⚓ Waterfront Advisory Committee
Waterfront Advisory Committee
Sep 16, 2026
⌛
This meeting has been held; coverage is pending.
What follows is the pre-meeting agenda listing, not an account of what happened. Full coverage arrives once the meeting record — video, transcript or minutes — is published and processed.
Meeting Agenda 4 items ▼
-
▶Call to Order
-
▶Old Business
-
•Referral from Village Board of Trustees to review correspondence from the Metropolitan Transportation Authority (MTA) for a Local Waterfront Revitalization Program (LWRP) Consistency review for the MNR Harmon to Poughkeepsie Signal System Upgrade Project📄 MTA Signal Upgrade Resolution.pdf 📄 MTA Signal Upgrade LWRP.pdf 📄 Responses.docx 📄 Location_Plan_Drawing.pdf 📄 Civil_Site_Plan_Drawings.pdf 📄 Typ_Conduit_Trough_Install_Detail_Drawings.pdf 📄 Typ_Structure_Install_Detail_Drawings.pdf 📄 Signal Equipment Information.png 📄 Erosion_Control_Detail_Drawings.pdf 📄 Grading_Drawings.pdf 📄 Platform _ Foundation_Drawings.pdf 📄 Snowmelter_Drawings.pdf 📄 Typical Case.JPG 📄 Typical Hut _10_ x 20__.jpg 📄 Typical Hut _10_ x 40__.jpg
-
-
▶Approval of Minutes - Draft Minutes August 25, 2026
-
▶Adjournment
Referral from Village Board of Trustees to review correspondence from the Metropolitan Transportation Authority (MTA)...
Referral from Village Board of Trustees to review correspondence from the Metropolitan Transportation Authority (MTA)...
Meeting Documents (16)
Attachments from the meeting packet, grouped by agenda item — each links to a searchable text page and the village's original PDF. Full meeting record with summaries →
Approval of Minutes - Draft Minutes August 25, 2026
Old Business — Referral from Village Board of Trustees to review correspondence from the Metropolitan Transportation Authority (MTA) for a Local Waterfront Revitalization Program (LWRP) Consistency review for the MNR Harmon to Poughkeepsie Signal System Upgrade Project
- Civil Site Plan Drawings
- Erosion Control Detail Drawings
- Grading Drawings
- Location Plan Drawing
- MTA Signal Upgrade LWRP
- MTA Signal Upgrade Resolution
- Platform Foundation Drawings
- Responses.docx
- Signal Equipment Information.png
- Snowmelter Drawings
- Typ Conduit Trough Install Detail Drawings
- Typ Structure Install Detail Drawings
- Typical Case.JPG
- Typical Hut 10 x 20 .jpg
- Typical Hut 10 x 40 .jpg
More from Waterfront Advisory Committee