DPW Q1 FY27
report
2 pages
From the meeting:
Board Of Trustees — 2026-09-30
· our coverage →
Agenda item: Consent Agenda — Quarterly Reports
Report / study, 2 pages. Attached to agenda item: “Consent Agenda — Quarterly Reports”
Retrieved 2026-09-29 from the village's meeting portal.
View the original file ↗
Also attached to this agenda item:
Clerk 1Q FY27
Engineering Q1 FY27
Justice Court Q1 FY27
Manager Q1 FY 27
Parking Q1 FY27
Police Q1 FY27
Recreation Q1 FY27
Treasurer Q1 FY27
Extracted text
Quarterly Report
PUBLIC WORKS QUARTERLY REPORT
Fiscal Year 2026/2027
First Quarter: June 1, 2026 – August 31, 2026
Highway
•
Repaired 10 catch basin locations throughout Village
•
Weekly asphalt maintenance (potholes and water patches)
•
Trimmed approximately 40 trees
•
Removed 10 trees (including grinding leftover stumps)
•
Catch basin cleaning throughout Village
•
Swept roadways
Sanitation:
•
Collected approximately 946 tons of refuse
•
Weekly collection of Village co-mingled, paper and metal recycling
•
Collected approximately 250 tons of organic waste
Building Maintenance:
•
Street light repairs
•
Replaced various signage throughout Village
•
Crosswalk and stop bar paint refresh
•
New HVAC in Main Office, Engineering Department
•
Painted hand rails at Municipal Building
•
Painted Community Room at Municipal Building
•
Started Phase I of Engineering Dept renovation
Water Department:
•
Meter reading for water billing
•
Maintenance to pumps and motors
•
Responded to 136 code 53-mark outs
•
Submission of monthly reports to Westchester County
•
Completed monthly water sampling
•
Replaced 144 non-working water meters
•
Work on Upper North Highland tank rehab/replacement project
•
Maintenance/Repairs to Chlorine systems
•
Work on lead service, line inventory list
•
Maintenance to orthophosphate system
•
WCDOH Annual Survey
•
Fix leaks and drain line issue at Silver Lake
•
(2) water leaks (not ours)
•
Repair damaged valve boxes
•
Work with school district to replace meter at CHHS
•
Assist with paving projects
•
Semi-Annual hydrant flushing
•
Service to Analyzers
•
Water leak 14 Amber Drive
Department of Public Works
Quarterly Report
•
Replace plumbing for entry point as per WCDOH
•
Work on Lounsbury Road relining project
•
Assist DPW
•
Repair multiple fire hydrants
•
Van Cortlandt Manor project – assist as needed
•
Remove/repair valve on Gerstein Street
Parks Department:
•
Installed and beautified area around Manes Memorial
•
Continue removing debris from Village Parks and Playgrounds
•
Litter removal in Village parks and fields
•
Installed multiple new benches and tables in Village Parks
•
Cut Village ball fields
Repair Facility:
•
Maintenance on all Village vehicles
•
Weekly inspection and maintenance of all police vehicles
•
Assist Fire Department with vehicle maintenance
Capital Projects:
•
Continued the design process for the Half Mon Bay Bridge project
•
Continued working on design of renovations/addition to the Gouveia property to accommodate
new Recreation Department
•
Resurfacing project completed on Cleveland Drive
•
Worked on layout and submission for new RRFBs at Maple and Van Cortlandt
•
Worked with consultant for Upper North Highland inspection/feasibility study
•
Started Phase II of train station drainage for solar canopies
•
Worked with D&B Engineers on Brook Street drainage project
•
Constructed first half of Farrington Step Project on time for the start of the school year
•
Scheduled new epoxy floors for new EMS facility/Harmon Firehouse for early October