croton.news
Croton-on-Hudson, NY · Sunday, November 22, 2026· Nov 22, 2026 Independent, AI-assisted local reporting from public records Source-linked·Corrections welcomed
Documents › Water Control Commission, 2026-11-24

QBR Wetlands Activity Permit App and Supporting Docs 2025

environmental 188 pages Scanned/OCR — text may contain errors
From the meeting: Water Control Commission — 2026-11-24 · our coverage →
Agenda item: NEW BUSINESS — Hugh Greechan, Jr.. P.E, Commissioner of Westchester County Department of Public Works & Transportation, has applied to the Water Control Commission of the Village of Croton-on-Hudson for the renewal of Wetlands Activity Permit #20250002 originally issued on August 26, 2025 for the proposed complete replacement of the existing Quaker Bridge over the Croton River.
Environmental review, 188 pages. Attached to agenda item: “NEW BUSINESS — Hugh Greechan, Jr.. P.E, Commissioner of Westchester County Department of Public Works & Transportation, has applied to the Water Control Commission of the Village of Croton-on-Hudson for the renewal of W” (Text recovered by OCR — may contain errors.)
Retrieved 2026-11-20 from the original source. View the original file ↗
Also attached to this agenda item: 11.24.26 Quaker Bridge Replacement Application PB Quaker Bridge Tree Removal Resolution QBR-Coastal assessment 7.25.2025 QBRB Chapter 230 Finding Statement QBRB Wetlands 227 Finding Statement QBR CAF 7.10.2025 QBR Village LWRP Letter Wetland Activity Permit 2025002 with 8.25.25 Final Resolution
ESTCHESTER, ua ws Kenneth W. Jenkins ev. ee Westchester County Executive tee Department of Public Works and Transportation a 1 Rt Hugh J. Greechan, Jr., P.E., Commissioner Gayle M. Katzman, P.E., First Deputy Commissioner Hernane N. De Almeida, P.E., Deputy Commissioner July 9, 2025 Mr. Brian Healy J 1Y wey Village Manager Village of Croton-on-Hudson 1 Van Wyck Street Croton-on-Hudson, NY 10520 RE: Quaker Bridge Road Bridge Replacement Waiver of Wetland Activity Permit Application Fee Mr. Healy, Westchester County is in the process of obtaining environmental permits to replace the Quaker Bridge Road Bridge over the Croton River. Along with this letter, we are submitting a Wetland Activity Permit application, which carries a $350 application fee. Westchester County hereby requests this fee to be waived as we work to complete this mutually beneficial project. Should you have any questions or require additional information as you consider this request, please contact me at 914-995-2546 or hig? @westchestercountyny.gov. Thank you, ZA fer, go Hugh J. reechan, Jr... (an Commissioner Westchester County Department of Public Works & Transportation Michaelian Office Building 148 Martine Avenue, Room 518 White Plains, New York 10601 Telephone: 914-995-2548 Eoeed nde 68.18-\|-4Q Croton-on-Hudson Application for Wetlands Village of Engineering Department Activity Permit Stanley H. Kellerhouse Municipal Building (Form # Eng-§227) One Van Wyck Street Tel: 914-271-4783 Croton-on-Hudson. NY 10520-2501 (Revised 03 2012) engineering@crotononhudson-ny.gov Application Date: _~1 Ye}| 25S Is this application relevant to an open building permit? 0 Yes No Application #: QOADO4/Q Building Permit #: Property Information: Section: N/A Block: Lot: Property Location (street address): Quaker Bridge Road Bridge # of Acres or Sq. Ft: Zoning District RA-5 Commercial Lot: O Yes {No Vacant Lot: D Yes & No Applicant Information: Person or Company Doing Work: [1 Owner D Contractor O Other: Last Name: Greechan, Jr., P.E. First Name: Hugh MI: J. Company: Westchester County Department of Public Works and Transportation Address: 148 Martine Avenue Address: Phone #: 914-995-2546 Cell #: E-mail: _hig7@westchestercountyny.gov Property Owner: Same As Above Last Name: First Name: MI: Company: Address: Address: Phone #: Cell #: E-mail: Description of proposed work in wetland or wetland buffer: Plans & Specifications: Note: See $227-7 of the Village Code for all requirements. Detail plans & specifications for the proposed wetland activity, drawn to a scale of not smaller than 1° = 50°, shall show the following: Estimated quantities of material to be deposited or removed. Pre- and post-development impervious surface area. Location of any well and any septic or other waste disposal system with 50 ft. of the area to be disturbed. Details of any proposed drainage system, both for the construction and the final development & maintenance requirements. [f creation, modification or enlargement of a pond is proposed, details of the construction of any dams, embankments, outlets or other water-control devices & deposition of the spoil material. activities. List all beneficial functions of the wetland, waterbody or watercourse which will be affected by the proposed Erosion and sediment controls must be provided and a schedule for their installation & maintenance. Submit eight @) copies of all specified supporting plans & documentation when WCC is approving authority, three (3) copies when Village Engineer is approving authority and fourteen (14) copies when Planning Board is approving authority. (Note: PDF's or other acceptable electronic copies of all documents must be submitted if WCC or Planning Board is approving authority.) Include a completed environmental assessment form (EAF), a Coastal Assessment Form (CAF) and a USGS topographic map with the property outlined. When the Village Engineer is approving authority, an EAF and CAF are not required. Wetland Activity Permit - Paget If proposed project qualifies as a land development activity, a Stormwater Pollution Prevention Plan (SWPP) consistent with the requirements of Chapter 196, Article I must be submitted. The approving authority for all applications is the Water Control Commission, exceptions are listed on page 2. Attach Certificate of Liability Insurance naming the Village of Croton-on-Hudson as additional insured and certificate holder and documentation of Disability and Workers Compensation Insurance with the Village listed as certificate holder. I certify that the above information is accurate, and ! am the property owner or authorized by the owner to file this application on their behalf and that | will indemnify and hold the Village harmless against any damage or injury that may be caused by or arise out of any entry onto the property in connection with the processing of the application, during construction or performance of the work or within one year after the completion of the work. Hugh J. Greechan, Jr., P.E. ZZ, yale Applicant’s Name (piease print) & Applican Date f FOR VILLAGE USE ONLY: por: Fee $ Fee Paid (date): Weavg ~VSat Received by: APPROVED BY: O wcc O VILLAGE ENGINEER O PLANNING BOARD a -' -) The approving authority for all applications shall be the Water Control Commission, except as follows: qd) The Planning Board shall be the approving authority for any application involving property that is also the subject of a pending site plan, minor site plan, subdivision or special permit application, or fill or excavation permit, in accordance with the Code of the Village of Croton-on-Hudson, and for any application that also involves the construction or establishment of a principal building or use. (2) The Village Engineer shall be the approving authority for any of the following activities proposed to be conducted on property not subject to regulation by the State of New York, and no public hearing shall be required: (a) Removing water-deposited silt and/or other matcrial in order to restore the preexisting land elevations, provided that the total amount removed does not exceed 15 cubic yards of material. (b) Restoring land elevations that have been altered by erosion or storm damage. (c) The construction, expansion or improvement of private residential or recreational facilities, as otherwise legally permitted, provided that the total amount of material deposited, removed or regraded does not exceed 15 cubic yards. (d) The construction of driveways not associated with any other construction approvals where alternative means of access are proved to be impractical, provided that the amount of material to be deposited or regraded in connection with such construction does not exceed 100 cubic yards. (e) The use of harmless chemicals, dyes and other similar substances to maintain or study any wetland. (f Decorative landscaping and planting in wetlands when covering less than 1/10 of an acre. (3) Where the Water Control Commission or Village Engineer initiates a review of an application submitted pursuant to this chapter and determines that because of the scope, nature, location or potential environmental impact of the action which could result from approval of the wetlands permit a public hearing would be either necessary or appropriate, the application shall be immediately forwarded to the Planning Board for public hearing, whereupon the Planning Board shall become the approving authority for such application. Welland Activity Permit - Page2 Civil, Environmental and Transportation Design Services OSPA Engineering Services, PC 800 Route 146, Bldg. 200, Suite 280 Clifton Park, NY 12065 Phone: 518.636.9956 E-Mail ospa@ospaengineering.com Web site WWW.OSPAENGINEERING.COM July 1, 2025 United States Army Corps of Engineers Jacob K. Javits Federal Building 26 Federal Plaza New York, NY 10278-0090 NYSDEC Region 3 Permits 21 South Putt Corners Road New Paltz, NY 12561-1620 Re: Quaker Bridge Replacement, Town of Cortlandt and Village of Croton-On-Hudson, Westchester County, NY Dear Sir or Madame: OSPA Engineering Services, PC has been contracted to submit the following permit application for activity for the county funded proposed Quaker Bridge Road Bridge Replacement Project. A location map is attached. The project is located at the following coordinates: Project Coordinates NAD 27: N 41.211976 W -73.869054 The project proposes the replacement of the Quaker Bridge Road Bridge with a new structure. The Croton River is a NYSDEC Class B stream and is mapped and classified as a USFWS riverine wetland. The bridge was closed to traffic in the fall of 2024 based on the bridge condition. All prudent and feasible alternatives to avoid and minimize the impacts upon the bridge have been explored. The deterioration and condition of the bridge is too severe for rehabilitation. The project site is designated SHPO Consultation Project 17PR02639. The Quaker Bridge Road Bridge is a late nineteenth century Pratt Truss bridge built in 1894, eligible for listing on the National Register of Historic Places. The County proposes to remove the Quaker Bridge Road Bridge and replace it with a two-lane, truss bridge made of galvanized steel, built on the existing alignment with the new bridge being approximately 12 feet wider to allow for 2- way vehicular traffic as well as 2-way pedestrian passage. Two fee conveyance areas and two permanent easements will be required for the proposed project. Coordination with SHPO regarding a Memorandum of Agreement has been started and will continue upon receipt of a USACE contact. There is the potential for the federally endangered Northern Long-eared Bat (Myotis septentrionalis), the federally endangered Indiana Bat (Myotis sodalis), the federally threatened Bog Turtle (Glyptemys muhlenbergii), the federally proposed endangered Quaker Bridge Road over Croton River Replacement Page 2 of 2 OSPA Engineering Services, PC 800 Route 146, Bldg. 200, Suite 280 Clifton Park, NY 12065 Phone: 518.636.9956 E-Mail ospa@ospaengineering.com Web site WWW.OSPAENGINEERING.COM Tricolored Bat (Perimyotis subflavus), and the federally proposed threatened Monarch Butterfly (Danaus plexippus) to occur within the project area. Approximately 76 trees with a diameter at breast height (DBH) equal to or greater than 2 inches are expected to be removed within the clearing window, November 1st – March 31st. The nearest hibernacula is located approximately 10.7 miles from the project site. The EAF Mapper indicates the project is within the Westchester County, County and State Park Lands Critical Environmental Area for its exceptional or unique character. The EAF Mapper indicates that there are no other known records of federally or state-listed rare or endangered animals or plants or significant natural communities, at the project site or in its immediate vicinity. The project site was evaluated for Bog turtle habitat and it was determined that habitat for the Bog Turtle is not present. A completed Joint Application Form and attachments, including project plans and additional pertinent documentation are included in this submission. If you have any questions, please contact me at 518-636-9956 or at mosterhout@ospaengineering.com. Sincerely, Melanie Osterhout, P.E. President Enclosures c: Westchester County Creighton Manning Engineering file LETTER .............................................................................................................................................. 1 TABLE OF CONTENTS ......................................................................................................................... 3 JOINT PERMIT APPLICATION .............................................................................................................. 5 TABLE OF CONTENTS ATTACHMENTS 1. Project Database Mapping, Wetland Delineation Report and FEAF 2. Plans 3. SHPO Documentation NEW | Department of Office of Department STATE | Environmental General Services of State i Conservation US Army Corps of Engineers JOINT APPLICATION FORM For Permits for activities activities affecting streams, waterways, waterbodies, wetlands, coastal areas, sources of water, and endangered and threatened species. You must separately apply for and obtain Permits from each involved agency before starting work. Please read all instructions. 1. Applications To: >NYS Department of Environmental Conservation Check here to confirm you sent this form to NYSDEC. Check all permits that apply: [__]Dams and Impound- [_] Tidal Wetlands [_] Water Withdrawal ment Structures Stream Disturbance Wild, Scenic and [__] Long Island Well 401 Water Quality Recreational Rivers [__] Excavation and Fill in [__] Incidental Take of Navigable Waters Certification* Coastal Erosion Endangered / [__] Docks, Moorings or [__] Freshwater Wetlands Management Threatened Species Platforms * See Instructions (page 3) >US Army Corps of Engineers Check here to confirm you sent this form to USACE. Check all permits that apply: LE] Section 404 Clean Water Act LE] Section 10 Rivers and Harbors Act Is the project Federally funded? Yes wv _No If yes, name of Federal Agency: | General Permit Type(s), if known: [Section 404 Nationwide #3 Preconstruction Notification: v Yes No >NYS Office of General Services EL] Check here to confirm you sent this form to NYSOGS. Check all permits that apply: [__] State Owned Lands Under Water LE] Utility Easement (pipelines, conduits, cables, etc.) LE] Docks, Moorings or Platforms >NYS Department of State im Check here to confirm you sent this form to NYSDOS. Check if this applies: LE] Coastal Consistency Concurrence 2. Name of Applicant Taxpayer ID (if applicant is NOT an individual) Hugh J. Greechan, Jr., P.E., Commissioner of Public Works and Transportation Mailing Address Post Office / City State Zip 148 Martine Avenue White Plains NY 10601 Telephone Email [ hjg7 @westchestercountyny.gov Applicant Must be (check all that apply): Owner LE] Operator LE] Lessee 3. Name of Property Owner (if different than Applicant) [Same Mailing Address Post Office / City State Zip Email Telephone L__| | For Agency Use Only | Agency Application Number: JOINT APPLICATION FoRM 04/22 Page 1 of 4 JOINT APPLICATION FORM — Continued. Submit this completed page as part of your Application. 4. Name of Contact / Agent Melanie Osterhout, OSPA Engineering Services, P.C. Mailing Address Post Office / City State Zip 800 Route 146, Bldg. 200, Suite 280 Clifton Park NY 12065 Telephone Email mosterhout@ospaengineering.com 5. Project / Facility Name Property Tax Map Section / Block / Lot Number: [Quaker Bridge Road Bridge Replacement N/A Project Street Address, if applicable Post Office / City State Zip N/A NY Cortlandt/Croton-on-Hudson 10520 Provide directions and distances to roads, intersections, bridges and bodies of water From US-9 in Croton-on-Hudson, turn onto Old Albany Post Road. In 0.8 miles, stay straight onto Quaker Bridge Road. The project site will be on the left in 1.4 miles. v Town Y Village City County Stream/Waterbody Name Cortlandt/Croton-on-Hudson [ Westchester ] | Croton River Project Location Coordinates: Enter Latitude and Longitude in degrees, minutes, seconds: G " Latitude:|41 ° {12 |! [43.4 Longitude:| 73 ° 52 | [s.6 6. Project Description: Provide the following information about your project. Continue each response and provide any additional information on other pages. Attach plans on separate pages. a. Purpose of the proposed project: The project proposes the complete replacement of the existing bridge and abutments on Quaker Bridge Road over the Croton River with a new structure. b. Description of current site conditions: The project area is comprised of a truss bridge, roadways, a stream, and forested cover. c. Proposed site changes: The bridge will be replaced. Areas adjacent to the bridge will be graded to accommodate the new structure and construction access. d. Type of structures and fill materials to be installed, and quantity of materials to be used (e.g., square feet of coverage, cubic yards of fill material, structures below ordinary/mean high water, etc.): 550 CY of stone fill within 2,290 SF of disturbance below OHW. 250 LF of the river will be impacted during construction. e. Area of excavation or dredging, volume of material to be removed, location of dredged material placement: 550 CY of excavation within 2,290 SF of disturbance below OHW. f No Is tree cutting or clearing proposed? v| Yes If Yes, explain below. Timing of the proposed cutting or clearing (month/year): [November 1- March 31 Number of trees to be cut: Acreage of trees to be cleared: JOINT APPLICATION FoRM 04/22 Page 2 of 4 JOINT APPLICATION FORM — Continued. Submit this completed page as part of your Application. . Work methods and type of equipment to be used: Excavators, front end loaders, bulldozers and paving equipment will be on site. After erosion and sediment controls are installed, typical site work methods will be utilized. h._Describe the planned sequence of activities: Install temporary erosion and sediment control measures, where appropriate. Silt fencing, erosion control mats, sediment traps, turbidity curtains and cofferdams will be utilized. Temporary erosion and sediment control measures will be established prior to disturbance. Finalization lof grading will be followed by site stabilization and the removal of the erosion and sediment controls. | Pollution control methods and other actions proposed to mitigate environmental impacts: Pollution prevention and controls include on-site spills kits, equipment cleaning, maintenance, and repair will be conducted in designated areas protected by berms. Toxic materials such as paints, solvents, etc... must be stored in waterproof containers and kept in storage facilities. J Erosion and silt control methods that will be used to prevent water quality impacts: Silt fencing, turbidity curtains and cofferdams will be utilized. Temporary erosion and sediment control measures will be established prior to disturbance. k. Alternatives considered to avoid regulated areas. If no feasible alternatives exist, explain how the project will minimize impacts: ‘The bridge has been closed to traffic due to the structural condition. Rehabilitation was not deemed feasible. | Public Proposed use: [_] Private | Commercial m. Proposed Start Date: [November 2025 ] Estimated Completion Date: [December 2026 n. Has work begun on project? Yes_lf Yes, explain below. Y No o. Will project occupy Federal, State, or Municipal Land? a Yes_If Yes, explain below. No The project will occupy the county-owned right-of-way. p._List any previous DEC, USACE, OGS or DOS Permit / Application numbers for activities at this location None q. Will this project require additional Federal, State, or Local authorizations, including zoning changes? Yes _ if Yes, list below. — No Village of Croton on Hudson and Town of Cortlandt approvals/permitting. JOINT APPLICATION FoRM 04/22 Page 3 of 4   7/5/25 JOINT APPLICATION FORM — Continued. Submit this completed page as part of your Application. 7. Signatures. Applicant and Owner (If different} must sign the application. If the applicant is the landowner, the landowner attestation form can be used as an electronic signature as an alternative to the signature below, if necessary. Append additional pages of this Signature section if there are multiple Applicants, Owners or Contact/Agents. (hereby affirm that information provided on this form and all attachments submitted herewith is true to the best of my knowledge and belief. Permission to Inspect - | hereby consent to Agency inspection of the project site and adjacent property areas. Agency staff may enter the property without notice between 7:00 am and 7:00 pm, Monday - Friday. Inspection may occur without the owner, applicant or agent present. If the property is posted with "keep out" signs or fenced with an unlocked gate, Agency staff may still enter the property. Agency staff may take measurements, analyze site physical characteristics, take soil and vegetation samples, sketch and photograph the site. | understand that failure to give this consent may result in denial of the permit(s) sought by this application. False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the NYS Penal Law. Further, the applicant accepts full responsibility for all damage, direct or indirect, of whatever nature, and by whomever suffered, arising out of the project described herein and agrees to indemnify and save harmless the State from suits, actions, damages and costs of every name and description resulting from said project. In addition, Federal Law, 18 U.S.C., Section 1001 provides for a fine of not more than $10,000 or imprisonment for not more than 5 years, or both where an applicant knowingly and willingly falsifies, conceals, or covers up a material fact; or knowingly makes or uses a false, fictitious or fraudulent statement. Signature of Applicant Date LE fer / VAS Lessee Appii€ant fed be (check all 0 apply): | | Owner ] Operator Printed Name Title Hugh J. Greechan, Jr., P.E. Commissioner of Public Works and Transportation Signature of Owner (if different than Applicant) Date Printed Name Title Date Signature of Contact / Agent 7/5/25 Oe Printed Name Title Melanie Osterhout, P.E. Consultant For Agency Use Only DETERMINATION OF NO PERMIT REQUIRED Agency Application Number [ ] {Agency Name) has determined that No Permit is required from this Agency for the project described in this application. Agency Representative: Printed Title Name Signature Date JOINT APPLICATION Form 04/22 Page 4 of 4 ATTACHMENT A: PROJECT DATABASE MAPPING, WETLAND DELINEATION REPORT AND FEAF USGS Topographic Map Quaker Bridge Replacement Town of Cortlandt Westchester County NOT TO SCALE Project Location Google Earth Site Location Map NOT TO SCALE Project Location Quaker Bridge Replacement Town of Cortlandt Westchester County Site Aerial NOT TO SCALE Project Location Quaker Bridge Replacement Town of Cortlandt Westchester County NYSDEC Environmental Resource Mapper NOT TO SCALE Project Location Quaker Bridge Replacement Town of Cortlandt Westchester County USFWS NWI Mapper NOT TO SCALE Project Location Quaker Bridge Replacement Town of Cortlandt Westchester County NYSHPO CRIS Mapper NOT TO SCALE Project Location Quaker Bridge Replacement Town of Cortlandt Westchester County FEMA Floodplains Mapper NOT TO SCALE Project Location Quaker Bridge Replacement Town of Cortlandt Westchester County USDA Soils Map NOT TO SCALE Project Location Quaker Bridge Replacement Town of Cortlandt Westchester County WETLAND AND ORDINARY HIGH WATER DELINEATION REPORT Quaker Bridge Replacement Town of Cortlandt, Westchester County November 2024 Prepared for: By: 800 Route 146, Bldg. 200 Suite 280, Clifton Park NY 12065 (518) 636-9956 Westchester County Department of Public Works and Transportation 148 Martine Ave. Room 512 White Plains, NY 10601 Quaker Bridge Replacement, Town of Cortlandt November 2024 US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report Page ii OSPA Engineering Services, P.C. TABLE OF CONTENTS 1.0 INTRODUCTION ................................................................................................... 