QBR Wetlands Activity Permit App and Supporting Docs 2025
environmental
188 pages
Scanned/OCR — text may contain errors
From the meeting:
Water Control Commission — 2026-11-24
· our coverage →
Agenda item: NEW BUSINESS — Hugh Greechan, Jr.. P.E, Commissioner of Westchester County Department of Public Works & Transportation, has applied to the Water Control Commission of the Village of Croton-on-Hudson for the renewal of Wetlands Activity Permit #20250002 originally issued on August 26, 2025 for the proposed complete replacement of the existing Quaker Bridge over the Croton River.
Environmental review, 188 pages. Attached to agenda item: “NEW BUSINESS — Hugh Greechan, Jr.. P.E, Commissioner of Westchester County Department of Public Works & Transportation, has applied to the Water Control Commission of the Village of Croton-on-Hudson for the renewal of W” (Text recovered by OCR — may contain errors.)
Retrieved 2026-11-20 from the original source.
View the original file ↗
Also attached to this agenda item:
11.24.26 Quaker Bridge Replacement Application
PB Quaker Bridge Tree Removal Resolution
QBR-Coastal assessment 7.25.2025
QBRB Chapter 230 Finding Statement
QBRB Wetlands 227 Finding Statement
QBR CAF 7.10.2025
QBR Village LWRP Letter
Wetland Activity Permit 2025002 with 8.25.25 Final Resolution
Extracted text
ESTCHESTER,
ua
ws
Kenneth W. Jenkins
ev.
ee
Westchester County Executive
tee
Department of Public Works and Transportation
a 1
Rt
Hugh J. Greechan, Jr., P.E., Commissioner
Gayle M. Katzman, P.E., First Deputy Commissioner
Hernane N. De Almeida, P.E., Deputy Commissioner
July 9, 2025
Mr. Brian Healy
J 1Y wey
Village Manager
Village of Croton-on-Hudson
1 Van Wyck Street
Croton-on-Hudson, NY 10520
RE:
Quaker Bridge Road Bridge Replacement
Waiver of Wetland Activity Permit Application Fee
Mr. Healy,
Westchester County is in the process of obtaining environmental permits to replace the Quaker Bridge Road Bridge
over the Croton River. Along with this letter, we are submitting a Wetland Activity Permit application, which carries
a $350 application fee. Westchester County hereby requests this fee to be waived as we work to complete this
mutually beneficial project.
Should you have any questions or require additional information as you consider this request, please contact me at
914-995-2546 or hig? @westchestercountyny.gov.
Thank you,
ZA fer,
go
Hugh J.
reechan, Jr...
(an
Commissioner
Westchester County Department of Public Works & Transportation
Michaelian Office Building
148 Martine Avenue, Room 518
White Plains, New York 10601
Telephone: 914-995-2548
Eoeed nde 68.18-\|-4Q
Croton-on-Hudson
Application for Wetlands
Village of
Engineering Department
Activity Permit
Stanley H. Kellerhouse Municipal Building
(Form # Eng-§227)
One Van Wyck Street
Tel: 914-271-4783
Croton-on-Hudson. NY 10520-2501
(Revised 03 2012)
engineering@crotononhudson-ny.gov
Application Date: _~1 Ye}| 25S Is this application relevant to an open building permit?
0 Yes
No
Application #: QOADO4/Q Building Permit #:
Property Information:
Section: N/A
Block:
Lot:
Property Location (street address): Quaker Bridge Road Bridge
# of Acres or Sq. Ft:
Zoning District RA-5
Commercial Lot: O Yes {No Vacant Lot: D Yes & No
Applicant Information: Person or Company Doing Work: [1 Owner D Contractor O Other:
Last Name: Greechan, Jr., P.E.
First Name: Hugh
MI: J.
Company: Westchester County Department of Public Works and Transportation
Address: 148 Martine Avenue
Address:
Phone #: 914-995-2546
Cell #:
E-mail: _hig7@westchestercountyny.gov
Property Owner:
Same As Above
Last Name:
First Name:
MI:
Company:
Address:
Address:
Phone #:
Cell #:
E-mail:
Description of proposed work in wetland or wetland buffer:
Plans & Specifications: Note: See $227-7 of the Village Code for all requirements.
Detail plans & specifications for the proposed wetland activity, drawn to a scale of not smaller than 1° = 50°, shall show
the following:
Estimated quantities of material to be deposited or removed.
Pre- and post-development impervious surface area.
Location of any well and any septic or other waste disposal system with 50 ft. of the area to be disturbed.
Details of any proposed drainage system, both for the construction and the final development & maintenance
requirements.
[f creation, modification or enlargement of a pond is proposed, details of the construction of any dams,
embankments, outlets or other water-control devices & deposition of the spoil material.
activities.
List all beneficial functions of the wetland, waterbody or watercourse which will be affected by the proposed
Erosion and sediment controls must be provided and a schedule for their installation & maintenance.
Submit eight @) copies of all specified supporting plans & documentation when WCC is approving authority, three (3)
copies when Village Engineer is approving authority and fourteen (14) copies when Planning Board is approving
authority. (Note: PDF's or other acceptable electronic copies of all documents must be submitted if WCC or Planning
Board is approving authority.)
Include a completed environmental assessment form (EAF), a Coastal Assessment Form (CAF) and a USGS
topographic map with the property outlined. When the Village Engineer is approving authority, an EAF and CAF are
not required.
Wetland Activity Permit - Paget
If proposed project qualifies as a land development activity, a Stormwater Pollution Prevention Plan (SWPP)
consistent with the requirements of Chapter 196, Article I must be submitted.
The approving authority for all applications is the Water Control Commission, exceptions are listed on page 2.
Attach Certificate of Liability Insurance naming the Village of Croton-on-Hudson as additional insured and certificate
holder and documentation of Disability and Workers Compensation Insurance with the Village listed as certificate
holder.
I certify that the above information is accurate, and ! am the property owner or authorized by the owner to file this application
on their behalf and that | will indemnify and hold the Village harmless against any damage or injury that may be caused by
or arise out of any entry onto the property in connection with the processing of the application, during construction or
performance of the work or within one year after the completion of the work.
Hugh J. Greechan, Jr., P.E.
ZZ,
yale
Applicant’s Name (piease print)
& Applican
Date f
FOR VILLAGE USE ONLY:
por:
Fee $
Fee Paid (date):
Weavg
~VSat
Received by:
APPROVED BY:
O wcc
O VILLAGE ENGINEER
O PLANNING BOARD
a
-'
-)
The approving authority for all applications shall be the Water Control Commission, except as follows:
qd)
The Planning Board shall be the approving authority for any application involving property that is also the
subject of a pending site plan, minor site plan, subdivision or special permit application, or fill or excavation
permit, in accordance with the Code of the Village of Croton-on-Hudson, and for any application that also
involves the construction or establishment of a principal building or use.
(2)
The Village Engineer shall be the approving authority for any of the following activities proposed to be
conducted on property not subject to regulation by the State of New York, and no public hearing shall be required:
(a)
Removing water-deposited silt and/or other matcrial in order to restore the preexisting land
elevations, provided that the total amount removed does not exceed 15 cubic yards of material.
(b)
Restoring land elevations that have been altered by erosion or storm damage.
(c)
The construction, expansion or improvement of private residential or recreational facilities, as
otherwise legally permitted, provided that the total amount of material deposited, removed or
regraded does not exceed 15 cubic yards.
(d)
The construction of driveways not associated with any other construction approvals where
alternative means of access are proved to be impractical, provided that the amount of material to
be deposited or regraded in connection with such construction does not exceed 100 cubic yards.
(e)
The use of harmless chemicals, dyes and other similar substances to maintain or study any
wetland.
(f
Decorative landscaping and planting in wetlands when covering less than 1/10 of an acre.
(3)
Where the Water Control Commission or Village Engineer initiates a review of an application submitted
pursuant to this chapter and determines that because of the scope, nature, location or potential environmental
impact of the action which could result from approval of the wetlands permit a public hearing would be either
necessary or appropriate, the application shall be immediately forwarded to the Planning Board for public
hearing, whereupon the Planning Board shall become the approving authority for such application.
Welland Activity Permit - Page2
Civil, Environmental and Transportation Design Services
OSPA Engineering Services, PC
800 Route 146, Bldg. 200, Suite 280
Clifton Park, NY 12065
Phone: 518.636.9956
E-Mail ospa@ospaengineering.com
Web site WWW.OSPAENGINEERING.COM
July 1, 2025
United States Army Corps of Engineers
Jacob K. Javits Federal Building
26 Federal Plaza
New York, NY 10278-0090
NYSDEC Region 3 Permits
21 South Putt Corners Road
New Paltz, NY 12561-1620
Re: Quaker Bridge Replacement, Town of Cortlandt and Village of Croton-On-Hudson,
Westchester County, NY
Dear Sir or Madame:
OSPA Engineering Services, PC has been contracted to submit the following permit
application for activity for the county funded proposed Quaker Bridge Road Bridge
Replacement Project. A location map is attached. The project is located at the following
coordinates:
Project Coordinates NAD 27:
N 41.211976
W -73.869054
The project proposes the replacement of the Quaker Bridge Road Bridge with a new
structure. The Croton River is a NYSDEC Class B stream and is mapped and classified as a
USFWS riverine wetland.
The bridge was closed to traffic in the fall of 2024 based on the bridge condition. All prudent
and feasible alternatives to avoid and minimize the impacts upon the bridge have been
explored. The deterioration and condition of the bridge is too severe for rehabilitation.
The project site is designated SHPO Consultation Project 17PR02639. The Quaker Bridge
Road Bridge is a late nineteenth century Pratt Truss bridge built in 1894, eligible for listing on
the National Register of Historic Places. The County proposes to remove the Quaker Bridge
Road Bridge and replace it with a two-lane, truss bridge made of galvanized steel, built on
the existing alignment with the new bridge being approximately 12 feet wider to allow for 2-
way vehicular traffic as well as 2-way pedestrian passage. Two fee conveyance areas and
two permanent easements will be required for the proposed project. Coordination with SHPO
regarding a Memorandum of Agreement has been started and will continue upon receipt of
a USACE contact.
There is the potential for the federally endangered Northern Long-eared Bat (Myotis
septentrionalis), the federally endangered Indiana Bat (Myotis sodalis), the federally
threatened Bog Turtle (Glyptemys muhlenbergii), the federally proposed endangered
Quaker Bridge Road over Croton River Replacement
Page 2 of 2
OSPA Engineering Services, PC
800 Route 146, Bldg. 200, Suite 280
Clifton Park, NY 12065
Phone:
518.636.9956
E-Mail ospa@ospaengineering.com
Web site WWW.OSPAENGINEERING.COM
Tricolored Bat (Perimyotis subflavus), and the federally proposed threatened Monarch
Butterfly (Danaus plexippus) to occur within the project area. Approximately 76 trees with a
diameter at breast height (DBH) equal to or greater than 2 inches are expected to be removed
within the clearing window, November 1st – March 31st. The nearest hibernacula is located
approximately 10.7 miles from the project site. The EAF Mapper indicates the project is within
the Westchester County, County and State Park Lands Critical Environmental Area for its
exceptional or unique character. The EAF Mapper indicates that there are no other known
records of federally or state-listed rare or endangered animals or plants or significant natural
communities, at the project site or in its immediate vicinity. The project site was evaluated
for Bog turtle habitat and it was determined that habitat for the Bog Turtle is not present.
A completed Joint Application Form and attachments, including project plans and additional
pertinent documentation are included in this submission. If you have any questions, please
contact me at 518-636-9956 or at mosterhout@ospaengineering.com.
Sincerely,
Melanie Osterhout, P.E.
President
Enclosures
c:
Westchester County
Creighton Manning Engineering
file
LETTER .............................................................................................................................................. 1
TABLE OF CONTENTS ......................................................................................................................... 3
JOINT PERMIT APPLICATION .............................................................................................................. 5
TABLE OF CONTENTS
ATTACHMENTS
1.
Project Database Mapping, Wetland Delineation Report and FEAF
2.
Plans
3.
SHPO Documentation
NEW | Department of
Office of
Department
STATE | Environmental
General Services
of State
i
Conservation
US Army Corps
of Engineers
JOINT APPLICATION FORM
For Permits for activities activities affecting streams, waterways, waterbodies, wetlands, coastal areas, sources of water,
and endangered and threatened species.
You must separately apply for and obtain Permits from each involved agency before starting work. Please read
all instructions.
1. Applications To:
>NYS Department of Environmental Conservation
Check here to confirm you sent this form to NYSDEC.
Check all permits that apply:
[__]Dams and Impound-
[_] Tidal Wetlands
[_] Water Withdrawal
ment Structures
Stream Disturbance
Wild, Scenic and
[__] Long Island Well
401 Water Quality
Recreational Rivers
[__] Excavation and Fill in
[__] Incidental Take of
Navigable Waters
Certification*
Coastal Erosion
Endangered /
[__] Docks, Moorings or
[__] Freshwater Wetlands
Management
Threatened Species
Platforms
* See Instructions (page 3)
>US Army Corps of Engineers
Check here to confirm you sent this form to USACE.
Check all permits that apply:
LE] Section 404 Clean Water Act
LE] Section 10 Rivers and Harbors Act
Is the project Federally funded?
Yes
wv _No
If yes, name of Federal Agency: |
General Permit Type(s), if known: [Section 404 Nationwide #3
Preconstruction Notification:
v Yes
No
>NYS Office of General Services
EL] Check here to confirm you sent this form to NYSOGS.
Check all permits that apply:
[__] State Owned Lands Under Water
LE] Utility Easement (pipelines, conduits, cables, etc.)
LE] Docks, Moorings or Platforms
>NYS Department of State
im Check here to confirm you sent this form to NYSDOS.
Check if this applies:
LE] Coastal Consistency Concurrence
2. Name of Applicant
Taxpayer ID (if applicant is NOT an individual)
Hugh J. Greechan, Jr., P.E., Commissioner of Public Works and Transportation
Mailing Address
Post Office / City
State Zip
148 Martine Avenue
White Plains
NY
10601
Telephone
Email
[ hjg7 @westchestercountyny.gov
Applicant Must be (check all that apply):
Owner
LE] Operator
LE] Lessee
3. Name of Property Owner (if different than Applicant)
[Same
Mailing Address
Post Office / City
State Zip
Email
Telephone L__|
|
For Agency Use Only | Agency Application Number:
JOINT APPLICATION FoRM 04/22
Page 1 of 4
JOINT APPLICATION FORM — Continued. Submit this completed page as part of your Application.
4. Name of Contact / Agent
Melanie Osterhout, OSPA Engineering Services, P.C.
Mailing Address
Post Office / City
State Zip
800 Route 146, Bldg. 200, Suite 280
Clifton Park
NY
12065
Telephone
Email
mosterhout@ospaengineering.com
5. Project / Facility Name
Property Tax Map Section / Block / Lot Number:
[Quaker Bridge Road Bridge Replacement
N/A
Project Street Address, if applicable
Post Office / City
State Zip
N/A
NY
Cortlandt/Croton-on-Hudson
10520
Provide directions and distances to roads, intersections, bridges and bodies of water
From US-9 in Croton-on-Hudson, turn onto Old Albany Post Road. In 0.8 miles, stay straight onto Quaker Bridge Road. The project site will be on
the left in 1.4 miles.
v Town
Y Village
City
County
Stream/Waterbody Name
Cortlandt/Croton-on-Hudson
[ Westchester
] | Croton River
Project Location Coordinates: Enter Latitude and Longitude in degrees, minutes, seconds:
G
"
Latitude:|41
° {12
|! [43.4
Longitude:| 73
°
52
| [s.6
6. Project Description: Provide the following information about your project. Continue each response and provide
any additional information on other pages. Attach plans on separate pages.
a. Purpose of the proposed project:
The project proposes the complete replacement of the existing bridge and abutments on Quaker Bridge Road over the Croton River with a
new structure.
b. Description of current site conditions:
The project area is comprised of a truss bridge, roadways, a stream, and forested cover.
c. Proposed site changes:
The bridge will be replaced. Areas adjacent to the bridge will be graded to accommodate the new structure and construction access.
d. Type of structures and fill materials to be installed, and quantity of materials to be used (e.g., square feet of
coverage, cubic yards of fill material, structures below ordinary/mean high water, etc.):
550 CY of stone fill within 2,290 SF of disturbance below OHW. 250 LF of the river will be impacted during construction.
e. Area of excavation or dredging, volume of material to be removed, location of dredged material placement:
550 CY of excavation within 2,290 SF of disturbance below OHW.
f
No
Is tree cutting or clearing proposed?
v| Yes If Yes, explain below.
Timing of the proposed cutting or clearing (month/year): [November 1- March 31
Number of trees to be cut: Acreage of trees to be cleared:
JOINT APPLICATION FoRM 04/22
Page 2 of 4
JOINT APPLICATION FORM — Continued. Submit this completed page as part of your Application.
. Work methods and type of equipment to be used:
Excavators, front end loaders, bulldozers and paving equipment will be on site. After erosion and sediment controls are installed, typical site
work methods will be utilized.
h._Describe the planned sequence of activities:
Install temporary erosion and sediment control measures, where appropriate. Silt fencing, erosion control mats, sediment traps, turbidity
curtains and cofferdams will be utilized. Temporary erosion and sediment control measures will be established prior to disturbance. Finalization
lof grading will be followed by site stabilization and the removal of the erosion and sediment controls.
|
Pollution control methods and other actions proposed to mitigate environmental impacts:
Pollution prevention and controls include on-site spills kits, equipment cleaning, maintenance, and repair will be conducted in designated areas
protected by berms. Toxic materials such as paints, solvents, etc... must be stored in waterproof containers and kept in storage facilities.
J
Erosion and silt control methods that will be used to prevent water quality impacts:
Silt fencing, turbidity curtains and cofferdams will be utilized. Temporary erosion and sediment control measures will be established prior to
disturbance.
k. Alternatives considered to avoid regulated areas. If no feasible alternatives exist, explain how the project will
minimize impacts:
‘The bridge has been closed to traffic due to the structural condition. Rehabilitation was not deemed feasible.
|
Public
Proposed use:
[_] Private
| Commercial
m. Proposed Start Date: [November 2025
] Estimated Completion Date: [December 2026
n. Has work begun on project?
Yes_lf Yes, explain below.
Y No
o. Will project occupy Federal, State, or Municipal Land?
a Yes_If Yes, explain below.
No
The project will occupy the county-owned right-of-way.
p._List any previous DEC, USACE, OGS or DOS Permit / Application numbers for activities at this location
None
q. Will this project require additional Federal, State, or Local authorizations, including zoning changes?
Yes _ if Yes, list below.
— No
Village of Croton on Hudson and Town of Cortlandt approvals/permitting.
JOINT APPLICATION FoRM 04/22
Page 3 of 4
7/5/25
JOINT APPLICATION FORM — Continued. Submit this completed page as part of your Application.
7. Signatures.
Applicant and Owner (If different} must sign the application. If the applicant is the landowner, the landowner
attestation form can be used as an electronic signature as an alternative to the signature below, if necessary.
Append additional pages of this Signature section if there are multiple Applicants, Owners or Contact/Agents.
(hereby affirm that information provided on this form and all attachments submitted herewith is true to the best of
my knowledge and belief.
Permission to Inspect - | hereby consent to Agency inspection of the project site and adjacent property areas.
Agency staff may enter the property without notice between 7:00 am and 7:00 pm, Monday - Friday. Inspection
may occur without the owner, applicant or agent present. If the property is posted with "keep out" signs or fenced
with an unlocked gate, Agency staff may still enter the property. Agency staff may take measurements, analyze
site physical characteristics, take soil and vegetation samples, sketch and photograph the site. | understand that
failure to give this consent may result in denial of the permit(s) sought by this application.
False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the NYS
Penal Law. Further, the applicant accepts full responsibility for all damage, direct or indirect, of whatever nature,
and by whomever suffered, arising out of the project described herein and agrees to indemnify and save harmless
the State from suits, actions, damages and costs of every name and description resulting from said project. In
addition, Federal Law, 18 U.S.C., Section 1001 provides for a fine of not more than $10,000 or imprisonment for
not more than 5 years, or both where an applicant knowingly and willingly falsifies, conceals, or covers up a
material fact; or knowingly makes or uses a false, fictitious or fraudulent statement.
Signature of Applicant
Date
LE fer
/
VAS
Lessee
Appii€ant fed be (check all 0 apply): | | Owner
] Operator
Printed Name
Title
Hugh J. Greechan, Jr., P.E.
Commissioner of Public Works and Transportation
Signature of Owner (if different than Applicant)
Date
Printed Name
Title
Date
Signature of Contact / Agent
7/5/25
Oe
Printed Name
Title
Melanie Osterhout, P.E.
Consultant
For Agency Use Only
DETERMINATION OF NO PERMIT REQUIRED
Agency Application Number [
] {Agency Name) has determined that No Permit is
required from this Agency for the project described in this application.
Agency Representative:
Printed
Title
Name
Signature
Date
JOINT APPLICATION Form 04/22
Page 4 of 4
ATTACHMENT A: PROJECT DATABASE MAPPING,
WETLAND DELINEATION REPORT AND FEAF
USGS Topographic Map
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
NOT TO SCALE
Project Location
Google Earth Site Location Map
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
Site Aerial
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
NYSDEC Environmental Resource Mapper
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
USFWS NWI Mapper
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
NYSHPO CRIS Mapper
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
FEMA Floodplains Mapper
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
USDA Soils Map
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
WETLAND AND ORDINARY HIGH WATER
DELINEATION REPORT
Quaker Bridge Replacement
Town of Cortlandt, Westchester County
November 2024
Prepared for:
By:
800 Route 146, Bldg. 200
Suite 280, Clifton Park
NY 12065
(518) 636-9956
Westchester County Department of Public
Works and Transportation
148 Martine Ave. Room 512
White Plains, NY 10601
Quaker Bridge Replacement, Town of Cortlandt November 2024
US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report
Page ii
OSPA Engineering Services, P.C.
TABLE OF CONTENTS
1.0
INTRODUCTION ................................................................................................... 1
2.0
EXISTING CONDITIONS ...................................................................................... 1
2.1
Topography ........................................................................................................ 1
2.2
Soils ................................................................................................................... 1
2.3
Hydrology ........................................................................................................... 1
2.4
Vegetative Communities .................................................................................... 2
2.5
Wetland Mapping ............................................................................................... 2
3.0
METHODOLOGY AND RESULTS ........................................................................ 2
4.0
WETLAND AND WATERWAY IMPACTS ............................................................. 3
LIST OF APPENDICES
APPENDIX A:
PROJECT DATABASE MAPPING
APPENDIX B:
PRELIMINARY ORDINARY HIGH WATER DELINEATION WITH
DATA POINT
APPENDIX C:
WETLAND DETERMINATION DATA FORMS
Quaker Bridge Replacement, Town of Cortlandt November 2024
US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report
Page 1
OSPA Engineering Services, P.C.
1.0
INTRODUCTION
This Wetland and Ordinary High Water (OHW) Delineation Report was prepared for a project site
located where Quaker Bridge Road crosses the Croton River in the Town of Cortlandt,
Westchester County, New York. The “Site Location Map”, in Appendix A – Project Database
Mapping, illustrates the site location.
2.0
EXISTING CONDITIONS
2.1
Topography
Surface water generally drains to the south by channel or sheet flow. The New York State
Department of Environmental Conservation (NYSDEC) Environmental Resource Mapper
(ERM), United State Department of Agriculture (USDA) Soil Survey Map, and the United
States Geological Survey (USGS) topographic mapping do not identify wetlands within the
project area. The United States Fish and Wildlife Service (USFWS) National Wetlands
Inventory (NWI) Map and the NYSDEC ERM both identify a river within the project site.
2.2
Soils
The following is a description of the soil found on the site. The Soil Survey Mapping with
the approximate project boundaries is included in Appendix A.
Charlton fine sandy loam, 15 to 25 percent slopes (ChD): This series is comprised of
well drained, coarse loamy melt out till derived from granite, gneiss and/or schist.
Charlton loam, 35 to 45 percent slopes, very stones (CIF): This series is comprised of
well drained, acid loamy till derived mainly from schist, gneiss, or granite.
2.3
Hydrology
Surface water generally drains to the south by channel or sheet flow which enters the
Croton River (NYSDEC Class B), and eventually the Hudson River (NYSDEC Class SB).
The best usage for Class B water is swimming and contact recreation, not suitable for
drinking. The best usage for Class SB water is swimming, contact recreation, and fishing.
Additionally, Flood Emergency Management Act (FEMA) floodplain maps (36119C0128F,
2007) were reviewed to identify any potential flood risk to the project site. The project site
in the vicinity of the crossing is located within the regulatory floodway and in the 100-year
floodplain of the Croton River.
A review of the National Resources Conservation Service (NRCS) Wetland Determination
Climate Data (WETS Table.36119. WESTCHESTER CO AP) for Westchester County
indicates that the 20-year average annual rainfall is 58.44 inches per year.
Quaker Bridge Replacement, Town of Cortlandt November 2024
US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report
Page 2
OSPA Engineering Services, P.C.
2.4
Vegetative Communities
Wetland plant communities follow the Cowardin system as identified in the “Classification
of Wetlands and Deepwater Habitats of the United States” as utilized by the United States
Fish and Wildlife Services (USFWS) National Wetland Inventory (NWI) mapping. The
NWI mapping identifies a riverine, tidal, unconsolidated bottom, permanently flooded- tidal
riverine community (R1UBV) within the project site.
Based on the site visit, the subject property has one waterbody (Croton River). The project
corridor is currently comprised of forested tree and shrub cover with an understory of
herbaceous cover. The tree cover included Red Maple (Acer rubrum), American Beech
(Fagus grandfolia), Eastern Hemlock (Tsuga canadensis), Eastern Sycamore (Platanus
occidentalis), and Tulip Tree (Liriodendron tulipfera). The shrub layer included Burning
Bush (Euonymus alatus), Witch Hazel (Hamamelis virginiana), and Ironwood (Ostrya
virginiana). The herbaceous cover included Christmas Fern (Polystichum acrostichoides),
Marginal Wood Fern (Dryopteris marginalis), Shagbark Hickory (Carya ovata), Bitternut
Hickory (Carya cordiformis), and Slender Goldenrod (Solidago erecta).
2.5
Wetland Mapping
The NYSDEC ERM identifies the approximate locations of the wetlands, streams, and
other environmental features on or near the project site that are regulated by the NYSDEC
(Appendix A). According to the NYSDEC ERM, there are no state-regulated wetlands on
the project site. There is one mapped NYSDEC river (Croton River). Additionally, the
NWI mapping for the project site, located in Appendix A, identifies a riverine vegetative
community on the site (Croton River).
3.0
METHODOLOGY AND RESULTS
The ordinary high water (OHW) determination for the area of investigation was conducted on
November 18th, 2024. The delineation was performed using the three-parameter approach
described in the United States Army Corps of Engineers’ (USACE) Wetland Delineation Manual
and the Northcentral and Northeast Regional Supplement.
Data was collected within the regulated areas and uplands at representative points to document
the existing vegetation, soils and hydrology. Data sampling protocols followed the USACE
Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Northcentral and
Northeast guidance for vegetation analysis. The sampling plot sizes were selected to ensure an
accurate assessment of the vegetation present within the existing wetland boundaries. A 20’ x
60’ plot (1200 sf) was utilized for both tree and shrub strata, and a 5’ x 20’ plot (100 sf) was utilized
for the herb stratum. These plots sizes were selected based on the narrow rectangular shape of
the subject property, the site vegetation composition, and the relative vegetation density in each
of the strata.
Using a soil auger, soil samples were taken approximately 12 inches below the ground surface to
characterize soils. Soil colors were documented using a Munsell Soil Color Chart. Hydrology
was assessed by evaluating for inundation, saturation, and other site conditions.
Quaker Bridge Replacement, Town of Cortlandt November 2024
US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report
Page 3
OSPA Engineering Services, P.C.
Vegetation found at the sampling locations was identified in terms of the dominant species in the
tree, shrub/sapling, herbaceous, and vine layers. The indicator status of the dominant plant
species was determined using the “The National Wetland Plant List - Northcentral and Northeast
Region 1” (Lichvar, R.W., 2016).
Following the establishment of the OHW boundaries in the field, the boundary was collected by
hand-held GPS and plotted on the field sketch. This OHW line and approximate property
boundary is included within Appendix B (“Preliminary Ordinary High Water and Delineation with
Data Point”) and includes the location of a representative data point. The information collected
at the data point locations is included in this report as Appendix C – Wetland Determination Data
Forms.
The field efforts identified one (1) perennial river (Croton River), the OHW was delineated as a
flag series of LB (1-16) and RB (1-27). No wetlands were identified during the site visit.
The upland areas are generally dominated by maintained right of way, residential homes and
maintained lawns, forested shrub and tree cover.
4.0
WETLAND AND WATERWAY IMPACTS
It was concluded that Stream LB (1-16) and RB (1-27) will be regulated by the USACE and the
NYSDEC as a Class B waterbody.
While the site is currently in preliminary design, impacts to regulated waterbodies will be
minimized as part of the proposed bridge replacement. It is anticipated that a USACE Section
404 Nationwide Permit 3 will be required based on the anticipated impacts (less than 0.5 acres).
In addition, a NYSDEC Article 15 Protection of Waters Permit and a NYSDEC Section 401 Water
Quality Certification would be required.
Ultimately, the exact permitting pathway can only be confirmed through coordination with the
USACE and the NYSDEC.
Quaker Bridge Replacement, Town of Cortlandt November 2024
US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report
Page 4
OSPA Engineering Services, P.C.
References
U.S. Army Corps of Engineers. 1987. Wetlands Delineation Manual.
U.S. Army Corps of Engineers. 2012. Regional Supplement to the Corps of Engineers
Wetland Delineation Manual: Northcentral and Northeast Region (Version 2.0)
National Wetland Inventory Map, USFWS.
USDA Natural Resource Conservation Service. Soil Survey for Westchester County, New
York.
USDA Natural Resources Conservation Service. National Cooperative Soil Survey.
Official Soil Descriptions from the National Soils Database.
U.S. Geological Survey. Bridgeport, NY Quadrangle. 2023.
Federal Emergency Management Agency. Flood Insurance Rate Map. Map Number
36119C0128F, 2007.
Lichvar, R.W. 2016. The National Wetland Plant List - Northcentral and Northeast Region
1. U.S. Army Corps of Engineers, Cold Regions Research and Engineering
Laboratory.
Appendix A
Project Database Mapping
DATABASE MAPPING PROVIDED PREVIOUSLY
Appendix B
Preliminary Wetland and Ordinary High Water Delineation with
Data Point
Preliminary Wetland and Ordinary High Water Delineation with Data Points
NOT TO SCALE
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
Appendix C
Wetland Determination Data Forms
Project/Site:
Sampling Date:
Applicant/Owner:
State:
Sampling Point:
Investigator(s):
Subregion (LRR or MLRA):
Lat:
Long:
Datum:
Soil Map Unit Name:
NWI classification:
Are Vegetation
, Soil
, or Hydrology
Are Vegetation
, Soil
, or Hydrology
SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc.
If yes, optional Wetland Site ID:
Secondary Indicators (minimum of two required)
Wetland Hydrology Present?
Crayfish Burrows (C8)
Hydrogen Sulfide Odor (C1)
No
Yes
Depth (inches):
X
X
0
X
Depth (inches):
X
Depth (inches):
Saturation Visible on Aerial Imagery (C9)
Stunted or Stressed Plants (D1)
Geomorphic Position (D2)
Sparsely Vegetated Concave Surface (B8)
Saturation Present?
Saturation (A3)
Water Marks (B1)
Iron Deposits (B5)
Inundation Visible on Aerial Imagery (B7)
Presence of Reduced Iron (C4)
Recent Iron Reduction in Tilled Soils (C6)
Other (Explain in Remarks)
Oxidized Rhizospheres on Living Roots (C3)
Sediment Deposits (B2)
Drift Deposits (B3)
Surface Water (A1)
FAC-Neutral Test (D5)
X
Shallow Aquitard (D3)
Microtopographic Relief (D4)
Remarks:
(includes capillary fringe)
Yes
No
No
Yes
Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available:
Field Observations:
Water Table Present?
High Water Table (A2)
WETLAND DETERMINATION DATA FORM – Northcentral and Northeast Region
X
X
Westchester County
No
41.211978°
Charlton laom, 35 to 45 percent slopes, very stony
11/18/2024
DP-RBU
Quaker Bridge Replacement
Westchester County
City/County:
NY
73.869444°
Yes
No
X
No
X
0
Yes
Remarks: (Explain alternative procedures here or in a separate report.)
Yes
HYDROLOGY
Surface Soil Cracks (B6)
Aquatic Fauna (B13)
Drainage Patterns (B10)
Moss Trim Lines (B16)
Dry-Season Water Table (C2)
No
No
X
X
No
Yes
No
10
NAD 83
Wetland Hydrology Indicators:
Wetland Hydrology Present?
Is the Sampled Area
within a Wetland?
Data point was sampled on streambank, upland.
Primary Indicators (minimum of one is required; check all that apply)
Yes
Yes
Hydrophytic Vegetation Present?
Hydric Soil Present?
Water-Stained Leaves (B9)
Slope (%):
Landform (hillside, terrace, etc.):
Are climatic / hydrologic conditions on the site typical for this time of year?
significantly disturbed?
Are “Normal Circumstances” present?
naturally problematic?
Surface Water Present?
Section, Township, Range:
Concave
Local relief (concave, convex, none):
Yes
Algal Mat or Crust (B4)
(If needed, explain any answers in Remarks.)
Thin Muck Surface (C7)
N. Laing, G. Koetzle
LRR R, MLRA 144A
(If no, explain in Remarks.)
Town of Cortlandt
Streambank
Marl Deposits (B15)
US Army Corps of Engineers
Northcentral and Northeast Region – Version 2.0
Sampling Point:
(Plot size:
1.
2.
3.
4.
5.
6.
(A/B)
7.
Sapling/Shrub Stratum (Plot size:
x 1 =
1.
x 2 =
2.
x 3 =
3.
x 4 =
4.
x 5 =
5.
Column Totals:
(B)
6.
7.
Herb Stratum
(Plot size:
1.
2.
4 - Morphological Adaptations1 (Provide supporting
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
(Plot size:
1.
2.
3.
4.
– Use scientific names of plants.
OBL species
FACW species
FAC species
FACU species
UPL species
DP-RBU
3
6
Liriodendron tulipifera
Platanus occidentalis
Betula populifolia
Quercus coccinea
FACU
30'x30'
Total Number of Dominant
Species Across All Strata:
)
Dominance Test worksheet:
Number of Dominant Species
That Are OBL, FACW, or FAC:
No
Acer rubrum
12
0
18
36
117
data in Remarks or on a separate sheet)
8
179
108
0
468
Acer rubrum
Euonymus alatus
Hydrophytic Vegetation Indicators:
40
652
Multiply by:
36
50.0%
Percent of Dominant Species
That Are OBL, FACW, or FAC:
Total % Cover of:
Prevalence Index worksheet:
6
No
FAC
15
10
10
FACU
Yes
No
69
15
FAC
Yes
No
No
FACU
FACU
FACU
FAC
Yes
Ostrya virginiana
No
No
Yes
No
15
Tree – Woody plants 3 in. (7.6 cm) or more in diameter
at breast height (DBH), regardless of height.
Definitions of Vegetation Strata:
Herb – All herbaceous (non-woody) plants, regardless
of size, and woody plants less than 3.28 ft tall.
Hydrophytic
Vegetation
Present?
Woody vines – All woody vines greater than 3.28 ft in
height.
Yes
No
Sapling/shrub – Woody plants less than 3 in. DBH
and greater than or equal to 3.28 ft (1 m) tall.
=Total Cover
)
5'x5'
=Total Cover
=Total Cover
55
)
Carya cordiformis
Solidago erecta
Botrychium multifidum
6
5
FACU
FACU
3
FACU
Equisetum arvense
6
Fraxinus americana
Polystichum acrostichoides
FACU
Indicator
Status
25
18
Absolute
% Cover
Yes
Yes
FACW
FACU
8
No
UPL
Dominant
Species?
Euonymus alatus
5
20
15'x15'
Tsuga canadensis
3.64
No
55
Problematic Hydrophytic Vegetation1 (Explain)
VEGETATION
(A)
(B)
(A)
Prevalence Index = B/A =
Tree Stratum
Woody Vine Stratum
Remarks: (Include photo numbers here or on a separate sheet.)
1 - Rapid Test for Hydrophytic Vegetation
2 - Dominance Test is >50%
3 - Prevalence Index is ≤3.01
)
=Total Cover
FACU
1Indicators of hydric soil and wetland hydrology must
be present, unless disturbed or problematic.
US Army Corps of Engineers
Northcentral and Northeast Region – Version 2.0
Sampling Point:
Polyvalue Below Surface (S8) (LRR K, L)
Thin Dark Surface (S9) (LRR K, L)
Iron-Manganese Masses (F12) (LRR K, L, R)
3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic.
Sandy Gleyed Matrix (S4)
Depleted Dark Surface (F7)
Redox Depressions (F8)
Redox Dark Surface (F6)
Hydrogen Sulfide (A4)
Stratified Layers (A5)
Thick Dark Surface (A12)
Sandy Mucky Mineral (S1)
Loamy Mucky Mineral (F1) (LRR K, L)
Loamy Gleyed Matrix (F2)
High Chroma Sands (S11) (LRR K, L)
Type:
Thin Dark Surface (S9) (LRR R, MLRA 149B)
5 cm Mucky Peat or Peat (S3) (LRR K, L, R)
Sandy Redox (S5)
Dark Surface (S7)
Mesic Spodic (TA6) (MLRA 144A, 145, 149B)
Piedmont Floodplain Soils (F19) (MLRA 149B)
Red Parent Material (F21)
Depleted Matrix (F3)
Black Histic (A3)
Coast Prairie Redox (A16) (LRR K, L, R)
2Location: PL=Pore Lining, M=Matrix.
Hydric Soil Indicators:
Polyvalue Below Surface (S8) (LRR R,
%
Matrix
Histic Epipedon (A2)
MLRA 149B)
Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)
Histosol (A1)
Indicators for Problematic Hydric Soils3:
2 cm Muck (A10) (LRR K, L, MLRA 149B)
Redox Features
Depth
(inches)
Color (moist)
2.5YR 3/1
0-8
DP-RBU
SOIL
Type1
%
This data form is revised from Northcentral and Northeast Regional Supplement Version 2.0 to reflect the NRCS Field Indicators of Hydric Soils
version 7.0 March 2013 Errata. (http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_051293.docx)
Remarks:
Stripped Matrix (S6)
Restrictive Layer (if observed):
Rock
No
Depleted Below Dark Surface (A11)
X
8
Depth (inches):
Yes
Hydric Soil Present?
Color (moist)
Marl (F10) (LRR K, L)
Other (Explain in Remarks)
Loc2
Texture
Remarks
Loamy/Clayey
Very Shallow Dark Surface (TF12)
1Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains.
US Army Corps of Engineers
Northcentral and Northeast Region – Version 2.0
Project/Site:
Sampling Date:
Applicant/Owner:
State:
Sampling Point:
Investigator(s):
Subregion (LRR or MLRA):
Lat:
Long:
Datum:
Soil Map Unit Name:
NWI classification:
Are Vegetation
, Soil
, or Hydrology
Are Vegetation
, Soil
, or Hydrology
SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc.
If yes, optional Wetland Site ID:
Secondary Indicators (minimum of two required)
Wetland Hydrology Present?
Crayfish Burrows (C8)
Hydrogen Sulfide Odor (C1)
No
Yes
Depth (inches):
X
X
0
X
Depth (inches):
X
Depth (inches):
Saturation Visible on Aerial Imagery (C9)
Stunted or Stressed Plants (D1)
Geomorphic Position (D2)
Sparsely Vegetated Concave Surface (B8)
Saturation Present?
Saturation (A3)
Water Marks (B1)
Iron Deposits (B5)
Inundation Visible on Aerial Imagery (B7)
Presence of Reduced Iron (C4)
Recent Iron Reduction in Tilled Soils (C6)
Other (Explain in Remarks)
Oxidized Rhizospheres on Living Roots (C3)
Sediment Deposits (B2)
Drift Deposits (B3)
Surface Water (A1)
FAC-Neutral Test (D5)
X
Shallow Aquitard (D3)
Microtopographic Relief (D4)
Remarks:
(includes capillary fringe)
Yes
No
No
Yes
Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available:
Field Observations:
Water Table Present?
High Water Table (A2)
WETLAND DETERMINATION DATA FORM – Northcentral and Northeast Region
X
X
Westchester County
No
41.212078°
Charlton laom, 35 to 45 percent slopes, very stony
11/18/2024
DP-LBU
Quaker Bridge Replacement
Westchester County
City/County:
NY
73.868333°
Yes
No
X
No
X
0
Yes
Remarks: (Explain alternative procedures here or in a separate report.)
Yes
HYDROLOGY
Surface Soil Cracks (B6)
Aquatic Fauna (B13)
Drainage Patterns (B10)
Moss Trim Lines (B16)
Dry-Season Water Table (C2)
No
No
X
X
No
Yes
No
10
NAD 83
Wetland Hydrology Indicators:
Wetland Hydrology Present?
Is the Sampled Area
within a Wetland?
Data point was sampled on streambank, upland.
Primary Indicators (minimum of one is required; check all that apply)
Yes
Yes
Hydrophytic Vegetation Present?
Hydric Soil Present?
Water-Stained Leaves (B9)
Slope (%):
Landform (hillside, terrace, etc.):
Are climatic / hydrologic conditions on the site typical for this time of year?
significantly disturbed?
Are “Normal Circumstances” present?
naturally problematic?
Surface Water Present?
Section, Township, Range:
Concave
Local relief (concave, convex, none):
Yes
Algal Mat or Crust (B4)
(If needed, explain any answers in Remarks.)
Thin Muck Surface (C7)
N. Laing, G. Koetzle
LRR R, MLRA 144A
(If no, explain in Remarks.)
Town of Cortlandt
Streambank
Marl Deposits (B15)
US Army Corps of Engineers
Northcentral and Northeast Region – Version 2.0
Sampling Point:
(Plot size:
1.
2.
3.
4.
5.
6.
(A/B)
7.
Sapling/Shrub Stratum (Plot size:
x 1 =
1.
x 2 =
2.
x 3 =
3.
x 4 =
4.
x 5 =
5.
Column Totals:
(B)
6.
7.
Herb Stratum
(Plot size:
1.
2.
4 - Morphological Adaptations1 (Provide supporting
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
(Plot size:
1.
2.
3.
4.
– Use scientific names of plants.
OBL species
FACW species
FAC species
FACU species
UPL species
DP-LBU
0
7
Fragus grandifolia
Tsuga canadensis
Acer rubrum
FAC
30'x30'
Total Number of Dominant
Species Across All Strata:
)
Dominance Test worksheet:
Number of Dominant Species
That Are OBL, FACW, or FAC:
No
6
0
0
9
100
data in Remarks or on a separate sheet)
15
124
27
0
400
Euonymus alatus
Fagus grandifolia
Hydrophytic Vegetation Indicators:
75
502
Multiply by:
0
0.0%
Percent of Dominant Species
That Are OBL, FACW, or FAC:
Total % Cover of:
Prevalence Index worksheet:
10
8
6
FACU
Yes
No
33
15
FACU
Yes
No
No
No
FACU
FACU
FACU
3
UPL
Yes
Quercus rubra
No
Yes
Yes
12
Tree – Woody plants 3 in. (7.6 cm) or more in diameter
at breast height (DBH), regardless of height.
Definitions of Vegetation Strata:
Herb – All herbaceous (non-woody) plants, regardless
of size, and woody plants less than 3.28 ft tall.
Hydrophytic
Vegetation
Present?
Woody vines – All woody vines greater than 3.28 ft in
height.
Yes
No
Sapling/shrub – Woody plants less than 3 in. DBH
and greater than or equal to 3.28 ft (1 m) tall.
=Total Cover
)
5'x5'
=Total Cover
=Total Cover
44
)
Carya ovata
Carya cordiformis
5
5
FACU
FACU
Fagus grandifolia
Acer rubrum
10
Hamamelis virginiana
Dryopteris marginalis
FACU
Indicator
Status
15
12
Absolute
% Cover
Yes
Yes
FACU
FACU
Dominant
Species?
Polystichum acrostichoides
5
12
15'x15'
Fraxinus americana
4.05
No
47
Problematic Hydrophytic Vegetation1 (Explain)
VEGETATION
(A)
(B)
(A)
Prevalence Index = B/A =
Tree Stratum
Woody Vine Stratum
Remarks: (Include photo numbers here or on a separate sheet.)
1 - Rapid Test for Hydrophytic Vegetation
2 - Dominance Test is >50%
3 - Prevalence Index is ≤3.01
)
=Total Cover
FAC
FACU
1Indicators of hydric soil and wetland hydrology must
be present, unless disturbed or problematic.
US Army Corps of Engineers
Northcentral and Northeast Region – Version 2.0
Sampling Point:
Polyvalue Below Surface (S8) (LRR K, L)
Thin Dark Surface (S9) (LRR K, L)
Iron-Manganese Masses (F12) (LRR K, L, R)
3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic.
Sandy Gleyed Matrix (S4)
Depleted Dark Surface (F7)
Redox Depressions (F8)
Redox Dark Surface (F6)
Hydrogen Sulfide (A4)
Stratified Layers (A5)
Thick Dark Surface (A12)
Sandy Mucky Mineral (S1)
Loamy Mucky Mineral (F1) (LRR K, L)
Loamy Gleyed Matrix (F2)
High Chroma Sands (S11) (LRR K, L)
Type:
Thin Dark Surface (S9) (LRR R, MLRA 149B)
5 cm Mucky Peat or Peat (S3) (LRR K, L, R)
Sandy Redox (S5)
Dark Surface (S7)
Mesic Spodic (TA6) (MLRA 144A, 145, 149B)
Piedmont Floodplain Soils (F19) (MLRA 149B)
Red Parent Material (F21)
Depleted Matrix (F3)
Black Histic (A3)
Coast Prairie Redox (A16) (LRR K, L, R)
2Location: PL=Pore Lining, M=Matrix.
Hydric Soil Indicators:
Polyvalue Below Surface (S8) (LRR R,
%
Matrix
Histic Epipedon (A2)
MLRA 149B)
Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)
Histosol (A1)
Indicators for Problematic Hydric Soils3:
2 cm Muck (A10) (LRR K, L, MLRA 149B)
Redox Features
Depth
(inches)
Color (moist)
7.5YR 3/1
0-3
DP-LBU
SOIL
Type1
%
This data form is revised from Northcentral and Northeast Regional Supplement Version 2.0 to reflect the NRCS Field Indicators of Hydric Soils
version 7.0 March 2013 Errata. (http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_051293.docx)
Remarks:
Stripped Matrix (S6)
Restrictive Layer (if observed):
Rock
No
Depleted Below Dark Surface (A11)
X
3
Depth (inches):
Yes
Hydric Soil Present?
Color (moist)
Marl (F10) (LRR K, L)
Other (Explain in Remarks)
Loc2
Texture
Remarks
Loamy/Clayey
Very Shallow Dark Surface (TF12)
1Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains.
US Army Corps of Engineers
Northcentral and Northeast Region – Version 2.0
Page 1 of 13
Full Environmental Assessment Form
Part 1 - Project and Setting
Instructions for Completing Part 1
Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding,
are subject to public review, and may be subject to further verification.
Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to
any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist,
or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to
update or fully develop that information.
Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that
must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the
answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any
additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information
contained in Part 1is accurate and complete.
A. Project and Applicant/Sponsor Information.
Name of Action or Project:
Project Location (describe, and attach a general location map):
Brief Description of Proposed Action (include purpose or need):
Name of Applicant/Sponsor:
Telephone:
E-Mail:
Address:
City/PO:
State:
Zip Code:
Project Contact (if not same as sponsor; give name and title/role):
Telephone:
E-Mail:
Address:
City/PO:
State:
Zip Code:
Property Owner (if not same as sponsor):
Telephone:
E-Mail:
Address:
City/PO:
State:
Zip Code:
Quaker Bridge Road Bridge Replacement (RB03W)
Quaker Bridge Road over Croton River, Town of Cortlandt and Village of Croton-On-Hudson, Westchester County, NY
Replacement of the steel truss bridge which carries Quaker Bridge Road over the Croton River. Constructed in 1894, it is a 98-foot long, single-lane bridge
with stone abutments that is now closed due to structural deficiencies. The new bridge will be also be a truss bridge made of galvanized steel and built on
the existing alignment, but will be approximately 12 feet wider to allow for 2-way vehicular traffic as well as 2-way pedestrian passage. Scope of work will
include new concrete abutments and the removal of trees to accommodate construction staging areas and overhead construction activities, such as those
utilizing cranes for pile and bridge installation, wingwall installation and site grading. Project limits will be Quaker bridge and approximately 200 feet along
the south approach and 500 feet along the north approach to the bridge to accommodate the bridge replacement and reconstructing the roadway impacted
by the construction activities, including excavation for the bridge abutment removal and reconstruction. An overhead electrical line may need to be
relocated to accommodate overhead construction activities.
County of Westchester
914-995-2000
148 Martine Avenue
White Plains
NY
10601
Hugh J. Greechan, Jr., P.E., Commissioner of Westchester County PW&T
914-995-2546
hjg7@westchestercountyny.gov
Department of Public Works and Transportation, 148 Martine Avenue, Room 512
White Plains
NY
10601
Bridge owned by County; riverbanks & roads owned by Town of Cortlandt, Village of Croton & NYS
Page 2 of 13
B. Government Approvals
B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial
assistance.)
Government Entity
If Yes: Identify Agency and Approval(s)
Required
Application Date
(Actual or projected)
a. City Counsel, Town Board,
9 Yes 9 No
or Village Board of Trustees
b. City, Town or Village
9 Yes 9 No
Planning Board or Commission
c. City, Town or
9 Yes 9 No
Village Zoning Board of Appeals
d. Other local agencies
9 Yes 9 No
e. County agencies
9 Yes 9 No
f. Regional agencies
9 Yes 9 No
g. State agencies
9 Yes 9 No
h. Federal agencies
9 Yes 9 No
i. Coastal Resources.
i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway?
9 Yes 9 No
ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program?
9 Yes 9 No
iii. Is the project site within a Coastal Erosion Hazard Area?
9 Yes 9 No
C. Planning and Zoning
C.1. Planning and zoning actions.
Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the
9 Yes 9 No
only approval(s) which must be granted to enable the proposed action to proceed?
•
If Yes, complete sections C, F and G.
•
If No, proceed to question C.2 and complete all remaining sections and questions in Part 1
C.2. Adopted land use plans.
a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site
9 Yes 9 No
where the proposed action would be located?
If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action
9 Yes 9 No
would be located?
b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway;
9 Yes 9 No
Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan;
or other?)
