Location Plan Drawing
map survey
1 page
From the meeting:
Board Of Trustees — 2026-09-30
· our coverage →
Agenda item: LWRP Consistency Review for the MTA Signal Project along the Metro-North Railroad Hudson Line.
Map / plans, 1 page. Attached to agenda item: “LWRP Consistency Review for the MTA Signal Project along the Metro-North Railroad Hudson Line.”
Retrieved 2026-09-29 from the village's meeting portal.
View the original file ↗
Also attached to this agenda item:
Civil Site Plan Drawings
Erosion Control Detail Drawings
Grading Drawings
LWRP MTA Signal System Upgrade
MTA Signal Upgrade LWRP
MTA Signal Upgrade Resolution
Memo to VB MTA Signal Upgrade Project
Platform Foundation Drawings
Resolution 227-2026 LWRP MNR Signal Upgrade
Responses
Signal Equipment Information.png
Snowmelter Drawings
Extracted text
33
34
N
36
37
35
N
0
500'
250'
500'
1000'
1" = 500'
OF
DATE:
SCALE:
DRAWING NUMBER
SHEET
CONTRACT NUMBER
DRAWN
CHECKED
APPROVED
DESIGNED
CHKD.
DRAWN
DATE
REVISIONS
NO.
APPRVD.
MODIFICATION
IT IS A VIOLATION OF THE
PROFESSIONAL LICENSE LAW FOR ANY
PERSON TO ALTER THIS DRAWING IN
ANY WAY, UNLESS ACTING UNDER THE
DIRECTION OF A LICENSED
PROFESSIONAL ENGINEER/ARCHITECT
AS APPLICABLE. THE ALTERING
ENGINEER/ARCHITECT SHALL AFFIX
HIS/HER SEAL AND THE NOTATION
"ALTERED BY" FOLLOWED BY HIS/HER
SIGNATURE AND DATE OF ALTERATION.
DISCLAIMER
CHKD.
DRAWN
DATE
REVISIONS
NO.
APPRVD.
MODIFICATION
Metro-North Railroad
347 MADISON AVENUE
NEW YORK, N.Y. 10017
GENERAL SHEETS
LOCATION PLAN
SHEET 1 OF 9
AS SHOWN
GEN-101
6
G.E.
J.L.B.
G.E.
A.E.M.
c:\pwworking\gfpw01\rboutin\d1137438\GEN-101.dwg
10/19/2022 5:33:13 PM by BOUTIN, RYAN E.
11/3/2022
HUDSON LINE C&S IMPROVEMENTS
EQUIPMENT INSTALLATIONS
39462
95% SUBMISSION
11/04/2022
610
MP-32 TO MP-76
Machine-extracted for search and reference — the original file is the authoritative version.