croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Saturday, August 15, 2026· Aug 15, 2026
Source-linkedCorrections welcomed
Documents

Contract 25-500 Plans A01 22X34

agreement 3 pages
Meeting: portal event 1074 (no meeting page on file)
Agenda item: Referral from the Planning Board for a Local Waterfront Revitalization Program (LWRP) Consistency Review for a Tree Removal Permit for Quaker Bridge Replacement Project
Agreement / contract, 3 pages. Attached to agenda item: “Referral from the Planning Board for a Local Waterfront Revitalization Program (LWRP) Consistency Review for a Tree Removal Permit for Quaker Bridge Replacement Project”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: LWRP 2024 Updated2 QBR Tree Permit Application - combined
E E X C R S L IO CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 07/28/2025 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 7/28/2025 N:\Projects\2024\124-296 Westchester Co - Quaker Bridge Replacement\Working\CADD\dgn connect_2023\124-296_cpb_lap_01.dgn FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 2:56:27 PM DetriKH N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T R E E N I G N E L A R P D E S N E C I L W WOODS WOODS WOODS CONCRETE RET. WAL CONCRETE RET. WALL STONE WING WALL EDGE OF WATER STONE WING WALL EDGE OF WATER EDGE OF WATER STONE WALL POST POST STONE RET. WALL WOODS WOODS WOODS KEY PAD BOLLARDS CROTON RIVER PILLAR STONE IRON GATE WROUGHT RAIL GUIDE WOOD BRIDGE WING WALL STONE WALL ROAD QUAKER BRIDGE TO ALBANY POST ROAD RIDGE ROAD TO QUAKER ROAD EAST QUAKER BRIDGE ROAD QUAKER BRIDGE GRID NORTH , STA. LINE, AND H.C.L. ¡ QUAKER BRIDGE ROAD EAST , STA. LINE, AND H.C.L. ¡ QUAKER BRIDGE ROAD FLOW CROTON RIVER TO RTE 129 80' 1" = 40' (136) LIVE STAKES 36" Ø (47) LIVE STAKES 36" Ø NUMBER NYDOT ITEM DESCRIPTION QUANTITY UNIT LANDSCAPING: 611.0114 PLANTING - MAJOR DECIDUOUS TREES – 6' HEIGHT, 2-3" CALIPER EA 611.19 POST-PLANTING CARE EA 616.08000024 LIVE STAKE PLANTINGS 1" TO 2" EA 610.1401 TOPSOIL - REUSE ON-SITE MATERIALS CY 610.1101 MULCH FOR PLANTING TYPE A,B & D WOOD CHIPS & SHREDDED BARK CY 610.19 WATERING VEGETATION 0.225 1000 GAL LAP-01 LANDSCAPE PLAN (117) LIVE STAKES 36" Ø 56-02-R-217-0 PLANTING LIST SYMBOL CODE QTY BOTANICAL/COMMON NAME CONTAINER REMARKS TREES AS ACER SACCHARUM/SUGAR MAPLE 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED BL BETULA LENTA/SWEET BIRCH 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED FA FRAXINUS