Home / crotonhistory.org / Passage

Diverting The Croton River

crotonhistory.org 47 words

hole that would become the foundation of the dam. Construction started on September 20, 1892 with excavation to divert the Croton River. A channel 125 feet wide and about a quarter of a mile long was blasted out of solid rock on the north side of the