Croton nets $4,000 in first-of-county streetlight solar deal
The Sustainability Committee announced that Croton became the first Westchester municipality to enroll streetlight accounts in community solar, securing $4,000 in immediate credits and saving the village approximately $3,000 annually. The committee also reported that an 18-port EV charging station contract at the train station has been signed, with installation planned for sections east of canopy #3 along Veterans Plaza.
●Public Comments: None (noting that invited guest Jessa Mittleman, a recent resident, did not attend).
●Reports:
●EV/EVSE/Renewable Diesel: The contract with Plug-In Stations Online (PISO) to install 18 EV charge ports at the train station was signed 11/18/25; planning is underway for sections D and E (east of canopy #3 along the west side of Veterans Plaza), featuring upgraded theft-resistant cables due to rising copper thefts. The Project MOVER e-Bike program recorded 1,088 rides between July 9 and October 31; it goes into hibernation on December 19 and will restart in early April with 2 new hubs (totaling 8). The NYSERDA grant expires in 2027, with future funding potentially coming from fee changes and hub advertising. The Renewable Diesel pilot test is running smoothly and will conclude in January, transitioning all village diesel trucks to RD.
●Solar Projects: Train station solar canopy and BESS commissioning is expected by the end of December. Sol is installing bollards to protect downspouts from commuter vehicles and adding shrouds to photocells at canopy #2 to block stray light from train yard lamps. The DPW solar canopy was re-bid on 11/20/25 (bids due 12/8/25), drawing two additional vendors to a 12/1 site meeting.
●Building Electrification: Gov. Hochul suspended the state's new all-electric building code on 11/13/25 pending an appeals court decision. If reinstated, it will initially ban fossil-fuel systems in new buildings under 7 stories and less than 100,000 SF, expanding to all new buildings in 2029.
●Food Scrap Recycling: The old shed was moved 11/29/25 to Lot G (far south end of train station parking lot by the salt shed). The new shed arrived 11/10/25; DPW fixed doors and added a ramp. The program plans to expand to more households in January.
●Funding and Budgeting: A revised proposal from Luminace for a smaller BESS behind the Municipal Place facility (halved to accommodate DPW) offers about half the previous leasing rent and is under village review. Exploring the state DOT-owned wooded strip northwest of the facility between Rt. 9 and South Riverside Ave was deemed unlikely to succeed. Moving the salt shed to make room for the original BESS design was scrapped after finding the adjacent power line lacks hosting capacity. After an 18-month effort, NYPA enrolled Croton's streetlight accounts into community solar (11/25/25), applying ~$4,000 in accrued credits to zero out the Nov. Muni Bldg bill, ~$1,000 against the Dec. bill, and yielding ~$3,000 in annual savings.
●Outreach: Croton100's next quilt will feature the EV chargers and e-bike program. Sustainable Westchester pledged at the Clinton Global Initiative to add rooftop solar to 30,000 homes and canopies to 300 parking lots in the county by 2030.
●Administrative: Members must complete annual NYS-mandated Workplace Violence and Sexual Harassment training (contact pdisanto@crotononhudson-ny.gov for password resets). The committee's next meeting is Sunday, Jan. 18, 2026, at 10:00 AM via Zoom following a winter recess.
Croton has officially become the first municipality in Westchester County to leverage its streetlight accounts for community solar savings, netting the village $4,000 in immediate credits and an estimated $3,000 in annual ongoing savings.
The hard-fought victory, which took 18 months to finalize with the New York Power Authority (NYPA), was a highlight of the Sustainability Committee’s final meeting of the year on December 7. NYPA applied the accrued credits to the Municipal Building account, completely zeroing out November’s electric bill and knocking $1,000 off December’s tab.
“Croton is (so far) the only Westchester muni to secure such financial credits via its street lighting accounts,” the committee noted in its minutes.
The meeting also brought updates on the village’s expanding EV infrastructure. A contract with Plug-In Stations Online (PISO) was signed on November 18 to install 18 EV charging ports at the train station. Installation will focus on sections D and E, located east of canopy #3 along the west side of Veterans Plaza. Because of a recent spike in copper thefts driven by higher commodity prices, the chargers will be equipped with newly available theft-resistant power cables.
Meanwhile, the village’s e-bike sharing program is heading into hibernation on December 19 after a highly successful debut. Between July 9 and October 31, residents initiated 1,088 rides. When the program wakes back up in early April, it will expand from six to eight hubs. While Sleepy Hollow is testing winter riding to gauge cold-weather demand, Croton’s program will rest. The current NYSERDA grant funding the six-town initiative expires in 2027, prompting officials to consider fee adjustments and hub advertising to sustain it long-term.
