croton.news
Independent, AI-assisted local reporting from public records
Croton-on-Hudson, New York · Tuesday, September 29, 2026· Sep 29, 2026
Source-linked•Corrections welcomed
Documents › Board Of Trustees, 2026-09-30

MTA Signal Upgrade LWRP

document 42 pages Scanned/OCR — text may contain errors
From the meeting: Board Of Trustees — 2026-09-30 · our coverage →
Agenda item: LWRP Consistency Review for the MTA Signal Project along the Metro-North Railroad Hudson Line.
Document, 42 pages. Attached to agenda item: “LWRP Consistency Review for the MTA Signal Project along the Metro-North Railroad Hudson Line.” (Text recovered by OCR — may contain errors.)
Retrieved 2026-09-29 from the village's meeting portal. View the original file ↗
Also attached to this agenda item: Civil Site Plan Drawings Erosion Control Detail Drawings Grading Drawings LWRP MTA Signal System Upgrade Location Plan Drawing MTA Signal Upgrade Resolution Memo to VB MTA Signal Upgrade Project Platform Foundation Drawings Resolution 227-2026 LWRP MNR Signal Upgrade Responses Signal Equipment Information.png Snowmelter Drawings
July 21, 2026 Village of Croton-on-Hudson Waterfront Advisory Committee 1 Van Wyck Street Croton-on-Hudson, NY 10520 RE: Hudson Line, Croton-Harmon to Poughkeepsie Signal System Phase II Dear Sir/Madam: Metropolitan Transportation Authority (MTA) Construction & Development (C&D) is currently in the design stages of the MNR Harmon to Poughkeepsie Signal System Upgrade Project (the “Project”), which aims to upgrade and replace signal and communications equipment along the northern portion of the MNR Hudson Line. Once complete, the Project will improve reliability and enable increased capacity for trains running between the Croton-Harmon and Poughkeepsie stations. The proposed project will install and upgrade signal equipment along the right-of-way (ROW) spanning the 43-mile stretch between Croton-Harmon and Poughkeepsie. At this time, MTA had requested a Local Waterfront Revitalization Program (LWRP) review from the Village of Croton-on-Hudson in connection with a Determination of Significance under the State Environmental Quality Review Act (SEQRA). The Project is located within the Coastal Area Boundary of the Hudson River, and a portion is subject to the Village of Croton-on-Hudson’s LWRP. Dewberry Engineers Inc. (Dewberry) conducted a review of the Project’s consistency with applicable Village of Croton-on-Hudson’s LWRP policies. As described in the attached materials, the Project is consistent with these policies. Please feel free to contact me at conor.devaney@mtacd.org if you have comments or questions. Sincerely, Conor Devaney MTA/MNR Project Manager 525 North Broadway White Plains, NY 10603 347-480-0078 cc: L. Marinescu, MTA C&D, S. Gianazza, MNR Attachments: Coastal Assessment Form Coastal Consistency Assessment Figure – Coastal Area, Significant Coastal Fish & Wildlife Habitats, and LWRPs Project Plans 1 Village of Croton-on-Hudson COASTAL ASSESSMENT FORM A. INSTRUCTIONS (Please print or type all answers) 1. Applicants, or in the case of direct actions (city, town, village) agencies, shall complete this CAF for proposed actions which are subject to the consistency review law. This assessment is intended to supplement other information used by a (city, town, village) agency in making a determination of consistency. 2. Before answering the questions in Section C, the preparer of this form should review the policies and explanations of policy contained in the Local Waterfront Revitalization Program (LWRP), a copy of which is on file in the (city, town, village) clerk's office. A proposed action should be evaluated as to its significant beneficial and adverse effects upon the coastal area. 3. If any question in Section C on this form is answered "yes", then the proposed action may affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, the action should be analyzed in more detail and, if necessary, modified prior to making a determination that it is consistent to the maximum extent practicable with the LWRP policy standards and conditions. If an action cannot be certified as consistent with the LWRP policy standards and conditions, it shall not be undertaken. B. DESCRIPTION OF SITE AND PROPOSED ACTION: 1. Type of (city, town, village) agency action (check appropriate response): a) Directly undertaken (e.g. capital construction, planning activity, agency regulation, land transaction) _____________________________________________ b) Financial assistance (e.g. grant, loan, subsidy) ______________________________ c) Permit, approval, license, certification _____________________________________ d) Agency undertaking action ______________________________________________ 2. Describe nature and extent of action: _________________________________________ 3. Location of actions: _______________________________________________________ (street or site description) 4. Size of site: _____________________________________________________________ 5. Present land use: _________________________________________________________ 6. Present zoning classification: _______________________________________________ Construction Metropolitan Transportation Authority/Metro-North Railroad Metropolitan Transportation Authority Construction & Development (MTA C&D) and Metro-North Railroad (MNR) are proposing to implement a Signal Systems Project (the Project), which would replace the existing signal system with a high-capacity vital cab signaling system between Croton-Harmon and Poughkeepsie. The proposed work within the Croton-on-Harmon LWRP area is shown in the attached plans. Various locations along the Railroad Right-of-Way (ROW) 43-mile corridor in total, less than 1 acre within Croton-on-Hudson Railroad N/A 2 7. List and describe any unique or unusual land forms within or contiguous to the project site (i.e. bluffs, dunes, swales, ground depressions, other geological formations): 8. Percent of site which contains slopes of 15% or greater: __________________________ 9. List and describe streams, lakes, ponds or wetlands existing within or contiguous to the project area. Give name and size of each if available: a) Name: ____________________________________________________________ b) Size (in acres):______________________________________________________ 10. If an application for the proposed action has been filed with the (city, town, village) agency, the following information shall be provided: a) Name of applicant: _______________________________________________ b) Mailing address: _________________________________________________ c) Telephone number: (area code) (______) _____________________________ d) Application number, if any: ________________________________________ 11. Will the action be directly undertaken, require funding or approval by a state or federal agency? NO _______ YES ______ If yes, which state or federal agency? ___________________________ 12. If the proposed action is a law, or planning or zoning document, SKIP Section “C” and go to Section “E”. C. COASTAL ASSESSMENT: YES NO N/A 1. Will the proposed action be located in, or contiguous to, or have a potentially adverse effect upon any of the resource areas identified on the coastal area map: _____ _____ _____ a) Significant fish or wildlife habitats? _____ _____ _____ b) Scenic resources of local or statewide significance? _____ _____ _____ c) Natural protective features in an erosion hazard area? _____ _____ _____ If the answer to any question above is "yes", please explain in Section D any measures which will be undertaken to mitigate any adverse effects. Wetlands associated with the Hudson River 20% Hudson River wetlands Various throughout project corridor X MTA/MNR X X X X 3 YES NO N/A 2. Will the proposed action have a significant effect upon: a) Commercial or recreational use of fish and wildlife resources? _____ _____ _____ b) Scenic quality of the coastal environment? _____ _____ _____ c) Development of future or existing water dependent uses? _____ _____ _____ d) Operation of the State's major ports? _____ _____ _____ e) Land or water uses within a small harbor area? _____ _____ _____ f) Stability of the shoreline? _____ _____ _____ g) Surface or groundwater quality? _____ _____ _____ h) Existing or potential public recreation opportunities? _____ _____ _____ i) Structures, sites or districts of historic, archeological or cultural significance to the (city, town, village), State or nation? _____ _____ _____ 3. Will the proposed action involve or result in any of the following: a) Physical alteration of land along the shoreline, land under water or coastal waters? _____ _____ _____ b) Physical alteration of two (2) acres or more of land located elsewhere in the coastal area? _____ _____ _____ c) Expansion of existing public services or infrastructure in undeveloped or low density areas of the coastal area? _____ _____ _____ d) Energy facility not subject to Article VII or VIII of the Public Service Law? _____ _____ _____ e) Mining, excavation, filling or dredging in coastal waters? _____ _____ _____ f) Reduction of existing or potential public access to or along the shore? _____ _____ _____ g) Sale or change in use of publicly-owned lands located on shoreline or under water? _____ _____ _____ h) Development within a designated flood or erosion hazard area? _____ _____ _____ i) Development on a beach, dune, barrier island or other natural feature that provides protection against flooding or erosion? _____ _____ _____ j) Construction or reconstruction of erosion protective structures? _____ _____ _____ k) Diminished surface or groundwater quality? _____ _____ _____ l) Removal of ground cover from the site? _____ _____ _____ X X X X X X X X X X X X X X X X X X X X X 4 4. Project YES NO N/A a) If project is to be located adjacent to shore: 1. Will water-related recreation be provided? _____ _____ _____ 2. Will public access to the foreshore be provided? _____ _____ _____ 3. Does the project require a waterfront site? _____ _____ _____ 4. Does it supplant a recreational or maritime use? _____ _____ _____ 5. Do essential public services and facilities presently exist at or near the site? _____ _____ _____ 6. Is it located in a flood prone area? _____ _____ _____ 7. Is it located in an area of high erosion? _____ _____ _____ b) If the project site is publicly owned: 1. Will the project protect, maintain and/or increase the level and industrial facilities into coastal facilities? _____ _____ _____ 2. If located in the foreshore, will access to those and adjacent lands be provided? _____ _____ _____ 3. Will it involve the siting and construction of major energy facilities? _____ _____ _____ 4. Will it involve the discharge of effluent from major steam electric generating and industrial facilities into coastal facilities? _____ _____ _____ c) Is the project site presently used by the community neighborhood as an open space or recreation area? _____ _____ _____ d) Does the present site offer or include scenic views or vistas known to be important to the community? _____ _____ _____ e) Is the project site presently used for commercial fishing or fish processing? _____ _____ _____ f) Will the surface area of any waterways or wetland area be increased or decreased by the proposals? _____ _____ _____ g) Does any mature forest (over 100 years old) or other locally important vegetation exist on this site which will be removed by the project? _____ _____ _____ h) Will the project involve any waste discharges into coastal waters? _____ _____ _____ i) Does the project involve surface or subsurface liquid waste disposal? _____ _____ _____ j) Does the project involve transport, storage, treatment or disposal of solid waste or hazardous materials? _____ _____ _____ k) Does the project involve shipment or storage of petroleum products? _____ _____ _____ X X X X X X X X X X X X X X X X X X X X 5 4. Project (continued) YES NO N/A l) Does the project involve discharge of toxic hazardous substances or other pollutants into coastal waters? _____ _____ _____ m) Does the project involve or change existing ice management practices? _____ _____ _____ n) Will the project affect any area designated as a tidal or freshwater wetland? _____ _____ _____ o) Will the project alter drainage flow, patterns or surface water runoff on or from the site? _____ _____ _____ p) Will best management practices be utilized to control storm water runoff into coastal waters? _____ _____ _____ q) Will the project utilize or affect the quality or quantity of sole source or surface water supplies? _____ _____ _____ r) Will the project cause emissions which exceed federal or state air quality standards or generate significant amounts of nitrates or sulfates? _____ _____ _____ D. REMARKS OR ADDITIONAL INFORMATION. For questions answered “yes” in Section C, explain methods you will undertake to reduce adverse effects. Review the LWRP to see if the project is consistent with each policy. List policies the project is not consistent with and explain all mitigating actions. (Add any additional sheets necessary to complete this form) X X X X X X X Please see attached supplemental responses. 