MTA Signal Upgrade Resolution
resolution
1 page
From the meeting:
Board Of Trustees — 2026-09-30
· our coverage →
Agenda item: LWRP Consistency Review for the MTA Signal Project along the Metro-North Railroad Hudson Line.
Resolution, 1 page. Attached to agenda item: “LWRP Consistency Review for the MTA Signal Project along the Metro-North Railroad Hudson Line.”
Retrieved 2026-09-29 from the village's meeting portal.
View the original file ↗
Also attached to this agenda item:
Civil Site Plan Drawings
Erosion Control Detail Drawings
Grading Drawings
LWRP MTA Signal System Upgrade
Location Plan Drawing
MTA Signal Upgrade LWRP
Memo to VB MTA Signal Upgrade Project
Platform Foundation Drawings
Resolution 227-2026 LWRP MNR Signal Upgrade
Responses
Signal Equipment Information.png
Snowmelter Drawings
Extracted text
On motion of TRUSTEE SIMON, seconded by TRUSTEE NICHOLSON, the
following resolution was adopted by the Board of Trustees of the Village of Croton-on-
Hudson, New York with a 5-0 vote.
Resolution #179-2026
NOW THEREFORE BE IT RESOLVED: that the Village Board of Trustees hereby
undertakes the following actions:
1. Approving the request to hold the Hudson Valley Gateway Chamber of
Commerce scarecrow contest during fall 2026.
2. Refer the consistency review request from MTA Metro-North Railroad to the
Waterfront Advisory Committee for their review and comment.
3. Filing for the record the 2025 Energy Benchmarking Report, the letter from
Westchester County Department of Senior Programs and Services for the
Senior Citizens Hall of Fame and the letter from AAA Northeast announcing
the 2026 Gold Award for the Village of Croton-on-Hudson in the AAA
Community Traffic Safety Awards Program.
Dated: August 19, 2026
Machine-extracted for search and reference — the original file is the authoritative version.