If Yes, identify the plan(s):
_______________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, 9 Yes 9 No
or an adopted municipal farmland protection plan?
If Yes, identify the plan(s):
________________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
(Village of Croton)
Village of Croton-on-Hudson (property transfer &
easement); Town of Cortlandt (various)
Coordination ongoing
Water Control Commission (Wetland permit)
Waterfront Advisory Committee (LWRP review)
TBD
Westchester County Board of Legislators (project
authorization and funding)
June 2025 (projected)
NYSDEC Section 401/Article 15
NYSHPO (consultation)
TBD
USACE NWP#3, USFWS (consultation)
TBD
Both Town of Cortlandt and Village of Croton-on-Hudson are Greenway Compact Communities. Site is within the County's Critical Environmental Areas
under County and State Park Lands and Croton Point Park. Part of the project area is also within the Village of Croton-on-Hudson's LWRP.
Page 3 of 13
C.3. Zoning
a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance.
9 Yes 9 No
If Yes, what is the zoning classification(s) including any applicable overlay district?
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
b. Is the use permitted or allowed by a special or conditional use permit?
9 Yes 9 No
c. Is a zoning change requested as part of the proposed action?
9 Yes 9 No
If Yes,
i. What is the proposed new zoning for the site? ___________________________________________________________________
C.4. Existing community services.
a. In what school district is the project site located? ________________________________________________________________
b. What police or other public protection forces serve the project site?
_________________________________________________________________________________________________________
c. Which fire protection and emergency medical services serve the project site?
__________________________________________________________________________________________________________
d. What parks serve the project site?
__________________________________________________________________________________________________________
__________________________________________________________________________________________________________
D. Project Details
D.1. Proposed and Potential Development
a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all
components)?
_________________________________________________________________________________________________________
b. a. Total acreage of the site of the proposed action?
_____________ acres
b. Total acreage to be physically disturbed?
_____________ acres
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor?
_____________ acres
c. Is the proposed action an expansion of an existing project or use?
9 Yes 9 No
i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units,
square feet)? % ____________________
Units: ____________________
d. Is the proposed action a subdivision, or does it include a subdivision?
9 Yes 9 No
If Yes,
i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types)
________________________________________________________________________________________________________
ii. Is a cluster/conservation layout proposed?
9 Yes 9 No
iii. Number of lots proposed? ________
iv. Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________
9 Yes 9 No
_____ months
_____
_____ month _____ year
e. Will the proposed action be constructed in multiple phases?
i. If No, anticipated period of construction:
ii. If Yes:
•
Total number of phases anticipated
•
Anticipated commencement date of phase 1 (including demolition)
•
Anticipated completion date of final phase
_____ month _____year
•
Generally describe connections or relationships among phases, including any contingencies where progress of one phase may
determine timing or duration of future phases: _______________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
Croton: PRE-1 Park Recreation and Education and RA-25 One Family Residence; Cortlandt: R-80 Single Family Residential
Croton-Harmon Union Free School District
Croton-on-Hudson Police Department, NYS Police and Westchester County Public Safety
The Croton Fire District and Westchester Emergency Medical Services
N/A
1.2
0.50
0.60
75
1,200 SF increase in deck
10
Infrastructural (transportation)
Page 4 of 13
f. Does the project include new residential uses?
9 Yes 9 No
If Yes, show numbers of units proposed.
One Family
Two Family Three Family
Multiple Family (four or more)
Initial Phase
___________ ___________
____________
________________________
At completion
of all phases ___________ ___________
____________
________________________
g. Does the proposed action include new non-residential construction (including expansions)?
9 Yes 9 No
If Yes,
i. Total number of structures ___________
ii. Dimensions (in feet) of largest proposed structure: ________height; ________width; and _______ length
iii. Approximate extent of building space to be heated or cooled: ______________________ square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any
9 Yes 9 No
liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
If Yes,
i. Purpose of the impoundment: ________________________________________________________________________________
ii. If a water impoundment, the principal source of the water: 9 Ground water 9 Surface water streams 9 Other specify:
_________________________________________________________________________________________________________
iii. If other than water, identify the type of impounded/contained liquids and their source.
_________________________________________________________________________________________________________
iv. Approximate size of the proposed impoundment.
Volume: ____________ million gallons; surface area: ____________ acres
v. Dimensions of the proposed dam or impounding structure: ________ height; _______ length
vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):
________________________________________________________________________________________________________
D.2. Project Operations
a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both?
9 Yes 9 No
(Not including general site preparation, grading or installation of utilities or foundations where all excavated
materials will remain onsite)
If Yes:
i .What is the purpose of the excavation or dredging? _______________________________________________________________
ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
•
Volume (specify tons or cubic yards): ____________________________________________
•
Over what duration of time? ____________________________________________________
iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.
________________________________________________________________________________________________________
________________________________________________________________________________________________________
iv. Will there be onsite dewatering or processing of excavated materials?
9 Yes 9 No
If yes, describe. ___________________________________________________________________________________________
________________________________________________________________________________________________________
v. What is the total area to be dredged or excavated? _____________________________________acres
vi. What is the maximum area to be worked at any one time? _______________________________ acres
vii. What would be the maximum depth of excavation or dredging? __________________________ feet
viii. Will the excavation require blasting?
9 Yes 9 No
ix. Summarize site reclamation goals and plan: _____________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment
9 Yes 9 No
into any existing wetland, waterbody, shoreline, beach or adjacent area?
If Yes:
i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic
description): ______________________________________________________________________________________________
_________________________________________________________________________________________________________
1
20
32
100
N/A
Suitable materials to be reused for wider roadway or will be disposed of in off-site location approved by engineer in charge.
Dewatering may be required for full depth removal of abutments.
0.1
0.1
6
Site will be restored to existing conditions.
Croton River
Page 5 of 13
ii.
iii.
Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or
alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres:
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
Will the proposed action cause or result in disturbance to bottom sediments?
Yes 9 No
If Yes, describe: __________________________________________________________________________________________
iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation?
9 Yes 9 No
If Yes:
•
acres of aquatic vegetation proposed to be removed: ___________________________________________________________
•
expected acreage of aquatic vegetation remaining after project completion:________________________________________
•
purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________
____________________________________________________________________________________________________
•
proposed method of plant removal: ________________________________________________________________________
•
if chemical/herbicide treatment will be used, specify product(s): _________________________________________________
v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________
_________________________________________________________________________________________________________
c. Will the proposed action use, or create a new demand for water?
9 Yes 9 No
If Yes:
i. Total anticipated water usage/demand per day: __________________________ gallons/day
ii. Will the proposed action obtain water from an existing public water supply?
9 Yes 9 No
If Yes:
•
Name of district or service area: _________________________________________________________________________
•
Does the existing public water supply have capacity to serve the proposal?
9 Yes 9 No
•
Is the project site in the existing district?
9 Yes 9 No
•
Is expansion of the district needed?
9 Yes 9 No
•
Do existing lines serve the project site?
9 Yes 9 No
iii. Will line extension within an existing district be necessary to supply the project?
9 Yes 9 No
If Yes:
•
Describe extensions or capacity expansions proposed to serve this project: ________________________________________
____________________________________________________________________________________________________
•
Source(s) of supply for the district: ________________________________________________________________________
iv. Is a new water supply district or service area proposed to be formed to serve the project site?
9 Yes 9 No
If, Yes:
•
Applicant/sponsor for new district: ________________________________________________________________________
•
Date application submitted or anticipated: __________________________________________________________________
•
Proposed source(s) of supply for new district: _______________________________________________________________
v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________
_________________________________________________________________________________________________________
vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: _______ gallons/minute.
d. Will the proposed action generate liquid wastes?
9 Yes 9 No
If Yes:
i. Total anticipated liquid waste generation per day: _______________ gallons/day
ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
approximate volumes or proportions of each): __________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
iii. Will the proposed action use any existing public wastewater treatment facilities?
9 Yes 9 No
If Yes:
•
Name of wastewater treatment plant to be used: _____________________________________________________________
•
Name of district: ______________________________________________________________________________________
•
Does the existing wastewater treatment plant have capacity to serve the project?
9 Yes 9 No
•
Is the project site in the existing district?
9 Yes 9 No
•
Is expansion of the district needed?
9 Yes 9 No
Croton River, less than 0.1 acres of permanent impacts. New wing walls will be constructed on both banks, with site grading and
placement of riprap on banks.
Page 6 of 13
9 Yes 9 No
•
Do existing sewer lines serve the project site?
•
Will a line extension within an existing district be necessary to serve the project?
9 Yes 9 No
If Yes:
•
Describe extensions or capacity expansions proposed to serve this project: ____________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
iv. Will a new wastewater (sewage) treatment district be formed to serve the project site?
9 Yes 9 No
If Yes:
•
Applicant/sponsor for new district: ____________________________________________________________________
•
Date application submitted or anticipated: _______________________________________________________________
•
What is the receiving water for the wastewater discharge? __________________________________________________
v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed
receiving water (name and classification if surface discharge or describe subsurface disposal plans):
________________________________________________________________________________________________________
________________________________________________________________________________________________________
vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point
9 Yes 9 No
sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point
source (i.e. sheet flow) during construction or post construction?
If Yes:
i. How much impervious surface will the project create in relation to total size of project parcel?
_____ Square feet or _____ acres (impervious surface)
_____ Square feet or _____ acres (parcel size)
ii. Describe types of new point sources. __________________________________________________________________________
_________________________________________________________________________________________________________
iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties,
groundwater, on-site surface water or off-site surface waters)?
________________________________________________________________________________________________________
________________________________________________________________________________________________________
•
If to surface waters, identify receiving water bodies or wetlands: ________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
•
Will stormwater runoff flow to adjacent properties?
9 Yes 9 No
iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater?
9 Yes 9 No
f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel
9 Yes 9 No
combustion, waste incineration, or other processes or operations?
If Yes, identify:
i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles)
_________________________________________________________________________________________________________
ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers)
________________________________________________________________________________________________________
iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation)
________________________________________________________________________________________________________
g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit,
9 Yes 9 No
or Federal Clean Air Act Title IV or Title V Permit?
If Yes:
i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet
9 Yes 9 No
ambient air quality standards for all or some parts of the year)
ii. In addition to emissions as calculated in the application, the project will generate:
•
___________Tons/year (short tons) of Carbon Dioxide (CO2)
•
___________Tons/year (short tons) of Nitrous Oxide (N2O)
•
___________Tons/year (short tons) of Perfluorocarbons (PFCs)
•
___________Tons/year (short tons) of Sulfur Hexafluoride (SF6)
•
___________Tons/year (short tons) of Carbon Dioxide equivalent of Hydroflourocarbons (HFCs)
•
___________Tons/year (short tons) of Hazardous Air Pollutants (HAPs)
Page 7 of 13
h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants,
9 Yes 9 No
landfills, composting facilities)?
If Yes:
i. Estimate methane generation in tons/year (metric): ________________________________________________________________
ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or
electricity, flaring): ________________________________________________________________________________________
_________________________________________________________________________________________________________
i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as
9 Yes 9 No
quarry or landfill operations?
If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust):
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial
9 Yes 9 No
new demand for transportation facilities or services?
If Yes:
i. When is the peak traffic expected (Check all that apply):
Morning
Evening
Weekend
Randomly between hours of __________ to ________.
ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): _____________
iii.
iv.
v.
Parking spaces:
Existing ___________________ Proposed ___________ Net increase/decrease _____________________
Does the proposed action include any shared use parking? Yes No
9 Yes 9 No
vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site?
vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric
9 Yes 9 No
or other alternative fueled vehicles?
viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing
9 Yes 9 No
pedestrian or bicycle routes?
k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand
9 Yes 9 No
for energy?
If Yes:
i. Estimate annual electricity demand during operation of the proposed action: ____________________________________________
_________________________________________________________________________________________________________
ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or
other):
________________________________________________________________________________________________________
iii. Will the proposed action require a new, or an upgrade, to an existing substation?
9 Yes 9 No
l. Hours of operation. Answer all items which apply.
i. During Construction:
ii. During Operations:
•
Monday - Friday: _________________________
•
Monday - Friday: ____________________________
•
Saturday: ________________________________
•
Saturday: ___________________________________
•
Sunday: _________________________________
•
Sunday: ____________________________________
•
Holidays: ________________________________
•
Holidays: ___________________________________
If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe:
________________________________________________________________________________________________________
________________________________________________________________________________________________________
7am-5pm
N/A
N/A
N/A
N/A
Page 8 of 13
m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction,
9 Yes 9 No
operation, or both?
If yes:
i. Provide details including sources, time of day and duration:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen?
9 Yes 9 No
Describe: _________________________________________________________________________________________________
_________________________________________________________________________________________________________
n. W
th
ill
prop
e
os
actio
ed
hav
n
e outd
ligh
oor
ting?
9 Yes 9 No
If yes:
i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures:
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen?
9 Yes 9 No
Describe: _________________________________________________________________________________________________
_________________________________________________________________________________________________________
o. Does the proposed action have the potential to produce odors for more than one hour per day?
9 Yes 9 No
If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest
occupied structures: ______________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
p.
9 Yes 9 No
Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons)
or chemical products 185 gallons in above ground storage or any amount in underground storage?
If Yes:
i. Product(s) to be stored ______________________________________________________________________________________
ii. Volume(s) ______ per unit time ___________ (e.g., month, year)
iii. Generally, describe the proposed storage facilities:________________________________________________________________
________________________________________________________________________________________________________
q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides,
9 Yes 9 No
insecticides) during construction or operation?
If Yes:
i. Describe proposed treatment(s):
________________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
ii. Will the proposed action use Integrated Pest Management Practices?
9 Yes 9 No
r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal
9 Yes 9 No
of solid waste (excluding hazardous materials)?
If Yes:
i. Describe any solid waste(s) to be generated during construction or operation of the facility:
•
Construction: ____________________ tons per ________________ (unit of time)
•
Operation : ____________________ tons per ________________ (unit of time)
ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:
•
Construction: ________________________________________________________________________________________
____________________________________________________________________________________________________
•
Operation: __________________________________________________________________________________________
____________________________________________________________________________________________________
iii. Proposed disposal methods/facilities for solid waste generated on-site:
•
Construction: ________________________________________________________________________________________
____________________________________________________________________________________________________
•
Operation: __________________________________________________________________________________________
____________________________________________________________________________________________________
During construction only for the hours previously listed.
Page 9 of 13
s. Does the proposed action include construction or modification of a solid waste management facility?
9 Yes 9 No
If Yes:
i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or
other disposal activities): ___________________________________________________________________________________
ii. Anticipated rate of disposal/processing:
•
________ Tons/month, if transfer or other non-combustion/thermal treatment, or
•
________ Tons/hour, if combustion or thermal treatment
iii. If landfill, anticipated site life: ________________________________ years
t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous 9 Yes 9 No
waste?
If Yes:
i. Name(s) of all hazardous wastes or constituents to be generated, handled or managed at facility: ___________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
ii. Generally describe processes or activities involving hazardous wastes or constituents: ___________________________________
_________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii. Specify amount to be handled or generated _____ tons/month
iv. Describe any proposals for on-site minimization, recycling or reuse of hazardous constituents: ____________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility?
9 Yes 9 No
If Yes: provide name and location of facility: _______________________________________________________________________
________________________________________________________________________________________________________
If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility:
________________________________________________________________________________________________________
________________________________________________________________________________________________________
E. Site and Setting of Proposed Action
E.1. Land uses on and surrounding the project site
a. Existing land uses.
i. Check all uses that occur on, adjoining and near the project site.
9 Urban 9 Industrial 9 Commercial 9 Residential (suburban) 9 Rural (non-farm)
9 Forest 9 Agriculture 9 Aquatic
9 Other (specify): ____________________________________
ii. If mix of uses, generally describe:
__________________________________________________________________________________________________________
__________________________________________________________________________________________________________
b. Land uses and covertypes on the project site.
Land use or
Covertype
Current
Acreage
Acreage After
Project Completion
Change
(Acres +/-)
•
Roads, buildings, and other paved or impervious
surfaces
•
Forested
•
Meadows, grasslands or brushlands (non-
agricultural, including abandoned agricultural)
•
Agricultural
(includes active orchards, field, greenhouse etc.)
•
Surface water features
(lakes, ponds, streams, rivers, etc.)
•
Wetlands (freshwater or tidal)
•
Non-vegetated (bare rock, earth or fill)
•
Other
Describe: _______________________________
________________________________________
Shoreline
0.20
0.21
+0.01
0.50
0.19
-0.31
0
0.30
+0.30
0.40
0.39
-0.01
0.10
0.11
+0.01
Page 10 of 13
c. Is the project site presently used by members of the community for public recreation?
9 Yes 9 No
i. If Yes: explain: __________________________________________________________________________________________
d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed
9 Yes 9 No
day care centers, or group homes) within 1500 feet of the project site?
If Yes,
i. Identify Facilities:
________________________________________________________________________________________________________
________________________________________________________________________________________________________
e. Does the project site contain an existing dam?
9 Yes 9 No
If Yes:
i. Dimensions of the dam and impoundment:
•
Dam height:
_________________________________ feet
•
Dam length:
_________________________________ feet
•
Surface area:
_________________________________ acres
•
Volume impounded: _______________________________ gallons OR acre-feet
ii. Dam=s existing hazard classification: _________________________________________________________________________
iii. Provide date and summarize results of last inspection:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility,
9 Yes 9 No
or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility?
If Yes:
i. Has the facility been formally closed?
9 Yes 9 No
•
If yes, cite sources/documentation: _______________________________________________________________________
ii. Describe the location of the project site relative to the boundaries of the solid waste management facility:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
iii. Describe any development constraints due to the prior solid waste activities: __________________________________________
_______________________________________________________________________________________________________
g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin
9 Yes 9 No
property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste?
If Yes:
i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any
9 Yes 9 No
remedial actions been conducted at or adjacent to the proposed site?
If Yes:
i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site
9 Yes 9 No
Remediation database? Check all that apply:
9 Yes – Spills Incidents database
Provide DEC ID number(s): ________________________________
9 Yes – Environmental Site Remediation database
Provide DEC ID number(s): ________________________________
9 Neither database
ii. If site has been subject of RCRA corrective activities, describe control measures:_______________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database?
9 Yes 9 No
If yes, provide DEC ID number(s): ______________________________________________________________________________
iv. If yes to (i), (ii) or (iii) above, describe current status of site(s):
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
Pedestrian use for Croton Gorge Trail Access
Page 11 of 13
v. Is the project site subject to an institutional control limiting property uses?
9 Yes 9 No
•
If yes, DEC site ID number: ____________________________________________________________________________
•
Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________
•
Describe any use limitations: ___________________________________________________________________________
•
Describe any engineering controls: _______________________________________________________________________
•
Will the project affect the institutional or engineering controls in place?
9 Yes 9 No
•
Explain: ____________________________________________________________________________________________
___________________________________________________________________________________________________
___________________________________________________________________________________________________
E.2. Natural Resources On or Near Project Site
a. What is the average depth to bedrock on the project site?
________________ feet
b. Are there bedrock outcroppings on the project site?
9 Yes 9 No
If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________%
c. Predominant soil type(s) present on project site:
___________________________
__________%
___________________________
__________%
____________________________
__________%
d. What is the average depth to the water table on the project site? Average: _________ feet
e. Drainage status of project site soils: 9 Well Drained:
_____% of site
9 Moderately Well Drained:
_____% of site
9 Poorly Drained
_____% of site
f. Approximate proportion of proposed action site with slopes: 9 0-10%:
_____% of site
9 10-15%:
_____% of site
9 15% or greater:
_____% of site
g. Are there any unique geologic features on the project site?
9 Yes 9 No
If Yes, describe: _____________________________________________________________________________________________
________________________________________________________________________________________________________
h. Surface water features.
i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers,
9 Yes 9 No
ponds or lakes)?
ii. Do any wetlands or other waterbodies adjoin the project site?
9 Yes 9 No
If Yes to either i or ii, continue. If No, skip to E.2.i.
iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal,
9 Yes 9 No
state or local agency?
iv. For each identified regulated wetland and waterbody on the project site, provide the following information:
•
Streams:
Name ____________________________________________ Classification _______________________
•
Lakes or Ponds: Name ____________________________________________ Classification _______________________
•
Wetlands:
Name ____________________________________________ Approximate Size ___________________
•
Wetland No. (if regulated by DEC) _____________________________
v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired
9 Yes 9 No
waterbodies?
If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________
___________________________________________________________________________________________________________
i. Is the project site in a designated Floo dway?
9 Yes 9 No
j. Is the project site in the 100-year Floodplain?
9 Yes 9 No
k. Is the project site in the 500-year Floodplain?
9 Yes 9 No
l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer?
9 Yes 9 No
If Yes:
i. Name of aquifer: _________________________________________________________________________________________
>7
Charlton loam (ClF)
98.3
Paxton fine Sandy loam (PnB)
1.7
>6
100
1.7
98.3
B
864-68
Federal Waters, Federal Waters, Federal Waters,...
Principal Aquifer, Primary Aquifer
Page 12 of 13
m. Identify the predominant wildlife species that occupy or use the project site:
______________________________
______________________________
_______________________________
______________________________
______________________________
_______________________________
______________________________
n. Does the project site contain a designated significant natural community?
9 Yes 9 No
If Yes:
i. Describe the habitat/community (composition, function, and basis for designation): _____________________________________
________________________________________________________________________________________________________
ii. Source(s) of description or evaluation: ________________________________________________________________________
iii. Extent of community/habitat:
•
Currently:
______________________ acres
•
Following completion of project as proposed: _____________________ acres
•
Gain or loss (indicate + or -):
______________________ acres
o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as
9 Yes 9 No
endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species?
p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of
9 Yes 9 No
special concern?
q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing?
9 Yes 9 No
If yes, give a brief description of how the proposed action may affect that use: ___________________________________________
________________________________________________________________________________________________________
E.3. Designated Public Resources On or Near Project Site
a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to
9 Yes 9 No
Agriculture and Markets Law, Article 25-AA, Section 303 and 304?
If Yes, provide county plus district name/number: _________________________________________________________________
b. Are agricultural lands consisting of highly productive soils present?
9 Yes 9 No
i. If Yes: acreage(s) on project site? ___________________________________________________________________________
ii. Source(s) of soil rating(s): _________________________________________________________________________________
c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National
9 Yes 9 No
Natural Landmark?
If Yes:
i. Nature of the natural landmark:
9 Biological Community 9 Geological Feature
ii. Provide brief description of landmark, including values behind designation and approximate size/extent: ___________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
d. Is the project site located in or does it adjoin a state listed Critical Environmental Area?
9 Yes 9 No
If Yes:
i. CEA name: _____________________________________________________________________________________________
ii. Basis for designation: _____________________________________________________________________________________
iii. Designating agency and date: ______________________________________________________________________________
If Yes:
i.
Species and listing (endangered or threatened):______________________________________________________________________________
________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________
If Yes:
i. Species and listing:____________________________________________________________________________________________________
_______________________________________________________________________________________________________________________
Consultant observed: Grey Squirrel
Nearby eBird sitings: Canada Goose
Prior observations: Bass, Minnows,
Bald Eagle, Mallard, White-tailed Deer
Tufted Titmouse, Common Merganser
Chubs, Shiners, American Eel, Herons,
Common Grackle, Dark-eyed Junco
Green Frogs,Chipmunks, Raccons
Croton River is used for fishing and is accessible at multiple locations beyond the project area, which will not be impacted.
County & State Park Lands
Exceptional or unique character
Agency:Westchester County, Date:1-31-90
Page 13 of 13
e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district
9 Yes 9 No
which is listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYS
Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places?
If Yes:
i. Nature of historic/archaeological resource: 9 Archaeological Site
9 Historic Building or District
ii. Name: _________________________________________________________________________________________________
iii. Brief description of attributes on which listing is based:
_______________________________________________________________________________________________________
f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for
9 Yes 9 No
archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
g. Have additional archaeological or historic site(s) or resources been identified on the project site?
9 Yes 9 No
If Yes:
i. Describe possible resource(s): _______________________________________________________________________________
ii. Basis for identification: ___________________________________________________________________________________
h.
9 Yes 9 No
Is the project site within fives miles of any officially designated and publicly accessible federal, state, or local
scenic or aesthetic resource?
If Yes:
i. Identify resource: _________________________________________________________________________________________
ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail or scenic byway,
etc.): ___________________________________________________________________________________________________
iii. Distance between project and resource: _____________________ miles.
i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers
9 Yes 9 No
Program 6 NYCRR 666?
If Yes:
i. Identify the name of the river and its designation: ________________________________________________________________
ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666?
9 Yes 9 No
F. Additional Information
Attach any additional information which may be needed to clarify your project.
If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any
measures which you propose to avoid or minimize them.
G. Verification
I certify that the information provided is true to the best of my knowledge.
Applicant/Sponsor Name ___________________________________ Date_______________________________________
Signature________________________________________________ Title_______________________________________
Eligible property:Quaker Bridge. BIN 3348560, Old Croton Aqueduct
Bridge is architecturally significant, recognizing it as a rare and outstanding example of a late nineteenth-century Pratt Truss bridge.
Black Rock Park, Silver Lake Park, Croton Gorge Trail, Croton Gorge Park, Old Croton Aqueduct State Historic Park
Local, County and State parks and trails
0 - 0.1
County of Westchester
April 15, 2025 (Revised: June 26, 2025)
PRINT FORM
Assistant Commissioner
EAF Mapper Summary Report
Thursday, November 21, 2024 11:39 AM
Disclaimer: The EAF Mapper is a screening tool intended to assist
project sponsors and reviewing agencies in preparing an environmental
assessment form (EAF). Not all questions asked in the EAF are
answered by the EAF Mapper. Additional information on any EAF
question can be obtained by consulting the EAF Workbooks. Although
the EAF Mapper provides the most up-to-date digital data available to
DEC, you may also need to contact local or other data sources in order
to obtain data not provided by the Mapper. Digital data is not a
substitute for agency determinations.
B.i.i [Coastal or Waterfront Area]
Yes
B.i.ii [Local Waterfront Revitalization Area]
Yes
C.2.b. [Special Planning District]
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
E.1.h [DEC Spills or Remediation Site -
Potential Contamination History]
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
E.1.h.i [DEC Spills or Remediation Site -
Listed]
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
E.1.h.i [DEC Spills or Remediation Site -
Environmental Site Remediation Database]
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
E.1.h.iii [Within 2,000' of DEC Remediation
Site]
No
E.2.g [Unique Geologic Features]
No
E.2.h.i [Surface Water Features]
Yes
E.2.h.ii [Surface Water Features]
Yes
E.2.h.iii [Surface Water Features]
Yes - Digital mapping information on local and federal wetlands and
waterbodies is known to be incomplete. Refer to EAF Workbook.
E.2.h.iv [Surface Water Features - Stream
Name]
864-68
E.2.h.iv [Surface Water Features - Stream
Classification]
B
E.2.h.iv [Surface Water Features - Wetlands
Name]
Federal Waters
E.2.h.v [Impaired Water Bodies]
No
E.2.i. [Floodway]
Yes
E.2.j. [100 Year Floodplain]
Yes
E.2.k. [500 Year Floodplain]
Yes
1
Full Environmental Assessment Form - EAF Mapper Summary Report
E.2.l. [Aquifers]
Yes
E.2.l. [Aquifer Names]
Principal Aquifer, Primary Aquifer
E.2.n. [Natural Communities]
No
E.2.o. [Endangered or Threatened Species]
No
E.2.p. [Rare Plants or Animals]
No
E.3.a. [Agricultural District]
No
E.3.c. [National Natural Landmark]
No
E.3.d [Critical Environmental Area]
Yes
E.3.d [Critical Environmental Area - Name]
County & State Park Lands
E.3.d.ii [Critical Environmental Area -
Reason]
Exceptional or unique character
E.3.d.iii [Critical Environmental Area – Date
and Agency]
Agency:Westchester County, Date:1-31-90
E.3.e. [National or State Register of Historic
Places or State Eligible Sites]
Yes - Digital mapping data for archaeological site boundaries are not
available. Refer to EAF Workbook.
E.3.e.ii [National or State Register of Historic
Places or State Eligible Sites - Name]
Eligible property:Quaker Bridge. BIN 3348560, Old Croton Aqueduct
E.3.f. [Archeological Sites]
Yes
E.3.i. [Designated River Corridor]
No
2
Full Environmental Assessment Form - EAF Mapper Summary Report
Page 1 of 10
Full Environmental Assessment Form
Part 2 - Identification of Potential Project Impacts
Part 2 is to be completed by the lead agency. Part 2 is designed to help the lead agency inventory all potential resources that could
be affected by a proposed project or action. We recognize that the lead agency=s reviewer(s) will not necessarily be environmental
professionals. So, the questions are designed to walk a reviewer through the assessment process by providing a series of questions that
can be answered using the information found in Part 1. To further assist the lead agency in completing Part 2, the form identifies the
most relevant questions in Part 1 that will provide the information needed to answer the Part 2 question. When Part 2 is completed, the
lead agency will have identified the relevant environmental areas that may be impacted by the proposed activity.
If the lead agency is a state agency and the action is in any Coastal Area, complete the Coastal Assessment Form before proceeding
with this assessment.
Tips for completing Part 2:
•
Review all of the information provided in Part 1.
•
Review any application, maps, supporting materials and the Full EAF Workbook.
•
Answer each of the 18 questions in Part 2.
•
If you answer “Yes” to a numbered question, please complete all the questions that follow in that section.
•
If you answer “No” to a numbered question, move on to the next numbered question.
•
Check appropriate column to indicate the anticipated size of the impact.
•
Proposed projects that would exceed a numeric threshold contained in a question should result in the reviewing agency
checking the box “Moderate to large impact may occur.”
•
The reviewer is not expected to be an expert in environmental analysis.
•
If you are not sure or undecided about the size of an impact, it may help to review the sub-questions for the general
question and consult the workbook.
•
When answering a question consider all components of the proposed activity, that is, the Awhole action@.
•
Consider the possibility for long-term and cumulative impacts as well as direct impacts.
•
Answer the question in a reasonable manner considering the scale and context of the project.
1.
Impact on Land
Proposed action may involve construction on, or physical alteration of,
NO
YES
the land surface of the proposed site. (See Part 1. D.1)
If “Yes”, answer questions a - j. If “No”, move on to Section 2.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may involve construction on land where depth to water table is
less than 3 feet.
E2d
9
9
b. The proposed action may involve construction on slopes of 15% or greater.
E2f
9
9
c. The proposed action may involve construction on land where bedrock is exposed, or
generally within 5 feet of existing ground surface.
E2a
9
9
d. The proposed action may involve the excavation and removal of more than 1,000 tons
of natural material.
D2a
9
9
e. The proposed action may involve construction that continues for more than one year
or in multiple phases.
D1e
9
9
f. The proposed action may result in increased erosion, whether from physical
disturbance or vegetation removal (including from treatment by herbicides).
D2e, D2q
9
9
g. The proposed action is, or may be, located within a Coastal Erosion hazard area.
B1i
9
9
h. Other impacts: _______________________________________________________
___________________________________________________________________
9
9
Agency Use Only [If applicable]
Project :
Date :
FEAF 2019
RB03W
June 2025
Page 2 of 10
2.
Impact on Geological Features
The proposed action may result in the modification or destruction of, or inhibit
access to, any unique or unusual land forms on the site (e.g., cliffs, dunes,
NO
YES
minerals, fossils, caves). (See Part 1. E.2.g)
If “Yes”, answer questions a - c. If “No”, move on to Section 3.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. Identify the specific land form(s) attached: ________________________________
___________________________________________________________________
E2g
9
9
b. The proposed action may affect or is adjacent to a geological feature listed as a
registered National Natural Landmark.
Specific feature: _____________________________________________________
E3c
9
9
c. Other impacts: ______________________________________________________
___________________________________________________________________
9
9
3.
Impacts on Surface Water
The proposed action may affect one or more wetlands or other surface water
NO
YES
bodies (e.g., streams, rivers, ponds or lakes). (See Part 1. D.2, E.2.h)
If “Yes”, answer questions a - l. If “No”, move on to Section 4.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may create a new water body.
D2b, D1h
9
9
b. The proposed action may result in an increase or decrease of over 10% or more than a
10 acre increase or decrease in the surface area of any body of water.
D2b
9
9
c. The proposed action may involve dredging more than 100 cubic yards of material
from a wetland or water body.
D2a
9
9
d. The proposed action may involve construction within or adjoining a freshwater or
tidal wetland, or in the bed or banks of any other water body.
E2h
9
9
e. The proposed action may create turbidity in a waterbody, either from upland erosion,
runoff or by disturbing bottom sediments.
D2a, D2h
9
9
f. The proposed action may include construction of one or more intake(s) for withdrawal
of water from surface water.
D2c
9
9
g. The proposed action may include construction of one or more outfall(s) for discharge
of wastewater to surface water(s).
D2d
9
9
h. The proposed action may cause soil erosion, or otherwise create a source of
stormwater discharge that may lead to siltation or other degradation of receiving
water bodies.
D2e
9
9
i. The proposed action may affect the water quality of any water bodies within or
downstream of the site of the proposed action.
E2h
9
9
j. The proposed action may involve the application of pesticides or herbicides in or
around any water body.
D2q, E2h
9
9
k. The proposed action may require the construction of new, or expansion of existing,
wastewater treatment facilities.
D1a, D2d
9
9
Page 3 of 10
l. Other impacts: _______________________________________________________
___________________________________________________________________
9
9
4.
Impact on groundwater
The proposed action may result in new or additional use of ground water, or
NO
YES
may have the potential to introduce contaminants to ground water or an aquifer.
(See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t)
If “Yes”, answer questions a - h. If “No”, move on to Section 5.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may require new water supply wells, or create additional demand
on supplies from existing water supply wells.
D2c
9
9
b. Water supply demand from the proposed action may exceed safe and sustainable
withdrawal capacity rate of the local supply or aquifer.
Cite Source: ________________________________________________________
D2c
9
9
c. The proposed action may allow or result in residential uses in areas without water and
sewer services.
D1a, D2c
9
9
d. The proposed action may include or require wastewater discharged to groundwater.
D2d, E2l
9
9
e. The proposed action may result in the construction of water supply wells in locations
where groundwater is, or is suspected to be, contaminated.
D2c, E1f,
E1g, E1h
9
9
f. The proposed action may require the bulk storage of petroleum or chemical products
over ground water or an aquifer.
D2p, E2l
9
9
g. The proposed action may involve the commercial application of pesticides within 100
feet of potable drinking water or irrigation sources.
E2h, D2q,
E2l, D2c
9
9
h. Other impacts: ______________________________________________________
__________________________________________________________________
9
9
5.
Impact on Flooding
The proposed action may result in development on lands subject to flooding.
NO
YES
(See Part 1. E.2)
If “Yes”, answer questions a - g. If “No”, move on to Section 6.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may result in development in a designated floodway.
E2i
9
9
b. The proposed action may result in development within a 100 year floodplain.
E2j
9
9
c. The proposed action may result in development within a 500 year floodplain.
E2k
9
9
d. The proposed action may result in, or require, modification of existing drainage
patterns.
D2b, D2e
9
9
e. The proposed action may change flood water flows that contribute to flooding.
D2b, E2i,
E2j, E2k
9
9
f. If there is a dam located on the site of the proposed action, is the dam in need of repair,
or upgrade?
E1e
9
9
Page 4 of 10
g. Other impacts: ______________________________________________________
___________________________________________________________________
9
9
6.
Impacts on Air
NO
YES
The proposed action may include a state regulated air emission source.
(See Part 1. D.2.f., D.2.h, D.2.g)
If “Yes”, answer questions a - f. If “No”, move on to Section 7.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. If the proposed action requires federal or state air emission permits, the action may
also emit one or more greenhouse gases at or above the following levels:
i. More than 1000 tons/year of carbon dioxide (CO2)
ii. More than 3.5 tons/year of nitrous oxide (N2O)
iii. More than 1000 tons/year of carbon equivalent of perfluorocarbons (PFCs)
iv. More than .045 tons/year of sulfur hexafluoride (SF6)
v. More than 1000 tons/year of carbon dioxide equivalent of
hydrochloroflourocarbons (HFCs) emissions
vi. 43 tons/year or more of methane
D2g
D2g
D2g
D2g
D2g
D2h
9
9
9
9
9
9
9
9
9
9
9
9
b. The proposed action may generate 10 tons/year or more of any one designated
hazardous air pollutant, or 25 tons/year or more of any combination of such hazardous
air pollutants.
D2g
9
9
c. The proposed action may require a state air registration, or may produce an emissions
rate of total contaminants that may exceed 5 lbs. per hour, or may include a heat
source capable of producing more than 10 million BTU=s per hour.
D2f, D2g
9
9
d. The proposed action may reach 50% of any of the thresholds in “a” through “c”,
above.
D2g
9
9
e. The proposed action may result in the combustion or thermal treatment of more than 1
ton of refuse per hour.
D2s
9
9
f. Other impacts: ______________________________________________________
__________________________________________________________________
9
9
7.
Impact on Plants and Animals
The proposed action may result in a loss of flora or fauna. (See Part 1. E.2. m.-q.)
NO
YES
If “Yes”, answer questions a - j. If “No”, move on to Section 8.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may cause reduction in population or loss of individuals of any
threatened or endangered species, as listed by New York State or the Federal
government, that use the site, or are found on, over, or near the site.
E2o
9
9
b. The proposed action may result in a reduction or degradation of any habitat used by
any rare, threatened or endangered species, as listed by New York State or the federal
government.
E2o
9
9
c. The proposed action may cause reduction in population, or loss of individuals, of any
species of special concern or conservation need, as listed by New York State or the
Federal government, that use the site, or are found on, over, or near the site.
E2p
9
9
d. The proposed action may result in a reduction or degradation of any habitat used by
any species of special concern and conservation need, as listed by New York State or
the Federal government.
E2p
9
9
Page 5 of 10
e. The proposed action may diminish the capacity of a registered National Natural
Landmark to support the biological community it was established to protect.
E3c
9
9
f. The proposed action may result in the removal of, or ground disturbance in, any
portion of a designated significant natural community.
Source: ____________________________________________________________
E2n
9
9
g. The proposed action may substantially interfere with nesting/breeding, foraging, or
over-wintering habitat for the predominant species that occupy or use the project site.
E2m
9
9
h. The proposed action requires the conversion of more than 10 acres of forest,
grassland or any other regionally or locally important habitat.
Habitat type & information source: ______________________________________
__________________________________________________________________
E1b
9
9
i. Proposed action (commercial, industrial or recreational projects, only) involves use of
herbicides or pesticides.
D2q
9
9
j. Other impacts: ______________________________________________________
__________________________________________________________________
9
9
8.
Impact on Agricultural Resources
The proposed action may impact agricultural resources. (See Part 1. E.3.a. and b.)
NO
YES
If “Yes”, answer questions a - h. If “No”, move on to Section 9.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may impact soil classified within soil group 1 through 4 of the
NYS Land Classification System.
E2c, E3b
9
9
b. The proposed action may sever, cross or otherwise limit access to agricultural land
(includes cropland, hayfields, pasture, vineyard, orchard, etc).
E1a, Elb
9
9
c. The proposed action may result in the excavation or compaction of the soil profile of
active agricultural land.
E3b
9
9
d. The proposed action may irreversibly convert agricultural land to non-agricultural
uses, either more than 2.5 acres if located in an Agricultural District, or more than 10
acres if not within an Agricultural District.
E1b, E3a
9
9
e. The proposed action may disrupt or prevent installation of an agricultural land
management system.
El a, E1b
9
9
f. The proposed action may result, directly or indirectly, in increased development
potential or pressure on farmland.
C2c, C3,
D2c, D2d
9
9
g. The proposed project is not consistent with the adopted municipal Farmland
Protection Plan.
C2c
9
9
h. Other impacts: ________________________________________________________
9
9
The project will require the removal of approximately 76 trees with DBH of 2
inches or greater; of which 45 are between 6-inch to 32-inch DBH.
Page 6 of 10
9.
Impact on Aesthetic Resources
The land use of the proposed action are obviously different from, or are in
NO
YES
sharp contrast to, current land use patterns between the proposed project and
a scenic or aesthetic resource. (Part 1. E.1.a, E.1.b, E.3.h.)
If “Yes”, answer questions a - g. If “No”, go to Section 10.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. Proposed action may be visible from any officially designated federal, state, or local
scenic or aesthetic resource.
E3h
9
9
b. The proposed action may result in the obstruction, elimination or significant
screening of one or more officially designated scenic views.
E3h, C2b
9
9
c. The proposed action may be visible from publicly accessible vantage points:
i. Seasonally (e.g., screened by summer foliage, but visible during other seasons)
ii. Year round
E3h
9
9
9
9
d. The situation or activity in which viewers are engaged while viewing the proposed
action is:
i. Routine travel by residents, including travel to and from work
ii. Recreational or tourism based activities
E3h
E2q,
E1c
9
9
9
9
e. The proposed action may cause a diminishment of the public enjoyment and
appreciation of the designated aesthetic resource.
E3h
9
9
f. There are similar projects visible within the following distance of the proposed
project:
0-1/2 mile
½ -3 mile
3-5 mile
5+ mile
D1a, E1a,
D1f, D1g
9
9
g. Other impacts: ______________________________________________________
__________________________________________________________________
9
9
10. Impact on Historic and Archeological Resources
The proposed action may occur in or adjacent to a historic or archaeological
NO
YES
resource. (Part 1. E.3.e, f. and g.)
If “Yes”, answer questions a - e. If “No”, go to Section 11.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
E3e
9
9
b. The proposed action may occur wholly or partially within, or substantially contiguous
to, an area designated as sensitive for archaeological sites on the NY State Historic
Preservation Office (SHPO) archaeological site inventory.
E3f
9
9
c. The proposed action may occur wholly or partially within, or substantially contiguous
to, an archaeological site not included on the NY SHPO inventory.
Source: ____________________________________________________________
E3g
9
9
a. The proposed action may occur wholly or partially within, or substantially contiguous
to, any buildings, archaeological site or district which is listed on the National or
State Register of Historical Places, or that has been determined by the Commissioner
of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for
listing on the State Register of Historic Places.
Page 7 of 10
d. Other impacts: ______________________________________________________
__________________________________________________________________
9
9
e. If any of the above (a-d) are answered “Moderate to large impact may
occur”, continue with the following questions to help support conclusions in Part 3:
i.
The proposed action may result in the destruction or alteration of all or part
of the site or property.
ii.
The proposed action may result in the alteration of the property’s setting or
integrity.
iii. The proposed action may result in the introduction of visual elements which
are out of character with the site or property, or may alter its setting.
E3e, E3g,
E3f
E3e, E3f,
E3g, E1a,
E1b
E3e, E3f,
E3g, E3h,
C2, C3
9
9
9
9
9
9
11. Impact on Open Space and Recreation
The proposed action may result in a loss of recreational opportunities or a
NO
YES
reduction of an open space resource as designated in any adopted
municipal open space plan.
(See Part 1. C.2.c, E.1.c., E.2.q.)
If “Yes”, answer questions a - e. If “No”, go to Section 12.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may result in an impairment of natural functions, or “ecosystem
services”, provided by an undeveloped area, including but not limited to stormwater
storage, nutrient cycling, wildlife habitat.
D2e, E1b
E2h,
E2m, E2o,
E2n, E2p
9
9
b. The proposed action may result in the loss of a current or future recreational resource.
C2a, E1c,
C2c, E2q
9
9
c. The proposed action may eliminate open space or recreational resource in an area
with few such resources.
C2a, C2c
E1c, E2q
9
9
d. The proposed action may result in loss of an area now used informally by the
community as an open space resource.
C2c, E1c
9
9
e. Other impacts: _____________________________________________________
_________________________________________________________________
9
9
12. Impact on Critical Environmental Areas
The proposed action may be located within or adjacent to a critical
NO
YES
environmental area (CEA). (See Part 1. E.3.d)
If “Yes”, answer questions a - c. If “No”, go to Section 13.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may result in a reduction in the quantity of the resource or
characteristic which was the basis for designation of the CEA.
E3d
9
9
b. The proposed action may result in a reduction in the quality of the resource or
characteristic which was the basis for designation of the CEA.
E3d
9
9
c. Other impacts: ______________________________________________________
__________________________________________________________________
9
9
The project will remove a structure that is eligible for listing.
Page 8 of 10
13. Impact on Transportation
The proposed action may result in a change to existing transportation systems.
NO
YES
(See Part 1. D.2.j)
If “Yes”, answer questions a - f. If “No”, go to Section 14.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. Projected traffic increase may exceed capacity of existing road network.
D2j
9
9
b. The proposed action may result in the construction of paved parking area for 500 or
more vehicles.
D2j
9
9
c. The proposed action will degrade existing transit access.
D2j
9
9
d. The proposed action will degrade existing pedestrian or bicycle accommodations.
D2j
9
9
e.The proposed action may alter the present pattern of movement of people or goods.
D2j
9
9
f. Other impacts: ______________________________________________________
__________________________________________________________________
9
9
14. Impact on Energy
The proposed action may cause an increase in the use of any form of energy.
NO
YES
(See Part 1. D.2.k)
If “Yes”, answer questions a - e. If “No”, go to Section 15.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action will require a new, or an upgrade to an existing, substation.
D2k
9
9
b. The proposed action will require the creation or extension of an energy transmission
or supply system to serve more than 50 single or two-family residences or to serve a
commercial or industrial use.
D1f,
D1q, D2k
9
9
c. The proposed action may utilize more than 2,500 MWhrs per year of electricity.
D2k
9
9
d. The proposed action may involve heating and/or cooling of more than 100,000 square
feet of building area when completed.
D1g
9
9
e. Other Impacts: ________________________________________________________
____________________________________________________________________
15. Impact on Noise, Odor, and Light
The proposed action may result in an increase in noise, odors, or outdoor lighting.
NO
YES
(See Part 1. D.2.m., n., and o.)
If “Yes”, answer questions a - f. If “No”, go to Section 16.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may produce sound above noise levels established by local
regulation.
D2m
9
9
b. The proposed action may result in blasting within 1,500 feet of any residence,
hospital, school, licensed day care center, or nursing home.
D2m, E1d
9
9
c. The proposed action may result in routine odors for more than one hour per day.
D2o
9
9
Temporary detour required during construction. Project will restore a
pre-existing vehicular travel route with added pedestrian accommodations.
Page 9 of 10
d. The proposed action may result in light shining onto adjoining properties.
D2n
9
9
e. The proposed action may result in lighting creating sky-glow brighter than existing
area conditions.
D2n, E1a
9
9
f. Other impacts: ______________________________________________________
__________________________________________________________________
9
9
16. Impact on Human Health
The proposed action may have an impact on human health from exposure
NO
YES
to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. f. g. and h.)
If “Yes”, answer questions a - m. If “No”, go to Section 17.
Relevant
Part I
Question(s)
No,or
small
impact
may cccur
Moderate
to large
impact may
occur
a. The proposed action is located within 1500 feet of a school, hospital, licensed day
care center, group home, nursing home or retirement community.
E1d
9
9
b. The site of the proposed action is currently undergoing remediation.
E1g, E1h
9
9
c. There is a completed emergency spill remediation, or a completed environmental site
remediation on, or adjacent to, the site of the proposed action.
E1g, E1h
9
9
d. The site of the action is subject to an institutional control limiting the use of the
property (e.g., easement or deed restriction).
E1g, E1h
9
9
e. The proposed action may affect institutional control measures that were put in place
to ensure that the site remains protective of the environment and human health.
E1g, E1h
9
9
f. The proposed action has adequate control measures in place to ensure that future
generation, treatment and/or disposal of hazardous wastes will be protective of the
environment and human health.
D2t
9
9
g. The proposed action involves construction or modification of a solid waste
management facility.
D2q, E1f
9
9
h. The proposed action may result in the unearthing of solid or hazardous waste.
D2q, E1f
9
9
i. The proposed action may result in an increase in the rate of disposal, or processing, of
solid waste.
D2r, D2s
9
9
j. The proposed action may result in excavation or other disturbance within 2000 feet of
a site used for the disposal of solid or hazardous waste.
E1f, E1g
E1h
9
9
k. The proposed action may result in the migration of explosive gases from a landfill
site to adjacent off site structures.
E1f, E1g
9
9
l. The proposed action may result in the release of contaminated leachate from the
project site.
D2s, E1f,
D2r
9
9
m. Other impacts: ______________________________________________________
__________________________________________________________________
Page 10 of 10
17. Consistency with Community Plans
The proposed action is not consistent with adopted land use plans.
NO
YES
(See Part 1. C.1, C.2. and C.3.)
If “Yes”, answer questions a - h. If “No”, go to Section 18.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action’s land use components may be different from, or in sharp
contrast to, current surrounding land use pattern(s).
C2, C3, D1a
E1a, E1b
9
9
b. The proposed action will cause the permanent population of the city, town or village
in which the project is located to grow by more than 5%.
C2
9
9
c. The proposed action is inconsistent with local land use plans or zoning regulations.
C2, C2, C3
9
9
d. The proposed action is inconsistent with any County plans, or other regional land use
plans.
C2, C2
9
9
e. The proposed action may cause a change in the density of development that is not
supported by existing infrastructure or is distant from existing infrastructure.
C3, D1c,
D1d, D1f,
D1d, Elb
9
9
f. The proposed action is located in an area characterized by low density development
that will require new or expanded public infrastructure.
C4, D2c, D2d
D2j
9
9
g. The proposed action may induce secondary development impacts (e.g., residential or
commercial development not included in the proposed action)
C2a
9
9
h. Other: _____________________________________________________________
__________________________________________________________________
9
9
18. Consistency with Community Character
The proposed project is inconsistent with the existing community character.
NO
YES
(See Part 1. C.2, C.3, D.2, E.3)
If “Yes”, answer questions a - g. If “No”, proceed to Part 3.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may replace or eliminate existing facilities, structures, or areas
of historic importance to the community.
E3e, E3f, E3g
9
9
b. The proposed action may create a demand for additional community services (e.g.
schools, police and fire)
C4
9
9
c. The proposed action may displace affordable or low-income housing in an area where
there is a shortage of such housing.
C2, C3, D1f
D1g, E1a
9
9
d. The proposed action may interfere with the use or enjoyment of officially recognized
or designated public resources.
C2, E3
9
9
e. The proposed action is inconsistent with the predominant architectural scale and
character.
C2, C3
9
9
f. Proposed action is inconsistent with the character of the existing natural landscape.
C2, C3
E1a, E1b
E2g, E2h
9
9
g. Other impacts: ______________________________________________________
__________________________________________________________________
9
9
PRINT FULL FORM
Full Environmental Assessment Form
Part 3 - Evaluation of the Magnitude and Importance of Project Impacts
and
Determination of Significance
Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question
in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular
element of the proposed action will not, or may, result in a significant adverse environmental impact.