6 E. SUBMISSION REQUIREMENTS. The final version of this form shall be sent to the Department of State (New York State Dept. of State, Coastal Management Program, 162 Washington Avenue, Albany, NY 12231) if any question in Section C is answered “yes” and either of the following conditions is met.  Section B.1 (a) or B.1 (b) is checked OR  Section B.1 (c) and B.11 is answered “yes” ================================================================== If assistance or further information is needed to complete this form, please contact the Village Engineer at (914) 271-4783. Preparer’s Name: _______________________________________________________________ Title: _________________________________________________________________________ Agency: ______________________________________________________________________ Telephone No.: (____) _________________ E-mail: __________________________________ Date: ___________________________ Annie Boggs Senior Planner at Dewberry On Behalf of MTA/MNR 646 551-4315 06/17/2026 acboggs@dewberry.com Croton-on-Hudson LWRP June 2026 1 MTA Task Order 11: Hudson Line Signal Improvements Croton-Harmon to Poughkeepsie Signal System II Project Westchester, Putnam, and Dutchess Counties Croton-on-Hudson Local Waterfront Revitalization Program (LWRP) Metropolitan Transportation Authority Construction & Development (MTA C&D) and Metro- North Railroad (MNR) are proposing to implement a Signal Systems Project (the Project), which would involve replacing the existing signal system with a high-capacity vital cab signaling system with centralized traffic control (CTC) between Croton-Harmon and Poughkeepsie, encompassing approximately 43 miles (the Project site or Project corridor). The Project involves performing improvements at 148 locations within the existing railroad right-of-way (ROW), with some locations requiring temporary or permanent easements. Work would be performed within Westchester, Putnam, and Dutchess Counties. A portion of the project site would be located within the Village of Croton-on-Hudson and is subject to its LWRP, as shown in Figure 7A. An assessment of the Project’s consistency with the applicable policies of the LWRP is provided below. As described below, the Project is consistent with LWRP policies. Figures 7A-7D show the Coastal Area Boundary, Significant Coastal Fish & Wildlife Habitats, and LWRPs throughout the Project corridor. Project plans showing the proposed work within Croton-on-Hudson are attached. Policy 1: Restore, revitalize, and redevelop deteriorated and underutilized waterfront areas for commercial, industrial, cultural, recreational and other compatible uses. Policy 1A: Encourage integrated development of Village property to assure fulfillment of requirements relating to parking and accessory uses of Metro-North train station, while facilitating public access to the bay area and recreational use. Policy 1B: Encourage restoration of deteriorating structures related to railroad use and assure appropriate maintenance and screening to reduce visual impact. The Village-owned land adjacent to the parking lots at the Croton-Harmon MNR station is an important recreational resource for the Village. The Project would not affect this resource, and it would not affect the public’s access to the bay area. Additionally, the Project directly supports Policy 1B by updating the components of the MNR signal system, which has reached its useful life and is in need of replacement to ensure continued reliable service in the future. The Project would not add any additional visual intrusions to the viewsheds of the Hudson River from the Village. Thus, the Project is consistent with Policies 1, 1A, and 1B. Policy 7: Significant coastal fish and wildlife habitats will be protected, preserved, and, where practical, restored so as to maintain their viability as habitats. Croton-on-Hudson LWRP June 2026 2 Policy 7A: The quality of the Croton River and Bay Significant Coastal Fish and Wildlife Habitat and Haverstraw Bay Significant Fish and Wildlife Habitat shall be protected and improved for conservation, economic, aesthetic, recreational, and other public uses and values. Its resources shall be protected from the threat of pollution, misuse, and mismanagement. Policy 7B: Materials that can degrade water quality and degrade or destroy the ecological system of the Croton River and Bay Significant Fish and Wildlife Habitat and the Haverstraw Bay Significant Fish and Wildlife Habitat shall not be disposed of or allowed to drain in, or on land within, the area of influence in the significant fish and wildlife habitats. Policy 7C: Storage of materials that can degrade water quality and degrade or destroy the ecological system of the Croton River and Bay Significant Fish and Wildlife Habitat or Haverstraw Bay Significant Fish and Wildlife Habitat shall not be permitted within the area of influence of the habitat unless best available technology is used to prevent adverse impacts to the habitat. Policy 7D: Restoration of degraded ecological elements of the Croton River and Bay and Haverstraw Bay Significant Fish and Wildlife Habitats and shorelands shall be included in any programs for cleanup of any adjacent toxic and hazardous waste sites. Policy 7E: Runoff from public and private parking lots and from storm sewer overflows shall be effectively managed so as to prevent oil, grease, and other contaminants from polluting surface and ground water and impact to the significant fish and wildlife habitats. Policy 7F: Construction activity of any kind must not cause a measurable increase in erosion or flooding at the site of such activity, or impact other locations. Construction activity in the Croton River and Hudson River spawning areas shall be timed so that spawning of anadromous fish species and shellfish will not be adversely affected. Policy 7G: Construction activity of any kind must not cause significant degradation of water quality or impact identified significant fish and wildlife habitats. The proposed work within the Village of Croton-on-Hudson will include the installation and maintenance of existing and proposed signal equipment and fences at various locations north of, south of, and at the Croton-Harmon MNR Station. Permanent easements and temporary staging areas are required for the proposed work. Work will occur adjacent to the Croton River and Bay and Haverstraw