1 2.0 EXISTING CONDITIONS ...................................................................................... 1 2.1 Topography ........................................................................................................ 1 2.2 Soils ................................................................................................................... 1 2.3 Hydrology ........................................................................................................... 1 2.4 Vegetative Communities .................................................................................... 2 2.5 Wetland Mapping ............................................................................................... 2 3.0 METHODOLOGY AND RESULTS ........................................................................ 2 4.0 WETLAND AND WATERWAY IMPACTS ............................................................. 3 LIST OF APPENDICES APPENDIX A: PROJECT DATABASE MAPPING APPENDIX B: PRELIMINARY ORDINARY HIGH WATER DELINEATION WITH DATA POINT APPENDIX C: WETLAND DETERMINATION DATA FORMS Quaker Bridge Replacement, Town of Cortlandt November 2024 US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report Page 1 OSPA Engineering Services, P.C. 1.0 INTRODUCTION This Wetland and Ordinary High Water (OHW) Delineation Report was prepared for a project site located where Quaker Bridge Road crosses the Croton River in the Town of Cortlandt, Westchester County, New York. The “Site Location Map”, in Appendix A – Project Database Mapping, illustrates the site location. 2.0 EXISTING CONDITIONS 2.1 Topography Surface water generally drains to the south by channel or sheet flow. The New York State Department of Environmental Conservation (NYSDEC) Environmental Resource Mapper (ERM), United State Department of Agriculture (USDA) Soil Survey Map, and the United States Geological Survey (USGS) topographic mapping do not identify wetlands within the project area. The United States Fish and Wildlife Service (USFWS) National Wetlands Inventory (NWI) Map and the NYSDEC ERM both identify a river within the project site. 2.2 Soils The following is a description of the soil found on the site. The Soil Survey Mapping with the approximate project boundaries is included in Appendix A. Charlton fine sandy loam, 15 to 25 percent slopes (ChD): This series is comprised of well drained, coarse loamy melt out till derived from granite, gneiss and/or schist. Charlton loam, 35 to 45 percent slopes, very stones (CIF): This series is comprised of well drained, acid loamy till derived mainly from schist, gneiss, or granite. 2.3 Hydrology Surface water generally drains to the south by channel or sheet flow which enters the Croton River (NYSDEC Class B), and eventually the Hudson River (NYSDEC Class SB). The best usage for Class B water is swimming and contact recreation, not suitable for drinking. The best usage for Class SB water is swimming, contact recreation, and fishing. Additionally, Flood Emergency Management Act (FEMA) floodplain maps (36119C0128F, 2007) were reviewed to identify any potential flood risk to the project site. The project site in the vicinity of the crossing is located within the regulatory floodway and in the 100-year floodplain of the Croton River. A review of the National Resources Conservation Service (NRCS) Wetland Determination Climate Data (WETS Table.36119. WESTCHESTER CO AP) for Westchester County indicates that the 20-year average annual rainfall is 58.44 inches per year. Quaker Bridge Replacement, Town of Cortlandt November 2024 US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report Page 2 OSPA Engineering Services, P.C. 2.4 Vegetative Communities Wetland plant communities follow the Cowardin system as identified in the “Classification of Wetlands and Deepwater Habitats of the United States” as utilized by the United States Fish and Wildlife Services (USFWS) National Wetland Inventory (NWI) mapping. The NWI mapping identifies a riverine, tidal, unconsolidated bottom, permanently flooded- tidal riverine community (R1UBV) within the project site. Based on the site visit, the subject property has one waterbody (Croton River). The project corridor is currently comprised of forested tree and shrub cover with an understory of herbaceous cover. The tree cover included Red Maple (Acer rubrum), American Beech (Fagus grandfolia), Eastern Hemlock (Tsuga canadensis), Eastern Sycamore (Platanus occidentalis), and Tulip Tree (Liriodendron tulipfera). The shrub layer included Burning Bush (Euonymus alatus), Witch Hazel (Hamamelis virginiana), and Ironwood (Ostrya virginiana). The herbaceous cover included Christmas Fern (Polystichum acrostichoides), Marginal Wood Fern (Dryopteris marginalis), Shagbark Hickory (Carya ovata), Bitternut Hickory (Carya cordiformis), and Slender Goldenrod (Solidago erecta). 2.5 Wetland Mapping The NYSDEC ERM identifies the approximate locations of the wetlands, streams, and other environmental features on or near the project site that are regulated by the NYSDEC (Appendix A). According to the NYSDEC ERM, there are no state-regulated wetlands on the project site. There is one mapped NYSDEC river (Croton River). Additionally, the NWI mapping for the project site, located in Appendix A, identifies a riverine vegetative community on the site (Croton River). 3.0 METHODOLOGY AND RESULTS The ordinary high water (OHW) determination for the area of investigation was conducted on November 18th, 2024. The delineation was performed using the three-parameter approach described in the United States Army Corps of Engineers’ (USACE) Wetland Delineation Manual and the Northcentral and Northeast Regional Supplement. Data was collected within the regulated areas and uplands at representative points to document the existing vegetation, soils and hydrology. Data sampling protocols followed the USACE Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Northcentral and Northeast guidance for vegetation analysis. The sampling plot sizes were selected to ensure an accurate assessment of the vegetation present within the existing wetland boundaries. A 20’ x 60’ plot (1200 sf) was utilized for both tree and shrub strata, and a 5’ x 20’ plot (100 sf) was utilized for the herb stratum. These plots sizes were selected based on the narrow rectangular shape of the subject property, the site vegetation composition, and the relative vegetation density in each of the strata. Using a soil auger, soil samples were taken approximately 12 inches below the ground surface to characterize soils. Soil colors were documented using a Munsell Soil Color Chart. Hydrology was assessed by evaluating for inundation, saturation, and other site conditions. Quaker Bridge Replacement, Town of Cortlandt November 2024 US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report Page 3 OSPA Engineering Services, P.C. Vegetation found at the sampling locations was identified in terms of the dominant species in the tree, shrub/sapling, herbaceous, and vine layers. The indicator status of the dominant plant species was determined using the “The National Wetland Plant List - Northcentral and Northeast Region 1” (Lichvar, R.W., 2016). Following the establishment of the OHW boundaries in the field, the boundary was collected by hand-held GPS and plotted on the field sketch. This OHW line and approximate property boundary is included within Appendix B (“Preliminary Ordinary High Water and Delineation with Data Point”) and includes the location of a representative data point. The information collected at the data point locations is included in this report as Appendix C – Wetland Determination Data Forms. The field efforts identified one (1) perennial river (Croton River), the OHW was delineated as a flag series of LB (1-16) and RB (1-27). No wetlands were identified during the site visit. The upland areas are generally dominated by maintained right of way, residential homes and maintained lawns, forested shrub and tree cover. 4.0 WETLAND AND WATERWAY IMPACTS It was concluded that Stream LB (1-16) and RB (1-27) will be regulated by the USACE and the NYSDEC as a Class B waterbody. While the site is currently in preliminary design, impacts to regulated waterbodies will be minimized as part of the proposed bridge replacement. It is anticipated that a USACE Section 404 Nationwide Permit 3 will be required based on the anticipated impacts (less than 0.5 acres). In addition, a NYSDEC Article 15 Protection of Waters Permit and a NYSDEC Section 401 Water Quality Certification would be required. Ultimately, the exact permitting pathway can only be confirmed through coordination with the USACE and the NYSDEC. Quaker Bridge Replacement, Town of Cortlandt November 2024 US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report Page 4 OSPA Engineering Services, P.C. References U.S. Army Corps of Engineers. 1987. Wetlands Delineation Manual. U.S. Army Corps of Engineers. 2012. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Northcentral and Northeast Region (Version 2.0) National Wetland Inventory Map, USFWS. USDA Natural Resource Conservation Service. Soil Survey for Westchester County, New York. USDA Natural Resources Conservation Service. National Cooperative Soil Survey. Official Soil Descriptions from the National Soils Database. U.S. Geological Survey. Bridgeport, NY Quadrangle. 2023. Federal Emergency Management Agency. Flood Insurance Rate Map. Map Number 36119C0128F, 2007. Lichvar, R.W. 2016. The National Wetland Plant List - Northcentral and Northeast Region 1. U.S. Army Corps of Engineers, Cold Regions Research and Engineering Laboratory. Appendix A Project Database Mapping DATABASE MAPPING PROVIDED PREVIOUSLY Appendix B Preliminary Wetland and Ordinary High Water Delineation with Data Point Preliminary Wetland and Ordinary High Water Delineation with Data Points NOT TO SCALE Quaker Bridge Replacement Town of Cortlandt Westchester County Appendix C Wetland Determination Data Forms Project/Site: Sampling Date: Applicant/Owner: State: Sampling Point: Investigator(s): Subregion (LRR or MLRA): Lat: Long: Datum: Soil Map Unit Name: NWI classification: Are Vegetation , Soil , or Hydrology Are Vegetation , Soil , or Hydrology SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc. If yes, optional Wetland Site ID: Secondary Indicators (minimum of two required) Wetland Hydrology Present? Crayfish Burrows (C8) Hydrogen Sulfide Odor (C1) No Yes Depth (inches): X X 0 X Depth (inches): X Depth (inches): Saturation Visible on Aerial Imagery (C9) Stunted or Stressed Plants (D1) Geomorphic Position (D2) Sparsely Vegetated Concave Surface (B8) Saturation Present? Saturation (A3) Water Marks (B1) Iron Deposits (B5) Inundation Visible on Aerial Imagery (B7) Presence of Reduced Iron (C4) Recent Iron Reduction in Tilled Soils (C6) Other (Explain in Remarks) Oxidized Rhizospheres on Living Roots (C3) Sediment Deposits (B2) Drift Deposits (B3) Surface Water (A1) FAC-Neutral Test (D5) X Shallow Aquitard (D3) Microtopographic Relief (D4) Remarks: (includes capillary fringe) Yes No No Yes Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Field Observations: Water Table Present? High Water Table (A2) WETLAND DETERMINATION DATA FORM – Northcentral and Northeast Region X X Westchester County No 41.211978° Charlton laom, 35 to 45 percent slopes, very stony 11/18/2024 DP-RBU Quaker Bridge Replacement Westchester County City/County: NY 73.869444° Yes No X No X 0 Yes Remarks: (Explain alternative procedures here or in a separate report.) Yes HYDROLOGY Surface Soil Cracks (B6) Aquatic Fauna (B13) Drainage Patterns (B10) Moss Trim Lines (B16) Dry-Season Water Table (C2) No No X X No Yes No 10 NAD 83 Wetland Hydrology Indicators: Wetland Hydrology Present? Is the Sampled Area within a Wetland? Data point was sampled on streambank, upland. Primary Indicators (minimum of one is required; check all that apply) Yes Yes Hydrophytic Vegetation Present? Hydric Soil Present? Water-Stained Leaves (B9) Slope (%): Landform (hillside, terrace, etc.): Are climatic / hydrologic conditions on the site typical for this time of year? significantly disturbed? Are “Normal Circumstances” present? naturally problematic? Surface Water Present? Section, Township, Range: Concave Local relief (concave, convex, none): Yes Algal Mat or Crust (B4) (If needed, explain any answers in Remarks.) Thin Muck Surface (C7) N. Laing, G. Koetzle LRR R, MLRA 144A (If no, explain in Remarks.) Town of Cortlandt Streambank Marl Deposits (B15) US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point: (Plot size: 1. 2. 3. 4. 5. 6. (A/B) 7. Sapling/Shrub Stratum (Plot size: x 1 = 1. x 2 = 2. x 3 = 3. x 4 = 4. x 5 = 5. Column Totals: (B) 6. 7. Herb Stratum (Plot size: 1. 2. 4 - Morphological Adaptations1 (Provide supporting 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. (Plot size: 1. 2. 3. 4. – Use scientific names of plants. OBL species FACW species FAC species FACU species UPL species DP-RBU 3 6 Liriodendron tulipifera Platanus occidentalis Betula populifolia Quercus coccinea FACU 30'x30' Total Number of Dominant Species Across All Strata: ) Dominance Test worksheet: Number of Dominant Species That Are OBL, FACW, or FAC: No Acer rubrum 12 0 18 36 117 data in Remarks or on a separate sheet) 8 179 108 0 468 Acer rubrum Euonymus alatus Hydrophytic Vegetation Indicators: 40 652 Multiply by: 36 50.0% Percent of Dominant Species That Are OBL, FACW, or FAC: Total % Cover of: Prevalence Index worksheet: 6 No FAC 15 10 10 FACU Yes No 69 15 FAC Yes No No FACU FACU FACU FAC Yes Ostrya virginiana No No Yes No 15 Tree – Woody plants 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Definitions of Vegetation Strata: Herb – All herbaceous (non-woody) plants, regardless of size, and woody plants less than 3.28 ft tall. Hydrophytic Vegetation Present? Woody vines – All woody vines greater than 3.28 ft in height. Yes No Sapling/shrub – Woody plants less than 3 in. DBH and greater than or equal to 3.28 ft (1 m) tall. =Total Cover ) 5'x5' =Total Cover =Total Cover 55 ) Carya cordiformis Solidago erecta Botrychium multifidum 6 5 FACU FACU 3 FACU Equisetum arvense 6 Fraxinus americana Polystichum acrostichoides FACU Indicator Status 25 18 Absolute % Cover Yes Yes FACW FACU 8 No UPL Dominant Species? Euonymus alatus 5 20 15'x15' Tsuga canadensis 3.64 No 55 Problematic Hydrophytic Vegetation1 (Explain) VEGETATION (A) (B) (A) Prevalence Index = B/A = Tree Stratum Woody Vine Stratum Remarks: (Include photo numbers here or on a separate sheet.) 1 - Rapid Test for Hydrophytic Vegetation 2 - Dominance Test is >50% 3 - Prevalence Index is ≤3.01 ) =Total Cover FACU 1Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point: Polyvalue Below Surface (S8) (LRR K, L) Thin Dark Surface (S9) (LRR K, L) Iron-Manganese Masses (F12) (LRR K, L, R) 3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Sandy Gleyed Matrix (S4) Depleted Dark Surface (F7) Redox Depressions (F8) Redox Dark Surface (F6) Hydrogen Sulfide (A4) Stratified Layers (A5) Thick Dark Surface (A12) Sandy Mucky Mineral (S1) Loamy Mucky Mineral (F1) (LRR K, L) Loamy Gleyed Matrix (F2) High Chroma Sands (S11) (LRR K, L) Type: Thin Dark Surface (S9) (LRR R, MLRA 149B) 5 cm Mucky Peat or Peat (S3) (LRR K, L, R) Sandy Redox (S5) Dark Surface (S7) Mesic Spodic (TA6) (MLRA 144A, 145, 149B) Piedmont Floodplain Soils (F19) (MLRA 149B) Red Parent Material (F21) Depleted Matrix (F3) Black Histic (A3) Coast Prairie Redox (A16) (LRR K, L, R) 2Location: PL=Pore Lining, M=Matrix. Hydric Soil Indicators: Polyvalue Below Surface (S8) (LRR R, % Matrix Histic Epipedon (A2) MLRA 149B) Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Histosol (A1) Indicators for Problematic Hydric Soils3: 2 cm Muck (A10) (LRR K, L, MLRA 149B) Redox Features Depth (inches) Color (moist) 2.5YR 3/1 0-8 DP-RBU SOIL Type1 % This data form is revised from Northcentral and Northeast Regional Supplement Version 2.0 to reflect the NRCS Field Indicators of Hydric Soils version 7.0 March 2013 Errata. (http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_051293.docx) Remarks: Stripped Matrix (S6) Restrictive Layer (if observed): Rock No Depleted Below Dark Surface (A11) X 8 Depth (inches): Yes Hydric Soil Present? Color (moist) Marl (F10) (LRR K, L) Other (Explain in Remarks) Loc2 Texture Remarks Loamy/Clayey Very Shallow Dark Surface (TF12) 1Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains. US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Project/Site: Sampling Date: Applicant/Owner: State: Sampling Point: Investigator(s): Subregion (LRR or MLRA): Lat: Long: Datum: Soil Map Unit Name: NWI classification: Are Vegetation , Soil , or Hydrology Are Vegetation , Soil , or Hydrology SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc. If yes, optional Wetland Site ID: Secondary Indicators (minimum of two required) Wetland Hydrology Present? Crayfish Burrows (C8) Hydrogen Sulfide Odor (C1) No Yes Depth (inches): X X 0 X Depth (inches): X Depth (inches): Saturation Visible on Aerial Imagery (C9) Stunted or Stressed Plants (D1) Geomorphic Position (D2) Sparsely Vegetated Concave Surface (B8) Saturation Present? Saturation (A3) Water Marks (B1) Iron Deposits (B5) Inundation Visible on Aerial Imagery (B7) Presence of Reduced Iron (C4) Recent Iron Reduction in Tilled Soils (C6) Other (Explain in Remarks) Oxidized Rhizospheres on Living Roots (C3) Sediment Deposits (B2) Drift Deposits (B3) Surface Water (A1) FAC-Neutral Test (D5) X Shallow Aquitard (D3) Microtopographic Relief (D4) Remarks: (includes capillary fringe) Yes No No Yes Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Field Observations: Water Table Present? High Water Table (A2) WETLAND DETERMINATION DATA FORM – Northcentral and Northeast Region X X Westchester County No 41.212078° Charlton laom, 35 to 45 percent slopes, very stony 11/18/2024 DP-LBU Quaker Bridge Replacement Westchester County City/County: NY 73.868333° Yes No X No X 0 Yes Remarks: (Explain alternative procedures here or in a separate report.) Yes HYDROLOGY Surface Soil Cracks (B6) Aquatic Fauna (B13) Drainage Patterns (B10) Moss Trim Lines (B16) Dry-Season Water Table (C2) No No X X No Yes No 10 NAD 83 Wetland Hydrology Indicators: Wetland Hydrology Present? Is the Sampled Area within a Wetland? Data point was sampled on streambank, upland. Primary Indicators (minimum of one is required; check all that apply) Yes Yes Hydrophytic Vegetation Present? Hydric Soil Present? Water-Stained Leaves (B9) Slope (%): Landform (hillside, terrace, etc.): Are climatic / hydrologic conditions on the site typical for this time of year? significantly disturbed? Are “Normal Circumstances” present? naturally problematic? Surface Water Present? Section, Township, Range: Concave Local relief (concave, convex, none): Yes Algal Mat or Crust (B4) (If needed, explain any answers in Remarks.) Thin Muck Surface (C7) N. Laing, G. Koetzle LRR R, MLRA 144A (If no, explain in Remarks.) Town of Cortlandt Streambank Marl Deposits (B15) US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point: (Plot size: 1. 2. 3. 4. 5. 6. (A/B) 7. Sapling/Shrub Stratum (Plot size: x 1 = 1. x 2 = 2. x 3 = 3. x 4 = 4. x 5 = 5. Column Totals: (B) 6. 7. Herb Stratum (Plot size: 1. 2. 4 - Morphological Adaptations1 (Provide supporting 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. (Plot size: 1. 2. 3. 4. – Use scientific names of plants. OBL species FACW species FAC species FACU species UPL species DP-LBU 0 7 Fragus grandifolia Tsuga canadensis Acer rubrum FAC 30'x30' Total Number of Dominant Species Across All Strata: ) Dominance Test worksheet: Number of Dominant Species That Are OBL, FACW, or FAC: No 6 0 0 9 100 data in Remarks or on a separate sheet) 15 124 27 0 400 Euonymus alatus Fagus grandifolia Hydrophytic Vegetation Indicators: 75 502 Multiply by: 0 0.0% Percent of Dominant Species That Are OBL, FACW, or FAC: Total % Cover of: Prevalence Index worksheet: 10 8 6 FACU Yes No 33 15 FACU Yes No No No FACU FACU FACU 3 UPL Yes Quercus rubra No Yes Yes 12 Tree – Woody plants 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Definitions of Vegetation Strata: Herb – All herbaceous (non-woody) plants, regardless of size, and woody plants less than 3.28 ft tall. Hydrophytic Vegetation Present? Woody vines – All woody vines greater than 3.28 ft in height. Yes No Sapling/shrub – Woody plants less than 3 in. DBH and greater than or equal to 3.28 ft (1 m) tall. =Total Cover ) 5'x5' =Total Cover =Total Cover 44 ) Carya ovata Carya cordiformis 5 5 FACU FACU Fagus grandifolia Acer rubrum 10 Hamamelis virginiana Dryopteris marginalis FACU Indicator Status 15 12 Absolute % Cover Yes Yes FACU FACU Dominant Species? Polystichum acrostichoides 5 12 15'x15' Fraxinus americana 4.05 No 47 Problematic Hydrophytic Vegetation1 (Explain) VEGETATION (A) (B) (A) Prevalence Index = B/A = Tree Stratum Woody Vine Stratum Remarks: (Include photo numbers here or on a separate sheet.) 