Water Control Commission
Croton to weigh wetlands permit renewal for Quaker Bridge replacement
Nov 24, 2026
Meeting Agenda 4 items ▼
-
▶CALL TO ORDER at 7:00 p.m.
-
▶NEW BUSINESS
-
•Hugh Greechan, Jr.. P.E, Commissioner of Westchester County Department of Public Works & Transportation, has applied to the Water Control Commission of the Village of Croton-on-Hudson for the renewal of Wetlands Activity Permit #20250002 originally issued on August 26, 2025 for the proposed complete replacement of the existing Quaker Bridge over the Croton River.📄 QBR Wetlands Activity Permit App and Supporting Docs 2025.pdf 📄 QBRB Wetlands 227 Finding Statement.pdf 📄 QBRB Chapter 230 Finding Statement.pdf 📄 QBR_Village_LWRP_Letter.pdf 📄 QBR-Coastal assessment 7.25.2025.pdf 📄 QBR_CAF 7.10.2025.pdf 📄 PB Quaker Bridge Tree Removal Resolution.pdf 📄 Wetland Activity Permit _2025002 with 8.25.25 Final Resolution.pdf 📄 11.24.26 Quaker Bridge Replacement Application.pdf
-
-
▶APPROVAL OF MINUTES
-
•Minutes of May 18, 2026
-
-
▶ADJOURNMENT
Key Actions & Decisions
- ◆ Consider the county’s request to renew the Quaker Bridge wetlands permit.
Croton’s Water Control Commission will consider Westchester County’s request to renew the wetlands permit for replacing Quaker Bridge over the Croton River on Tuesday, Nov. 24. The posted agenda lists a 7 p.m. meeting in the Georgianna Grant Public Meeting Room at 1 Van Wyck Street. The Village calendar confirms the time.
The existing permit was issued Aug. 26, 2025. The renewal application gives the existing expiration as Dec. 31, 2026 and requests an extension through Dec. 31, 2027, the county’s stated construction completion date.
The county says construction is underway and the permanent bridge, roadway, drainage and restoration plans are substantially unchanged. The application describes temporary construction changes the contractor has made or proposed. They include a soil nail wall for excavation support on the Cortlandt side and sheeting to limit excavation around the bridge supports. The county says it expects no additional permanent impacts from those changes.
The existing permit requires inspections of erosion and sediment controls and repair of construction damage to Quaker Bridge Road and Niles Road.
This preview is based on the posted agenda and permit documents.
Meeting Documents (10)
Meeting documents and agenda items, grouped by agenda item — each links to a searchable text page and its original source. Full meeting record with summaries →
APPROVAL OF MINUTES — Minutes of May 18, 2026
NEW BUSINESS — Hugh Greechan, Jr.. P.E, Commissioner of Westchester County Department of Public Works & Transportation, has applied to the Water Control Commission of the Village of Croton-on-Hudson for the renewal of Wetlands Activity Permit #20250002 originally issued on August 26, 2025 for the proposed complete replacement of the existing Quaker Bridge over the Croton River.
- 11.24.26 Quaker Bridge Replacement Application
- PB Quaker Bridge Tree Removal Resolution
- QBR Wetlands Activity Permit App and Supporting Docs 2025
- QBR-Coastal assessment 7.25.2025
- QBRB Chapter 230 Finding Statement
- QBRB Wetlands 227 Finding Statement
- QBR CAF 7.10.2025
- QBR Village LWRP Letter
- Wetland Activity Permit 2025002 with 8.25.25 Final Resolution
More from Water Control Commission