Bay Significant Fish and Wildlife Habitats (Figure 7A). The work will occur within an active rail corridor that is already disturbed, and land disturbance will be minimal. It will require minor in-water work at several locations for the placement of footings for platforms within the Hudson River. Work will adhere to any in-water work restrictions Croton-on-Hudson LWRP June 2026 3 recommended by NYSDEC and USACE.1 Soil erosion and sediment control measures implemented prior to construction, including silt fences, erosion protection matting, inlet sediment control bags, hay bales, filter socks, turbidity curtains, and sediment filter bags, will reduce the amount of sediment entering the Hudson River and nearby wetlands. The proposed work will not impair the viability of either area or affect these habitats by changing their physical, biological, or chemical parameters. Thus, the Project is consistent with Policies 7 and 7A-7G. Policy 8: Protect fish and wildlife resources in the coastal area from the introduction of hazardous wastes and other pollutants which bio-accumulate in the food chain or which cause significant sub-lethal or lethal effect on those resources. This Project will not result in the release of pollutants or hazardous wastes into coastal waters. Soil and construction debris generated as a result of construction activities will be properly managed (e.g., handled, tested, transported, and disposed of) in accordance with all applicable regulations and MTA C&D’s standard waste management practices. Pesticides, herbicides, insecticides, and fertilizers are not anticipated to be used during operation or construction. The chosen contractor will utilize removal methods and containment systems that eliminate or minimize the risk of degradation of natural resources, including turbidity curtains and filter socks. Thus, the Project is consistent with Policy 8. Policy 11: Buildings and other structures will be sited in the coastal area so as to minimize damage to property and the endangering of human lives caused by flooding and erosion. Policy 12: Activities or development in the coastal area will be undertaken so as to minimize damage to natural resources and property from flooding and erosion by protecting natural protective features including beaches, dunes, barrier islands and bluffs. Policy 12A: Every effort should be made to protect Croton Point, a natural protective barrier to Croton Bay from activities or development that would increase erosion of or flooding of the point. Portions of the project corridor within the Village are mapped within a 100-year floodplain (Zone AE or Zone A) and 500-year floodplain. No coastal erosion hazard areas are designated within Croton-on-Hudson. The Project will require very minor in-water work at several locations for the placement of footings for platforms within the Hudson River. Land disturbance will be minimal, and the overall use of the land will remain the same, as an active rail line. Flood and waterproofing measures will be incorporated into the design where appropriate. These efforts will be made to minimize damage to property and damage to natural resources. Work will not occur on Croton 1 Pursuant to PAL Section 1266(11), MTA MNR is not subject to ECL Articles 24 (FWW) and 25 (TW) and pursuant to ECL Section 15-0501(5) is exempt from Protection of Waters permits. If MTA MNR invokes any or all of these exemptions, MTA MNR will still adhere to NYSDEC guidance and standards. Croton-on-Hudson LWRP June 2026 4 Point, and the activities will not increase erosion or flooding. Thus, the Project is consistent with Policies 11, 12 and 12A. Policy 19: Protect, maintain, and increase the level and types of access to public water-related recreation resources and facilities. Policy 19A: Encourage the linkage of open space from upland areas to and along the Hudson and Croton Rivers in the form of a trail or walkway system. Policy 19B: Increase public access to areas that offer physical and visual connection to the Hudson River or Croton River and Bay. Policy 19C: Encourage the improvement of public transportation, when feasible, where water- dependent and water-enhanced recreation activities are located. Policy 19D: Improve and maintain access to Croton River and Bay at the Village-owned Echo Canoe Launch south of the Village parking lots at the Croton-Harmon Station. Policy 20: Access to the publicly owned foreshore and to lands immediately adjacent to the foreshore or the water's edge that are publicly-owned shall be provided and it should be provided in a manner compatible with adjoining uses. The Project improves public transportation by upgrading MNR’s existing signal system, which has reached the end of its useful life. While the Project is not increasing public access, it will maintain the level of access to public water-related recreation resources and facilities in the Village, as well as publicly owned land adjacent to the water’s edge. Existing and future access to these resources will not be reduced or eliminated by the Project, which will maintain access to these resources via safe and reliable MNR service. Access south of the Village parking lots at the Croton-Harmon Station will be maintained. Thus, the Project is consistent with Policies 19, 19A-19D, and 20. Policy 24: Prevent impairment of scenic resources of statewide significance. Policy 25: Protect, restore or enhance natural and manmade resources which are not identified as being of statewide significance, but which contribute to the overall scenic quality of the coastal area. While there are no scenic resources of statewide significance located within Croton-on-Hudson, the Hudson Highlands SASS is located adjacent to the City’s waterfront on the Hudson River. The Project will not affect the beauty of this important scenic resource, reduce identified views to the resource, or diminish the scenic quality of the resource. Further, pursuant to Policy 25, none of the natural or manmade resources in the Village would be affected by the proposed work. None of the proposed signal structures, fences, or signage would reduce identified views or diminish the scenic quality of the coastal area. Thus, the Project is consistent with Policies 24 and 25. Croton-on-Hudson LWRP June 2026 5 Policy 30: Municipal, industrial, and commercial discharge of pollutants, including but not limited to, toxic and hazardous substances, into coastal waters will conform to State and National water quality standards. Policy 30A: Existing rail