Municipal Place facility
Location
2 mentions
· 2026-01-18
Related
Appearances (3)
During a Sunday morning Zoom meeting, the Sustainability Committee revealed that Luminace, the developer tapped to build a half-sized battery energy storage system (BESS) at the Municipal Place facility, has backed out. The firm’s development directo…
On the solar front, the long-awaited commissioning of the train station solar canopies and Battery Energy Storage System (BESS) is slated for completion by the end of December. However, plans for a second, larger BESS behind the Municipal Place facil…
On the infrastructure front, the committee reviewed a lucrative proposal to lease village land for a large-scale battery energy storage system (BESS). A developer proposed building a ~5 MW system on the dirt plot behind the Municipal Place facility, …