AMERICANA/WHITE ASH 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED LT LIRIODENDRON TULIPFERA/TULIP POPLAR 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED PO PLATANUS OCCIDENTALIS/AMERICAN SYCAMORE 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED QR QUERCUS RUBRA/NORTHERN RED OAK 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED TC TSUGA CANADENSIS/EASTERN HEMLOCK 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED UA ULMUS AMERICANA/AMERICAN ELM 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED SYMBOL CODE QTY BOTANICAL/COMMON NAME CONTAINER SPACING REMARKS SHRUB AREAS SN SALIX NIGRA/LIVE STAKES 1" MIN. CAL. LIVE STAKE 36" O.C. APPLICATION 1-2" DIAMETER, 2-6' LONG DEPENDING ON SITE A1 M 1+26.29 PC M 2+54.22 PCC M 2+90.48 PT M 3+97.40 PC M 4+50.79 PT M 1+00.00 P.I. STA M 1+00 M 2+00 M 3+00 M 4+00 M 5+00 S 1+00 S 2+00 (BK) 1+00.00 STA (AH) = S 1+00.00 STA S 1+00 S 2+00 BEGIN RECONSTRUCTION END RECONSTRUCTION #13 KV P.P. W 57 13 KV P.P. W 5 P.P. SE.INV.=36.82 N.INV.=38.47 T.F.=39.57 C.B. W/LIGHT P.P. P.P. 7/18/25 KSE QUANTITY REVISION E E X C R S L IO CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 07/28/2025 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 7/28/2025 N:\Projects\2024\124-296 Westchester Co - Quaker Bridge Replacement\Working\CADD\dgn connect_2023\124-296_cpb_lan_01.dgn FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 2:57:34 PM DetriKH N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T R E E N I G N E L A R P D E S N E C I L W LANDSCAPING NOTES LAN-01 SCHEDULE (LOCATION TO BE DETERMINED BY TOWN) THE REMAINING 28 TREES WILL NEED TO BE PLANTED OFF-SITE. RECOMMENDED SPECIES TO BE SELECTED FROM PLANT AT THE 2:1 RATIO, 19 TREES WERE REMOVED, 10 TREES HAVE BEEN SITED FOR REPLACEMENT ON SITE. TOWN OF CORTLANDT TREES AT THE 1:1 RATIO, 35 OF THE 35 REMOVED TREES HAVE BEEN SITED FOR REPLACEMENT ON SITE. SCHEDULE (LOCATION TO BE DETERMINED BY VILLAGE) THE REMAINING 41 TREES WILL NEED TO BE PLANTED OFF-SITE. RECOMMENDED SPECIES TO BE SELECTED FROM PLANT AT THE 2:1 RATIO, 22 TREES WERE REMOVED, 3 TREES HAVE BEEN SITED FOR REPLACEMENT ON SITE. VILLAGE OF CROTON ON HUDSON TREES REPLACED ON CORTLANDT SIDE CONTRACTOR TO NOTIFY ENGINEER IF FIELD CONDITIONS PREVENT REQUIRED NUMBER OF TREES TO BE PLANTREES TREE PLACEMENT TO BE FIELD VERIFIED BY CONTRACTOR AND APPROVED BY ENGINEER PRIOR TO INSTALLATION. 