Based on the analysis in Part 3, the lead agency must decide whether to require an environmental impact statement to further assess
the proposed action or whether available information is sufficient for the lead agency to conclude that the proposed action will not
have a significant adverse environmental impact. By completing the certification on the next page, the lead agency can complete its
determination of significance.
Reasons Supporting This Determination:
To complete this section:
•
Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity,
size or extent of an impact.
•
Assess the importance of the impact. Importance relates to the geographic scope, duration, probability of the impact
occurring, number of people affected by the impact and any additional environmental consequences if the impact were to
occur.
•
The assessment should take into consideration any design element or project changes.
•
Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where
there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse
environmental impact.
•
Provide the reason(s) why the impact may, or will not, result in a significant adverse environmental impact
•
For Conditional Negative Declarations identify the specific condition(s) imposed that will modify the proposed action so that
no significant adverse environmental impacts will result.
•
Attach additional sheets, as needed.
Determination of Significance - Type 1 and Unlisted Actions
SEQR Status:
Type 1
Unlisted
Identify portions of EAF completed for this Project: Part 1
Part 2
Part 3
Agency Use Only [IfApplicable]
Project :
Date :
FEAF 2019
Impact on Land/Water: Steep slopes of 50% or more exist throughout the project site, extending both down the banks to the stream as well as on the
upland side along the approaches. Temporary soldier pile retaining walls will be installed to limit the extent of disturbance needed for construction. Erosion
and sediment controls during construction will include silt fencing, coffer dams and turbidity curtains, among other controls as may be required by
NYSDEC. NYSDOT Environmental Ground and Water Protection specifications will also be followed during demolition and construction. Site restoration
will include biodegradeable erosion control matting and live staking where appropriate.
Impact on Flooding: Hydraulic analyses were performed for the existing and proposed bridges, which determined that the water surface elevation for both
the 50- and 100-year storm events are unchanged. As such, the new bridge will not result in any new flooding impacts.
Impact on Plants and Animals: The project will disturb between approximately 40 - 80 feet of the land area next to the bridge, which includes a mix of
young and mature trees. Of the 76 trees that must be removed to enable construction, 31 are less than 6 inches DBH and only 5 are equal to or above
20-inch DBH. Tree removals will be offset by the planting of 99 new trees. Since part of the project area must remain cleared for continued access and
maintenance of the bridge, approximately half of the trees will be planted offsite. To prevent potential impacts to endangered bats that may be roosting in
these trees, all tree removals will occur between November 1st and March 31st in accordance NYSDEC guidelines.
Impact on Historic and Archeological Resources: SHPO concurred that the bridge must be replaced for long-term safety and has no concerns regarding
archaeological resources. A Historic American Engineering Record Level II Documentation has been prepared for the bridge. In addition, the historic
plaque and certain components of the original bridge will be salvaged and set aside for preservation options. The new bridge will replicate the truss design.
The project is not adjacent to and will not affect the Old Croton Aqueduct.
Impact on Open Space: While there will be no reduction in open space, a village trail that connects to Croton Gorge Trail will not be accessible during
construction. The trail connection will be restored following construction, which is targeted to begin in the fall and conclude by the following summer.
Impact on Critical Environmental Areas (CEA): The project area is in the County's Croton Point Park and River CEA, which was designated for its
geological, archaeological and ecological significance. It also encompasses an underlying aquifer that provides drinking water to the Village of Croton. As
the project involves replacement of a bridge in its existing location with appropriate construction mitigation and restoration, there will be no significant
adverse impacts as it relates to the CEA and is consistent in general with the Village of Croton's LWRP.
Impact on Transportation: The bridge replacement will restore a vital corridor between the Town and Village, reducing extended travel times currently
experienced by school buses and emergency vehicles due to the closure of the existing bridge, along with reducing associated energy consumption and
carbon emissions. Widening of the bridge to provide 2-way traffic as well as pedestrian lanes will improve safety and encourage non-motorized uses.
RB03W
June 2025
Upon review of the information recorded on this EAF, as noted, plus this additional support information
and considering both the magnitude and importance of each identified potential impact, it is the conclusion of the
as lead agency that:
A. This project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact
statement need not be prepared. Accordingly, this negative declaration is issued.
B. Although this project could have a significant adverse impact on the environment, that impact will be avoided or
substantially mitigated because of the following conditions which will be required by the lead agency:
There will, therefore, be no significant adverse impacts from the project as conditioned, and, therefore, this conditioned negative
declaration is issued. A conditioned negative declaration may be used only for UNLISTED actions (see 6 NYCRR 617.7(d)).
C. This Project may result in one or more significant adverse impacts on the environment, and an environmental impact
statement must be prepared to further assess the impact(s) and possible mitigation and to explore alternatives to avoid or reduce those
impacts. Accordingly, this positive declaration is issued.
Name of Action:
Name of Lead Agency:
Name of Responsible Officer in Lead Agency:
Title of Responsible Officer:
Signature of Responsible Officer in Lead Agency:
Date:
Signature of Preparer (if different from Responsible Officer)
Date:
For Further Information:
Contact Person:
Address:
Telephone Number:
E-mail:
For Type 1 Actions and Conditioned Negative Declarations, a copy of this Notice is sent to:
Chief Executive Officer of the political subdivision in which the action will be principally located (e.g., Town / City / Village of)
Other involved agencies (if any)
Applicant (if any)
Environmental Notice Bulletin: http://www.dec.ny.gov/enb/enb.html
Page 2 of 2
Quaker Bridge Road Bridge Replacement (RB03W)
County of Westchester
Malika Vanderberg
Clerk and Chief Administrative Officer, Westchester County Board of Legislators
June 26, 2025
David S. Kvinge, Assistant Commissioner, Westchester County Department of Planning
148 Martine Avenue, White Plains, NY 10601
914-995-2089
dsk2@WestchesterCountyNY.gov
PRINT FULL FORM
ATTACHMENT B: PLANS
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
(ANSI B) 11X17
06/06/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/5/2025
N:\Projects\2024\124-296 Westchester Co - Quaker Bridge Replacement\Working\CADD\dgn connect_2023\124-296_cpb_gen_01.dgn
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
2:46:16 PM
morrimm
20
TM 79.06-2-3
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
WOODS
STRUCTURE
CONCRETE
STONE WING WALL
EDGE OF WATER
STONE WING WALL
L
L
A
W
G
NI
W
E
G
DI
R
B
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
POST
POST
WOODS
SIGN
CORTLANDT
TOWN OF
LIMIT 30
VIL. SPEED
15 TONS &
WEIGHT LIMIT
STONE LINED DITCH
PARKING
NO
SIGN
STREET
BRIDGE WING WALL
BORING
BORING
BORING
BORING
0
10
20
30
40'
10
1" = 20'
ROAD
QUAKER BRIDGE
POST ROAD
TO ALBANY
RIDGE ROAD
TO QUAKER
ROAD EAST
QUAKER BRIDGE
TO RTE 129
TO BE REMOVED
SUPERSTRUCTURE
EXISTING
STA. M 2+94.61
BRGS.
¡
STA. 3+94.61
BRGS.
¡
UTILITIES REMAIN
EXISTING OVERHEAD
BRGS.
¡
BRGS. TO
¡
100'-0"
PLAN
ELEVATION A-A
ROAD
QUAKER BRIDGE
CONCRETE BARRIER (TYP.)
PROPOSED SINGLE SLOPE
GRID
NORTH
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD EAST
STA M 2+91.86
BEGIN BRIDGE
STA M 3+97.36
END BRIDGE
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD
STA. 3+94.61
EXP. BRGS.
¡
ORGINAL GROUND
CONCRETE WINGWALL (TYP.)
PROPOSED CAST-IN-PLACE
FLOW
CROTON RIVER
STA. 2+94.61
FIX BRGS.
¡
A
A
GENERAL PLAN AND ELEVATION
DATUM EL. 10.00
CONCRETE WINGWALL (TYP.)
PROPOSED CAST-IN-PLACE
CONCRETE BARRIER (TYP.)
PROPOSED SINGLE SLOPE
5'-0" SHOULDER
TRAVEL WAY
11'-0"
TRAVEL WAY
11'-0"
OUT TO OUT
31'-4"
CLEAR
28'-0"
BOT. FTG EL. 21.25
BOT. FTG EL. 25.25
SEAT EL. 39.53
SEAT EL. 42.60
EL. 36.50
100'-0" SPAN
1'-0" SHOULDER
AZ. 132°15'0.26"
AZ. 42°15'0.22"
PROPOSED GRADE
INVENTORY
OPERATING
LOAD RATING (LRFR)
HL-93
HL-93
RF=**
RF=**
** TO BE PROVIDED BY TRUSS MANUFACTURER
LOW CHORD EL. 41.44
ITEM 551.30 (TYP.)
PROPOSED MICROPILES,
HYDRAULIC DATA
DRAINAGE AREA
RECURRENCY INTERVAL
(YEARS)
PEAK DISCHARGE
/
POINT OF MAX. BACKWATER
HIGH WATER ELEVATION AT
EXISTING
PROPOSED
FLOOD
BASIC
FLOOD
DESIGN
100
50
377 SQ. MILES
34.6
33.2
34.6
34.51
(FT. S)
r
15,600
13,080
AVG. VELOCITY THRU STRUCT. @ DESIGN FLOOD 14.6 FT./SEC.
OF TRUSS (TYP.)
¡
ITEM 568.70 (TYP.)
TRANSITION BRIDGE RAILING,
DHW EL. 33.2 (50 - YR STORM)
FILL LIMITS
APPROXIMATE
ITEM 620.03
STONE FILLING (LIGHT)
ITEM 620.05
STONE FILLING (HEAVY)
LEGEND:
ABUTMENT (TYP.)
PROPOSED CAST-IN-PLACE
ENDS STA. M 2+68.85
APPROACH PAVEMENT
BEGINS STA. M 4+26.67
APPROACH PAVEMENT
TO BE REPLACED
EXISTING CULVERT
BEGINS STA. S 2+07.07
APPROACH PAVEMENT
TO BE REMOVED (TYP.)
EXISTING SUBSTRUCTURE
TO REMAIN
EXISTING CULVERT
ST-01
(STONE BEDDING) (TYP.)
APPROACH DRAINAGE
CONCRETE FOOTING (TYP.)
PROPOSED CAST-IN-PLACE
2
1
4
1
OHW EL. 28.25
OHW EL. 28.25'
OHW EL. 28.25'
35'-6"
¡ TRUSS TO ¡ TRUSS
56-02-R-221-0
CONCRETE PILES, ITEM 551.11 (TYP.)
PROPOSED CAST-IN-PLACE
13'-6"
EL. 25.00
EL. 28.75
8'-0"
EL. 26.00
EL. 30.00
1 ON 1.5
1 ON 1.5
AZ. 42°15'0.22"
M 2+54.22
PCC
M 2+90.48
PT
M 3+97.40
PC
M 4+50.79
PT
M 2+00
M 3+00
M 4+00
S 2+00
S 2+00
HEAD WALL
CONC.
W 5
P.P.
=46.62
INV.
=49.95
INV.
=43.13
INV.
=43.20
INV.
INV.=44.40
GRATE=45.80
SLOT DRAIN
VAULT
DRAINAGE
12" PVC
15" CMP
18" CMP
=41.7
INV.
PERMANENT
IMPACTS
BELOW OHW
BUFFER
LINE
ORDINARY
HIGH
WATER LINE
TEMPORARY
IMPACTS
BELOW OHW
PERMANENT
BUFFER
IMPACTS
TEMPORARY
BUFFER
IMPACTS
3348560)
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:34:41 AM
morrimm
2
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
¢
£
¡
§
¡
E
EMH
G
GP
GSB
GV
HYD
LP
LPG
PP
SA
SMH
ST
T
TCB
TELBOX
TEL P
TMH
CTV
W
WSB
WV
AHEAD
AZIMUTH
BACK
BASELINE
BEARING
CENTERLINE
CURVE TO SPIRAL
SUPERELEVATION RATE (CROSS SLOPE)
EQUALITY
EXTERNAL
HORIZONTAL CONTROL LINE
HEADLIGHT SIGHT DISTANCE
LENGTH OF CIRCULAR CURVE
LENGTH OF SPIRAL
LENGTH OF VERTICAL CURVE
CENTER CORRECTION OF VERTICAL CURVE
MAIN LINE
POINT OF CURVATURE
POINT OF INTERSECTION
POINT ON LINE
PASSING SIGHT DISTANCE
POINT OF TANGENT
POINT OF VERTICAL CURVE
POINT OF VERTICAL INTERSECTION
POINT OF VERTICAL TANGENT
RADIUS
SPIRAL TO CURVE
STOPPING SIGHT DISTANCE
SPIRAL TO TANGENT
STATION
TANGENT LENGTH
THEORETICAL GRADE LINE
TANGENT TO SPIRAL
VERTICAL CURVE
ELECTRIC
ELECTRIC MANHOLE
GAS
GUY POLE
GAS SERVICE BOX (HOUSE LINE)
GAS VALVE (MAIN LINE)
HYDRANT
LIGHT POLE
LOW PRESSURE GAS
POWER POLE
SANITARY SEWER
SANITARY MANHOLE
STORM SEWER
TELEPHONE
TRAFFIC CONTROL BOX
TELEPHONE BOX
TELEPHONE POLE
TELEPHONE MANHOLE
CABLE TELEVISION
WATER
WATER SERVICE BOX (HOUSE LINE)
WATER VALVE (MAIN LINE)
ALIGNMENT
SUBSURFACE EXPLORATION
HAND AUGER
DRILLING MUD
HOLLOW FLIGHT AUGER
POWER AUGER
PROBE
PERCOLATION TEST HOLE
TO BE DEFINED AT THE TIME OF EXPLORATION
SEISMIC POINT
TEST PIT
BRIDGE
CUT
DAM
FILL
CULVERT
WALL
AH
CP
DA
DM
DN
FH
PA
PH
PT
SP
B
C
D
F
K
W
X
IS MADE
BE DEFINED AT THE TIME THE EXPLORATION
TO BE USED IF ONE OF THE ABOVE CANNOT
ABUT
AOBE
ASPH
BDY
BLDG
BM
CC
CONC
CONST
CR
D
DM
DWY
EP
ES
FP
FD
FL
GAR
GR
HO
HWY
IP
MB
MON
N&W
OG
O/H
P
PAV'T
PE
PED POLE
POR
RR
RTE
ROW
FEE WO/A
ABUTMENT
AS ORDERED BY ENGINEER
ASPHALT
BOUNDARY
BUILDING
BENCH MARK
CENTER TO CENTER
CONCRETE
CONSTRUCTION
COUNTY ROAD
DEED DISTANCE
DIRECT MEASUREMENT
DRIVEWAY
EDGE OF PAVEMENT
EDGE OF SHOULDER
FENCE POST
FOUNDATION
FENCE LINE
GARAGE
GRAVEL
HOUSE
HIGHWAY
IRON PIN OR IRON PIPE
MAILBOX
MONUMENT
NAIL AND WASHER
ORIGINAL GROUND
OVERHEAD
PARCEL
PAVEMENT
PERMANENT EASEMENT
PEDESTRIAN POLE
PROPERTY LINE
PORCH
RAILROAD
ROUTE
RIGHT OF WAY
TOPOGRAPHY (MISCELLANEOUS)
RW
SH
SHLDR
RETAINING WALL
STATE HIGHWAY
SHOULDER
BOTTOM OF BANK (STREAM)
BOTTOM OF CURB
BOTTOM OF OPENING
CORRUGATED ALUMINUM PIPE
CATCH BASIN
CAST IRON PIPE
CENTERLINE OF STREAM
CORRUGATED METAL PIPE
CONCRETE PIPE
BB
BC
BO
CAP
CB
CIP
CMP
CP
CORRUGATED STEEL PIPE
CULVERT
DIAMETER
DRAINAGE MANHOLE
DRAINAGE STRUCTURE PIPE
DITCH CROSSING
EXTREME HIGH WATER
ELEVATION
ELEVATION
EXTREME LOW WATER
END SECTION
HEADWALL
INVERT
MANHOLE
MEAN HIGH WATER
ORDINARY HIGH WATER
ORDINARY LOW WATER
REINFORCED CONCRETE PIPE
TOP OF BANK (STREAM)
TOP OF CURB
TOP OF GRATE
VITRIFIED CLAY PIPE
CSP
CULV
DIA
DMH
DS
D'XING
EHW
EL
ELEV
ELW
ES
HW
INV
MH
MHW
OHW
OLW
RCP
TB
TC
TG
VCP
SPK
ST
STK
STY
SW
TE
TO
U/G
WW
SPIKE
STREET
STAKE
STORY
SIDEWALK
TEMPORARY EASEMENT
TEMPORARY OCCUPANCY
UNDERGROUND
WING WALL
AH
AZ
BK
BRG
CS
e
EQ
EXT
HCL
HSD
L
LS
LVC
E
PC
PI
POL
PSD
PT
PVC
PVI
PVT
R
SC
SSD
ST
STA
T
TGL
TS
VC
FEE ACQUISITION WITHOUT ACCESS
FEE
FEE ACQUISITION
ABBR.
DESCRIPTION
REPLACE ABBREVIATION "AB" WITH:
ABBR.
DESCRIPTION
ABBR.
DESCRIPTION
ABBR.
DESCRIPTION
ABBR.
DESCRIPTION
UTILITIES
TOPOGRAPHY (DRAINAGE)
4 INCHES CASED DRILL HOLE
1 INCH SAMPLER (RETRACTABLE PLUG)
2‚ INCHES CASED DRILL HOLE
SICPP
SMOOTH INTERIOR CORRUGATED POLYETHYLENE PIPE
STRM
RP
TP
SQUARE FEET
GALLON
'
mi
lb
LB
MI
(PLANS)
SYMBOL
STANDARD
(SPECS/PROPOSAL)
NOMENCLATURE:
EQUIVALENT
ftq
YDr
CUBIC YARD
CY
MILES
ACRES
LINEAR FEET
TON
TON
TON
GAL
POUND
GAL
SF
AC
AC
QUANTITIES SHEET
ESTIMATE OF
ITEM PAYMENT UNIT:
"
-
INCHES
YDq
SQUARE YARD
SY
LF
CONE PENETROMETER
DA, DM, DN, AND FH WITH:
ABBREVIATION "C" IN CATEGORIES:
INDEX AND ABBREVATIONS
IND-01
56-02-G-203-0
NO.
SHEET
DESCRIPTION
NUMBER
DWG
NUMBER
DPW
1
COVER SHEET
COV
56-02-T-202-0
2
INDEX & ABBREVIATIONS
IND-01
56-02-G-203-0
3
LEGEND POINT SYMBOLS
LEG-01
56-02-G-204-0
4
LEGEND LINE SYMBOLS
LEG-02
56-02-G-205-0
5
GENERAL NOTES - 1
GNN-01
56-02-G-206-0
6
GENERAL NOTES - 2
GNN-02
56-02-G-207-0
7
ESTIMATE OF QUANTITIES & BASELINE TIES
BLT-01
56-02-G-208-0
8
MAINTENANCE JURISTICTION PLAN AND TABLE
MJP-01
56-02-R-209-0
9
WORK ZONE TRAFFIC CONTROL NOTES
MPP-01
56-02-R-210-0
10
DETOUR PLAN
MPP-02
56-02-R-211-0
11
HIGHWAY GENERAL PLAN
GNP-01
56-02-R-212-0
12
HIGHWAY TYPICAL SECTIONS
TYP-01
56-02-R-213-0
13
PROFILE - QUAKER BRIDGE ROAD
PRO-01
56-02-R-214-0
14
PROFILE - QUAKER BRIDGE ROAD EAST
PRO-02
56-02-R-215-0
15
GRADING PLAN
GRD-01
56-02-R-216-0
16
LANDSCAPE PLAN
LAP-01
56-02-R-217-0
17
LANDSCAPING DETAILS
LAD-01
56-02-R-218-0
18
LANDSCAPING NOTES
LAN-01
56-02-R-219-0
19
MISCELLANEOUS DETAILS & TABLES
MSD-01
56-02-R-220-0
20
GENERAL PLAN AND ELEVATION
ST-01
56-02-R-221-0
21
TYPICAL BRIDGE SECTIONS
ST-02
56-02-R-222-0
22
BORING LOCATION PLAN
ST-03
56-02-B-223-0
23
BORING LOGS (1 OF 8)
ST-04
56-02-B-224-0
24
BORING LOGS (2 OF 8)
ST-05
56-02-B-225-0
25
BORING LOGS (3 OF 8)
ST-06
56-02-B-226-0
26
BORING LOGS (4 OF 8)
ST-07
56-02-B-227-0
27
BORING LOGS (5 OF 8)
ST-08
56-02-B-228-0
28
BORING LOGS (6 OF 8)
ST-09
56-02-B-229-0
29
BORING LOGS (7 OF 8)
ST-10
56-02-B-230-0
30
BORING LOGS (8 OF 8)
ST-11
56-02-B-231-0
31
EARTHWORK PLAN
ST-12
56-02-S-232-0
32
EARTHWORK SECTIONS
ST-13
56-02-S-233-0
33
EXCAVATION SUPPORT WALL PLAN AND ELEVATION (1 OF 2)
ST-14
56-02-S-234-0
34
EXCAVATION SUPPORT WALL PLAN AND ELEVATION (2 OF 2)
ST-15
56-02-S-235-0
35
ABUTMENT PILE LAYOUT PLAN
ST-16
56-02-S-236-0
36
BEGIN ABUTMENT PLAN AND ELEVATION
ST-17
56-02-S-237-0
37
BEGIN ABUTMENT REINFORCEMENT PLAN AND SECTION
ST-18
56-02-S-238-0
38
END ABUTMENT PLAN AND ELEVATION
ST-19
56-02-S-239-0
39
END ABUTMENT REINFORCEMENT PLAN AND SECTION
ST-20
56-02-S-240-0
40
ABUTMENT DETAILS (1 OF 2)
ST-21
56-02-S-241-0
41
ABUTMENT DETAILS (2 OF 2)
ST-22
56-02-S-242-0
42
WINGWALL SECTIONS
ST-23
56-02-S-243-0
43
ELASTOMERIC FIXED BEARINGS
ST-24
56-02-S-244-0
44
ELASTOMERIC EXPANSION BEARINGS
ST-25
56-02-S-245-0
45
TRANSVERSE SECTION
ST-26
56-02-S-246-0
46
TRUSS FRAMING PLAN
ST-27
56-02-S-247-0
47
TRUSS DETAILS
ST-28
56-02-S-248-0
48
SUPERSTRUCTURE SLAB PLAN
ST-29
56-02-S-249-0
49
APPROACH SLAB PLAN
ST-30
56-02-S-250-0
50
BARRIER AND RAILING PLAN
ST-31
56-02-S-251-0
51
SINGLE SLOPE CONCRETE BARRIER DETAILS (1 OF 3)
ST-32
56-02-S-252-0
52
SINGLE SLOPE CONCRETE BARRIER DETAILS (2 OF 3)
ST-33
56-02-S-253-0
53
SINGLE SLOPE CONCRETE BARRIER DETAILS (3 OF 3)
ST-34
56-02-S-254-0
54
TRANSITION RAIL DETAILS (1 OF 2)
ST-35
56-02-S-255-0
55
TRANSITION RAIL DETAILS (2 OF 2)
ST-36
56-02-S-256-0
56
DRAINAGE DETAILS
ST-37
56-02-S-257-0
INDEX
TOTAL NUMBER OF SHEETS: 56
STANDARD SHEETS
203-04
603-01
604-02
619-02
619-12
655-06
203-05
603-02
606-09
619-10
655-04
685-01
402-01
603-04
619-01
619-11
E
E
X
C
R
S
L
IO
CBP
CBPOL
CBSP
CBTP
ACC
ACOGO
ACS
AEQN
AEQNAHD
AEQNBK
AEVT
APC
APCC
API
APOB
APOC
APOE
APOL
APOS
APOT
APOVC
APOVT
APRC
APT
APVC
APVCC
APVI
APVRC
APVT
ASC
ASPI
ASTS
AVEVT
AVHIGH
AVLOW
CENTER OF CURVATURE
COGO
CURVE TO SPIRAL
EQUATION
EQUATION AHEAD
EQUATION BACK
EVENT STATION
SPIRAL TO CURVE
SPIRAL TO SPIRAL
SPIRAL TO TANGENT
TANGENT TO SPIRAL
DRILL HOLE
ELEVATION, SPOT
FLAG POLE
MAILBOX
PAPER BOX
ROCK, BOULDER
SHRUB, CONIFEROUS
SHRUB, DECIDUOUS
TREE, CONIFEROUS
TREE, DECIDUOUS
TREE, STUMP
SINGLE POST
DELINEATORS
REFERENCE MARKERS
GDH
LELS
LFP
LMB
LPB
LPST
LRB
LSHC
LSHD
LTC
LTD
LTS
LUKP
SDEL
SRM
S
CABINET & PAD
CCTV SITE
CDPD TRANSCEIVER
CELL PHONE TOWER
CONDUIT JACK OR BORING
CONTROLLER CABINET
COMMUNICATION PULL BOX
CONDUIT TURNING DOWN
CONDUIT TURNING UP
DEFAULT
TRANSMITTAL READER
FUSION SPLICE
HAR ADVISORY SIGN
HAR SITE
LOAD CENTER
MECHANICAL SPLICE
PEDESTRIAN SIGNAL HEAD
RAMP METER
SOLAR PANEL
WEIGHT IN MOTION DETECTOR
WIRELESS VIDEO REPEATER
WIRELESS VIDEO RECEIVER
WIRELESS VIDEO TRANSMITTER
PERM. OVERHEAD VMS
PERM. VMS
ACCOU. SPEED/COUNT SNSR.S
IASCTS
ICABPAD
ICCTV
ICDPD
ICELLT
ICJB
ICNTLCAB
ICPB
ICTD
ICTU
ICVTRT
IEZR
IEZTR
IFOXCAB
IFUSSPL
IHARADV
IHARST
IMECSPL
IMSCS
IMSCTS
IMT
IOVHVMS
IPASCS
IPEDS
IPSS
IPVMS
IRM
IRWIS
ISP
ISST
ITDB
ITP
IVTRT
IWIMD
IWVR
IWVTT
IWVRC
ILC
SPM
PARKING METER
SPREAD SPECT. TRANSCEIVER
TELEPHONE DEMARCATION BLK
SUBSURFACE TEMP. PROBE
MICRO SPEED & COUNT SENSOR
POST, SINGLE
PT., WALL LOCATION
PT., TREE W/ WIRE
PT., STAKE
PT., RAILROAD SPIKE
PT., SPIKE
PT., NAIL
PT., MONUMENT, MISC.
PT., MONUMENT
PT., IRON ROD
PT., IRON PIPE
PT., FENCE LOCATION
PT., DRILL HOLE
HISTORICAL, BLDG. CORNERS
HIGHWAY BNDRY., APPROX.
HIGHWAY BNDRY, PT.
DEED LINE, TYPE 1
DEED LINE, TYPE 2
DEED LINE, TYPE 3
DEED LINE, TYPE 4
DEED LINE, TYPE 5
EASEMENT, EXISTING
BOX, JUNCTION
BOX, PULL BOX
BOX, SPLICE
MICROCOMPUTER CABINET
PED POLE
SIGNAL HEADS
SIGNAL POLE
MDL1P
MHBCP
MPCC
MPDH
MPF
MPIP
MPIR
MPM
MPMM
MPN
MPRS
MPSP
MPST
MPTW
MPWL
TCMC
TCPP
TCSH
TCSP
C
MJCP
PT., JURIS. CITY
PT., CROSS CUT
IDEFAULT
POINT OF CURVATURE
POINT OF INTERSECTION
POINT OF BEGINNING
POINT OF CURVATURE
POINT OF END
POINT ON LINE
POINT ON SPIRAL
POINT ON TANGENT
POINT ON VERTICAL CURVE
POINT ON VERTICAL TANGENT
POINT ON REVERSE CURVE
POINT OF TANGENCY
POINT OF VERTICAL CURVATURE
POINT OF VERT. INTERSECTION
POINT OF VERT. REVERSE CURVE
POINT OF VERTICAL TANGENCY
SPIRAL POINT OF INTERSECTION
VERTICAL EVENT POINT
VERTICAL HIGH POINT
BASELINE, POINT
BASELINE, POINT ON LINE
UNKNOWN POINT
COMM. VEH. ROAD TRANSCEIVER
E-ZPASS READER
MICROWAVE TRANSCEIVER
PORT. ACCOU. SPD & CNT. SENSOR
VEHICLE TO RDWY TRANSCEIVER
PORT. SPEED & COUNT SENSOR
FIBER OPTIC X-CONNECT CABINET
PAVEMENT SURFACE SENSOR
RDWY WEATHER INFO. SENSOR
GUIDE RAIL, ANCHOR
GUIDE POST, SINGLE
RGA
RGP
CPBM
BENCHMARK
POINT, HORIZ. PHOTOGRAMMETRY
POINT, SURVEY MARKER, PERM.
CPV
CPSM
CPH
ATS
AST
MDL2P
MDL3P
MDL4P
MDL5P
MEEP
MHBP
TCBJ
TCBP
TCBS
POINT OF C0MPOUND CURVATURE
POINT OF VERT. CMPND CURVE
VERTICAL LOW POINT
BASELINE, SPUR POINT
BASELINE, TIE POINT
MHBAP
POINT, VERT., PHOTOGRAMMETRY
WETLAND FLAG
EWFG
RFM
A
B
1
2
3
4
5
A
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:34:45 AM
morrimm
3
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
BRIDGE, SCUPPER
EASEMENT, PERM., SHAPE
EASEMENT, PERM., APPROX.
EASEMENT, PERM., BACK LINE
EASEMENT, PERM., BACK LINE
MEPAP_P
EIOP_P
ADPI_P
DETOUR, POINT OF INTERSECT.
DETOUR, POINT ON LINE
BSC
LTW_P
TREE, WELL OR WALL
SINGLE POST, PROPOSED
BACK TO BACK, PROPOSED
SRSC3
SRSC4
SRSCT2
SRSCT4
SRSI
SRSN2
SRSN3
SRSS2
SRSS3
SRSS4
FEE ACQUISITION, SHAPE
MPBC
PT., BUILDING CORNER
MFS_P_T
MEPS_P_T
EASEMENT, PERMANENT
METS_P_T
EASEMENT, TEMPORARY
METS_P_T
OCCUPANCY, TEMPORARY
MFS_P_T
FEE ACQUISITION
TWZBCD_P
RES_P
ELEVATION, SPOT
TWZCMS_P
CHANGEABLE MESSAGE SIGN (PVMS)
TWZFLG_P
FLAGGER
TWZFT_P
FLAG TREE
TWZIA_P
TWZSDT_P
TWZAP_P
ARROW PANEL
TWZAPC_P
ARROW PANEL, CAUTION MODE
TWZAPT_P
ARROW PANEL, TRAILER OR SUPPORT
TWZWVA_P
SYMBOL, DIRECTION OF TRAFFIC
TWZSDTD_P
LUMINAIRE (TEMPORARY)
TWZSGN_P
SIGN (TEMPORARY)
TWZSIG_P
TWZWL_P
WARNING LIGHT
TWZWV_P
WORK VEHICLE
BARRICADE (TYPE III)
TWZLUM_P
S_P
SB_P
SHLD, INTERSTATE
SHLD, NATIONAL, 2 DIG.
SHLD, NATIONAL, 3 DIG.
SHLD, STATE, 2 DIG.
SHLD, STATE, 3 DIG.
SHLD, STATE, 4 DIG.
SHLD, CTY, 123 DIG.
SHLD, CTY, 4 DIG.
SHLD, CTY TOUR, 1-2 DIG.
SHLD, CTY TOUR, 3-4 DIG.
STR., INLET PROT., GRAVEL BAG
STR., INLET PROT., FILTER LOG
STR., INLET PROT., PREFAB.
STR., INLET PROT., SILT FENCE
STR., INLET, OUTLET PROT.
MEPP_P
MEPSP_P
MFAP_P
MFP_P
MFSP_P
EIPGB_P
EIPEFL_P
EIPP_P
EIPSF_P
ADPL_P
FEE ACQUISITION, BACK LINE
FEE ACQUISITION, APPROX.
FEE ACQUISITION W/O ACCESS
CRASH CUSHION (TEMPORARY)
IMPACT ATTENUATOR /
TRAFFIC DETOUR
SYMBOL, DIRECTION OF TEMPORARY
(TEMPORARY)
SIGNAL, TRAFFIC OR PEDESTRIAN
MOUNTED ATTENUATOR
WORK VEHICLE WITH TRUCK
ALIGNMENT
TRAP, SEDIMENT
LANDSCAPE
GEOTECHNICAL
ENVIRONMENTAL
ITS
ROW MAPPING
TRAFFIC CONTROL
UTILITIES
ETRS_P
CELL
DESCRIPTION
CELL
CELL
CELL
DESCRIPTION
DESCRIPTION
DESCRIPTION
RISER, CONCRETE BOX
ERCB
NAME
NAME
NAME
NAME
DESCRIPTION
NAME
CELL
CELL
NAME
DESCRIPTION
ROW ACQUISITION
BRIDGE
CONTROL
TRAFFIC WORK ZONE
ROADWAY
SIGNS
DRAINAGE
GB
CULV
FL
PRFB
SF
CDPD
C
C
EZ
EZ-T
XC
H
M
RM
SS
TC
TP
WVR
V
V
A
A
P1
M1
FEE
PE
M1
P1
TE
M1
P1
TO
M1
P1
FEE WO/A
M1
P1
LEGEND POINT SYMBOLS
LEG-01
56-02-G-204-0
DINV
DS
STRUCTURE, RECTANGULAR
INVERT
ANTENNAS
IANT_P
GAS, METER
GAS, MANHOLE
GAS, LINE MARKER
GAS/FUEL PUMP
GAS, VALVE
GAS, VENT
LIGHTING, POLE
LIGHTING, POLE, MEDIAN
LIGHTING, POLE, PED.
MISC. FILLER CAP
OIL, LINE MARKER
TELEPHONE, LINE MARKER
TELEPHONE, MANHOLE
CABLE TV, LINE MARKER
CABLE TV, PULL BOX
UNKNOWN, MANHOLE
UNKNOWN, VALVE
WATER, FIRE HYDRANT
WATER, METER
WATER, MANHOLE
WATER, VALVE
WATER, WELL
UGM
UGMH
UGLM
UGP
UGV
UGVT
ULP
ULPM
ULPP
UMFC
UOLM
UP
UPD
UPL
USMH
UTB
UTLM
UTMH
UTVPB
UUJB
UUMH
UUVL
UWFH
UWM
UWMH
UWV
UWW
UNKNOWN, JUNCTION BOX
UTVLM
UUB
UNKNOWN, BOX
UUPB
UNKNOWN, PULL BOX
UUVT
UNKNOWN, VENT
UUW
UNKNOWN, WELL
ELECTRIC, BOX
ELECTRIC, METER
ELECTRIC, MANHOLE
ELECTRIC, POLE, TRANS.
UEB
UEM
UEMH
UEPT
DSMTXX_P
POLE, WITH UTILITY
POLE, DEAD (NO UTILITY)
POLE, WITH LIGHT
SANITARY SEWER MANHOLE
TELEPHONE, BOOTH
DSI
STRUCTURE, INVERT
DSM
STRUCTURE, MANHOLE
DSR
STRUCTURE, ROUND
DST"X"CB_P
STRUCTURE, RECT., TYPE "X"
DST"X"_P
"XX" = 48, 60, 72, 84, 96
TYPE "XX"
STRUCTURE, MANHOLE,
TYPE "X"
STRUCTURE, RECT., WITH CURB
"X" = I, K, L, M, O, P, U
"X" = F, G, N, O, P, R
G
T
W
FP
E
E
G
C
A
A
P
LC
PM
M
VMS
PA
PVMS
RWIS
WIM
E
O
S
P
T
C
U
W
W
G
E
E
X
C
R
S
L
IO
AC
CONTROL (CENTERLINE)
CB
CBPR
ESFL
ECT
EDMC
CURTAIN, TURBIDITY
BASELINE
BASELINE, PROJECTION
SHEET PILING
EFNS
EFNV
EWFS
EWM
EWS
WETLAND, STATE
WETLAND, MITIGATION AREA
WETLAND, FEDERAL
FENCE, VEGETATION
FENCE, SILT
LABL
LAHR
LAPB
LAWA
LAWE
LFNC
LTRC
LTRD
LWR
LWS
AREA, BRUSH LINE
AREA, HEDGE ROW
AREA, PLANTING BED
AREA, WATERS EDGE
FENCE
TREE ROW, CONIFEROUS
WALL, RETAINING
TREE ROW, DECIDUOUS
WALL, STONE
MDL
MEE
HIGHWAY BOUNDARY, W/ ACCESS
EASEMENT, EXISTING
DEED LINE
RG
RRPSS
BROKEN LINE
TCSW
SIGNAL, SPAN WIRE
SM
SSO
SSOC
MULTIPLE POST
STRUCTURE, OVERHEAD
RRS
RUMBLE STRIP
STB*
EWF
BR
RAIL
BSHT
FENCE, SILT & VEGETATION
EFNSV
WETLAND, FEDERAL AND STATE
SBLB
BILLBOARDS
STRUCTURE, OVHD. CANTILEVER
AREA, WOODED AREA OUTLINE
LWH
WALL, H PILE
MHB
MHBA
HIGHWAY BOUNDARY, APPROX.
MHBW
HWY BOUNDARY, FACE OF WALL
MHBWOA
HIGHWAY BOUNDARY, W/O ACCESS
MJC
JURISDICTION, CITY
MJCY
JURISDICTION, COUNTY
MJHD
JURISDICTION, HISTORIC DISTRICT
MJLL
JURIS., (GREAT, MILITARY) LOT LINE
MJN
JURISDICTION, NATION
MJPB
JURISDICTION, PUBLIC LANDS
MJS
JURISDICTION, STATE
MJT
JURISDICTION, TOWN
MJV
JURISDICTION, VILLAGE
MPL
PROPERTY LOT LINE
PROPERTY LOT LINE, APPROXIMATE
MPLA
MSL
SUB LOT LINE
GUIDE RAIL, MISCELLANEOUS
RGB
GUIDE RAIL, BOX BEAM
RGBM
GUIDE RAIL, BOX BEAM, MEDIAN
RGC
GUIDE RAIL, CABLE
RGCB
GUIDE RAIL, CONCRETE BARRIER
RGW
GUIDE RAIL, W BEAM
RGWM
GUIDE RAIL, W BEAM, MEDIAN
RPB
PARKING BUMPER
RRC
RAIL ROAD, CATENARY
RRER
RAIL ROAD, 3RD RAIL
RAIL, PHOTO, SMALL SCALE
RRSSS
RAIL, SURVEY, SMALL SCALE
DOUBLE BROKEN LINE
STDB*
STDL*
DOTTED LINE LONG
STDS*
DOTTED LINE SHORT
STFB*
FULL BARRIER LINE
STH*
HATCH LINE
STRCT
ROUNDABOUT, CAT TRACKS
STRYL
ROUNDABOUT, YIELD LINE
STSB
STOP BAR
SOLID, EDGE
X WALK, LADDER LINE
* = W (WHITE) OR Y (YELLOW)
FILTER, SEDIMENT LOG
STSE*
MHA
HISTORICAL, ACQUISITION
STXLB
X WALK, LADDER BAR LINE
STXL
DAM, COFFER
FL
FW
FW
SW
WM
SW
PE
HB
AHB
HB W / OA
PL
PL
A
Z
3R
L
B
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:34:46 AM
morrimm
4
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
LIGHTS
BARRIER, TEMPORARY, W/ WARNING
COVERING
PAVEMENT MARKING REMOVAL OR
DO NOT HAVE CORRESPONDING EXISTING FEATURES.
FEATURES SHOWN AT THE HEAVIER WEIGHT ARE PROPOSED ONLY AND
6.
SHOULD BE LABELED ON THE PLANS.
SYMBOLOGY (SUCH AS THE PAVEMENT EDGE, PAVEMENT EDGE OF TRAVEL WAY) AND
MAPPING FEATURES NOT INCLUDED ON THE LEGEND SHEET DO NOT HAVE A UNIQUE
5.
ON B SIZE DRAWINGS).
EXCLUDING LINE WEIGHT. LINE WEIGHT FOR PROPOSED FEATURES IS THICKER (0.015 in
PROPOSED FEATURE SYMBOLOGY IS IDENTICAL TO EXISTING FEATURE SYMBOLOGY
4.
PROPOSED FEATURES.
FEATURES SHOWN ON THE LEGEND AS EXISTING FEATURES ALSO HAVE CORRESPONDING
3.
UTILITY LINES, ETC.) OR POINT (SIGN, UTILITY POLE, ETC.).
FEATURES ARE SHOWN AS EITHER LINEAR (ROADWAY GUIDERAIL, ROADWAY SIDEWALK,
2.
THE LEGEND ILLUSTRATES MAPPING FEATURES (EXISTING AND PROPOSED).
1.
ALIGNMENT
CONTROL
DRAINAGE
ENVIRONMENTAL
LANDSCAPE
ROW MAPPING
STRIPING
TRAFFIC CONTROL
AD_P
AT_P
DETOUR
DDG_P
DDP_P
DDS_P
DFL_P
FLOW LINE
DITCH, STONE LINED
DITCH, PAVED INVERT
DITCH, GRASS LINED
EWAA_P
WETLAND, ADJACENT AREA
EDMEC_P
EDMPC_P
EDMSC_P
LFILL_P
FILL LIMIT
RRPLS_P
RRSLS_P
TRANSITION CONTROL
SIGNS
STYLE
NAME
DESCRIPTION
BRIDGE
DESCRIPTION
NAME
STYLE
MEP_P
EASEMENT, PERMANENT
MEPA_P
EASEMENT, PERMANENT, APPROX.
MET_P
EASEMENT, TEMPORARY
META_P
EASEMENT. TEMPORARY, APPROX.
MF_P
MFA_P
FEE ACQUISITION, APPROXIMATE
MFS_P
FEE ACQUISITION, SHAPE
ROADWAY
DESCRIPTION
NAME
STYLE
GUIDE POST
RAIL, PHOTO, LARGE SCALE
RAIL, SURVEY, LARGE SCALE
RGP_P
STPB*
PARTIAL BARRIER LINE
UTILITIES
FEE ACQUISITION, W/ ACCESS
LCUT_P
CUT LIMIT
STYLE
NAME
DESCRIPTION
RCZ_P
BARRIER, TEMPORARY
TRAFFIC WORK ZONE
TWZBT_P
CHANNELIZING DEVICE
TWZCD_P
TWZPMRC_P
TWZBTWL_P
MFWOA_P
FEE ACQUISITION, W/O ACCESS
CLEAR ZONE
EDMGSC_P
DAM, EARTHEN CHECK
BAG CHECK
DAM, GRAVEL BAG/SAND
DAM, PREFABRICATED CHECK
DAM, STONE CHECK
AA
PE
APE
TE
ATE
FEE
AFEE
FEE W / OA
CZ
LEGEND LINE SYMBOLS
LEG-02
56-02-G-205-0
DCP
DCP_P
CULVERT PIPE (DIR)
CULVERT PIPE
UC
DSSD
SLOTTED DRAIN
CONDUIT, UNDERGROUND
UCH
CONDUIT, HANGING
UCO
CONDUIT, OVERHEAD
UE
ELECTRIC LINE, UNDERGROUND
UEH
ELECTRIC LINE, HANGING
UEO
ELECTRIC LINE, OVERHEAD
UESS
ELECTRIC, SUBSTATIONS
UFO
FIBER OPTIC, UNDERGROUND
UFOH
FIBER OPTIC, HANGING
UFOO
FIBER OPTIC, OVERHEAD
UG
GAS, UNDERGROUND
UGH
GAS, HANGING
UGO
GAS, OVERHEAD
UIC
INFORM CABLE, UNDERGROUND
UICH
INFORM CABLE, HANGING
OIL LINE, UNDERGROUND
UO
UOH
OIL LINE, HANGING
UPBP
POLE, BRACE, PUSH BRACE
POLE, GUY WIRE
USA
USAH
SANITARY SEWER, HANGING
SANITARY SEWER, UNDERGROUND
UT
TELEPHONE, UNDERGROUND
UTH
TELEPHONE, HANGING
UTO
TELEPHONE, OVERHEAD
UUU
UNKNOWN, UNDERGROUND
UUH
UNKNOWN, HANGING
UUO
UNKNOWN, OVERHEAD
UW
WATER LINE, UNDERGROUND
UWH
WATER LINE, HANGING
UWO
WATER LINE, OVERHEAD
UETO
ELECTRIC TRANSMISSION, OVERHEAD
USAF
SANITARY SEWER, FORCE MAIN, UGND
USAFH
SANITARY SEWER, FORCE MAIN, HANG
UTV
UTVH
UTVO
CABLE TV, UNDERGROUND
CABLE TV, HANGING
CABLE TV, OVERHEAD
UPGW
UNDERDRAIN
DUD_P
ST
ST
UD
C
C
OC
E
E
OE
OET
FO
FO
OFO
G
G
OG
IC
IC
O
O
SA
SA
SAF
SAF
T
T
OT
CTV
CTV
OCTV
UU
UU
OUU
W
W
OW
] [
[
]
] [
] [
] [
] [
] [
]
[
] [
]
[
] [
] [
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:34:47 AM
morrimm
5
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
HIGH VOLTAGE ELECTRICAL LINES ARE IN PROXIMITY TO THIS BRIDGE.
CONTAINING MATERIALS HAVE BEEN INDICATED IN THE CONTRACT DOCUMENTS.
PLANS OF THE STRUCTURE(S) AND/OR ENCOUNTERED DURING FIELD INSPECTIONS. ALL KNOWN ASBESTOS
STRUCTURES CONTAINED IN THIS CONTRACT. THESE MATERIALS WERE NOTED ON THE ORIGINAL CONTRACT
MATERIALS CONTAINING ASBESTOS ARE BELIEVED TO EXIST AT VARIOUS LOCATIONS ON OR IN CERTAIN
ALL SHOP DRAWINGS FOR THIS PROJECT SHALL BE PREPARED IN U.S. CUSTOMARY UNITS.
FULLY DIMENSIONED.
VISUAL CLARITY. ALL OTHER DETAILS FOR WHICH NO SCALE IS SHOWN ARE DRAWN PROPORTIONALLY AND ARE
DETAILS ON THE DRAWINGS LABELED AS "NOT TO SCALE" ARE INTENTIONALLY DRAWN NOT TO SCALE FOR
DESIGN LIVE LOAD: AASHTO HL - 93.
THE LOAD RATINGS ARE IN ACCORDANCE WITH THE AASHTO MANUAL FOR BRIDGE EVALUATION.
VERSION OF THE AASHTO MAINTENANCE MANUAL FOR ROADWAYS AND BRIDGES.
THIS BRIDGE SHALL BE MAINTAINED IN ACCORDANCE WITH THE GUIDELINES CONTAINED IN THE CURRENT
ALL PROVISIONS IN EFFECT AS OF JUNE 2025.
CONSTRUCTION SPECIFICATIONS: NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION AND MATERIALS WITH
SLABS AT 28 DAYS: f'c = 4,000 psi.)
JUNE 2025 (FOR DESIGN PURPOSES, COMPRESSIVE STRENGTH OF CONCRETE FOR SUBSTRUCTURES AND DECK
DESIGN SPECIFICATIONS: NYSDOT LRFD BRIDGE DESIGN SPECIFICATIONS WITH ALL PROVISIONS IN EFFECT AS OF
GENERAL NOTES:
FOUNDATION NOTES:
UNIT PRICE BID FOR ITEM 203.03 - EMBANKMENT IN PLACE.
THE COST OF WATER USED FOR COMPACTION OF EMBANKMENT IN PLACE MATERIAL SHALL BE INCLUDED IN THE
PRICE BID FOR ITEM 203.21 - SELECT STRUCTURE FILL.
THE COST OF WATER USED FOR COMPACTION OF THE SELECT STRUCTURAL FILL SHALL BE INCLUDED IN THE UNIT
SIMULTANEOUSLY, ON BOTH SIDES OF THE VERTICAL PAYMENT LINE.
EMBANKMENT IN PLACE, ITEM 203.03, AND SELECT STRUCTURE FILL, ITEM 203.21, SHALL BE PLACED
SUBSTRUCTURE NOTES:
CONTRACT.
EXPANSION JOINTS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS CONCRETE ITEMS IN THE
THE COST OF ALL JOINT MATERIAL AND WATERSTOPS AT CONCRETE CONSTRUCTION JOINTS, CONTRACTION AND
ABUTMENTS AND/OR WINGWALLS SHOULD PREFERABLY BE PLACED MIDWAY BETWEEN THE PEDESTALS.
BE PROVIDED WITH SHEAR KEYS AND WATERSTOPS. VERTICAL CONSTRUCTION JOINTS INTRODUCED IN THE
THE ABUTMENTS AND/OR WINGWALLS AT LOCATIONS NOT SHOWN IN THE PLANS. CONSTRUCTION JOINTS SHALL
THE CONTRACTOR, WITH THE APPROVAL OF THE COUNTY, MAY ELECT TO INTRODUCE CONSTRUCTION JOINTS IN
CONTRACTOR SHALL INCLUDE COSTS FOR THIS WORK IN THE UNIT PRICE BID FOR THE APPROACH SLAB ITEM.
SIDES), §728-06, SHALL BE PLACED ON THE TOP OF THE BACKWALLS OF FIXED AND EXPANSION ABUTMENTS. THE
TOP OF BACKWALLS SHALL BE STEEL TROWEL FINISHED. TWO SHEETS OF SHEET GASKET (TREATED BOTH
COFFERDAM AND HYDRAULIC NOTES:
ELEVATION RATHER THAN A COMPUTED ONE.
PREVALENT DURING ONE CONSTRUCTION SEASON FOR MORE THAN 25% OF THE TIME. IT IS AN OBSERVED
LOW WATER IS ESTIMATED TO BE 24.30 FT. LOW WATER IS DEFINED AS THE NORMAL LOW WATER ELEVATION
RATHER THAN A COMPUTED ONE.
IS ALWAYS LESS THAN THE ORDINARY HIGH-WATER ELEVATION AND IT IS USUALLY AN OBSERVED ELEVATION
ELEVATION LIKELY TO BE ENCOUNTERED DURING ONE CONSTRUCTION SEASON (EXCLUDING MAJOR FLOODS). IT
ORDINARY WATER IS ESTIMATED TO BE 25.75 FT. ORDINARY WATER IS DEFINED AS THE HIGHEST SURFACE WATER
OF 2.33 YEARS.
SURFACE ELEVATION FOR THE MEAN ANNUAL FLOOD, WHICH IS THE FLOOD THAT HAS A RECURRENCE INTERVAL
ORDINARY HIGH-WATER IS ESTIMATED TO BE 28.25 FT. ORDINARY HIGH-WATER IS DEFINED AS THE WATER
DETERMINED BY THE ENGINEER. NO SETTLEMENT BASIN SHALL BE CONSTRUCTED.