services and transportation-related facilities shall not dispose of any regulated materials in coastal waters until all such regulated materials have been tested by the State for conformance with water quality standards. The Project will not result in the release of pollutants into coastal waters. Soil and construction debris generated as a result of construction activities will be properly managed (e.g., handled, tested, transported, and disposed of) in accordance with all applicable regulations and MTA C&D’s standard waste management practices. Pesticides, herbicides, insecticides, and fertilizers are not anticipated to be used during operation or construction. Construction materials and equipment will be stored in locations that do not create risks to public health or the environment. Material transport off-site for disposal will be conducted in accordance with Federal, State, and local requirements. This includes properly licensed haulers and trucks, required placarding, approved truck routes, and manifesting. The chosen contractor will utilize removal methods and containment systems that eliminate or minimize the risk of human exposure to contaminants, dust, hazardous materials, and/or debris generated from construction, as well as potential degradation of natural resources, as required. The contractor will also abide by MTA C&D’s waste disposal requirements. Thus, the Project is consistent with Policies 30 and 30A. Policy 35: Dredging and filling in coastal waters and disposal of dredged material will be undertaken in a manner that meets existing State permit requirements, and protects significant fish and wildlife habitats, scenic resources, natural protective features, important agricultural lands, and wetlands. The Project will require minor in-water work at several locations for the placement of footings for platforms within the Hudson River. No dredging is required. The work will be undertaken in a manner that meets existing New York State permitting requirements, including adherence to any in-water work restrictions during construction. Thus, the Project is consistent with Policy 35. Policy 44: Preserve and protect tidal and freshwater wetlands and preserve the benefits derived from these areas. Policy 44A: Wetlands, water bodies and watercourses shall be protected by preventing damage from erosion or siltation, minimizing disturbance, preserving natural habitats and protecting against flood and pollution. Based on use of the NYSDEC Environmental Resource Mapper, the USFWS NWI Mapper, and high- resolution aerial imagery of the Project site, the limited in-water work for the installation of signal platforms and upgrades with the Project work areas is anticipated to have temporary minor impacts to open water areas and wetlands. Soil erosion and sediment control measures will be implemented prior to construction to reduce the amount of sediment entering the Hudson River Croton-on-Hudson LWRP June 2026 6 and nearby wetlands. Permits for in-water work will be obtained from NYSDEC and USACE, and the Project will comply with all permit conditions.2 Thus, the Project is consistent with Policies 44 and 44A. 2 Pursuant to PAL Section 1266(11), MTA-MNR is not subject to ECL Articles 24 (FWW) and 25 (TW) and pursuant to ECL Section 15-0501(5) is exempt from Protection of Waters permits. If MTA-MNR invokes any or all of these exemptions, MTA MNR will still adhere to NYSDEC guidance and standards. @, So YL [~) Beer Mountin 2 Toms Gove (iE San rs eee ae woot 2 @ abe a IONA ISLAND MARSH NN © 8, ASU STINTE DEEL PEELED ts SA eee SS SS EETEE EY ISIE SSSIISsnssessssssscesscccsssessssusassecassnesssssseey WP ESE, EPEEEEEEED) St eee Ch te ve —_— ome ey \ EC EE SK OOS ® u (ON Se ee Se Seo SS SNE iit pepe MANITOUMARSEN SQN SaaS. RS SIIIIIITEESSSSSSL Urbs essai irssssssii i pimpeessscsssssssss Qa ciiiisssss SIIIIIDEDEEDE SQ. RSIIIIIISS yA Mig a EEE Se EEEESESSEESESTETS aco SESSSEESESSESSSESESSTSESESSESSSSSSSSSS (SELTTSESLSSSSSSSSSLLY ASSSTSTSETEISSSEESSESSSSSSESSSSS CSUN PS fhe RHESUS VA SeSEPESTEEESSESESEESESSESEESESSESEESESESSLESESESELSESSEESESSESESELSEES] FELELSSTSTESESSESILY <SSEESEESESEESEESESTESESSESTEEESEE HESSEN SEEN fen NEDSS iNet SUESETLLSSESEESEESESSESSESSEEEESESSELSESSESELSEESSESEESESSTEEOESSESEESEESESELSES SEStEsEsSTECtsey” Cetesetteeteseeeteeestteteseesteeien © DLAC K WI SEE SUNG EEE ff Myo» Stele QCSES ESSSEEEEEESEEEESEEEEEESSEESEEEEECSEEEEEEESEEESEEEEEEESSEESEEEEEESSOEEEEESSOEEEEESEEEEES SittzS=> oc QlSEESSOEEEEEEEEEESSESEESS SC CREESEEESES 6 \_ [Hudson Line Signal Upgrades] /_/ (Agee reece eee eee eee EEC cee ee Project Limit Sf aSeSSOEEEEESSEESSEESSOEEEEESEEEESEESSCEEEEEEEEESSESSEEEEEEEEEESEESSCEEEEESEEEESEESSEEEEOCCoEEESEESEEEEEEESOEEESEESEEEEEEESEED v fs TE NS a Gf feePeEHTGeEETeeEE eee RETESET eee EREEEEREEEE SEES REEL EOeEE SEE REESE / HUDSONHIGHLANDS” Camp Sma Pare ee J Le : ASGELEEESSEESeEEEEEESSEEEEEESEESSSESSOEEESESSEEEEEESEEEESEESSEEEESESSEEEEESSON-<ctC4tE) SESSOEEEEEESEEEEEEESTESSSESSEEEEEESEEEEEE 8 (SEE EEE EEE EEE HAVER TAW) BAY Gog neG _ B) 7g SESE EE Seg Se Se Se Su Su Su ea PR Ve Mentioso Sa EA DN (SEEESSESEESEESESEESEESSESEESESSESSEESESSESEESESSELEESSESSESEESSS®" <oClSCEEES TES SISELSESSEEELSSESELECLESD CEUEStESEESESSTEEE REESE S| [cae eo naan y io] I ESEERESESESSSSSESSSEELSESESESESSESSSSSO™= coe sttlSE Les teteSESESESTSESSSSETE C500) (2). cl SESS SERSESISEED GEESE QD Lf z oe ee, Ko} @) PIES ESSE Ese sciceciiccisssscscsescscssss Weg Q €| (EEA EEE EEE EE GO| [ESA EES gk SE i SURES SSasES Sore cSETEs SELES EEESSSELESSSELESSEEESEEEEESSSOTESSEEEEEEEESSSEETESSESEEEEEEESEELESSEOTEESEEIEEERLEES of" island] Barks Sr eee ROOEESSSeaEESSeEaEEEEEEESEEEEESSSEEEESSSSOEESSSSOTESSSESEEEESEESEEEEEESESEELESSESELEESSEEIEESEEDO o> POsaaal > * O) PIE EEE EEE UIIIIIEE EEE EEE gg iGatewayjRark} ay rl SIREEERESIEESIESSITSELEESOTEEOSSSESSELESSOEECESSOtEEEESSETEECLSSOLEEEEESETESEESSEIEEEESHIEEELESY” oO Le} Chugers 7 3] BEES EGS ELE ELE ELE EEE oP Depew Penk } hs SESEEESSESSESSESEESESSSSSETSSSESSESSESSTSESSSSSSSSSSSSESEESSESESSSTSSSSESESSEESSSSEESESEESESS’ (97° ry | SESEESESSESESESESSSESESSSEESESESESESESESESESESEESTSSSSSESSESTSESESEEEESTSSSETESSESESESSED 7 Eins Mountain fl | SESESESESESESESESESESESESESESERESOeOOCAAEESESESLSESESESESSSESEEEEESESLEESSSESSESSESSEEEESS Geer Mountain Dif (UES EEE EEE EEE EEE County Pants STS : RpEEy~ ey SORE EEE ESE SESS SSSSSSSSESSS SESS SSS S SSS Pentaway Lends ep: puseetrerretesttteseStetettststteisesteeeseeey Exiatein Stracks a) \) GrotemPotmt —° 2p \ cso Pests NESE SY Eg Cortlandy OPM ITO QUE Sp