6. THE SITE LEFT IN A NEAT AND ACCEPTABLE CONDITION AS APPROVED BY THE LANDSCAPE ARCHITECT. MATERIAL, EQUIPMENT, AND DEBRIS RESULTING FROM HIS/HER WORK. ALL PAVED AREAS SHALL BE BROOM CLEANED AND UPON THE COMPLETION OF ALL PLANTING WORK AND BEFORE FINAL ACCEPTANCE, THE CONTRACTOR SHALL REMOVE ALL 5. NO TREE WRAPPING, STAKING, OR GUYING IS PERMITTED UNLESS AUTHORIZED BY THE LANDSCAPE ARCHITECT. 4. UNIFORM FINISHED SURFACE. IMMEDIATELY AFTER PLANTING. THOROUGHLY WATER MULCHED AREAS. AFTER WATERING, RAKE MULCH TO PROVIDE A MULCHING: MULCH TREE, SHRUB PLANTING PITS, AND PERENNIAL BEDS WITH REQUIRED MULCH MATERIAL 3" DEEP 3. REMOVE ALL BURLAP, ROPES, AND WIRES FROM THE TOP 1/3 OF BALLS AFTER ONE YEAR GUARANTEE PERIOD. a. FILL ALL VOIDS. AFTER BALLED AND BURLAPPED PLANTS ARE SET, MUDDLE PLANTING SOIL MIXTURE AROUND THE BASES OF BALLS AND 2. EDGE OF EACH PLANTING PIT TO RETAIN WATER. PLANTING MIXTURE. DO NOT USE FROZEN OR MUDDY MIXTURES FOR BACKFILLING. FORM A RING OF SOIL AROUND THE 3" ABOVE THE FINISH GRADE. NO FILLING WILL BE PERMITTED AROUND TRUNKS OR STEMS. BACKFILL THE PIT WITH FACED TO GIVE THE BEST APPEARANCE OR RELATIONSHIP TO OTHER OR ADJACENT STRUCTURE. SET PLANT MATERIAL 2- SET PLANT MATERIAL IN THE PLANTING PIT TO PROPER GRADE AND ALIGNMENT. SET PLANTS UPRIGHT, PLUMB, AND 1. BE REMOVED HAVE BEEN MARKED IN THE FIELD. EXISTING TREES SHAL BE REMOVED INCLUDING THE ROOTS UNDER ITEM 201.06 - CLEARING AND GRUBBING. ALL TREES TO 8. CONTRACTOR SHALL ALSO APPLY A PREEMERGIENT TO ALL LANDSCAPE BEDS AT THE CONTRACTOR'S EXPENSE. PREPARATION, ALL WEEDS AND GRASSES SHALL BE DUG OUT BY THE ROOTS AT THE CONTRACTOR'S EXPENSE. THE WEEDING - BEFORE AND DURING PRELIMINARY GRADING AND FINISH GRADING, FINISH GRADING AND PLANTING BED 7. RESET THE GRADES IN THIS AREA, IF REQUIRED, TO THE FINAL GRADES SHOWN ON THE GRADING PLAN. GRADING PLAN TO ANTICIPATE SETTLEMENT OVER THE FIRST YEAR. AT THE END OF THE PLANTING GUARANTEE PERIOD, PLANTING MIX OR TOPSOIL. ALLOW THE FINISHED GRADES TO REMAIN 50-75 MM (2-3") HIGHER THAN THE GRADES ON THE OVER ALL MULCHED BED AREAS DESIGNATED ON THE DRAWINGS AND ROTOTILL INTO THE TOP 100 MM (4") OF THE FINAL GRADING AND INSTALLATION OF TREE, SHRUB, OR FLOWER PLANTINGS, SPREAD 100 MM (4") OF ORGANIC MATTER INSTALL ORGANIC MATTER LAYER - AFTER THE SPECIFIED TOPSOIL OR PLANTING MIX IS INSTALLED AND JUST PRIOR TO 6. TYPE "A" FOR EACH CU. YD. OF MIXTURE OR APPROVED EQUAL. ) LB. PLANT FERTILIZER EXISTING SOIL, TWO (2) PARTS PLANTING TOPSOIL, ONE (1) PART PEAT MOSS, AND ONE-HALF ( PROVIDE