AND WATER POLLUTION CONTROL, SUCH AS SEDIMENT FILTER LOGS OR APPROVED EQUAL, MAY BE REQUIRED AS
THE STREAMBED AS SHOWN IN THE PLANS AND/OR APPROVED BY THE ENGINEER. TEMPORARY SOIL EROSION
DEWATER THE COFFERDAM BY PUMPING THE WATER TO AN APPROVED UPLAND VEGETATED AREA OUTSIDE OF
SHALL BE BASED ON ALL OF THE APPLICABLE COFFERDAM ITEMS INDICATED IN THE PLANS.
IF MULTIPLE COFFERDAMS ARE REPLACED BY A SINGLE SYSTEM, WHEN APPROVED BY THE COUNTY,PAYMENT
MEANS WHEN THE WATER ELEVATION EXCEEDS 28.25 FT.
THE COFFERDAM AND TREMIE SYSTEM SHALL BE DESIGNED TO AUTOMATICALLY FLOOD BY NON-MECHANICAL
THE CONTRACTOR SHALL SUBMIT THE CHANGES TO THE COUNTY FOR REVIEW AND APPROVAL.
SHOULD FIELD CONDITIONS REQUIRE A CHANGE IN THE TYPE OF COFFERDAM SYSTEM CALLED FOR IN THE PLANS,
SOURCE OF WATER, SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE COFFERDAM ITEM.
WHEN A COFFERDAM IS USED, THE COST OF DEWATERING THE ENTIRE EXCAVATION, REGARDLESS OF THE
WATER FROM ENTERING THE EXCAVATION SHALL BE FURNISHED AND PLACED AT NO COST TO THE COUNTY.
EXCAVATION REQUIRING A COFFERDAM, ANY REQUIRED EXTENSIONS TO THE COFFERDAM NECESSARY TO KEEP
SHOULD THE CONTRACTOR ELECT TO LAY BACK A PORTION OF THE EXISTING EARTH ADJACENT TO AN
SUPERSTRUCTURE NOTES:
ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM A709, GRADE 50.
GALVANIZING NOTES:
THE BOLTS.
DRILLED HOLES SHALL BE CLEANED OF ALL EXCESS MATERIAL THAT PREVENTS THE PROPER INSTALLATION OF
CONSTRUCTION MANUAL.
ALL BOLTS, NUTS, AND WASHERS SHALL BE GALVANIZED IN ACCORDANCE WITH THE NEW YORK STATE STEEL
565.2025 AND 565.2035.
PLATE, SHALL BE METALIZED. THE COST OF METALIZING SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEMS
ALL EXPOSED STEEL COMPONENTS OF BRIDGE BEARINGS, INCLUDING THE SOLE PLATE AND THE MASONRY
COST TO THE COUNTY.
DETERMINED TO BE CAUSED BY IMPROPER STORAGE OR SHIPPING OF HDG MATERIALS SHALL BE REPAIRED AT NO
SHALL BE REPAIRED IN ACCORDANCE WITH THE NYS STEEL CONSTRUCTION MANUAL. WHITE RUST THAT IS
DETRIMENTAL TO THE INTENDED USE OF THE MEMBER OR HAVE A NEGATIVE VISUAL IMPACT ON THE STRUCTURE
EXAMPLES OF NON-RESINOUS WOODS ARE: POPLAR, ASH AND SPRUCE. WHITE RUST THAT IS DETERMINED TO BE
SPACERS TO ALLOW VENTILATION AND AVOID MOISTURE BUILD UP, INCLINE MEMBERS TO ALLOW DRAINAGE.
FOLLOWS: STORE MATERIALS OFF OF THE GROUND AWAY FROM ALL VEGETATION, USE NON-RESINOUS WOODEN
AVOIDED. IF OUTDOOR STORAGE IS UNAVOIDABLE, EXAMPLES OF REASONABLE ACCOMMODATIONS ARE AS
SHOULD BE AVOIDED. STORAGE (OR SHIPPING) OF HDG MATERIALS IN CONTACT WITH ONE ANOTHER SHALL BE
GALVANIZED (HDG) MATERIALS SHALL BE PROVIDED AT ALL TIMES. STORAGE OF HDG MATERIALS OUTDOORS
REASONABLE ACCOMMODATIONS FOR THE PREVENTION OF WET STORAGE STAINING (WHITE RUST) OF HOT-DIP
WORKERS.
PLAN SHALL SPECIFY THE TYPE OF WALKING/WORKING PRECAUTIONS TO BE IMPLEMENTED TO PROTECT THE
STUD SHEAR CONNECTORS SHALL BE INSTALLED PRIOR TO GALVANIZING. THE CONTRACTOR'S WORKER SAFETY
STEEL ERECTION NOTES:
NEW YORK STATE PROFESSIONAL ENGINEER AND SUBMITTED TO THE COUNTY IN ACCORDANCE WITH THE SCM.
CALCULATIONS. THE ERECTION DRAWINGS AND STABILITY CALCULATIONS SHALL BE SEALED BY A REGISTERED
SHALL BE DOCUMENTED ON THE ERECTION DRAWINGS AND INCLUDED IN THE SUPPORTING STABILITY
HAVE BEEN ERECTED AND CROSS FRAMES INSTALLED. THE MEANS AND METHODS USED BY THE CONTRACTOR
ALTERNATE PICKING POINTS, OR BY USE OF A HOLDING CRANE UNTIL A SUFFICIENT NUMBER OF FLOORBEAMS
BY USE OF FALSEWORK, TEMPORARY BRACING, COMPRESSION FLANGE STIFFENING TRUSSES, CHOOSING
STEEL CONSTRUCTION MANUAL (SCM). THE TRUSSES FOR THIS BRIDGE SHALL BE STABILIZED DURING ERECTION
ERECTION AND CONSTRUCTION, IN ACCORDANCE WITH SECTION 2, SUBSECTION 204 OF THE NEW YORK STATE
THE CONTRACTOR SHALL PROVIDE FOR THE STABILITY OF STRUCTURAL STEEL DURING ALL PHASES OF
STEEL CONSTRUCTION NOTES:
ACCORDING TO THE AISC MANUAL.
DIMENSIONS FOR THICKNESSES OF STEEL ROLLED ANGLE SHAPES AND STRUCTURAL TUBING ARE SHOWN
TENSION COMPONENTS OF LIFTING BOXES AND LIFTING FRAMES
-
END PORTAL FRAMES
-
SWAY FRAMES
-
TOP AND BOTTOM LATERAL BRACING
-
VERTICAL GUSSET PLATES
-
SPLICE PLATES
-
CANTILEVER BRACKETS AND TIE PLATES
-
TENSION FLANGES AND WEBS PLATES OF BASCULE GIRDERS
-
MINIMUM CHARPY V-NOTCH FRACTURE TOUGHNESS REQUIREMENTS:
STANDARD SPECIFICATIONS - CONSTRUCTION AND MATERIALS, THE FOLLOWING ELEMENTS SHALL MEET THE
IN ADDITION TO THE STRUCTURAL STEEL ELEMENTS LISTED IN §715-01 - STRUCTURAL STEEL OF THE NYSDOT
SUPERSTRUCTURE SLAB NOTES:
TARPS OR OTHER BARRIER-TYPE MEANS TO THE SATISFACTION OF THE EIC.
THE SEALER OR BY PHYSICALLY ISOLATING THE AREA TO BE SPRAYED FROM THE WATERWAY BY THE USE OF
WATERWAY. CARE SHALL BE TAKEN TO PREVENT SPRAYED SEALER FROM ENTERING THE WATERWAY BY ROLLING
SURFACE, SUCH AS SCUPPERS OR OPEN DRAINS SHALL BE COVERED TO PREVENT CONTAMINATION OF THE
APPLICATION OF THE SEALER, ANY OPENINGS IN THE SURFACE OF THE BRIDGE DECK OR IN THE WALKING
AVAILABLE FOR IMMEDIATE USE MATERIALS TO SOAK UP OR CONTAIN ANY ACCIDENTAL SPILLS. PRIOR TO THE
IN A MANNER THAT WILL PREVENT CONTAMINATION OF THE WATERWAY. THE CONTRACTOR SHALL HAVE
MANUFACTURER'S INSTRUCTIONS REQUIRE MIXING OF THE SEALER PRIOR TO APPLICATION, MIXING SHALL OCCUR
CARE SHALL BE TAKEN TO PREVENT CONTAMINATION OF THE WATERWAY BY THE SEALER. IF THE
DAYS FOR EACH SUBMISSION, WILL BE ALLOWED UPON RECEIPT OF THE SUBMISSION.
AND MATERIALS SHALL APPLY. A REVIEW TIME OF TWO DAYS PER PLACEMENT DRAWING, WITH A MINIMUM OF 15
PROVISIONS OF §557-3.17 - NO BARLIST PROVIDED, OF THE NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION
BARLISTS ARE NOT PROVIDED FOR SUPERSTRUCTURE SLABS, APPROACH SLABS, AND/OR SUBSTRUCTURES. THE
NEW BRIDGE DECKS AND BRIDGE DECK OVERLAYS. ONLY PENETRATING TYPE SEALERS SHALL BE USED.
SHALL BE SEALED IN ACCORDANCE WITH ITEM 559.01 - PROTECTIVE SEALING OF STRUCTURAL CONCRETE ON
TOP SURFACES OF NEW SIDEWALKS AND EXPOSED SURFACES OF NEW CONCRETE PARAPETS OR BARRIERS
559.01 - PROTECTIVE SEALING OF STRUCTURAL CONCRETE ON NEW BRIDGE DECKS AND BRIDGE DECK OVERLAYS.
TOP SURFACES OF NEW BRIDGE DECKS AND APPROACH SLABS SHALL BE SEALED IN ACCORDANCE WITH ITEM
PRICE BID FOR THE BARRIER ITEM.
COST OF BARRIER AND ANCHORAGE REINFORCEMENT ORIGINATING IN THE SLAB SHALL BE INCLUDED IN THE UNIT
THE DETAILS FOR THE BARRIER REINFORCEMENT ARE FOR THE SLIP-FORMED OR CAST-IN-PLACE OPTION ONLY.
PERMISSION OF THE ENGINEER.
THE CONTRACTOR SHALL MAKE NO DEVIATIONS FROM THE HAUNCH DETAILS SHOWN IN THE PLANS WITHOUT THE
REMOVAL NOTES:
OF THE STRUCTURE'S PAINT PRIOR TO SUBMITTING A BID.
REQUIRED. BECAUSE OF THE ABOVE-MENTIONED CONDITION, THE CONTRACTOR SHALL EXAMINE THE CONDITION
ON THE ALTERNATIVE CHOSEN, THE TREATMENT AND DISPOSAL OF PAINT REMOVAL WASTE ITEM MAY BE
THE USE OF ENVIRONMENTAL GROUND AND/OR WATERWAY PROTECTION ITEMS WILL BE REQUIRED. DEPENDING
FOR THE SUPERSTRUCTURE REMOVAL ITEM(S) (OR THE UNIT PRICE BID FOR THE SUBSTRUCTURE REMOVAL ITEM.)
OPERATIONS. THE COST OF REMEDIATING THIS CONDITION SHALL BE INCLUDED IN THE LUMP SUM PRICE(S) BID
PRIOR TO REMOVAL, ENCAPSULATING THE LOOSE PAINT OR REMOVAL OF LOOSE PAINT PRIOR TO DISMANTLING
COULD INCLUDE TRANSPORTING AFFECTED MEMBERS IN CLOSED TRUCKS, WRAPPING AFFECTED MEMBERS
WORKER LEAD PROTECTION IN ACCORDANCE WITH 29 CFR 1926.62 SHALL BE SATISFIED. REMEDIATION METHODS
SHALL FORMULATE AND SUBMIT A METHOD OF REMEDIATING THE CONDITION FOR APPROVAL BY THE ENGINEER.
OR DURING TRANSPORTATION FROM THE SITE UNLESS APPROPRIATE MEASURES ARE TAKEN. THE CONTRACTOR
LOOSE AND/OR PEELING PAINT ON STEEL SURFACES MAY BECOME DISLODGED DURING REMOVAL OPERATIONS
SHALL BE DISPOSED OF USING THE TREATMENT AND DISPOSAL OF PAINT REMOVAL WASTE ITEM.
SHALL BE COLLECTED USING THE ENVIRONMENTAL GROUND AND/OR WATERWAY PROTECTION ITEM(S). WASTE
PRICE BID FOR THE SUBSTRUCTURE REMOVAL ITEM). PAINT WASTE NOT COLLECTED BY VACUUM METHODS
SHALL BE INCLUDED IN THE LUMP SUM PRICE(S) BID FOR THE SUPERSTRUCTURE REMOVAL ITEM(S) (OR THE UNIT
CONSTRUCTION AND MATERIALS. AND §574 OF THE STANDARD SPECIFICATIONS. THE COST OF PAINT REMOVAL
SHALL MEET THE PROVISIONS OF §202-3.01 - GENERAL, OF THE NYSDOT STANDARD SPECIFICATIONS -
LIMITS AND METHODS FOR THE REMOVAL OF PAINT AT LOCATIONS OF FASTENER REMOVAL OR FLAME CUTTING
RECORD PLANS FOR THIS STRUCTURE ARE NOT AVAILABLE.
DISPOSED OF USING THE TREATMENT AND DISPOSAL OF PAINT REMOVAL WASTE ITEM.
COLLECTED USING THE ENVIRONMENTAL GROUND AND/OR WATERWAY PROTECTION ITEM(S). WASTE SHALL BE
BID FOR THE SUBSTRUCTURE REMOVAL ITEM). PAINT WASTE NOT COLLECTED BY VACUUM METHODS SHALL BE
SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE SUPERSTRUCTURE REMOVAL ITEM(S) (OR THE UNIT PRICE
OF THE NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION AND MATERIALS. THE COST OF PAINT REMOVAL
SUPERSTRUCTURE REMOVAL SHALL MEET THE PROVISIONS OF §202-3.01 GENERAL AND SAFETY REQUIREMENTS,
ENGINEER THIRTY (30) DAYS PRIOR TO BEGINNING THE DEMOLITION.
PLAN, SEALED BY A REGISTERED NEW YORK STATE PROFESSIONAL ENGINEER, SHALL BE SUBMITTED TO THE
REQUIREMENTS, OF THE NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION AND MATERIALS. A REMOVAL
SUPERSTRUCTURE REMOVAL SHALL MEET THE PROVISIONS OF §202-3.01 - GENERAL AND SAFETY
SUPERSTRUCTURES.
EXISTING SUPERSTRUCTURE SHALL BE REMOVED UNDER ITEM 202.120001 - REMOVING EXISTING
REMOVAL OF SUBSTRUCTURES..
EXISTING SUBSTRUCTURE SHALL BE REMOVED WITHIN THE PAY LIMITS SHOWN IN THE PLANS UNDER ITEM 202.19 -
GENERAL NOTES - 1
GNN-01
56-02-G-206-0
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:34:49 AM
morrimm
6
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
RECONSTRUCTION NOTES:
GENERAL NOTES - 2
PROTECT IT DURING CONSTRUCTION OR REMOVE AND REMOUNT IT AFTER CONSTRUCTION IS COMPLETED.
IF THE STRUCTURE HAS A BRIDGE IDENTIFICATION NUMBER (B.I.N.) PLATE ATTACHED, THE CONTRACTOR SHALL
1.
CASTING NEW PEDESTALS AND INSTALLING THE NEW BEARINGS.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TOP OF PEDESTAL ELEVATIONS PRIOR TO
7.
ITEMS IN THE CONTRACT.
SCREENS OR OTHER PROTECTIVE DEVICES SHALL BE INCLUDED IN THE UNIT PRICE BID USING THE APPROPRIATE
THE COST OF FURNISHING, INSTALLING, MAINTAINING, REMOVING AND DISPOSING OF ALL PLATFORMS, NETS,
6.
DISPOSED OF BY THE CONTRACTOR AT NO COST TO THE COUNTY.
ALL MATERIAL FALLING ON THE AREA BELOW AND ADJACENT TO THE BRIDGE SHALL BE REMOVED AND
5.
ADEQUATE PROTECTION IS PROVIDED.
MATERIAL. IF ADEQUATE PROTECTIVE DEVICES ARE NOT BEING EMPLOYED, THE WORK WILL BE STOPPED UNTIL
OF MATERIAL. PLATFORMS, NETS, SCREENS OR OTHER PROTECTIVE DEVICES SHALL BE USED TO CATCH THE
MATERIAL TO THE AREA BELOW THE BRIDGE EXCEPT WHERE THE PLANS SPECIFICALLY PERMIT THE DROPPING
DURING REMOVAL OPERATIONS, THE CONTRACTOR SHALL NOT DROP WASTE CONCRETE, DEBRIS, AND OTHER
4.
BID FOR THOSE ITEMS.
SUPPLYING A DISPOSAL AREA AND TRANSPORTATION TO THAT AREA SHALL BE INCLUDED IN THE UNIT PRICES
WHEN ITEMS IN THE CONTRACT REQUIRE MATERIALS TO BE REMOVED AND DISPOSED OF, THE COST OF
3.
ENGINEER AT THE EXPENSE OF THE CONTRACTOR.
STATE, THE DAMAGED MATERIALS SHALL BE REPAIRED OR REPLACED IN A MANNER SATISFACTORY TO THE
DAMAGES ANY MATERIALS WHICH ARE TO REMAIN IN PLACE OR WHICH ARE TO REMAIN THE PROPERTY OF THE
PLACE, OR WHICH ARE TO REMAIN THE PROPERTY OF THE STATE, WILL NOT BE DAMAGED. IF THE CONTRACTOR
THE CONTRACTOR SHALL PERFORM ALL WORK WITH CARE SO THAT ANY MATERIALS WHICH ARE TO REMAIN IN
2.
CONTRACTOR SHALL PERFORM THE WORK IN ACCORDANCE WITH FIELD CONDITIONS.
FIELD CONDITIONS MAY REQUIRE MODIFICATIONS TO CONSTRUCTION DETAILS AND WORK QUANTITIES. THE
BEEN PREPARED BASED ON FIELD INSPECTION AND OTHER INFORMATION AVAILABLE AT THE TIME. ACTUAL
BE ACCURATELY DETERMINED PRIOR TO THE COMMENCEMENT OF WORK. THE CONTRACT DOCUMENTS HAVE
DUE TO THE NATURE OF RECONSTRUCTION PROJECTS, THE EXACT EXTENT OF RECONSTRUCTION WORK CANNOT
1.
MISCELLANEOUS NOTE:
RIVER/STREAM PROTECTION PLAN TO THE ENGINEER FOR APPROVAL PRIOR TO THE COMMENCEMENT OF WORK.
SHALL BE MADE UNDER THE VARIOUS ITEMS IN THIS CONTRACT. THE CONTRACTOR SHALL SUBMIT A
PROTECT AND MAINTAIN WATER RIGHTS AND TO SUSTAIN FISH LIFE DOWNSTREAM. PAYMENT FOR ALL THIS WORK
USES WATER FROM A STREAM, THE CONTRACTOR SHALL CONSTRUCT AN INTAKE OR TEMPORARY DAM TO
STREAM TO BECOME POLLUTED WITH SAND, SILT, CEMENT, OIL, OR OTHER IMPURITIES. IF THE CONTRACTOR
WATER WHICH HAS BEEN USED FOR WASH PURPOSES OR OTHER SIMILAR OPERATIONS WHICH CAUSE THE
EQUIPMENT IN OR NEAR SUCH STREAMS. THE CONTRACTOR SHALL NOT RETURN DIRECTLY TO A STREAM ANY
SEDIMENT, CONSTRUCTION MATERIALS OR OTHER FOREIGN MATERIALS, OR FROM THE OPERATION OF
AS TO PREVENT OR REDUCE TO A MINIMUM ANY DAMAGE TO ANY STREAM FROM POLLUTION BY DEBRIS,
DURING THE COURSE OF CONSTRUCTION, THE CONTRACTOR SHALL CONDUCT OPERATIONS IN SUCH A MANNER
1.
STREAM PROTECTION NOTE
GNN-02
B.I.N. PLATE NOTE:
56-02-G-207-0
Alignment Name: Quaker Bridge Road
Alignment Description:
Alignment Style: Alignment\AC_P
Station
Northing
Easting
Element: Linear
START
( START )
M 1+00.000
867255.78
665717.18
EQNBK
0
867255.78
665717.18
EQNAHD
M 1+00.000
867255.78
665717.18
PC
( PC )
M 1+26.291
867237.76
665698.04
Tangential Direction:
S46.728°W
Tangential Length:
26.291
Element: Circular
PC
( PC )
M 1+26.291
867237.76
665698.04
HPI
( HPI )
M 1+93.091
867191.97
665649.4
CC
( CC )
867106.7
665821.42
PCC
( PCC )
M 2+54.220
867125.54
665642.41
Radius:
180
Delta:
40.72 Left
Degree of Curvature (Arc):
31.83
Length:
127.929
Tangent:
66.8
Chord:
125.254
Middle Ordinate:
11.246
External:
11.996
Back Tangent Direction:
S46.728°W
Back Radial Direction:
N43.272°W
Chord Direction:
S26.367°W
Ahead Radial Direction:
N83.993°W
Ahead Tangent Direction:
S6.007°W
Element: Circular
PCC
( PCC )
M 2+54.220
867125.54
665642.41
HPI
( HPI )
M 2+73.745
867106.08
665640.74
CC
( CC )
867122.16
665681.73
PT
( PT )
M 2+90.483
867092.95
665655.19
Radius:
39.469
Delta:
52.64 Left
Degree of Curvature (Arc):
145.17
Length:
36.263
Tangent:
19.525
Chord:
35.001
Middle Ordinate:
4.092
External:
4.565
Back Tangent Direction:
S4.906°W
Back Radial Direction:
N85.094°W
Chord Direction:
S21.415°E
Ahead Radial Direction:
S42.263°W
Ahead Tangent Direction:
S47.737°E
Element: Linear
PT
( PT )
M 2+90.483
867092.95
665655.19
PC
( PC )
M 3+97.398
867021.06
665734.33
Tangential Direction:
S47.750°E
Tangential Length:
106.915
Element: Circular
PC
( PC )
M 3+97.398
867021.06
665734.33
HPI
( HPI )
M 4+27.922
867000.54
665756.92
CC
( CC )
866988.44
665704.7
PT
( PT )
M 4+50.791
866972.17
665745.66
Radius:
44.076
Delta:
69.41 Right
Degree of Curvature (Arc):
129.99
Length:
53.393
Tangent:
30.524
Chord:
50.188
Middle Ordinate:
7.841
External:
9.537
Back Tangent Direction:
S47.750°E
Back Radial Direction:
S42.250°W
Chord Direction:
S13.046°E
Ahead Radial Direction:
N68.343°W
Ahead Tangent Direction:
S21.657°W
Element: Linear
PT
( PT )
M 4+50.791
866972.17
665745.66
HPI
( HPI )
M 5+19.475
866908.1
665720.9
Tangential Direction:
S21.130°W
Tangential Length:
68.684
Element: Linear
HPI
( HPI )
M 5+19.475
866908.1
665720.9
END
( END )
M 5+41.583
866887.92
665711.87
Tangential Direction:
S24.103°W
Tangential Length:
22.109
Alignment Name: Quaker Bridge Road East
Alignment Description:
Alignment Style: Alignment\AC_P
Station
Northing
Easting
Element: Linear
START
( START )
S 1+00.000
867061.33
665850.59
EQNBK
1+00.000
867061.33
665850.59
EQNAHD
S 1+00.000
867061.33
665850.59
END
( END )
S 2+20.063
867000.46
665747.1
Tangential Direction:
S59.540°W
Tangential Length:
120.063
CONSULTANT SEAL
INFORMATION
CONSULTANT
BIN# 3348560
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
03/06/2025
XX
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
5/1/2025
N:\Projects\2024\124-296 Westchester Co - Quaker Bridge Replacement\Working\CADD\dgn connect_2023\124-296_cph_gnn-02.dgn
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
3:32:18 PM
DetriKH
6
RECONSTRUCTION NOTES:
GENERAL NOTES - 2
PROTECT IT DURING CONSTRUCTION OR REMOVE AND REMOUNT IT AFTER CONSTRUCTION IS COMPLETED.
IF THE STRUCTURE HAS A BRIDGE IDENTIFICATION NUMBER (B.I.N.) PLATE ATTACHED, THE CONTRACTOR SHALL
CASTING NEW PEDESTALS AND INSTALLING THE NEW BEARINGS.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TOP OF PEDESTAL ELEVATIONS PRIOR TO
ITEMS IN THE CONTRACT.
SCREENS OR OTHER PROTECTIVE DEVICES SHALL BE INCLUDED IN THE UNIT PRICE BID USING THE APPROPRIATE
THE COST OF FURNISHING, INSTALLING, MAINTAINING, REMOVING AND DISPOSING OF ALL PLATFORMS, NETS,
DISPOSED OF BY THE CONTRACTOR AT NO COST TO THE COUNTY.
ALL MATERIAL FALLING ON THE AREA BELOW AND ADJACENT TO THE BRIDGE SHALL BE REMOVED AND
ADEQUATE PROTECTION IS PROVIDED.
MATERIAL. IF ADEQUATE PROTECTIVE DEVICES ARE NOT BEING EMPLOYED, THE WORK WILL BE STOPPED UNTIL
OF MATERIAL. PLATFORMS, NETS, SCREENS OR OTHER PROTECTIVE DEVICES SHALL BE USED TO CATCH THE
MATERIAL TO THE AREA BELOW THE BRIDGE EXCEPT WHERE THE PLANS SPECIFICALLY PERMIT THE DROPPING
DURING REMOVAL OPERATIONS, THE CONTRACTOR SHALL NOT DROP WASTE CONCRETE, DEBRIS, AND OTHER
BID FOR THOSE ITEMS.
SUPPLYING A DISPOSAL AREA AND TRANSPORTATION TO THAT AREA SHALL BE INCLUDED IN THE UNIT PRICES
WHEN ITEMS IN THE CONTRACT REQUIRE MATERIALS TO BE REMOVED AND DISPOSED OF, THE COST OF
ENGINEER AT THE EXPENSE OF THE CONTRACTOR.
STATE, THE DAMAGED MATERIALS SHALL BE REPAIRED OR REPLACED IN A MANNER SATISFACTORY TO THE
DAMAGES ANY MATERIALS WHICH ARE TO REMAIN IN PLACE OR WHICH ARE TO REMAIN THE PROPERTY OF THE
PLACE, OR WHICH ARE TO REMAIN THE PROPERTY OF THE STATE, WILL NOT BE DAMAGED. IF THE CONTRACTOR
THE CONTRACTOR SHALL PERFORM ALL WORK WITH CARE SO THAT ANY MATERIALS WHICH ARE TO REMAIN IN
CONTRACTOR SHALL PERFORM THE WORK IN ACCORDANCE WITH FIELD CONDITIONS.
FIELD CONDITIONS MAY REQUIRE MODIFICATIONS TO CONSTRUCTION DETAILS AND WORK QUANTITIES. THE
BEEN PREPARED BASED ON FIELD INSPECTION AND OTHER INFORMATION AVAILABLE AT THE TIME. ACTUAL
BE ACCURATELY DETERMINED PRIOR TO THE COMMENCEMENT OF WORK. THE CONTRACT DOCUMENTS HAVE
DUE TO THE NATURE OF RECONSTRUCTION PROJECTS, THE EXACT EXTENT OF RECONSTRUCTION WORK CANNOT
MICELLANEOUS NOTE:
PROTECT AND MAINTAIN WATER RIGHTS AND TO SUSTAIN FISH LIFE DOWNSTREAM.
USES WATER FROM A STREAM, THE CONTRACTOR SHALL CONSTRUCT AN INTAKE OR TEMPORARY DAM TO
STREAM TO BECOME POLLUTED WITH SAND, SILT, CEMENT, OIL, OR OTHER IMPURITIES. IF THE CONTRACTOR
WATER WHICH HAS BEEN USED FOR WASH PURPOSES OR OTHER SIMILAR OPERATIONS WHICH CAUSE THE
EQUIPMENT IN OR NEAR SUCH STREAMS. THE CONTRACTOR SHALL NOT RETURN DIRECTLY TO A STREAM ANY
SEDIMENT, CONSTRUCTION MATERIALS OR OTHER FOREIGN MATERIALS, OR FROM THE OPERATION OF
AS TO PREVENT OR REDUCE TO A MINIMUM ANY DAMAGE TO ANY STREAM FROM POLLUTION BY DEBRIS,
DURING THE COURSE OF CONSTRUCTION, THE CONTRACTOR SHALL CONDUCT OPERATIONS IN SUCH A MANNER
STREAM PROTECTION NOTE
GNN-02
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:10 AM
morrimm
11
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
TM 68.18-1-42
LIBER 6502, PAGE 289
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
LIBER 7575, PAGE 439
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
CONTROL NO. 593163545
LINDA HAMILTON
LANDS N/F OF
TM 68.18-3-12
CONTROL NO. 512863213
NICHOLAS KAPLAN
MICHAEL A. KAPLAN AND
LANDS N/F OF
TM 68.18-3-11
LIBER 11069, PAGE 103
MICHAEL I. WEINTRAUB CROTON TRUST
AS TRUSTEES OF THE
ANITA B. WEINTRAUB AND SANFORD WEINTRAUB
LANDS N/F OF
(FILED MAP 19964)
PARCEL D
(FILED MAP 19964)
PARCEL C
WOODS
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET. WALL
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
AREA
RIP RAP
EDGE OF WATER
L
L
A
W
G
NI
W
E
G
DI
R
B
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
MAPLE
18"
STONE WALL
DITCH
POST
POST
STONE RET. WALL
WOODS
WOODS
WOODS
BOLLARDS
CROTON RIVER
RAIL
GUIDE
WOOD
STONE LINED DITCH
BRIDGE WING WALL
BORING
FOUND
PIPE
IRON
ROCK
X-CUT IN
STONE WALL
DITCH
BORING
BORING
BORING
BORING
BORING
GNP-01
HIGHWAY GENERAL PLAN
0
20
40
60
80'
20
1" = 40'
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
5'-0" SHOULDER
1'-0" SHOULDER
TRAVEL LANE
9'-0"
TRAVEL LANE
9'-0"
1'-0" SHOULDER
1'-0" SHOULDER
TRAVEL LANE
9'-0"
TRAVEL LANE
9'-0"
1'-0" SHOULDER
1'-0" SHOULDER
56-02-R-212-0
CUTTING PAVEMENT
ITEM 627.50140008
ACQUIRED BY COUNTY
LIMITS OF TO BE
THE PROJECT
ACCESS AT COMPLETION OF
REESTABLISH WALKING TRAIL
EASEMENT
LIMITS OF PERMANENT
CUTTING PAVEMENT
ITEM 627.50140008
CUTTING PAVEMENT
ITEM 627.50140008
FOLLOWING LOCATIONS.
FINAL ROAD STRIPING SHALL BE INSTALLED IN THE
1.
NOTE:
START STA. END STA. ITEM NO.
DESCIPTION
M 2+25.00
M 2+25.00
M 1+26.29
M 4+00.00
M 4+00.00
M 4+00.00
685.1102
685.1102
685.1202
SINGLE WHITE LT. SHLDR.
SINGLE WHITE RT. SHLDR.
¡
DOUBLE YELLOW
M 1+26.29
PC
M 2+54.22
PCC
M 2+90.48
PT
M 3+97.40
PC
M 4+50.79
PT
M 1+00.00
P.I. STA
M 1+00
M 2+00
M 3+00
M 4+00
M 5+00
S 1+00
S 2+00
(BK)
1+00.00
STA
(AH) =
S 1+00.00
STA
S 1+00
S 2+00
BEGIN RECONSTRUCTION
END RECONSTRUCTION
M 2+90.48
PT
M 3+97.40
PC
END RECONSTRUCTION
STA. M 5+40.01
#13 KV
P.P.
W 57 13 KV
P.P.
HEAD WALL
CONC.
W 5
P.P.
8" CMP
INV.=35.96
15" CMP
SE.INV.=36.82
N.INV.=38.47
T.F.=39.57
C.B.
=46.62
INV.
=49.95
INV.
61.51
INV.=
12" CMP
=43.13
INV.
=43.20
INV.
12" PVC
15" CMP
18" CMP
=41.7
INV.
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:12 AM
morrimm
12
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
SHOULDER
2'-3"
SHOULDER
5'-0"
BREAK
2.0%
T.G.L.
6.0%
6.0%
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
¡
PROPOSED
ITEM 606.2702
BEAM GUIDE RAILING
HPBO (MOD.) CORRUGATED
GROUND
ORIGINAL
TYPICAL HIGHWAY SECTION
SHOULDER
2'-3"
TRAVEL LANE
11'-0"
6.0%
2.0%
T.G.L.
6.0%
2
ITEMS 610.1402 & 610.1601
TURF (ROADSIDE),
4" TOPSOIL & ESTABLISH
GROUND
ORIGINAL
TO REMAIN
RETAINING WALL
EXISTING CONCRETE
ITEM 304.12
COURSE TYPE II,
12" - SUBBASE
TYPICAL HIGHWAY SECTION
TRAVEL LANE
11'-0"
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
¡
PROPOSED
ITEM 606.2702
BEAM GUIDE RAILING
HPBO (MOD.) CORRUGATED
RETAINING WALL
STA. M 1+26.29 TO STA. M 1+80.00
STA. M 1+80.00 TO STA. M 2+67.25
T.G.L.
80 SERIES COMPACTION
" - 9.5 F3 TOP COURSE,
2
1
1
80 SERIES COMPACTION
" - 19 F9 BINDER COURSE,
2
1
2
80 SERIES COMPACTION
5" - 37.5 F9 BASE COURSE,
VARIES
SHOULDER
2'-3"
SHOULDER
2'-3"
ITEM 606.2702
BEAM GUIDE RAILING
HPBO (MOD.) CORRUGATED
TRAVEL LANE
VARIES
TRAVEL LANE
VARIES
2
1
TYPICAL HIGHWAY SECTION
STA. M 4+27.17 TO STA. M 5+40.01
1
2.0%
VARIES
GROUND
ORIGINAL
80 SERIES COMPACTION, ITEM 404.0983
" - 9.5 F3 TOP COURSE,
2
1
1
80 SERIES COMPACTION, ITEM 404.1989
" - 19 F9 BINDER COURSE,
2
1
2
80 SERIES COMPACTION, ITEM 404.3789
5" - 37.5 F9 BASE COURSE,
2.0%
ITEM 304.12
COURSE TYPE II,
12" - SUBBASE
SHOULDER
1'-0"
VARIES
SHOULDER
BREAK
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
¡
PROPOSED
BREAK
BREAK
TYP-01
HIGHWAY TYPICAL SECTIONS
80 SERIES COMPACTION, ITEM 404.0983
" - 9.5 F3 TOP COURSE,
2
1
1
80 SERIES COMPACTION, ITEM 404.1989
" - 19 F9 BINDER COURSE,
2
1
2
80 SERIES COMPACTION, ITEM 404.3789
5" - 37.5 F9 BASE COURSE,
ITEM 304.12
COURSE TYPE II,
12" - SUBBASE
ITEMS 610.1402 & 610.1601
TURF (ROADSIDE),
4" TOPSOIL & ESTABLISH
ITEMS 610.1402 & 610.1601
TURF (ROADSIDE),
4" TOPSOIL & ESTABLISH
T.G.L.
ITEM 304.12
COURSE TYPE II,
12" - SUBBASE
2.0%
SHOULDER
2'-3"
6.0%
VARIES
1
BREAK
SHOULDER
1'-0"
ITEM 606.2702
BEAM GUIDE RAILING
HPBO (MOD.) CORRUGATED
ITEMS 610.1402 & 610.1601
TURF (ROADSIDE),
4" TOPSOIL & ESTABLISH
QUAKER BRIDGE ROAD EAST
, STA. LINE, & H.C.L.
¡
PROPOSED
80 SERIES COMPACTION, ITEM 404.0983
" - 9.5 F3 TOP COURSE,
2
1
1
80 SERIES COMPACTION, ITEM 404.1989
" - 19 F9 BINDER COURSE,
2
1
2
80 SERIES COMPACTION, ITEM 404.3789
5" - 37.5 F9 BASE COURSE,
TYPICAL HIGHWAY SECTION
STA. S 1+00.00 TO STA. S 2+05.74
TRAVEL LANE
9'-0"
2.0%
SHOULDER
2'-3"
6.0%
BREAK
TRAVEL LANE
9'-0"
SHOULDER
1'-0"
1'-0"
VARIES
2
1
0
2
4
6
8'
2
3/16" = 1'
ROUND 4' V.C.
ROUND 4' V.C.
56-02-R-213-0
ITEM 407.0102
DILUTED TACK COAT,
ITEM 407.0102
DILUTED TACK COAT,
ITEM 407.0102
DILUTED TACK COAT,
ITEM 407.0102
DILUTED TACK COAT,
EXCAVATION AND DISPOSAL.
SUBBASE TO BE PAID UNDER ITEM 203.02 - UNCLASSIFIED
REMOVAL OF EXISTING PAVEMENT TO BOTTOM OF PROPOSED
1.
NOTE:
42.07
40.43
28.42
46.07
55.79
42.07
40.43
28.42
46.07
55.79
E
E
X
C
R
S
L
IO
ROAD-2
M 1+00
M 1+00
M 2+00
M 3+00
M 4+00
M 5+00
0
0
5
5
10
10
15
15
20
20
25
25
30
30
35
35
40
40
45
45
50
50
55
55
60
60
65
65
70
70
41.53
41.05
40.97
42.40
43.90
45.40
46.90
50.68
56.27
41.53
41.03
40.43
41.30
18.67
51.23
STA. M 3+95.00
EXP. BRGS.
¡
STA. M 2+95.00
FIX BRGS.
¡
41.53
41.05
40.97
42.40
43.90
45.40
46.90
50.68
56.27
41.53
41.03
40.43
41.30
18.67
51.23
STA. S 2+20.06
STA. M 4+21.95
EQUALITY STATION
25'-0"
APPROACH SLAB
100'-0" ¡ BRG. TO ¡ BRG.
25'-0"
APPROACH SLAB
BEGINS STA. M 4+27.17
PPROACH PAVMENT
A
ENDS STA. M 2+67.25
PPROACH PAVMENT
A
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:14 AM
morrimm
13
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
PROFILE - QUAKER BRIDGE ROAD
0
20
40
60
80'
HORIZONTAL SCALE
0
2
4'
VERTICAL SCALE
PRO-01
QUAKER BRIDGE ROAD
56-02-R-214-0
40.75
EL
M 1+77.04
-
VLP
-2.00%
+3.00%
+11.17%
40.99
EL
M 1+53.06
-
VPC
41.29
EL
M 2+13.06
-
VPT
46.90
EL
M 4+00.11
-
VPC
50.70
EL
M 4+50.11
-
VPT
PROPOSED GRADE
ORGINAL GROUND
PROPOSED GRADE
EXISTING GRADE
FT.
108
HSD =
FT.
0.38
E =
+3.00%
G2 =
-2.00%
G1 =
FT.
60.00
L =
SAG
CURVE:
FT.
58
HSD =
FT.
0.57
E =
G2 = +11.17%
+3.00%
G1 =
FT.
50.00
L =
SAG
CURVE:
40.75
EL
M 1+77.04
-
VLP
-2.00%
+3.00%
+11.17%
40.99
EL
M 1+53.06
-
VPC
41.29
EL
M 2+13.06
-
VPT
46.90
EL
M 4+00.11
-
VPC
50.70
EL
M 4+50.11
-
VPT
41.53
EL
BEGIN RECONSTRUCTION
M 1+26.00
-
VPI
60.74
EL
END RECONSTRUCTION
M 5+40.01
-
VPI
40.39
EL
M 1+83.06
-
VPI
47.65
EL
M 4+25.11
-
VPI
58.15
49.61
58.15
49.61
58.15
49.61
58.15
49.61
E
E
X
C
R
S
L
IO
S 1+00
S 1+00
S 2+00
25
25
30
30
35
35
40
40
45
45
50
50
55
55
60
60
65
65
70
70
75
75
58.15
53.33
49.51
0.00
58.15
53.33
49.51
0.00
STA. S 2+20.06
STA. M 4+21.95
EQUALITY STATION
58.15
52.50
48.70
58.15
53.48
49.61
58.15
52.50
48.70
58.15
53.48
49.61
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:16 AM
morrimm
14
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
0
20
40
60
80'
HORIZONTAL SCALE
0
2
4'
VERTICAL SCALE
PROFILE - QUAKER BRIDGE ROAD EAST
PRO-02
QUAKER BRIDGE ROAD EAST
56-02-R-215-0
ORIGINAL GROUND
PROPOSED GRADE
FT.
76
HSD =
FT.
0.87
E =
-2.35%
G2 =
-11.37%
G1 =
FT.
77.48
L =
SAG
CURVE:
-11.37%
53.31
EL
S 1+42.58
-
VPC
47.99
EL
S 2+20.06
-
VPT
48.91
EL
S 1+81.32
-
VPI
E
E
X
C
R
S
L
IO
5
30
35
25
30
40
45
35
40
45
55
50
50
50
50
55
60
30
35
40
45
20
20
20
20
25
25
25
25
30
30
30
30
30
30
35
35
35
35
35
40
40
40
40
40
40
45
45
45
45
45
45
45
50
50
50
50
50
50
50
55
55
55
55
55
55
55
55
60
60
60
60
60
60
60
60
60
65
65
65
65
65
65
65
65
65
70
70
70
70
70
70
70
70
70
75
75
75
75
75
75
75
80
80
80
80
80
80
85
85
85
85
85
85
90
90
90
90
90
95
95
95
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:22 AM
morrimm
15
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
TM 68.18-1-42
LIBER 6502, PAGE 289
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
LIBER 7575, PAGE 439
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
CONTROL NO. 593163545
LINDA HAMILTON
LANDS N/F OF
TM 68.18-3-12
CONTROL NO. 512863213
NICHOLAS KAPLAN
MICHAEL A. KAPLAN AND
LANDS N/F OF
TM 68.18-3-11
LIBER 11069, PAGE 103
MICHAEL I. WEINTRAUB CROTON TRUST
AS TRUSTEES OF THE
ANITA B. WEINTRAUB AND SANFORD WEINTRAUB
LANDS N/F OF
(FILED MAP 19964)
PARCEL D
(FILED MAP 19964)
PARCEL C
WOODS
WOODS
WOODS
CONCRETE RET. WAL
CONCRETE RET. WALL
EDGE OF WATER
EDGE OF WATER
AREA
RIP RAP
EDGE OF WATER
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
MAPLE
18"
STONE WALL
STONE RET. WALL
WOODS
WOODS
WOODS
CROTON RIVER
PILLAR
STONE
IRON GATE
WROUGHT
RAIL
GUIDE
WOOD
FOUND
PIPE
IRON
ROD FOUND
CAPPED IRON
ROCK
X-CUT IN
STONE WALL
M 1+26.29
PC
M 2+54.22
PCC
M 2+90.48
PT
M 3+97.40
PC
M 4+50.79
PT
M 1+00.00
P.I. STA
M 1+00
M 2+00
M 3+00
M 4+00
M 5+00
S 1+00
S 2+00
(BK)
1+00.00
STA
(AH) =
S 1+00.00
STA
S 1+00
S 2+00
BEGIN RECONSTRUCTION
END RECONSTRUCTION
ROAD
QUAKER BRIDGE
TO ALBANY POST ROAD
RIDGE ROAD
TO QUAKER
ROAD EAST
QUAKER BRIDGE
ROAD
QUAKER BRIDGE
GRID
NORTH
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD EAST
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD
FLOW
CROTON RIVER
GRADING PLAN
TO RTE 129
GRD-01
0
20
40
60
80'
20
1" = 40'
6
OHW EL. 28.25
OHW EL. 28.25
56-02-R-216-0
#13 KV
P.P.
W 57 13 KV
P.P.
HEAD WALL
CONC.
W 5
P.P.
W/LIGHT
P.P.
P.P.
#13 KV
P.P.
W 57 13 KV
P.P.
W 5
P.P.
W/LIGHT
P.P.
P.P.
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:25 AM
morrimm
16
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
WOODS
WOODS
WOODS
CONCRETE RET. WAL
CONCRETE RET. WALL
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
EDGE OF WATER
STONE WALL
POST
POST
STONE RET. WALL
WOODS
WOODS
WOODS
KEY PAD
BOLLARDS
CROTON RIVER
PILLAR
STONE
IRON GATE
WROUGHT
RAIL
GUIDE
WOOD
BRIDGE WING WALL
STONE WALL
ROAD
QUAKER BRIDGE
TO ALBANY POST ROAD
RIDGE ROAD
TO QUAKER
ROAD EAST
QUAKER BRIDGE
ROAD
QUAKER BRIDGE
GRID
NORTH
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD EAST
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD
FLOW
CROTON RIVER
TO RTE 129
LAP-01
0
20
40
60
80'
20
1" = 40'
(136) LIVE STAKES 36" Ø
(47) LIVE STAKES 36" Ø
NUMBER
NYDOT ITEM
DESCRIPTION
QUANTITY
UNIT
LANDSCAPING:
611.0114
PLANTING - MAJOR DECIDUOUS TREES – 6' HEIGHT, 2-3" CALIPER
75
EA
611.19
POST-PLANTING CARE
75
EA
616.08000024
LIVE STAKE PLANTINGS 1" TO 2"
300
EA
610.1401
TOPSOIL - REUSE ON-SITE MATERIALS
90
CY
610.1101
MULCH FOR PLANTING TYPE A,B & D WOOD CHIPS & SHREDDED BARK
90
CY
610.19
WATERING VEGETATION
0.225
1000 GAL
LAP-01
LANDSCAPE PLAN
(117) LIVE STAKES 36" Ø
56-02-R-217-0
PLANTING LIST
SYMBOL
CODE
QTY
BOTANICAL/COMMON NAME
CONTAINER
REMARKS
TREES
AS
17
ACER SACCHARUM/SUGAR MAPLE
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
BL
11
BETULA LENTA/SWEET BIRCH
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
FA
4
FRAXINUS AMERICANA/WHITE ASH
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
LT
11
LIRIODENDRON TULIPFERA/TULIP POPLAR
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
PO
4
PLATANUS OCCIDENTALIS/AMERICAN SYCAMORE
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
QR
15
QUERCUS RUBRA/NORTHERN RED OAK
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
TC
5
TSUGA CANADENSIS/EASTERN HEMLOCK
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
UA
9
ULMUS AMERICANA/AMERICAN ELM
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
SYMBOL
CODE
QTY
BOTANICAL/COMMON NAME
CONTAINER
SPACING
REMARKS
SHRUB AREAS
SN
300
SALIX NIGRA/LIVE STAKES
1" MIN. CAL. LIVE STAKE
36" O.C.
APPLICATION
1-2" DIAMETER, 2-6' LONG DEPENDING ON SITE
M 1+26.29
PC
M 2+54.22
PCC
M 2+90.48
PT
M 3+97.40
PC
M 4+50.79
PT
M 1+00.00
P.I. STA
M 1+00
M 2+00
M 3+00
M 4+00
M 5+00
S 1+00
S 2+00
(BK)
1+00.00
STA
(AH) =
S 1+00.00
STA
S 1+00
S 2+00
BEGIN RECONSTRUCTION
END RECONSTRUCTION
#13 KV
P.P.
W 57 13 KV
P.P.
W 5
P.P.
SE.INV.=36.82
N.INV.=38.47
T.F.=39.57
C.B.
W/LIGHT
P.P.
P.P.
E
E
X
C
R
S
L
IO
3B
4
2
5
1
3A
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:33 AM
morrimm
17
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
LANDSCAPING DETAILS
LAD-01
FOR TREE PLANTING.
SEE SHEET LAP-01 FOR PAY ITEMS
2.
SEASON.
ETC. AFTER ONE GROWING
REMOVE GUYING, TREE WRAP,
1.
PLAN VIEW OF STAKING
FLUORESECNT FLAGGING ON WIRE.
3.
CUT LEADERS.
BRANCHES. DO NOT
PROVIDE MINIMAL PRUNING. ONLY TO CORRECT DAMAGED
2.
SLOPE.
THIS DETAIL SHALL APPLY TO ALL TREES PLANTED ON A
1.
TREE HEIGHT
APPROX 2 / 3
STAKE W/ CENTERED
1" x 2" x 18" WOOD
" SISAL ROPE
4
1
5" ABOVE FINAL GRADE
NATURAL ROOT COLLAR 3" -
TRUNK)
NOT TO BE IN CONTACT WITH TREE
HARDWOOD MULCH MIN. (MULCH
3" LAYER OF SHREDDED
AREA ABOVE ROOT BALL
PROVIDE 6" RADIUS UNMULCHED
4" HIGH WATER BERM
COMPACT FILL TO BE BENCHED IN
PLANTING PIT
FINISHED GRADE
1/2 OF WIRE BASKET ( FROM ROOT BALL AND PIT.)
SYNTHETIC MATERIAL. CUT AND REMOVE UPPER
CUT AND REMOVE UPPER 1/3 OF BURLAP. NO
MIXTURE AS SPECIFIED
BACKFILL PLANTING SOIL
UNDISTURBED SOIL
SET BALL ON
PLAN VIEW OF STAKING
TREE PIT 2X
ROOTBALL DIA.
MIN. 6" DEPTH
INTO UNDISTURBED SOIL
LODGE POLES EXTEND 2'
UNDISTURBED SOIL
PLANTING MIX AS SPEC'D
AROUND TOPE 1/3 OF BALL
BURLAP AND WIRE BASKETS
LOOSEN AND FOLD BACK
3" SAUCER AROUND TREE
3" SHREDDED BARK MULCH
2" ABOVE FINISH GRADE
SET TOP OF ROOT BALL
HOSE OVER #12 GALV. WIRE
1/ 2" FABRIC BEARING RUBBER
#12 GALV. WIRE
ALTERNATE STAKING
2" x 2" STAKES, 2 GUYS PER TREE
2 1 /2" OR LARGER (10' OR LARGER)
PRUNE 1 / 4 TO 1 / 3 BRANCHES
NOTES:
TREE PIT 2X
ROOTBALL DIA.
SLOPE TREE PLANTING DETAIL
(NOT TO SCALE)
TREE PLANTING DETAIL
(NOT TO SCALE)
(NOT TO SCALE)
SLOPE INSTALLATION GUIDELINES:
12" INTERVALS.
THE END OF BLANKET MUST BE SECURED IN A 6"x6" TRENCH WITH A ROW OF STAPLES PLACED AT
7.
PLACED 4" BELOW IN A STAGGERED PATTERN. THEN CONTINUE WITH GENERAL INSTALLATION.
ROW OF STAPLES 4" APART ALONG ENTIRE WIDTH OF THE SLOPE. A SECOND ROW SHOULD BE
FOR MAXIMUM PERFORMANCE A CHECK SLOT SHOULD BE PLACED AT 25'-40' INTERVALS. PLACE A
6.