MS Seen 2eoN Woe ¢ Menor I ities Weseee susie a Woadysnoets oe S| CROTON/RIVER AND BAY | ee otonzonetiudson WISTCHATOS \, oii \ oe oo” i & epic Ning ay Q Pa ReeeaStee Ace 0) SS a Ph, ee oe ns Coll? Course F Newburgh 9 ewburg me} : 3 — ¢ Pake}Reekskill —hog @) eae tN Baud 3 (( aceey cl Ot R & gen co] des MTA CONSTRUCTION AND DEVELOPMENT 8 COASTAL AREA, SIGNIFICANT COASTAL FISH 2 AND WILDLIFE HABITATS, AND Q LEGEND LOCAL WATERFRONT REVITALIZATION PLANS ) «=== Project Corridor —— = Landward Coastal Area Boundary Communities with Local Waterfront Revitalization Programs MNR Hudson Line Signal System Upgrades < Croton-Harmon to Poughkeepsie Fi —+— Hudson Line [-] significant Coastal Fish & Wildlife Habitats - NY [__] Federally Approved Coastal LWRP Between (CP-33) and (CP-75) & Cc] Study Area 500 Ft Buffer 0 2,000 4,000 8,000 Westchester, Putnam & Dutchess County, New York 5 SCALE: 1" = 4,000’ DATE: May 2026 8 Rect = 6 ih ; 5 Source: Light Gray Basemap, ESRI. NYSDEC, New York State Department of State, Office of Planning & Development. te De berry FIGURE 7A —__—_ 3 \ co) 8) (<7 Se New Windsor Gis OR Q iiinsse: ty) fows Newhunch 0 ee! Batic ornwall-on- hudson! yas % "MOODNA CREEK West Point — aaa geez nEEEEE SSEEEESEEESSrecrerrrrone ~ Military OSL SEISETEESESEESESESETSESSESETESSESEESEEESSLSESSESETSTSESSESEEESSESE ISS PSSEEEESETSESSESELSEESESSESSESEESESSESSESESSEESSSSESESSSSESSESSESSESSSSESSESSESD stv crane rune o> “|Hudson Line Signal Upgrades} Oo West Point 2a / /Project Limit TESESSESSSETSEETSSSSEEESEETSEESEEESEEESSY Sy Seto Park EA | COPS Rrra ay fo PE a PEE Bciiiiion fv] ay AOE EEE peg ) (Nia. : -D y Rog. oy & AERTS foP se a 7 4 A HUDSONHIGHLANDS fe pe dE West Point SRREST Seer eee SETHE \ SPUN EET emmy X¢ BNQESSSNETINE An Mriniisiisgtiggisay : os Gin BREESE lo SCORSESE EERO ESS SS Coe, SB eh © \ EL NRO SEUSS — = Y A © Tangient sccscs see ss (UPS ie b, 8 oT Bist ctaie seeninnenae QE E EE EEE tee, ecscccpissitarssssscscecsttttsesssvesy Re 5 hei mag EST SEE See SS sgl Highlands}State) i, Fd 8 ma SHEE EEEST NN SORIA omen Ap Rents Notch " y, o QUIS USSU ee oS ee Nrailhead 3 SR eeeteath ae > x Gale Spang ; SS eae mM fe xe] s. AEE = 9 0 3 Canison A" CONSTITUTION MARSH i Qiiiinnnist: : : 8 Eu ‘| gastos G9 a Qy ao] ° 3 y 4 INSET MAP le ne : Sh Northiilighland 8 ewburgh sOUtn ge othlan Zsa — Se McKee! 2 xd C2 NEVSOMNGOIDAES FFs Corners {93 me) fe) 6 se] fs des MTA CONSTRUCTION AND DEVELOPMENT 8 COASTAL AREA, SIGNIFICANT COASTAL FISH 2 AND WILDLIFE HABITATS, AND 0 LEGEND LOCAL WATERFRONT REVITALIZATION PLANS ) «=== Project Corridor —— = Landward Coastal Area Boundary Communities with Local Waterfront Revitalization Programs MNR Hudson Line Signal System Upgrades aS Croton-Harmon to Poughkeepsie = —— Hudson Line FE] Significant Coastal Fish & Wildlife Habitats - NY Cc Federally Approved Coastal LWRP Between (CP-33) and (CP-75) & [__] study Area 500 Ft Buffer 0 2,000 4,000 8,000 Westchester, Putnam & Dutchess County, New York 3 SCALE: 1" = 4,000' DATE: May 2026 3 ect : ic) Asses i | | | # Dewberry FIGURE 7B &| Source: Light Gray Basemap, ESRI. NYSDEC, New York State Department of State, Office of Planning & Development. “ yatitionn Rd % x bainville Canter Ave es 4 Rome OW rd . © ap WS ve S b CT ieriboroug = Milton ry “ey Merion oy ; 7 0} Hudson Line Signal Upgrades OO ig GOO Ia ca aN S Project Limit ERECT SEES cee ge = o pr lm Eo : sew re it > ACESS : Re ene orem hicights s a ON ee ewe amburg 5 m a Bowclotn Pent: ral WAPPINGER:CREEK Q \ < 3 O Me — GY) ; ap, =o8e% . Spachentall ? Re FA Sonn 5 R 2 se wll — of 5 oO Wappingers a, 3 Fall's pak sy > Q te, Q) O) 3 oe Ss 2 g Oo @ INSET MAP 5 ewburgh = Dutchess OAS cpr E “» i <—— im 3 U ® = 6 ° Vi 0° & 3 8] ps New S: New MTA CONSTRUCTION AND DEVELOPMENT = CT, ae ne | ay 2 COASTAL AREA, SIGNIFICANT COASTAL FISH 2 AND WILDLIFE HABITATS, AND 0 LEGEND LOCAL WATERFRONT REVITALIZATION PLANS ) «=== Project Corridor —— = Landward Coastal Area Boundary Communities with Local Waterfront Revitalization Programs MNR Hudson Line Signal System Upgrades < Croton-Harmon to Poughkeepsie z —t— Hudson Line [7] significant Coastal Fish & Wildlife Habitats -Ny [__] Federally Approved Coastal LWRP Between (CP-33) and (CP-75) & Cc] Study Area 500 Ft Buffer 0 2,000 4,000 8,000 Westchester, Putnam & Dutchess County, New York 3 SCALE: 1" = 4,000' DATE: May 2026 8 ect : 3 & Dew : 5 Source: Light Gray Basemap, ESRI. NYSDEC, New York State Department of State, Office of Planning & Development. Se De berry FIGU RE 7C a BIACK CREEK eT mESOPUS. Me ACWS {ows mee ge VANDERBURG, COVE AND SHALLOWS Law KINGSTON: POUGHKEEPSIE DEEPWATER. = Pants Levi Lf Siaatsburg Te ff f hydeweark & Hudson Line Signal Upgrades — OGG / EMATET EAST py f pacreer erent Cooe “ = ne pee ; oy at st a _ Homes i Ie Ne ow gianklin[oy x ae 3 : oe 4 a : mA . % oP ao a : ro “ wees f : a a : i : : 3 : ee . ® a st aa wy agp 2 Lk : ME: whe “gees a ~ Site) Bp <3 ca marist{collegey eo meme eh z + e Ws DeWitt Cc \ p a —S, Raviland 5) Ne “| o NY) 5 3 O ra Fainview 8 Site) ry : L] ao] Acihngion y 2 VESSEP COlAGaNSET MAP & 8 Newburgh 5 " ; id LZ “Pea, r Sau : = Van ep Gretna) E eg 8 ta MTA CONSTRUCTION AND DEVELOPMENT 3 COASTAL AREA, SIGNIFICANT COASTAL FISH 2 AND WILDLIFE HABITATS, AND 0 LEGEND LOCAL WATERFRONT REVITALIZATION PLANS ) «=== Project Corridor —— = Landward Coastal Area Boundary Communities with Local Waterfront Revitalization Programs MNR Hudson Line Signal System Upgrades aS Croton-Harmon to Poughkeepsie < —+— Hudson Line FE] Significant Coastal Fish & Wildlife Habitats - NY Co Federally Approved Coastal LWRP Between (CP-33) and (CP-75) & C_] Study Area 500 Ft Buffer ) 2,000 4,000 8,000 Westchester, Putnam & Dutchess County, New York 8 eee sce reso eae Moyes 2 Feet = G se é | | | # Dewberry FIGURE 7D &| Source: Light Gray Basemap, ESRI. NYSDEC, New York State Department of State, Office of Planning & Development. “ PH PH PH PH PH PH PH PH PH PH PH PH PH PH TF TF TF TF 5 5 5 5 TRACK 1 TRACK 2 TRACK 4 TRACK 3 TRACK 1 TRACK 2 TRACK 4 TRACK 3 N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL S cs RTU 1707 1708 1709 1710 1711 1712 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-33 SHEET 1 OF 7 AS SHOWN CIV - 101 22 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP33_1.dwg 2/3/2026 8:25:49 AM by ANDREW MARTIN 2/4/2026 PH PH PH PH PH PH PH PH PH PH PHPH PH PH PH PH PH PH PH PH PH PH TF TF TF 5 5 5 5 5 5 5 TF - - TRACK 1 TRACK 2 TRACK 4 TRACK 3 TRACK 1 TRACK 2 TRACK 4 TRACK 3 N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL c N P 1713 1714 