1 - Rapid Test for Hydrophytic Vegetation 2 - Dominance Test is >50% 3 - Prevalence Index is ≤3.01 ) =Total Cover FAC FACU 1Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point: Polyvalue Below Surface (S8) (LRR K, L) Thin Dark Surface (S9) (LRR K, L) Iron-Manganese Masses (F12) (LRR K, L, R) 3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Sandy Gleyed Matrix (S4) Depleted Dark Surface (F7) Redox Depressions (F8) Redox Dark Surface (F6) Hydrogen Sulfide (A4) Stratified Layers (A5) Thick Dark Surface (A12) Sandy Mucky Mineral (S1) Loamy Mucky Mineral (F1) (LRR K, L) Loamy Gleyed Matrix (F2) High Chroma Sands (S11) (LRR K, L) Type: Thin Dark Surface (S9) (LRR R, MLRA 149B) 5 cm Mucky Peat or Peat (S3) (LRR K, L, R) Sandy Redox (S5) Dark Surface (S7) Mesic Spodic (TA6) (MLRA 144A, 145, 149B) Piedmont Floodplain Soils (F19) (MLRA 149B) Red Parent Material (F21) Depleted Matrix (F3) Black Histic (A3) Coast Prairie Redox (A16) (LRR K, L, R) 2Location: PL=Pore Lining, M=Matrix. Hydric Soil Indicators: Polyvalue Below Surface (S8) (LRR R, % Matrix Histic Epipedon (A2) MLRA 149B) Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Histosol (A1) Indicators for Problematic Hydric Soils3: 2 cm Muck (A10) (LRR K, L, MLRA 149B) Redox Features Depth (inches) Color (moist) 7.5YR 3/1 0-3 DP-LBU SOIL Type1 % This data form is revised from Northcentral and Northeast Regional Supplement Version 2.0 to reflect the NRCS Field Indicators of Hydric Soils version 7.0 March 2013 Errata. (http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_051293.docx) Remarks: Stripped Matrix (S6) Restrictive Layer (if observed): Rock No Depleted Below Dark Surface (A11) X 3 Depth (inches): Yes Hydric Soil Present? Color (moist) Marl (F10) (LRR K, L) Other (Explain in Remarks) Loc2 Texture Remarks Loamy/Clayey Very Shallow Dark Surface (TF12) 1Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains. US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Page 1 of 13 Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information contained in Part 1is accurate and complete. A. Project and Applicant/Sponsor Information. Name of Action or Project: Project Location (describe, and attach a general location map): Brief Description of Proposed Action (include purpose or need): Name of Applicant/Sponsor: Telephone: E-Mail: Address: City/PO: State: Zip Code: Project Contact (if not same as sponsor; give name and title/role): Telephone: E-Mail: Address: City/PO: State: Zip Code: Property Owner (if not same as sponsor): Telephone: E-Mail: Address: City/PO: State: Zip Code: Quaker Bridge Road Bridge Replacement (RB03W) Quaker Bridge Road over Croton River, Town of Cortlandt and Village of Croton-On-Hudson, Westchester County, NY Replacement of the steel truss bridge which carries Quaker Bridge Road over the Croton River. Constructed in 1894, it is a 98-foot long, single-lane bridge with stone abutments that is now closed due to structural deficiencies. The new bridge will be also be a truss bridge made of galvanized steel and built on the existing alignment, but will be approximately 12 feet wider to allow for 2-way vehicular traffic as well as 2-way pedestrian passage. Scope of work will include new concrete abutments and the removal of trees to accommodate construction staging areas and overhead construction activities, such as those utilizing cranes for pile and bridge installation, wingwall installation and site grading. Project limits will be Quaker bridge and approximately 200 feet along the south approach and 500 feet along the north approach to the bridge to accommodate the bridge replacement and reconstructing the roadway impacted by the construction activities, including excavation for the bridge abutment removal and reconstruction. An overhead electrical line may need to be relocated to accommodate overhead construction activities. County of Westchester 914-995-2000 148 Martine Avenue White Plains NY 10601 Hugh J. Greechan, Jr., P.E., Commissioner of Westchester County PW&T 914-995-2546 hjg7@westchestercountyny.gov Department of Public Works and Transportation, 148 Martine Avenue, Room 512 White Plains NY 10601 Bridge owned by County; riverbanks & roads owned by Town of Cortlandt, Village of Croton & NYS Page 2 of 13 B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Required Application Date (Actual or projected) a. City Counsel, Town Board, 9 Yes 9 No or Village Board of Trustees b. City, Town or Village 9 Yes 9 No Planning Board or Commission c. City, Town or 9 Yes 9 No Village Zoning Board of Appeals d. Other local agencies 9 Yes 9 No e. County agencies 9 Yes 9 No f. Regional agencies 9 Yes 9 No g. State agencies 9 Yes 9 No h. Federal agencies 9 Yes 9 No i. Coastal Resources. i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway? 9 Yes 9 No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? 9 Yes 9 No iii. Is the project site within a Coastal Erosion Hazard Area? 9 Yes 9 No C. Planning and Zoning C.1. Planning and zoning actions. Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the 9 Yes 9 No only approval(s) which must be granted to enable the proposed action to proceed? • If Yes, complete sections C, F and G. • If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans. a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site 9 Yes 9 No where the proposed action would be located? If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action 9 Yes 9 No would be located? b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; 9 Yes 9 No Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; or other?) If Yes, identify the plan(s): _______________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, 9 Yes 9 No or an adopted municipal farmland protection plan? If Yes, identify the plan(s): ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ (Village of Croton)  Village of Croton-on-Hudson (property transfer & easement); Town of Cortlandt (various) Coordination ongoing    Water Control Commission (Wetland permit) Waterfront Advisory Committee (LWRP review) TBD  Westchester County Board of Legislators (project authorization and funding) June 2025 (projected)   NYSDEC Section 401/Article 15 NYSHPO (consultation) TBD  USACE NWP#3, USFWS (consultation) TBD       Both Town of Cortlandt and Village of Croton-on-Hudson are Greenway Compact Communities. Site is within the County's Critical Environmental Areas under County and State Park Lands and Croton Point Park. Part of the project area is also within the Village of Croton-on-Hudson's LWRP.  Page 3 of 13 C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. 9 Yes 9 No If Yes, what is the zoning classification(s) including any applicable overlay district? _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ b. Is the use permitted or allowed by a special or conditional use permit? 9 Yes 9 No c. Is a zoning change requested as part of the proposed action? 9 Yes 9 No If Yes, i. What is the proposed new zoning for the site? ___________________________________________________________________ C.4. Existing community services. a. In what school district is the project site located? ________________________________________________________________ b. What police or other public protection forces serve the project site? _________________________________________________________________________________________________________ c. Which fire protection and emergency medical services serve the project site? __________________________________________________________________________________________________________ d. What parks serve the project site? __________________________________________________________________________________________________________ __________________________________________________________________________________________________________ D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? _________________________________________________________________________________________________________ b. a. Total acreage of the site of the proposed action? _____________ acres b. Total acreage to be physically disturbed? _____________ acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? _____________ acres c. Is the proposed action an expansion of an existing project or use? 9 Yes 9 No i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % ____________________ Units: ____________________ d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes 9 No If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ________________________________________________________________________________________________________ ii. Is a cluster/conservation layout proposed? 9 Yes 9 No iii. Number of lots proposed? ________ iv. Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________ 9 Yes 9 No _____ months _____ _____ month _____ year e. Will the proposed action be constructed in multiple phases? i. If No, anticipated period of construction: ii. If Yes: • Total number of phases anticipated • Anticipated commencement date of phase 1 (including demolition) • Anticipated completion date of final phase _____ month _____year • Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: _______________________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________  Croton: PRE-1 Park Recreation and Education and RA-25 One Family Residence; Cortlandt: R-80 Single Family Residential   Croton-Harmon Union Free School District Croton-on-Hudson Police Department, NYS Police and Westchester County Public Safety The Croton Fire District and Westchester Emergency Medical Services N/A 1.2 0.50 0.60  75 1,200 SF increase in deck   10 Infrastructural (transportation) Page 4 of 13 f. Does the project include new residential uses? 9 Yes 9 No If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family (four or more) Initial Phase ___________ ___________ ____________ ________________________ At completion of all phases ___________ ___________ ____________ ________________________ g. Does the proposed action include new non-residential construction (including expansions)? 9 Yes 9 No If Yes, i. Total number of structures ___________ ii. Dimensions (in feet) of largest proposed structure: ________height; ________width; and _______ length iii. Approximate extent of building space to be heated or cooled: ______________________ square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any 9 Yes 9 No liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: ________________________________________________________________________________ ii. If a water impoundment, the principal source of the water: 9 Ground water 9 Surface water streams 9 Other specify: _________________________________________________________________________________________________________ iii. If other than water, identify the type of impounded/contained liquids and their source. _________________________________________________________________________________________________________ iv. Approximate size of the proposed impoundment. Volume: ____________ million gallons; surface area: ____________ acres v. Dimensions of the proposed dam or impounding structure: ________ height; _______ length vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): ________________________________________________________________________________________________________ D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? 9 Yes 9 No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i .What is the purpose of the excavation or dredging? _______________________________________________________________ ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site? • Volume (specify tons or cubic yards): ____________________________________________ • Over what duration of time? ____________________________________________________ iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ iv. Will there be onsite dewatering or processing of excavated materials? 9 Yes 9 No If yes, describe. ___________________________________________________________________________________________ ________________________________________________________________________________________________________ v. What is the total area to be dredged or excavated? _____________________________________acres vi. What is the maximum area to be worked at any one time? _______________________________ acres vii. What would be the maximum depth of excavation or dredging? __________________________ feet viii. Will the excavation require blasting? 9 Yes 9 No ix. Summarize site reclamation goals and plan: _____________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment 9 Yes 9 No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ______________________________________________________________________________________________ _________________________________________________________________________________________________________   1 20 32 100 N/A   Suitable materials to be reused for wider roadway or will be disposed of in off-site location approved by engineer in charge.  Dewatering may be required for full depth removal of abutments. 0.1 0.1 6  Site will be restored to existing conditions.  Croton River Page 5 of 13 ii. iii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ Will the proposed action cause or result in disturbance to bottom sediments? Yes 9 No If Yes, describe: __________________________________________________________________________________________ iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? 9 Yes 9 No If Yes: • acres of aquatic vegetation proposed to be removed: ___________________________________________________________ • expected acreage of aquatic vegetation remaining after project completion:________________________________________ • purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________ ____________________________________________________________________________________________________ • proposed method of plant removal: ________________________________________________________________________ • if chemical/herbicide treatment will be used, specify product(s): _________________________________________________ v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________ _________________________________________________________________________________________________________ c. Will the proposed action use, or create a new demand for water? 9 Yes 9 No If Yes: i. Total anticipated water usage/demand per day: __________________________ gallons/day ii. Will the proposed action obtain water from an existing public water supply? 9 Yes 9 No If Yes: • Name of district or service area: _________________________________________________________________________ • Does the existing public water supply have capacity to serve the proposal? 9 Yes 9 No • Is the project site in the existing district? 9 Yes 9 No • Is expansion of the district needed? 9 Yes 9 No • Do existing lines serve the project site? 9 Yes 9 No iii. Will line extension within an existing district be necessary to supply the project? 9 Yes 9 No If Yes: • Describe extensions or capacity expansions proposed to serve this project: ________________________________________ ____________________________________________________________________________________________________ • Source(s) of supply for the district: ________________________________________________________________________ iv. Is a new water supply district or service area proposed to be formed to serve the project site? 9 Yes 9 No If, Yes: • Applicant/sponsor for new district: ________________________________________________________________________ • Date application submitted or anticipated: __________________________________________________________________ • Proposed source(s) of supply for new district: _______________________________________________________________ v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________ _________________________________________________________________________________________________________ vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: _______ gallons/minute. d. Will the proposed action generate liquid wastes? 9 Yes 9 No If Yes: i. Total anticipated liquid waste generation per day: _______________ gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): __________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ iii. Will the proposed action use any existing public wastewater treatment facilities? 9 Yes 9 No If Yes: • Name of wastewater treatment plant to be used: _____________________________________________________________ • Name of district: ______________________________________________________________________________________ • Does the existing wastewater treatment plant have capacity to serve the project? 9 Yes 9 No • Is the project site in the existing district? 9 Yes 9 No • Is expansion of the district needed? 9 Yes 9 No Croton River, less than 0.1 acres of permanent impacts. New wing walls will be constructed on both banks, with site grading and placement of riprap on banks.     Page 6 of 13 9 Yes 9 No • Do existing sewer lines serve the project site? • Will a line extension within an existing district be necessary to serve the project? 9 Yes 9 No If Yes: • Describe extensions or capacity expansions proposed to serve this project: ____________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? 9 Yes 9 No If Yes: • Applicant/sponsor for new district: ____________________________________________________________________ • Date application submitted or anticipated: _______________________________________________________________ • What is the receiving water for the wastewater discharge? __________________________________________________ v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point 9 Yes 9 No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e. sheet flow) during construction or post construction? If Yes: i. How much impervious surface will the project create in relation to total size of project parcel? _____ Square feet or _____ acres (impervious surface) _____ Square feet or _____ acres (parcel size) ii. Describe types of new point sources. __________________________________________________________________________ _________________________________________________________________________________________________________ iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water or off-site surface waters)? ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ • If to surface waters, identify receiving water bodies or wetlands: ________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ • Will stormwater runoff flow to adjacent properties? 9 Yes 9 No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? 9 Yes 9 No f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel 9 Yes 9 No combustion, waste incineration, or other processes or operations? If Yes, identify: i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) _________________________________________________________________________________________________________ ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ________________________________________________________________________________________________________ iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation) ________________________________________________________________________________________________________ g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit, 9 Yes 9 No or Federal Clean Air Act Title IV or Title V Permit? If Yes: i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet 9 Yes 9 No ambient air quality standards for all or some parts of the year) ii. In addition to emissions as calculated in the application, the project will generate: • ___________Tons/year (short tons) of Carbon Dioxide (CO2) • ___________Tons/year (short tons) of Nitrous Oxide (N2O) • ___________Tons/year (short tons) of Perfluorocarbons (PFCs) • ___________Tons/year (short tons) of Sulfur Hexafluoride (SF6) • ___________Tons/year (short tons) of Carbon Dioxide equivalent of Hydroflourocarbons (HFCs) • ___________Tons/year (short tons) of Hazardous Air Pollutants (HAPs)    Page 7 of 13 h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants, 9 Yes 9 No landfills, composting facilities)? If Yes: i. Estimate methane generation in tons/year (metric): ________________________________________________________________ ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or electricity, flaring): ________________________________________________________________________________________ _________________________________________________________________________________________________________ i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as 9 Yes 9 No quarry or landfill operations? If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial 9 Yes 9 No new demand for transportation facilities or services? If Yes: i. When is the peak traffic expected (Check all that apply): † Morning † Evening †Weekend † Randomly between hours of __________ to ________. ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): _____________ iii. iv. v. Parking spaces: Existing ___________________ Proposed ___________ Net increase/decrease _____________________ Does the proposed action include any shared use parking? Yes No 9 Yes 9 No vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric 9 Yes 9 No or other alternative fueled vehicles? viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing 9 Yes 9 No pedestrian or bicycle routes? k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand 9 Yes 9 No for energy? If Yes: i. Estimate annual electricity demand during operation of the proposed action: ____________________________________________ _________________________________________________________________________________________________________ ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other): ________________________________________________________________________________________________________ iii. Will the proposed action require a new, or an upgrade, to an existing substation? 9 Yes 9 No l. Hours of operation. Answer all items which apply. i. During Construction: ii. During Operations: • Monday - Friday: _________________________ • Monday - Friday: ____________________________ • Saturday: ________________________________ • Saturday: ___________________________________ • Sunday: _________________________________ • Sunday: ____________________________________ • Holidays: ________________________________ • Holidays: ___________________________________ If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: ________________________________________________________________________________________________________ ________________________________________________________________________________________________________     7am-5pm N/A N/A N/A N/A Page 8 of 13 m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, 9 Yes 9 No operation, or both? If yes: i. Provide details including sources, time of day and duration: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? 