PLANTING MIXTURE TO USE AROUND THE BALLS AND ROOTS OF ALL PLANTS CONSISTING OF THREE (3) PARTS 5. INDIVIDUAL TREES WILL BE CONSISTENT IN SIZE THROUGHOUT THE PROJECT AREAS. TREE BALLS. MULCH BEDS ARE TO BE PROVIDED FOR ALL LANDSCAPE MASSINGS. CIRCULAR MULCH AREAS FOR EXCAVATE TREE PITS TO THE DEPTH OF THE TREE BALL AND BACK FILL IN PLANTING MIX TO CORRECT ELEVATION FOR IN BEDS. PROVIDE TREE AND SHRUB PITS AT LEAST TWO (2) TIMES GREATER THAN THE DIAMETER OF THE ROOT SYSTEM. EXCAVATED CIRCULAR PLANT PITS WITH VERTICAL SIDES, EXCEPT FOR PLANTS SPECIFICALLY INDICATED TO BE PLANTED 4. OPERATIONS UNTIL ALTERNATE PLANT LOCATIONS HAVE BEEN SELECTED AND APPROVED BY LANDSCAPE ARCHITECT. OBSTRUCTIONS ARE ENCOUNTERED THAT ARE NOT SHOWN ON THE DRAWINGS, DO NOT PROCEED WITH PLANTING CONTRACTOR TO LOCATE PLANTS IN THE FIELD BY STAKING. LANDSCAPE ARCHITECT TO APPROVE LOCATIONS. IF 3. SUPERVISION OF A QUALIFIED SUPERVISOR. PLANTING SHALL BE PERFORMED ONLY BY EXPERIENCED WORKMEN FAMILIAR WITH PLANTING PROCEDURES UNDER THE 2. PLANTING TIMES SHALL BE APPROVED BY LANDSCAPE ARCHITECT. d. FALL PLANTING: SEPTEMBER 15TH THROUGH OCTOBER 15TH c. SPRING PLANTING: MARCH 15TH THROUGH MAY 15TH b. LEAF, THEY SHALL BE SPRAYED WITH AN ANTI-DESICCANT PRIOR TO PLANTING OPERATION. DECIDUOUS MATERIAL: PLANT DECIDUOUS MATERIAL IN A DORMANT CONDITION. IF DECIDUOUS TREES ARE PLANTED IN- a. TIME OF PLANTING: 1. LANDSCAPE SPECIFICATIONS: WARRANTY MATERIALS ACCESSORIES WATER ON SITE. CONTRACTOR WILL PROVIDE WATER: FREE OF SUBSTANCES HARMFUL TO PLANT GROWTH. HOSES OR OTHER METHODS OF TRANSPORTATION FURNISHED BY CONTRACTOR. 6. MULCH: TREES, SHRUBS, AND PERENNIAL BEDS - SHREDDED HARDWOOD MULCH FURNISHED IN BAGS OR BULK. 5. ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. MIXED AND APPLIED IN ANTI-DESICCANT: PROTECTIVE FILM EMULSION PROVIDING A PROTECTIVE FILM OVER PLANT SURFACES; PERMEABLE TO PERMIT TRANSPIRATION, 4. AMMONIA SALT, AND ONE-HALF IN FORM OF ORGANIC NITROGEN OR EQUAL. POTASH BY WEIGHT. ONE-FOURTH OF NITROGEN IN THE FORM OF NITRATES, ONE-FOURTH IN FORM OF PHOSPHORIC ACID, AND 12 PERCENT FERTILIZER: TYPE "A": COMMERCIAL TYPE APPROVED BY THE LANDSCAPE ARCHITECT, CONTAINING 12 PERCENT NITROGEN, 12 PERCENT 3. PERCENT MINERAL ON A DRY BASIS. PEAT MOSS: BROWN TO BLACK IN COLOR, WEED AND SEED FREE GRANULATED RAW PEAT OR BALED PEAT, CONTAINING NOT MORE THAN 9 2. PROVIDE TOPSOIL FREE OF SUBSTANCES HARMFUL TO THE PLANTS WHICH WILL BE GROWN IN THE SOIL. b. IDENTIFY SOURCE LOCATION OF TOPSOIL PROPOSED FOR USE ON THE PROJECT. a. OTHER FOREIGN MATERIALS. ARABLE SITE, REASONABLY FREE FROM CLAY, LUMPS, COARSE SANDS, STONES, PLANTS, ROOTS, STICKS, AND OBTAINED FROM A WELL-DRAINED TOPSOIL FOR PLANTING BEDS; FERTILE, FRIABLE, NATURAL TOPSOIL OF LOAMY CHARACTER, WITHOUT ADMIXTURE OF SUBSOIL MATERIAL, 1. 