Memo from Village Manager Bryan Healy re%3A Fire Department input on the 1 Croton Point Avenue development%2C dated November 6%2C 2024
application
1 page
Meeting: portal event 1005 (no meeting page on file)
Agenda item: Continued review of the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.
Application, 1 page. Attached to agenda item: “Continued review of the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
1 Croton Point Neg Dec DRAFT Reasons in Support 2024.11.20
10152024 Response Letter
1CrotonPoint Fiscal 20241016
1CrotonPoint PSAC 20241016
1CrotonPoint Part 2 FEAF 20241120
1CrotonPoint Part 3 FEAF 20241120
AKRF Memo 1 Croton Point SUP Conditions 20241202
Draft Phase II Environmental Site Assessment Report
Environmental Noise Study and Facade Glazing...
Insite Preliminary Wastewater Engineering Report dated...
Insite Preliminary Water Engineering Report dated July...
Insite Stormwater Pollution Prevention Plan dated July...
Extracted text
To:
From:
Date:
November 6, 2024
Re:
1 Croton Point Avenue Development
On October 2, 2024, a meeting with WBP Development and a number of Village officials was held
to discuss the fire department’s response to the 1 Croton Point Avenue development plans. In
attendance were Mayor Brian Pugh, Village Engineer Dan O’Connor, Fire Chief Joshua Karpoff and
myself from the Village, along with John Bainlardi from WBP, Michael Bevivino from Arketekcher
and Rich Williams from Insite Engineering.
At the meeting, we discussed the preference of the fire department to have a machine room hydraulic
elevator to ensure access to the necessary equipment in case of elevator rescues. It was also discussed
that a condition be added to require the bike storage room have a 3-hour fire rating due to the
increasing amount of lithium-ion battery fires.
The fire apparatus turning plan was reviewed and determined to be acceptable based on the example
apparatus used. The vehicle height clearance for the garage was discussed to see if any potential
changes could be made to allow some smaller FD vehicles access.
The fire department has requested that an additional hydrant be installed in front of the building which
will be accommodated. The location of standpipes in the building to maximize access was also
discussed.
The building is being designed to be solar-ready, which the fire department is prepared to handle;
however, solar panels may not be installed immediately as there may be some system capacity issues
in the area.
Mayor
Brian Pugh
Trustees
Nora Moriarty Nicholson
Ian Murtaugh
Cara Politi
Len Simon
Village Manager
Bryan T. Healy
Village Treasurer
Daniel Tucker
Village Clerk
Pauline DiSanto
Village of Croton-on-Hudson New York
Stanley H. Kellerhouse Municipal Building
One Van Wyck Street
Croton-on-Hudson, NY 10520-2501
Machine-extracted for search and reference — the original PDF is the authoritative version.