9 Yes 9 No Describe: _________________________________________________________________________________________________ _________________________________________________________________________________________________________ n. W th ill prop e os actio ed hav n e outd ligh oor ting? 9 Yes 9 No If yes: i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? 9 Yes 9 No Describe: _________________________________________________________________________________________________ _________________________________________________________________________________________________________ o. Does the proposed action have the potential to produce odors for more than one hour per day? 9 Yes 9 No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: ______________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ p. 9 Yes 9 No Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes: i. Product(s) to be stored ______________________________________________________________________________________ ii. Volume(s) ______ per unit time ___________ (e.g., month, year) iii. Generally, describe the proposed storage facilities:________________________________________________________________ ________________________________________________________________________________________________________ q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides, 9 Yes 9 No insecticides) during construction or operation? If Yes: i. Describe proposed treatment(s): ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ii. Will the proposed action use Integrated Pest Management Practices? 9 Yes 9 No r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal 9 Yes 9 No of solid waste (excluding hazardous materials)? If Yes: i. Describe any solid waste(s) to be generated during construction or operation of the facility: • Construction: ____________________ tons per ________________ (unit of time) • Operation : ____________________ tons per ________________ (unit of time) ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste: • Construction: ________________________________________________________________________________________ ____________________________________________________________________________________________________ • Operation: __________________________________________________________________________________________ ____________________________________________________________________________________________________ iii. Proposed disposal methods/facilities for solid waste generated on-site: • Construction: ________________________________________________________________________________________ ____________________________________________________________________________________________________ • Operation: __________________________________________________________________________________________ ____________________________________________________________________________________________________  During construction only for the hours previously listed.       Page 9 of 13 s. Does the proposed action include construction or modification of a solid waste management facility? 9 Yes 9 No If Yes: i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or other disposal activities): ___________________________________________________________________________________ ii. Anticipated rate of disposal/processing: • ________ Tons/month, if transfer or other non-combustion/thermal treatment, or • ________ Tons/hour, if combustion or thermal treatment iii. If landfill, anticipated site life: ________________________________ years t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous 9 Yes 9 No waste? If Yes: i. Name(s) of all hazardous wastes or constituents to be generated, handled or managed at facility: ___________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ ii. Generally describe processes or activities involving hazardous wastes or constituents: ___________________________________ _________________________________________________________________________________________________________ ________________________________________________________________________________________________________ iii. Specify amount to be handled or generated _____ tons/month iv. Describe any proposals for on-site minimization, recycling or reuse of hazardous constituents: ____________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? 9 Yes 9 No If Yes: provide name and location of facility: _______________________________________________________________________ ________________________________________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ E. Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a. Existing land uses. i. Check all uses that occur on, adjoining and near the project site. 9 Urban 9 Industrial 9 Commercial 9 Residential (suburban) 9 Rural (non-farm) 9 Forest 9 Agriculture 9 Aquatic 9 Other (specify): ____________________________________ ii. If mix of uses, generally describe: __________________________________________________________________________________________________________ __________________________________________________________________________________________________________ b. Land uses and covertypes on the project site. Land use or Covertype Current Acreage Acreage After Project Completion Change (Acres +/-) • Roads, buildings, and other paved or impervious surfaces • Forested • Meadows, grasslands or brushlands (non- agricultural, including abandoned agricultural) • Agricultural (includes active orchards, field, greenhouse etc.) • Surface water features (lakes, ponds, streams, rivers, etc.) • Wetlands (freshwater or tidal) • Non-vegetated (bare rock, earth or fill) • Other Describe: _______________________________ ________________________________________      Shoreline 0.20 0.21 +0.01 0.50 0.19 -0.31 0 0.30 +0.30 0.40 0.39 -0.01 0.10 0.11 +0.01 Page 10 of 13 c. Is the project site presently used by members of the community for public recreation? 9 Yes 9 No i. If Yes: explain: __________________________________________________________________________________________ d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed 9 Yes 9 No day care centers, or group homes) within 1500 feet of the project site? If Yes, i. Identify Facilities: ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ e. Does the project site contain an existing dam? 9 Yes 9 No If Yes: i. Dimensions of the dam and impoundment: • Dam height: _________________________________ feet • Dam length: _________________________________ feet • Surface area: _________________________________ acres • Volume impounded: _______________________________ gallons OR acre-feet ii. Dam=s existing hazard classification: _________________________________________________________________________ iii. Provide date and summarize results of last inspection: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, 9 Yes 9 No or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility? If Yes: i. Has the facility been formally closed? 9 Yes 9 No • If yes, cite sources/documentation: _______________________________________________________________________ ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ iii. Describe any development constraints due to the prior solid waste activities: __________________________________________ _______________________________________________________________________________________________________ g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin 9 Yes 9 No property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any 9 Yes 9 No remedial actions been conducted at or adjacent to the proposed site? If Yes: i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site 9 Yes 9 No Remediation database? Check all that apply: 9 Yes – Spills Incidents database Provide DEC ID number(s): ________________________________ 9 Yes – Environmental Site Remediation database Provide DEC ID number(s): ________________________________ 9 Neither database ii. If site has been subject of RCRA corrective activities, describe control measures:_______________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? 9 Yes 9 No If yes, provide DEC ID number(s): ______________________________________________________________________________ iv. If yes to (i), (ii) or (iii) above, describe current status of site(s): _______________________________________________________________________________________________________ _______________________________________________________________________________________________________  Pedestrian use for Croton Gorge Trail Access        Page 11 of 13 v. Is the project site subject to an institutional control limiting property uses? 9 Yes 9 No • If yes, DEC site ID number: ____________________________________________________________________________ • Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________ • Describe any use limitations: ___________________________________________________________________________ • Describe any engineering controls: _______________________________________________________________________ • Will the project affect the institutional or engineering controls in place? 9 Yes 9 No • Explain: ____________________________________________________________________________________________ ___________________________________________________________________________________________________ ___________________________________________________________________________________________________ E.2. Natural Resources On or Near Project Site a. What is the average depth to bedrock on the project site? ________________ feet b. Are there bedrock outcroppings on the project site? 9 Yes 9 No If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________% c. Predominant soil type(s) present on project site: ___________________________ __________% ___________________________ __________% ____________________________ __________% d. What is the average depth to the water table on the project site? Average: _________ feet e. Drainage status of project site soils: 9 Well Drained: _____% of site 9 Moderately Well Drained: _____% of site 9 Poorly Drained _____% of site f. Approximate proportion of proposed action site with slopes: 9 0-10%: _____% of site 9 10-15%: _____% of site 9 15% or greater: _____% of site g. Are there any unique geologic features on the project site? 9 Yes 9 No If Yes, describe: _____________________________________________________________________________________________ ________________________________________________________________________________________________________ h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, 9 Yes 9 No ponds or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? 9 Yes 9 No If Yes to either i or ii, continue. If No, skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, 9 Yes 9 No state or local agency? iv. For each identified regulated wetland and waterbody on the project site, provide the following information: • Streams: Name ____________________________________________ Classification _______________________ • Lakes or Ponds: Name ____________________________________________ Classification _______________________ • Wetlands: Name ____________________________________________ Approximate Size ___________________ • Wetland No. (if regulated by DEC) _____________________________ v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired 9 Yes 9 No waterbodies? If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________ ___________________________________________________________________________________________________________ i. Is the project site in a designated Floo dway? 9 Yes 9 No j. Is the project site in the 100-year Floodplain? 9 Yes 9 No k. Is the project site in the 500-year Floodplain? 9 Yes 9 No l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? 9 Yes 9 No If Yes: i. Name of aquifer: _________________________________________________________________________________________  >7  Charlton loam (ClF) 98.3 Paxton fine Sandy loam (PnB) 1.7 >6  100  1.7  98.3     B 864-68 Federal Waters, Federal Waters, Federal Waters,...      Principal Aquifer, Primary Aquifer Page 12 of 13 m. Identify the predominant wildlife species that occupy or use the project site: ______________________________ ______________________________ _______________________________ ______________________________ ______________________________ _______________________________ ______________________________ n. Does the project site contain a designated significant natural community? 9 Yes 9 No If Yes: i. Describe the habitat/community (composition, function, and basis for designation): _____________________________________ ________________________________________________________________________________________________________ ii. Source(s) of description or evaluation: ________________________________________________________________________ iii. Extent of community/habitat: • Currently: ______________________ acres • Following completion of project as proposed: _____________________ acres • Gain or loss (indicate + or -): ______________________ acres o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as 9 Yes 9 No endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of 9 Yes 9 No special concern? q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? 9 Yes 9 No If yes, give a brief description of how the proposed action may affect that use: ___________________________________________ ________________________________________________________________________________________________________ E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to 9 Yes 9 No Agriculture and Markets Law, Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: _________________________________________________________________ b. Are agricultural lands consisting of highly productive soils present? 9 Yes 9 No i. If Yes: acreage(s) on project site? ___________________________________________________________________________ ii. Source(s) of soil rating(s): _________________________________________________________________________________ c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National 9 Yes 9 No Natural Landmark? If Yes: i. Nature of the natural landmark: 9 Biological Community 9 Geological Feature ii. Provide brief description of landmark, including values behind designation and approximate size/extent: ___________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? 9 Yes 9 No If Yes: i. CEA name: _____________________________________________________________________________________________ ii. Basis for designation: _____________________________________________________________________________________ iii. Designating agency and date: ______________________________________________________________________________ If Yes: i. Species and listing (endangered or threatened):______________________________________________________________________________ ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ If Yes: i. Species and listing:____________________________________________________________________________________________________ _______________________________________________________________________________________________________________________ Consultant observed: Grey Squirrel Nearby eBird sitings: Canada Goose Prior observations: Bass, Minnows, Bald Eagle, Mallard, White-tailed Deer Tufted Titmouse, Common Merganser Chubs, Shiners, American Eel, Herons, Common Grackle, Dark-eyed Junco Green Frogs,Chipmunks, Raccons     Croton River is used for fishing and is accessible at multiple locations beyond the project area, which will not be impacted.    County & State Park Lands Exceptional or unique character Agency:Westchester County, Date:1-31-90  Page 13 of 13 e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district 9 Yes 9 No which is listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes: i. Nature of historic/archaeological resource: 9 Archaeological Site 9 Historic Building or District ii. Name: _________________________________________________________________________________________________ iii. Brief description of attributes on which listing is based: _______________________________________________________________________________________________________ f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for 9 Yes 9 No archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory? g. Have additional archaeological or historic site(s) or resources been identified on the project site? 9 Yes 9 No If Yes: i. Describe possible resource(s): _______________________________________________________________________________ ii. Basis for identification: ___________________________________________________________________________________ h. 9 Yes 9 No Is the project site within fives miles of any officially designated and publicly accessible federal, state, or local scenic or aesthetic resource? If Yes: i. Identify resource: _________________________________________________________________________________________ ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail or scenic byway, etc.): ___________________________________________________________________________________________________ iii. Distance between project and resource: _____________________ miles. i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers 9 Yes 9 No Program 6 NYCRR 666? If Yes: i. Identify the name of the river and its designation: ________________________________________________________________ ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? 9 Yes 9 No F. Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name ___________________________________ Date_______________________________________ Signature________________________________________________ Title_______________________________________   Eligible property:Quaker Bridge. BIN 3348560, Old Croton Aqueduct Bridge is architecturally significant, recognizing it as a rare and outstanding example of a late nineteenth-century Pratt Truss bridge.    Black Rock Park, Silver Lake Park, Croton Gorge Trail, Croton Gorge Park, Old Croton Aqueduct State Historic Park Local, County and State parks and trails 0 - 0.1  County of Westchester April 15, 2025 (Revised: June 26, 2025) PRINT FORM Assistant Commissioner EAF Mapper Summary Report Thursday, November 21, 2024 11:39 AM Disclaimer: The EAF Mapper is a screening tool intended to assist project sponsors and reviewing agencies in preparing an environmental assessment form (EAF). Not all questions asked in the EAF are answered by the EAF Mapper. Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC, you may also need to contact local or other data sources in order to obtain data not provided by the Mapper. Digital data is not a substitute for agency determinations. B.i.i [Coastal or Waterfront Area] Yes B.i.ii [Local Waterfront Revitalization Area] Yes C.2.b. [Special Planning District] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h [DEC Spills or Remediation Site - Potential Contamination History] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h.i [DEC Spills or Remediation Site - Listed] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h.i [DEC Spills or Remediation Site - Environmental Site Remediation Database] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h.iii [Within 2,000' of DEC Remediation Site] No E.2.g [Unique Geologic Features] No E.2.h.i [Surface Water Features] Yes E.2.h.ii [Surface Water Features] Yes E.2.h.iii [Surface Water Features] Yes - Digital mapping information on local and federal wetlands and waterbodies is known to be incomplete. Refer to EAF Workbook. E.2.h.iv [Surface Water Features - Stream Name] 864-68 E.2.h.iv [Surface Water Features - Stream Classification] B E.2.h.iv [Surface Water Features - Wetlands Name] Federal Waters E.2.h.v [Impaired Water Bodies] No E.2.i. [Floodway] Yes E.2.j. [100 Year Floodplain] Yes E.2.k. [500 Year Floodplain] Yes 1 Full Environmental Assessment Form - EAF Mapper Summary Report E.2.l. [Aquifers] Yes E.2.l. [Aquifer Names] Principal Aquifer, Primary Aquifer E.2.n. [Natural Communities] No E.2.o. [Endangered or Threatened Species] No E.2.p. [Rare Plants or Animals] No E.3.a. [Agricultural District] No E.3.c. [National Natural Landmark] No E.3.d [Critical Environmental Area] Yes E.3.d [Critical Environmental Area - Name] County & State Park Lands E.3.d.ii [Critical Environmental Area - Reason] Exceptional or unique character E.3.d.iii [Critical Environmental Area – Date and Agency] Agency:Westchester County, Date:1-31-90 E.3.e. [National or State Register of Historic Places or State Eligible Sites] Yes - Digital mapping data for archaeological site boundaries are not available. Refer to EAF Workbook. E.3.e.ii [National or State Register of Historic Places or State Eligible Sites - Name] Eligible property:Quaker Bridge. BIN 3348560, Old Croton Aqueduct E.3.f. [Archeological Sites] Yes E.3.i. [Designated River Corridor] No 2 Full Environmental Assessment Form - EAF Mapper Summary Report Page 1 of 10 Full Environmental Assessment Form Part 2 - Identification of Potential Project Impacts Part 2 is to be completed by the lead agency. Part 2 is designed to help the lead agency inventory all potential resources that could be affected by a proposed project or action. We recognize that the lead agency=s reviewer(s) will not necessarily be environmental professionals. So, the questions are designed to walk a reviewer through the assessment process by providing a series of questions that can be answered using the information found in Part 1. To further assist the lead agency in completing Part 2, the form identifies the most relevant questions in Part 1 that will provide the information needed to answer the Part 2 question. When Part 2 is completed, the lead agency will have identified the relevant environmental areas that may be impacted by the proposed activity. If the lead agency is a state agency and the action is in any Coastal Area, complete the Coastal Assessment Form before proceeding with this assessment. Tips for completing Part 2: • Review all of the information provided in Part 1. • Review any application, maps, supporting materials and the Full EAF Workbook. • Answer each of the 18 questions in Part 2. • If you answer “Yes” to a numbered question, please complete all the questions that follow in that section. • If you answer “No” to a numbered question, move on to the next numbered question. • Check appropriate column to indicate the anticipated size of the impact. • Proposed projects that would exceed a numeric threshold contained in a question should result in the reviewing agency checking the box “Moderate to large impact may occur.” • The reviewer is not expected to be an expert in environmental analysis. • If you are not sure or undecided about the size of an impact, it may help to review the sub-questions for the general question and consult the workbook. • When answering a question consider all components of the proposed activity, that is, the Awhole action@. • Consider the possibility for long-term and cumulative impacts as well as direct impacts. • Answer the question in a reasonable manner considering the scale and context of the project. 