1715 1716 1717 1718 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-33 SHEET 2 OF 7 AS SHOWN CIV - 102 23 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP33_2.dwg 2/2/2026 5:34:09 PM by ANDREW MARTIN 2/4/2026 PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH 5 5 5 5 6 6 4 32 4 3 2 TRACK 1 TRACK 2 TRACK 4 TRACK 3 TRACK 1 TRACK 2 TRACK 4 TRACK 3 N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL SC S N P c N P 1719 1720 1721 1722 1723 1724 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-33 SHEET 3 OF 7 AS SHOWN CIV - 103 24 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP33_3.dwg 2/3/2026 8:27:59 AM by ANDREW MARTIN 2/4/2026 PH PH PH PH PH PH PH PH PH PH PH PH PH PH PHPH PH PH PH PH PH PH 5 5 5 5 5 TRACK 1 TRACK 2 TRACK 4 TRACK 3 TRACK 1 TRACK 2 TRACK 4 TRACK 3 N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL S ST p n cs 1724 1725 1726 1727 1728 1729 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-33 SHEET 4 OF 7 AS SHOWN CIV - 104 25 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP33_4.dwg 2/2/2026 5:22:27 PM by ANDREW MARTIN 2/4/2026 X X X X X X X X 5 5 PH PH PH PH PH PH PH PH PH PH PH PH PH PH TRACK 1 TRACK 2 TRACK 4 TRACK 3 TRACK 1 TRACK 2 TRACK 4 TRACK 3 N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL S cs 1730 1731 1732 1733 1734 1735 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-33 SHEET 5 OF 7 AS SHOWN CIV - 105 26 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP33_5.dwg 2/2/2026 5:21:05 PM by ANDREW MARTIN 2/4/2026 N/F VILLAGE OF CROTON PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X TF TF TF 5 PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH TRACK 1 TRACK 2 TRACK 4 TRACK 3 TRACK 1 TRACK 2 TRACK 4 TRACK 3 N/F MIDTOWN TRACKAGE VENTURES LLC N/F MIDTOWN TRACKAGE VENTURES LLC N/F MIDTOWN TRACKAGE VENTURES LLC MHHWL cs H 33 1736 1737 1738 1739 1740 1741 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-33 SHEET 6 OF 7 AS SHOWN CIV - 106 27 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP33_6.dwg 2/2/2026 5:19:28 PM by ANDREW MARTIN 2/4/2026 N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH - X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X - - - - + TRACK 1 TRACK 2 TRACK 4 TRACK 3 TRACK 1 TRACK 2 TRACK 4 TRACK 3 TRACK 6 N/F MIDTOWN TRACKAGE VENTURES LLC N/F VILLAGE OF CROTON N/F MIDTOWN TRACKAGE VENTURES LLC N/F MIDTOWN TRACKAGE VENTURES LLC 1742 1743 1744 1745 1746 1747 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-33 SHEET 7 OF 7 AS SHOWN CIV - 107 28 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP33_7.dwg 2/2/2026 5:17:44 PM by ANDREW MARTIN 2/4/2026 N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON PH PH PH PH PH PH PH PH PH PH PH PH X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X TRACK 1 TRACK 2 TRACK 4 TRACK 3 TRACK 6 TRACK 1 TRACK 2 TRACK 4 TRACK 3 TRACK 6 N/F MIDTOWN TRACKAGE VENTURES LLC N/F MIDTOWN TRACKAGE VENTURES LLC N/F MIDTOWN TRACKAGE VENTURES LLC T S cs cs cs 1747 1748 1749 1750 1751 1752 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS MILE POST 33.2 AS SHOWN CIV - 108 29 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-MP33.2.dwg 2/2/2026 5:16:04 PM by ANDREW MARTIN 2/4/2026 N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON PH PH PH PH PH PH TF PH PH PH PH PH PH PH X X X X X X X X X X X X X X X X X X X X X X X X X X X X 10 TRACK 1 TRACK 2 TRACK 4 TRACK 3 TRACK 6 TRACK 1 TRACK 2 TRACK 4 TRACK 3 TRACK 6 N/F MIDTOWN TRACKAGE VENTURES LLC N/F MIDTOWN TRACKAGE VENTURES LLC N/F MIDTOWN TRACKAGE VENTURES LLC T 1753 1754 1755 1756 1757 1758 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS MILE POST 33.3 AS SHOWN CIV - 109 30 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-MP33.3.dwg 2/2/2026 5:10:45 PM by ANDREW MARTIN 2/4/2026 N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON PHPH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PHPH PH PH PH PH PH PH PH PH PH PH PH PH X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 10 10 PH PH + PH PH PH PH PH PH PH PH PH PH PH PH PH PH TF PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH + + PH PH PH PH PH PH PH PH TF PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH + TRACK 1 TRACK 2 TRACK 4 TRACK 3 TRACK 6 TRACK 1 TRACK 2 TRACK 3 N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON N/F MIDTOWN TRACKAGE VENTURES LLC N/F MIDTOWN TRACKAGE VENTURES LLC N/F MIDTOWN TRACKAGE VENTURES LLC S cs cs LV cs cs S LV H SMC X X X 1759 1760 1761 1762 1763 1764 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-34 SHEET 1 OF 2 AS SHOWN CIV - 110 31 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP34_1.dwg 2/2/2026 5:08:22 PM by ANDREW MARTIN 2/4/2026 N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X TF TF 45 PH PH PH PH PH PH PH PH PH PH TF PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH TF PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH TRACK 1 TRACK 2 TRACK 3 TRACK 1 TRACK 2 TRACK 3 N/F VILLAGE OF CROTON N/F MIDTOWN TRACKAGE VENTURES LLC N/F GREENTREE REALTY LLC & C/O:KENNETH GUNSHOR ESQ N/F GREENTREE REALTY LLC & C/O:KENNETH GUNSHOR ESQ N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON N/F MIDTOWN TRACKAGE VENTURES LLC N/F MIDTOWN TRACKAGE VENTURES LLC H H s cs cs S LV SMC X-X X-X X-X X-X X-X X-X X-X X-X X-X 1765 1766 1767 1768 1769 1770 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-34 SHEET 2 OF 2 AS SHOWN CIV - 111 32 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP34_2.dwg 2/2/2026 4:58:27 PM by ANDREW MARTIN 2/4/2026 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH TRACK 1 TRACK 2 TRACK 3 TRACK 1 TRACK 2 TRACK 3 N/F GREENTREE REALTY LLC & C/O:KENNETH GUNSHOR ESQ N/F GREENTREE REALTY LLC & C/O:KENNETH GUNSHOR ESQ N/F GREENTREE REALTY LLC & C/O:KENNETH GUNSHOR ESQ Q S 1770 1771 1772 1773 1774 1775 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS MILE POST 33.6 AS SHOWN CIV - 112 33 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-MP33.6.dwg 2/2/2026 4:53:27 PM by ANDREW MARTIN 2/4/2026 X X X X X X X X X PH PH PH PH PH PH PH PH X X X X X X X X X X X X X X X X X X X X X X X X TRACK 1 TRACK 2 TRACK 3 TRACK 1 TRACK 2 TRACK 3 N/F GREENTREE REALTY LLC & C/O:KENNETH GUNSHOR ESQ N/F GREENTREE REALTY LLC & C/O:KENNETH GUNSHOR ESQ N/F GREENTREE REALTY LLC & C/O:KENNETH GUNSHOR ESQ 1776 1777 1778 1779 1780 1781 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS MILE POST 33.7 AS SHOWN CIV - 113 34 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-MP33.7.dwg 2/3/2026 8:30:15 AM by ANDREW MARTIN 2/4/2026 X X X X X X X X X