4) PLANTS SHALL BE IN A MOIST, VIGOROUS CONDITION, FREE FROM DEAD WOOD, BRUISES, OR OTHER ROOT OR BRANCH INJURIES. 3) SIDE BRANCHES SHALL BE GENEROUS, WELL-TWIGGED, AND THE PLANT AS A WHOLE WELL-BUSHED TO THE GROUND. 2) SINGLE STEMMED OR THIN PLANTS WILL NOT BE ACCEPTED. THE LONGEST BRANCH. 1) THE MEASUREMENT FOR HEIGHT SHALL BE TAKEN FROM THE GROUND LEVEL TO THE AVERAGE HEIGHT OF THE TOP OF THE PLANT AND NOT SHRUBS AND SMALL PLANTS SHALL MEET THE REQUIREMENTS FOR A SPREAD AND HEIGHT INDICATED IN THE PLANT LIST. f. 1) IF THE USE OF LARGER PLANTS IS ACCEPTABLE, INCREASE THE SPREAD OF ROOTS OR ROOTBALL IN PROPORTION TO THE SIZE OF THE PLANT. PLANTS LARGER THAN THOSE SPECIFIED IN THE PLANT LIST MAY BE USED WHEN ACCEPTABLE TO THE LANDSCAPE ARCHITECT. e. PLANTS PLANTED IN ROWS OR MASS SHALL BE MATCHED IN FORM. d. PROVIDE TREE SPECIES WITH A SINGLE MAIN TRUNK. TREES THAT HAVE THE MAIN TRUNK FORMING A "Y" SHAPE ARE NOT ACCEPTABLE. c. 2) CONTAINER STOCK SHALL NOT BE POT BOUND. 1) NO PLANTS SHALL BE LOOSE IN CONTAINER. WHOLE. SOIL TOGETHER, FIRM AND CONTAINER GROWN STOCK: GROWN IN A CONTAINER FOR SUFFICIENT LENGTH OF TIME FOR THE ROOT SYSTEM TO HAVE DEVELOPED TO HOLD ITS b. ACCEPTABLE. COMPLYING WITH THE LATEST EDITION OF THE "AMERICAN STANDARD FOR NURSERY STOCK". CRACKED OR MUSHROOMED BALLS ARE NOT FIBROUS AND FEEDING ROOT SYSTEM NECESSARY FOR FULL RECOVER OF THE PLANT. PROVIDE BALL SIZES DEPTH TO ENCOMPASS THE BALLED AND BURLAPPED PLANTS: DIG BALLED AND BURLAPPED PLANTS WITH FIRM NATURAL BALLS OF EARTH OF SUFFICIENT DIAMETER AND a. DURING STORAGE. FULLY DEVELOPED FORM WITHOUT VOIDS AND OPEN SPACES. PLANTS HELD IN STORAGE WILL BE REJECTED IF THEY SHOW SIGNS OF GROWTH CRACKS, ABRASIONS OF THE BARK, PLANT DISEASES, INSECT EGGS, BORERS, AND ALL FORMS OF INFESTATION. ALL PLANTS SHALL HAVE A SOUND, HEALTHY, VIGOROUS PLANTS FREE FROM DEFECTS, DISFIGURING KNOTS, SUN SCALD INJURIES, FROST ROOT SYSTEMS. PROVIDE ONLY PLANTS: PROVIDE PLANTS TYPICAL OF THEIR SPECIES OR VARIETY; WITH NORMAL, DENSELY-DEVELOPED BRANCHES AND VIGOROUS, FIBROUS 1. DURING THE INITIAL PLANTING INSTALLATION. REPRESENTATIVE) TO BE UNSATISFACTORY