1. Impact on Land Proposed action may involve construction on, or physical alteration of, † NO † YES the land surface of the proposed site. (See Part 1. D.1) If “Yes”, answer questions a - j. If “No”, move on to Section 2. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may involve construction on land where depth to water table is less than 3 feet. E2d 9 9 b. The proposed action may involve construction on slopes of 15% or greater. E2f 9 9 c. The proposed action may involve construction on land where bedrock is exposed, or generally within 5 feet of existing ground surface. E2a 9 9 d. The proposed action may involve the excavation and removal of more than 1,000 tons of natural material. D2a 9 9 e. The proposed action may involve construction that continues for more than one year or in multiple phases. D1e 9 9 f. The proposed action may result in increased erosion, whether from physical disturbance or vegetation removal (including from treatment by herbicides). D2e, D2q 9 9 g. The proposed action is, or may be, located within a Coastal Erosion hazard area. B1i 9 9 h. Other impacts: _______________________________________________________ ___________________________________________________________________ 9 9 Agency Use Only [If applicable] Project : Date : FEAF 2019 RB03W June 2025         Page 2 of 10 2. Impact on Geological Features The proposed action may result in the modification or destruction of, or inhibit access to, any unique or unusual land forms on the site (e.g., cliffs, dunes, † NO † YES minerals, fossils, caves). (See Part 1. E.2.g) If “Yes”, answer questions a - c. If “No”, move on to Section 3. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. Identify the specific land form(s) attached: ________________________________ ___________________________________________________________________ E2g 9 9 b. The proposed action may affect or is adjacent to a geological feature listed as a registered National Natural Landmark. Specific feature: _____________________________________________________ E3c 9 9 c. Other impacts: ______________________________________________________ ___________________________________________________________________ 9 9 3. Impacts on Surface Water The proposed action may affect one or more wetlands or other surface water † NO † YES bodies (e.g., streams, rivers, ponds or lakes). (See Part 1. D.2, E.2.h) If “Yes”, answer questions a - l. If “No”, move on to Section 4. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may create a new water body. D2b, D1h 9 9 b. The proposed action may result in an increase or decrease of over 10% or more than a 10 acre increase or decrease in the surface area of any body of water. D2b 9 9 c. The proposed action may involve dredging more than 100 cubic yards of material from a wetland or water body. D2a 9 9 d. The proposed action may involve construction within or adjoining a freshwater or tidal wetland, or in the bed or banks of any other water body. E2h 9 9 e. The proposed action may create turbidity in a waterbody, either from upland erosion, runoff or by disturbing bottom sediments. D2a, D2h 9 9 f. The proposed action may include construction of one or more intake(s) for withdrawal of water from surface water. D2c 9 9 g. The proposed action may include construction of one or more outfall(s) for discharge of wastewater to surface water(s). D2d 9 9 h. The proposed action may cause soil erosion, or otherwise create a source of stormwater discharge that may lead to siltation or other degradation of receiving water bodies. D2e 9 9 i. The proposed action may affect the water quality of any water bodies within or downstream of the site of the proposed action. E2h 9 9 j. The proposed action may involve the application of pesticides or herbicides in or around any water body. D2q, E2h 9 9 k. The proposed action may require the construction of new, or expansion of existing, wastewater treatment facilities. D1a, D2d 9 9              Page 3 of 10 l. Other impacts: _______________________________________________________ ___________________________________________________________________ 9 9 4. Impact on groundwater The proposed action may result in new or additional use of ground water, or † NO † YES may have the potential to introduce contaminants to ground water or an aquifer. (See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t) If “Yes”, answer questions a - h. If “No”, move on to Section 5. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may require new water supply wells, or create additional demand on supplies from existing water supply wells. D2c 9 9 b. Water supply demand from the proposed action may exceed safe and sustainable withdrawal capacity rate of the local supply or aquifer. Cite Source: ________________________________________________________ D2c 9 9 c. The proposed action may allow or result in residential uses in areas without water and sewer services. D1a, D2c 9 9 d. The proposed action may include or require wastewater discharged to groundwater. D2d, E2l 9 9 e. The proposed action may result in the construction of water supply wells in locations where groundwater is, or is suspected to be, contaminated. D2c, E1f, E1g, E1h 9 9 f. The proposed action may require the bulk storage of petroleum or chemical products over ground water or an aquifer. D2p, E2l 9 9 g. The proposed action may involve the commercial application of pesticides within 100 feet of potable drinking water or irrigation sources. E2h, D2q, E2l, D2c 9 9 h. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 5. Impact on Flooding The proposed action may result in development on lands subject to flooding. † NO † YES (See Part 1. E.2) If “Yes”, answer questions a - g. If “No”, move on to Section 6. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may result in development in a designated floodway. E2i 9 9 b. The proposed action may result in development within a 100 year floodplain. E2j 9 9 c. The proposed action may result in development within a 500 year floodplain. E2k 9 9 d. The proposed action may result in, or require, modification of existing drainage patterns. D2b, D2e 9 9 e. The proposed action may change flood water flows that contribute to flooding. D2b, E2i, E2j, E2k 9 9 f. If there is a dam located on the site of the proposed action, is the dam in need of repair, or upgrade? E1e 9 9         Page 4 of 10 g. Other impacts: ______________________________________________________ ___________________________________________________________________ 9 9 6. Impacts on Air † NO † YES The proposed action may include a state regulated air emission source. (See Part 1. D.2.f., D.2.h, D.2.g) If “Yes”, answer questions a - f. If “No”, move on to Section 7. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. If the proposed action requires federal or state air emission permits, the action may also emit one or more greenhouse gases at or above the following levels: i. More than 1000 tons/year of carbon dioxide (CO2) ii. More than 3.5 tons/year of nitrous oxide (N2O) iii. More than 1000 tons/year of carbon equivalent of perfluorocarbons (PFCs) iv. More than .045 tons/year of sulfur hexafluoride (SF6) v. More than 1000 tons/year of carbon dioxide equivalent of hydrochloroflourocarbons (HFCs) emissions vi. 43 tons/year or more of methane D2g D2g D2g D2g D2g D2h 9 9 9 9 9 9 9 9 9 9 9 9 b. The proposed action may generate 10 tons/year or more of any one designated hazardous air pollutant, or 25 tons/year or more of any combination of such hazardous air pollutants. D2g 9 9 c. The proposed action may require a state air registration, or may produce an emissions rate of total contaminants that may exceed 5 lbs. per hour, or may include a heat source capable of producing more than 10 million BTU=s per hour. D2f, D2g 9 9 d. The proposed action may reach 50% of any of the thresholds in “a” through “c”, above. D2g 9 9 e. The proposed action may result in the combustion or thermal treatment of more than 1 ton of refuse per hour. D2s 9 9 f. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 7. Impact on Plants and Animals The proposed action may result in a loss of flora or fauna. (See Part 1. E.2. m.-q.) † NO † YES If “Yes”, answer questions a - j. If “No”, move on to Section 8. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may cause reduction in population or loss of individuals of any threatened or endangered species, as listed by New York State or the Federal government, that use the site, or are found on, over, or near the site. E2o 9 9 b. The proposed action may result in a reduction or degradation of any habitat used by any rare, threatened or endangered species, as listed by New York State or the federal government. E2o 9 9 c. The proposed action may cause reduction in population, or loss of individuals, of any species of special concern or conservation need, as listed by New York State or the Federal government, that use the site, or are found on, over, or near the site. E2p 9 9 d. The proposed action may result in a reduction or degradation of any habitat used by any species of special concern and conservation need, as listed by New York State or the Federal government. E2p 9 9       Page 5 of 10 e. The proposed action may diminish the capacity of a registered National Natural Landmark to support the biological community it was established to protect. E3c 9 9 f. The proposed action may result in the removal of, or ground disturbance in, any portion of a designated significant natural community. Source: ____________________________________________________________ E2n 9 9 g. The proposed action may substantially interfere with nesting/breeding, foraging, or over-wintering habitat for the predominant species that occupy or use the project site. E2m 9 9 h. The proposed action requires the conversion of more than 10 acres of forest, grassland or any other regionally or locally important habitat. Habitat type & information source: ______________________________________ __________________________________________________________________ E1b 9 9 i. Proposed action (commercial, industrial or recreational projects, only) involves use of herbicides or pesticides. D2q 9 9 j. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 8. Impact on Agricultural Resources The proposed action may impact agricultural resources. (See Part 1. E.3.a. and b.) † NO † YES If “Yes”, answer questions a - h. If “No”, move on to Section 9. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may impact soil classified within soil group 1 through 4 of the NYS Land Classification System. E2c, E3b 9 9 b. The proposed action may sever, cross or otherwise limit access to agricultural land (includes cropland, hayfields, pasture, vineyard, orchard, etc). E1a, Elb 9 9 c. The proposed action may result in the excavation or compaction of the soil profile of active agricultural land. E3b 9 9 d. The proposed action may irreversibly convert agricultural land to non-agricultural uses, either more than 2.5 acres if located in an Agricultural District, or more than 10 acres if not within an Agricultural District. E1b, E3a 9 9 e. The proposed action may disrupt or prevent installation of an agricultural land management system. El a, E1b 9 9 f. The proposed action may result, directly or indirectly, in increased development potential or pressure on farmland. C2c, C3, D2c, D2d 9 9 g. The proposed project is not consistent with the adopted municipal Farmland Protection Plan. C2c 9 9 h. Other impacts: ________________________________________________________ 9 9       The project will require the removal of approximately 76 trees with DBH of 2 inches or greater; of which 45 are between 6-inch to 32-inch DBH.  Page 6 of 10 9. Impact on Aesthetic Resources The land use of the proposed action are obviously different from, or are in † NO † YES sharp contrast to, current land use patterns between the proposed project and a scenic or aesthetic resource. (Part 1. E.1.a, E.1.b, E.3.h.) If “Yes”, answer questions a - g. If “No”, go to Section 10. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. Proposed action may be visible from any officially designated federal, state, or local scenic or aesthetic resource. E3h 9 9 b. The proposed action may result in the obstruction, elimination or significant screening of one or more officially designated scenic views. E3h, C2b 9 9 c. The proposed action may be visible from publicly accessible vantage points: i. Seasonally (e.g., screened by summer foliage, but visible during other seasons) ii. Year round E3h 9 9 9 9 d. The situation or activity in which viewers are engaged while viewing the proposed action is: i. Routine travel by residents, including travel to and from work ii. Recreational or tourism based activities E3h E2q, E1c 9 9 9 9 e. The proposed action may cause a diminishment of the public enjoyment and appreciation of the designated aesthetic resource. E3h 9 9 f. There are similar projects visible within the following distance of the proposed project: 0-1/2 mile ½ -3 mile 3-5 mile 5+ mile D1a, E1a, D1f, D1g 9 9 g. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 10. Impact on Historic and Archeological Resources The proposed action may occur in or adjacent to a historic or archaeological † NO † YES resource. (Part 1. E.3.e, f. and g.) If “Yes”, answer questions a - e. If “No”, go to Section 11. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur E3e 9 9 b. The proposed action may occur wholly or partially within, or substantially contiguous to, an area designated as sensitive for archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory. E3f 9 9 c. The proposed action may occur wholly or partially within, or substantially contiguous to, an archaeological site not included on the NY SHPO inventory. Source: ____________________________________________________________ E3g 9 9 a. The proposed action may occur wholly or partially within, or substantially contiguous to, any buildings, archaeological site or district which is listed on the National or State Register of Historical Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places.      Page 7 of 10 d. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 e. If any of the above (a-d) are answered “Moderate to large impact may occur”, continue with the following questions to help support conclusions in Part 3: i. The proposed action may result in the destruction or alteration of all or part of the site or property. ii. The proposed action may result in the alteration of the property’s setting or integrity. iii. The proposed action may result in the introduction of visual elements which are out of character with the site or property, or may alter its setting. E3e, E3g, E3f E3e, E3f, E3g, E1a, E1b E3e, E3f, E3g, E3h, C2, C3 9 9 9 9 9 9 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a † NO † YES reduction of an open space resource as designated in any adopted municipal open space plan. (See Part 1. C.2.c, E.1.c., E.2.q.) If “Yes”, answer questions a - e. If “No”, go to Section 12. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may result in an impairment of natural functions, or “ecosystem services”, provided by an undeveloped area, including but not limited to stormwater storage, nutrient cycling, wildlife habitat. D2e, E1b E2h, E2m, E2o, E2n, E2p 9 9 b. The proposed action may result in the loss of a current or future recreational resource. C2a, E1c, C2c, E2q 9 9 c. The proposed action may eliminate open space or recreational resource in an area with few such resources. C2a, C2c E1c, E2q 9 9 d. The proposed action may result in loss of an area now used informally by the community as an open space resource. C2c, E1c 9 9 e. Other impacts: _____________________________________________________ _________________________________________________________________ 9 9 12. Impact on Critical Environmental Areas The proposed action may be located within or adjacent to a critical † NO † YES environmental area (CEA). (See Part 1. E.3.d) If “Yes”, answer questions a - c. If “No”, go to Section 13. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may result in a reduction in the quantity of the resource or characteristic which was the basis for designation of the CEA. E3d 9 9 b. The proposed action may result in a reduction in the quality of the resource or characteristic which was the basis for designation of the CEA. E3d 9 9 c. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9  The project will remove a structure that is eligible for listing.        Page 8 of 10 13. Impact on Transportation The proposed action may result in a change to existing transportation systems. † NO † YES (See Part 1. D.2.j) If “Yes”, answer questions a - f. If “No”, go to Section 14. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. Projected traffic increase may exceed capacity of existing road network. D2j 9 9 b. The proposed action may result in the construction of paved parking area for 500 or more vehicles. D2j 9 9 c. The proposed action will degrade existing transit access. D2j 9 9 d. The proposed action will degrade existing pedestrian or bicycle accommodations. D2j 9 9 e.The proposed action may alter the present pattern of movement of people or goods. D2j 9 9 f. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 14. Impact on Energy The proposed action may cause an increase in the use of any form of energy. † NO † YES (See Part 1. D.2.k) If “Yes”, answer questions a - e. If “No”, go to Section 15. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action will require a new, or an upgrade to an existing, substation. D2k 9 9 b. The proposed action will require the creation or extension of an energy transmission or supply system to serve more than 50 single or two-family residences or to serve a commercial or industrial use. D1f, D1q, D2k 9 9 c. The proposed action may utilize more than 2,500 MWhrs per year of electricity. D2k 9 9 d. The proposed action may involve heating and/or cooling of more than 100,000 square feet of building area when completed. D1g 9 9 e. Other Impacts: ________________________________________________________ ____________________________________________________________________ 15. Impact on Noise, Odor, and Light The proposed action may result in an increase in noise, odors, or outdoor lighting. † NO † YES (See Part 1. D.2.m., n., and o.) If “Yes”, answer questions a - f. If “No”, go to Section 16. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may produce sound above noise levels established by local regulation. D2m 9 9 b. The proposed action may result in blasting within 1,500 feet of any residence, hospital, school, licensed day care center, or nursing home. D2m, E1d 9 9 c. The proposed action may result in routine odors for more than one hour per day. D2o 9 9        Temporary detour required during construction. Project will restore a pre-existing vehicular travel route with added pedestrian accommodations.   Page 9 of 10 d. The proposed action may result in light shining onto adjoining properties. D2n 9 9 e. The proposed action may result in lighting creating sky-glow brighter than existing area conditions. D2n, E1a 9 9 f. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 16. Impact on Human Health The proposed action may have an impact on human health from exposure † NO † YES to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. f. g. and h.) If “Yes”, answer questions a - m. If “No”, go to Section 17. Relevant Part I Question(s) No,or small impact may cccur Moderate to large impact may occur a. The proposed action is located within 1500 feet of a school, hospital, licensed day care center, group home, nursing home or retirement community. E1d 9 9 b. The site of the proposed action is currently undergoing remediation. E1g, E1h 9 9 c. There is a completed emergency spill remediation, or a completed environmental site remediation on, or adjacent to, the site of the proposed action. E1g, E1h 9 9 d. The site of the action is subject to an institutional control limiting the use of the property (e.g., easement or deed restriction). E1g, E1h 9 9 e. The proposed action may affect institutional control measures that were put in place to ensure that the site remains protective of the environment and human health. E1g, E1h 9 9 f. The proposed action has adequate control measures in place to ensure that future generation, treatment and/or disposal of hazardous wastes will be protective of the environment and human health. D2t 9 9 g. The proposed action involves construction or modification of a solid waste management facility. D2q, E1f 9 9 h. The proposed action may result in the unearthing of solid or hazardous waste. D2q, E1f 9 9 i. The proposed action may result in an increase in the rate of disposal, or processing, of solid waste. D2r, D2s 9 9 j. The proposed action may result in excavation or other disturbance within 2000 feet of a site used for the disposal of solid or hazardous waste. E1f, E1g E1h 9 9 k. The proposed action may result in the migration of explosive gases from a landfill site to adjacent off site structures. E1f, E1g 9 9 l. The proposed action may result in the release of contaminated leachate from the project site. D2s, E1f, D2r 9 9 m. Other impacts: ______________________________________________________ __________________________________________________________________  Page 10 of 10 17. Consistency with Community Plans The proposed action is not consistent with adopted land use plans. † NO † YES (See Part 1. C.1, C.2. and C.3.) If “Yes”, answer questions a - h. If “No”, go to Section 18. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action’s land use components may be different from, or in sharp contrast to, current surrounding land use pattern(s). C2, C3, D1a E1a, E1b 9 9 b. The proposed action will cause the permanent population of the city, town or village in which the project is located to grow by more than 5%. C2 9 9 c. The proposed action is inconsistent with local land use plans or zoning regulations. C2, C2, C3 9 9 d. The proposed action is inconsistent with any County plans, or other regional land use plans. C2, C2 9 9 e. The proposed action may cause a change in the density of development that is not supported by existing infrastructure or is distant from existing infrastructure. C3, D1c, D1d, D1f, D1d, Elb 9 9 f. The proposed action is located in an area characterized by low density development that will require new or expanded public infrastructure. C4, D2c, D2d D2j 9 9 g. The proposed action may induce secondary development impacts (e.g., residential or commercial development not included in the proposed action) C2a 9 9 h. Other: _____________________________________________________________ __________________________________________________________________ 9 9 18. Consistency with Community Character The proposed project is inconsistent with the existing community character. † NO † YES (See Part 1. C.2, C.3, D.2, E.3) If “Yes”, answer questions a - g. If “No”, proceed to Part 3. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may replace or eliminate existing facilities, structures, or areas of historic importance to the community. E3e, E3f, E3g 9 9 b. The proposed action may create a demand for additional community services (e.g. schools, police and fire) C4 9 9 c. The proposed action may displace affordable or low-income housing in an area where there is a shortage of such housing. C2, C3, D1f D1g, E1a 9 9 d. The proposed action may interfere with the use or enjoyment of officially recognized or designated public resources. C2, E3 9 9 e. The proposed action is inconsistent with the predominant architectural scale and character. C2, C3 9 9 f. Proposed action is inconsistent with the character of the existing natural landscape. C2, C3 E1a, E1b E2g, E2h 9 9 g. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9   PRINT FULL FORM Full Environmental Assessment Form Part 3 - Evaluation of the Magnitude and Importance of Project Impacts and Determination of Significance Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse environmental impact. Based on the analysis in Part 3, the lead agency must decide whether to require an environmental impact statement to further assess the proposed action or whether available information is sufficient for the lead agency to conclude that the proposed action will not have a significant adverse environmental impact. By completing the certification on the next page, the lead agency can complete its determination of significance. Reasons Supporting This Determination: To complete this section: • Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity, size or extent of an impact. • Assess the importance of the impact. Importance relates to the geographic scope, duration, probability of the impact occurring, number of people affected by the impact and any additional environmental consequences if the impact were to occur. • The assessment should take into consideration any design element or project changes. • Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse environmental impact. • Provide the reason(s) why the impact may, or will not, result in a significant adverse environmental impact • For Conditional Negative Declarations identify the specific condition(s) imposed that will modify the proposed action so that no significant adverse environmental impacts will result. • Attach additional sheets, as needed. Determination of Significance - Type 1 and Unlisted Actions SEQR Status: † Type 1 † Unlisted Identify portions of EAF completed for this Project: † Part 1 † Part 2 † Part 3 Agency Use Only [IfApplicable] Project : Date : FEAF 2019     Impact on Land/Water: Steep slopes of 50% or more exist throughout the project site, extending both down the banks to the stream as well as on the upland side along the approaches. Temporary soldier pile retaining walls will be installed to limit the extent of disturbance needed for construction. Erosion and sediment controls during construction will include silt fencing, coffer dams and turbidity curtains, among other controls as may be required by NYSDEC. NYSDOT Environmental Ground and Water Protection specifications will also be followed during demolition and construction. Site restoration will include biodegradeable erosion control matting and live staking where appropriate. Impact on Flooding: Hydraulic analyses were performed for the existing and proposed bridges, which determined that the water surface elevation for both the 50- and 100-year storm events are unchanged. As such, the new bridge will not result in any new flooding impacts. Impact on Plants and Animals: The project will disturb between approximately 40 - 80 feet of the land area next to the bridge, which includes a mix of young and mature trees. Of the 76 trees that must be removed to enable construction, 31 are less than 6 inches DBH and only 5 are equal to or above 20-inch DBH. Tree removals will be offset by the planting of 99 new trees. Since part of the project area must remain cleared for continued access and maintenance of the bridge, approximately half of the trees will be planted offsite. To prevent potential impacts to endangered bats that may be roosting in these trees, all tree removals will occur between November 1st and March 31st in accordance NYSDEC guidelines. Impact on Historic and Archeological Resources: SHPO concurred that the bridge must be replaced for long-term safety and has no concerns regarding archaeological resources. A Historic American Engineering Record Level II Documentation has been prepared for the bridge. In addition, the historic plaque and certain components of the original bridge will be salvaged and set aside for preservation options. The new bridge will replicate the truss design. The project is not adjacent to and will not affect the Old Croton Aqueduct. Impact on Open Space: While there will be no reduction in open space, a village trail that connects to Croton Gorge Trail will not be accessible during construction. The trail connection will be restored following construction, which is targeted to begin in the fall and conclude by the following summer. Impact on Critical Environmental Areas (CEA): The project area is in the County's Croton Point Park and River CEA, which was designated for its geological, archaeological and ecological significance. It also encompasses an underlying aquifer that provides drinking water to the Village of Croton. As the project involves replacement of a bridge in its existing location with appropriate construction mitigation and restoration, there will be no significant adverse impacts as it relates to the CEA and is consistent in general with the Village of Croton's LWRP. Impact on Transportation: The bridge replacement will restore a vital corridor between the Town and Village, reducing extended travel times currently experienced by school buses and emergency vehicles due to the closure of the existing bridge, along with reducing associated energy consumption and carbon emissions. Widening of the bridge to provide 2-way traffic as well as pedestrian lanes will improve safety and encourage non-motorized uses. RB03W June 2025 Upon review of the information recorded on this EAF, as noted, plus this additional support information and considering both the magnitude and importance of each identified potential impact, it is the conclusion of the as lead agency that: † A. This project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is issued. † B. Although this project could have a significant adverse impact on the environment, that impact will be avoided or substantially mitigated because of the following conditions which will be required by the lead agency: There will, therefore, be no significant adverse impacts from the project as conditioned, and, therefore, this conditioned negative declaration is issued. A conditioned negative declaration may be used only for UNLISTED actions (see 6 NYCRR 617.7(d)). † C. This Project may result in one or more significant adverse impacts on the environment, and an environmental impact statement must be prepared to further assess the impact(s) and possible mitigation and to explore alternatives to avoid or reduce those impacts. Accordingly, this positive declaration is issued. Name of Action: Name of Lead Agency: Name of Responsible Officer in Lead Agency: Title of Responsible Officer: Signature of Responsible Officer in Lead Agency: Date: Signature of Preparer (if different from Responsible Officer) Date: For Further Information: Contact Person: Address: Telephone Number: E-mail: For Type 1 Actions and Conditioned Negative Declarations, a copy of this Notice is sent to: Chief Executive Officer of the political subdivision in which the action will be principally located (e.g., Town / City / Village of) Other involved agencies (if any) Applicant (if any) Environmental Notice Bulletin: http://www.dec.ny.gov/enb/enb.html Page 2 of 2  Quaker Bridge Road Bridge Replacement (RB03W) County of Westchester Malika Vanderberg Clerk and Chief Administrative Officer, Westchester County Board of Legislators June 26, 2025 David S. Kvinge, Assistant Commissioner, Westchester County Department of Planning 148 Martine Avenue, White Plains, NY 10601 914-995-2089 dsk2@WestchesterCountyNY.gov PRINT FULL FORM ATTACHMENT B: PLANS CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING (ANSI B) 11X17 06/06/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/5/2025 N:\Projects\2024\124-296 Westchester Co - Quaker Bridge Replacement\Working\CADD\dgn connect_2023\124-296_cpb_gen_01.dgn FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 2:46:16 PM morrimm 20 TM 79.06-2-3 DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 VILLAGE OF CROTON ON HUDSON LANDS N/F OF WOODS STRUCTURE CONCRETE STONE WING WALL EDGE OF WATER STONE WING WALL L L A W G NI W E G DI R B ASPHALT ASPHALT DRAINAGE RIP RAP POST POST WOODS SIGN CORTLANDT TOWN OF LIMIT 30 VIL. SPEED 15 TONS & WEIGHT LIMIT STONE LINED DITCH PARKING NO SIGN STREET BRIDGE WING WALL BORING BORING BORING BORING 0 10 20 30 40' 10 1" = 20' ROAD QUAKER BRIDGE POST ROAD TO ALBANY RIDGE ROAD TO QUAKER ROAD EAST QUAKER BRIDGE TO RTE 129 TO BE REMOVED SUPERSTRUCTURE EXISTING STA. M 2+94.61 BRGS. ¡ STA. 3+94.61 BRGS. ¡ UTILITIES REMAIN EXISTING OVERHEAD BRGS. ¡ BRGS. TO ¡ 100'-0" PLAN ELEVATION A-A ROAD QUAKER BRIDGE CONCRETE BARRIER (TYP.) PROPOSED SINGLE SLOPE GRID NORTH , STA. LINE, AND H.C.L. ¡ QUAKER BRIDGE ROAD EAST STA M 2+91.86 BEGIN BRIDGE STA M 3+97.36 END BRIDGE , STA. LINE, AND H.C.L. ¡ QUAKER BRIDGE ROAD STA. 3+94.61 EXP. BRGS. ¡ ORGINAL GROUND CONCRETE WINGWALL (TYP.) PROPOSED CAST-IN-PLACE FLOW CROTON RIVER STA. 2+94.61 FIX BRGS. ¡ A A GENERAL PLAN AND ELEVATION DATUM EL. 10.00 CONCRETE WINGWALL (TYP.) PROPOSED CAST-IN-PLACE CONCRETE BARRIER (TYP.) PROPOSED SINGLE SLOPE 5'-0" SHOULDER TRAVEL WAY 11'-0" TRAVEL WAY 11'-0" OUT TO OUT 31'-4" CLEAR 28'-0" BOT. FTG EL. 21.25 BOT. FTG EL. 25.25 SEAT EL. 39.53 SEAT EL. 42.60 EL. 36.50 100'-0" SPAN 1'-0" SHOULDER AZ. 132°15'0.26" AZ. 42°15'0.22" PROPOSED GRADE INVENTORY OPERATING LOAD RATING (LRFR) HL-93 HL-93 RF=** RF=** ** TO BE PROVIDED BY TRUSS MANUFACTURER LOW CHORD EL. 41.44 ITEM 551.30 (TYP.) PROPOSED MICROPILES, HYDRAULIC DATA DRAINAGE AREA RECURRENCY INTERVAL (YEARS) PEAK DISCHARGE / POINT OF MAX. BACKWATER HIGH WATER ELEVATION AT EXISTING PROPOSED FLOOD BASIC FLOOD DESIGN 100 50 377 SQ. MILES 34.6 33.2 34.6 34.51 (FT. S) r 15,600 13,080 AVG. VELOCITY THRU STRUCT. @ DESIGN FLOOD 14.6 FT./SEC. OF TRUSS (TYP.) ¡ ITEM 568.70 (TYP.) TRANSITION BRIDGE RAILING, DHW EL. 33.2 (50 - YR STORM) FILL LIMITS APPROXIMATE ITEM 620.03 STONE FILLING (LIGHT) ITEM 620.05 STONE FILLING (HEAVY) LEGEND: ABUTMENT (TYP.) PROPOSED CAST-IN-PLACE ENDS STA. M 2+68.85 APPROACH PAVEMENT BEGINS STA. M 4+26.67 APPROACH PAVEMENT TO BE REPLACED EXISTING CULVERT BEGINS STA. S 2+07.07 APPROACH PAVEMENT TO BE REMOVED (TYP.) EXISTING SUBSTRUCTURE TO REMAIN EXISTING CULVERT ST-01 (STONE BEDDING) (TYP.) APPROACH DRAINAGE CONCRETE FOOTING (TYP.) PROPOSED CAST-IN-PLACE 2 1 4 1 OHW EL. 28.25 OHW EL. 28.25' OHW EL. 28.25' 35'-6" ¡ TRUSS TO ¡ TRUSS 56-02-R-221-0 CONCRETE PILES, ITEM 551.11 (TYP.) PROPOSED CAST-IN-PLACE 13'-6" EL. 25.00 EL. 28.75 8'-0" EL. 26.00 EL. 30.00 1 ON 1.5 1 ON 1.5 AZ. 42°15'0.22" M 2+54.22 PCC M 2+90.48 PT M 3+97.40 PC M 4+50.79 PT M 2+00 M 3+00 M 4+00 S 2+00 S 2+00 HEAD WALL CONC. W 5 P.P. =46.62 INV. =49.95 INV. =43.13 INV. =43.20 INV. INV.=44.40 GRATE=45.80 SLOT DRAIN VAULT DRAINAGE 12" PVC 15" CMP 18" CMP =41.7 INV. PERMANENT IMPACTS BELOW OHW BUFFER LINE ORDINARY HIGH WATER LINE TEMPORARY IMPACTS BELOW OHW PERMANENT BUFFER IMPACTS TEMPORARY BUFFER IMPACTS 3348560) E E X C R S L IO CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:34:41 AM morrimm 2 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W ¢ £ ¡ § ¡ E EMH G GP GSB GV HYD LP LPG PP SA SMH ST T TCB TELBOX TEL P TMH CTV W WSB WV AHEAD AZIMUTH BACK BASELINE BEARING CENTERLINE CURVE TO SPIRAL SUPERELEVATION RATE (CROSS SLOPE) EQUALITY EXTERNAL HORIZONTAL CONTROL LINE HEADLIGHT SIGHT DISTANCE LENGTH OF CIRCULAR CURVE LENGTH OF SPIRAL LENGTH OF VERTICAL CURVE CENTER CORRECTION OF VERTICAL CURVE MAIN LINE POINT OF CURVATURE POINT OF INTERSECTION POINT ON LINE PASSING SIGHT DISTANCE POINT OF TANGENT POINT OF VERTICAL CURVE POINT OF VERTICAL INTERSECTION POINT OF VERTICAL TANGENT RADIUS SPIRAL TO CURVE STOPPING SIGHT DISTANCE SPIRAL TO TANGENT STATION TANGENT LENGTH THEORETICAL GRADE LINE TANGENT TO SPIRAL VERTICAL CURVE ELECTRIC ELECTRIC MANHOLE GAS GUY POLE GAS SERVICE BOX (HOUSE LINE) GAS VALVE (MAIN LINE) HYDRANT LIGHT POLE LOW PRESSURE GAS POWER POLE SANITARY SEWER SANITARY MANHOLE STORM SEWER TELEPHONE TRAFFIC CONTROL BOX TELEPHONE BOX TELEPHONE POLE TELEPHONE MANHOLE CABLE TELEVISION WATER WATER SERVICE BOX (HOUSE LINE) WATER VALVE (MAIN LINE) ALIGNMENT SUBSURFACE EXPLORATION HAND AUGER DRILLING MUD HOLLOW FLIGHT AUGER POWER AUGER PROBE PERCOLATION TEST HOLE TO BE DEFINED AT THE TIME OF EXPLORATION SEISMIC POINT TEST PIT BRIDGE CUT DAM FILL CULVERT WALL AH CP DA DM DN FH PA PH PT SP B C D F K W X IS MADE BE DEFINED AT THE TIME THE EXPLORATION TO BE USED IF ONE OF THE ABOVE CANNOT ABUT AOBE ASPH BDY BLDG BM CC CONC CONST CR D DM DWY EP ES FP FD FL GAR GR HO HWY IP MB MON N&W OG O/H P PAV'T PE PED POLE POR RR RTE ROW FEE WO/A ABUTMENT AS ORDERED BY ENGINEER ASPHALT BOUNDARY BUILDING BENCH MARK CENTER TO CENTER CONCRETE CONSTRUCTION COUNTY ROAD DEED DISTANCE DIRECT MEASUREMENT DRIVEWAY EDGE OF PAVEMENT EDGE OF SHOULDER FENCE POST FOUNDATION FENCE LINE GARAGE GRAVEL HOUSE HIGHWAY IRON PIN OR IRON PIPE MAILBOX MONUMENT NAIL AND WASHER ORIGINAL GROUND OVERHEAD PARCEL PAVEMENT PERMANENT EASEMENT PEDESTRIAN POLE PROPERTY LINE PORCH RAILROAD ROUTE RIGHT OF WAY TOPOGRAPHY (MISCELLANEOUS) RW SH SHLDR RETAINING WALL STATE HIGHWAY SHOULDER BOTTOM OF BANK (STREAM) BOTTOM OF CURB BOTTOM OF OPENING CORRUGATED ALUMINUM PIPE CATCH BASIN CAST IRON PIPE CENTERLINE OF STREAM CORRUGATED METAL PIPE CONCRETE PIPE BB BC BO CAP CB CIP CMP CP CORRUGATED STEEL PIPE CULVERT DIAMETER DRAINAGE MANHOLE DRAINAGE STRUCTURE PIPE DITCH CROSSING EXTREME HIGH WATER ELEVATION ELEVATION EXTREME LOW WATER END SECTION HEADWALL INVERT MANHOLE MEAN HIGH WATER ORDINARY HIGH WATER ORDINARY LOW WATER REINFORCED CONCRETE PIPE TOP OF BANK (STREAM) TOP OF CURB TOP OF GRATE VITRIFIED CLAY PIPE CSP CULV DIA DMH DS D'XING EHW EL ELEV ELW ES HW INV MH MHW OHW OLW RCP TB TC TG VCP SPK ST STK STY SW TE TO U/G WW SPIKE STREET STAKE STORY SIDEWALK TEMPORARY EASEMENT TEMPORARY OCCUPANCY UNDERGROUND WING WALL AH AZ BK BRG CS e EQ EXT HCL HSD L LS LVC E PC PI POL PSD PT PVC PVI PVT R SC SSD ST STA T TGL TS VC FEE ACQUISITION WITHOUT ACCESS FEE FEE ACQUISITION ABBR. DESCRIPTION REPLACE ABBREVIATION "AB" WITH: ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION UTILITIES TOPOGRAPHY (DRAINAGE) 4 INCHES CASED DRILL HOLE 1 INCH SAMPLER (RETRACTABLE PLUG) 2‚ INCHES CASED DRILL HOLE SICPP SMOOTH INTERIOR CORRUGATED POLYETHYLENE PIPE STRM RP TP SQUARE FEET GALLON ' mi lb LB MI (PLANS) SYMBOL STANDARD (SPECS/PROPOSAL) NOMENCLATURE: EQUIVALENT ftq YDr CUBIC YARD CY MILES ACRES LINEAR FEET TON TON TON GAL POUND GAL SF AC AC QUANTITIES SHEET ESTIMATE OF ITEM PAYMENT UNIT: " - INCHES YDq SQUARE YARD SY LF CONE PENETROMETER DA, DM, DN, AND FH WITH: ABBREVIATION "C" IN CATEGORIES: INDEX AND ABBREVATIONS IND-01 56-02-G-203-0 NO. SHEET DESCRIPTION NUMBER DWG NUMBER DPW 1 COVER SHEET COV 56-02-T-202-0 2 INDEX & ABBREVIATIONS IND-01 56-02-G-203-0 3 LEGEND POINT SYMBOLS LEG-01 56-02-G-204-0 4 LEGEND LINE SYMBOLS LEG-02 56-02-G-205-0 5 GENERAL NOTES - 1 GNN-01 56-02-G-206-0 6 GENERAL NOTES - 2 GNN-02 56-02-G-207-0 7 ESTIMATE OF QUANTITIES & BASELINE TIES BLT-01 56-02-G-208-0 8 MAINTENANCE JURISTICTION PLAN AND TABLE MJP-01 56-02-R-209-0 9 WORK ZONE TRAFFIC CONTROL NOTES MPP-01 56-02-R-210-0 10 DETOUR PLAN MPP-02 56-02-R-211-0 11 HIGHWAY GENERAL PLAN GNP-01 56-02-R-212-0 12 HIGHWAY TYPICAL SECTIONS TYP-01 56-02-R-213-0 13 PROFILE - QUAKER BRIDGE ROAD PRO-01 56-02-R-214-0 14 PROFILE - QUAKER BRIDGE ROAD EAST PRO-02 56-02-R-215-0 15 GRADING PLAN GRD-01 56-02-R-216-0 16 LANDSCAPE PLAN LAP-01 56-02-R-217-0 17 LANDSCAPING DETAILS LAD-01 56-02-R-218-0 18 LANDSCAPING NOTES LAN-01 56-02-R-219-0 19 MISCELLANEOUS DETAILS & TABLES MSD-01 56-02-R-220-0 20 GENERAL PLAN AND ELEVATION ST-01 56-02-R-221-0 21 TYPICAL BRIDGE SECTIONS ST-02 56-02-R-222-0 22 BORING LOCATION PLAN ST-03 56-02-B-223-0 23 BORING LOGS (1 OF 8) ST-04 56-02-B-224-0 24 BORING LOGS (2 OF 8) ST-05 56-02-B-225-0 25 BORING LOGS (3 OF 8) ST-06 56-02-B-226-0 26 BORING LOGS (4 OF 8) ST-07 56-02-B-227-0 27 BORING LOGS (5 OF 8) ST-08 56-02-B-228-0 28 BORING LOGS (6 OF 8) ST-09 56-02-B-229-0 29 BORING LOGS (7 OF 8) ST-10 56-02-B-230-0 30 BORING LOGS (8 OF 8) ST-11 56-02-B-231-0 31 EARTHWORK PLAN ST-12 56-02-S-232-0 32 EARTHWORK SECTIONS ST-13 56-02-S-233-0 33 EXCAVATION SUPPORT WALL PLAN AND ELEVATION (1 OF 2) ST-14 56-02-S-234-0 34 EXCAVATION SUPPORT WALL PLAN AND ELEVATION (2 OF 2) ST-15 56-02-S-235-0 35 ABUTMENT PILE LAYOUT PLAN ST-16 56-02-S-236-0 36 BEGIN ABUTMENT PLAN AND ELEVATION ST-17 56-02-S-237-0 37 BEGIN ABUTMENT REINFORCEMENT PLAN AND SECTION ST-18 56-02-S-238-0 38 END ABUTMENT PLAN AND ELEVATION ST-19 56-02-S-239-0 39 END ABUTMENT REINFORCEMENT PLAN AND SECTION ST-20 56-02-S-240-0 40 ABUTMENT DETAILS (1 OF 2) ST-21 56-02-S-241-0 41 ABUTMENT DETAILS (2 OF 2) ST-22 56-02-S-242-0 42 WINGWALL SECTIONS ST-23 56-02-S-243-0 43 ELASTOMERIC FIXED BEARINGS ST-24 56-02-S-244-0 44 ELASTOMERIC EXPANSION BEARINGS ST-25 56-02-S-245-0 45 TRANSVERSE SECTION ST-26 56-02-S-246-0 46 TRUSS FRAMING PLAN ST-27 56-02-S-247-0 47 TRUSS DETAILS ST-28 56-02-S-248-0 48 SUPERSTRUCTURE SLAB PLAN ST-29 56-02-S-249-0 49 APPROACH SLAB PLAN ST-30 56-02-S-250-0 50 BARRIER AND RAILING PLAN ST-31 56-02-S-251-0 51 SINGLE SLOPE CONCRETE BARRIER DETAILS (1 OF 3) ST-32 56-02-S-252-0 52 SINGLE SLOPE CONCRETE BARRIER DETAILS (2 OF 3) ST-33 56-02-S-253-0 53 SINGLE SLOPE CONCRETE BARRIER DETAILS (3 OF 3) ST-34 56-02-S-254-0 54 TRANSITION RAIL DETAILS (1 OF 2) ST-35 56-02-S-255-0 55 TRANSITION RAIL DETAILS (2 OF 2) ST-36 56-02-S-256-0 56 DRAINAGE DETAILS ST-37 56-02-S-257-0 INDEX TOTAL NUMBER OF SHEETS: 56 STANDARD SHEETS 203-04 603-01 604-02 619-02 619-12 655-06 203-05 603-02 606-09 619-10 655-04 685-01 402-01 603-04 619-01 619-11 E E X C R S L IO CBP CBPOL CBSP CBTP ACC ACOGO ACS AEQN AEQNAHD AEQNBK AEVT APC APCC API APOB APOC APOE APOL APOS APOT APOVC APOVT APRC APT APVC APVCC APVI APVRC APVT ASC ASPI ASTS AVEVT AVHIGH AVLOW CENTER OF CURVATURE COGO CURVE TO SPIRAL EQUATION EQUATION AHEAD EQUATION BACK EVENT STATION SPIRAL TO CURVE SPIRAL TO SPIRAL SPIRAL TO TANGENT TANGENT TO SPIRAL DRILL HOLE ELEVATION, SPOT FLAG POLE MAILBOX PAPER BOX ROCK, BOULDER SHRUB, CONIFEROUS SHRUB, DECIDUOUS TREE, CONIFEROUS TREE, DECIDUOUS TREE, STUMP SINGLE POST DELINEATORS REFERENCE MARKERS GDH LELS LFP LMB LPB LPST LRB LSHC LSHD LTC LTD LTS LUKP SDEL SRM S CABINET & PAD CCTV SITE CDPD TRANSCEIVER CELL PHONE TOWER CONDUIT JACK OR BORING CONTROLLER CABINET COMMUNICATION PULL BOX CONDUIT TURNING DOWN CONDUIT TURNING UP DEFAULT TRANSMITTAL READER FUSION SPLICE HAR ADVISORY SIGN HAR SITE LOAD CENTER MECHANICAL SPLICE PEDESTRIAN SIGNAL HEAD RAMP METER SOLAR PANEL WEIGHT IN MOTION DETECTOR WIRELESS VIDEO REPEATER WIRELESS VIDEO RECEIVER WIRELESS VIDEO TRANSMITTER PERM. OVERHEAD VMS PERM. VMS ACCOU. SPEED/COUNT SNSR.S IASCTS ICABPAD ICCTV ICDPD ICELLT ICJB ICNTLCAB ICPB ICTD ICTU ICVTRT IEZR IEZTR IFOXCAB IFUSSPL IHARADV IHARST IMECSPL IMSCS IMSCTS IMT IOVHVMS IPASCS IPEDS IPSS IPVMS IRM IRWIS ISP ISST ITDB ITP IVTRT IWIMD IWVR IWVTT IWVRC ILC SPM PARKING METER SPREAD SPECT. TRANSCEIVER TELEPHONE DEMARCATION BLK SUBSURFACE TEMP. PROBE MICRO SPEED & COUNT SENSOR POST, SINGLE PT., WALL LOCATION PT., TREE W/ WIRE PT., STAKE PT., RAILROAD SPIKE PT., SPIKE PT., NAIL PT., MONUMENT, MISC. PT., MONUMENT PT., IRON ROD PT., IRON PIPE PT., FENCE LOCATION PT., DRILL HOLE HISTORICAL, BLDG. CORNERS HIGHWAY BNDRY., APPROX. HIGHWAY BNDRY, PT. DEED LINE, TYPE 1 DEED LINE, TYPE 2 DEED LINE, TYPE 3 DEED LINE, TYPE 4 DEED LINE, TYPE 5 EASEMENT, EXISTING BOX, JUNCTION BOX, PULL BOX BOX, SPLICE MICROCOMPUTER CABINET PED POLE SIGNAL HEADS SIGNAL POLE MDL1P MHBCP MPCC MPDH MPF MPIP MPIR MPM MPMM MPN MPRS MPSP MPST MPTW MPWL TCMC TCPP TCSH TCSP C MJCP PT., JURIS. CITY PT., CROSS CUT IDEFAULT POINT OF CURVATURE POINT OF INTERSECTION POINT OF BEGINNING POINT OF CURVATURE POINT OF END POINT ON LINE POINT ON SPIRAL POINT ON TANGENT POINT ON VERTICAL CURVE POINT ON VERTICAL TANGENT POINT ON REVERSE CURVE POINT OF TANGENCY POINT OF VERTICAL CURVATURE POINT OF VERT. INTERSECTION POINT OF VERT. REVERSE CURVE POINT OF VERTICAL TANGENCY SPIRAL POINT OF INTERSECTION VERTICAL EVENT POINT VERTICAL HIGH POINT BASELINE, POINT BASELINE, POINT ON LINE UNKNOWN POINT COMM. VEH. ROAD TRANSCEIVER E-ZPASS READER MICROWAVE TRANSCEIVER PORT. ACCOU. SPD & CNT. SENSOR VEHICLE TO RDWY TRANSCEIVER PORT. SPEED & COUNT SENSOR FIBER OPTIC X-CONNECT CABINET PAVEMENT SURFACE SENSOR RDWY WEATHER INFO. SENSOR GUIDE RAIL, ANCHOR GUIDE POST, SINGLE RGA RGP CPBM BENCHMARK POINT, HORIZ. PHOTOGRAMMETRY POINT, SURVEY MARKER, PERM. CPV CPSM CPH ATS AST MDL2P MDL3P MDL4P MDL5P MEEP MHBP TCBJ TCBP TCBS POINT OF C0MPOUND CURVATURE POINT OF VERT. CMPND CURVE VERTICAL LOW POINT BASELINE, SPUR POINT BASELINE, TIE POINT MHBAP POINT, VERT., PHOTOGRAMMETRY WETLAND FLAG EWFG RFM A B 1 2 3 4 5 A CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:34:45 AM morrimm 3 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W BRIDGE, SCUPPER EASEMENT, PERM., SHAPE EASEMENT, PERM., APPROX. EASEMENT, PERM., BACK LINE EASEMENT, PERM., BACK LINE MEPAP_P EIOP_P ADPI_P DETOUR, POINT OF INTERSECT. DETOUR, POINT ON LINE BSC LTW_P TREE, WELL OR WALL SINGLE POST, PROPOSED BACK TO BACK, PROPOSED SRSC3 SRSC4 SRSCT2 SRSCT4 SRSI SRSN2 SRSN3 SRSS2 SRSS3 SRSS4 FEE ACQUISITION, SHAPE MPBC PT., BUILDING CORNER MFS_P_T MEPS_P_T EASEMENT, PERMANENT METS_P_T EASEMENT, TEMPORARY METS_P_T OCCUPANCY, TEMPORARY MFS_P_T FEE ACQUISITION TWZBCD_P RES_P ELEVATION, SPOT TWZCMS_P CHANGEABLE MESSAGE SIGN (PVMS) TWZFLG_P FLAGGER TWZFT_P FLAG TREE TWZIA_P TWZSDT_P TWZAP_P ARROW PANEL TWZAPC_P ARROW PANEL, CAUTION MODE TWZAPT_P ARROW PANEL, TRAILER OR SUPPORT TWZWVA_P SYMBOL, DIRECTION OF TRAFFIC TWZSDTD_P LUMINAIRE (TEMPORARY) TWZSGN_P SIGN (TEMPORARY) TWZSIG_P TWZWL_P WARNING LIGHT TWZWV_P WORK VEHICLE BARRICADE (TYPE III) TWZLUM_P S_P SB_P SHLD, INTERSTATE SHLD, NATIONAL, 2 DIG. SHLD, NATIONAL, 3 DIG. SHLD, STATE, 2 DIG. SHLD, STATE, 3 DIG. SHLD, STATE, 4 DIG. SHLD, CTY, 123 DIG. SHLD, CTY, 4 DIG. SHLD, CTY TOUR, 1-2 DIG. SHLD, CTY TOUR, 3-4 DIG. STR., INLET PROT., GRAVEL