APPROXIMATELY 12" APART ACROSS THE WIDTH OF BLANKETS.
STYLE IN THE DIRECTION OF WATER FLOW. CONNECT THE BLANKETS BY PLACING STAPLES
ADDITIONAL VERTICAL BLANKETS CAN BE JOINED USING A MINIMUM 4" OVERLAPPING OF SHINGLE
5.
STAPLES PLACED APPROXIMATELY 3'-0" APART.
PARALLEL BLANKETS MUST BE OVERLAPPED BY A MINIMUM OF 4", AND SECURED WITH A ROW OF
4.
PATTERN BELOW, SPECIFIED BY SLOPE.
ROLL THE BLANKET VERTICALLY DOWN THE SLOPE. SECURE USING THE APPROPRIATE STAPLE
3.
WITH A ROW OF STAPLES PLACED 12" APART ACROSS THE WIDTH OF THE BLANKET.
BACKFILL AND COMPACT THE TRENCH. APPLY SEED, AND FOLD THE BLANKET OVER SOIL, SECURE
SECURE THE BLANKET AT THE BOTTOM OF THE TRENCH WITH STAPLES PLACED 12" APART.
BEGIN BY PLACING THE BLANKET A MINIMUM OF 12" DOWN-SLOPE OF THE UP-SLOPE TRENCH.
2.
APPLIED. PREPARE THE SLOPE SOIL SURFACE (RAKING, SEEDING AND FERTILIZING).
DIG A 6" BY 6" TRENCH BOTH UP-SLOPE AND DOWN-SLOPE OF THE AREA THE MATTING IS TO BE
1.
PRODUCT AND ALL ASSOCIATED LABOR AND MATERIALS SHALL BE PAID FOR UNDER ITEM 209.1801.
BE CONFIRMED WITH YOUR LOCAL DISTRIBUTOR. PAYMENT FOR ROLLED EROSION CONTROL
THESE GUIDELINES ARE RECOMMENDATIONS ONLY, ANY QUESTIONS WITH THE INSTALLATION SHOULD
SLOPE APPLICATION
6"
6"
12"
2"-5"
3"
ROLLED EROSION CONTROL PRODUCT DETAIL
NOTES:
56-02-R-218-0
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:34 AM
morrimm
18
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
LANDSCAPING NOTES
LAN-01
10 SHRUBS (3 GALLONS) WILL BE CONSIDERED THE EQUIVALENT OF A TREE
d.
3 LOW MATURING TREES WILL BE CONSIDERED THE EQUIVALENT OF A TREE
c.
6-8 FT ONCE PLANTED
b.
2-3” DBH
a.
REPLANTED TREES SHALL BE AS FOLLOWS:
REMOVED ON SLOPES IN EXCESS OF 25% SHALL BE MITIGATED AT A RATIO OF 2:1.
ANY TREE REMOVED FOR TEMPORARY STAGING AND CONSTRUCTION SHALL BE MITIGATED AT A RATIO OF 1:1. TREES
1.
AT THE 1:1 RATIO, 35 OF THE 35 REMOVED TREES HAVE BEEN SITED FOR REPLACEMENT ON SITE.
TREES REPLACED ON VILLAGE OF CROTON-ON-HUDSON SIDE
SCHEDULE (LOCATION TO BE DETERMINED BY CLIENT)
THE REMAINING 21 TREES WILL NEED TO BE PLANTED OFF-SITE. RECOMMENDED SPECIES TO BE SELECTED FROM PLANT
AT THE 2:1 RATIO, 12 TREES WERE REMOVED, 3TREES HAVE BEEN SITED FOR REPLACEMENT ON SITE.
REPLACED ON CORTLANDT SIDE
CONTRACTOR TO NOTIFY ENGINEER IF FIELD CONDITIONS PREVENT REQUIRED NUMBER OF TREES TO BE PLANTREES
TREE PLACEMENT TO BE FIELD VERIFIED BY CONTRACTOR AND APPROVED BY ENGINEER PRIOR TO INSTALLATION.
6.
THE SITE LEFT IN A NEAT AND ACCEPTABLE CONDITION AS APPROVED BY THE LANDSCAPE ARCHITECT.
MATERIAL, EQUIPMENT, AND DEBRIS RESULTING FROM HIS/HER WORK. ALL PAVED AREAS SHALL BE BROOM CLEANED AND
UPON THE COMPLETION OF ALL PLANTING WORK AND BEFORE FINAL ACCEPTANCE, THE CONTRACTOR SHALL REMOVE ALL
5.
NO TREE WRAPPING, STAKING, OR GUYING IS PERMITTED UNLESS AUTHORIZED BY THE LANDSCAPE ARCHITECT.
4.
UNIFORM FINISHED SURFACE.
IMMEDIATELY AFTER PLANTING. THOROUGHLY WATER MULCHED AREAS. AFTER WATERING, RAKE MULCH TO PROVIDE A
MULCHING: MULCH TREE, SHRUB PLANTING PITS, AND PERENNIAL BEDS WITH REQUIRED MULCH MATERIAL 3" DEEP
3.
REMOVE ALL BURLAP, ROPES, AND WIRES FROM THE TOP 1/3 OF BALLS AFTER ONE YEAR GUARANTEE PERIOD.
a.
FILL ALL VOIDS.
AFTER BALLED AND BURLAPPED PLANTS ARE SET, MUDDLE PLANTING SOIL MIXTURE AROUND THE BASES OF BALLS AND
2.
EDGE OF EACH PLANTING PIT TO RETAIN WATER.
PLANTING MIXTURE. DO NOT USE FROZEN OR MUDDY MIXTURES FOR BACKFILLING. FORM A RING OF SOIL AROUND THE
3" ABOVE THE FINISH GRADE. NO FILLING WILL BE PERMITTED AROUND TRUNKS OR STEMS. BACKFILL THE PIT WITH
FACED TO GIVE THE BEST APPEARANCE OR RELATIONSHIP TO OTHER OR ADJACENT STRUCTURE. SET PLANT MATERIAL 2-
SET PLANT MATERIAL IN THE PLANTING PIT TO PROPER GRADE AND ALIGNMENT. SET PLANTS UPRIGHT, PLUMB, AND
1.
CONTRACTOR SHALL ALSO APPLY A PREEMERGIENT TO ALL LANDSCAPE BEDS AT THE CONTRACTOR'S EXPENSE.
PREPARATION, ALL WEEDS AND GRASSES SHALL BE DUG OUT BY THE ROOTS AT THE CONTRACTOR'S EXPENSE. THE
WEEDING - BEFORE AND DURING PRELIMINARY GRADING AND FINISH GRADING, FINISH GRADING AND PLANTING BED
7.
RESET THE GRADES IN THIS AREA, IF REQUIRED, TO THE FINAL GRADES SHOWN ON THE GRADING PLAN.
GRADING PLAN TO ANTICIPATE SETTLEMENT OVER THE FIRST YEAR. AT THE END OF THE PLANTING GUARANTEE PERIOD,
PLANTING MIX OR TOPSOIL. ALLOW THE FINISHED GRADES TO REMAIN 50-75 MM (2-3") HIGHER THAN THE GRADES ON THE
OVER ALL MULCHED BED AREAS DESIGNATED ON THE DRAWINGS AND ROTOTILL INTO THE TOP 100 MM (4") OF THE
FINAL GRADING AND INSTALLATION OF TREE, SHRUB, OR FLOWER PLANTINGS, SPREAD 100 MM (4") OF ORGANIC MATTER
INSTALL ORGANIC MATTER LAYER - AFTER THE SPECIFIED TOPSOIL OR PLANTING MIX IS INSTALLED AND JUST PRIOR TO
6.
TYPE "A" FOR EACH CU. YD. OF MIXTURE OR APPROVED EQUAL.
) LB. PLANT FERTILIZER
2
1
EXISTING SOIL, TWO (2) PARTS PLANTING TOPSOIL, ONE (1) PART PEAT MOSS, AND ONE-HALF (
PROVIDE PLANTING MIXTURE TO USE AROUND THE BALLS AND ROOTS OF ALL PLANTS CONSISTING OF THREE (3) PARTS
5.
INDIVIDUAL TREES WILL BE CONSISTENT IN SIZE THROUGHOUT THE PROJECT AREAS.
TREE BALLS. MULCH BEDS ARE TO BE PROVIDED FOR ALL LANDSCAPE MASSINGS. CIRCULAR MULCH AREAS FOR
EXCAVATE TREE PITS TO THE DEPTH OF THE TREE BALL AND BACK FILL IN PLANTING MIX TO CORRECT ELEVATION FOR
IN BEDS. PROVIDE TREE AND SHRUB PITS AT LEAST TWO (2) TIMES GREATER THAN THE DIAMETER OF THE ROOT SYSTEM.
EXCAVATED CIRCULAR PLANT PITS WITH VERTICAL SIDES, EXCEPT FOR PLANTS SPECIFICALLY INDICATED TO BE PLANTED
4.
OPERATIONS UNTIL ALTERNATE PLANT LOCATIONS HAVE BEEN SELECTED AND APPROVED BY LANDSCAPE ARCHITECT.
OBSTRUCTIONS ARE ENCOUNTERED THAT ARE NOT SHOWN ON THE DRAWINGS, DO NOT PROCEED WITH PLANTING
CONTRACTOR TO LOCATE PLANTS IN THE FIELD BY STAKING. LANDSCAPE ARCHITECT TO APPROVE LOCATIONS. IF
3.
SUPERVISION OF A QUALIFIED SUPERVISOR.
PLANTING SHALL BE PERFORMED ONLY BY EXPERIENCED WORKMEN FAMILIAR WITH PLANTING PROCEDURES UNDER THE
2.
PLANTING TIMES SHALL BE APPROVED BY LANDSCAPE ARCHITECT.
d.
FALL PLANTING: SEPTEMBER 15TH THROUGH OCTOBER 15TH
c.
SPRING PLANTING: MARCH 15TH THROUGH MAY 15TH
b.
LEAF, THEY SHALL BE SPRAYED WITH AN ANTI-DESICCANT PRIOR TO PLANTING OPERATION.
DECIDUOUS MATERIAL: PLANT DECIDUOUS MATERIAL IN A DORMANT CONDITION. IF DECIDUOUS TREES ARE PLANTED IN-
a.
TIME OF PLANTING:
1.
LANDSCAPE SPECIFICATIONS:
WARRANTY
MATERIALS
ACCESSORIES
WATER ON SITE.
CONTRACTOR WILL PROVIDE
WATER: FREE OF SUBSTANCES HARMFUL TO PLANT GROWTH. HOSES OR OTHER METHODS OF TRANSPORTATION FURNISHED BY CONTRACTOR.
6.
MULCH: TREES, SHRUBS, AND PERENNIAL BEDS - SHREDDED HARDWOOD MULCH FURNISHED IN BAGS OR BULK.
5.
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
MIXED AND APPLIED IN
ANTI-DESICCANT: PROTECTIVE FILM EMULSION PROVIDING A PROTECTIVE FILM OVER PLANT SURFACES; PERMEABLE TO PERMIT TRANSPIRATION,
4.
AMMONIA SALT, AND ONE-HALF IN FORM OF ORGANIC NITROGEN OR EQUAL.
POTASH BY WEIGHT. ONE-FOURTH OF NITROGEN IN THE FORM OF NITRATES, ONE-FOURTH IN FORM OF
PHOSPHORIC ACID, AND 12 PERCENT
FERTILIZER: TYPE "A": COMMERCIAL TYPE APPROVED BY THE LANDSCAPE ARCHITECT, CONTAINING 12 PERCENT NITROGEN, 12 PERCENT
3.
PERCENT MINERAL ON A DRY BASIS.
PEAT MOSS: BROWN TO BLACK IN COLOR, WEED AND SEED FREE GRANULATED RAW PEAT OR BALED PEAT, CONTAINING NOT MORE THAN 9
2.
PROVIDE TOPSOIL FREE OF SUBSTANCES HARMFUL TO THE PLANTS WHICH WILL BE GROWN IN THE SOIL.
b.
IDENTIFY SOURCE LOCATION OF TOPSOIL PROPOSED FOR USE ON THE PROJECT.
a.
OTHER FOREIGN MATERIALS.
ARABLE SITE, REASONABLY FREE FROM CLAY, LUMPS, COARSE SANDS, STONES, PLANTS, ROOTS, STICKS, AND
OBTAINED FROM A WELL-DRAINED
TOPSOIL FOR PLANTING BEDS; FERTILE, FRIABLE, NATURAL TOPSOIL OF LOAMY CHARACTER, WITHOUT ADMIXTURE OF SUBSOIL MATERIAL,
1.
4) PLANTS SHALL BE IN A MOIST, VIGOROUS CONDITION, FREE FROM DEAD WOOD, BRUISES, OR OTHER ROOT OR BRANCH INJURIES.
3) SIDE BRANCHES SHALL BE GENEROUS, WELL-TWIGGED, AND THE PLANT AS A WHOLE WELL-BUSHED TO THE GROUND.
2) SINGLE STEMMED OR THIN PLANTS WILL NOT BE ACCEPTED.
THE LONGEST BRANCH.
1) THE MEASUREMENT FOR HEIGHT SHALL BE TAKEN FROM THE GROUND LEVEL TO THE AVERAGE HEIGHT OF THE TOP OF THE PLANT AND NOT
SHRUBS AND SMALL PLANTS SHALL MEET THE REQUIREMENTS FOR A SPREAD AND HEIGHT INDICATED IN THE PLANT LIST.
f.
1) IF THE USE OF LARGER PLANTS IS ACCEPTABLE, INCREASE THE SPREAD OF ROOTS OR ROOTBALL IN PROPORTION TO THE SIZE OF THE PLANT.
PLANTS LARGER THAN THOSE SPECIFIED IN THE PLANT LIST MAY BE USED WHEN ACCEPTABLE TO THE LANDSCAPE ARCHITECT.
e.
PLANTS PLANTED IN ROWS OR MASS SHALL BE MATCHED IN FORM.
d.
PROVIDE TREE SPECIES WITH A SINGLE MAIN TRUNK. TREES THAT HAVE THE MAIN TRUNK FORMING A "Y" SHAPE ARE NOT ACCEPTABLE.
c.
2) CONTAINER STOCK SHALL NOT BE POT BOUND.
1) NO PLANTS SHALL BE LOOSE IN CONTAINER.
WHOLE.
SOIL TOGETHER, FIRM AND
CONTAINER GROWN STOCK: GROWN IN A CONTAINER FOR SUFFICIENT LENGTH OF TIME FOR THE ROOT SYSTEM TO HAVE DEVELOPED TO HOLD ITS
b.
ACCEPTABLE.
COMPLYING WITH THE LATEST EDITION OF THE "AMERICAN STANDARD FOR NURSERY STOCK". CRACKED OR MUSHROOMED BALLS ARE NOT
FIBROUS AND FEEDING ROOT SYSTEM NECESSARY FOR FULL RECOVER OF THE PLANT. PROVIDE BALL SIZES
DEPTH TO ENCOMPASS THE
BALLED AND BURLAPPED PLANTS: DIG BALLED AND BURLAPPED PLANTS WITH FIRM NATURAL BALLS OF EARTH OF SUFFICIENT DIAMETER AND
a.
DURING STORAGE.
FULLY DEVELOPED FORM WITHOUT VOIDS AND OPEN SPACES. PLANTS HELD IN STORAGE WILL BE REJECTED IF THEY SHOW SIGNS OF GROWTH
CRACKS, ABRASIONS OF THE BARK, PLANT DISEASES, INSECT EGGS, BORERS, AND ALL FORMS OF INFESTATION. ALL PLANTS SHALL HAVE A
SOUND, HEALTHY, VIGOROUS PLANTS FREE FROM DEFECTS, DISFIGURING KNOTS, SUN SCALD INJURIES, FROST
ROOT SYSTEMS. PROVIDE ONLY
PLANTS: PROVIDE PLANTS TYPICAL OF THEIR SPECIES OR VARIETY; WITH NORMAL, DENSELY-DEVELOPED BRANCHES AND VIGOROUS, FIBROUS
1.
DURING THE INITIAL PLANTING INSTALLATION.
REPRESENTATIVE) TO BE UNSATISFACTORY
REMOVE AND IMMEDIATELY REPLACE ALL PLANTS, AS DETERMINED BY THE LANDSCAPE ARCHITECT (OR ENGINEER AUTHORIZED
4.
TYPICAL OF PLANTING AREA, ACTS OF VANDALISM, OR NEGLIGENCE ON THE PART OF THE OWNER.
MILES PER HOUR, WINTER KILL CAUSED BY EXTREME COLD AND SEVER WINTER CONDITIONS NOT
LIGHTNING STORMS, OR WINDS OVER 75
WARRANTY SHALL NOT INCLUDE DAMAGE OR LOSS OF TREES, PLANTS, OR GROUND COVER CAUSED BY FIRES, FLOODS, FREEZING RAINS,
3.
APPARENT AND WEATHER AND SEASON PERMIT.
REPLACEMENT PLANTS FOR 1 YEAR AFTER INSTALLATION. CORRECT DEFECTIVE WORK AS SOON AS POSSIBLE AFTER DEFICIENCIES BECOME
CAUSES DUE TO THE CONTRACTOR'S NEGLIGENCE. THE COST OF SUCH REPLACEMENT(S) IS AT CONTRACTOR'S EXPENSE. WARRANT ALL
OR UNSIGHTLY CONDITION, AND HAVE LOST THEIR NATURAL SHAPE DUE TO DEAD BRANCHES, OR OTHER
ARCHITECT, ARE IN AN UNHEALTHY
REPLACE, IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS, ALL PLANTS THAT ARE DEAD OR, AS DETERMINED BY THE LANDSCAPE
2.
AREA. PROJECT AREAS WILL BE ACCEPTED UPON FULL COMPLETION OF PROJECT SITE.
ACCEPTANCE OF EACH PROJECT
WARRANT PLANT MATERIAL TO REMAIN ALIVE AND BE IN HEALTHY, VIGOROUS CONDITION FOR A PERIOD OF 1 YEAR AFTER COMPLETION AND
1.
PREPARATION
INSTALLATION
PER COMMENTS RECEIVED BY CORTLANDT
56-02-R-219-0
ROLLED EROSION CONTROL MAT
THE SELECTED ROLLED EROSION CONTROL PRODUCT SHALL BE BIODEGRADABLE.
2.
INCORPORATED INTO THE WORK.
ESTABLISHED AND HAVE A ROLLED EROSION CONTROL PRODUCT, CLASS I TYPE A, SHORT TERM
ALL SLOPES STEEPER THAN 25% THAT ARE NOT PROTECTED BY STONE FILL SHALL HAVE TURF
1.
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:48 AM
morrimm
20
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
TM 79.06-2-3
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
WOODS
STRUCTURE
CONCRETE
STONE WING WALL
EDGE OF WATER
STONE WING WALL
L
L
A
W
G
NI
W
E
G
DI
R
B
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
POST
POST
WOODS
SIGN
CORTLANDT
TOWN OF
LIMIT 30
VIL. SPEED
15 TONS &
WEIGHT LIMIT
STONE LINED DITCH
PARKING
NO
SIGN
STREET
BRIDGE WING WALL
BORING
BORING
BORING
BORING
0
10
20
30
40'
10
1" = 20'
ROAD
QUAKER BRIDGE
POST ROAD
TO ALBANY
RIDGE ROAD
TO QUAKER
ROAD EAST
QUAKER BRIDGE
TO RTE 129
TO BE REMOVED
SUPERSTRUCTURE
EXISTING
STA. M 2+95.00
BRGS.
¡
STA. 3+95.00
BRGS.
¡
UTILITIES REMAIN
EXISTING OVERHEAD
BRGS.
¡
BRGS. TO
¡
100'-0"
PLAN
ELEVATION A-A
ROAD
QUAKER BRIDGE
CONCRETE BARRIER (TYP.)
PROPOSED SINGLE SLOPE
GRID
NORTH
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD EAST
STA M 2+92.25
BEGIN BRIDGE
STA M 3+97.25
END BRIDGE
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD
STA. 3+95.00
EXP. BRGS.
¡
ORGINAL GROUND
CONCRETE WINGWALL (TYP.)
PROPOSED CAST-IN-PLACE
FLOW
CROTON RIVER
STA. 2+95.00
FIX BRGS.
¡
A
A
GENERAL PLAN AND ELEVATION
DATUM EL. 10.00
CONCRETE WINGWALL (TYP.)
PROPOSED CAST-IN-PLACE
CONCRETE BARRIER (TYP.)
PROPOSED SINGLE SLOPE
5'-0" SHOULDER
TRAVEL WAY
11'-0"
TRAVEL WAY
11'-0"
OUT TO OUT
31'-4"
CLEAR
28'-0"
BOT. FTG EL. 21.25
BOT. FTG EL. 25.25
SEAT EL. 39.49
SEAT EL. 42.58
EL. 36.66
100'-0" SPAN
1'-0" SHOULDER
AZ. 132°15'0.26"
AZ. 42°15'0.22"
PROPOSED GRADE
INVENTORY
OPERATING
LOAD RATING (LRFR)
HL-93
HL-93
RF=**
RF=**
** TO BE PROVIDED BY TRUSS MANUFACTURER
LOW CHORD EL. 41.44
ITEM 551.30 (TYP.)
PROPOSED MICROPILES,
HYDRAULIC DATA
DRAINAGE AREA
RECURRENCY INTERVAL
(YEARS)
PEAK DISCHARGE
/
POINT OF MAX. BACKWATER
HIGH WATER ELEVATION AT
EXISTING
PROPOSED
FLOOD
BASIC
FLOOD
DESIGN
100
50
377 SQ. MILES
34.6
33.2
34.6
33.2
(FT. S)
r
15,600
13,080
AVG. VELOCITY THRU STRUCT. @ DESIGN FLOOD 14.6 FT./SEC.
OF TRUSS (TYP.)
¡
ITEM 568.70 (TYP.)
TRANSITION BRIDGE RAILING,
DHW EL. 33.2 (50 - YR STORM)
FILL LIMITS
APPROXIMATE
ITEM 620.03
STONE FILLING (LIGHT)
ITEM 620.05
STONE FILLING (HEAVY)
LEGEND:
ABUTMENT (TYP.)
PROPOSED CAST-IN-PLACE
ENDS STA. M 2+67.25
APPROACH PAVEMENT
BEGINS STA. M 4+27.17
APPROACH PAVEMENT
TO BE REPLACED
EXISTING CULVERT
BEGINS STA. S 2+05.74
APPROACH PAVEMENT
TO BE REMOVED (TYP.)
EXISTING SUBSTRUCTURE
ST-01
(STONE BEDDING) (TYP.)
APPROACH DRAINAGE
CONCRETE FOOTING (TYP.)
PROPOSED CAST-IN-PLACE
2
1
4
1
OHW EL. 28.25
OHW EL. 28.25'
OHW EL. 28.25'
35'-6"
¡ TRUSS TO ¡ TRUSS
56-02-R-221-0
CONCRETE PILES, ITEM 551.11 (TYP.)
PROPOSED CAST-IN-PLACE
13'-6"
EL. 25.00
EL. 28.75
8'-0"
EL. 26.00
EL. 30.00
1 ON 1.5
1 ON 1.5
AZ. 42°15'0.22"
STRUCTURE EXCAVATION ITEM
PROPOSED GRADE UNDER THE
TO BE REMOVED TO 2 FT BELOW
EXISTING STONE WINGWALL
AND DRAINAGE GUTTER (TYP.)
FILL BETWEEN WINGWALL
PROPOSED LIGHT STONE
M 2+54.22
PCC
M 2+90.48
PT
M 3+97.40
PC
M 4+50.79
PT
M 2+00
M 3+00
M 4+00
S 2+00
S 2+00
HEAD WALL
CONC.
W 5
P.P.
=46.62
INV.
=49.95
INV.
=43.13
INV.
=43.20
INV.
INV.=44.40
GRATE=45.80
SLOT DRAIN
VAULT
DRAINAGE
12" PVC
15" CMP
18" CMP
=41.7
INV.
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:51 AM
morrimm
21
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
WEARING SURFACE
WITH INTEGRAL
SUPERSTRUCTURE SLAB
T.G.L.
S.B.
2'-3"
SHLD
1'-0"
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
VARIES (TYP.)
S.B.
2'-3"
SHOULDER
5'-0"
28'-0" APPROACH SLAB
2.0%
T.G.L.
RAIL (TYP.)
BRIDGE TRANSITION
GROUND
ORIGINAL
ITEM 557.1012
12" - APPROACH SLAB
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
¡
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
¡
ITEM 569.04
BARRIER (TYP.)
CONCRETE
SINGLE SLOPE
SHOULDER
5'-0"
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
OUT-TO-OUT
31'-4"
2.0%
2.0%
2.0%
TYPICAL BRIDGE SECTION
ST-02
ITEM 564.81020016
SUPERSTRUCTURE
GALVANIZED TRUSS
TYPICAL BRIDGE SECTIONS
1.5%
1.5%
6" (TYP.)
ITEM 555.0021 (TYP.)
CONCRETE WINGWALL
CAST-IN-PLACE
2
1
2
1
8" (TYP.)
(LIGHT), ITEM 620.03 (TYP.)
1'-0" STONE FILLING
STA. M 2+91.86 TO STA. M 3+97.36
TYPICAL BRIDGE APPROACH SECTION
STA. M 3+97.36 TO STA. M 4+26.67
STA. M 2+68.85 TO STA. M 2+91.86
2.0%
1'-0"
SHOULDER
14'-6" MIN VERTICAL CLEARANCE
1'-8"
(TYP.)
3'-6" STRUCTURE DEPTH
2.0%
ITEM 304.12
12" - SUBBASE COURSE TYPE II
ITEM 203.24010017 (TYP.)
SHOULDER BACK UP MATERIAL,
ITEM 620.0801 (TYP.)
9" BEDDING MATERAIL
ITEM 609.0302 (TYP.)
STONE CURB (TYPE A),
ROUND 4' V.C. (TYP.)
3'-6"
ON BARRIER (TYP.)
AESTHETIC TREATMENT
0
2
4
6
8'
2
3/16" = 1'
56-02-R-222-0
ITEM 203.03 (TYP.)
EMBANKMENT IN PLACE
E
E
X
C
R
S
L
IO
(TYP.)
3'-0"
(TYP.)
1'-0"
(TYP.)
1'-0"
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:36:45 AM
morrimm
31
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
TM 79.06-2-3
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 6
LIBER 757
VILLAGE OF CR
LAND
TM 68.18-3-
CONTROL NO. 59
LINDA HAMILT
LANDS N/F O
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET
EDGE OF WATER
EDGE OF WATE
EDGE OF WATER
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
POST
POST
WOODS
STONE LINED DITCH
BORING
BORING
BORING
BORING
ROAD
QUAKER BRIDGE
POST ROAD
TO ALBANY
RIDGE ROAD
TO QUAKER
ROAD EAST
QUAKER BRIDGE
TO RTE 129
ITEM 202.120001
TO BE REMOVED,
SUPERSTRUCTURE
EXISTING
STA. M 2+95.00
BRGS.
¡
STA. M 3+95.00
BRGS.
¡
UTILITIES TO REMAIN
EXISTING OVERHEAD
EARTHWORK PLAN
ROAD
QUAKER BRIDGE
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD EAST
STA M 2+92.25
BEGIN BRIDGE
STA M 3+97.25
END BRIDGE
, STA. LINE, AND H.C.L.
¡
PROPOSED QUAKER BRIDGE ROAD
FLOW
CROTON RIVER
AZ. 132°15'0.26"
ITEM 203.03
EMBANKMENT IN PLACE
ITEM 620.03
STONE FILLING, (LIGHT)
ITEM 206.01
EXCAVATION
LIMIT OF STRUCTURE
ITEM 209.13
SILT FENCE
ITEM 207.26
STRUCTURAL DRAIN
PREFABRICATED COMPOSITE
ITEM 203.21
SELECT STRUCTURAL FILL
TYPE I, ITEM 620.0801
BEDDING MATERIAL,
ITEM 620.05
STONE FILLING, (HEAVY)
CX
ITEM 202.19
SUBSTRUCTURES
REMOVAL OF
553.020002
ITEMS 553.020001 &
COFFERDAM (TYPE 2)
EXCAVATION, ITEM 206.0201
TRENCH AND CULVERT
0
10
20
30
40'
10
1" = 20'
ST-12
EARTHWORK PLAN
(SEE DWG. ST-14)
PILE WALL
SOE WALL #2 SOLDIER
EXCAVATION ITEM (TYP.)
STRUCTURE
COST INCLUDED IN
TO BE REMOVED
EXISTING DRAINAGE
AND DWG. ST-15)
PILE WALL (SEE NOTE 6
SOE WALL #1 SOLDIER
TO BE REMOVED (TYP.)
EXISTING SUBSTRUCTURE
AT SUBGRADE
LIMITS OF EMBANKMENT
3'-0" (TYP.)
(TYP.)
3'-0"
GRID
NORTH
LEGEND:
ITEM 209.1501
TURBIDIDTY CURTAIN,
STRUCTURE EXCAVATION ITEM
PROPOSED GRADE UNDER THE
BE REMOVED TO 2 FT BELOW
EXISTING STONE WALL TO
C1
C1
C1
C1
C1
C1
C1
ST-13
D
ST-13
B
ST-13
A
ST-13
C
LAGGING WALL NOTES
ST-13
D
ST-13
C
PROPOSAL TO BE CONSIDERED BY THE COUNTY.
THE PROPERTY OWNER TO FACILITATE A VALUE ENGINEERING
PROPERTY. CONTRACTOR MAY PURSUE A GRADING RELEASE WITH
THE INTENT OF THE SOE WALL #1 IS TO AVOID IMPACTING PRIVATE
6.
DO NOT USE WEATHERING STEEL (ASTM A588) FOR SOLDIER PILES.
5.
EQUIPMENT AND/OR PROCEDURES.
NO EXTRA PAYMENT WILL BE MADE FOR SPECIAL
SPECIAL EQUIPMENT AND/OR PROCEDURES.
EARTH FOR SOLDIER PILE AND LAGGING WALL, ITEM MAY REQUIRE
DUE TO THE PRESENCE OF BOULDERS, PROGRESSING THE HOLES IN
4.
EXTRA PAYMENT WILL BE MADE FOR THE CASING.
HOLES IN EARTH FOR SOLDIER PILE AND LAGGING WALLS. NO
TEMPORARY SLEEVES OR CASINGS ARE REQUIRED FOR ITEM
3.
ASTM A572 GRADE 50 STEEL.
PROVIDE SOLDIER PILE SECTIONS MEETING THE REQUIREMENTS OF
2.
OF 2'-0" BELOW FINAL GROUND SURFACE.
SURFACE. CUT OFF AND REMOVE SOLDIER PILES TO A MINIMUM
REMOVE LAGGING TO A MINIMUM OF 2'-0" BELOW FINAL GROUND
WHEN NO LONGER NECESSARY FOR EXCAVATION SUPPORT,
1.
NOTE:
UNDER NYSDOT SPECIFICATION SECTION 614.
BID DOCUMENTS. EXISTING TREE REMOVAL SHALL BE AS SPECIFIED
REFER TO THE LANDSCAPING PLAN AND THE SPECIAL NOTES IN THE
FOR INFORMATION REGARDING EXISTING TREES TO BE REMOVED,
1.
FOR DETAILS
CULVERT, SEE DWG. MSD-01
PROPOSED DRAINAGE
HEAVY STONE FILL
LIMITS OF PROPOSED
HEAVY STONE FILL
LIMITS OF PROPOSED
C1
C1
C1
C1
C1
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
HEADWALL TO REMAIN
EXISTING CONCRETE
FOR DETAILS
CULVERT, SEE DWG. MSD-01
PROPOSED DRAINAGE
FOR DETAILS
CULVERT, SEE DWG. MSD-01
PROPOSED DRAINAGE
56-02-S-232-0
STRUCTURE EXCAVATION ITEM (TYP.)
THROUGH THE WORK SITE. COST TO BE INCLUDE IN THE
CONTRACTOR SHALL DEVELOP A PLANT TO CONVEY DRAINAGE
M 2+54.22
PCC
M 2+90.48
PT
M 3+97.40
PC
M 4+50.79
PT
M 2+00
M 3+00
M 4+00
M 5+00
S 2+00
S 2+00
ENDR
#13 KV
P.P.
HEAD WALL
CONC.
W 5
P.P.
SE.INV.=36.82
N.INV.=38.47
T.F.=39.57
C.B.
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
56
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
0
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:36:49 AM
morrimm
32
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
0
8
5
3
9
8
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
BOT. FTG. EL. 21.25
BOT. FTG. EL. 21.25
BOT. FTG. EL. 25.25
ST-12
A
BEGIN ABUTMENT EARTHWORK SECTION
ST-12
B
END ABUTMENT EARTHWORK SECTION
ST-12
C
EARTHWORK SECTION
ST-12
D
EARTHWORK SECTION
BOT. FTG. EL. 25.25
ITEM 203.03
EMBANKMENT IN PLACE
ITEM 620.03
STONE FILLING, (LIGHT)
EXCAVATION, ITEM 206.01
LIMIT OF STRUCTURE
ITEM 207.26
STRUCTURAL DRAIN
PREFABRICATED COMPOSITE
ITEM 203.21
SELECT STRUCTURAL FILL
TYPE I, ITEM 620.0801
BEDDING MATERIAL,
ITEM 620.05
STONE FILLING, (HEAVY)
ITEM 202.19
SUBSTRUCTURE
REMOVAL OF
ITEM 206.01
EXCAVATION,
FOR STRUCTURE
PAYMENT LIMITS
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
1.5
1
1.5
1
1.5
1
1.5
1
ITEM 207.26 (TYP.)
STRUCTURAL DRAIN,
PREFABRICATED COMPOSITE
ITEM 207.26 (TYP.)
STRUCTURAL DRAIN,
PREFABRICATED COMPOSITE
LAGGING WALL
ORIGNAL GROUND
ORIGNAL GROUND
PROPOSED GRADE
PROPOSED GRADE
PROPOSED GRADE
THE SAME TIME
LINE SHALL BE PLACED AT
OF THIS VERTICAL PAYMENT
MATERIALS ON BOTH SIDES
THE SAME TIME
LINE SHALL BE PLACE AT
OF THIS VERTICAL PAYMENT
MATERIALS ON BOTH SIDES
ROADWAY SUBGRADE
BOTTOM OF
LEGEND:
EARTHWORK SECTIONS
ST-13
0
5
10
15
20'
5
1" = 10'
LAGGING WALL
ORIGNAL GROUND
VARIES
1
SOIL AT TOE
PROPOSED FINISHED GROUND LINE
5'-0"
4'-0"
0 (TYP.)
STREAMBED
EXISTING
TOE OF SLOPE
FILLING
MATERIAL UNDER STONE
9" THICK BEDDING
0"
(HEAVY)
2'-6" STONE FILLING
NOTE:
EXISTING SUBSTRUCTURE DIMENSIONS ARE ASSUMED.
1.
THE SAME TIME
LINE SHALL BE PLACE AT
OF THIS VERTICAL PAYMENT
MATERIALS ON BOTH SIDES
THE SAME TIME
LINE SHALL BE PLACED AT
OF THIS VERTICAL PAYMENT
MATERIALS ON BOTH SIDES
1'-0"
1'-0"
ORIGNAL GROUND
(NOT SCALE)
56-02-S-233-0
2
1
PROPOSED GRADE
BOTTOM OF ROADWAY
LAGGING WALL
ATTACHMENT C: SHPO DOCUMENTATION
Division for Historic Preservation
P.O. Box 189, Waterford, New York 12188-0189 • (518) 237-8643 • www.nysparks.com
ANDREW M. CUOMO
ROSE HARVEY
Governor
Commissioner
May 8, 2017
Mr. Matt Hunt
Creighton Manning
2 Winners Circle
Albany, NY 12205
Re:
DOT
Quaker Bridge Road Bridge Study
Quaker Bridge Rd, Cortlandt, NY
17PR02639
Dear Mr. Hunt:
Thank you for requesting the comments of the Division for Historic Preservation of the Office of Parks,
Recreation and Historic Preservation (OPRHP). We have reviewed the submitted materials in accordance
with the New York State Historic Preservation Act of 1980 (section 14.09 of the New York Parks,
Recreation and Historic Preservation Law). These comments are those of the Division for Historic
Preservation and relate only to Historic/Cultural resources. They do not include potential environmental
impacts to New York State Parkland that may be involved in or near your project. Such impacts must be
considered as part of the environmental review of the project pursuant to the State Environmental Quality
Review Act (NY Environmental Conservation Law Article 8) and its implementing regulations (6NYCRR
Part 617).
We note that the Quaker Road Bridge is eligible for listing in the State and National Registers of Historic
Places, and that the project area is located in an archaeologically sensitive area. Please see attached,
the Resource Evaluation for the property. We understand that the proposed work entails a study of repair
vs. replacement of the bridge. We would remind you that Section 14.09 of the State Historic Preservation
Act is clear that demolition of a historic resource is deemed an Adverse Impact, and we advocate for
repair of the bridge rather than replacement. In order to continue our review, please provide the following
additional information:
1. Please provide a description and map of the proposed Area of Potential Effect
2. Please provide a description of any evidence of the extent of prior ground disturbance, as
well as a description of the proposed ground disturbance. Based on this, OPRHP will make
further recommendations with regard to archaeology.
3. Please provide the name and contact information of the DOT contact person for this project
We would appreciate if the requested information could be provided via our Cultural Resource Information
System (CRIS) at www.nysparks.com/shpo/online-tools/ Once on the CRIS site, you can log in as a guest
and choose "submit" at the very top menu. Next choose "submit new information for an existing project".
You will need this project number and your e-mail address. If you have any questions, I can be reached
at (518) 268-2182.
Sincerely,
Olivia Brazee
Historic Site Restoration Coordinator
olivia.brazee@parks.ny.gov
via e-mail only
ENGINEERS
Creighton
PLANNERS
Manning
SURVEYORS
May 25, 2017
Ms. Olivia Brazee
New York State Parks, Recreation & Historic Preservation
Peebles Island State Park, P.O. Box 189
Waterford, NY 12188-0189
RE: BIN 3348560 — Quaker Bridge Road Bridge over Croton River; Town of Cortlandt, Westchester
County: 17PR02639
Dear Ms. Brazee,
This letter is in response to your request for more information in the initial project review letter
dated May 8, 2017.
The 2010 ‘as-built’ rehabilitation plans, previously uploaded to CRIS, were referenced to locate
previous deep excavation limits in lieu of unavailable original construction plans. The previous deep
excavation limits have been established by projecting a 1 vertical to 2 horizontal line from the
bottom of existing abutments, wing walls, and retaining walls. Approach roadway areas were
assumed to be previously disturbed along with the rip rap drainage and asphalt driveways found
along the bridge approaches.
The intent of this study is to evaluate rehabilitation and replacement options. For the bridge
rehabilitation alternative, there is potential for disturbance outside previous limits for the
construction of a temporary bridge and/or temporary staging area upstream. Bridge replacement
alternatives currently include a new bridge on existing, parallel adjacent, or diagonal alignments.
For the adjacent and diagonal alignment alternatives, the new bridge will be constructed upstream
of the existing. Approximate limits of proposed disturbance for the northwest bank approach will
extend 180 ft upstream of the existing bridge and comprise a 40 ft wide area from the stream edge.
Additionally, approximate limits of proposed disturbance for the southeast bank will extend 110 ft
upstream of the existing bridge and comprise a 45 ft wide area from the stream edge. Proposed
disturbance is delineated on the attached figure (area contained within the dashed red line). The
roadway reconstruction associated with the bridge replacement will tie into the existing
approaches within the limits of proposed disturbance shown in the figure. If deemed necessary,
temporary shoring and/or retaining walls will be utilized to avoid impacts to existing structures
during excavation and construction of new substructures.
As we discussed during a phone call on May 8, 2017, the NYSDOT is not the lead agency for this
project. The study and eventual rehabilitation or replacement is being progressed by Westchester
County, and construction is anticipated to be completed with 100% county funds. The County’s
contact for this project is R. Scott Donnelly (rsd1@westchestergov.com). There will be State and
Federal involvement in the form of environmental permits from NYSDEC and the US Army Corps of
Engineers, respectively.
Sincergly,
Matt Hunt, PE
2 Winners Circle
Lead Project Engineer
Albany, NY 12205
518.446.0396 (p)
CC: Bud Nicoletti & R. Scott Donnelly, Westchester DPW
518.446.0397 (f)
www.cmellp.com
LEGEND:
ROADWAY AND/OR PATH CONSTRUCTION
APPROXIMATE LIMIT OF ROADWAY FILL OR EXCAVATION FOR PREVIOUS
STRUCTURE CONSTRUCTION
APPROXIMATE LIMIT OF PREVIOUS FILL OR EXCAVATION FOR MISC.
BASE OF FOUNDATION)
AND/OR BACKFILL (LIMITS BASED ON A 1V:2H PROJECTION FROM THE
APPROXIMATE LIMIT OF PREVIOUS DEEP ABUTMENT EXCAVATION
0
15
30
45
60'
15
1" = 30'
PROJECT:
DATE:
116-043
FIGURE:
1
USER =
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\graphics\116-043_cpb_shpo_pln_01.dgn
5/25/2017
lshort
FILE NAME =
DATE/TIME =
AREA OF POTENTIAL EFFECT MAP
GRID
NORTH
CONSTRUCTION
AREA OF POTENTIAL EFFECT FOR BRIDGE AND APPROACH ROADWAY
CONSTRUCTION ON PREVIOUSLY UNDISTURBED SOIL
AREA OF POTENTIAL EFFECT FOR BRIDGE AND APPROACH ROADWAY
BRIDGE
FLOW
SHPO # 17PR02639
CROTON RIVER BRIDGE STUDY
QUAKER BRIDGE ROAD BRIDGE OVER
5/2017
TM 68.18-1-42
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
BK. PG.
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-4
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
BK. PG.
CHAO DAI
LOUIS V. PINKHAM AND
LANDS N/F OF
TM 68.18-3-11
LIBER 11069, PAGE 103
MICHAEL I. WEINTRAUB CROTON TRUST
AS TRUSTEES OF THE
ANITA B. WEINTRAUB AND SANFORD WEINTRAUB
LANDS N/F OF
WOODS
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET. W
CONCRETE RET. WALL
#13 KV
P.P.
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
AREA
RIP RAP
SLOT DRAIN
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
ELEV.=40.82
IN HEAD WALL
BOX CUT
B.M.
HEAD WALL
CONC.
POST
POST
W 5
P.P.
STONE RET. WALL
WOODS
WOODS
WOODS
KEY PAD
BOLLARDS
CROTON RIVER
8" CMP
INV.=20.98
15" CMP
SE.INV.=21.85
N.INV.=23.50
T.F.=24.60
C.B.
=31.65
INV.
=34.98
INV.
PARKING
NO
W/LIGHT
P.P.
PILLAR
STONE
INV.=46.54
12" CMP
46.54
INV.=
P.P.
IRON GATE
WROUGHT
RAIL
GUIDE
WOOD
BRIDGE
ONE LANE
SIGN
CORTLANDT
TOWN OF
VAULT
DRAINAGE
LIMIT 30
VIL. SPEED
15 TONS &
WEIGHT LIMIT
LIMIT 30
& SPEED
NO PARKING
STONE LINED DITCH
PARKING
NO
SIGN
STREET
QUAKER BRIDGE ROAD EAST
Division for Historic Preservation
P.O. Box 189, Waterford, New York 12188-0189 • (518) 237-8643 • www.nysparks.com
ANDREW M. CUOMO
ROSE HARVEY
Governor
Commissioner
June 15, 2017
Mr. Matt Hunt, PE
Creighton Manning
2 Winners Circle
Albany, NY 12205
Re:
USACE
Quaker Bridge Road Bridge Study
Quaker Bridge Rd, Cortlandt, NY
17PR02639
Dear Mr. Hunt:
Thank you for requesting the comments of the New York State Historic Preservation Office (SHPO).
We have reviewed the provided documentation in accordance with Section 106 of the National
Historic Preservation Act of 1966. These comments are those of the SHPO and relate only to
Historic/Cultural resources. They do not include other environmental impacts to New York State
Parkland that may be involved in or near your project. Such impacts must be considered as part of
the environmental review of the project pursuant to the National Environmental Policy Act and/or the
State Environmental Quality Review Act (NY Environmental Conservation Law Article 8).
We have reviewed your letter and the accompanying map of the Area of Potential Effect (APE) that
was provided to our office on May 25th, 2017. Based upon our office’s review, we have no concerns
with regards to archaeological resources. However, from the provided map it appears that the
National Register eligible Quaker Bridge Road bridge is not included in the APE. Under section 106
regulations, the APE must include all identified historic and cultural resources that may be directly or
indirectly affected by the proposed undertaking. For this undertaking, the APE must include the
Quaker Bridge Road bridge and the project must evaluate the potential direct physical impacts
resulting from replacement and/or the potential indirect visual and setting impacts resulting from any
new construction adjacent to the bridge.
We look forward to continued consultation as the project progresses and the specific nature of the
undertaking is determined. We would appreciate if the requested information could be provided via
our Cultural Resource Information System at www.nysparks.com/shpo/online-tools/ Once on the
CRIS site, you can log in as a guest and choose "submit" at the very top menu. Next choose "submit
new information for an existing project". You will need this project number and your e-mail address.
If you have any questions, I can be reached at (518) 268-2182.
Sincerely,
Olivia Brazee
Historic Site Restoration Coordinator
olivia.brazee@parks.ny.gov
via e-mail only
DRAFT MEMORANDUM
ENGINEERS
PLANNERS
SURVEYORS
Date:
November 17, 2017
To:
Phil Abenavoli, P.E.
Westchester County Dept. of Public Works and Transportation
148 Martine Avenue
White Plains, NY 10601
From:
Charles Tutunjian, P.E.
Creighton Manning Engineering, LLP
Project: Quaker Bridge Road over Croton River (BIN 3348560)
Bridge Replacement Study
Town of Cortlandt, Westchester County, NY
Re:
Draft Scope Summary Memorandum
1.
Introduction
The purpose of this memorandum is to summarize the feasible replacement options, identify the scope of
work, document the existing conditions, establish project objectives, and document environmental
concerns for the above referenced project.
The Quaker Bridge Road Bridge over the Croton River is located approximately 1.25 miles southwest of the
Croton Dam at the border of the Town of Cortlandt and the Village of Croton on Hudson. The project area
is primarily residential with significant elevation changes within a wooded setting. Quaker Bridge Road is a
winding two-lane road that connects Rt. 129 to the west and Old Albany Post Road to the east of the
bridge. The asphalt roadway width is approximately 26 ft north of the bridge and 20 ft south of the bridge.
Originally built in 1894, the existing bridge is a 98 ft. single span steel through-truss structure on stone
abutments founded on soil or bedrock. The existing structure is oriented perpendicular to the river and has
no skew. The clear bridge roadway width is 15’-6” and therefore functions as a single-lane bridge as it is
less than 16’-0”. “One lane bridge” signs are present on all approaches to the bridge.
Quaker Bridge Rd over Croton River
Draft Scope Summary Memorandum
November 17, 2017
Page 2 of 11
2.
Conditions
A bridge rehabilitation project was conducted in 2010 that provided various
steel member retrofits in addition to providing a new paint system. Despite
this recent rehabilitation, the Quaker Bridge Road Bridge is currently load
posted for 15 tons. The NYSDOT has determined that the bridge should be
posted for 12 tons, and there is an outstanding Yellow Flag for this
inconsistent posting. The bridge has a long history of Yellow and Red
Structural Flags with some of the most recent Yellow Flags being for the
inconsistent load posting noted above, a cracked cover plate weld on a
fracture critical floor beam 1, and a missing nut at the pin connection on the
fracture critical lower chord.
In addition to the Yellow Flags noted above, the bridge superstructure
exhibits widespread deterioration. Various truss members have deterioration
approaching 25% of the cross-sectional member area. In most locations on
the bridge, previous corrosion was cleaned and painted over during the 2010
rehabilitation project. Additionally, both the left and right end chords are
slightly twisted and bowed upward, indicating a past incident of being
overstressed.
The 2010 rehabilitation also retrofit the
vertical members, which consisted of thin
forged-eye tension rods, with steel cables
looped around the top and bottom chords.
This was necessary to keep the bridge open to traffic, as numerous tension
members were cracked around the forge lines at the connection to the
bottom chord. The failure of these types of members would result in
complete failure of the bridge.
The deck consists of open steel grating with concrete filled sections above
the truss floor beams. The steel grating is in fair condition, but concrete infill
present at the floorbeams, is severely deteriorated and crumbled. The
presence of the concrete has resulted in trapped water in those areas,
leading to corrosion of the floor beams. While not yet deteriorated, the
steel stringers spanning between floorbeams exhibit significant deflection
under live loading.
The bridge is posted for a vertical clearance of 11’-5”, which is significantly
less than the standard of 14’-0” and restricts some vehicles from using the bridge. There is evidence of past
impacts to the upper bracing members of the end portal.
Both stone abutments are overall in good condition. No undermining or scour is present, but without
original as-built plans, the NYSDOT has flagged this structure as a potential scour critical bridge due to its
unknown foundation type. The approaches of the bridge are in poor condition. The east approach has up to
1.25” of differential settlement at the joint between the bridge deck and the pavement, and a slot drain
located within the roadway at the west end of the bridge is clogged and not performing as originally
intended. Approach guide rail consists of w-rail and is in fair condition with minor deformations due field
bending of the rail and impact damage.
Cracked cover plate weld
Missing nut on bottom chord.
Also shows retrofit
attachment to floorbeams
Truss diagonal bowed due to
overstress (right of photo)
Existing truss members
retrofit with steel cables
Quaker Bridge Rd over Croton River
Draft Scope Summary Memorandum
November 17, 2017
Page 3 of 11
3.
Project Objective
Provide a structurally and geometrically sufficient structure meeting current NYSDOT
standards with a 75+ year design life.
4.
Design Criteria
The design criteria for this project are based on the NYSDOT Highway Design Manual, Chapter 2 and the
NYSDOT Bridge Design Manual, 2014. The project is being designed for an anticipated annual average daily
traffic (AADT) of 800 vpd for the design year 2048, and an urban local road classification with a design
speed of 30 mph.
4.1
Critical Design Elements
Table 4.1-A - Critical Design Elements for Quaker Bridge Road over Croton River
Route No. & Name:
Quaker Bridge Road
Project Type:
Bridge Replacement
Roadway
Classification:
Urban Local
ETC+30 AADT (2048):
800
Element
Standard
Existing
Condition
Proposed
Condition
1
Design Speed
30 mph – HDM 2.7.4.3
30 mph
30 mph
2
Lane Width
9 ft Min. - BM Table R and N, Appendix 2A
7.8 ft
11 ft(1)
Approach Lane Width
13 ft NW
9 ft SE
11 ft
3
Shoulder Width
3 ft Min. - BM Table R and N, Appendix 2A
0 ft
1 ft (LT shldr.)*
5 ft (RT shldr.)
