Croton’s Water Control Commission will consider Westchester County’s request to renew the wetlands permit for replacing Quaker Bridge over the Croton River on Tuesday, Nov. 24. The posted agenda lists a 7 p.m. meeting in the Georgianna Grant Public Meeting Room at 1 Van Wyck Street. The Village calendar confirms the time. The existing permit was issued Aug. 26, 2025. The renewal application gives the existing expiration as Dec. 31, 2026 and requests an extension through Dec. 31, 2027, the county’s stated construction completion date. The county says construction is underway and the permanent bridge, roadway, drainage and restoration plans are substantially unchanged. The application describes temporary construction changes the contractor has made or proposed. They include a soil nail wall for excavation support on the Cortlandt side and sheeting to limit excavation around the bridge supports. The county says it expects no additional permanent impacts from those changes. The existing permit requires inspections of erosion and sediment controls and repair of construction damage to Quaker Bridge Road and Niles Road. This preview is based on the posted agenda and permit documents.