BAG STR., INLET PROT., FILTER LOG STR., INLET PROT., PREFAB. STR., INLET PROT., SILT FENCE STR., INLET, OUTLET PROT. MEPP_P MEPSP_P MFAP_P MFP_P MFSP_P EIPGB_P EIPEFL_P EIPP_P EIPSF_P ADPL_P FEE ACQUISITION, BACK LINE FEE ACQUISITION, APPROX. FEE ACQUISITION W/O ACCESS CRASH CUSHION (TEMPORARY) IMPACT ATTENUATOR / TRAFFIC DETOUR SYMBOL, DIRECTION OF TEMPORARY (TEMPORARY) SIGNAL, TRAFFIC OR PEDESTRIAN MOUNTED ATTENUATOR WORK VEHICLE WITH TRUCK ALIGNMENT TRAP, SEDIMENT LANDSCAPE GEOTECHNICAL ENVIRONMENTAL ITS ROW MAPPING TRAFFIC CONTROL UTILITIES ETRS_P CELL DESCRIPTION CELL CELL CELL DESCRIPTION DESCRIPTION DESCRIPTION RISER, CONCRETE BOX ERCB NAME NAME NAME NAME DESCRIPTION NAME CELL CELL NAME DESCRIPTION ROW ACQUISITION BRIDGE CONTROL TRAFFIC WORK ZONE ROADWAY SIGNS DRAINAGE GB CULV FL PRFB SF CDPD C C EZ EZ-T XC H M RM SS TC TP WVR V V A A P1 M1 FEE PE M1 P1 TE M1 P1 TO M1 P1 FEE WO/A M1 P1 LEGEND POINT SYMBOLS LEG-01 56-02-G-204-0 DINV DS STRUCTURE, RECTANGULAR INVERT ANTENNAS IANT_P GAS, METER GAS, MANHOLE GAS, LINE MARKER GAS/FUEL PUMP GAS, VALVE GAS, VENT LIGHTING, POLE LIGHTING, POLE, MEDIAN LIGHTING, POLE, PED. MISC. FILLER CAP OIL, LINE MARKER TELEPHONE, LINE MARKER TELEPHONE, MANHOLE CABLE TV, LINE MARKER CABLE TV, PULL BOX UNKNOWN, MANHOLE UNKNOWN, VALVE WATER, FIRE HYDRANT WATER, METER WATER, MANHOLE WATER, VALVE WATER, WELL UGM UGMH UGLM UGP UGV UGVT ULP ULPM ULPP UMFC UOLM UP UPD UPL USMH UTB UTLM UTMH UTVPB UUJB UUMH UUVL UWFH UWM UWMH UWV UWW UNKNOWN, JUNCTION BOX UTVLM UUB UNKNOWN, BOX UUPB UNKNOWN, PULL BOX UUVT UNKNOWN, VENT UUW UNKNOWN, WELL ELECTRIC, BOX ELECTRIC, METER ELECTRIC, MANHOLE ELECTRIC, POLE, TRANS. UEB UEM UEMH UEPT DSMTXX_P POLE, WITH UTILITY POLE, DEAD (NO UTILITY) POLE, WITH LIGHT SANITARY SEWER MANHOLE TELEPHONE, BOOTH DSI STRUCTURE, INVERT DSM STRUCTURE, MANHOLE DSR STRUCTURE, ROUND DST"X"CB_P STRUCTURE, RECT., TYPE "X" DST"X"_P "XX" = 48, 60, 72, 84, 96 TYPE "XX" STRUCTURE, MANHOLE, TYPE "X" STRUCTURE, RECT., WITH CURB "X" = I, K, L, M, O, P, U "X" = F, G, N, O, P, R G T W FP E E G C A A P LC PM M VMS PA PVMS RWIS WIM E O S P T C U W W G E E X C R S L IO AC CONTROL (CENTERLINE) CB CBPR ESFL ECT EDMC CURTAIN, TURBIDITY BASELINE BASELINE, PROJECTION SHEET PILING EFNS EFNV EWFS EWM EWS WETLAND, STATE WETLAND, MITIGATION AREA WETLAND, FEDERAL FENCE, VEGETATION FENCE, SILT LABL LAHR LAPB LAWA LAWE LFNC LTRC LTRD LWR LWS AREA, BRUSH LINE AREA, HEDGE ROW AREA, PLANTING BED AREA, WATERS EDGE FENCE TREE ROW, CONIFEROUS WALL, RETAINING TREE ROW, DECIDUOUS WALL, STONE MDL MEE HIGHWAY BOUNDARY, W/ ACCESS EASEMENT, EXISTING DEED LINE RG RRPSS BROKEN LINE TCSW SIGNAL, SPAN WIRE SM SSO SSOC MULTIPLE POST STRUCTURE, OVERHEAD RRS RUMBLE STRIP STB* EWF BR RAIL BSHT FENCE, SILT & VEGETATION EFNSV WETLAND, FEDERAL AND STATE SBLB BILLBOARDS STRUCTURE, OVHD. CANTILEVER AREA, WOODED AREA OUTLINE LWH WALL, H PILE MHB MHBA HIGHWAY BOUNDARY, APPROX. MHBW HWY BOUNDARY, FACE OF WALL MHBWOA HIGHWAY BOUNDARY, W/O ACCESS MJC JURISDICTION, CITY MJCY JURISDICTION, COUNTY MJHD JURISDICTION, HISTORIC DISTRICT MJLL JURIS., (GREAT, MILITARY) LOT LINE MJN JURISDICTION, NATION MJPB JURISDICTION, PUBLIC LANDS MJS JURISDICTION, STATE MJT JURISDICTION, TOWN MJV JURISDICTION, VILLAGE MPL PROPERTY LOT LINE PROPERTY LOT LINE, APPROXIMATE MPLA MSL SUB LOT LINE GUIDE RAIL, MISCELLANEOUS RGB GUIDE RAIL, BOX BEAM RGBM GUIDE RAIL, BOX BEAM, MEDIAN RGC GUIDE RAIL, CABLE RGCB GUIDE RAIL, CONCRETE BARRIER RGW GUIDE RAIL, W BEAM RGWM GUIDE RAIL, W BEAM, MEDIAN RPB PARKING BUMPER RRC RAIL ROAD, CATENARY RRER RAIL ROAD, 3RD RAIL RAIL, PHOTO, SMALL SCALE RRSSS RAIL, SURVEY, SMALL SCALE DOUBLE BROKEN LINE STDB* STDL* DOTTED LINE LONG STDS* DOTTED LINE SHORT STFB* FULL BARRIER LINE STH* HATCH LINE STRCT ROUNDABOUT, CAT TRACKS STRYL ROUNDABOUT, YIELD LINE STSB STOP BAR SOLID, EDGE X WALK, LADDER LINE * = W (WHITE) OR Y (YELLOW) FILTER, SEDIMENT LOG STSE* MHA HISTORICAL, ACQUISITION STXLB X WALK, LADDER BAR LINE STXL DAM, COFFER FL FW FW SW WM SW PE HB AHB HB W / OA PL PL A Z 3R L B CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:34:46 AM morrimm 4 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W LIGHTS BARRIER, TEMPORARY, W/ WARNING COVERING PAVEMENT MARKING REMOVAL OR DO NOT HAVE CORRESPONDING EXISTING FEATURES. FEATURES SHOWN AT THE HEAVIER WEIGHT ARE PROPOSED ONLY AND 6. SHOULD BE LABELED ON THE PLANS. SYMBOLOGY (SUCH AS THE PAVEMENT EDGE, PAVEMENT EDGE OF TRAVEL WAY) AND MAPPING FEATURES NOT INCLUDED ON THE LEGEND SHEET DO NOT HAVE A UNIQUE 5. ON B SIZE DRAWINGS). EXCLUDING LINE WEIGHT. LINE WEIGHT FOR PROPOSED FEATURES IS THICKER (0.015 in PROPOSED FEATURE SYMBOLOGY IS IDENTICAL TO EXISTING FEATURE SYMBOLOGY 4. PROPOSED FEATURES. FEATURES SHOWN ON THE LEGEND AS EXISTING FEATURES ALSO HAVE CORRESPONDING 3. UTILITY LINES, ETC.) OR POINT (SIGN, UTILITY POLE, ETC.). FEATURES ARE SHOWN AS EITHER LINEAR (ROADWAY GUIDERAIL, ROADWAY SIDEWALK, 2. THE LEGEND ILLUSTRATES MAPPING FEATURES (EXISTING AND PROPOSED). 1. ALIGNMENT CONTROL DRAINAGE ENVIRONMENTAL LANDSCAPE ROW MAPPING STRIPING TRAFFIC CONTROL AD_P AT_P DETOUR DDG_P DDP_P DDS_P DFL_P FLOW LINE DITCH, STONE LINED DITCH, PAVED INVERT DITCH, GRASS LINED EWAA_P WETLAND, ADJACENT AREA EDMEC_P EDMPC_P EDMSC_P LFILL_P FILL LIMIT RRPLS_P RRSLS_P TRANSITION CONTROL SIGNS STYLE NAME DESCRIPTION BRIDGE DESCRIPTION NAME STYLE MEP_P EASEMENT, PERMANENT MEPA_P EASEMENT, PERMANENT, APPROX. MET_P EASEMENT, TEMPORARY META_P EASEMENT. TEMPORARY, APPROX. MF_P MFA_P FEE ACQUISITION, APPROXIMATE MFS_P FEE ACQUISITION, SHAPE ROADWAY DESCRIPTION NAME STYLE GUIDE POST RAIL, PHOTO, LARGE SCALE RAIL, SURVEY, LARGE SCALE RGP_P STPB* PARTIAL BARRIER LINE UTILITIES FEE ACQUISITION, W/ ACCESS LCUT_P CUT LIMIT STYLE NAME DESCRIPTION RCZ_P BARRIER, TEMPORARY TRAFFIC WORK ZONE TWZBT_P CHANNELIZING DEVICE TWZCD_P TWZPMRC_P TWZBTWL_P MFWOA_P FEE ACQUISITION, W/O ACCESS CLEAR ZONE EDMGSC_P DAM, EARTHEN CHECK BAG CHECK DAM, GRAVEL BAG/SAND DAM, PREFABRICATED CHECK DAM, STONE CHECK AA PE APE TE ATE FEE AFEE FEE W / OA CZ LEGEND LINE SYMBOLS LEG-02 56-02-G-205-0 DCP DCP_P CULVERT PIPE (DIR) CULVERT PIPE UC DSSD SLOTTED DRAIN CONDUIT, UNDERGROUND UCH CONDUIT, HANGING UCO CONDUIT, OVERHEAD UE ELECTRIC LINE, UNDERGROUND UEH ELECTRIC LINE, HANGING UEO ELECTRIC LINE, OVERHEAD UESS ELECTRIC, SUBSTATIONS UFO FIBER OPTIC, UNDERGROUND UFOH FIBER OPTIC, HANGING UFOO FIBER OPTIC, OVERHEAD UG GAS, UNDERGROUND UGH GAS, HANGING UGO GAS, OVERHEAD UIC INFORM CABLE, UNDERGROUND UICH INFORM CABLE, HANGING OIL LINE, UNDERGROUND UO UOH OIL LINE, HANGING UPBP POLE, BRACE, PUSH BRACE POLE, GUY WIRE USA USAH SANITARY SEWER, HANGING SANITARY SEWER, UNDERGROUND UT TELEPHONE, UNDERGROUND UTH TELEPHONE, HANGING UTO TELEPHONE, OVERHEAD UUU UNKNOWN, UNDERGROUND UUH UNKNOWN, HANGING UUO UNKNOWN, OVERHEAD UW WATER LINE, UNDERGROUND UWH WATER LINE, HANGING UWO WATER LINE, OVERHEAD UETO ELECTRIC TRANSMISSION, OVERHEAD USAF SANITARY SEWER, FORCE MAIN, UGND USAFH SANITARY SEWER, FORCE MAIN, HANG UTV UTVH UTVO CABLE TV, UNDERGROUND CABLE TV, HANGING CABLE TV, OVERHEAD UPGW UNDERDRAIN DUD_P ST ST UD C C OC E E OE OET FO FO OFO G G OG IC IC O O SA SA SAF SAF T T OT CTV CTV OCTV UU UU OUU W W OW ] [ [ ] ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ E E X C R S L IO CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:34:47 AM morrimm 5 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W HIGH VOLTAGE ELECTRICAL LINES ARE IN PROXIMITY TO THIS BRIDGE. CONTAINING MATERIALS HAVE BEEN INDICATED IN THE CONTRACT DOCUMENTS. PLANS OF THE STRUCTURE(S) AND/OR ENCOUNTERED DURING FIELD INSPECTIONS. ALL KNOWN ASBESTOS STRUCTURES CONTAINED IN THIS CONTRACT. THESE MATERIALS WERE NOTED ON THE ORIGINAL CONTRACT MATERIALS CONTAINING ASBESTOS ARE BELIEVED TO EXIST AT VARIOUS LOCATIONS ON OR IN CERTAIN ALL SHOP DRAWINGS FOR THIS PROJECT SHALL BE PREPARED IN U.S. CUSTOMARY UNITS. FULLY DIMENSIONED. VISUAL CLARITY. ALL OTHER DETAILS FOR WHICH NO SCALE IS SHOWN ARE DRAWN PROPORTIONALLY AND ARE DETAILS ON THE DRAWINGS LABELED AS "NOT TO SCALE" ARE INTENTIONALLY DRAWN NOT TO SCALE FOR DESIGN LIVE LOAD: AASHTO HL - 93. THE LOAD RATINGS ARE IN ACCORDANCE WITH THE AASHTO MANUAL FOR BRIDGE EVALUATION. VERSION OF THE AASHTO MAINTENANCE MANUAL FOR ROADWAYS AND BRIDGES. THIS BRIDGE SHALL BE MAINTAINED IN ACCORDANCE WITH THE GUIDELINES CONTAINED IN THE CURRENT ALL PROVISIONS IN EFFECT AS OF JUNE 2025. CONSTRUCTION SPECIFICATIONS: NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION AND MATERIALS WITH SLABS AT 28 DAYS: f'c = 4,000 psi.) JUNE 2025 (FOR DESIGN PURPOSES, COMPRESSIVE STRENGTH OF CONCRETE FOR SUBSTRUCTURES AND DECK DESIGN SPECIFICATIONS: NYSDOT LRFD BRIDGE DESIGN SPECIFICATIONS WITH ALL PROVISIONS IN EFFECT AS OF GENERAL NOTES: FOUNDATION NOTES: UNIT PRICE BID FOR ITEM 203.03 - EMBANKMENT IN PLACE. THE COST OF WATER USED FOR COMPACTION OF EMBANKMENT IN PLACE MATERIAL SHALL BE INCLUDED IN THE PRICE BID FOR ITEM 203.21 - SELECT STRUCTURE FILL. THE COST OF WATER USED FOR COMPACTION OF THE SELECT STRUCTURAL FILL SHALL BE INCLUDED IN THE UNIT SIMULTANEOUSLY, ON BOTH SIDES OF THE VERTICAL PAYMENT LINE. EMBANKMENT IN PLACE, ITEM 203.03, AND SELECT STRUCTURE FILL, ITEM 203.21, SHALL BE PLACED SUBSTRUCTURE NOTES: CONTRACT. EXPANSION JOINTS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS CONCRETE ITEMS IN THE THE COST OF ALL JOINT MATERIAL AND WATERSTOPS AT CONCRETE CONSTRUCTION JOINTS, CONTRACTION AND ABUTMENTS AND/OR WINGWALLS SHOULD PREFERABLY BE PLACED MIDWAY BETWEEN THE PEDESTALS. BE PROVIDED WITH SHEAR KEYS AND WATERSTOPS. VERTICAL CONSTRUCTION JOINTS INTRODUCED IN THE THE ABUTMENTS AND/OR WINGWALLS AT LOCATIONS NOT SHOWN IN THE PLANS. CONSTRUCTION JOINTS SHALL THE CONTRACTOR, WITH THE APPROVAL OF THE COUNTY, MAY ELECT TO INTRODUCE CONSTRUCTION JOINTS IN CONTRACTOR SHALL INCLUDE COSTS FOR THIS WORK IN THE UNIT PRICE BID FOR THE APPROACH SLAB ITEM. SIDES), §728-06, SHALL BE PLACED ON THE TOP OF THE BACKWALLS OF FIXED AND EXPANSION ABUTMENTS. THE TOP OF BACKWALLS SHALL BE STEEL TROWEL FINISHED. TWO SHEETS OF SHEET GASKET (TREATED BOTH COFFERDAM AND HYDRAULIC NOTES: ELEVATION RATHER THAN A COMPUTED ONE. PREVALENT DURING ONE CONSTRUCTION SEASON FOR MORE THAN 25% OF THE TIME. IT IS AN OBSERVED LOW WATER IS ESTIMATED TO BE 24.30 FT. LOW WATER IS DEFINED AS THE NORMAL LOW WATER ELEVATION RATHER THAN A COMPUTED ONE. IS ALWAYS LESS THAN THE ORDINARY HIGH-WATER ELEVATION AND IT IS USUALLY AN OBSERVED ELEVATION ELEVATION LIKELY TO BE ENCOUNTERED DURING ONE CONSTRUCTION SEASON (EXCLUDING MAJOR FLOODS). IT ORDINARY WATER IS ESTIMATED TO BE 25.75 FT. ORDINARY WATER IS DEFINED AS THE HIGHEST SURFACE WATER OF 2.33 YEARS. SURFACE ELEVATION FOR THE MEAN ANNUAL FLOOD, WHICH IS THE FLOOD THAT HAS A RECURRENCE INTERVAL ORDINARY HIGH-WATER IS ESTIMATED TO BE 28.25 FT. ORDINARY HIGH-WATER IS DEFINED AS THE WATER DETERMINED BY THE ENGINEER. NO SETTLEMENT BASIN SHALL BE CONSTRUCTED. AND WATER POLLUTION CONTROL, SUCH AS SEDIMENT FILTER LOGS OR APPROVED EQUAL, MAY BE REQUIRED AS THE STREAMBED AS SHOWN IN THE PLANS AND/OR APPROVED BY THE ENGINEER. TEMPORARY SOIL EROSION DEWATER THE COFFERDAM BY PUMPING THE WATER TO AN APPROVED UPLAND VEGETATED AREA OUTSIDE OF SHALL BE BASED ON ALL OF THE APPLICABLE COFFERDAM ITEMS INDICATED IN THE PLANS. IF MULTIPLE COFFERDAMS ARE REPLACED BY A SINGLE SYSTEM, WHEN APPROVED BY THE COUNTY,PAYMENT MEANS WHEN THE WATER ELEVATION EXCEEDS 28.25 FT. THE COFFERDAM AND TREMIE SYSTEM SHALL BE DESIGNED TO AUTOMATICALLY FLOOD BY NON-MECHANICAL THE CONTRACTOR SHALL SUBMIT THE CHANGES TO THE COUNTY FOR REVIEW AND APPROVAL. SHOULD FIELD CONDITIONS REQUIRE A CHANGE IN THE TYPE OF COFFERDAM SYSTEM CALLED FOR IN THE PLANS, SOURCE OF WATER, SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE COFFERDAM ITEM. WHEN A COFFERDAM IS USED, THE COST OF DEWATERING THE ENTIRE EXCAVATION, REGARDLESS OF THE WATER FROM ENTERING THE EXCAVATION SHALL BE FURNISHED AND PLACED AT NO COST TO THE COUNTY. EXCAVATION REQUIRING A COFFERDAM, ANY REQUIRED EXTENSIONS TO THE COFFERDAM NECESSARY TO KEEP SHOULD THE CONTRACTOR ELECT TO LAY BACK A PORTION OF THE EXISTING EARTH ADJACENT TO AN SUPERSTRUCTURE NOTES: ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM A709, GRADE 50. GALVANIZING NOTES: THE BOLTS. DRILLED HOLES SHALL BE CLEANED OF ALL EXCESS MATERIAL THAT PREVENTS THE PROPER INSTALLATION OF CONSTRUCTION MANUAL. ALL BOLTS, NUTS, AND WASHERS SHALL BE GALVANIZED IN ACCORDANCE WITH THE NEW YORK STATE STEEL 565.2025 AND 565.2035. PLATE, SHALL BE METALIZED. THE COST OF METALIZING SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEMS ALL EXPOSED STEEL COMPONENTS OF BRIDGE BEARINGS, INCLUDING THE SOLE PLATE AND THE MASONRY COST TO THE COUNTY. DETERMINED TO BE CAUSED BY IMPROPER STORAGE OR SHIPPING OF HDG MATERIALS SHALL BE REPAIRED AT NO SHALL BE REPAIRED IN ACCORDANCE WITH THE NYS STEEL CONSTRUCTION MANUAL. WHITE RUST THAT IS DETRIMENTAL TO THE INTENDED USE OF THE MEMBER OR HAVE A NEGATIVE VISUAL IMPACT ON THE STRUCTURE EXAMPLES OF NON-RESINOUS WOODS ARE: POPLAR, ASH AND SPRUCE. WHITE RUST THAT IS DETERMINED TO BE SPACERS TO ALLOW VENTILATION AND AVOID MOISTURE BUILD UP, INCLINE MEMBERS TO ALLOW DRAINAGE. FOLLOWS: STORE MATERIALS OFF OF THE GROUND AWAY FROM ALL VEGETATION, USE NON-RESINOUS WOODEN AVOIDED. IF OUTDOOR STORAGE IS UNAVOIDABLE, EXAMPLES OF REASONABLE ACCOMMODATIONS ARE AS SHOULD BE AVOIDED. STORAGE (OR SHIPPING) OF HDG MATERIALS IN CONTACT WITH ONE ANOTHER SHALL BE GALVANIZED (HDG) MATERIALS SHALL BE PROVIDED AT ALL TIMES. STORAGE OF HDG MATERIALS OUTDOORS REASONABLE ACCOMMODATIONS FOR THE PREVENTION OF WET STORAGE STAINING (WHITE RUST) OF HOT-DIP WORKERS. PLAN SHALL SPECIFY THE TYPE OF WALKING/WORKING PRECAUTIONS TO BE IMPLEMENTED TO PROTECT THE STUD SHEAR CONNECTORS SHALL BE INSTALLED PRIOR TO GALVANIZING. THE CONTRACTOR'S WORKER SAFETY STEEL ERECTION NOTES: NEW YORK STATE PROFESSIONAL ENGINEER AND SUBMITTED TO THE COUNTY IN ACCORDANCE WITH THE SCM. CALCULATIONS. THE ERECTION DRAWINGS AND STABILITY CALCULATIONS SHALL BE SEALED BY A REGISTERED SHALL BE DOCUMENTED ON THE ERECTION DRAWINGS AND INCLUDED IN THE SUPPORTING STABILITY HAVE BEEN ERECTED AND CROSS FRAMES INSTALLED. THE MEANS AND METHODS USED BY THE CONTRACTOR ALTERNATE PICKING POINTS, OR BY USE OF A HOLDING CRANE UNTIL A SUFFICIENT NUMBER OF FLOORBEAMS BY USE OF FALSEWORK, TEMPORARY BRACING, COMPRESSION FLANGE STIFFENING TRUSSES, CHOOSING STEEL CONSTRUCTION MANUAL (SCM). THE TRUSSES FOR THIS BRIDGE SHALL BE STABILIZED DURING ERECTION ERECTION AND CONSTRUCTION, IN ACCORDANCE WITH SECTION 2, SUBSECTION 204 OF THE NEW YORK STATE THE CONTRACTOR SHALL PROVIDE FOR THE STABILITY OF STRUCTURAL STEEL DURING ALL PHASES OF STEEL CONSTRUCTION NOTES: ACCORDING TO THE AISC MANUAL. DIMENSIONS FOR THICKNESSES OF STEEL ROLLED ANGLE SHAPES AND STRUCTURAL TUBING ARE SHOWN TENSION COMPONENTS OF LIFTING BOXES AND LIFTING FRAMES - END PORTAL FRAMES - SWAY FRAMES - TOP AND BOTTOM LATERAL BRACING - VERTICAL GUSSET PLATES - SPLICE PLATES - CANTILEVER BRACKETS AND TIE PLATES - TENSION FLANGES AND WEBS PLATES OF BASCULE GIRDERS - MINIMUM CHARPY V-NOTCH FRACTURE TOUGHNESS REQUIREMENTS: STANDARD SPECIFICATIONS - CONSTRUCTION AND MATERIALS, THE FOLLOWING ELEMENTS SHALL MEET THE IN ADDITION TO THE STRUCTURAL STEEL ELEMENTS LISTED IN §715-01 - STRUCTURAL STEEL OF THE NYSDOT SUPERSTRUCTURE SLAB NOTES: TARPS OR OTHER BARRIER-TYPE MEANS TO THE SATISFACTION OF THE EIC. THE SEALER OR BY PHYSICALLY ISOLATING THE AREA TO BE SPRAYED FROM THE WATERWAY BY THE USE OF WATERWAY. CARE SHALL BE TAKEN TO PREVENT SPRAYED SEALER FROM ENTERING THE WATERWAY BY ROLLING SURFACE, SUCH AS SCUPPERS OR OPEN DRAINS SHALL BE COVERED TO PREVENT CONTAMINATION OF THE APPLICATION OF THE SEALER, ANY OPENINGS IN THE SURFACE OF THE BRIDGE DECK OR IN THE WALKING AVAILABLE FOR IMMEDIATE USE MATERIALS TO SOAK UP OR CONTAIN ANY ACCIDENTAL SPILLS. PRIOR TO THE IN A MANNER THAT WILL PREVENT CONTAMINATION OF THE WATERWAY. THE CONTRACTOR SHALL HAVE MANUFACTURER'S INSTRUCTIONS REQUIRE MIXING OF THE SEALER PRIOR TO APPLICATION, MIXING SHALL OCCUR CARE SHALL BE TAKEN TO PREVENT CONTAMINATION OF THE WATERWAY BY THE SEALER. IF THE DAYS FOR EACH SUBMISSION, WILL BE ALLOWED UPON RECEIPT OF THE SUBMISSION. AND MATERIALS SHALL APPLY. A REVIEW TIME OF TWO DAYS PER PLACEMENT DRAWING, WITH A MINIMUM OF 15 PROVISIONS OF §557-3.17 - NO BARLIST PROVIDED, OF THE NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION BARLISTS ARE NOT PROVIDED FOR SUPERSTRUCTURE SLABS, APPROACH SLABS, AND/OR SUBSTRUCTURES. THE NEW BRIDGE DECKS AND BRIDGE DECK OVERLAYS. ONLY PENETRATING TYPE SEALERS SHALL BE USED. SHALL BE SEALED IN ACCORDANCE WITH ITEM 559.01 - PROTECTIVE SEALING OF STRUCTURAL CONCRETE ON TOP SURFACES OF NEW SIDEWALKS AND EXPOSED SURFACES OF NEW CONCRETE PARAPETS OR BARRIERS 559.01 - PROTECTIVE SEALING OF STRUCTURAL CONCRETE ON NEW BRIDGE DECKS AND BRIDGE DECK OVERLAYS. TOP SURFACES OF NEW BRIDGE DECKS AND APPROACH SLABS SHALL BE SEALED IN ACCORDANCE WITH ITEM PRICE BID FOR THE BARRIER ITEM. COST OF BARRIER AND ANCHORAGE REINFORCEMENT ORIGINATING IN THE SLAB SHALL BE INCLUDED IN THE UNIT THE DETAILS FOR THE BARRIER REINFORCEMENT ARE FOR THE SLIP-FORMED OR CAST-IN-PLACE OPTION ONLY. PERMISSION OF THE ENGINEER. THE CONTRACTOR SHALL MAKE NO DEVIATIONS FROM THE HAUNCH DETAILS SHOWN IN THE PLANS WITHOUT THE REMOVAL NOTES: OF THE STRUCTURE'S PAINT PRIOR TO SUBMITTING A BID. REQUIRED. BECAUSE OF THE ABOVE-MENTIONED CONDITION, THE CONTRACTOR SHALL EXAMINE THE CONDITION ON THE ALTERNATIVE CHOSEN, THE TREATMENT AND DISPOSAL OF PAINT REMOVAL WASTE ITEM MAY BE THE USE OF ENVIRONMENTAL GROUND AND/OR WATERWAY PROTECTION ITEMS WILL BE REQUIRED. DEPENDING FOR THE SUPERSTRUCTURE REMOVAL ITEM(S) (OR THE UNIT PRICE BID FOR THE SUBSTRUCTURE REMOVAL ITEM.) OPERATIONS. THE COST OF REMEDIATING THIS CONDITION SHALL BE INCLUDED IN THE LUMP SUM PRICE(S) BID PRIOR TO REMOVAL, ENCAPSULATING THE LOOSE PAINT OR REMOVAL OF LOOSE PAINT PRIOR TO DISMANTLING COULD INCLUDE TRANSPORTING AFFECTED MEMBERS IN CLOSED TRUCKS, WRAPPING AFFECTED MEMBERS WORKER LEAD PROTECTION IN ACCORDANCE WITH 29 CFR 1926.62 SHALL BE SATISFIED. REMEDIATION METHODS SHALL FORMULATE AND SUBMIT A METHOD OF REMEDIATING THE CONDITION FOR APPROVAL BY THE ENGINEER. OR DURING TRANSPORTATION FROM THE SITE UNLESS APPROPRIATE MEASURES ARE TAKEN. THE CONTRACTOR LOOSE AND/OR PEELING PAINT ON STEEL SURFACES MAY BECOME DISLODGED DURING REMOVAL OPERATIONS SHALL BE DISPOSED OF USING THE TREATMENT AND DISPOSAL OF PAINT REMOVAL WASTE ITEM. SHALL BE COLLECTED USING THE ENVIRONMENTAL GROUND AND/OR WATERWAY PROTECTION ITEM(S). WASTE PRICE BID FOR THE SUBSTRUCTURE REMOVAL ITEM). PAINT WASTE NOT COLLECTED BY VACUUM METHODS SHALL BE INCLUDED IN THE LUMP SUM PRICE(S) BID FOR THE SUPERSTRUCTURE REMOVAL ITEM(S) (OR THE UNIT CONSTRUCTION AND MATERIALS. AND §574 OF THE STANDARD SPECIFICATIONS. THE COST OF PAINT REMOVAL SHALL MEET THE PROVISIONS OF §202-3.01 - GENERAL, OF THE NYSDOT STANDARD SPECIFICATIONS - LIMITS AND METHODS FOR THE REMOVAL OF PAINT AT LOCATIONS OF FASTENER REMOVAL OR FLAME CUTTING RECORD PLANS FOR THIS STRUCTURE ARE NOT AVAILABLE. DISPOSED OF USING THE TREATMENT AND DISPOSAL OF PAINT REMOVAL WASTE ITEM. COLLECTED USING THE ENVIRONMENTAL GROUND AND/OR WATERWAY PROTECTION ITEM(S). WASTE SHALL BE BID FOR THE SUBSTRUCTURE REMOVAL ITEM). PAINT WASTE NOT COLLECTED BY VACUUM METHODS SHALL BE SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE SUPERSTRUCTURE REMOVAL ITEM(S) (OR THE UNIT PRICE OF THE NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION AND MATERIALS. THE COST OF PAINT REMOVAL SUPERSTRUCTURE REMOVAL SHALL MEET THE PROVISIONS OF §202-3.01 GENERAL AND SAFETY REQUIREMENTS, ENGINEER THIRTY (30) DAYS PRIOR TO BEGINNING THE DEMOLITION. PLAN, SEALED BY A REGISTERED NEW YORK STATE PROFESSIONAL ENGINEER, SHALL BE SUBMITTED TO THE REQUIREMENTS, OF THE NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION AND MATERIALS. A REMOVAL SUPERSTRUCTURE REMOVAL SHALL MEET THE PROVISIONS OF §202-3.01 - GENERAL AND SAFETY SUPERSTRUCTURES. EXISTING SUPERSTRUCTURE SHALL BE REMOVED UNDER ITEM 202.120001 - REMOVING EXISTING REMOVAL OF SUBSTRUCTURES.. EXISTING SUBSTRUCTURE SHALL BE REMOVED WITHIN THE PAY LIMITS SHOWN IN THE PLANS UNDER ITEM 202.19 - GENERAL NOTES - 1 GNN-01 56-02-G-206-0 E E X C R S L IO CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:34:49 AM morrimm 6 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W RECONSTRUCTION NOTES: GENERAL NOTES - 2 PROTECT IT DURING CONSTRUCTION OR REMOVE AND REMOUNT IT AFTER CONSTRUCTION IS COMPLETED. IF THE STRUCTURE HAS A BRIDGE IDENTIFICATION NUMBER (B.I.N.) PLATE ATTACHED, THE CONTRACTOR SHALL 1. CASTING NEW PEDESTALS AND INSTALLING THE NEW BEARINGS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TOP OF PEDESTAL ELEVATIONS PRIOR TO 7. ITEMS IN THE CONTRACT. SCREENS OR OTHER PROTECTIVE DEVICES SHALL BE INCLUDED IN THE UNIT PRICE BID USING THE APPROPRIATE THE COST OF FURNISHING, INSTALLING, MAINTAINING, REMOVING AND DISPOSING OF ALL PLATFORMS, NETS, 6. DISPOSED OF BY THE CONTRACTOR AT NO COST TO THE COUNTY. ALL MATERIAL FALLING ON THE AREA BELOW AND ADJACENT TO THE BRIDGE SHALL BE REMOVED AND 5. ADEQUATE PROTECTION IS PROVIDED. MATERIAL. IF ADEQUATE PROTECTIVE DEVICES ARE NOT BEING EMPLOYED, THE WORK WILL BE STOPPED UNTIL OF MATERIAL. PLATFORMS, NETS, SCREENS OR OTHER PROTECTIVE DEVICES SHALL BE USED TO CATCH THE MATERIAL TO THE AREA BELOW THE BRIDGE EXCEPT WHERE THE PLANS SPECIFICALLY PERMIT THE DROPPING DURING REMOVAL OPERATIONS, THE CONTRACTOR SHALL NOT DROP WASTE CONCRETE, DEBRIS, AND OTHER 4. BID FOR THOSE ITEMS. SUPPLYING A DISPOSAL AREA AND TRANSPORTATION TO THAT AREA SHALL BE INCLUDED IN THE UNIT PRICES WHEN ITEMS IN THE CONTRACT REQUIRE MATERIALS TO BE REMOVED AND DISPOSED OF, THE COST OF 3. ENGINEER AT THE EXPENSE OF THE CONTRACTOR. STATE, THE DAMAGED MATERIALS SHALL BE REPAIRED OR REPLACED IN A MANNER SATISFACTORY TO THE DAMAGES ANY MATERIALS WHICH ARE TO REMAIN IN PLACE OR WHICH ARE TO REMAIN THE PROPERTY OF THE PLACE, OR WHICH ARE TO REMAIN THE PROPERTY OF THE STATE, WILL NOT BE DAMAGED. IF THE CONTRACTOR THE CONTRACTOR SHALL PERFORM ALL WORK WITH CARE SO THAT ANY MATERIALS WHICH ARE TO REMAIN IN 2. CONTRACTOR SHALL PERFORM THE WORK IN ACCORDANCE WITH FIELD CONDITIONS. FIELD CONDITIONS MAY REQUIRE MODIFICATIONS TO CONSTRUCTION DETAILS AND WORK QUANTITIES. THE BEEN PREPARED BASED ON FIELD INSPECTION AND OTHER INFORMATION AVAILABLE AT THE TIME. ACTUAL BE ACCURATELY DETERMINED PRIOR TO THE COMMENCEMENT OF WORK. THE CONTRACT DOCUMENTS HAVE DUE TO THE NATURE OF RECONSTRUCTION PROJECTS, THE EXACT EXTENT OF RECONSTRUCTION WORK CANNOT 1. MISCELLANEOUS NOTE: RIVER/STREAM PROTECTION PLAN TO THE ENGINEER FOR APPROVAL PRIOR TO THE COMMENCEMENT OF WORK. SHALL BE MADE UNDER THE VARIOUS ITEMS IN THIS CONTRACT. THE CONTRACTOR SHALL SUBMIT A PROTECT AND MAINTAIN WATER RIGHTS AND TO SUSTAIN FISH LIFE DOWNSTREAM. PAYMENT FOR ALL THIS WORK USES WATER FROM A STREAM, THE