Approach Shoulder
Width
0 ft
1 ft (LT shldr.)*
5 ft (RT shldr)
4
Horizontal Curvature
188 ft. - HDM Sect 2.7.4.3, Exhibit 2-8
58 ft.*
38 ft.*
5
Superelevation Rate
4% Max. – HDM Sect 2.7.4.3, Exhibit 2-8
None*
None*
6
Stopping Site Distance
175 ft. – HDM Sect 2.7.4.3, Exhibit 2-8
78 ft*
63 ft*
7
Grade
15% Max – HDM Sect 2.7.4.3, Exhibit 2-8
10%
11.2%
8
Cross Slope
1.5% Min. - 3% Max. – HDM Sect 2.7.4.3, Exhibit 2-8
0.0%
2.0%
9
Vertical Clearance
14.5 ft. - BM Sect 2.4
11.5 ft.*
Unlimited
10
Structural Capacity
AASHTO HL-93 Live Load - BM Sect 2.6.1
12 Tons*
HL-93
11
ADA Compliance
HDM Chapter 18
N/A
5 ft shoulder(2)
12
Freeboard
Q50 + 2 ft (BM 2.4.3)
9.2 ft
7.5 ft
* Non-Standard Feature
(1) 11’-0” lane widths are proposed at the request of Westchester County
(2) 5 ft shoulder accommodates two-way pedestrian traffic
Quaker Bridge Rd over Croton River
Draft Scope Summary Memorandum
November 17, 2017
Page 4 of 11
5.
Alternatives Considered
5.1
Recommended Alternative - Replacement on Existing Alignment with Road Closure - (Alt. 2A)
This alternative will replace the existing bridge with a new 100 ft. single span on the existing alignment. The
bridge roadway will consist of two 11 ft wide travel lanes, a 5 ft wide shoulder on the downstream side,
and a 1 ft wide shoulder on the upstream side of the bridge. The 5 ft wide shoulder is proposed on the
downstream side of the bridge to accommodate two-way pedestrian traffic in the vicinity of the Croton
Gorge Trail. The rail-to-rail clear bridge roadway width of 28 ft (12.5 ft increase over existing) and an out to
out bridge width of 31’-4”.
The proposed structure type will be evaluated and selected in a subsequent phase of this project, but
superstructure options include either steel or prestressed concrete beams with a composite concrete deck
or a precast concrete twin-leaf arch. Factors to be considered in selecting the superstructure type include
long-term maintenance, initial cost, and aesthetic treatment options. Superstructure types will also be
contingent upon the feasibility of delivering superstructure components to the site. After evaluating the
shipping route, it is anticipated that delivery of full length beams or precast arch units associated with this
alternative is feasible from the north approach.
The substructures will consist of cast-in-place conventional cantilever concrete abutments supported by a
spread footing founded on bedrock. The precast concrete arch structure only requires a cast-in-place
concrete footing founded on bedrock. The proposed west abutment will be located in the same location as
the existing abutment while the east abutment will be set approximately 2 ft back from the centerline of
bearings of the existing abutment. The proposed bridge will be perpendicular to the stream with non-
skewed substructures.
Retaining walls in addition to abutment wingwalls will be required to retain the northeast and southeast
approach roadways. The retaining wall along the northeast approach roadway will replace an existing laid
up stone wall, while the wall along the southeast approach will accommodate a slight change in roadway
geometry at the top of a very steep embankment slope (1.3H to 1.0V). The retaining wall type will be
selected in a subsequent phase of this project, but wall options include precast fill type walls,
Geosynthetically reinforced soil walls, or cast-in-place concrete cantilever walls.
The proposed horizontal alignment of the new bridge and its approaches will closely match the existing
roadway on the north side and be modified on the south side. The north approach roadway alignment will
consist a compound curve with radii of 180 ft and 38 ft connecting into a tangent across the bridge. The
tangent then connects to a curve on the south approach with a radii of 51 ft followed by another tangent
section continuing along Quaker Bridge Road. Quaker Bridge Road East consists of a single tangent
intersecting into the Quaker Bridge Road alignment. The modifications to the alignment on the south
approach creates a through-movement pattern for Quaker Bridge Road. The proposed vertical alignment
will consist of a 3.0% grade across the bridge that will tie into the south approach at the reconstruction
limit and will tie into the reconstructed Quaker Bridge Road/Quaker Bridge Road East roadway. The
proposed vertical profile will raise the south end of the bridge approximately 1 ft. The approaches will be
reconstructed for approximately 165 ft and 225 ft to the north and south of the bridge, respectively. See
the Alternative Comparison Table in the appendices.
This alternative will have Right-of-Way (ROW) impacts due to the increased bridge roadway width,
embankment construction, and close proximity of existing highway boundary to the existing structure. See
the ROW section of this report for additional details.
Overhead utilities are located within the project area, it is anticipated that these lines will need to be
temporarily relocated to facilitate erection of the new beams and demolition of the existing bridge.
Quaker Bridge Rd over Croton River
Draft Scope Summary Memorandum
November 17, 2017
Page 5 of 11
The bridge will be closed during construction and traffic detoured via an offsite detour route. The full
length detour from one side of the bridge to the other side will be 5.7 miles long and add approximately 11
minutes to travel times. The detour route will utilize Rt. 129, Rt. 9, and Old Albany Post Road. Construction
is anticipated to last 6 months.
This Alternative will meet most current NYSDOT geometric and structural standards while providing a 75+
year design life. This alternative is a feasible replacement solution while balancing total costs and impacts
to adjacent properties. The total cost of Alternative 2A which includes design, ROW acquisition,
construction, and construction inspection is approximately $7,100,000.
5.2
Dismissed Alternatives
Several additional alternatives were evaluated with respect to bridge location, span length, feasible
superstructure types, approach reconstruction work, impact to Right-of-Way, and constructability. A
summary of Alternatives in tabular format and schematic level plan details are contained in the
Alternatives Comparison Table included in the appendices. They are as follows:
Alternatives 1A & 1B
Bridge Rehabilitation was studied due to the historic eligibility of the bridge and to serve as a cost
comparison to the other alternatives. Both of these alternatives will keep the existing truss and
substructures, thus retaining the existing nonstandard geometric features and load carrying capacity. The
majority of the work involved with these alternatives would consist of steel repairs and strengthening, deck
replacement, painting and the reconstruction of the approach pavement. The traffic maintenance plan for
Alternative 1A would consist of a road closure with an offsite detour, while Alternative 1B would maintain
traffic on an onsite temporary detour structure. Closing the road during construction would be the most
efficient and least expensive traffic maintenance plan while providing a temporary bridge to maintain
traffic on site would add cost and complexity to the project. The total cost of Alternative 1A which includes
design, ROW acquisition, construction, and construction inspection is approximately $5,700,000. The total
cost of Alternative 1B which includes design, ROW acquisition, construction, and construction inspection is
approximately $7,000,000.
Reason for Dismissal
These alternatives although lower in the initial construction cost, will retain non-standard bridge
roadway width, vertical clearance, and substandard load carrying capacity. In addition, the design
service life for this alternative is expected to be less than 20 years and require greater continued
complex and costly maintenance efforts on fracture-critical members when compared to a
replacement structure. Since the project objectives will not be achieved, alternatives 1A and 1B
have been dismissed.
Alternative 2B
Alternative 2B is the same as the recommended Alternative 2A, except traffic is detoured on site with a
temporary bridge. See the Alternative 2A write up for a description of new the alignment and structure.
Alternative 2B will construct temporary abutments upstream of the new bridge location and install a
temporary bridge to maintain traffic through the site. Temporary GRSS walls and additional fill will be
required to build up the approach roadway over the steep side slopes. The total cost of Alternative 2B
which includes design, ROW acquisition, construction, and construction inspection is approximately
$8,400,000.
Reason for Dismissal
This alternative has been dismissed due to the more significant ROW acquisitions and higher
construction costs relative to Alternative 2A.
Quaker Bridge Rd over Croton River
Draft Scope Summary Memorandum
November 17, 2017
Page 6 of 11
Alternative 3
The Replacement on Adjacent Alignment alternative will construct a new parallel structure upstream from
the existing bridge. A new 115 ft. single span structure will provide the same clear bridge width as
described in Alternative 2A and will be constructed while maintaining traffic on the existing bridge. The
approach configuration will not change significantly from the existing. Right-of-way impacts with this
alternative will be significantly greater than Alternative 2A, as it will be constructed entirely outside of the
existing highway boundary. The feasible superstructure type is limited to spliced steel beams due to
geometric constraints of the delivery route. The total cost of Alternative 3 which includes design, ROW
acquisition, construction, and construction inspection is approximately $7,500,000.
Reason for Dismissal
This alternative has more significant ROW acquisitions and higher construction costs relative to
Alternative 2A. The possible feasible superstructure types are also limited when compared to the
preferred alternative. For these reasons alternate 3 has been dismissed.
Alternatives 4 & 5
Both of the Replacement on a Diagonal Alignment alternatives will construct a new 140 ft. structure on a
20° skew across the river from the north quadrant to the south quadrant. The new structure will provide
the same clear bridge width as described in Alternative 2A and will improve the horizontal alignment by
providing increased curve radii at each approach. Right-of-way impacts will be significantly greater than
Alternative 2A, as a majority of the new structure will be constructed outside of the existing highway
boundary. Alternative 4 would include a roadway alignment shifted to the north of the existing bridge to
allow traffic to be maintained on the existing bridge during construction of the new bridge. Shifting the
entire bridge upstream of the existing structure results in more significant ROW acquisitions in the form of
Fee takings, and would necessitate temporary staging walls to maintain traffic on the approaches while
raising the profile for the new bridge. The roadway alignment for Alternative 5 would overlap with the
existing bridge alignment, resulting in the bridge being closed and traffic being detoured around the site
similar to Alternative 2A. Closing the road during construction will allow the new structure to be partially
built within the existing bridge footprint but ROW impacts are still significantly greater than Alternative 2A.
The total cost of Alternative 4 which includes design, ROW acquisition, construction, and construction
inspection is approximately $7,900,000. The total cost of Alternative 5 which includes design, ROW
acquisition, construction, and construction inspection is approximately $7,600,000.
Reason for Dismissal
These alternatives have more significant ROW acquisitions and higher construction costs relative to
Alternative 2A. The possible feasible superstructure types are also very limited due to the larger
span length. For these reasons alternate 4 & 5 has been dismissed.
See the Alternatives Comparison Table & Plans in the appendix of the memo for further details of each
alternative evaluated within this bridge study.
6.
Recommended Alternative
Alternative 2A is the preferred alternative, as it meets all of the project objectives while having the least
ROW impacts and lowest anticipated construction cost of all concepts evaluated except the rehabilitation
concept.
7.
Geotechnical
At least one (1) soil boring and rock core will be progressed at each proposed abutment location.
Additional borings and rock cores should be taken if soldier pile and lagging walls will be utilized during
Quaker Bridge Rd over Croton River
Draft Scope Summary Memorandum
November 17, 2017
Page 7 of 11
construction or incorporated into the final substructures. The borings will be progressed using a standard
rotary drill rig equipped with a hollow stem auger until refusal on bedrock and then progress a rock core.
Soil borings will be scheduled as soon as the final location of the proposed abutments have been finalized.
The subsurface soil profile/boring logs will be prepared by Atlantic Testing Laboratories.
8.
Hydraulics
The hydraulic model was developed using the as-built record plans, inspection reports for the existing
bridge (BIN 3348560), NYS stream stats, USGS gauge stations, and FEMA maps. The Croton River is a
relatively straight flowing river with several manmade features built within the river channel including the
Black Rock Dam located approximately 650 ft upstream of the Quaker Bridge Road Bridge. The most
notable manmade feature affecting stream flow data is the Croton Dam. The hydraulic model determines
the water surface elevations for the 50- and 100-yr storm events as required per NYSDOT Bridge Manual
2.4.3. Flow data for the 50- and 100-yr storm events came from NYS Stream Stats and are 10,800 cf and
12,800 cf respectively. As part of testing and calibrating the model to ensure accuracy, flow data for the
Hurricane Irene storm event measured by an upstream USGS gauging station was entered in the model.
The Irene storm event produced a flow of 22,600 cf, and the hydraulic model was adjusted to reflect water
surface elevations similar to documented observations.
The hydraulic analysis for the existing Quaker Bridge Road Bridge over the Croton River indicates water
surface elevations at the structure inlet of 31.7 ft and 33.0 ft for the 50- and 100-yr storms respectively.
With the low chord at elevation 40.9 ft for the existing structure, there is 9.2 ft and 7.9 ft of freeboard
provided for each respective storm event.
Summary of Existing Hydraulics
Drainage Area, 377 square miles
Design Flood
Base Flood
Recurrence Interval (years)
50
100
Peak Discharge (ft3/s)
10,800
12,800
WSE at Structure Inlet (ft)
31.7
33.0
Freeboard Provided (ft)
9.2
7.9
Average Velocity thru Structure (ft/s)
13.8
14.6
Hydraulic analyses were performed for both a proposed structure utilizing conventional concrete
abutments and beams and a twin-leaf arch structure. The low chord for the proposed conventional
structure is set at 39.2 ft and the arch crown is at 41.1 ft. Based on the analyses, the water surface
elevations for the conventional structure did not change from the existing. For the arch structure, the
water surface elevations were 31.7 ft and 33.1 ft respectively for the 50- and 100-yr storm event. Water
surface elevation for the 100 yr storm increased slightly when compared to existing for the arch
superstructure option. Freeboard provided by the conventional structure is at 7.5 ft and 6.2 ft respectively
for the 50- and 100-yr storm event. For the arch, freeboard provided is at 9.4 ft and 8.0 ft respectively for
the 50- and 100-yr storm event. See tables below for a summary of the hydraulic information.
Quaker Bridge Rd over Croton River
Draft Scope Summary Memorandum
November 17, 2017
Page 8 of 11
Summary of Proposed Hydraulics – Steel Superstructure
Drainage Area, 377 square miles
Design Flood
Base Flood
Recurrence Interval (years)
50
100
Peak Discharge (ft3/s)
10,800
12,800
WSE at Structure Inlet (ft)
31.7
33.0
Freeboard Provided (ft)
7.5
6.2
Average Velocity thru Structure (ft/s)
13.8
14.6
Summary of Proposed Hydraulics – Twin-leaf Arch
Drainage Area, 377 square miles
Design Flood
Base Flood
Recurrence Interval (years)
50
100
Peak Discharge (ft3/s)
10,800
12,800
WSE at Structure Inlet (ft)
31.7
33.1
Freeboard Provided
(ft)
@ arch crown
9.4
8.0
@ face of abutments
-1.5
-2.9
Average Velocity thru Structure (ft/s)
14.0
15.1
9.
Utilities
Overhead utilities are located within the project area along the upstream side of the existing bridge. Utility
lines are approximately 35 ft to 45 ft away from the upstream fascia. The utilities consist of electric and
telephone/cable lines owned by Con Edison and Verizon respectively. It is anticipated that these lines will
need to be temporarily relocated to facilitate erection of the new beams.
Quaker Bridge Rd over Croton River
Draft Scope Summary Memorandum
November 17, 2017
Page 9 of 11
10.
Right of Way
Right-of-way acquisitions are required in Alternative 2A. There are four properties owned by the Village of
Croton on Hudson surrounding the highway boundary on the north end of the bridge. In the northeast
quadrant, there is a private property owned by Louis Pinkham and Chao Dai, and in the southeast
quadrant, there is a parcel of land owned by NYSDEC. It is anticipated that FEE takings will be required from
all four of the Village of Croton on Hudson parcels, and one Temporary Easement Taking will be required
from the private parcel.
Table 10.1-A - Summary of ROW Acquisitions
Tax Map #
Property Owner
Area (SF)
Type of Acquisition
68.18-1-42 & 79.06-1-2
Village of Croton On
Hudson
2500
FEE Taking
68.18-2-4
Village of Croton On
Hudson
400
FEE Taking
68.18-2-1
Village of Croton On
Hudson
2000
FEE Taking
68.18-3-10
Louis V. Pinkham &
Chao Dai
3090
Temporary Easement
11.
Environmental
11.1 SEQR
Westchester County is the SEQR lead agency. In accordance with 6 NYCRR, Part 617, “Procedures for
Implementation of State Environmental Quality Review Act”, the project is a SEQR Type II Action, therefore
no further SEQR processing is required.
11.2 SHPO
A consultation with the New York State Historic Preservation Office has been initiated for the Quaker
Bridge Road Bridge Study. The initial screening on the NYSHPO website did not identify any other cultural
resources located within or immediately adjacent to the project site other than the bridge itself, which is
eligible for National Register listing. Hartgen Archeological Associates, Inc. has completed a Historic
American Engineering Record (HAER) Level II Documentation package. No determination has been made at
this time.
11.3 Environmental Screenings
An environmental screening of the project area was performed and it has been determined that the
proposed construction will not have an impact nor adverse affect on any of the following:
Floodplains (Flood elevations remain the same);
Prime or unique agricultural land;
Agricultural districts, when more than one acre may be affected;
Water resources, including lakes, reservoirs, rivers and streams;
Water supply sources;
Quaker Bridge Rd over Croton River
Draft Scope Summary Memorandum
November 17, 2017
Page 10 of 11
Designated wild, scenic and recreational rivers;
Unique ecological, natural wooded or scenic areas;
Rare, threatened or endangered species;
Any area designated as a critical environmental area pursuant to 6 NYCRR, Part 617
11.3.1 Wetlands
An initial review on the NYSDEC Environmental Resource Mapper, accessed on August 15, 2017, indicates
there are no NYSDEC regulated freshwater wetlands within the project area. It is anticipated that no
impacts to wetlands will occur as a result of this project.
11.3.2 Surface Waterbodies and Watercourses
The Croton River is classified by the NYSDEC as a class B stream through the project site. The best usage for
Class “B” water is for swimming and other contact recreational uses, but not for drinking water.
This construction project will require substructure work that will occur in the stream. Stream work, as well
as any work that may result in suspension of sediment, can be accomplished any time of the year with no
seasonal restriction dates.
11.3.3 Endangered and Threatened Species
The USFWS IPAC system, accessed August 16, 2017, indicates one endangered and one threatened species
within the project area. The endangered species include the Indiana Bat and the threatened species is the
Northern Long-eared Bat. Since this project will likely require a federal permit from the US Army Corp of
Engineers, the regulations enforced by the USFWS to protect endangered and threatened species are
mandatory to follow.
The Indiana Bat is known to occur at elevations below 900’ NGVD within 10 to 40 miles away from the
nearest hibernaculum. Their roosting habitat is in trees greater than 4” in diameter. The project site has an
approximate elevation of 45’ NGVD and is located approximately 20 miles from the nearest hibernaculum
located at Williams Lake Roost Site. The Northern Long-Eared Bat whose range encompasses all of New
York State, is proposed for inclusion on the USFWS Endangered Species List. To ensure that this project will
not adversely impact the Indiana or Northern Long-eared bat populations, tree removals shall occur
between October 1 and March 31.
11.4 Anticipated Environmental Permits
The proposed project will require a New York Department of Environmental Conversation (NYSDEC)
permits for stream disturbance and 401 water quality certification. In addition, a Temporary Revocable
Permit from NYSDEC will be required for temporary access to NYSDEC land during construction.
It is anticipated that project will proceed under the U.S. Army Corps of Engineers (ACOE) Nationwide
Permit #3.
Quaker Bridge Rd over Croton River
Draft Scope Summary Memorandum
November 17, 2017
Page 11 of 11
12.
Project Schedule
Project Schedule
Milestone
Date
Stakeholder Meeting
February 2018
Address Stakeholder Comments
April 2018
Final Report
May 2018
ACCEPTANCE OF FINAL REPORT: _________________________________ DATE: _________________
Responsible Local Official
Appendices
Preferred Alternative Preliminary Plans
Preferred Alternative Estimate
Alternative Comparison Table
Dismissed Alternative Plan Views
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET. WALL
#13 KV
P.P.
EDGE OF WATER
EDGE OF WATER
EDGE OF WATER
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
W 5
P.P.
WOODS
SE.INV.=36.82
N.INV.=38.47
T.F.=39.57
C.B.
STONE LINED DITCH
ELEV.=55.80
IN HEAD WALL
BOX CUT
B.M.
M 2+00
M 3+00
M 4+00
M 5+00
M 2+54.22
PCC
M 2+90.59
PT
M 3+91.07
PC
M 4+53.35
PT
S 1+00
S 2+00
S 2+20
S 2+20
S 1+00.00
POB
S 2+20.34
POE
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_01.dgn
11/17/2017
mhunt
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
25
25
30
30
30
30
30
30
30
30
30
30
30
35
35
35
35
35
35
35
35
35
35
35
35
35
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
45
45
45
45
45
45
45
45
45
50
50
50
50
50
50
50
50
55
55
55
55
55
55
55
60
60
60
60
60
60
65
65
65
65
65
70
TM 68.18-1-42
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
BK. PG.
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-4
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
BK. PG.
CHAO DAI
LOUIS V. PINKHAM AND
LANDS N/F OF
M 1+26.29
PC
35
40
50
W 57 13 KV
P.P.
DITCH
M 5+42
M 5+42
M 5+41.86
POE
35
40
45
50
55
60
65
70
75
80
100'-0" SPAN
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
5'-0" SHLDR.
1'-0" SHLDR.
OUT TO OUT
31'-4"
CLEAR WIDTH
28'-0"
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
5'-0" SHLDR.
SHLDR.
1'-0"
TO RTE 129
POST ROAD
TO ALBANY
ROAD EAST
QUAKER BRIDGE
CURVE #2
CURVE #3
ROAD
QUAKER BRIDGE
STA. M 2+04.50
BRGS.
c
STA M 2+92.25
BEGIN BRIDGE
STA. 3+96.75
END BRIDGE
GRID
NORTH
CURVE #1
R
L
T
=
=
=
=
Dc
=
= STA.
= STA.
R
L
T
=
=
=
=
Dc
=
= STA.
= STA.
CONCRETE WINGWALL (TYP.)
PROPOSED CAST-IN-PLACE
1'-0" SHLDR.
1'-0" SHLDR.
, STA. LINE, AND H.C.L.
c
PROPOSED QUAKER BRIDGE ROAD
WALL (TYP.)
PROPOSED RETAINING
, STA. LINE, AND H.C.L.
c
BRIDGE ROAD EAST
PROPOSED QUAKER
TO BE REMOVED
EXISTING SUPERSTRUCTURE
AZ 41°9'46"
AZ 41°9'46"
CROTON RIVER
BRIDGE ROAD
TO QUAKER
END SECTION (TYP.)
GALVANIZED
STRUCTURE (TYP.)
PROPOSED DRAINAGE
CULVERT PIPE (TYP.)
PROPOSED CROSS
RECONSTRUCTION
BEGIN FULL DEPTH
STA. S 1+10.00
RECONSTRUCTION
BEGIN FULL DEPTH
STA. M 1+26.00
ROAD EAST
QUAKER BRIDGE
ST-1
1
PROPOSED PLAN
R
L
T
=
=
=
=
Dc
=
CURVE 1
= STA.
= STA.
PC
PCC
40°43'16.22"
180.00'
127.92
66.80'
CURVE 2
PCC
PT
38.00'
150°46'42.12"
36.37'
19.72
54°50'38.67"
CURVE 3
PT
27.42'
M 1+26.9
M 2+54.22
M 2+54.22
M 2+90.59
CURVE #3
PC
M 3+91.07
M 4+53.35
51.00'
62.28'
0
10
20
30
40'
10
1" = 20'
LANE
TRAVEL
VARIES
LANE
TRAVEL
VARIES
STA. 3+94.50
BRGS.
c
STA. M 5+42.00
RECONSTRUCTION
END FULL DEPTH
GUTTER
CONCRETE
PROPOSED
ASPHALT CURB
PROPOSED
58'29.36''
n
AZ 238
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_elv_01.dgn
10/5/2017
dborjas
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
DATUM EL. 10.00
100'-0" SPAN
STA. M 2+94.50
BRGS.
c
STA. M 3+94.50
BRGS.
c
ORIGINAL GROUND
ABUTMENT (TYP.)
CONCRETE CANTILEVER
PROPOSED CAST-IN-PLACE
WINGWALL (TYP.)
PROPOSED CONCRETE
M 4+22.53 & S 2+20.34
EQUALITY
STATION
RAILING (FOUR-RAIL)
PROPOSED STEEL BRIDGE
TRANSITION RAIL (TYP.)
PROPOSED BRIDGE
RECONSTRUCTION
BEGIN FULL DEPTH
STA. M 1+26.00
(TYP.)
BEAM GUIDERAIL
PROPOSED BOX
GRADE
PROPOSED
(STEEL BEAMS SHOWN)
TYPE TO BE EVALUATED
PROPOSED SUPERSTRUCTURE
DHW EL. 31.7
HYDRAULIC DATA
EXIST
PROP.
100 YR
FLOOD
DESIGN
FLOOD
BASE
RECURRENCY INTERVAL
@ PT. OF MAX BACKWATER
HIGH WATER ELEVATION
PEAK DISCHARGE cfs
2
50 YR
10,800
12,800
31.7
33.0
0
10
20
30
40'
10
1" = 20'
ST-2
2
PROPOSED ELEVATIONS
DATUM EL. 10.00
ORIGINAL GROUND
TRANSITION RAIL (TYP.)
PROPOSED BRIDGE
RECONSTRUCTION
BEGIN FULL DEPTH
STA. M 1+26.00
(TYP.)
BEAM GUIDERAIL
PROPOSED BOX
GRADE
PROPOSED
RAILING (FOUR-RAIL)
PROPOSED STEEL BRIDGE
M 4+22.53 & S 2+20.34
EQUALITY
STATION
100'-0" SPAN
STA. M 2+94.50
BEGIN OPENING
STA. M 3+94.50
END OPENING
DHW EL. 31.7
FOUNDATION (TYP.)
CONCRETE FOOTING
PROPOSED CAST-IN-PLACE
WALL (TYP.)
PRECAST SPANDREL
STEEL SUPERSTRUCTURE ELEVATION
HYDRAULIC DATA
EXIST
PROP.
100 YR
FLOOD
DESIGN
FLOOD
BASE
RECURRENCY INTERVAL
@ PT. OF MAX BACKWATER
HIGH WATER ELEVATION
PEAK DISCHARGE cfs
2
50 YR
10,800
12,800
31.7
33.0
WINGWALL (TYP.)
PROPOSED CONCRETE
31.7
33.1
33.0
31.7
DRAINAGE AREA = 337 mi
DRAINAGE AREA = 337 mi
TWIN-LEAF ARCH SUPERSTRUCTURE ELEVATION
FREEBOARD
9.2'
LEAF ARCH SHOWN)
(PRECAST CONCRETE TWIN
TYPE TO BE EVALUATED
PROPOSED SUPERSTRUCTURE
FREEBOARD
9.4'
FREEBOARD
-1.5'
@ DESIGN FLOOD = 13.8 ft/s
AVG. VELOCITY THRU STRUCTURE
@ DESIGN FLOOD = 14.0 ft/s
AVG. VELOCITY THRU STRUCTURE
SHLDR.
5'-0"
WEARING SURFACE
WITH INTEGRAL
SUPERSTRUCTURE SLAB
2.0%
2.0%
T.G.L.
(TYP.)
RAILING (FOUR-RAIL)
PROPOSED STEEL BRIDGE
TYPICAL BRIDGE SECTION
SHLDR.
1'-0"
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
SHLDR.
5'-0"
SCALE: 1/8" = 1'-0"
28'-0" APPROACH SLAB
2.0%
2.0%
T.G.L.
(TYP.)
TRANSITION RAIL
PROPOSED BRIDGE
GROUND
ORIGINAL
(TYPE 2 FRICTION)
WEARING SURFACE
SLAB WITH INTEGRAL
1'-0" CONCRETE APPROACH
TYPE II
12" SUBBASE COURSE
SCALE: 1/8" = 1'-0"
TYPICAL BRIDGE APPROACH SECTION
SHLDR.
2'-3"
SHLDR.
5'-0"
SHLDR.
2'-3"
BREAK
BREAK
SHLDR.
1'-0"
2.0%
T.G.L.
2.0%
6.0%
6.0%
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
c
PROPOSED
(TYP.)
BEAM GUIDERAIL
PROPOSED BOX
31'-4" OUT-TO-OUT
TYPE II
12" SUBBASE COURSE
80 SERIES COMPACTION
1•" 9.5 F3 TOP COURSE HMA,
80 SERIES COMPACTION
2•" 19 F9 BINDER COURSE HMA,
80 SERIES COMPACTION
5" 37.5 F9 BASE COURSE HMA,
(TYP.)
TURF (ROADSIDE)
4" TOPSOIL & ESTABLISH
GROUND
ORIGINAL
SCALE: 1/8" = 1'-0"
TYPICAL HIGHWAY SECTION
SHLDR.
1'-0"
SHLDR.
2'-3"
BREAK
VARIES
SHLDR.
TRAVEL LANE
11'-0"
6.0%
2.0%
T.G.L.
2.0%
6.0%
SHLDR.
1'-0"
(TYP.)
WINGWALL
CONCRETE
PROPOSED
SCALE: 1/8" = 1'-0"
2
1
TURF (ROADSIDE)
4" TOPSOIL & ESTABLISH
GROUND
ORIGINAL
TO REMAIN
RETAINING WALL
EXISTING CONCRETE
80 SERIES COMPACTION
1•" 9.5 F3 TOP COURSE HMA,
80 SERIES COMPACTION
2•" 19 F9 BINDER COURSE HMA,
80 SERIES COMPACTION
5" 37.5 F9 BASE COURSE HMA,
TYPE II
COURSE
12" SUBBASE
TYPICAL HIGHWAY SECTION
ST-3
3
TYPICAL SECTIONS - 01
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
c
PROPOSED
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
c
PROPOSED
TRAVEL LANE
11'-0"
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
c
PROPOSED
TYPE TO BE EVALUATED
PROPOSED SUPERSTRUCTURE
(TYP.)
BEAM GUIDERAIL
PROPOSED BOX
RETAINING WALL
5'-0"
STA. M 1+26.00 TO STA. M 1+80.00
STA. M 1+80.00 TO STA. M 2+77.00
T.G.L.
80 SERIES COMPACTION
1•" 9.5 F3 TOP COURSE HMA,
80 SERIES COMPACTION
2•" 19 F9 BINDER COURSE HMA,
80 SERIES COMPACTION
5" 37.5 F9 BASE COURSE HMA,
2.0%
6.0%
BREAK
SHLDR.
2'-3"
SHLDR.
1'-0"
(TYP.)
TURF (ROADSIDE)
4" TOPSOIL & ESTABLISH
2.0%
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
c
PROPOSED
SHLDR.
2'-3"
BREAK
6.0%
(TYP.)
BEAM GUIDERAIL
PROPOSED BOX
SHLDR.
1'-0"
TRAVEL LANE
VARIES
TRAVEL LANE
VARIES
TYPE II
COURSE
12" SUBBASE
2
1
SCALE: 1/8" = 1'-0"
TYPICAL HIGHWAY SECTION
STA. M 4+40.00 TO STA. M 5+42.00
2.0%
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_typ_01.dgn
10/5/2017
dborjas
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
ST-4
4
TYPICAL SECTIONS - 02
SHLDR.
1'-0"
SHLDR.
2'-3"
BREAK
6.0%
2.0%
SHLDR.
1'-0"
2.0%
(TYP.)
BEAM GUIDERAIL
PROPOSED BOX
GROUND
ORIGINAL
80 SERIES COMPACTION
1•" 9.5 F3 TOP COURSE HMA,
80 SERIES COMPACTION
2•" 19 F9 BINDER COURSE HMA,
80 SERIES COMPACTION
5" 37.5 F9 BASE COURSE HMA,
TYPE II
COURSE
12" SUBBASE
(TYP.)
TURF (ROADSIDE)
& ESTABLISH
4" TOPSOIL
SCALE: 1/8" = 1'-0"
TYPICAL HIGHWAY SECTION
1
VARIES
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
c
PROPOSED
TRAVEL LANE
9'-0"
PROPOSED RETAINING WALL
TRAVEL LANE
9'-0"
ASPHALT CURB
5'-0"
CONCRETE GUTTER
STA. S 1+10.00 TO STA. S 1+84.00
SHLDR.
1'-0"
SHLDR.
2'-3"
BREAK
6.0%
2.0%
SHLDR.
1'-0"
2.0%
(TYP.)
BEAM GUIDERAIL
PROPOSED BOX
GROUND
ORIGINAL
80 SERIES COMPACTION
1•" 9.5 F3 TOP COURSE HMA,
80 SERIES COMPACTION
2•" 19 F9 BINDER COURSE HMA,
80 SERIES COMPACTION
5" 37.5 F9 BASE COURSE HMA,
TYPE II
COURSE
12" SUBBASE
(TYP.)
TURF (ROADSIDE)
& ESTABLISH
4" TOPSOIL
SCALE: 1/8" = 1'-0"
TYPICAL HIGHWAY SECTION
1
VARIES
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
c
PROPOSED
ASPHALT CURB
CONCRETE GUTTER
STA. S 1+84.00 TO STA. S 2+20.00
TRAVEL LANE
VARIES
VARIES
PROPOSED WINGWALL
TRAVEL LANE
VARIES
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_typ_02.dgn
10/5/2017
dborjas
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
0
20
40
60
80'
HORIZONTAL SCALE
0
10
20'
VERTICAL SCALE
ST-5
5
PROFILE
THEORETICAL GRADE LINE (T.G.L.)
LEVEL
-4.00%
-6.00%
-2.00%
+2.00%
+4.00%
+6.00%
LT. E.O.P. (e=-2.00%)
LEVEL
-4.00%
-6.00%
-2.00%
+2.00%
+4.00%
+6.00%
BANKING DIAGRAM
RT. E.O.P. (e=-2.00%)
15
20
25
30
35
40
45
50
55
60
65
65
15
20
25
30
35
40
45
50
55
60
65
65
M 1+00
M 1+00
M 2+00
M 3+00
M 4+00
M 5+00
M 6+00
41.05
40.97
42.39
43.89
45.39
46.89
50.44
56.05
PVI M 1+26.00
PVC M 1+53.06
ELEV 40.99
LOW M 1+77.07
ELEV 40.75
PVI M 1+83.06
ELEV 40.39
L = 60.00'
G1 = -2.00%
G2 = 3.00%
E= 0.37'
HSD = 108'
PVT M 2+13.06
ELEV 41.29
PVC M 4+00.00
ELEV 46.89
PVI M 4+25.00
ELEV 47.64
L = 50.00'
G1 = 3.00%
G2 = 11.21%
E= 0.51'
HSD = 63'
PVT M 4+50.00
ELEV 50.44
-2.00%
3.00%
11.21%
PROPOSED GRADE
ORGINAL GROUND
QUAKER BRIDGE ROAD
42.07
41.03
55.75
51.21
41.30
40.43
STATION EQUALITY
STA. M 4+22.53 & S 2+20.34
ELEV. 47.98
ELEV 41.53
BEGIN FULL DEPTH RECONSTRUCTION
PVI M 5+42.00
ELEV 60.74
RECONSTRUCTION
END FULL DEPTH
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_pro_01.dgn
10/5/2017
dborjas
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
0
20
40
60
80'
HORIZONTAL SCALE
0
10
20'
VERTICAL SCALE
ST-6
6
PROFILE
THEORETICAL GRADE LINE (T.G.L.)
LEVEL
-4.00%
-6.00%
-2.00%
+2.00%
+4.00%
+6.00%
LT. E.O.P. (e=-2.00%)
LEVEL
-4.00%
-6.00%
-2.00%
+2.00%
+4.00%
+6.00%
RT. E.O.P. (e=-2.00%)
BANKING DIAGRAM - QUAKER ROAD EAST
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_pro_02.dgn
10/5/2017
dborjas
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
35
40
45
50
55
60
65
65
35
40
45
50
55
60
65
65
S 1+00
S 1+00
S 2+00
S 3+00
58.15
53.33
49.51
58.15
PVC S 1+52.69
ELEV 53.07
PVI S 1+72.69
ELEV 51.15
L = 40.00'
G1 = -9.64%
G2 = -6.00%
E= 0.18'
HSD = 144'
PVT S 1+92.69
ELEV 49.95
-9.64%
-6.00%
-8.43%
ORGINAL GROUND
PROPOSED GRADE
QUAKER BRIDGE ROAD EAST
53.48
49.61
STATION EQUALITY
STA. M 4+22.53 & S 2+20.34
ELEV. 47.98
ELEV 57.22
BEGIN FULL DEPTH RECONSTRUCTION
STA S 1+10.00
N:\Projects\2016\116-043 Quaker Bridge\comps\estimate\Prelim_Est2A - Replace on Existing - Offsite Detour
10/6/2017
Item No.
Description
Unit
Quantity
Unit Price
Total Cost
201.06
CLEARING AND GRUBBING
LS
1
$50,000.00
$50,000.00
202.120001
REMOVING EXISTING SUPERSTRUCTURES
LS
1
$400,000.00
$400,000.00
202.19
REMOVAL OF SUBSTRUCTURES
CY
278
$500.00
$139,000.00
203.02
UNCLASSIFIED EXCAVATION AND DISPOSAL
CY
670
$75.00
$50,250.00
203.03
EMBANKMENT IN PLACE
CY
429
$50.00
$21,450.00
203.21
SELECT STRUCTURE FILL
CY
289
$115.00
$33,235.00
206.01
STRUCTURE EXCAVATION
CY
1865
$75.00
$139,875.00
209.1801
ROLLED EROSION CONTROL PRODUCT, CLASS I TYPE A, SHORT TERM
SY
56
$10.00
$560.00
304.12
SUBBASE COURSE, TYPE 2
CY
452
$100.00
$45,200.00
402.128903
12.5 F9 TOP COURSE HMA, SHOULDER COURSE,80 SERIES COMPACTION
TON
95
$250.00
$23,750.00
402.198903
19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION
TON
164
$250.00
$41,000.00
402.378903
37.5 F9 BASE COURSE HMA, 80 SERIES COMPACTION
TON
338
$250.00
$84,500.00
552.2101
ROCK SOCKETS FOR SOLDIER PILE AND LAGGING WALL
LF
259
$2,250.00
$582,750.00
552.2201
SOLDIER PILES FOR SOLDIER PILE AND LAGGING WALL
LF
689
$325.00
$223,925.00
552.230301
PRECAST CONCRETE PANEL LAGGING FOR SOLDIER PILE AND LAGGING WALL
SF
5418
$75.00
$406,350.00
555.08
FOOTING CONCRETE, CLASS HP
CY
151
$800.00
$120,800.00
555.09
CONCRETE FOR STRUCTURES, CLASS HP
CY
249
$1,600.00
$398,400.00
556.03
STUD SHEAR CONNECTORS FOR BRIDGES
EACH
2583
$5.00
$12,915.00
557.0102
SUPERSTRUCTURE SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM FORMWORK REQUIRED - TYPE 2 FRICT
SY
364
$425.00
$154,700.00
557.2002
STRUCTURAL APPROACH SLAB WITH INTEGRAL WEARING SURFACE - TYP E 2 FRICTION
SY
63
$325.00
$20,475.00
558.02
LONGITUDINAL SAWCUT GROOVING OF STRUCTURAL SLAB SURFACE
SY
388
$15.00
$5,820.00
564.0501
STRUCTURAL STEEL, TYPE 1
LS
1
$590,000.00
$590,000.00
564.20010008
HOT-DIP GALVANIZING OF STRUCTURAL STEEL
LB
116020
$1.00
$116,020.00
565.2022
TYPE E.B. FIXED BEARING (56 TO 111 KIPS)
EACH
4
$5,000.00
$20,000.00
565.2032
TYPE E.B EXPANSION BEARING (56 TO 111 KIPS)
EACH
4
$5,000.00
$20,000.00
568.51
STEEL BRIDGE RAILING (FOUR RAIL)
LF
212
$250.00
$53,000.00
568.70
TRANSITION BRIDGE RAILING
LF
128
$175.00
$22,400.00
603.171316
GALVANIZED STEEL END SECTIONS-PIPE (2-2/3" X 1/2" CORRUGATIONS) 21 INCH DIAMETER, 16 GAUGE
EACH
3
$500.00
$1,500.00
603.9815
SMOOTH INTERIOR CORRUGATED POLYETHYLENE CULVERT AND STORM DRAIN 15 INCH DIAMETER
LF
130
$60.00
$7,800.00
604.300611
RECTANGULAR DRAINAGE STRUCTURE TYPE F FOR #11 WELDED FRAME
LF
20
$1,500.00
$30,000.00
606.10
BOX BEAM GUIDE RAILING
LF
342
$40.00
$13,680.00
606.120101
BOX BEAM END PIECE
EACH
1
$600.00
$600.00
619.01
BASIC WORK ZONE TRAFFIC CONTROL
LS
1
$200,000.00
$200,000.00
620.05
STONE FILLING (HEAVY)
CY
311
$120.00
$37,320.00
625.01
SURVEY OPERATIONS
LS
1
$40,000.00
$40,000.00
637.12----25
ENGINEER'S FIELD OFFICE - TYPE 2
MNTH
9
$5,000.00
$45,000.00
637.34
OFFICE TECHNOLOGY AND SUPPLIES
DC
10000
$1.00
$10,000.00
Construction Cost
$4,163,000
Wetland Mitigation
$0
Incidentals (25%)
$1,041,000
Subtotal 1
$5,204,000
Field Change Order
$261,000
Subtotal 2
$5,465,000
Mobilization (4%)
$219,000
Subtotal 3
$5,684,000
Design
$750,000
Construction Inspection
$500,000
ROW Costs
$100,000
Total Cost
$7,100,000
Oct-17
QUAKER BRIDGE ROAD OVER CROTON RIVER
CME#: 116-043
Preliminary Engineer's Estimate - Alternative 2A Replacement on existing alignment with detour
Quaker Bridge Road over Croton River
Town of Cortlandt
Westchester County
Revised 10/6/2017
Page 1
Alternatives Comparison Table
Description
Bridge
Span &
Road-
way
Width
Maintenance
of Traffic
Right-of-
Way
SHPO
General Constructability
Concerns
Structure
Type
Options
Total
Project
Cost
Pros
Cons
1A
Bridge
Rehabilitation
(Road Closure)
98'-0"
15’-6”
Road Closed
Offsite Detour
None
• Retains
historic
register
eligible truss
• No new
ground
disturbance
• Use existing approaches
for staging
• No utility Relocation
• Existing
truss to
remain
$5.7M
• No new
ground
disturbance
• Lowest cost
alternative
• Road Closed
• Retains non-
standard bridge
features
• Less than 20-yr
design life
• Ongoing
maintenance
costs higher
than
replacement
alternatives
1B
Bridge
Rehabilitation
(Temporary
Bridge)
98'-0"
15’-6”
Onsite with
temporary
bridge
2 TEs:
• Village of
Croton on
Hudson
• Private
property
(Louis
Pinkham)
• Retains
historic
register
eligible truss
• New ground
disturbance
anticipated
for
construction
of temporary
bridge
substructures
• GRSS wall substructures
lengthened to create a
staging area.
• Steep grades and lack of
open space around site
pose a challenge to
launching or lifting a
temporary bridge.
• Utility relocation required
for temporary bridge
• Existing
truss to
remain
$7.0M
• Low traffic
impact
• Retains non-
standard bridge
features
• Less than 20-yr
design life
• New ground
disturbance
anticipated
• Temporary
bridge (added
cost)
• Utility conflicts
with temporary
bridge
• ROW Required
• Ongoing
maintenance
costs higher
than
replacement
alternatives
Quaker Bridge Road over Croton River
Town of Cortlandt
Westchester County
Revised 10/6/2017
Page 2
Alternatives Comparison Table
Description
Bridge
Span &
Road-
way
Width
Maintenance
of Traffic
Right-of-
Way
SHPO
General Constructability
Concerns
Structure
Type
Options
Total
Project
Cost
Pros
Cons
2A
Replacement
on Existing
Alignment
(Road Closure)
100'-0"
28’-0”
Road Closed
Offsite Detour
4 Fees:
• Village of
Croton on
Hudson
(3)
• Private
property
(Louis
Pinkham)
• Removes
historic
register
eligible truss
and
substructures
• No new
ground
disturbance
• Existing approaches used
for material storage and
crane setup
• New beam length limited
to 100 FT +/- for pre-
stressed concrete box
beams due to shipping
route.
• Steel I-beam can be
erected with a splice for
shorter individual beam
lengths
• Utility relocation required
for erection
• Pre-
stressed
concrete
box beam
units
• Twin Leaf
Arch
• Steel I-
Beam
$7.1M
• No new
ground
disturbance
• Standard
bridge
roadway
width
• Lowest cost
replacement
alternative
• 75+ year
design life
• Road closed
• Utility conflict for
erection of
beams
• No roadway
geometry
improvements
2B
Replacement
on Existing
Alignment
(Temporary
Bridge)
100'-0"
26’-0”
Onsite with
temporary
bridge
4 Fees:
• Village of
Croton on
Hudson
• Private
property
(Louis
Pinkham)
• Removes
historic
register
eligible truss
and
substructures
• New ground
disturbance
anticipated
for a
temporary
bridge
substructure
• GRSS Wall required for
staging
• Short duration road
closures during erection of
superstructure elements.
• Steep grades and lack of
open space around site
pose a challenge to
launching or lifting a
temporary bridge
• New beam length limited
to 100 FT +/- for pre-
stressed concrete box
beams due to shipping
route.
• Steel I-beam can be
erected with a splice for
shorter individual beam
lengths
• Pre-
stressed
concrete
box beam
units
• Twin Leaf
Arch
• Steel I-
Beam
$8.4M
• Standard
bridge
roadway
width
• 75+ year
design life
• Utility conflicts
with temporary
bridge
• New ground
disturbance
anticipated
• ROW Required
• Temporary
bridge (added
cost)
• Limited
construction
staging
areas/access
(added costs)
• No roadway
geometry
improvements
Quaker Bridge Road over Croton River
Town of Cortlandt
Westchester County
Revised 10/6/2017
Page 3
Alternatives Comparison Table
Description
Bridge
Span &
Road-
way
Width
Maintenance
of Traffic
Right-of-
Way
SHPO
General Constructability
Concerns
Structure
Type
Options
Total
Project
Cost
Pros
Cons
3
Replacement
on Adjacent
Alignment
(Upstream)
115'-0"
26’-0”
Onsite utilizing
existing bridge
3 Fees and 3
TEs:
• Village of
Croton on
Hudson
(2)
• Private
property
(Louis
Pinkham)
• Removes
historic
register
eligible truss
and
substructures,
but has the
potential to
retain, if
required.
• New ground
disturbance
anticipated
for a new
bridge
substructure
• GRSS Wall required for
staging
• Short duration road
closures during
construction
superstructure elements.
• New beam segments
limited to 100 FT +/- for
shipping (Splice Required)
• Utility relocation required
for new bridge
• Steel I-
Beam
$7.5M
• Standard
bridge
roadway
width
• 75+ year
design life
• Utility conflicts
with new bridge
location
• New ground
disturbance
anticipated
• ROW Required
• Limited
construction
staging
areas/access
(added costs)
• Impact to
retaining wall on
NW approach
4
Replacement
on a Diagonal
Alignment
(Upstream)
140'-0"
26’-0”
Onsite utilizing
existing bridge
2 Fees and 2
TEs:
• Village of
Croton on
Hudson
• Private
property
(Louis
Pinkham)
• Removes
historic
register
eligible truss
and
substructures,
but has the
potential to
retain, if
required.
• New ground
disturbance
anticipated
for new
bridge
substructure
• GRSS Wall required for
staging
• Short duration road
closures during
construction
superstructure elements.
• New beam segments
limited to 100 FT +/- for
shipping (Splice Required)
• Utility relocation required
for new bridge
• Steel I-
Beam
$7.9M
• Standard
bridge
roadway
width
• Improves
horizontal
approach
radius and
increases
stream
opening
• 75+ year
design life
• Utility conflicts
with new bridge
location
• New ground
disturbance
anticipated
• ROW Required
• Limited
construction
staging
areas/access
(added costs)
• Longer structure
(added costs)
Quaker Bridge Road over Croton River
Town of Cortlandt
Westchester County
Revised 10/6/2017
Page 4
Alternatives Comparison Table
Description
Bridge
Span &
Road-
way
Width
Maintenance
of Traffic
Right-of-
Way
SHPO
General Constructability
Concerns
Structure
Type
Options
Total
Project
Cost
Pros
Cons
5
Replacement
on a Diagonal
Alignment
(Road Closure)
140'-0"
26’-0”
Road Closed
Offsite Detour
2 Fees:
• Village of
Croton on
Hudson
• Private
property
(Louis
Pinkham)
• Removes
historic
register
eligible truss
and
substructures.
• New ground
disturbance
anticipated
for new
bridge
substructure
• Existing approaches used
for material storage and
crane setup.
• New beam segments
limited to 100 FT +/- for
shipping (Splice Required)
• Steel I-
Beam
$7.6M
• Improves
horizontal
approach
radius and
increases
stream
opening
• Standard
bridge
roadway
width
• Best
roadway
geometry
• 75+ year
design life
• Road Closed
• ROW Required
• Utility conflicts
with new bridge
• New ground
disturbance
anticipated
• Limited
construction
staging
areas/access
(added costs)
• Longer structure
(added costs)
PROJECT:
DATE:
FIGURE:
USER =
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_01.dgn
6/16/2017
MHunt
FILE NAME =
DATE/TIME =
GRID
NORTH
0
10
20
30
40'
10
1" = 20'
116-043
1
CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
R1 = 35'
R3 = 70'
ELECTRIC LINES
EXISTING OVERHEAD
R2 = 180'
ROAD CLOSURE (ALT 1A)
BRIDGE REHABILITATION -
JUNE 2017
DECK
STEEL GRATE
PROPOSED NEW
98'-0" SPAN
CLEAR ROADWAY
15'-6"
OUT-TO-OUT
17'-0"
TRUSS
OF
c
TRUSS
OF
c
RECONSTRUCTION
LIMITS OF ROADWAY
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET. WALL
#13 KV
P.P.
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
SLOT DRAIN
L
L
A
W
G
NI
W
E
G
DI
R
B
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
ELEV.=40.82
IN HEAD WALL
BOX CUT
B.M.
HEAD WALL
CONC.
POST
POST
W 5
P.P.
STONE RET. W
WOODS
8" CMP
INV.=20.98
15" CMP
SE.INV.=21.85
N.INV.=23.50
T.F.=24.60
C.B.
=31.65
INV.
=34.98
INV.