REMOVE AND IMMEDIATELY REPLACE ALL PLANTS, AS DETERMINED BY THE LANDSCAPE ARCHITECT (OR ENGINEER AUTHORIZED 4. TYPICAL OF PLANTING AREA, ACTS OF VANDALISM, OR NEGLIGENCE ON THE PART OF THE OWNER. MILES PER HOUR, WINTER KILL CAUSED BY EXTREME COLD AND SEVER WINTER CONDITIONS NOT LIGHTNING STORMS, OR WINDS OVER 75 WARRANTY SHALL NOT INCLUDE DAMAGE OR LOSS OF TREES, PLANTS, OR GROUND COVER CAUSED BY FIRES, FLOODS, FREEZING RAINS, 3. APPARENT AND WEATHER AND SEASON PERMIT. REPLACEMENT PLANTS FOR 1 YEAR AFTER INSTALLATION. CORRECT DEFECTIVE WORK AS SOON AS POSSIBLE AFTER DEFICIENCIES BECOME CAUSES DUE TO THE CONTRACTOR'S NEGLIGENCE. THE COST OF SUCH REPLACEMENT(S) IS AT CONTRACTOR'S EXPENSE. WARRANT ALL OR UNSIGHTLY CONDITION, AND HAVE LOST THEIR NATURAL SHAPE DUE TO DEAD BRANCHES, OR OTHER ARCHITECT, ARE IN AN UNHEALTHY REPLACE, IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS, ALL PLANTS THAT ARE DEAD OR, AS DETERMINED BY THE LANDSCAPE 2. AREA. PROJECT AREAS WILL BE ACCEPTED UPON FULL COMPLETION OF PROJECT SITE. ACCEPTANCE OF EACH PROJECT WARRANT PLANT MATERIAL TO REMAIN ALIVE AND BE IN HEALTHY, VIGOROUS CONDITION FOR A PERIOD OF 1 YEAR AFTER COMPLETION AND 1. PREPARATION INSTALLATION 56-02-R-219-0 ROLLED EROSION CONTROL MAT THE SELECTED ROLLED EROSION CONTROL PRODUCT SHALL BE BIODEGRADABLE. 2. INCORPORATED INTO THE WORK. ESTABLISHED AND HAVE A ROLLED EROSION CONTROL PRODUCT, CLASS I TYPE A, SHORT TERM ALL SLOPES STEEPER THAN 25% THAT ARE NOT PROTECTED BY STONE FILL SHALL HAVE TURF 1. A1 7/18/25 KSE NOTE REVISION E E X C R S L IO 3B 3A CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:35:33 AM morrimm N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T R E E N I G N E L A R P D E S N E C I L W LANDSCAPING DETAILS LAD-01 FOR TREE PLANTING. SEE SHEET LAP-01 FOR PAY ITEMS 2. SEASON. ETC. AFTER ONE GROWING REMOVE GUYING, TREE WRAP, 1. PLAN VIEW OF STAKING FLUORESECNT FLAGGING ON WIRE. 3. CUT LEADERS. BRANCHES. DO NOT PROVIDE MINIMAL PRUNING. ONLY TO CORRECT DAMAGED 2. SLOPE. THIS DETAIL SHALL APPLY TO ALL TREES PLANTED ON A 1. TREE HEIGHT APPROX 2 / 3 STAKE W/ CENTERED 1" x 2" x 18" WOOD " SISAL ROPE 5" ABOVE FINAL GRADE NATURAL ROOT COLLAR 3" - TRUNK) NOT TO BE IN CONTACT WITH TREE HARDWOOD MULCH MIN. (MULCH 3" LAYER OF SHREDDED AREA ABOVE ROOT BALL PROVIDE 6" RADIUS UNMULCHED 4" HIGH WATER BERM COMPACT FILL TO BE BENCHED IN PLANTING PIT FINISHED GRADE 1/2 OF WIRE BASKET ( FROM ROOT BALL AND PIT.) SYNTHETIC MATERIAL. CUT