🌿 Sustainability Committee
Croton races a shrinking state incentive to revive its battery storage plan
Croton's Sustainability Committee is racing a state incentive that already fell from $175 to $125 per stored kWh to revive a 5 MW battery storage project at Municipal Place, after developer Luminace stepped back from building it. The committee also completed a renewable diesel pilot with a projected municipal carbon-footprint reduction of about 12.5% and moved 18 train-station EV chargers toward a March construction start.
How this was made — Minutes report
◯ Written meeting record
✓ Minutes review recorded
◯ AI review is not human approval
An AI-assisted report based on the official meeting record identified with the article.
Published under the editorial responsibility of
Matthew Broudy,
who is accountable for every article on this site.
The race is on to keep Croton's second battery storage project alive before state incentives erode any further.
This account is based on the Sustainability Committee’s January 18 official minutes and their attached reports; croton.news had no reporter present. Project schedules, expected savings and state-program developments below reflect what was reported then.
At its Jan. 18 meeting, held by Zoom, the Sustainability Committee learned that Luminace — the developer behind a half-sized battery energy storage system (BESS) proposed for the Municipal Place facility — has shifted course and now prefers acquiring existing storage projects to building new ones, according to the minutes. The news came six weeks after the committee reviewed the scaled-down proposal at its Dec. 7 meeting.
The committee's answer: issue a request for proposals to other BESS developers based on the existing design, a move now under discussion. The minutes thank committee member Carly Shanks for her help building a bidder list.
The minutes describe the incentive urgency: “Expeditious pursuit of another BESS lease in Croton is imperative: last March, the commercial BESS incentive dropped from $175 per stored kWh to $125.” They say lower incentives mean lower lease rent and describe the remaining funding as limited and first-come, first-served.
To restore the project to its originally proposed 5 MW size, the committee is also eyeing the village salt shed. Relocating it — so the space could temporarily hold the seasonal yard waste now stored at Municipal Place — would open more room at the facility for batteries. The shed's current site itself can't host a BESS because it is not near a power line with hosting capacity. Deputy Mayor Len Simon agreed to accelerate the relocation discussion with village officials before the committee's next meeting.
Chair Lindsay Audin offered a glimpse of the regional field after attending two battery-storage events the previous week hosted by New Yorkers for Clean Power. The main presenter was Jeff Seidman, a Vassar College associate professor of environmental studies. The main takeaway: many communities have little experience with their storage options; more than 1 GW of projects, ranging from 42 to 420 MW each, have already been proposed in the downstate region.
There was money news as well: a recent state Public Service Commission proceeding indicated that the Clean Energy Community program that brought Croton more than $700K in NYSERDA grants — suspended in November 2024 — will be restored this year, funded through the Regional Greenhouse Gas Initiative during a four-year transition as it merges with the state's Climate Smart Community program. Details on how and when are awaited.
Coverage of the Sustainability Committee meeting on 2026-01-18, Village of Croton-on-Hudson, NY. View original document ↗
Written by Matthew Broudy, publisher & responsible editor, croton.news. Read our editorial policy.
Community Discussion
Be the first to comment on this story.
Sent to the editor for review
This is what you asked us to forward to the Village Board:
An editor reads it first. Once it goes, your comment here will show a ✓ Forwarded to the Village Board mark — that is your confirmation.