SIGN
CORTLANDT
TOWN OF
VAULT
DRAINAGE
LIMIT 30
VIL. SPEED
15 TONS &
WEIGHT LIMIT
LIMIT 30
& SPEED
NO PARKING
STONE LINED DITCH
PARKING
NO
SIGN
STREET
QUAKER BRIDGE ROAD EAST
BRIDGE WING WALL
TM 68.18-1-42
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
BK. PG.
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-4
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
BK. PG.
CHAO DAI
LOUIS V. PINKHAM AND
LANDS N/F OF
DRAFT
PROJECT:
DATE:
FIGURE:
USER =
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_02.dgn
6/16/2017
MHunt
FILE NAME =
DATE/TIME =
GRID
NORTH
0
10
20
30
40'
10
1" = 20'
116-043
2
CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
110'-0"
GRSS WALL (TYP.)
PROPOSED TEMPORARY
R3 = 70'
R1 = 35'
AREA (TYP.)
TEMPORARY STAGING
PROPOSED POSSIBLE
RELOCATED
ELECTRIC LINES TO BE
EXISTING OVERHEAD
BRIDGE
TEMPORARY
PROPOSED
R2 = 180'
TEMPORARY BRIDGE (ALT 1B)
BRIDGE REHABILITATION -
DECK
STEEL GRATE
PROPOSED NEW
CLEAR ROADWAY
15'-6"
OUT-TO-OUT
17'-0"
98'-0" SPAN
TRUSS
OF
c
TRUSS
OF
c
RECONSTRUCTION
LIMITS OF ROADWAY
CLEAR
24'-0" (MIN.)
TRAVEL LANE
12'-0"
TRAVEL LANE
12'-0"
JUNE 2017
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET. WALL
#13 KV
P.P.
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
SLOT DRAIN
L
L
A
W
G
NI
W
E
G
DI
R
B
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
ELEV.=40.82
IN HEAD WALL
BOX CUT
B.M.
HEAD WALL
CONC.
POST
POST
W 5
P.P.
STONE RET. W
WOODS
8" CMP
INV.=20.98
15" CMP
SE.INV.=21.85
N.INV.=23.50
T.F.=24.60
C.B.
=31.65
INV.
=34.98
INV.
SIGN
CORTLANDT
TOWN OF
VAULT
DRAINAGE
LIMIT 30
VIL. SPEED
15 TONS &
WEIGHT LIMIT
LIMIT 30
& SPEED
NO PARKING
STONE LINED DITCH
PARKING
NO
SIGN
STREET
QUAKER BRIDGE ROAD EAST
BRIDGE WING WALL
TM 68.18-1-42
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
BK. PG.
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-4
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
BK. PG.
CHAO DAI
LOUIS V. PINKHAM AND
LANDS N/F OF
DRAFT
PROJECT:
DATE:
FIGURE:
USER =
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_04.dgn
6/16/2017
MHunt
FILE NAME =
DATE/TIME =
GRID
NORTH
0
10
20
30
40'
10
1" = 20'
116-043
4
CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
110'-0"
BRIDGE
PROPOSED TEMPORARY
AREA (TYP.)
TEMPORARY STAGING
PROPOSED POSSIBLE
GRSS WALL (TYP.)
PROPOSED TEMPORARY
R3 = 80'
R1 = 35'
100'-0" SPAN
TRAVEL
9'-0"
TRAVEL
9'-0"
SHLDR.
5'-0"
SHLDR.
3'-0"
RELOCATED
ELECTRIC LINE TO BE
EXISTING OVERHEAD
R2 = 180'
ALIGNMENT (ALT 2B)
ALIGNMENT - TEMPORARY BRIDGE
BRIDGE REPLACEMENT ON EXISTING
CLEAR ROADWAY
26'-0"
LANE
LANE
TRAVEL LANE
12'-0"
TRAVEL LANE
12'-0"
CLEAR
24'-0" (MIN.)
JUNE 2017
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET. WALL
#13 KV
P.P.
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
SLOT DRAIN
L
L
A
W
G
NI
W
E
G
DI
R
B
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
ELEV.=40.82
IN HEAD WALL
BOX CUT
B.M.
HEAD WALL
CONC.
POST
POST
W 5
P.P.
STONE RET. W
WOODS
8" CMP
INV.=20.98
15" CMP
SE.INV.=21.85
N.INV.=23.50
T.F.=24.60
C.B.
=31.65
INV.
=34.98
INV.
SIGN
CORTLANDT
TOWN OF
VAULT
DRAINAGE
LIMIT 30
VIL. SPEED
15 TONS &
WEIGHT LIMIT
LIMIT 30
& SPEED
NO PARKING
STONE LINED DITCH
PARKING
NO
SIGN
STREET
QUAKER BRIDGE ROAD EAST
BRIDGE WING WALL
TM 68.18-1-42
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
BK. PG.
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-4
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
BK. PG.
CHAO DAI
LOUIS V. PINKHAM AND
LANDS N/F OF
DRAFT
PROJECT:
DATE:
FIGURE:
USER =
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_05.dgn
6/16/2017
MHunt
FILE NAME =
DATE/TIME =
GRID
NORTH
0
10
20
30
40'
10
1" = 20'
116-043
5
CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AREA (TYP.)
TEMPORARY STAGING
PROPOSED POSSIBLE
R1 = 48'
R2 = 70'
TRAVEL
9'-0"
TRAVEL
9'-0"
SHLDR.
3'-0"
SHLDR.
5'-0"
115'-0" SPAN
RELOCATED
ELECTRIC LINE TO BE
EXISTING OVEHEAD
ADJACENT ALIGNMENT (ALT 3)
BRIDGE REPLACEMENT ON UPSTREAM
CLEAR ROADWAY
26'-0"
LANE
LANE
JUNE 2017
BRIDGE CAN REMAIN
EXISTING TRUSS
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET. WALL
#13 KV
P.P.
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
SLOT DRAIN
L
L
A
W
G
NI
W
E
G
DI
R
B
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
ELEV.=40.82
IN HEAD WALL
BOX CUT
B.M.
HEAD WALL
CONC.
POST
POST
W 5
P.P.
STONE RET. WALL
WOODS
8" CMP
INV.=20.98
15" CMP
SE.INV.=21.85
N.INV.=23.50
T.F.=24.60
C.B.
=31.65
INV.
=34.98
INV.
SIGN
CORTLANDT
TOWN OF
VAULT
DRAINAGE
LIMIT 30
VIL. SPEED
15 TONS &
WEIGHT LIMIT
LIMIT 30
& SPEED
NO PARKING
STONE LINED DITCH
PARKING
NO
SIGN
STREET
QUAKER BRIDGE ROAD EAST
BRIDGE WING WALL
TM 68.18-1-42
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
BK. PG.
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-4
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
BK. PG.
CHAO DAI
LOUIS V. PINKHAM AND
LANDS N/F OF
DRAFT
PROJECT:
DATE:
FIGURE:
USER =
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_06.dgn
6/16/2017
MHunt
FILE NAME =
DATE/TIME =
GRID
NORTH
0
10
20
30
40'
10
1" = 20'
116-043
6
CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
140'-0" SPAN
20°0'0.0"
SKEW
SHLDR.
3'-0"
SHLDR.
5'-0"
TRAVEL
9'-0"
TRAVEL
9'-0"
R1 = 55'
R1 = 50'
GRSS WALLS AND FILL (TYP.)
STAGING AREA BUILT WITH
PROPOSED POSSIBLE TEMPORARY
LINE TO BE RELOCATED
EXISTING OVERHEAD ELECTRIC
DIAGONAL ALIGNMENT (ALT 4)
BRIDGE REPLACEMENT ON UPSTREAM
LANE
LANE
CLEAR ROADWAY
26'-0"
JUNE 2017
REMAIN
BRIDGE CAN
EXISING TRUSS
RECONSTRUCTION
LIMIT OF ROADWAY
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET. WALL
#13 KV
P.P.
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
SLOT DRAIN
L
L
A
W
G
NI
W
E
G
DI
R
B
ASPHALT
POST
POST
W 5
P.P.
STONE RET. WALL
WOODS
8" CMP
INV.=20.98
15" CMP
SE.INV.=21.85
N.INV.=23.50
T.F.=24.60
C.B.
=31.65
INV.
BRIDGE
ONE LANE
SIGN
CORTLANDT
TOWN OF
VAULT
DRAINAGE
LIMIT 30
VIL. SPEED
15 TONS &
WEIGHT LIMIT
STONE LINED DITCH
PARKING
NO
SIGN
STREET
QUAKER BRIDGE ROAD EAST
BRIDGE WING WALL
TM 68.18-1-42
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-1-2
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-4
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
BK. PG.
CHAO DAI
LOUIS V. PINKHAM AND
LANDS N/F OF
DRAFT
PROJECT:
DATE:
FIGURE:
USER =
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_07.dgn
6/16/2017
MHunt
FILE NAME =
DATE/TIME =
GRID
NORTH
0
10
20
30
40'
10
1" = 20'
116-043
7
CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
SHLDR.
3'-0"
SHLDR.
5'-0"
TRAVEL
9'-0"
140'-0" SPAN
R1 = 68'
TRAVEL
9'-0"
20°0'0.0"
SKEW
R1 = 110'
LINE TO BE RELOCATED
EXISTING OVERHEAD ELECTRIC
(ALT 5)
DIAGONAL ALIGNMENT - ROAD CLOSURE
BRIDGE REPLACEMENT ON UPSTREAM
CLEAR ROADWAY
26'-0"
LANE
LANE
JUNE 2017
REMOVED
BRIDGE TO BE
EXISTING TRUSS
RECONSTRUCTION
LIMIT OF ROADWAY
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET. WALL
#13 KV
P.P.
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
SLOT DRAIN
L
L
A
W
G
NI
W
E
G
DI
R
B
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
HEAD WALL
CONC.
POST
POST
W 5
P.P.
STONE RET. WALL
WOODS
8" CMP
INV.=20.98
15" CMP
SE.INV.=21.85
N.INV.=23.50
T.F.=24.60
C.B.
=31.65
INV.
=34.98
INV.
SIGN
CORTLANDT
TOWN OF
VAULT
DRAINAGE
LIMIT 30
VIL. SPEED
15 TONS &
WEIGHT LIMIT
STONE LINED DITCH
PARKING
NO
SIGN
STREET
QUAKER BRIDGE ROAD EAST
BRIDGE WING WALL
TM 68.18-1-42
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
BK. PG.
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-4
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
BK. PG.
CHAO DAI
LOUIS V. PINKHAM AND
LANDS N/F OF
DRAFT
LEGEND:
ROADWAY AND/OR PATH CONSTRUCTION
APPROXIMATE LIMIT OF ROADWAY FILL OR EXCAVATION FOR PREVIOUS
STRUCTURE CONSTRUCTION
APPROXIMATE LIMIT OF PREVIOUS FILL OR EXCAVATION FOR MISC.
BASE OF FOUNDATION)
AND/OR BACKFILL (LIMITS BASED ON A 1V:2H PROJECTION FROM THE
APPROXIMATE LIMIT OF PREVIOUS DEEP ABUTMENT EXCAVATION
0
15
30
45
60'
15
1" = 30'
PROJECT:
DATE:
116-043
FIGURE:
1
USER =
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\graphics\116-043_cpb_shpo_pln_01.dgn
11/15/2017
mhunt
FILE NAME =
DATE/TIME =
AREA OF POTENTIAL EFFECT MAP
GRID
NORTH
CONSTRUCTION
AREA OF POTENTIAL EFFECT FOR BRIDGE AND APPROACH ROADWAY
CONSTRUCTION ON PREVIOUSLY UNDISTURBED SOIL
AREA OF POTENTIAL EFFECT FOR BRIDGE AND APPROACH ROADWAY
BRIDGE
FLOW
SHPO # 17PR02639
CROTON RIVER BRIDGE STUDY
QUAKER BRIDGE ROAD BRIDGE OVER
11/2017
TM 68.18-1-42
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
BK. PG.
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-4
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
BK. PG.
CHAO DAI
LOUIS V. PINKHAM AND
LANDS N/F OF
TM 68.18-3-11
LIBER 11069, PAGE 103
MICHAEL I. WEINTRAUB CROTON TRUST
AS TRUSTEES OF THE
ANITA B. WEINTRAUB AND SANFORD WEINTRAUB
LANDS N/F OF
WOODS
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET. W
CONCRETE RET. WALL
#13 KV
P.P.
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
AREA
RIP RAP
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
HEAD WALL
CONC.
POST
POST
W 5
P.P.
STONE RET. WALL
WOODS
WOODS
WOODS
KEY PAD
BOLLARDS
CROTON RIVER
8" CMP
INV.=35.96
15" CMP
SE.INV.=36.82
N.INV.=38.47
T.F.=39.57
C.B.
=46.62
INV.
=49.95
INV.
PARKING
NO
W/LIGHT
P.P.
PILLAR
STONE
61.51
INV.=
P.P.
IRON GATE
WROUGHT
RAIL
GUIDE
WOOD
BRIDGE
ONE LANE
SIGN
CORTLANDT
TOWN OF
LIMIT 30
VIL. SPEED
15 TONS &
WEIGHT LIMIT
LIMIT 30
& SPEED
NO PARKING
STONE LINED DITCH
PARKING
NO
SIGN
STREET
QUAKER BRIDGE ROAD EAST
BRIDGE WING WALL
ELEV.=55.80
IN HEAD WALL
BOX CUT
B.M.
12" CMP
=43.13
INV.
=43.20
INV.
INV.=44.40
GRATE=45.80
SLOT DRAIN
VAULT
DRAINAGE
12" PVC
15" CMP
18" CMP
=41.7
INV.
HAER Level II Documentation
Quaker Bridge Road Bridge
Town of Cortlandt, Westchester County, New York.
(BIN 3348560)
NYS OPRHP 17PR02639
(HAA #5157-61)
Sponsored by:
Westchester County Department of Public Works and Transportation
Prepared By:
WALTER RICHARD WHEELER
HARTGEN ARCHEOLOGICAL ASSOCIATES, INC.
1744 Washington Avenue Extension
Rensselaer, New York 12144
PHONE (518) 283-0534
FAX (518) 283-6276
email: wwheeler@hartgen.com
www.hartgen.com
AN ACRA MEMBER FIRM
www.acra-crm.org
October 2017
Quaker Bridge Road Bridge
HAER No. NY-
Town of Cortlandt
Westchester County
New York
OUTLINE FORM REPORT
Historic American Engineering Record
National Park Service
Department of the Interior
Washington, D. C. 20240
HISTORIC AMERICAN ENGINEERING RECORD
QUAKER BRIDGE ROAD BRIDGE
HAER No. NY-
Location:
The Quaker Bridge Road Bridge is located approximately 6,500 feet southwest of
the Croton Dam, in the Town of Cortlandt, New York. The bridge carries Quaker
Bridge Road over the Croton River.
USGS Tarrytown, NY Quadrangle
UTM Zone 18N 594802 Easting 4562908 Northing
Owner:
Westchester County, New York
Significance:
J. A. Bonafide of the NYSOPRHP wrote the following statement of significance in
1994:
The Quaker Bridge Road Bridge (BIN 3348560) is architecturally significant as a
rare and outstanding example of a late nineteenth century Pratt Truss bridge. Built
by the New York City firm of Dean and Westbrook, the bridge retains an
outstanding degree of integrity. The bridge is further distinguished as the earliest
example of its type in the county.
PART I. HISTORICAL INFORMATION
A.
Physical History:
1.
Date of erection:
The bridge was constructed in 1894.
2.
Architect:
Bridge designers and contractors Dean & Westbrook of New York city designed
and built the bridge.
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 2)
3.
Original and subsequent owners, occupants, uses:
The bridge was initially owned by the Town of Croton; at an unknown date
ownership was transferred to Westchester County.
4.
Builder, Contractor, suppliers:
Dean & Westbrook, with materials provided by the Phoenix Iron Works, in
Phoenixville, PA. Some of the principal structural members of the bridge bear the
embossed mark of that firm.
5. Original plans and construction:
Unlocated.
6. Alterations and additions:
The bridge was altered by the replacement of its original latticed guard rails in c. 1938. At
that time the original wood decking, stringers and wheel guards were removed and replaced
with new wood decking consisting of 4” x 10” creosoted planks, with ¼” spacing between.
Over these ¼” thick rolled steep traffic treads were laid. Some of the lattice bars in the
vertical columns, top chord and end post were replaced in-kind at that time. This scope of
work is recorded in contract documents from the period; the annual report to the Board of
Supervisors described a slightly different scope of work:
This contract consisted of the removal of old steel bars, replacement of new
bars, and the painting of the bridge. The award was made on August 29th,
1938, to the lowest bidder, Vitale, Gagliardi, Pisani and Company, from
bids submitted August 24th, 1938, at the contract bid of $1,820.00
(Proceedings 1939: 650).
The work was reported complete as of 19 December 1938, and, according to a “final
estimate” had cost $1,784.25 (Proceedings 1939: 650).
Repairs to the framing in the summer of 1951 are recorded in embossed dates on
the flanges of principal members, some of which also record engineer’s initials. Despite
this, in the summer of 1954 it was reported that the bridge was “soon to be replaced by a
modern structure” (Hunt 1954: 88). This did not come to pass.
The next recorded alterations and repairs to the bridge occurred c. 1977. In that
year drawings were generated which detailed the replacement of the wood deck with new
concrete-filled 3” steel grid decking, and the installation of corrugated bridge rails, with
associated outriggers, stringers, and guide rail supports. This work was largely replaced in
1994, under the direction of Maser Sosinski & Associates, NYC, engineers, when new steel
stringers, new outriggers, and new steel grid decking was installed. The corrugated beam
type bridge railings installed in 1977 were reused in the new work.
In 2009, the bridge was rehabilitated. Work undertaken at that time included
painting, repairs to the wing walls and abutments, and some structural repairs and minor
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 3)
replacements. This work was accomplished under the direction of Lockwood, Kessler &
Bartlett, Inc., consulting engineers of Syosset, New York.
B.
Historical Context:
The Quaker Bridge for which Quaker Bridge Road was named, and which was
replaced by the current structure, was a covered bridge initially constructed in 1847.
The early history of this span has been recorded in a recent publication by the Croton-on-Hudson
Historical Society.
In 1807, New York State created the Croton Turnpike Company, which called for
the building of roads and bridges. By 1809, a new bridge carried Albany Post Road
traffic across the Croton River. The bridge was later rebuilt in 1830 by local Quaker
preacher William Purdy. He named the structure Quaker Bridge. The dam collapse
of 1841 swept the bridge away, but it was replaced again in 1847 (Croton-on-
Hudson Historical Society: 42).
A brief biography of the firm that designed and built the bridge, Dean & Westbrook, was published
in 1894, the same year the Quaker Bridge was built.
This firm have [sic] become widely and justly celebrated for reliability and skill as
bridge engineers and contractors. They established their business in 1871, and the
reputation they enjoy has been secured upon the legitimate basis of superior
workmanship and the substantial character of all construction. They are engineers,
designers and contractors for both railroad, highway, iron and steel, and stone
bridges, making a specialty of high-class work, and are recognized as authority
upon all matters pertaining to bridge building. They built the first electric
drawbridge in the United states [sic], at Bridgeport, Conn.; also one at Wilmington,
Del.; a magnificent stone arch bridge at New Brunswick, N. J., across the Raritan
River; over fifty bridges for Monmouth County. N. J., and thirty for Bergen County.
N. J.; the Washington Bridge between Stratford and Milford, Conn., for the counties
of New Haven and Fairfield, Connecticut; the Princess Louise Bridge at Winnipeg,
Manitoba, the first iron bridge built in the Canadian Northwest; three other bridges
at Winnipeg, and one at Emerson, Manitoba; a highway bridge at Harrisburg, Pa.,
over the Susquehanna River, seven-eighths of a mile long: a bridge for the Passaic
Park Company at Passaic, N. J.; and one at Woonsocket. R. I.: while they have also
designed and built several bridges for the Brazilian Government, and are now
engaged in designing a number of important bridges for the Engineering
Department of the State of New York, and their services are in constant and
important requisition throughout the country. The firm are earnest and unremitting
in their efforts to afford entire satisfaction to all their patrons, and are actuated in
all their undertakings by a laudable spirit of enterprise and an ambition to excel.
The co-partners. Messrs. C. W. Dean and J. A. Westbrook, are eminent in their
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 4)
profession and thoroughly practical in all their methods. Mr. Dean is a native of
Milan. O., a well-known resident of New York, and a member of the Ohio Society
and Colonial Club. Mr. Westbrook is a Pennsylvanian by birth, a citizen of
Englewood, N. J., and a director of the People's Bridge Company of Harrisburg, Pa
(New York 1894: 140).
Dean & Westbrook were responsible for the design of other Westchester County bridges, including
a concrete span at Harrison in 1890, and Pines Bridge over the Croton Lake, in 1896 (Supervisor
1891; Proceedings 1897:498). The Phoenix Bridge Company, headquartered in New York City,
has sometimes been attributed as the builders of the Quaker Bridge Road Bridge (Croton-on-
Hudson Historical Society: 42). It may be that that firm, which appears to have had a close working
relationship with Dean & Westbrook, undertook the actual assembly of the bridge on site.
PART II. ARCHITECTURAL INFORMATION
A.
General statement:
1.
Architectural Character:
The Quaker Bridge Road Bridge is a Pratt through-truss type bridge constructed of
cast and wrought iron elements. It is a representative example of what was once a
large group of vehicular bridges constructed in the late 19th and early 20th century,
but from which an ever-decreasing number of examples survive.
2.
Condition of fabric:
The bridge is in a fair state of repair.
B.
Description:
1.
Superstructure:
The superstructure of the bridge is comprised of two Pratt trusses consisting of
seven truss panels, each 14’-0” in length, for an overall length of 98’-0”. The
trusses are spaced 19’-2” apart, center-to-center. The deck width measures 16’-0”
in width, and there is a posted vertical clearance of 11’-5”. The portals are 16’-0”
high.
2.
Abutments and wingwalls:
The west (called north) abutment measures approximately 29’-6” in width.
Wingwalls extend approximately 59 feet and 64 feet from either side this abutment.
The east (called south) abutment measures 26’-3” in width; wingwalls measuring
approximately 29’-6” and 36 feet extend from this abutment. The abutments
consist of local granitic stone laid in mortar; the wingwalls are of the same material,
dry laid.
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 5)
3.
Plaques:
Construction plaques remain in situ at both portals of the bridge. That on the south
portal reads, from left to right:
Committee: Jas. F. Lawrence, Wm. R. Torne, Chas. W. Underhill.
Built on the site of the old “Quaker Bridge” by order of the Board
of Supervisors of Westchester County. Built by Dean & Westbrook,
Engineers & Contractors, New York.
A date plaque, affixed to the east side of the south portal, bears the date 1894.
The north portal plaques are of similar form, although the larger plaque lacks the
decorative cresting which is retained at the south. The construction plaque and the
date plaque bear the same information as recorded on those affixed to the south
portal.
C.
Site:
1.
Setting:
The Quaker Bridge Road Bridge is in a rural setting, located within a shallow valley
created by the Croton River. The adjacent areas are largely overgrown with second-
growth trees and underbrush. A hiking trail is located to the north and west of the
bridge site.
PART III. SOURCES OF INFORMATION
A.
Architectural drawings:
No drawings are known to survive for the initial construction of the bridge. Drawings
dating from as early as 1930 and as recently as 2009 exist. These include as-built drawings
by Lockwood, Kessler & Bartlett, Inc., of Syosset, New York, and are on file with the
Westchester County Department of Public Works and Transportation.
B.
Early Views:
Postcard views, reproduced here in the Supplemental Material section of this report, were
generated at the turn of the 19th century.
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 6)
C.
Bibliography:
Croton-on-Hudson Historical Society
2001 Croton-on-Hudson. Charleston, SC: Arcadia Publishing.
Hunt, Elliot Baldwin
1954 “Quaker Bridge,” The Quarterly Bulletin [Westchester County Historical Society] 30: 3
(Summer 1954), 83-89.
New York
1894 New York, 1894, Illustrated. New York: A. F. Parsons Publishing Co.
Proceedings
1897 Proceedings of the Board of Supervisors of Westchester County, N. Y. Session of 1896.
White Plains, NY: Press of The Westchester County Reporter.
1939 Proceedings of the Board of Supervisors of Westchester County, N. Y. Session of 1938.
White Plains, NY: Artcraft Press.
Supervisor
1891 “Supervisor’s and Town Officers’ Reports. Town of Harrison, 1890,” The Eastern State
Journal (White Plains, NY), 4 April 1891, 1.
D.
Likely Sources Not Yet Investigated:
None known.
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 7)
E.
Supplemental Material:
Figure 1. The previous bridge on the site of the Quaker Bridge Road Bridge (Collection Westchester County Historical
Society).
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 8)
Figure 2. Postcard dating between 1901 and 1906, from a photograph by J. A. Given. Printed by the Albertype
Company of Brooklyn, NY.
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 9)
Figure 3. C. 1910 postcard view.
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 10)
Figure 4. Postcard view dating to c. 1914, published by Frank L. Simone.
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 11)
Figure 5. Postcard view, c. 1930. This view shows the original railings in place, and the original location of the date
plaque, which was attached to the bottom of the portal lintel.
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 12)
Figure 6. Elevation view, 1930 (Westchester County Department of Public Works and Transportation).
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 13)
Figure 7. Plan and elevation of the bridge, as-builts, 2010 (Lockwood, Kessler & Bartlett, Inc., on file at Westchester
County Department of Public Works and Transportation).
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 14)
Figure 8. Plan and elevation of the bridge, as-builts, 2010 (Lockwood, Kessler & Bartlett, Inc., on file at Westchester
County Department of Public Works and Transportation).
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 15)
F. Location Map
QUAKER BRIDGE ROAD BRIDGE
HAER NY- (page 16)
PART IV. PROJECT INFORMATION
This report was assembled by Walter Richard Wheeler. Mr. Wheeler wrote all sections of the
documentation. A site visit was undertaken on 18 July 2017 by Mr. Wheeler and Stephen Penson
Ross, who executed the HAER photography.
HISTORIC AMERICAN BUILDINGS SURVEY
QUAKER BRIDGE ROAD BRIDGE
HAER No. NY-
INDEX TO PHOTOGRAPHS
Photographer: Stephen Penson Ross
18 July 2017
1.
Bridge approach, looking south
2.
Bridge approach, looking north
3.
South portal, looking northwest, with scale stick
4.
South portal, looking southeast
5.
East façade, looking north, with scale stick
6.
Detail, showing screw pin shackles, cables, outriggers and guide rail supports,
looking northwest
7.
Undercarriage of bridge, deck, and north abutment, looking northwest
8.
South abutment and west façade, looking east
9.
North abutment, looking northeast
10.
General view, looking southwest from Croton River bed
Bridge approach, looking south
Bridge approach, looking north
South portal, looking northwest, with scale stick
South portal, looking southeast
East façade, looking north, with scale stick
Detail, showing screw pin shackles, cables, outriggers and
guide rail supports, looking northwest
Undercarriage of bridge, deck, and north abutment, looking northwest
South abutment and west façade, looking east
North abutment, looking northeast
General view, looking southwest from Croton River bed
ANDREW M. CUOMO
ROSE HARVEY
Governor
Commissioner
January 9, 2018
Mr. Matt Hunt, P.E.
Creighton Manning
2 Winners Circle
Albany, NY 12205
Re:
USACE
Quaker Bridge Road Bridge Study
Quaker Bridge Rd, Cortlandt, NY
17PR02639
Dear Mr. Hunt:
Thank you for continuing to consult with the New York State Historic Preservation Office
(SHPO). We have reviewed the provided documentation in accordance with Section 106 of the
National Historic Preservation Act of 1966. These comments are those of the SHPO and relate
only to Historic/Cultural resources. They do not include other environmental impacts to New
York State Parkland that may be involved in or near your project.
We have reviewed the revised APE map, the memorandum and alternatives analysis dated
November 17th, 2017, and the HAER Level II documentation provided to our office on December
12th, 2017. We understand that demolition of the bridge is being proposed. As such, by
definition under applicable state and federal historic preservation laws, demolition would be
considered an Adverse Effect. Before our office can concur with the proposal it must be
demonstrated that all reasonable alternatives to demolition have been considered. Based upon
our review of the memorandum and alternatives analysis, it appears that all reasonable
alternatives have not been satisfactorily explored. Specifically, we would request that the project
team look at two additional alternatives:
1. Retrofitting the bridge to meet current performance standards while retaining some
or all of the components of the historic truss. For example, retaining the truss but
inserting a new bridge deck supported on new abutments.
2. An adaptive reuse alternative that would preserve the bridge for pedestrian use
Once we have reviewed the additional alternatives analysis and can agree that demolition is the
most reasonable approach, we would move to an Agreement that admits the Adverse Effect,
identifies mitigation, and includes the signature of the involved parties. We note that the public
must be involved in the consultation process, per 106 regulations, and also that at this point
review of mitigation such as the submitted HAER documentation is premature.
Please provide the additional analysis so that we can continue our review of the proposal and
resolution of the project. We also note that for many 106 projects NYS DOT typically forwards a
Finding Document to our office for review. Please provide this Finding Document, if available.
We would appreciate if the requested information could be provided via our Cultural Resource
Information System (CRIS) at www.nysparks.com/shpo/online-tools/ Once on the CRIS site, you
Division for Historic Preservation
P.O. Box 189, Waterford, New York 12188-0189 • (518) 237-8643 • www.nysparks.com
can log in as a guest and choose "submit" at the very top menu. Next choose "submit new
information for an existing project". You will need this project number and your e-mail address.
If you have any questions, I can be reached at (518) 268-2182.
Sincerely,
Olivia Brazee
Historic Site Restoration Coordinator
olivia.brazee@parks.ny.gov
via e-mail only
ENGINEERS
Creighton
PLANNERS
a
Manning
SURVEYORS
June 1, 2018
Ms. Olivia Brazee
New York State Parks, Recreation & Historic Preservation
Peebles Island State Park, P.O. Box 189
Waterford, NY 12188-0189
RE:
BIN 3348560 — Quaker Bridge Road Bridge over Croton River; Town of Cortlandt,
Westchester County: 17PR02639
Dear Ms. Brazee,
This letter is in response to the New York State Historic Preservation Office’s (SHPO) letter
dated January 9, 2018 requesting additional alternatives be evaluated for the above
referenced project. The alternatives SHPO requested to be evaluated included:
1
“Retrofitting the bridge to meet current performance standards while retaining some
or all of the components of the historic truss. For example, retaining the truss but
inserting a new bridge deck supported on new abutments.”
2.
“An adaptive reuse alternative that would preserve the bridge for pedestrian use”
After consideration of SHPO’s comments and further consultation with the Westchester
County Department of Public Works (WCDPW), the alternatives under consideration for this
project have been revised. The revised Scope Summary Memorandum dated June 1, 2018
(attached) includes a detailed evaluation of three (3) feasible alternatives under consideration:
one (1) Rehabilitation Alternative, one (1) Replacement Alternative and one (1) Replacement
and Rehabilitation Alternative.
The Rehabilitation Alternative (Alternative 1 in the attached SSM) addresses the “retrofitting
the bridge” evaluation required, and the Replacement and Rehabilitation Alternative
(Alternative 7 in the attached SSM) addresses the “adaptive reuse alternative” evaluation
request.
We respectfully request your review of the attached information and provide SHPO’s opinion
on the recommend alternative as identified in the Scope Summary Memorandum. If you have
any questions,
do not hesitate to
reach out to me at ph: 518.689.1821 or
ctutunjian@cmellp.com.
Sincerely,
Charles Tutunjian, PE
Project Manager
ce:
Bud Nicoletti, WCDPW
E. Rivas, WCDPW
2 Winners Circle
Albany, NY 12205
518.446.0396 (p)
518.446.0397 (f)
www.cmellp.com
MEMORANDUM
ENGINEERS
PLANNERS
SURVEYORS
Date:
June 1, 2018
To:
Olivia Brazee
New York State Parks, Recreation & Historic Preservation Office
Peebles Island State Park, P.O. Box 189
Waterford, NY 12188-0189
From:
Matt Hunt, P.E.
Creighton Manning Engineering, LLP
Project: Quaker Bridge Road over Croton River (BIN 3348560)
Bridge Replacement Study
Town of Cortlandt, Westchester County, NY
Re:
Scope Summary Memorandum
1.
Introduction
The Existing Quaker Road Bridge is in a deteriorated state and does not meet many of the modern day
standards for roadway bridges. The project proposes to replace the existing bridge with a new structure that
meets most current standards and eliminates all existing bridge deficiencies. The purpose of this
memorandum is to describe the existing conditions, project objectives, and environmental review, as well
as, to summarize the feasible alternatives and identify a preferred alternative for the above referenced
project.
The Quaker Bridge Road Bridge over the Croton River is located approximately 1.25 miles southwest of the
Croton Dam at the border of the Town of Cortlandt and the Village of Croton on Hudson. The project area is
primarily residential with significant elevation changes within a wooded setting. Quaker Bridge Road is a
winding two-lane road that connects Rt. 129 to the west and Old Albany Post Road to the east of the bridge.
The asphalt roadway width is approximately 26 ft north of the bridge and 20 ft south of the bridge.
Originally built in 1894, the existing bridge is a 98 ft. single span steel through-truss structure on stone
abutments founded on soil or bedrock. The existing structure is oriented perpendicular to the river and has
Existing Bridge Elevation View
Quaker Bridge Rd over Croton River
Bridge Study
June 1, 2018
Page 2 of 11
no skew. The clear bridge roadway width is 16’-5” and functions as a single-lane bridge. “One lane bridge”
signs are present on all approaches to the bridge.
2.
Conditions
Westchester County conducted a bridge rehabilitation project in 2010 that
provided various steel member retrofits in addition to providing a new paint
system. Despite this recent rehabilitation, the Quaker Bridge Road Bridge is
currently load posted for 15 tons. The NYSDOT has determined that the bridge
should be posted for 12 tons, and there is an outstanding Yellow Flag for this
inconsistent posting. The bridge has a long history of Yellow and Red Structural
Flags with some of the most recent Yellow Flags being for the inconsistent load
posting noted above, a cracked cover plate weld on a fracture critical floor
beam 1, and a missing nut at the pin connection on the fracture critical lower
chord.
In addition to the Yellow Flags noted above, the bridge superstructure exhibits
widespread deterioration. Various truss members have deterioration
approaching 25% of the cross-sectional member area. In most locations on the
bridge, previous corrosion was cleaned and painted over during the 2010
rehabilitation project. Additionally, both the left and right end chords are
slightly twisted and bowed upward, indicating a past incident of being
overstressed.
The 2010 rehabilitation also retrofit the
vertical members, which consisted of thin
forged-eye tension rods, with steel cables
looped around the top and bottom chords. This
was necessary to keep the bridge open to traffic, as numerous tension
members were cracked around the forge lines at the connection to the
bottom chord. The failure of these types of members would result in complete
failure of the bridge.
The deck consists of open steel grating with concrete filled sections above the
truss floor beams. The steel grating is in fair condition, but concrete infill
present at the floorbeams is severely deteriorated and crumbled. The
presence of the concrete has resulted in trapped water in those areas, leading
to corrosion of the floor beams. While not yet deteriorated, the steel stringers
spanning between floorbeams exhibit significant deflection under live loading.
The bridge is posted for a vertical clearance of 11’-5”, which is significantly less
than the standard of 14’-0” and restricts some vehicles from using the bridge.
There is evidence of past impacts to the upper bracing members of the end
portal.
Both stone abutments are overall in good condition. No undermining or scour
is present, but without original as-built plans, the NYSDOT flagged this structure as a potential scour critical
bridge due to its unknown foundation type. The borings progressed for this study confirm that the abutments
are not founded on bedrock and are therefore susceptible to failure due to scour. The approaches of the
bridge are in poor condition. The east approach has up to 1.25” of differential settlement at the joint between
the bridge deck and the pavement, and a slot drain located within the roadway at the west end of the bridge
is clogged and not performing as originally intended. Approach guide rail consists of w-rail and is in fair
condition with minor deformations due field bending of the rail and impact damage.
Cracked cover plate weld
Missing nut on bottom chord.
Also shows retrofit
attachment to floorbeams
Truss diagonal bowed due to
overstress (right of photo)
Existing truss members
retrofit with steel cables
Quaker Bridge Rd over Croton River
Bridge Study
June 1, 2018
Page 3 of 11
3.
Project Objective
Provide a structurally sufficient structure meeting current NYSDOT standards with a 75+ year
design life.
4.
Design Criteria
The design criteria are based on the NYSDOT Highway Design Manual, Chapter 2 and the NYSDOT Bridge
Design Manual, 2017. The project is being designed for an anticipated annual average daily traffic (AADT) of
800 vpd for the design year 2048, and an urban local road classification with a design speed of 30 mph.
4.1
Critical Design Elements
Table 4.1-A - Critical Design Elements for Quaker Bridge Road over Croton River
Route No. & Name:
Quaker Bridge Road
Project Type:
Bridge Rehab/Replacement
Roadway Classification:
Urban Local
ETC+30 AADT (2048):
800
Element
Standard
Existing Condition
Alternative 2
1
Design Speed
30 mph – HDM 2.7.4.3
30 mph
30 mph
2
Lane Width
9 ft Min. - BM Table R and N, Appendix 2A
8.2 ft*
11 ft(1)
Approach Lane
Width
13 ft NW
9 ft SE
11 ft
3
Shoulder Width
3 ft Min. - BM Table R and N, Appendix 2A
0 ft*
1 ft (LT shldr.)*
5 ft (RT shldr.)
Approach
Shoulder Width
0 ft*
1 ft (LT shldr.)*
5 ft (RT shldr)
4
Horizontal
Curvature
188 ft. - HDM Sect 2.7.4.3, Exhibit 2-8
58 ft.*
38 ft.*
5
Superelevation
Rate
4% Max. – HDM Sect 2.7.4.3, Exhibit 2-8
None*
None*
6
Stopping Site
Distance
175 ft. – HDM Sect 2.7.4.3, Exhibit 2-8
78 ft*
63 ft*
7
Grade
15% Max – HDM Sect 2.7.4.3, Exhibit 2-8
10%
11.2%
8
Cross Slope
1.5% Min. - 3% Max. – HDM Sect 2.7.4.3,
Exhibit 2-8
0.0%
2.0%
9 Vertical Clearance
14.5 ft. - BM Sect 2.4
12.4 ft.*
Unlimited
10
Str Capacity
HS-20 Live Load - BM Sect 2.5.2
12 Tons*
HL-93
11 ADA Compliance
HDM Chapter 18
N/A
5 ft shoulder(2)
12
Freeboard
Q50 + 2 ft (BM 2.4.3)
9.2 ft
7.5 ft
13
Design Life
N/A
75+ Years
* Non-Standard Feature
(1) 11’-0” lane widths are proposed at the request of Westchester County
(2) 5 ft shoulder accommodates two-way pedestrian traffic
Quaker Bridge Rd over Croton River
Bridge Study
June 1, 2018
Page 4 of 11
5.
Feasible Alternatives
5.1
Preferred Alternative - Replacement on Existing Alignment with Road Closure (Alternative 2)
This alternative will replace the existing bridge with a new 100 ft. single span on the existing alignment. The
bridge roadway will consist of two 11 ft wide travel lanes, a 5 ft wide shoulder on the downstream side, and
a 1 ft wide shoulder on the upstream side of the bridge. The 5 ft wide shoulder is proposed on the
downstream side of the bridge to accommodate two-way pedestrian traffic in the vicinity of the Croton
Gorge Trail. The rail-to-rail clear bridge roadway width is 28 ft (12.5 ft increase over existing) and the out to
out bridge width is 31’-4”. See drawing ST2-1 in Appendix A.
The proposed structure type will be evaluated and selected in a subsequent phase of this project, but
superstructure options include either steel or prestressed concrete beams with a composite concrete deck.
Factors to be considered in selecting the superstructure type include long-term maintenance, initial cost, and
aesthetic treatment options. Superstructure types will also be contingent upon the feasibility of delivering
superstructure components to the site. After evaluating the shipping route, it is anticipated that delivery of
full length beams associated with this alternative is feasible from the north approach. See the visual
simulations below and drawing ST2-2 in Appendix A for an elevation view of this alternative.
Simulated new bridge with concrete barrier
Simulated new bridge with steel bridge railing
The substructures will consist of cast-in-place conventional cantilever concrete abutments supported by a
footing founded on piles bearing on bedrock. Both of the proposed abutments will be located in
approximately the same location as the existing abutments. The proposed bridge will be perpendicular to
the stream with non-skewed substructures.
Retaining walls in addition to abutment wingwalls will be required to retain the northeast and southeast
approach roadways. The retaining wall along the northeast approach roadway will replace an existing laid up
stone wall, while the wall along the southeast approach will accommodate a slight change in roadway
geometry at the top of a very steep embankment slope (1.3H to 1.0V). The retaining wall type will be selected
in a subsequent phase of this project, but wall options include precast fill type walls, Geosynthetically
reinforced soil walls, or cast-in-place concrete cantilever walls.
The proposed horizontal alignment of the new bridge and its approaches will closely match the existing
roadway on the north side and will be modified on the south side. The north approach roadway alignment
will consist of a compound curve with radii of 180 ft and 38 ft connecting into a tangent across the bridge.
The tangent then connects to a curve on the south approach with a radius of 51 ft followed by another
tangent section continuing along Quaker Bridge Road. Quaker Bridge Road East consists of a single tangent
intersecting into the Quaker Bridge Road alignment. The modifications to the alignment on the south
approach creates a through-movement pattern for Quaker Bridge Road. The proposed vertical alignment will
consist of a 3.0% grade across the bridge that will tie into the south approach at the reconstruction limit and
will tie into the reconstructed Quaker Bridge Road/Quaker Bridge Road East roadway. The proposed vertical
profile will raise the south end of the bridge approximately 1 ft. The approaches will be reconstructed for
Quaker Bridge Rd over Croton River
Bridge Study
June 1, 2018
Page 5 of 11
approximately 165 ft and 225 ft to the north and south of the bridge, respectively. See the alternative 2 plans
in the Appendix.
This alternative will have Right-of-Way (ROW) impacts due to the increased bridge roadway width,
embankment construction, and close proximity of existing highway boundary to the existing structure. See
the ROW section of this report for additional details.
Overhead utilities are located within the project area, it is anticipated that these lines will need to be
temporarily relocated to facilitate erection of the new beams and demolition of the existing bridge.
The bridge will be closed during construction and traffic detoured via an offsite detour route. The full length
detour from one side of the bridge to the other side will be 5.7 miles long and add approximately 11 minutes
to travel times. The detour route will utilize Rt. 129, Rt. 9, and Old Albany Post Road. Construction is
anticipated to last 8 months.
This Alternative will meet most current NYSDOT geometric and structural standards while providing a 75+
year design life. It will; however, remove the historic eligible truss bridge from the site. This alternative is a
feasible replacement solution while balancing total costs and impacts to adjacent properties. The total cost
of Alternative 2 including design, ROW acquisition, construction, and construction inspection is
approximately $7,100,000.
5.2
Dismissed Alternatives
Several additional alternatives were evaluated with respect to bridge location, span length, feasible
superstructure types, approach reconstruction work, impact to Right-of-Way, and constructability. These
additional alternatives were provided in a previous submission and will not be included in this package. Two
of the feasible alternatives considered are bridge rehabilitation and bridge replacement with adaptive reuse
of the existing bridge. A summary of these feasible alternatives and the reasons for dismissal are as follows:
Bridge Rehabilitation – Alternative 1
This alternative will rehabilitate and strengthen the existing bridge to remove the existing load posting and
prolong its service life. Geometric improvements to the bridge roadway or the roadway approaches are not
feasible with this alternative, as the location of the bridge will not change. The project will retain all of the
non-standard features noted in the design criteria table with the exception of the load carrying capacity.
The original truss was not designed to carry loads equivalent to
modern vehicles, so based on an analysis completed by Creighton
Manning, this bridge rehabilitation project will replace and/or
strengthen 16 of the 28 members along with the associated pins and
other connection elements on each truss (see member summary
table in Appendix B). The floorbeams will also be replaced to both
ensure adequate strength for the increased bridge load carrying
capacity and to eliminate reoccurring yellow flags for cracking
floorbeam cover plate welds. See drawing ST1-2 in Appendix A for a
visual representation of the members to be replaced. The steel
grating deck will be replaced with a cast-in-place concrete
exodermic deck with new painted steel bridge railing. This type of
deck incorporates steel stringers into the deck, thereby eliminating
the need for separate stringers and provides a concrete surface to
protect the steel floorbeams below. The bridge roadway width will be reduced by 5”± to 16’-0” to
accommodate the new bridge railing and a decorative fencing that will mimic the original 1894 X-patterned
railing.
Concrete Exodermic Deck
Quaker Bridge Rd over Croton River
Bridge Study
June 1, 2018
Page 6 of 11
The existing substructures will be retained and modified to accept the rehabilitated truss along with new
elastomeric bearings. The existing concrete bridge seat will be removed and a new seat will be installed to
accommodate taller replacement bearings. In addition to the new bridge seat, the laid-up stone joints in the
abutment will be cleaned and repointed.
The bridge approaches will be reconstructed in the vicinity of the bridge to ensure the roadway will exactly
match the rehabilitated bridge. As previously noted, geometric improvements are not feasible, so the work
will be limited to repaving to match the existing roadway widths along with minimal drainage improvements
at the ends of the bridge to eliminate the existing trench drains extending across the both approach
roadways. See drawing ST1-1 in Appendix A for reconstruction limits.
All of the existing steel members will be sandblasted to bare metal and the entire bridge will be painted with
a 3-coat paint system after it has been reassembled.
This alternative will have temporary Right-of-Way (ROW) impacts to provide the contractor access for
construction.
It is likely that the entire bridge superstructure will be removed from its abutments and disassembled in
order to make the necessary repairs and improvements. The rehabilitated truss will then be reinstalled,
which will likely require relocation of the overhead utilities.
The bridge will be closed during construction and traffic detoured via an offsite detour route. The full length
detour from one side of the bridge to the other side will be 5.7 miles long and add approximately 11 minutes
to travel times. The detour route will utilize Rt. 129, Rt. 9, and Old Albany Post Road. Construction is
anticipated to last 8-12 months.
This Alternative will not improve the geometric characteristics of the bridge and its approaches. It will,
however, upgrade the structure to accept HS-20 loading standards and provide an estimated 20-year
extension of the bridge service life before additional repairs are required. This alternative is feasible
insomuch as it will maintain connectivity between the Village of Croton and Town of Cortlandt. The total cost
of Alternative 1 including design, temporary ROW acquisition, construction, and construction inspection is
approximately $6,700,000.
Reason for Dismissal
The design and construction cost of this rehabilitation alternative is estimated to be 94% of the
preferred alternative, which is an initial savings of approximately $400,000. While the rehabilitated
structure will be able to carry standard highway loading, the non-standard bridge roadway width and
vertical clearance will be retained. The bridge service life is also anticipated to be only 20 years (55
years less than the preferred alternative). For these reasons, alternative 1 has been dismissed.
New Bridge on Adjacent Alignment and Adaptive Reuse of Existing Bridge for Pedestrians – Alternative 7
This alternative will retain the existing bridge and construct a new bridge on an adjacent parallel alignment
upstream from the existing bridge. A new 115 ft. single span structure will provide two 11 ft wide travel
lanes, and 3 ft wide shoulders on the each side of the bridge for a clear bridge roadway width of 28 ft (12.5
ft increase over existing).
The structure and scope of work for the new bridge will essentially be the same as described in Alternative
3 of the draft scope summary memorandum (SSM) dated November 17, 2017 except the existing bridge will
be closed during construction so it can be rehabilitated for use as a pedestrian bridge. The face of the new
substructures will utilize a custom formliner and staining to mimic the existing stone abutments, which will
also remain in place.
Quaker Bridge Rd over Croton River
Bridge Study
June 1, 2018
Page 7 of 11
In addition to constructing a new bridge, the existing bridge will be rehabilitated to adapt its use to a
pedestrian bridge to accommodate users of the nearby Croton Gorge Trail. Pedestrian design criteria requires
at least an 8 ft bridge path width and an 8 ft vertical clearance must be provided. The existing bridge deck
geometry of 15.5 ft wide by 11.4 ft vertical clearance meets this design criteria, but the load carrying capacity
is not sufficient for the standard 80 pounds per square foot live load. The existing bridge will therefore need
to be rehabilitated to increase its strength to ensure the ongoing safety of its users.
The scope of the bridge rehabilitation portion of this alternative will be the same as described in Alternative
1 in this memorandum. However, the approaches to the rehabilitated existing bridge will be reconfigured to
be a 10 ft wide connection to the Croton Gorge Trail on the north end and a 15.5 ft wide connection to
Quaker Bridge Rd on the south end. The north end will be entirely shielded from vehicular traffic by new box
beam guiderail, while removable bollards will be installed on the south end. Asphalt outside of the new multi-
use path will be removed and the areas will be topsoiled and seeded.
The total cost of Alternative 7 including design, ROW acquisition, construction, and construction inspection
is approximately $11,600,000.
Reason for Dismissal
This alternative meets the project objective for providing a new vehicular bridge meeting all current
structural standards. However, compared to the preferred alternative, this alternative has more
significant permanent ROW acquisitions and environmental impacts, a 63% higher ($4.5M) total
project cost, and the possible feasible superstructure types are more limited due to the increased
span length. Additionally, this alternative will retain the existing structure, which is anticipated to
require costly maintenance and/or replacement within 20 years. For these reasons, Alternative 7 has
been dismissed from further consideration.
6.
Geotechnical
Three soil borings were progressed at the project site; two on the Cortlandt end and one on the Croton end.
On the Cortlandt side, the soil consists primarily of very compact gravelly sand with a trace amount of silt.
Bedrock was encountered at a depth of 54 feet below the roadway surface.
Soil characteristics were similar on the Croton end with the soil consisting of gravelly sand with trace silt to
a depth of approximately 10 feet below the roadway surface. A gravelly sand mixture with possible
weathered rock fragments exists from a depth of 10 ft to 26 ft, where a silver-black-brown-grey schist was
encountered.
7.
Hydraulics
The hydraulic model was developed using the as-built record plans, inspection reports for the existing bridge
(BIN 3348560), NYS stream stats, USGS gauge stations, and FEMA maps. The Croton River is a relatively
straight flowing river with several manmade features built within the river channel including the Black Rock
Dam located approximately 650 ft upstream of the Quaker Bridge Road Bridge. The most notable manmade
feature affecting stream flow data is the Croton Dam. The hydraulic model determines the water surface
elevations for the 50- and 100-yr storm events as required per NYSDOT Bridge Manual 2.4.3. Flow data for
the 50- and 100-yr storm events came from NYS Stream Stats and are 10,800 cf and 12,800 cf respectively.
As part of testing and calibrating the model to ensure accuracy, flow data for the Hurricane Irene storm event
measured by an upstream USGS gauging station was entered in the model. The Irene storm event produced
a flow of 22,600 cf, and the hydraulic model was adjusted to reflect water surface elevations similar to
documented observations.
