing for the passenger car/delivery van (Figure 3) shows
these vehicles utilizing the eastern driveway, which is being proposed for school bus and emergency
vehicle use only. This drawing should be revised if the eastern driveway is indeed for school bus and
emergency vehicle use only.
Applicant Response: The Applicant is working through this concept as a part of the site plan review to
confirm the best configuration. The front of building turning analysis has been modified to show what
it would look like if the eastern driveway were closed.
AKRF 11/4/24: Comment addressed. AKRF will review future modifications to the site plan that
may be incorporated as a result of the site plan review.
7. AKRF 10/4/24: The Village Manager clarified that the current parking count in Lot A is 122 spaces, not
134. This number should be verified and the revised TIS should update any references to the current
capacity of Lot A accordingly.
Applicant Response: As indicated in the AKRF memo, dated August 31, 2022, there were 134 spaces
in Lot A. However, the Village Manager has indicated that the Village terminated its lease of the spaces
on DOT property next to the railroad, and the Village currently has 122 spaces in Lot A. As previously
indicated in Kimley-Horn memo, dated September 13, 2024, these spaces will be eliminated but were
more than compensated for by the addition of spaces in the Lot next to the train station and the
elimination of these parking spaces will not have a significant adverse impact on area parking.
AKRF 11/4/24: Comment addressed.
11.4.24
8. AKRF 10/4/24: The parking demand calculations were based on ITE data for ITE Land Use 223
(“Affordable Housing”). These calculations should be revised to be based on ITE Land Use 221
(“Multifamily Housing – Mid-Rise”) so that they are consistent with the Land Use utilized to develop the
trip generation traffic volumes. These changes should be incorporated into the revised TIS. The
Village Manager noted that the number of current parking spaces in Lot A are 122 spaces, not 134.
This number should be verified and the revised TIS should update any references to the current
capacity of Lot A accordingly.
Applicant Response: While the project is an affordable housing development which has its own
category in the ITE, for consistency, Kimley-Horn calculated parking demand based on ITE Land Use
Code (LUC) 221. The project has 100 units with 154 bedrooms. Based on the ITE LUC 221, which is
located close to rail, and using bedrooms as the independent variable, the parking demand will be 102
vehicles. The project has 105 parking proposed spots which satisfies the demand. Please see the
image below for details.
AKRF 11/4/24: Comment addressed. The parking demand of 102 vehicles based on the ITE LUC
221 (located close to rail) is based on utilizing bedrooms, not units, as the independent variable.
It is noted that the number of parking spaces provided also meets the zoning requirement.
9. AKRF 10/4/24: Please recheck the project-generated traffic volumes. Based on a review of the
development of the Build volumes, the project-generated volumes appear to have been applied to the
incorrect traffic movements at the Croton Point Avenue and Veterans Plaza intersection.
Applicant Response: Comment noted. It appears the discrepancy is the relocation of existing Lot A
traffic, and we believe the traffic volume and analysis are correct.
AKRF 11/4/24: Comment substantively addressed. The final TIS should include figures that
depict the traffic reassignments based on the relocation of existing Lot A traffic for clarity.
10. AKRF 10/4/24: The TIS should present the impact criteria utilized to identify traffic impacts.
Applicant Response: Previous studies in the Village of Croton-on Hudson (including the 2022 rezoning
study) suggest that a change from ‘LOS D’ to ‘E’ or ‘F’, a change from ‘LOS E’ to ‘F’, or an increase in
delay of more than 10% when the No-Build condition is ‘LOS F’ would be considered significant.
AKRF 11/4/24: Comment addressed.
11.4.24
11. AKRF 10/4/24: For the PM peak hour, the change in level of service (LOS)/Delay from No Build to
Build Conditions for the following approaches should be identified as impacts and improvements
should be proposed; the southbound approach at the Croton Point Avenue and Veteran’s Plaza
intersection (decline in LOS from LOS A to LOS E) and the northbound approach at the Croton Point
Avenue and Route 9/9A Northbound On/Off Ramps intersection (increase in delay greater than 10
percent within LOS F).
