valley. A masonry wall 25 feet high was built along this channel, with earth dams at each end. The temporary dam in this photo was about 1,600 feet long. Approximately 1,821,400 cubic yards of earth and 400,250 cubic yards of rock were excavated for
Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.