X X X X X X X X X X X PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH X X X X X X X X X X X X X X X X X X X X X X X X X X X TRACK 1 TRACK 2 TRACK 3 TRACK 1 TRACK 2 TRACK 3 N/F GREENTREE REALTY LLC & C/O:KENNETH GUNSHOR ESQ N/F GREENTREE REALTY LLC & C/O:KENNETH GUNSHOR ESQ N/F GREENTREE REALTY LLC & C/O:KENNETH GUNSHOR ESQ R R R cs ST 1782 1783 1784 1785 1786 1787 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS TCML-338 AS SHOWN CIV - 114 35 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-TCML338.dwg 2/2/2026 4:46:23 PM by ANDREW MARTIN 2/4/2026 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH PH X X X X X X X X X X X X X TRACK 1 TRACK 2 TRACK 3 TRACK 1 TRACK 2 TRACK 3 N/F GREENTREE REALTY LLC & C/O:KENNETH GUNSHOR ESQ N/F VILLAGE OF CROTON N/F HALF MOON BAY-HOME ASSOC INC & C/O:KATONAH MANAGEMENT GROUP N/F MIDTOWN TRACKAGE VENTURES LLC N/F GROTON ON HUDSON REALTY, LLC N/F GREENTREE REALTY LLC & C/O:KENNETH GUNSHOR ESQ N/F MIDTOWN TRACKAGE VENTURES LLC N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON S S cs cs X 1788 1789 1790 1791 1792 1793 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS EL-339 AS SHOWN CIV - 115 36 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-EL339.dwg 2/2/2026 4:39:48 PM by ANDREW MARTIN 2/4/2026 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X TRACK 1 TRACK 2 TRACK 3 TRACK 1 TRACK 2 TRACK 3 TRACK 4 N/F GROTON ON HUDSON REALTY, LLC N/F GROTON ON HUDSON REALTY, LLC N/F GROTON ON HUDSON REALTY, LLC N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON 34 1793 1794 1795 1796 1797 1798 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS MILE POST 34.0 AS SHOWN CIV - 116 37 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-MP34.0.dwg 2/2/2026 4:30:46 PM by ANDREW MARTIN 2/4/2026 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PH PH PH PH PH PH PH PH PH PH TRACK 1 TRACK 2 TRACK 3 TRACK 2 TRACK 4 TRACK 1 TRACK 6 TRACK 4 N/F VILLAGE OF CROTON N/F GROTON ON HUDSON REALTY, LLC N/F GROTON ON HUDSON REALTY, LLC N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON SB XX 1799 1800 1801 1802 1803 1804 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-35 SHEET 1 OF 3 AS SHOWN CIV - 117 38 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP35_1.dwg 2/2/2026 4:26:51 PM by ANDREW MARTIN 2/4/2026 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PH PH PH PH PH PH PH PH PHPH PHPH PH PH PH PH X X X X X X X X X PTC TRACK 2 TRACK 4 TRACK 1 TRACK 2 TRACK 4 TRACK 1 TRACK 6 TRACK 6 N/F VILLAGE OF CROTON S H SMC TRANS VR XFMR SHP X X X X 1805 1806 1807 1808 1809 1810 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-35 SHEET 2 OF 3 PTC RADIO CASE CP-35 AND SHP-1 AS SHOWN CIV - 118 39 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP35_2.dwg 2/2/2026 4:24:34 PM by ANDREW MARTIN 2/4/2026 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PHPH PH PH PHPH PH PH PH PH PH PH PHPH PHPH TF TRACK 2 TRACK 4 TRACK 1 TRACK 2 TRACK 4 TRACK 1 TRACK 6 TRACK 6 N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON MHHWL MHHWL P P SWGR H X X X X X X SMC 1811 1812 1813 1814 1815 1816 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-35 SHEET 3 OF 3 AS SHOWN CIV - 119 40 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP35_3.dwg 2/2/2026 4:21:34 PM by ANDREW MARTIN 2/4/2026 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PH PH PH PH PH PH PH PH PH TRACK 2 TRACK 4 TRACK 1 TRACK 6 N/F VILLAGE OF CROTON & C/O:CROTON YACHT CLUB N/F VILLAGE OF CROTON N/F VILLAGE OF CROTON ROTON N/F VILLAGE OF CROTON & C/O:CROTON YACHT CLUB MHHWL MHHWL TRACK 2 TRACK 4 TRACK 1 TRACK 6 P P X-X X-X X-X 1818 1819 1820 1821 1822 1823 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS EL-345 AS SHOWN CIV - 120 41 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-EL345.dwg 11/18/2025 11:12:56 AM by ANDREW MARTIN 2/4/2026 TRACK 2 TRACK 4 TRACK 1 TRACK 6 P 35 X-X X-X X-X X-X X-X X-X X-X XFMR 1845 1846 1847 1848 1849 1850 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS ML-350 AS SHOWN CIV - 121 42 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-ML350.dwg 1/30/2026 12:03:49 PM by ANDREW MARTIN 2/4/2026 PTC CV TRACK 4 TRACK 1 TRACK 2 TRACK 4 TRACK 1 TRACK 2 TRACK 6 TRACK 6 N/F STATE OF N Y & DEPT OF PW N/F STATE OF N Y & DEPT OF PW N/F STATE OF N Y & DEPT OF PW MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL P X-X X-X X-X X-X X-X X-X X-X XFMR 1880 1881 1882 1883 1884 1885 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS ML-356 AND PTC RADIO CASE CP-36 SOUTH AS SHOWN CIV - 122 43 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-ML356.dwg 2/3/2026 8:33:45 AM by ANDREW MARTIN 2/4/2026 TRACK 4 TRACK 1 TRACK 2 TRACK 4 TRACK 1 TRACK 2 TRACK 6 N/F RUBINFIEN, LEO N/F RUBINFIEN, LEO N/F RUBINFIEN, LEO MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL P X-X X-X X-X X-X 1914 1915 1916 1917 1918 1919 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-36 SHEET 1 OF 2 AS SHOWN CIV - 123 44 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP36_1.dwg 11/6/2025 12:37:39 PM by ANDREW MARTIN 2/4/2026 X X X X X X X X X X X X TRACK 4 TRACK 1 TRACK 2 TRACK 4 TRACK 1 TRACK 2 N/F RUBINFIEN, LEO N/F RUBINFIEN, LEO N/F COUNTY OF WESTCHESTER N/F COUNTY OF WESTCHESTER N/F RUBINFIEN, LEO N/F RUBINFIEN, LEO N/F RUBINFIEN, LEO MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL MHHWL P TRANS SMC XFMR X-X X-X X-X X-X X-X X-X X-X X-X X-X X-X X-X X-X X-X X-X X-X GENERATOR VR XFMR SHP SP 1920 1921 1922 1923 1924 1925 +50 +50 +50 +50 +50 +50 0 20' 10' 20' 40' 1" = 20'-0" N OF DATE: SCALE: DRAWING NUMBER SHEET CONTRACT NUMBER DRAWN CHECKED APPROVED DESIGNED CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION IT IS A VIOLATION OF THE PROFESSIONAL LICENSE LAW FOR ANY PERSON TO ALTER THIS DRAWING IN ANY WAY, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER/ARCHITECT AS APPLICABLE. THE ALTERING ENGINEER/ARCHITECT SHALL AFFIX HIS/HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS/HER SIGNATURE AND DATE OF ALTERATION. DISCLAIMER CHKD. DRAWN DATE REVISIONS NO. APPRVD. MODIFICATION Metro-North Railroad 347 MADISON AVENUE NEW YORK, N.Y. 10017 HUDSON LINE C&S IMPROVEMENTS EQUIPMENT INSTALLATIONS 39462 100% DRAFT 11/04/2022 610 MP-32 TO MP-76 CIVIL SITE PLANS CP-36 SHEET 2 OF 2 AND SHP-2 AS SHOWN CIV - 124 45 G.E. J.L.B. G.E. A.E.M. c:\pwworking\gfpw01\ajmartin\d1137418\CIV-CP36_2.dwg 1/27/2026 5:11:42 PM by ANDREW MARTIN 2/4/2026

Machine-extracted for search and reference — the original file is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.