Pumphouse Road facility
Location
2 mentions
· in our records since Oct 5, 2025
Related
Appearances (2)
accepted, but a site other than the Pumphouse Road facility was desired. The
Village’s property on Hessian Hills Road was examined, but the nearest distribution
power line has a hosting capacity <300 kW and is not worth developing.
We reviewed an 11/…
As a possible site for a 2-4 MW BESS, Lindsay scoped out two small plots at the
Village’s Pumphouse Road facility, from which our drinking water is pumped from the
aquifer below us. Based on data in a recent proposal for a site in Cortlandt (presentl…