AND REMOVE UPPER CUT AND REMOVE UPPER 1/3 OF BURLAP. NO MIXTURE AS SPECIFIED BACKFILL PLANTING SOIL UNDISTURBED SOIL SET BALL ON PLAN VIEW OF STAKING TREE PIT 2X ROOTBALL DIA. MIN. 6" DEPTH INTO UNDISTURBED SOIL LODGE POLES EXTEND 2' UNDISTURBED SOIL PLANTING MIX AS SPEC'D AROUND TOPE 1/3 OF BALL BURLAP AND WIRE BASKETS LOOSEN AND FOLD BACK 3" SAUCER AROUND TREE 3" SHREDDED BARK MULCH 2" ABOVE FINISH GRADE SET TOP OF ROOT BALL HOSE OVER #12 GALV. WIRE 1/ 2" FABRIC BEARING RUBBER #12 GALV. WIRE ALTERNATE STAKING 2" x 2" STAKES, 2 GUYS PER TREE 2 1 /2" OR LARGER (10' OR LARGER) PRUNE 1 / 4 TO 1 / 3 BRANCHES NOTES: TREE PIT 2X ROOTBALL DIA. SLOPE TREE PLANTING DETAIL (NOT TO SCALE) TREE PLANTING DETAIL (NOT TO SCALE) (NOT TO SCALE) SLOPE INSTALLATION GUIDELINES: 12" INTERVALS. THE END OF BLANKET MUST BE SECURED IN A 6"x6" TRENCH WITH A ROW OF STAPLES PLACED AT 7. PLACED 4" BELOW IN A STAGGERED PATTERN. THEN CONTINUE WITH GENERAL INSTALLATION. ROW OF STAPLES 4" APART ALONG ENTIRE WIDTH OF THE SLOPE. A SECOND ROW SHOULD BE FOR MAXIMUM PERFORMANCE A CHECK SLOT SHOULD BE PLACED AT 25'-40' INTERVALS. PLACE A 6. APPROXIMATELY 12" APART ACROSS THE WIDTH OF BLANKETS. STYLE IN THE DIRECTION OF WATER FLOW. CONNECT THE BLANKETS BY PLACING STAPLES ADDITIONAL VERTICAL BLANKETS CAN BE JOINED USING A MINIMUM 4" OVERLAPPING OF SHINGLE 5. STAPLES PLACED APPROXIMATELY 3'-0" APART. PARALLEL BLANKETS MUST BE OVERLAPPED BY A MINIMUM OF 4", AND SECURED WITH A ROW OF 4. PATTERN BELOW, SPECIFIED BY SLOPE. ROLL THE BLANKET VERTICALLY DOWN THE SLOPE. SECURE USING THE APPROPRIATE STAPLE 3. WITH A ROW OF STAPLES PLACED 12" APART ACROSS THE WIDTH OF THE BLANKET. BACKFILL AND COMPACT THE TRENCH. APPLY SEED, AND FOLD THE BLANKET OVER SOIL, SECURE SECURE THE BLANKET AT THE BOTTOM OF THE TRENCH WITH STAPLES PLACED 12" APART. BEGIN BY PLACING THE BLANKET A MINIMUM OF 12" DOWN-SLOPE OF THE UP-SLOPE TRENCH. 2. APPLIED. PREPARE THE SLOPE SOIL SURFACE (RAKING, SEEDING AND FERTILIZING). DIG A 6" BY 6" TRENCH BOTH UP-SLOPE AND DOWN-SLOPE OF THE AREA THE MATTING IS TO BE 1. PRODUCT AND ALL ASSOCIATED LABOR AND MATERIALS SHALL BE PAID FOR UNDER ITEM 209.1801. BE CONFIRMED WITH YOUR LOCAL DISTRIBUTOR. PAYMENT FOR ROLLED EROSION CONTROL THESE GUIDELINES ARE RECOMMENDATIONS ONLY, ANY QUESTIONS WITH THE INSTALLATION SHOULD SLOPE APPLICATION 6" 6" 12" 2"-5" 3" ROLLED EROSION CONTROL PRODUCT DETAIL NOTES: 56-02-R-218-0

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.