Quaker Bridge Rd over Croton River
Bridge Study
June 1, 2018
Page 8 of 11
The hydraulic analysis for the existing Quaker Bridge Road Bridge over the Croton River indicates water
surface elevations at the structure inlet of 31.7 ft and 33.0 ft for the 50- and 100-yr storms respectively. With
the low chord at elevation 40.9 ft for the existing structure, there is 9.2 ft and 7.9 ft of freeboard provided
for each respective storm event.
Summary of Existing Hydraulics
Drainage Area = 377 square miles
Design Flood
Base Flood
Recurrence Interval (years)
50
100
Peak Discharge (ft3/s)
10,800
12,800
WSE at Structure Inlet (ft)
31.7
33.0
Freeboard Provided (ft)
9.2
7.9
Average Velocity thru Structure (ft/s)
13.8
14.6
Creighton Manning performed a hydraulic analysis for a conventional concrete abutment and beam type
structure. The low chord for the proposed structure is set at 39.2 ft. Based on the analysis, the water surface
elevations for the conventional structure did not change from the existing. Freeboard provided by the
conventional structure is at 7.5 ft and 6.2 ft respectively for the 50- and 100-yr storm event. See table below
for a summary of the hydraulic information.
Summary of Proposed Alternative 2 Hydraulics
Drainage Area = 377 square miles
Design Flood
Base Flood
Recurrence Interval (years)
50
100
Peak Discharge (ft3/s)
10,800
12,800
WSE at Structure Inlet (ft)
31.7
33.0
Freeboard Provided (ft)
7.5
6.2
Average Velocity thru Structure (ft/s)
13.8
14.6
8.
Utilities
Overhead utilities are located within the project area along the upstream side of the existing bridge. Utility
lines are approximately 35 ft to 45 ft away from the upstream fascia. The utilities consist of electric and
telephone/cable lines owned by Con Edison and Verizon respectively. It is anticipated that these lines will
need to be temporarily relocated to facilitate erection of the new beams and removal of the existing bridge.
Quaker Bridge Rd over Croton River
Bridge Study
June 1, 2018
Page 9 of 11
9.
Right of Way
Right-of-way acquisitions are required for Alternatives 2. There are four properties owned by the Village of
Croton on Hudson surrounding the highway boundary on the north end of the bridge. In the northeast
quadrant, there is a private property owned by Louis Pinkham and Chao Dai, and in the southeast quadrant,
there is a parcel of land owned by NYSDEC. The anticipated acquisitions for the preferred alternative are as
follows:
Table 9.1-A - Summary of ROW Acquisitions
Tax Map #
Property Owner
Alternative 2
68.18-1-42 & 79.06-1-2
Village of Croton On
Hudson
2500 SF
FEE Taking
68.18-2-4
Village of Croton On
Hudson
400 SF
FEE Taking
68.18-2-1
Village of Croton On
Hudson
2000 SF
FEE Taking
68.18-3-10
Louis V. Pinkham &
Chao Dai
3100 SF
Temporary Easement
10.
Work Zone Traffic Control
The bridge will be closed during construction and traffic detoured via an offsite detour route. The full length
detour from one side of the bridge to the other side will be 5.7 miles long and add approximately 11 minutes
to travel times. The detour route will utilize Rt. 129, Rt. 9, and Old Albany Post Road.
As an alternative to detouring traffic, the use of a temporary bridge to maintain traffic onsite was
investigated. However, this option is estimated to cost $1.3 million more than the detour option and would
result in additional right-of-way easements and environmental impacts due to the construction of temporary
abutments and roads. For the reasons of cost, ROW, and environmental impacts, this option for traffic
management during construction has been dismissed.
11.
Environmental
11.1 SEQR
Westchester County is the SEQR lead agency. In accordance with 6 NYCRR, Part 617, “Procedures for
Implementation of State Environmental Quality Review Act”, the project is a SEQR Type II Action, therefore
no further SEQR processing is required.
11.2 SHPO
A consultation with the New York State Historic Preservation Office has been initiated for the Quaker Bridge
Road Bridge Study. The initial screening on the NYSHPO website did not identify any other cultural resources
located within or immediately adjacent to the project site other than the bridge itself, which is eligible for
National Register listing. Hartgen Archeological Associates, Inc. has completed a Historic American
Engineering Record (HAER) Level II Documentation package. An effect determination has not been made by
SHPO at this time regarding the preferred alternative.
Quaker Bridge Rd over Croton River
Bridge Study
June 1, 2018
Page 10 of 11
11.3 Environmental Screenings
An environmental screening of the project area was performed and it has been determined that the
proposed construction will not have an impact nor adverse affect on any of the following:
Floodplains (Flood elevations remain the same);
Prime or unique agricultural land;
Agricultural districts, when more than one acre may be affected;
Water resources, including lakes, reservoirs, rivers and streams;
Water supply sources;
Designated wild, scenic and recreational rivers;
Unique ecological, natural wooded or scenic areas;
Rare, threatened or endangered species;
Any area designated as a critical environmental area pursuant to 6 NYCRR, Part 617
11.3.1 Wetlands
An initial review on the NYSDEC Environmental Resource Mapper, accessed on August 15, 2017, indicates
there are no NYSDEC regulated freshwater wetlands within the project area. It is anticipated that no impacts
to wetlands will occur as a result of this project.
11.3.2 Surface Waterbodies and Watercourses
The Croton River is classified by the NYSDEC as a class B stream through the project site. The best usage for
Class “B” water is for swimming and other contact recreational uses, but not for drinking water.
This construction project will require substructure work that will occur in the stream. Stream work, as well
as any work that may result in suspension of sediment, can be accomplished any time of the year with no
seasonal restriction dates.
11.3.3 Endangered and Threatened Species
The USFWS IPAC system, accessed August 16, 2017, indicates one endangered and one threatened species
within the project area. The endangered species include the Indiana Bat and the threatened species is the
Northern Long-eared Bat. Since this project will likely require a federal permit from the US Army Corp of
Engineers, the regulations enforced by the USFWS to protect endangered and threatened species are
mandatory to follow.
The Indiana Bat is known to occur at elevations below 900’ NGVD within 10 to 40 miles away from the nearest
hibernaculum. Their roosting habitat is in trees greater than 4” in diameter. The project site has an
approximate elevation of 45’ NGVD and is located approximately 20 miles from the nearest hibernaculum
located at Williams Lake Roost Site. The Northern Long-Eared Bat whose range encompasses all of New York
State, is proposed for inclusion on the USFWS Endangered Species List. To ensure that this project will not
adversely impact the Indiana or Northern Long-eared bat populations, tree removals shall occur between
October 1 and March 31.
11.4 Anticipated Environmental Permits
The proposed project will require a New York Department of Environmental Conversation (NYSDEC) permits
for stream disturbance and 401 water quality certification. In addition, a Temporary Revocable Permit from
NYSDEC will be required for temporary access to NYSDEC land during construction.
It is anticipated that project will proceed under the U.S. Army Corps of Engineers (ACOE) Nationwide Permit
#3.
Quaker Bridge Rd over Croton River
Bridge Study
June 1, 2018
Page 11 of 11
12.
Project Schedule
Project Schedule
Milestone
Date
Stakeholder Meeting
July 2018
Address Stakeholder Comments
August 2018
Final Report
September 2018
Appendix A
Feasible Alternatives Preliminary Plans
Feasible Alternatives Estimate
GRID
NORTH
98'-0" SPAN
TRUSS
OF
c
TRUSS
OF
c
OUT-TO-OUT
19'-2" DECK
CLEAR ROADWAY
16'-0"
ST1-1
1
STA. 2+95.70
BRGS.
c
STA. 1+97.70
BRGS.
c
STA. 2+97.20
END BRIDGE
STA. 1+96.20
BEGIN BRIDGE
1+63.93
PCC
1+95.55
PT
2+00
1+00
4+00
3+52.17
PT
3+03.32
PC
3+00
CURVE #3
CURVE #2
CURVE #1
R
emax
FT./
FT.DN RT
L
T
=
=
=
=
=
Dc
=
CURVE 1
= STA.
= STA.
PC
0+6.29
1+63.93
180.00'
137.64
72.38'
PT
R
emax
FT./
FT.DN RT
L
T
=
=
=
=
=
Dc
=
CURVE 2
= STA.
= STA.
PC
1+63.93
1+95.55
35.00'
31.61'
16.98'
PT
R
emax
FT./
FT.DN RT
L
T
=
=
=
=
=
Dc
=
CURVE 3
= STA.
= STA.
PC
3+03.32
3+52.17
40.00'
48.85'
27.99'
PT
EXODERMIC DECK
PROPOSED NEW
STA. LINE, AND H.C.L.
,
c,
PROPOSED QUAKER BRIDGE ROAD
ELECTRIC LINES
EXISTING OVERHEAD
TO RTE 129
ROAD
QUAKER BRIDGE
TRAVEL
9'-0"
LANE
SHLDR.
2'-0"
TRAVEL
9'-0"
LANE
SHLDR.
2'-0"
STA. LINE, AND H.C.L.
,
c,
PROPOSED QUAKER BRIDGE ROAD EAST
PROPOSED CONCRETE GUTTER
PROPOSED DRAINAGE STRUCTURE (TYP.)
ROAD
TO QUAKER BRIDGE
TRAVEL
9'-0"
LANE
TRAVEL
9'-0"
LANE
SHLDR.
2'-0"
VARIES
SHLDR.
POST ROAD
TO ALBANY
ROAD EAST
QUAKER BRIDGE
1+00
1+12
1+11.55
PI
1+11.55
POE
0+00.00
PI
0+00
STA. 0+75.00
STA. 3+98.00
RECONSTRUCTION
END FULL DEPTH
0
10
10
20
30
40'
1" = 20'
STA. 0+98.00
RECONSTRUCTION
BEGIN FULL DEPTH
GENERAL PLAN
ALT 1 - TRUSS REHABILITATION
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET. WALL
#13 KV
P.P.
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
L
L
A
W
G
NI
W
E
G
DI
R
B
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
HEAD WALL
CONC.
POST
POST
W 5
P.P.
WOODS
8" CMP
INV.=35.96
15" CMP
SE.INV.=36.82
N.INV.=38.47
T.F.=39.57
C.B.
=46.62
INV.
=49.95
INV.
SIGN
CORTLANDT
TOWN OF
LIMIT 30
VIL. SPEED
15 TONS &
WEIGHT LIMIT
LIMIT 30
& SPEED
NO PARKING
STONE LINED DITCH
PARKING
NO
SIGN
STREET
BRIDGE WING WALL
ELEV.=55.80
IN HEAD WALL
BOX CUT
B.M.
=43.13
INV.
=43.20
INV.
INV.=44.40
GRATE=45.80
SLOT DRAIN
VAULT
DRAINAGE
12" PVC
15" CMP
18" CMP
=41.7
INV.
TM 68.18-1-42
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
BK. PG.
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-4
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
BK. PG.
CHAO DAI
LOUIS V. PINKHAM AND
LANDS N/F OF
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_01a.dgn
6/1/2018
MMorrissey
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
BEGIN FULL DEPTH
RECONSTRUCTION
25
30
30
30
30
30
30
30
30
30
30
30
35
35
35
35
35
35
35
35
35
35
35
35
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
45
45
45
45
45
45
45
45
45
50
50
50
50
50
50
50
50
55
55
55
55
55
55
60
60
60
60
60
65
65
65
65
65
U1
U2
73
U4
U5
U6
L0
L1
L2
L3
L4
L5
L6
L7
TRUSS ELEVATION
ST1-2
STRENGTHENED/REPLACED (TYP.)
END VERTICALS TO BE
STRENGTHENED/REPLACED (TYP.)
DIAGONALS TO BE
STRENGTHEN TOP CHORD (TYP.)
COVER PLATE ADDED TO
STRENGTHENED/REPLACED (TYP.)
FLOOR BEAMS TO BE
TO BE STRENGTHEND/REPLACED (TYP.)
STRINGERS AND DECK SYTSTEM
D.H.W. ELEV. 31.7
STONES TO BE REPOINTED (TYP.)
JOINTS BETWEEN ABUTMENT
(TYP.)
DIAGONALS TO REMAIN
ENTIRE SUPERSTRUCTURE
CLEAN AND PAINT
(TYP.)
VERTICALS TO REMAIN
ORIGINAL RAILING
FENCING TO REPLICATE
NEW DECORATIVE
BRIDGE RAILING
3-RAIL PAINTED
(TYP.)
BRIDGE SEAT
NEW CONCRETE
BACKWALL (TYP.)
NEW CONCRETE
(TYP.)
NEW BEARING
CHORD CONNECTION PINS
REPLACE TOP AND BOTTOM
ELEVATION
ALT 1 - TRUSS REHABILITATION
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\figures\116-043_fig_lft_trs_qbr.dgn
6/1/2018
MMorrissey
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
NOT TO SCALE
PROPOSED BRIDGE SECTION
NOTES:
1. ALL STEEL TO BE SAND BLASTED AND PAINTED.
NOT TO SCALE
EXISTING BRIDGE SECTION
u
u
19'-2"
GRID FLOORING
EXISTING STEEL
BRIDGE RAILING
CORRUGATED BEAM
EXISTING
CLEAR BRIDGE WIDTH
u
16'-5"
u
MINIMUM VERTICAL CLEARANCE
u
12'-5"
u
u
19'-2"
u
MINIMUM VERTICAL CLEARANCE
u
12'-6"
DECK
BRIDGE AND
c
NEW DECK
BRIDGE AND
c
16'-0" CLEAR BRIDGE WIDTH
NORTH TRUSS
c
SOUTH TRUSS
c
NORTH TRUSS
c
SOUTH TRUSS
c
STRINGERS
INTEGRAL
DECK WITH
NEW EXODERMIC
RAILING TYP.)
NEW 3-RAIL BRIDGE
ST1-3
##
CHORD (TYP.)
EXISTING TOP
PORTAL BRACE
EXISTING
MEMBER
VERTICAL
EXISTING
MEMBER
DIAGONAL
EXISTING
STRINGERS
EXISTING
FLOORBEAM
EXISTING
TOP CHORD TO REMAIN
EXISTING PORTAL AND
ENTIRE SUPERSTRUCTURE
CLEAN AND PAINT
(TYP.)
ALONG TOP CHORD
TOP COVER PLATE
PROPOSED ADDITIONAL
(SEE DWG. ST1A-2)
MEMBERS TO REMAIN
AND VERTICAL
EXISTING DIAGONAL
(TYP.)
PINS
CONNECTION
NEW
FLOORBEAM
NEW PAINTED
ORIGINAL RAIL (TYP.)
FENCING TO REPLICATE
NEW DECORATIVE
SECTIONS
ALT 1 - TRUSS REHABILITATION
(SEE DWG. ST1A-2)
VERTICAL MEMBER
DIAGONAL OR
NEW PAINTED
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\175971_cpb_typ_02.dgn
6/1/2018
MMorrissey
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET. WALL
#13 KV
P.P.
EDGE OF WATER
EDGE OF WATER
EDGE OF WATER
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
W 5
P.P.
WOODS
SE.INV.=36.82
N.INV.=38.47
T.F.=39.57
C.B.
STONE LINED DITCH
ELEV.=55.80
IN HEAD WALL
BOX CUT
B.M.
M 2+00
M 3+00
M 4+00
M 5+00
M 2+54.22
PCC
M 2+90.59
PT
M 3+91.07
PC
M 4+53.35
PT
S 1+00
S 2+00
S 2+20
S 2+20
S 1+00.00
POB
S 2+20.34
POE
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_01.dgn
6/1/2018
MMorrissey
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
25
25
30
30
30
30
30
30
30
30
30
30
30
35
35
35
35
35
35
35
35
35
35
35
35
35
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
45
45
45
45
45
45
45
45
45
45
50
50
50
50
50
50
50
50
55
55
55
55
55
55
55
60
60
60
60
60
60
65
65
65
65
65
70
TM 68.18-1-42
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
BK. PG.
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-4
BK. PG.
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
BK. PG.
CHAO DAI
LOUIS V. PINKHAM AND
LANDS N/F OF
M 1+26.29
PC
35
40
50
W 57 13 KV
P.P.
DITCH
M 5+42
M 5+42
M 5+41.86
POE
35
40
45
50
55
60
65
70
75
80
100'-0" SPAN
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
5'-0" SHLDR.
1'-0" SHLDR.
OUT TO OUT
31'-4"
CLEAR WIDTH
28'-0"
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
5'-0" SHLDR.
SHLDR.
1'-0"
TO RTE 129
POST ROAD
TO ALBANY
ROAD EAST
QUAKER BRIDGE
CURVE #2
CURVE #3
ROAD
QUAKER BRIDGE
STA. M 2+04.50
BRGS.
c
STA M 2+92.25
BEGIN BRIDGE
STA. 3+96.75
END BRIDGE
GRID
NORTH
CURVE #1
R
L
T
=
=
=
=
Dc
=
= STA.
= STA.
R
L
T
=
=
=
=
Dc
=
= STA.
= STA.
CONCRETE WINGWALL (TYP.)
PROPOSED CAST-IN-PLACE
1'-0" SHLDR.
1'-0" SHLDR.
, STA. LINE, AND H.C.L.
c
PROPOSED QUAKER BRIDGE ROAD
WALL (TYP.)
PROPOSED RETAINING
, STA. LINE, AND H.C.L.
c
BRIDGE ROAD EAST
PROPOSED QUAKER
TO BE REMOVED
EXISTING SUPERSTRUCTURE
AZ 41°9'46"
AZ 41°9'46"
CROTON RIVER
BRIDGE ROAD
TO QUAKER
END SECTION (TYP.)
GALVANIZED
STRUCTURE (TYP.)
PROPOSED DRAINAGE
CULVERT PIPE (TYP.)
PROPOSED CROSS
RECONSTRUCTION
BEGIN FULL DEPTH
STA. S 1+10.00
RECONSTRUCTION
BEGIN FULL DEPTH
STA. M 1+26.00
ROAD EAST
QUAKER BRIDGE
R
L
T
=
=
=
=
Dc
=
CURVE 1
= STA.
= STA.
PC
PCC
40°43'16.22"
180.00'
127.92
66.80'
CURVE 2
PCC
PT
38.00'
150°46'42.12"
36.37'
19.72
54°50'38.67"
CURVE 3
PT
27.42'
M 1+26.9
M 2+54.22
M 2+54.22
M 2+90.59
CURVE #3
PC
M 3+91.07
M 4+53.35
51.00'
62.28'
0
10
20
30
40'
10
1" = 20'
LANE
TRAVEL
VARIES
LANE
TRAVEL
VARIES
STA. 3+94.50
BRGS.
c
STA. M 5+42.00
RECONSTRUCTION
END FULL DEPTH
GUTTER
CONCRETE
PROPOSED
ASPHALT CURB
PROPOSED
58'29.36''
n
AZ 238
ST2-1
1
ALT 2 - PROPOSED PLAN
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_elv_01.dgn
6/1/2018
MMorrissey
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
DATUM EL. 10.00
100'-0" SPAN
STA. M 2+94.50
BRGS.
c
STA. M 3+94.50
BRGS.
c
ORIGINAL GROUND
ABUTMENT (TYP.)
CONCRETE CANTILEVER
PROPOSED CAST-IN-PLACE
WINGWALL (TYP.)
PROPOSED CONCRETE
M 4+22.53 & S 2+20.34
EQUALITY
STATION
RAILING (FOUR-RAIL)
PROPOSED STEEL BRIDGE
TRANSITION RAIL (TYP.)
PROPOSED BRIDGE
RECONSTRUCTION
BEGIN FULL DEPTH
STA. M 1+26.00
(TYP.)
BEAM GUIDERAIL
PROPOSED BOX
GRADE
PROPOSED
(STEEL BEAMS SHOWN)
TYPE TO BE EVALUATED
PROPOSED SUPERSTRUCTURE
DHW EL. 31.7
0
10
20
30
40'
10
1" = 20'
HYDRAULIC DATA
EXIST
PROP.
100 YR
FLOOD
DESIGN
FLOOD
BASE
RECURRENCY INTERVAL
@ PT. OF MAX BACKWATER
HIGH WATER ELEVATION
PEAK DISCHARGE cfs
2
50 YR
10,800
12,800
31.7
33.0
33.0
31.7
DRAINAGE AREA = 337 mi
FREEBOARD
9.2'
@ DESIGN FLOOD = 13.8 ft/s
AVG. VELOCITY THRU STRUCTURE
ST2-2
2
ALT 2 -PROPOSED ELEVATION
ELEVATION
SHLDR.
5'-0"
WEARING SURFACE
WITH INTEGRAL
SUPERSTRUCTURE SLAB
2.0%
2.0%
T.G.L.
(TYP.)
RAILING (FOUR-RAIL)
PROPOSED STEEL BRIDGE
TYPICAL BRIDGE SECTION
SHLDR.
1'-0"
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
SHLDR.
5'-0"
SCALE: 1/8" = 1'-0"
28'-0" APPROACH SLAB
2.0%
2.0%
T.G.L.
(TYP.)
TRANSITION RAIL
PROPOSED BRIDGE
GROUND
ORIGINAL
(TYPE 2 FRICTION)
WEARING SURFACE
SLAB WITH INTEGRAL
1'-0" CONCRETE APPROACH
TYPE II
12" SUBBASE COURSE
SCALE: 1/8" = 1'-0"
TYPICAL BRIDGE APPROACH SECTION
SHLDR.
2'-3"
SHLDR.
5'-0"
SHLDR.
2'-3"
BREAK
BREAK
SHLDR.
1'-0"
2.0%
T.G.L.
2.0%
6.0%
6.0%
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
c
PROPOSED
(TYP.)
BEAM GUIDERAIL
PROPOSED BOX
31'-4" OUT-TO-OUT
TYPE II
12" SUBBASE COURSE
80 SERIES COMPACTION
1•" 9.5 F3 TOP COURSE HMA,
80 SERIES COMPACTION
2•" 19 F9 BINDER COURSE HMA,
80 SERIES COMPACTION
5" 37.5 F9 BASE COURSE HMA,
(TYP.)
TURF (ROADSIDE)
4" TOPSOIL & ESTABLISH
GROUND
ORIGINAL
SCALE: 1/8" = 1'-0"
TYPICAL HIGHWAY SECTION
SHLDR.
1'-0"
SHLDR.
2'-3"
BREAK
VARIES
SHLDR.
TRAVEL LANE
11'-0"
6.0%
2.0%
T.G.L.
2.0%
6.0%
SHLDR.
1'-0"
(TYP.)
WINGWALL
CONCRETE
PROPOSED
SCALE: 1/8" = 1'-0"
2
1
TURF (ROADSIDE)
4" TOPSOIL & ESTABLISH
GROUND
ORIGINAL
TO REMAIN
RETAINING WALL
EXISTING CONCRETE
80 SERIES COMPACTION
1•" 9.5 F3 TOP COURSE HMA,
80 SERIES COMPACTION
2•" 19 F9 BINDER COURSE HMA,
80 SERIES COMPACTION
5" 37.5 F9 BASE COURSE HMA,
TYPE II
COURSE
12" SUBBASE
TYPICAL HIGHWAY SECTION
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
c
PROPOSED
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
c
PROPOSED
TRAVEL LANE
11'-0"
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
c
PROPOSED
TYPE TO BE EVALUATED
PROPOSED SUPERSTRUCTURE
(TYP.)
BEAM GUIDERAIL
PROPOSED BOX
RETAINING WALL
5'-0"
STA. M 1+26.00 TO STA. M 1+80.00
STA. M 1+80.00 TO STA. M 2+77.00
T.G.L.
80 SERIES COMPACTION
1•" 9.5 F3 TOP COURSE HMA,
80 SERIES COMPACTION
2•" 19 F9 BINDER COURSE HMA,
80 SERIES COMPACTION
5" 37.5 F9 BASE COURSE HMA,
2.0%
6.0%
BREAK
SHLDR.
2'-3"
SHLDR.
1'-0"
(TYP.)
TURF (ROADSIDE)
4" TOPSOIL & ESTABLISH
2.0%
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
c
PROPOSED
SHLDR.
2'-3"
BREAK
6.0%
(TYP.)
BEAM GUIDERAIL
PROPOSED BOX
SHLDR.
1'-0"
TRAVEL LANE
VARIES
TRAVEL LANE
VARIES
TYPE II
COURSE
12" SUBBASE
2
1
SCALE: 1/8" = 1'-0"
TYPICAL HIGHWAY SECTION
STA. M 4+40.00 TO STA. M 5+42.00
2.0%
ST2-3
3
ALT 2 - TYPICAL SECTIONS - 01
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_typ_01.dgn
6/1/2018
MMorrissey
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
0
20
40
60
80'
HORIZONTAL SCALE
0
10
20'
VERTICAL SCALE
THEORETICAL GRADE LINE (T.G.L.)
LEVEL
-4.00%
-6.00%
-2.00%
+2.00%
+4.00%
+6.00%
LT. E.O.P. (e=-2.00%)
LEVEL
-4.00%
-6.00%
-2.00%
+2.00%
+4.00%
+6.00%
BANKING DIAGRAM
RT. E.O.P. (e=-2.00%)
ST2-4
5
ALT 2 - PROFILE
15
20
25
30
35
40
45
50
55
60
65
65
15
20
25
30
35
40
45
50
55
60
65
65
M 1+00
M 1+00
M 2+00
M 3+00
M 4+00
M 5+00
M 6+00
41.05
40.97
42.39
43.89
45.39
46.89
50.44
56.05
PVI M 1+26.00
PVC M 1+53.06
ELEV 40.99
LOW M 1+77.07
ELEV 40.75
PVI M 1+83.06
ELEV 40.39
L = 60.00'
G1 = -2.00%
G2 = 3.00%
E= 0.37'
HSD = 108'
PVT M 2+13.06
ELEV 41.29
PVC M 4+00.00
ELEV 46.89
PVI M 4+25.00
ELEV 47.64
L = 50.00'
G1 = 3.00%
G2 = 11.21%
E= 0.51'
HSD = 63'
PVT M 4+50.00
ELEV 50.44
-2.00%
3.00%
11.21%
PROPOSED GRADE
ORGINAL GROUND
QUAKER BRIDGE ROAD
42.07
41.03
55.75
51.21
41.30
40.43
STATION EQUALITY
STA. M 4+22.53 & S 2+20.34
ELEV. 47.98
ELEV 41.53
BEGIN FULL DEPTH RECONSTRUCTION
PVI M 5+42.00
ELEV 60.74
RECONSTRUCTION
END FULL DEPTH
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_pro_01.dgn
6/1/2018
MMorrissey
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
0
20
40
60
80'
HORIZONTAL SCALE
0
10
20'
VERTICAL SCALE
THEORETICAL GRADE LINE (T.G.L.)
LEVEL
-4.00%
-6.00%
-2.00%
+2.00%
+4.00%
+6.00%
LT. E.O.P. (e=-2.00%)
LEVEL
-4.00%
-6.00%
-2.00%
+2.00%
+4.00%
+6.00%
RT. E.O.P. (e=-2.00%)
BANKING DIAGRAM - QUAKER ROAD EAST
ST2-5
6
ALT 2 - PROFILE
N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_pro_02.dgn
6/1/2018
MMorrissey
APPLICABLE STATE AND / OR LOCAL LAW S
TO THIS DOCUMENT IS A VIOLATION OF
UNAUTHORIZED ALTERATION OR ADDITION
BY
DATE
REVISION
NO.
SHEET NUMBER
6
XXX
mm/dd/yy
Description
1
DESIGNED:
CM No.:
CHECKED:
DATE:
SCALE:
AS NOTED
of
FILE =
USER =
DATE =
CREIGHTON MANNING ENGINEERING, LLP
2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205
P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
116-043
DRAW N BY:
W HITE PLAINS, NEW YORK 10601
148 MARTINE AVENUE,
OF PUBLIC W ORKS
W ESTCHESTER COUNTY DEPARTMENT
W ESTCHESTER COUNTY, NEW YORK
TOW N OF CORTLANDT,
BRIDGE REPLACEMENT STUDY
OVER CROTON RIVER (BIN 3348560)
QUAKER BRIDGE ROAD BRIDGE
AUGUST 2017
MJH
AJB
KHD
CONSTRUCTION
NOT FOR
PRINT
PROGRESS
35
40
45
50
55
60
65
65
35
40
45
50
55
60
65
65
S 1+00
S 1+00
S 2+00
S 3+00
58.15
53.33
49.51
58.15
PVC S 1+52.69
ELEV 53.07
PVI S 1+72.69
ELEV 51.15
L = 40.00'
G1 = -9.64%
G2 = -6.00%
E= 0.18'
HSD = 144'
PVT S 1+92.69
ELEV 49.95
-9.64%
-6.00%
-8.43%
ORGINAL GROUND
PROPOSED GRADE
QUAKER BRIDGE ROAD EAST
53.48
49.61
STATION EQUALITY
STA. M 4+22.53 & S 2+20.34
ELEV. 47.98
ELEV 57.22
BEGIN FULL DEPTH RECONSTRUCTION
STA S 1+10.00
Description
Unit
Quantity
Unit Price
Total Cost
CLEARING AND GRUBBING
LS
1
$50,000.00
$50,000.00
REMOVING EXISTING SUPERSTRUCTURES
LS
1
$400,000.00
$400,000.00
REINSTALLATION OF REHABILITATED SUPERSTRUCTURE
LS
1
$400,000.00
$400,000.00
SUBBASE COURSE, TYPE 2
CY
1000
$100.00
$100,000.00
9.5 F3 TOP COURSE HMA, 80 SERIES COMPACTION
TON
40
$250.00
$10,000.00
19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION
TON
50
$250.00
$12,500.00
37.5 F9 BASE COURSE HMA, 80 SERIES COMPACTION
TON
108
$250.00
$27,000.00
SUPERSTRUCTURE SLAB WITH INTEGRAL WEARING SURFACE - BOTT
SY
213
$300.00
$63,900.00
EXODERMIC BRIDGE DECK PANELS
SY
213
$450.00
$95,850.00
CLEAN AND REPOINT RUBBLE STONE MASONRY
SY
94
$500.00
$47,000.00
STRUCTURAL STEEL, TYPE 1
LS
1
$30,000.00
$30,000.00
STRUCTURAL STEEL REPLACEMENT
LB
4100
$15.00
$61,500.00
STRUCTURAL STEEL REPLACEMENT
LB
2100
$15.00
$31,500.00
STRUCTURAL STEEL REPLACEMENT
LB
1400
$15.00
$21,000.00
STRUCTURAL STEEL REPLACEMENT
LB
7000
$15.00
$105,000.00
STRUCTURAL STEEL REPLACEMENT
LB
11000
$15.00
$165,000.00
STRUCTURAL STEEL REPLACEMENT - MISCELLANEOUS
LB
15000
$15.00
$225,000.00
CLASS A CONTAINMENT FOR PAINT REMOVAL
LS
1
$100,000.00
$100,000.00
DISPOSAL OF NON-HAZARDOUS INDUSTRIAL SOLID PAINT WASTE
LB
57750
$1.00
$57,750.00
STRUCTURAL STEEL PAINTING FIELD APPLIED, TOTAL REMOVAL
LS
1
$750,000.00
$750,000.00
REMOVAL OF RIVETS - REPLACEMENT WITH HIGH STRENGTH BOLTS
EACH
1900
$110.00
$209,000.00
BOX BEAM GUIDE RAILING
LF
202
$50.00
$10,100.00
REMOVAL OF EXISTING STEEL
LB
4300
$20.00
$86,000.00
REMOVAL OF EXISTING STEEL
LB
2200
$20.00
$44,000.00
REMOVAL OF EXISTING STEEL
LB
1400
$20.00
$28,000.00
REMOVAL OF EXISTING STEEL
LB
7300
$20.00
$146,000.00
REMOVAL OF EXISTING STEEL
LB
8300
$20.00
$166,000.00
STEEL BRIDGE RAILING (THREE RAIL)
LF
204
$175.00
$35,700.00
DECORATIVE RAILING
LF
204
$150.00
$30,600.00
BASIC WORK ZONE TRAFFIC CONTROL
LS
1
$340,000.00
$340,000.00
SURVEY OPERATIONS
LS
1
$80,000.00
$80,000.00
Construction Cost
$3,929,000
Wetland Mitigation
$0
Incidentals (25%)
$983,000
Subtotal 1
$4,912,000
Field Change Order (5%)
$246,000
Subtotal 2
$5,158,000
Mobilization (4%)
$207,000
Subtotal 3
$5,365,000
Design
$750,000
Construction Inspection
$500,000
ROW Costs
$80,000
Total Cost
$6,700,000
Quaker Bridge over Croton River
CME#: 116-043
Preliminary Rehabilitation Estimate
Jun-18
Bridge Rehabilitation - Offsite Detour Alternative (Alt 1)
N:\Projects\2016\116-043 Quaker Bridge\comps\estimate\Prelim_Est 1A - Rehab - Offsite Detour_AB
6/1/2018
Item No.
Description
Unit
Quantity
Unit Price
Total Cost
201.06
CLEARING AND GRUBBING
LS
1
$50,000.00
$50,000.00
202.120001
REMOVING EXISTING SUPERSTRUCTURES
LS
1
$400,000.00
$400,000.00
202.19
REMOVAL OF SUBSTRUCTURES
CY
278
$500.00
$139,000.00
203.02
UNCLASSIFIED EXCAVATION AND DISPOSAL
CY
670
$75.00
$50,250.00
203.03
EMBANKMENT IN PLACE
CY
429
$50.00
$21,450.00
203.21
SELECT STRUCTURE FILL
CY
289
$115.00
$33,235.00
206.01
STRUCTURE EXCAVATION
CY
1865
$75.00
$139,875.00
209.1801
ROLLED EROSION CONTROL PRODUCT, CLASS I TYPE A, SHORT TERM
SY
56
$10.00
$560.00
304.12
SUBBASE COURSE, TYPE 2
CY
452
$100.00
$45,200.00
402.128903
12.5 F9 TOP COURSE HMA, SHOULDER COURSE,80 SERIES COMPACTION
TON
95
$250.00
$23,750.00
402.198903
19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION
TON
164
$250.00
$41,000.00
402.378903
37.5 F9 BASE COURSE HMA, 80 SERIES COMPACTION
TON
338
$250.00
$84,500.00
552.2101
ROCK SOCKETS FOR SOLDIER PILE AND LAGGING WALL
LF
259
$2,250.00
$582,750.00
552.2201
SOLDIER PILES FOR SOLDIER PILE AND LAGGING WALL
LF
689
$325.00
$223,925.00
552.230301
PRECAST CONCRETE PANEL LAGGING FOR SOLDIER PILE AND LAGGING W
SF
5418
$75.00
$406,350.00
555.08
FOOTING CONCRETE, CLASS HP
CY
151
$800.00
$120,800.00
555.09
CONCRETE FOR STRUCTURES, CLASS HP
CY
249
$1,600.00
$398,400.00
556.03
STUD SHEAR CONNECTORS FOR BRIDGES
EACH
2583
$5.00
$12,915.00
557.0102
SUPERSTRUCTURE SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM F
SY
364
$425.00
$154,700.00
557.2002
STRUCTURAL APPROACH SLAB WITH INTEGRAL WEARING SURFACE - TYP
SY
63
$325.00
$20,475.00
558.02
LONGITUDINAL SAWCUT GROOVING OF STRUCTURAL SLAB SURFACE
SY
388
$15.00
$5,820.00
564.0501
STRUCTURAL STEEL, TYPE 1
LS
1
$590,000.00
$590,000.00
564.20010008
HOT-DIP GALVANIZING OF STRUCTURAL STEEL
LB
116020
$1.00
$116,020.00
565.2022
TYPE E.B. FIXED BEARING (56 TO 111 KIPS)
EACH
4
$5,000.00
$20,000.00
565.2032
TYPE E.B EXPANSION BEARING (56 TO 111 KIPS)
EACH
4
$5,000.00
$20,000.00
568.51
STEEL BRIDGE RAILING (FOUR RAIL)
LF
212
$250.00
$53,000.00
568.70
TRANSITION BRIDGE RAILING
LF
128
$175.00
$22,400.00
603.171316
GALVANIZED STEEL END SECTIONS-PIPE (2-2/3" X 1/2" CORRUGATIONS) 21
EACH
3
$500.00
$1,500.00
603.9815
SMOOTH INTERIOR CORRUGATED POLYETHYLENE CULVERT AND STORM
LF
130
$60.00
$7,800.00
604.300611
RECTANGULAR DRAINAGE STRUCTURE TYPE F FOR #11 WELDED FRAME
LF
20
$1,500.00
$30,000.00
606.10
BOX BEAM GUIDE RAILING
LF
342
$40.00
$13,680.00
606.120101
BOX BEAM END PIECE
EACH
1
$600.00
$600.00
619.01
BASIC WORK ZONE TRAFFIC CONTROL
LS
1
$200,000.00
$200,000.00
620.05
STONE FILLING (HEAVY)
CY
311
$120.00
$37,320.00
625.01
SURVEY OPERATIONS
LS
1
$40,000.00
$40,000.00
637.12----25
ENGINEER'S FIELD OFFICE - TYPE 2
MNTH
9
$5,000.00
$45,000.00
637.34
OFFICE TECHNOLOGY AND SUPPLIES
DC
10000
$1.00
$10,000.00
Construction Cost
$4,163,000
Wetland Mitigation
$0
Incidentals (25%)
$1,041,000
Subtotal 1
$5,204,000
Field Change Order
$261,000
Subtotal 2
$5,465,000
Mobilization (4%)
$219,000
Subtotal 3
$5,684,000
Design
$750,000
Construction Inspection
$500,000
ROW Costs
$100,000
Total Cost
$7,100,000
Jun-18
QUAKER BRIDGE ROAD OVER CROTON RIVER
CME#: 116-043
Preliminary Engineer's Estimate - Alternative 2 Replacement on existing alignment with detour
N:\Projects\2016\116-043 Quaker Bridge\comps\estimate\Prelim_Est2A - Replace on Existing - Offsite Detour
6/1/2018
Item No.
Description
Unit
Quantity
Unit Price
Total Cost
201.06
CLEARING AND GRUBBING
LS
1
$50,000.00
$50,000.00
202.120001
TEMPORARY BRIDGE SUPPORT SYSTEM
LS
1
$500,000.00
$500,000.00
203.02
UNCLASSIFIED EXCAVATION AND DISPOSAL
CY
670
$75.00
$50,250.00
203.03
EMBANKMENT IN PLACE
CY
429
$50.00
$21,450.00
203.21
SELECT STRUCTURE FILL
CY
289
$115.00
$33,235.00
206.01
STRUCTURE EXCAVATION
CY
1865
$75.00
$139,875.00
209.1801
ROLLED EROSION CONTROL PRODUCT, CLASS I TYPE A, SHORT TERM
SY
56
$10.00
$560.00
304.12
SUBBASE COURSE, TYPE 2
CY
452
$100.00
$45,200.00
402.128903
12.5 F9 TOP COURSE HMA, SHOULDER COURSE,80 SERIES COMPACTION
TON
95
$250.00
$23,750.00
402.198903
19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION
TON
164
$250.00
$41,000.00
402.378903
37.5 F9 BASE COURSE HMA, 80 SERIES COMPACTION
TON
338
$250.00
$84,500.00
551.99420017
MICROPILES (CONTRACTOR DESIGNED) - WITH EXTENDED LENGTHS - DESIGN LOAD LESS THAN 100 TONS
EACH
60
$10,000.00
$600,000.00
551.99450017
PERMANENT CASING FOR MICROPILES
LF
400
$200.00
$80,000.00
552.2101
ROCK SOCKETS FOR SOLDIER PILE AND LAGGING WALL
LF
259
$2,250.00
$582,750.00
552.2201
SOLDIER PILES FOR SOLDIER PILE AND LAGGING WALL
LF
689
$325.00
$223,925.00
552.230301
PRECAST CONCRETE PANEL LAGGING FOR SOLDIER PILE AND LAGGING WALL
SF
5418
$75.00
$406,350.00
555.08
FOOTING CONCRETE, CLASS HP
CY
151
$1,500.00
$226,500.00
555.09
CONCRETE FOR STRUCTURES, CLASS HP
CY
249
$2,200.00
$547,800.00
556.03
STUD SHEAR CONNECTORS FOR BRIDGES
EACH
2583
$10.00
$25,830.00
557.0101
SUPERSTRUCTURE SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM FORMWORK REQUIRED - TYPE 1 FRICTIO
SY
190
$550.00
$104,500.00
557.0102
SUPERSTRUCTURE SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM FORMWORK REQUIRED - TYPE 2 FRICTIO
SY
401
$425.00
$170,425.00
557.2002
STRUCTURAL APPROACH SLAB WITH INTEGRAL WEARING SURFACE - TYP E 2 FRICTION
SY
63
$375.00
$23,625.00
558.02
LONGITUDINAL SAWCUT GROOVING OF STRUCTURAL SLAB SURFACE
SY
577
$20.00
$11,540.00
560.10010007
CLEAN AND REPOINT RUBBLE STONE MASONRY
SY
105
$650.00
$68,250.00
564.0501
STRUCTURAL STEEL, TYPE 1
LS
1
$850,000.00
$850,000.00
564.0502
STRUCTURAL STEEL, TYPE 2
LS
1
$87,000.00
$87,000.00
564.700001
STRUCTURAL STEEL REPLACEMENT
EACH
1
$15,000.00
$15,000.00
564.700002
STRUCTURAL STEEL REPLACEMENT
EACH
2
$50,000.00
$100,000.00
564.700003
STRUCTURAL STEEL REPLACEMENT
EACH
1
$15,000.00
$15,000.00
564.700004
STRUCTURAL STEEL REPLACEMENT
EACH
1
$75,000.00
$75,000.00
564.700005
STRUCTURAL STEEL REPLACEMENT
EACH
4
$50,000.00
$200,000.00
564.700006
STRUCTURAL STEEL REPLACEMENT
EACH
7
$15,000.00
$105,000.00
564.700007
STRUCTURAL STEEL REPLACEMENT
EACH
2
$30,000.00
$60,000.00
573.010001
STRUCTURAL STEEL PAINTING FIELD APPLIED, TOTAL REMOVAL
LS
1
$500,000.00
$500,000.00
565.2021
TYPE E.B. FIXED BEARING (0 TO 55 KIPS)
EACH
2
$5,000.00
$10,000.00
565.2031
TYPE E.B EXPANSION BEARING (0 TO 55 KIPS)
EACH
2
$5,000.00
$10,000.00
565.2022
TYPE E.B. FIXED BEARING (56 TO 111 KIPS)
EACH
4
$2,500.00
$10,000.00
565.2032
TYPE E.B EXPANSION BEARING (56 TO 111 KIPS)
EACH
4
$2,500.00
$10,000.00
568.10010011
BIKEWAY WALKWAY FENCE
LF
200
$300.00
$60,000.00
568.51
STEEL BRIDGE RAILING (FOUR RAIL)
LF
212
$250.00
$53,000.00
568.70
TRANSITION BRIDGE RAILING
LF
128
$175.00
$22,400.00
585.01
STRUCTURAL LIFTING OPERATIONS - TYPE A
EACH
4
$15,000.00
$60,000.00
585.02
STRUCTURAL LIFTING OPERATIONS - TYPE B
EACH
2
$15,000.00
$30,000.00
585.03
STRUCTURAL LIFTING OPERATIONS - TYPE C
EACH
1
$15,000.00
$15,000.00
603.171316
GALVANIZED STEEL END SECTIONS-PIPE (2-2/3" X 1/2" CORRUGATIONS) 21 INCH DIAMETER, 16 GAUGE
EACH
3
$500.00
$1,500.00
603.9815
SMOOTH INTERIOR CORRUGATED POLYETHYLENE CULVERT AND STORM DRAIN 15 INCH DIAMETER
LF
130
$60.00
$7,800.00
604.300611
RECTANGULAR DRAINAGE STRUCTURE TYPE F FOR #11 WELDED FRAME
LF
20
$1,500.00
$30,000.00
606.10
BOX BEAM GUIDE RAILING
LF
342
$40.00
$13,680.00
606.120101
BOX BEAM END PIECE
EACH
1
$600.00
$600.00
607.45120011
ORNAMENTAL STEEL MESH FENCE 4 FT HIGH
LF
180
$250.00
$45,000.00
608.71145108
BOLLARD-FIXED SURFACE MOUNTED, WITHOUT LIGHTING, WIDTH OVER 7 TO 9 INCHES, HEIGHT 30 TO 36 INCHES
EACH
4
$2,000.00
$8,000.00
619.01
BASIC WORK ZONE TRAFFIC CONTROL
LS
1
$500,000.00
$500,000.00
620.05
STONE FILLING (HEAVY)
CY
311
$120.00
$37,320.00
625.01
SURVEY OPERATIONS
LS
1
$40,000.00
$40,000.00
637.12----25
ENGINEER'S FIELD OFFICE - TYPE 2
MNTH
9
$5,000.00
$45,000.00
637.34
OFFICE TECHNOLOGY AND SUPPLIES
DC
10000
$1.00
$10,000.00
Construction Cost
$7,088,000
Wetland Mitigation
$0
Incidentals (25%)
$1,772,000
Subtotal 1
$8,860,000
Field Change Order
$443,000
Subtotal 2
$9,303,000
Mobilization (4%)
$373,000
Subtotal 3
$9,676,000
Design
$1,000,000
Construction Inspection
$800,000
ROW Costs
$100,000
Total Cost
$11,600,000
Jun-18
QUAKER BRIDGE ROAD OVER CROTON RIVER
CME#: 116-043
Preliminary Engineer's Estimate - Alternative 7 Replacement on adjacent alignment adaptive use of existing
N:\Projects\2016\116-043 Quaker Bridge\comps\estimate\Prelim_Est7 - Replace on Adjacent Adaptive Use Existing
6/1/2018
Appendix B
Load Rating Summary Table
Quaker Bridge Load Rating Summary
Truss Members (Rehabilitated With New Exodermic Deck)
All Spans
Tension (k)
Compression (k)
Tension (k)
Compression (k)
L0‐U1
206.2
‐
206.66
‐
193.74
FAIL
U1‐U2
230.1
‐
223.47
‐
195.62
PASS
U2‐U3
230.1
‐
265.15
‐
234.45
FAIL
U3‐U4
230.1
‐
266.84
‐
234.52
FAIL
U4‐U5
230.1
‐
264.80
‐
234.10
FAIL
U5‐U6
230.1
‐
222.70
‐
194.84
PASS
U6‐U7
206.2
‐
205.66
‐
192.74
PASS
L0‐L1
107.3
136.08
‐
117.32
‐
FAIL
L1‐L2
107.3
136.08
‐
117.32
‐
FAIL
L2‐L3
136.5
223.47
‐
195.62
‐
FAIL
L3‐L4
156.0
259.67
‐
222.83
‐
FAIL
L4‐L5
136.5
222.70
‐
194.84
‐
FAIL
L5‐L6
107.3
135.42
‐
116.66
‐
FAIL
L6‐L7
107.3
135.42
‐
116.66
‐
FAIL
L1‐U1
52.0
76.64
‐
82.00
‐
FAIL
L2‐U2
93.6
‐
82.49
‐
69.29
PASS
L3‐U3
93.6
‐
44.49
‐
33.33
PASS
L4‐U4
93.6
‐
45.30
‐
34.14
PASS
L5‐U5
93.6
‐
82.98
‐
69.78
PASS
L6‐U6
52.0
76.02
‐
81.38
‐
FAIL
U1‐L2
107.3
157.53
‐
140.62
‐
PASS
U2‐L3
107.3
107.22
‐
89.68
‐
PASS
U3‐L4
39.8
56.72
‐
42.04
‐
FAIL
U4‐L5
19.9
5.69
‐
3.58
‐
PASS
L2‐U3
19.9
5.84
‐
3.73
‐
PASS
L3‐U4
39.8
57.79
‐
43.10
‐
FAIL
L4‐U5
107.3
107.87
‐
90.33
‐
FAIL
L5‐U6
107.3
157.36
‐
140.44
‐
FAIL
Quaker Bridge Load Rating Summary
Stringers & Floorbeams (Rehabilitated w/New Exodermic Deck)
All Spans
Flexure (k‐
ft)
Shear (k)
LL Flexure (k‐
ft)
Shear (k)
LL Flexure (k‐
ft)
Shear (k)
Stringers ‐ 2 & 5
93.84
46.15
44.11
15.25
31.15
15.51
PASS
Floorbeam ‐ 1
431.60
78.42
483.52
95.26
438.97
86.55
FAIL
Notes:
1. Analysis assumes all deficent members of the truss has been repaired to full capacity.
2. Analysis assumes no section loss to members
3. No slack eye bar in analysis
4. Analysis assumes all floorbeams are similar
5. All ratings are based off of inventory ratings
PASS/FAIL
Member
Capacity
Axle Loading
Lane Loading
Verticals
Diagonals
Top Chord
Member
Capacity (k)
Member
Bottom Chord
Applied Load ‐ Axle Loading
Applied Load ‐ Lane Loading
Division for Historic Preservation
P.O. Box 189, Waterford, New York 12188-0189 • (518) 237-8643 • www.nysparks.com
ANDREW M. CUOMO
ROSE HARVEY
Governor
Commissioner
June 19, 2018
Mr. Matt Hunt, P.E.
Creighton Manning
2 Winners Circle
Albany, NY 12205
Re:
USACE
Quaker Bridge Road Bridge Study
Quaker Bridge Rd, Cortlandt, NY
17PR02639
Dear Mr. Hunt:
Thank you for continuing to consult with the New York State Historic Preservation Office
(SHPO). We have reviewed the provided documentation in accordance with Section 106 of the
National Historic Preservation Act of 1966. These comments are those of the SHPO and relate
only to Historic/Cultural resources. They do not include other environmental impacts to New
York State Parkland that may be involved in or near your project.
We have reviewed the additional Alternatives Analysis information that was provided to our
office on June 1st, 2018. Based upon our review, we concur with the determination that the
existing bridge must be replaced for long-term safety, performance, and cost reasons. The
removal and replacement will have an Adverse Effect on the historic bridge, and therefore, at
this time we suggest drafting a Memorandum of Agreement to memorialize the Adverse Effect
and stipulate appropriate mitigation measures. Remember that the Advisory Council on Historic
Preservation and Tribal Historic Preservation Officers must be consulted on the adverse effect
and proposed mitigation under Section 106.
We would appreciate if the requested information could be provided via our Cultural Resource
Information System (CRIS) at www.nysparks.com/shpo/online-tools/ Once on the CRIS site, you
can log in as a guest and choose "submit" at the very top menu. Next choose "submit new
information for an existing project". You will need this project number and your e-mail address.
If you have any questions, I can be reached at (518) 268-2182.
Sincerely,
Olivia Brazee
Historic Site Restoration Coordinator
olivia.brazee@parks.ny.gov
via e-mail only
Machine-extracted for search and reference — the original file is the authoritative version.