Applicant Response: Kimley-Horn has corrected a delay calculation for the No Build site driveway (see
attached). There is no longer a decline in LOS exiting the driveway (though there is a delay increase
in approximately 16.8 secs). At the NB ramp, technically, the addition of 8 vehicles increases the delay
by 15%, which is more than the 10% threshold used previously in past studies. While we believe this
increase in delay, may be larger than what will occur, the calculated delay can be restored to No-build
conditions by transferring 1.5 seconds from the protected left-turn phase onto the southbound Route
9/9A on-ramp (phase 11) to the northbound and southbound off-ramp phase (phase 3 and 7). To
restore the delay on the southbound approach to no build conditions on the south driveway the amount
of time on the north-south protected turn phases (phase 8) will need to be reduced by 27 seconds.
Please see the attached synchro files for more details.
AKRF 11/4/24: Comment addressed.
12. AKRF 10/4/24: The details of the signal timing changes that are assumed by KH to address the levels
of service documented at the above locations should be presented in the text of the TIS, specifically
within the discussion that references Table 4.
Applicant Response: This application is to construct affordable housing at the intersection that serves
one of the busiest train stations on Metro-North’s Hudson line. Delays at this intersection are due to
train station traffic and will prevail regardless of whether or not the affordable housing project is
approved. However, based on a review of the signal timings it was determined if the timing changes
listed below were implemented, all ‘LOS F’ conditions could be improved to at least ‘LOS E’ conditions.
Timing Changes were implemented at the Croton Point Avenue & SB and NB On/Off Ramps as follows:
AKRF 11/4/24: Comment addressed.
13. AKRF 10/4/24: The following data/information should be included in the TIS Appendix: Agency
(NYSDOT) traffic signal timing plan sheets for the signalized study area intersections, the September
2024 traffic count data (e.g., turning movement counts).
Applicant Response: The signal timing and traffic volume data are attached.
AKRF 11/4/24: Comment addressed.
11.4.24
14. AKRF 10/4/24: The electronic Synchro (.syn) files should be provided to AKRF for further review.
Applicant Response: Synchro files will be provided directly to the Village’s traffic consultant; updated
synchro printouts are attached.
AKRF 11/4/24: Comment addressed. A review of the NYSDOT traffic signal timing sheets
indicate that the signalized intersections operate on the coordinated signal timings during the
peak hours identified. While KH has utilized the non-coordinated signal timings in the Synchro
models, those timings provide more conservative results than those of the coordinated signal
timings and therefore there are no fundamental changes to the findings/conclusions presented
in the KH study. However, it is recommended that the signal timings included in the Synchro
models are reevaluated for any future uses or references to the TIS, including during permitting
with NYSDOT. Similarly, AKRF recommends that an analysis of the most recent 3-years of
NYSDOT crash data be included in the final TIS used to inform the permitting process.
15. AKRF 10/4/24: The final revised TIS should incorporate the items listed above as well as the data and
findings presented in the August 13, 2024 TIA and KH’s 9/24/24 response memo. This includes key
discussions and data on parking, trip generation, and circulation. The appropriate backup data from
these documents should also be included as part of the TIS appendix.
Applicant Response: The final revised TIS will include the data/findings requested.
AKRF 11/4/24: Comment partially addressed. See AKRF Conclusions above.
16. AKRF 10/4/24: Efforts should be made to improve sight lines for the parking spaces adjacent to the
northern garage entrance. Assuming both sides of the garage entrance are concrete foundation walls,
sight lines for the adjacent parking spaces on both sides of the walls are limited. Options to be
considered could include relocation of those parking spaces to areas on-site with better sight lines, or
providing columns (rather than solid concrete walls) at this location so that vehicles exiting these
spaces are easily visible to drivers in the travel aisle from both inside and outside the garage.
Applicant Response: The Applicant is working to improve sight lines for parking spaces adjacent to the
northern garage entrance.
AKRF 11/4/24: Comment partially addressed. AKRF will continue to review during the site plan
review process.
C. RECOMMENDATIONS
At the November 6, 2024 Village Board work session, AKRF recommends that the Village Board discuss
the latest materials submitted by the Applicant, the comments contained in this memorandum, and continue
deliberations on FEAF Part 2.