On the solar front, the long-awaited commissioning of the train station solar canopies and Battery Energy Storage System (BESS) is slated for completion by the end of December. However, plans for a second, larger BESS behind the Municipal Place facility hit a snag. A revised proposal from developer Luminace—scaled down by half to accommodate ongoing DPW operations—offers roughly half the original leasing revenue and is currently under review by village officials. Exploring an alternate site by purchasing a narrow strip of state DOT land near Route 9 was dismissed by Mayor Brian Pugh, who noted past problematic dealings with the agency. A subsequent review of moving the salt shed to make room for the original BESS also fell through after discovering the adjacent power line lacks sufficient hosting capacity.
Residents looking to participate in the Food Scrap Recycling program should note that the new shed is now operational, and the program is expanding to more households this January. The Sustainability Committee will reconvene via Zoom on Sunday, January 18, 2026, at 10:00 AM.
Share
Community Discussion
0 comments
One email per new comment on this story. You'll confirm by email first; unsubscribe any time. Your address is never shown publicly.
Be the first to comment on this story.
Sent to the editor for review
This is what you asked us to forward to the Village Board:
An editor reads it first. Once it goes, your comment here
will show a ✓ Forwarded to the Village Board mark —
that is your confirmation.
Coverage of the Sustainability Committee meeting on 2025-12-07,
Village of Croton-on-Hudson, NY.
View original document ↗
●Trustee Len Simon reported that Westchester Power would end its Community Choice Aggregation program on November 30, 2025.
●A proposal offered $172,000 a year plus a 2% escalator for a roughly 5-megawatt battery system at Municipal Place; the committee recommended staff review and competing offers.
●The DPW solar canopy was to be rebid after a contractor’s paperwork failure cost about $9,000 in incentives.
●The train-station charging project had a spring completion goal, and the renewable-diesel test had added two vehicles.
Croton races a shrinking state incentive to revive its battery storage plan
●Revive the 5 MW Municipal Place battery storage project — new RFP under discussion — after developer Luminace shifted to acquiring existing projects; Deputy Mayor Len Simon to accelerate salt-shed relocation talks with village officials
●Complete the three-month renewable diesel pilot: RD now fuels all 18 municipal diesel vehicles, cutting the municipal carbon footprint about 12.5%
●Advance the 18-port train-station EV charger project toward early-March excavation; hold the ~60 kW DPW solar canopy award pending paperwork from preferred bidder Rivertowns
Committee explores battery-storage lease as a source of climate-project funding
●A preliminary battery-storage concept at Pumphouse Road was discussed as a possible source of roughly $100,000 in annual rent; no lease approval was recorded.
●The contract for 18 train-station EV charging ports remained in progress, with construction then expected in November.
●Paperwork issues were delaying the DPW solar-canopy award.
●A larger food-scrap shed had been ordered, with supplies planned to support 20 to 25 additional families.
Croton's diesel fleet goes fully renewable, cutting 186 tons of CO2 a year
●Confirmed all 18 village diesel vehicles now run on renewable diesel, cutting 186 metric tons of CO2 annually — 12.5% of the village carbon footprint — at no taxpayer cost
●Reported the roughly $300K, grant-funded DPW solar canopy stalled again over contractor paperwork; the contract remains unsigned with a Labor Day completion goal
●BESS 2.0 battery storage at Municipal Place back on track after Luminace accepted the village's easement change request on Jan. 27
●Food scrap recycling to open to all residents; two new collection toters delivered Feb. 19
●Set a March 22 meeting featuring new resident Corey Cummings' report on balcony solar systems
Sustainability committee reviews EV-charger plans and proposed food-scrap expansion
●Train station solar canopies: third-party commissioning due by the end of March; Con Ed permission to operate expected in early April
●Train station EV chargers: power will not be available until Nov. 25, 2026, per a Con Ed update included in the minutes; non-utility work can proceed
●DPW solar canopy: roughly $300K project covered by a state grant targets Labor Day completion; a NY-SUN incentive of about $39K still needs to be locked in
●Food scrap recycling formally opened to all Croton residents on March 19
●Committee to pursue one of three $60K Clean Energy Communities grants as the state program returns this spring
●Proposed 5 MW battery storage developer to act first as a consultant under a not-to-exceed fee; chair Lindsay Audin and Village Manager Bryan Healy to convert the letter of intent into a consulting agreement
Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.AI-assisted experimental site — may contain errors. Corrections
Community Discussion
Be the first to comment on this story.
Sent to the editor for review
This is what you asked us to forward to the Village Board:
An editor reads it first. Once it goes, your comment here will show a ✓ Forwarded to the Village Board mark — that is your confirmation.