DPW Quarterly Report 1Q26
report
2 pages
From the meeting:
Board Of Trustees — 2025-09-24
Agenda item: Consent Agenda — Quarterly Reports
Report / study, 2 pages. Attached to agenda item: “Consent Agenda — Quarterly Reports”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Court Quarterly Report 1Q26
ENG Quarterly Report 1Q26
FIN Quarterly Report MAY25
Managers Office Q1 FY 2026
Parking Q1 FY 2026
Police Quarterly Report 1Q26
REC Quarterly Report 1Q26
Village Clerk Quarterly Report - 1Q 2026
Extracted text
Quarterly Report
PUBLIC WORKS QUARTERLY REPORT
Fiscal Year 2025/2026
First Quarter: June 1, 2025 – August 31, 2025
Highway
•
Repaired 3 catch basins
•
Weekly asphalt maintenance (potholes and water patches)
•
Trimmed approximately 15 trees
•
Removed 12 trees (including grinding leftover stumps)
•
Cleaned approximately 20 catch basins
Sanitation:
•
Collected approximately 900 tons of refuse
•
Weekly collection of Village co-mingled, paper and metal recycling
•
Collected approximately 116 tons of organic waste
Building Maintenance:
•
Street light repairs and painted poles
•
Replaced various signage throughout Village
•
Assist in EMS addition
•
Line striped MTA Parking Lot, Municipal Bldg. Lot, stop bars/crosswalks
•
Finished Silver Lake renovation
•
Installed new door for PD Lieutenant Office
•
Replaced HVAC at Grand Street Firehouse
•
Installed Purple Heart signs
•
Installed new blinds in yoga room – Municipal Bldg.
•
Refinished floors at Municipal Bldg.
Water Department:
•
Meter reading for water billing
•
Flushed hydrants
•
Maintenance to pumps and motors
•
Plumbing work at Municipal Place building
•
Responded to 141 code 53-mark outs
•
Submission of monthly reports to Westchester County
•
Assist DPW on low staff days
•
Completed monthly water sampling
•
Replaced 84 non-working water meters
•
Chemical deliveries
•
Painted Hydrants
•
Helped with irrigation systems
•
Site visits for: FIOS – Beekman Ave & Georgia Lane, CON ED – Albany Post Road, Cleveland
Drive, Kuney Street, Batten Road, Elm Street, CHHS – OPRS, PVC – Glen Place
•
2” tap for sprinkler system – Morningside Drive
•
Fixed damage issues at Silver Lake
Department of Public Works
Quarterly Report
•
Maintenance/Repairs to Chlorine systems
•
Started process of having schools and county update their meters
•
D & M and Westchester County installed new pole – electric service – assist as needed
•
Service to generators
•
Turn water on Silver Lake (fix shower)
•
Fix water fountain at Croton Landing
•
Update CMP for WCDOH
•
Work on load service, line inventory list
•
Annual Sanitary Survey WCDOH
•
Fixed 5 curb boxes
•
Issue with Well #4 – motor sent to shop for repair
Parks Department:
•
Continue removing debris and leaves from Village Parks and Playgrounds
•
Continued mowing of lawns/field in all Village parks
•
Litter removal in Village parks and fields
•
Maintenance of Village ballfields
Repair Facility:
•
Maintenance on all Village vehicles
•
Weekly inspection and maintenance of all police vehicles
•
Assist Fire Department with vehicle maintenance
Capital Projects:
•
Continued the design process for the Half Mon Bay Bridge project
•
Working towards approval for Cleveland resurfacing grant
•
Completed exterior framing for new EMS building including set bar joists, poured second floor
slab, roof bar joist and metal decking
•
Completed exterior walls and roof for new EMS building
•
Posted the Farrington steps project for public bid
•
Continued working on design of renovations/addition to the Gouveia property to accommodate
new Recreation Department
•
Installed Rapid Flashing Crosswalk on Rt 129 by Wood Road
•
Exterior brick installed, sheetrock, windows, mechanical rough ins complete on new EMS
addition
•
New sidewalks dead end of Thompson and Whelan Avenue
•
Installed pads for new E bike program
•
Installed clock at Maple Commons
•
Completed Gotwald Circle project with landscaping