CONTRACTOR SHALL CONSTRUCT AN INTAKE OR TEMPORARY DAM TO STREAM TO BECOME POLLUTED WITH SAND, SILT, CEMENT, OIL, OR OTHER IMPURITIES. IF THE CONTRACTOR WATER WHICH HAS BEEN USED FOR WASH PURPOSES OR OTHER SIMILAR OPERATIONS WHICH CAUSE THE EQUIPMENT IN OR NEAR SUCH STREAMS. THE CONTRACTOR SHALL NOT RETURN DIRECTLY TO A STREAM ANY SEDIMENT, CONSTRUCTION MATERIALS OR OTHER FOREIGN MATERIALS, OR FROM THE OPERATION OF AS TO PREVENT OR REDUCE TO A MINIMUM ANY DAMAGE TO ANY STREAM FROM POLLUTION BY DEBRIS, DURING THE COURSE OF CONSTRUCTION, THE CONTRACTOR SHALL CONDUCT OPERATIONS IN SUCH A MANNER 1. STREAM PROTECTION NOTE GNN-02 B.I.N. PLATE NOTE: 56-02-G-207-0 Alignment Name: Quaker Bridge Road Alignment Description: Alignment Style: Alignment\AC_P Station Northing Easting Element: Linear START ( START ) M 1+00.000 867255.78 665717.18 EQNBK 0 867255.78 665717.18 EQNAHD M 1+00.000 867255.78 665717.18 PC ( PC ) M 1+26.291 867237.76 665698.04 Tangential Direction: S46.728°W Tangential Length: 26.291 Element: Circular PC ( PC ) M 1+26.291 867237.76 665698.04 HPI ( HPI ) M 1+93.091 867191.97 665649.4 CC ( CC ) 867106.7 665821.42 PCC ( PCC ) M 2+54.220 867125.54 665642.41 Radius: 180 Delta: 40.72 Left Degree of Curvature (Arc): 31.83 Length: 127.929 Tangent: 66.8 Chord: 125.254 Middle Ordinate: 11.246 External: 11.996 Back Tangent Direction: S46.728°W Back Radial Direction: N43.272°W Chord Direction: S26.367°W Ahead Radial Direction: N83.993°W Ahead Tangent Direction: S6.007°W Element: Circular PCC ( PCC ) M 2+54.220 867125.54 665642.41 HPI ( HPI ) M 2+73.745 867106.08 665640.74 CC ( CC ) 867122.16 665681.73 PT ( PT ) M 2+90.483 867092.95 665655.19 Radius: 39.469 Delta: 52.64 Left Degree of Curvature (Arc): 145.17 Length: 36.263 Tangent: 19.525 Chord: 35.001 Middle Ordinate: 4.092 External: 4.565 Back Tangent Direction: S4.906°W Back Radial Direction: N85.094°W Chord Direction: S21.415°E Ahead Radial Direction: S42.263°W Ahead Tangent Direction: S47.737°E Element: Linear PT ( PT ) M 2+90.483 867092.95 665655.19 PC ( PC ) M 3+97.398 867021.06 665734.33 Tangential Direction: S47.750°E Tangential Length: 106.915 Element: Circular PC ( PC ) M 3+97.398 867021.06 665734.33 HPI ( HPI ) M 4+27.922 867000.54 665756.92 CC ( CC ) 866988.44 665704.7 PT ( PT ) M 4+50.791 866972.17 665745.66 Radius: 44.076 Delta: 69.41 Right Degree of Curvature (Arc): 129.99 Length: 53.393 Tangent: 30.524 Chord: 50.188 Middle Ordinate: 7.841 External: 9.537 Back Tangent Direction: S47.750°E Back Radial Direction: S42.250°W Chord Direction: S13.046°E Ahead Radial Direction: N68.343°W Ahead Tangent Direction: S21.657°W Element: Linear PT ( PT ) M 4+50.791 866972.17 665745.66 HPI ( HPI ) M 5+19.475 866908.1 665720.9 Tangential Direction: S21.130°W Tangential Length: 68.684 Element: Linear HPI ( HPI ) M 5+19.475 866908.1 665720.9 END ( END ) M 5+41.583 866887.92 665711.87 Tangential Direction: S24.103°W Tangential Length: 22.109 Alignment Name: Quaker Bridge Road East Alignment Description: Alignment Style: Alignment\AC_P Station Northing Easting Element: Linear START ( START ) S 1+00.000 867061.33 665850.59 EQNBK 1+00.000 867061.33 665850.59 EQNAHD S 1+00.000 867061.33 665850.59 END ( END ) S 2+20.063 867000.46 665747.1 Tangential Direction: S59.540°W Tangential Length: 120.063 CONSULTANT SEAL INFORMATION CONSULTANT BIN# 3348560 M. HUNT K. SCHUMAN-EKES K. DETRICK WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 03/06/2025 XX 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 5/1/2025 N:\Projects\2024\124-296 Westchester Co - Quaker Bridge Replacement\Working\CADD\dgn connect_2023\124-296_cph_gnn-02.dgn FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 3:32:18 PM DetriKH 6 RECONSTRUCTION NOTES: GENERAL NOTES - 2 PROTECT IT DURING CONSTRUCTION OR REMOVE AND REMOUNT IT AFTER CONSTRUCTION IS COMPLETED. IF THE STRUCTURE HAS A BRIDGE IDENTIFICATION NUMBER (B.I.N.) PLATE ATTACHED, THE CONTRACTOR SHALL CASTING NEW PEDESTALS AND INSTALLING THE NEW BEARINGS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TOP OF PEDESTAL ELEVATIONS PRIOR TO ITEMS IN THE CONTRACT. SCREENS OR OTHER PROTECTIVE DEVICES SHALL BE INCLUDED IN THE UNIT PRICE BID USING THE APPROPRIATE THE COST OF FURNISHING, INSTALLING, MAINTAINING, REMOVING AND DISPOSING OF ALL PLATFORMS, NETS, DISPOSED OF BY THE CONTRACTOR AT NO COST TO THE COUNTY. ALL MATERIAL FALLING ON THE AREA BELOW AND ADJACENT TO THE BRIDGE SHALL BE REMOVED AND ADEQUATE PROTECTION IS PROVIDED. MATERIAL. IF ADEQUATE PROTECTIVE DEVICES ARE NOT BEING EMPLOYED, THE WORK WILL BE STOPPED UNTIL OF MATERIAL. PLATFORMS, NETS, SCREENS OR OTHER PROTECTIVE DEVICES SHALL BE USED TO CATCH THE MATERIAL TO THE AREA BELOW THE BRIDGE EXCEPT WHERE THE PLANS SPECIFICALLY PERMIT THE DROPPING DURING REMOVAL OPERATIONS, THE CONTRACTOR SHALL NOT DROP WASTE CONCRETE, DEBRIS, AND OTHER BID FOR THOSE ITEMS. SUPPLYING A DISPOSAL AREA AND TRANSPORTATION TO THAT AREA SHALL BE INCLUDED IN THE UNIT PRICES WHEN ITEMS IN THE CONTRACT REQUIRE MATERIALS TO BE REMOVED AND DISPOSED OF, THE COST OF ENGINEER AT THE EXPENSE OF THE CONTRACTOR. STATE, THE DAMAGED MATERIALS SHALL BE REPAIRED OR REPLACED IN A MANNER SATISFACTORY TO THE DAMAGES ANY MATERIALS WHICH ARE TO REMAIN IN PLACE OR WHICH ARE TO REMAIN THE PROPERTY OF THE PLACE, OR WHICH ARE TO REMAIN THE PROPERTY OF THE STATE, WILL NOT BE DAMAGED. IF THE CONTRACTOR THE CONTRACTOR SHALL PERFORM ALL WORK WITH CARE SO THAT ANY MATERIALS WHICH ARE TO REMAIN IN CONTRACTOR SHALL PERFORM THE WORK IN ACCORDANCE WITH FIELD CONDITIONS. FIELD CONDITIONS MAY REQUIRE MODIFICATIONS TO CONSTRUCTION DETAILS AND WORK QUANTITIES. THE BEEN PREPARED BASED ON FIELD INSPECTION AND OTHER INFORMATION AVAILABLE AT THE TIME. ACTUAL BE ACCURATELY DETERMINED PRIOR TO THE COMMENCEMENT OF WORK. THE CONTRACT DOCUMENTS HAVE DUE TO THE NATURE OF RECONSTRUCTION PROJECTS, THE EXACT EXTENT OF RECONSTRUCTION WORK CANNOT MICELLANEOUS NOTE: PROTECT AND MAINTAIN WATER RIGHTS AND TO SUSTAIN FISH LIFE DOWNSTREAM. USES WATER FROM A STREAM, THE CONTRACTOR SHALL CONSTRUCT AN INTAKE OR TEMPORARY DAM TO STREAM TO BECOME POLLUTED WITH SAND, SILT, CEMENT, OIL, OR OTHER IMPURITIES. IF THE CONTRACTOR WATER WHICH HAS BEEN USED FOR WASH PURPOSES OR OTHER SIMILAR OPERATIONS WHICH CAUSE THE EQUIPMENT IN OR NEAR SUCH STREAMS. THE CONTRACTOR SHALL NOT RETURN DIRECTLY TO A STREAM ANY SEDIMENT, CONSTRUCTION MATERIALS OR OTHER FOREIGN MATERIALS, OR FROM THE OPERATION OF AS TO PREVENT OR REDUCE TO A MINIMUM ANY DAMAGE TO ANY STREAM FROM POLLUTION BY DEBRIS, DURING THE COURSE OF CONSTRUCTION, THE CONTRACTOR SHALL CONDUCT OPERATIONS IN SUCH A MANNER STREAM PROTECTION NOTE GNN-02 E E X C R S L IO CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:35:10 AM morrimm 11 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W TM 68.18-1-42 LIBER 6502, PAGE 289 VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 79.06-2-3 DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-1 LIBER 7575, PAGE 439 VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-3-10 CONTROL NO. 593163545 LINDA HAMILTON LANDS N/F OF TM 68.18-3-12 CONTROL NO. 512863213 NICHOLAS KAPLAN MICHAEL A. KAPLAN AND LANDS N/F OF TM 68.18-3-11 LIBER 11069, PAGE 103 MICHAEL I. WEINTRAUB CROTON TRUST AS TRUSTEES OF THE ANITA B. WEINTRAUB AND SANFORD WEINTRAUB LANDS N/F OF (FILED MAP 19964) PARCEL D (FILED MAP 19964) PARCEL C WOODS WOODS WOODS STRUCTURE CONCRETE CONCRETE RET. WALL STONE WING WALL EDGE OF WATER STONE WING WALL EDGE OF WATER AREA RIP RAP EDGE OF WATER L L A W G NI W E G DI R B ASPHALT ASPHALT DRAINAGE RIP RAP MAPLE 18" STONE WALL DITCH POST POST STONE RET. WALL WOODS WOODS WOODS BOLLARDS CROTON RIVER RAIL GUIDE WOOD STONE LINED DITCH BRIDGE WING WALL BORING FOUND PIPE IRON ROCK X-CUT IN STONE WALL DITCH BORING BORING BORING BORING BORING GNP-01 HIGHWAY GENERAL PLAN 0 20 40 60 80' 20 1" = 40' TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" 5'-0" SHOULDER 1'-0" SHOULDER TRAVEL LANE 9'-0" TRAVEL LANE 9'-0" 1'-0" SHOULDER 1'-0" SHOULDER TRAVEL LANE 9'-0" TRAVEL LANE 9'-0" 1'-0" SHOULDER 1'-0" SHOULDER 56-02-R-212-0 CUTTING PAVEMENT ITEM 627.50140008 ACQUIRED BY COUNTY LIMITS OF TO BE THE PROJECT ACCESS AT COMPLETION OF REESTABLISH WALKING TRAIL EASEMENT LIMITS OF PERMANENT CUTTING PAVEMENT ITEM 627.50140008 CUTTING PAVEMENT ITEM 627.50140008 FOLLOWING LOCATIONS. FINAL ROAD STRIPING SHALL BE INSTALLED IN THE 1. NOTE: START STA. END STA. ITEM NO. DESCIPTION M 2+25.00 M 2+25.00 M 1+26.29 M 4+00.00 M 4+00.00 M 4+00.00 685.1102 685.1102 685.1202 SINGLE WHITE LT. SHLDR. SINGLE WHITE RT. SHLDR. ¡ DOUBLE YELLOW M 1+26.29 PC M 2+54.22 PCC M 2+90.48 PT M 3+97.40 PC M 4+50.79 PT M 1+00.00 P.I. STA M 1+00 M 2+00 M 3+00 M 4+00 M 5+00 S 1+00 S 2+00 (BK) 1+00.00 STA (AH) = S 1+00.00 STA S 1+00 S 2+00 BEGIN RECONSTRUCTION END RECONSTRUCTION M 2+90.48 PT M 3+97.40 PC END RECONSTRUCTION STA. M 5+40.01 #13 KV P.P. W 57 13 KV P.P. HEAD WALL CONC. W 5 P.P. 8" CMP INV.=35.96 15" CMP SE.INV.=36.82 N.INV.=38.47 T.F.=39.57 C.B. =46.62 INV. =49.95 INV. 61.51 INV.= 12" CMP =43.13 INV. =43.20 INV. 12" PVC 15" CMP 18" CMP =41.7 INV. E E X C R S L IO CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:35:12 AM morrimm 12 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W SHOULDER 2'-3" SHOULDER 5'-0" BREAK 2.0% T.G.L. 6.0% 6.0% TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. ¡ PROPOSED ITEM 606.2702 BEAM GUIDE RAILING HPBO (MOD.) CORRUGATED GROUND ORIGINAL TYPICAL HIGHWAY SECTION SHOULDER 2'-3" TRAVEL LANE 11'-0" 6.0% 2.0% T.G.L. 6.0% 2 ITEMS 610.1402 & 610.1601 TURF (ROADSIDE), 4" TOPSOIL & ESTABLISH GROUND ORIGINAL TO REMAIN RETAINING WALL EXISTING CONCRETE ITEM 304.12 COURSE TYPE II, 12" - SUBBASE TYPICAL HIGHWAY SECTION TRAVEL LANE 11'-0" QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. ¡ PROPOSED ITEM 606.2702 BEAM GUIDE RAILING HPBO (MOD.) CORRUGATED RETAINING WALL STA. M 1+26.29 TO STA. M 1+80.00 STA. M 1+80.00 TO STA. M 2+67.25 T.G.L. 80 SERIES COMPACTION " - 9.5 F3 TOP COURSE, 2 1 1 80 SERIES COMPACTION " - 19 F9 BINDER COURSE, 2 1 2 80 SERIES COMPACTION 5" - 37.5 F9 BASE COURSE, VARIES SHOULDER 2'-3" SHOULDER 2'-3" ITEM 606.2702 BEAM GUIDE RAILING HPBO (MOD.) CORRUGATED TRAVEL LANE VARIES TRAVEL LANE VARIES 2 1 TYPICAL HIGHWAY SECTION STA. M 4+27.17 TO STA. M 5+40.01 1 2.0% VARIES GROUND ORIGINAL 80 SERIES COMPACTION, ITEM 404.0983 " - 9.5 F3 TOP COURSE, 2 1 1 80 SERIES COMPACTION, ITEM 404.1989 " - 19 F9 BINDER COURSE, 2 1 2 80 SERIES COMPACTION, ITEM 404.3789 5" - 37.5 F9 BASE COURSE, 2.0% ITEM 304.12 COURSE TYPE II, 12" - SUBBASE SHOULDER 1'-0" VARIES SHOULDER BREAK QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. ¡ PROPOSED BREAK BREAK TYP-01 HIGHWAY TYPICAL SECTIONS 80 SERIES COMPACTION, ITEM 404.0983 " - 9.5 F3 TOP COURSE, 2 1 1 80 SERIES COMPACTION, ITEM 404.1989 " - 19 F9 BINDER COURSE, 2 1 2 80 SERIES COMPACTION, ITEM 404.3789 5" - 37.5 F9 BASE COURSE, ITEM 304.12 COURSE TYPE II, 12" - SUBBASE ITEMS 610.1402 & 610.1601 TURF (ROADSIDE), 4" TOPSOIL & ESTABLISH ITEMS 610.1402 & 610.1601 TURF (ROADSIDE), 4" TOPSOIL & ESTABLISH T.G.L. ITEM 304.12 COURSE TYPE II, 12" - SUBBASE 2.0% SHOULDER 2'-3" 6.0% VARIES 1 BREAK SHOULDER 1'-0" ITEM 606.2702 BEAM GUIDE RAILING HPBO (MOD.) CORRUGATED ITEMS 610.1402 & 610.1601 TURF (ROADSIDE), 4" TOPSOIL & ESTABLISH QUAKER BRIDGE ROAD EAST , STA. LINE, & H.C.L. ¡ PROPOSED 80 SERIES COMPACTION, ITEM 404.0983 " - 9.5 F3 TOP COURSE, 2 1 1 80 SERIES COMPACTION, ITEM 404.1989 " - 19 F9 BINDER COURSE, 2 1 2 80 SERIES COMPACTION, ITEM 404.3789 5" - 37.5 F9 BASE COURSE, TYPICAL HIGHWAY SECTION STA. S 1+00.00 TO STA. S 2+05.74 TRAVEL LANE 9'-0" 2.0% SHOULDER 2'-3" 6.0% BREAK TRAVEL LANE 9'-0" SHOULDER 1'-0" 1'-0" VARIES 2 1 0 2 4 6 8' 2 3/16" = 1' ROUND 4' V.C. ROUND 4' V.C. 56-02-R-213-0 ITEM 407.0102 DILUTED TACK COAT, ITEM 407.0102 DILUTED TACK COAT, ITEM 407.0102 DILUTED TACK COAT, ITEM 407.0102 DILUTED TACK COAT, EXCAVATION AND DISPOSAL. SUBBASE TO BE PAID UNDER ITEM 203.02 - UNCLASSIFIED REMOVAL OF EXISTING PAVEMENT TO BOTTOM OF PROPOSED 1. NOTE: 42.07 40.43 28.42 46.07 55.79 42.07 40.43 28.42 46.07 55.79 E E X C R S L IO ROAD-2 M 1+00 M 1+00 M 2+00 M 3+00 M 4+00 M 5+00 0 0 5 5 10 10 15 15 20 20 25 25 30 30 35 35 40 40 45 45 50 50 55 55 60 60 65 65 70 70 41.53 41.05 40.97 42.40 43.90 45.40 46.90 50.68 56.27 41.53 41.03 40.43 41.30 18.67 51.23 STA. M 3+95.00 EXP. BRGS. ¡ STA. M 2+95.00 FIX BRGS. ¡ 41.53 41.05 40.97 42.40 43.90 45.40 46.90 50.68 56.27 41.53 41.03 40.43 41.30 18.67 51.23 STA. S 2+20.06 STA. M 4+21.95 EQUALITY STATION 25'-0" APPROACH SLAB 100'-0" ¡ BRG. TO ¡ BRG. 25'-0" APPROACH SLAB BEGINS STA. M 4+27.17 PPROACH PAVMENT A ENDS STA. M 2+67.25 PPROACH PAVMENT A CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:35:14 AM morrimm 13 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W PROFILE - QUAKER BRIDGE ROAD 0 20 40 60 80' HORIZONTAL SCALE 0 2 4' VERTICAL SCALE PRO-01 QUAKER BRIDGE ROAD 56-02-R-214-0 40.75 EL M 1+77.04 - VLP -2.00% +3.00% +11.17% 40.99 EL M 1+53.06 - VPC 41.29 EL M 2+13.06 - VPT 46.90 EL M 4+00.11 - VPC 50.70 EL M 4+50.11 - VPT PROPOSED GRADE ORGINAL GROUND PROPOSED GRADE EXISTING GRADE FT. 108 HSD = FT. 0.38 E = +3.00% G2 = -2.00% G1 = FT. 60.00 L = SAG CURVE: FT. 58 HSD = FT. 0.57 E = G2 = +11.17% +3.00% G1 = FT. 50.00 L = SAG CURVE: 40.75 EL M 1+77.04 - VLP -2.00% +3.00% +11.17% 40.99 EL M 1+53.06 - VPC 41.29 EL M 2+13.06 - VPT 46.90 EL M 4+00.11 - VPC 50.70 EL M 4+50.11 - VPT 41.53 EL BEGIN RECONSTRUCTION M 1+26.00 - VPI 60.74 EL END RECONSTRUCTION M 5+40.01 - VPI 40.39 EL M 1+83.06 - VPI 47.65 EL M 4+25.11 - VPI 58.15 49.61 58.15 49.61 58.15 49.61 58.15 49.61 E E X C R S L IO S 1+00 S 1+00 S 2+00 25 25 30 30 35 35 40 40 45 45 50 50 55 55 60 60 65 65 70 70 75 75 58.15 53.33 49.51 0.00 58.15 53.33 49.51 0.00 STA. S 2+20.06 STA. M 4+21.95 EQUALITY STATION 58.15 52.50 48.70 58.15 53.48 49.61 58.15 52.50 48.70 58.15 53.48 49.61 CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:35:16 AM morrimm 14 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W 0 20 40 60 80' HORIZONTAL SCALE 0 2 4' VERTICAL SCALE PROFILE - QUAKER BRIDGE ROAD EAST PRO-02 QUAKER BRIDGE ROAD EAST 56-02-R-215-0 ORIGINAL GROUND PROPOSED GRADE FT. 76 HSD = FT. 0.87 E = -2.35% G2 = -11.37% G1 = FT. 77.48 L = SAG CURVE: -11.37% 53.31 EL S 1+42.58 - VPC 47.99 EL S 2+20.06 - VPT 48.91 EL S 1+81.32 - VPI E E X C R S L IO 5 30 35 25 30 40 45 35 40 45 55 50 50 50 50 55 60 30 35 40 45 20 20 20 20 25 25 25 25 30 30 30 30 30 30 35 35 35 35 35 40 40 40 40 40 40 45 45 45 45 45 45 45 50 50 50 50 50 50 50 55 55 55 55 55 55 55 55 60 60 60 60 60 60 60 60 60 65 65 65 65 65 65 65 65 65 70 70 70 70 70 70 70 70 70 75 75 75 75 75 75 75 80 80 80 80 80 80 85 85 85 85 85 85 90 90 90 90 90 95 95 95 CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:35:22 AM morrimm 15 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W TM 68.18-1-42 LIBER 6502, PAGE 289 VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 79.06-2-3 DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-1 LIBER 7575, PAGE 439 VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-3-10 CONTROL NO. 593163545 LINDA HAMILTON LANDS N/F OF TM 68.18-3-12 CONTROL NO. 512863213 NICHOLAS KAPLAN MICHAEL A. KAPLAN AND LANDS N/F OF TM 68.18-3-11 LIBER 11069, PAGE 103 MICHAEL I. WEINTRAUB CROTON TRUST AS TRUSTEES OF THE ANITA B. WEINTRAUB AND SANFORD WEINTRAUB LANDS N/F OF (FILED MAP 19964) PARCEL D (FILED MAP 19964) PARCEL C WOODS WOODS WOODS CONCRETE RET. WAL CONCRETE RET. WALL EDGE OF WATER EDGE OF WATER AREA RIP RAP EDGE OF WATER ASPHALT ASPHALT DRAINAGE RIP RAP MAPLE 18" STONE WALL STONE RET. WALL WOODS WOODS WOODS CROTON RIVER PILLAR STONE IRON GATE WROUGHT RAIL GUIDE WOOD FOUND PIPE IRON ROD FOUND CAPPED IRON ROCK X-CUT IN STONE WALL M 1+26.29 PC M 2+54.22 PCC M 2+90.48 PT M 3+97.40 PC M 4+50.79 PT M 1+00.00 P.I. STA M 1+00 M 2+00 M 3+00 M 4+00 M 5+00 S 1+00 S 2+00 (BK) 1+00.00 STA (AH) = S 1+00.00 STA S 1+00 S 2+00 BEGIN RECONSTRUCTION END RECONSTRUCTION ROAD QUAKER BRIDGE TO ALBANY POST ROAD RIDGE ROAD TO QUAKER ROAD EAST QUAKER BRIDGE ROAD QUAKER BRIDGE GRID NORTH , STA. LINE, AND H.C.L. ¡ QUAKER BRIDGE ROAD EAST , STA. LINE, AND H.C.L. ¡ QUAKER BRIDGE ROAD FLOW CROTON RIVER GRADING PLAN TO RTE 129 GRD-01 0 20 40 60 80' 20 1" = 40' 6 OHW EL. 28.25 OHW EL. 28.25 56-02-R-216-0 #13 KV P.P. W 57 13 KV P.P. HEAD WALL CONC. W 5 P.P. W/LIGHT P.P. P.P. #13 KV P.P. W 57 13 KV P.P. W 5 P.P. W/LIGHT P.P. P.P. E E X C R S L IO CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:35:25 AM morrimm 16 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W WOODS WOODS WOODS CONCRETE RET. WAL CONCRETE RET. WALL STONE WING WALL EDGE OF WATER STONE WING WALL EDGE OF WATER EDGE OF WATER STONE WALL POST POST STONE RET. WALL WOODS WOODS WOODS KEY PAD BOLLARDS CROTON RIVER PILLAR STONE IRON GATE WROUGHT RAIL GUIDE WOOD BRIDGE WING WALL STONE WALL ROAD QUAKER BRIDGE TO ALBANY POST ROAD RIDGE ROAD TO QUAKER ROAD EAST QUAKER BRIDGE ROAD QUAKER BRIDGE GRID NORTH , STA. LINE, AND H.C.L. ¡ QUAKER BRIDGE ROAD EAST , STA. LINE, AND H.C.L. ¡ QUAKER BRIDGE ROAD FLOW CROTON RIVER TO RTE 129 LAP-01 0 20 40 60 80' 20 1" = 40' (136) LIVE STAKES 36" Ø (47) LIVE STAKES 36" Ø NUMBER NYDOT ITEM DESCRIPTION QUANTITY UNIT LANDSCAPING: 611.0114 PLANTING - MAJOR DECIDUOUS TREES – 6' HEIGHT, 2-3" CALIPER 75 EA 611.19 POST-PLANTING CARE 75 EA 616.08000024 LIVE STAKE PLANTINGS 1" TO 2" 300 EA 610.1401 TOPSOIL - REUSE ON-SITE MATERIALS 90 CY 610.1101 MULCH FOR PLANTING TYPE A,B & D WOOD CHIPS & SHREDDED BARK 90 CY 610.19 WATERING VEGETATION 0.225 1000 GAL LAP-01 LANDSCAPE PLAN (117) LIVE STAKES 36" Ø 56-02-R-217-0 PLANTING LIST SYMBOL CODE QTY BOTANICAL/COMMON NAME CONTAINER REMARKS TREES AS 17 ACER SACCHARUM/SUGAR MAPLE 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED BL 11 BETULA LENTA/SWEET BIRCH 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED FA 4 FRAXINUS AMERICANA/WHITE ASH 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED LT 11 LIRIODENDRON TULIPFERA/TULIP POPLAR 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED PO 4 PLATANUS OCCIDENTALIS/AMERICAN SYCAMORE 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED QR 15 QUERCUS RUBRA/NORTHERN RED OAK 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED TC 5 TSUGA CANADENSIS/EASTERN HEMLOCK 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED UA 9 ULMUS AMERICANA/AMERICAN ELM 2" CAL. MIN. 6-8' MINIMUM HEIGHT ONCE PLANTED SYMBOL CODE QTY BOTANICAL/COMMON NAME CONTAINER SPACING REMARKS SHRUB AREAS SN 300 SALIX NIGRA/LIVE STAKES 1" MIN. CAL. LIVE STAKE 36" O.C. APPLICATION 1-2" DIAMETER, 2-6' LONG DEPENDING ON SITE M 1+26.29 PC M 2+54.22 PCC M 2+90.48 PT M 3+97.40 PC M 4+50.79 PT M 1+00.00 P.I. STA M 1+00 M 2+00 M 3+00 M 4+00 M 5+00 S 1+00 S 2+00 (BK) 1+00.00 STA (AH) = S 1+00.00 STA S 1+00 S 2+00 BEGIN RECONSTRUCTION END RECONSTRUCTION #13 KV P.P. W 57 13 KV P.P. W 5 P.P. SE.INV.=36.82 N.INV.=38.47 T.F.=39.57 C.B. W/LIGHT P.P. P.P. E E X C R S L IO 3B 4 2 5 1 3A CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:35:33 AM morrimm 17 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W LANDSCAPING DETAILS LAD-01 FOR TREE PLANTING. SEE SHEET LAP-01 FOR PAY ITEMS 2. SEASON. ETC. AFTER ONE GROWING REMOVE GUYING, TREE WRAP, 1. PLAN VIEW OF STAKING FLUORESECNT FLAGGING ON WIRE. 3. CUT LEADERS. BRANCHES. DO NOT PROVIDE MINIMAL PRUNING. ONLY TO CORRECT DAMAGED 2. SLOPE. THIS DETAIL SHALL APPLY TO ALL TREES PLANTED ON A 1. TREE HEIGHT APPROX 2 / 3 STAKE W/ CENTERED 1" x 2" x 18" WOOD " SISAL ROPE 4 1 5" ABOVE FINAL GRADE NATURAL ROOT COLLAR 3" - TRUNK) NOT TO BE IN CONTACT WITH TREE HARDWOOD MULCH MIN. (MULCH 3" LAYER OF SHREDDED AREA ABOVE ROOT BALL PROVIDE 6" RADIUS UNMULCHED 4" HIGH WATER BERM COMPACT FILL TO BE BENCHED IN PLANTING PIT FINISHED GRADE 1/2 OF WIRE BASKET ( FROM ROOT BALL AND PIT.) SYNTHETIC MATERIAL. CUT AND REMOVE UPPER CUT AND REMOVE UPPER 1/3 OF BURLAP. NO MIXTURE AS SPECIFIED BACKFILL PLANTING SOIL UNDISTURBED SOIL SET BALL ON PLAN VIEW OF STAKING TREE PIT 2X ROOTBALL DIA. MIN. 6" DEPTH INTO UNDISTURBED SOIL LODGE POLES EXTEND 2' UNDISTURBED SOIL PLANTING MIX AS SPEC'D AROUND TOPE 1/3 OF BALL BURLAP AND WIRE BASKETS LOOSEN AND FOLD BACK 3" SAUCER AROUND TREE 3" SHREDDED BARK MULCH 2" ABOVE FINISH GRADE SET TOP OF ROOT BALL HOSE OVER #12 GALV. WIRE 1/ 2" FABRIC BEARING RUBBER #12 GALV. WIRE ALTERNATE STAKING 2" x 2" STAKES, 2 GUYS PER TREE 2 1 /2" OR LARGER (10' OR LARGER) PRUNE 1 / 4 TO 1 / 3 BRANCHES NOTES: TREE PIT 2X ROOTBALL DIA. SLOPE TREE PLANTING DETAIL (NOT TO SCALE) TREE PLANTING DETAIL (NOT TO SCALE) (NOT TO SCALE) SLOPE INSTALLATION GUIDELINES: 12" INTERVALS. THE END OF BLANKET MUST BE SECURED IN A 6"x6" TRENCH WITH A ROW OF STAPLES PLACED AT 7. PLACED 4" BELOW IN A STAGGERED PATTERN. THEN CONTINUE WITH GENERAL INSTALLATION. ROW OF STAPLES 4" APART ALONG ENTIRE WIDTH OF THE SLOPE. A SECOND ROW SHOULD BE FOR MAXIMUM PERFORMANCE A CHECK SLOT SHOULD BE PLACED AT 25'-40' INTERVALS. PLACE A 6. APPROXIMATELY 12" APART ACROSS THE WIDTH OF BLANKETS. STYLE IN THE DIRECTION OF WATER FLOW. CONNECT THE BLANKETS BY PLACING STAPLES ADDITIONAL VERTICAL BLANKETS CAN BE JOINED USING A MINIMUM 4" OVERLAPPING OF SHINGLE 5. STAPLES PLACED APPROXIMATELY 3'-0" APART. PARALLEL BLANKETS MUST BE OVERLAPPED BY A MINIMUM OF 4", AND SECURED WITH A ROW OF 4. PATTERN BELOW, SPECIFIED BY SLOPE. ROLL THE BLANKET VERTICALLY DOWN THE SLOPE. SECURE USING THE APPROPRIATE STAPLE 3. WITH A ROW OF STAPLES PLACED 12" APART ACROSS THE WIDTH OF THE BLANKET. BACKFILL AND COMPACT THE TRENCH. APPLY SEED, AND FOLD THE BLANKET OVER SOIL, SECURE SECURE THE BLANKET AT THE BOTTOM OF THE TRENCH WITH STAPLES PLACED 12" APART. BEGIN BY PLACING THE BLANKET A MINIMUM OF 12" DOWN-SLOPE OF THE UP-SLOPE TRENCH. 2. APPLIED. PREPARE THE SLOPE SOIL SURFACE (RAKING, SEEDING AND FERTILIZING). DIG A 6" BY 6" TRENCH BOTH UP-SLOPE AND DOWN-SLOPE OF THE AREA THE MATTING IS TO BE 1. PRODUCT AND ALL ASSOCIATED LABOR AND MATERIALS SHALL BE PAID FOR UNDER ITEM 209.1801. BE CONFIRMED WITH YOUR LOCAL DISTRIBUTOR. PAYMENT FOR ROLLED EROSION CONTROL THESE GUIDELINES ARE RECOMMENDATIONS ONLY, ANY QUESTIONS WITH THE INSTALLATION SHOULD SLOPE APPLICATION 6" 6" 12" 2"-5" 3" ROLLED EROSION CONTROL PRODUCT DETAIL NOTES: 56-02-R-218-0 E E X C R S L IO CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:35:34 AM morrimm 18 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W LANDSCAPING NOTES LAN-01 10 SHRUBS (3 GALLONS) WILL BE CONSIDERED THE EQUIVALENT OF A TREE d. 3 LOW MATURING TREES WILL BE CONSIDERED THE EQUIVALENT OF A TREE c. 6-8 FT ONCE PLANTED b. 2-3” DBH a. REPLANTED TREES SHALL BE AS FOLLOWS: REMOVED ON SLOPES IN EXCESS OF 25% SHALL BE MITIGATED AT A RATIO OF 2:1. ANY TREE REMOVED FOR TEMPORARY STAGING AND CONSTRUCTION SHALL BE MITIGATED AT A RATIO OF 1:1. TREES 1. AT THE 1:1 RATIO, 35 OF THE 35 REMOVED TREES HAVE BEEN SITED FOR REPLACEMENT ON SITE. TREES REPLACED ON VILLAGE OF CROTON-ON-HUDSON SIDE SCHEDULE (LOCATION TO BE DETERMINED BY CLIENT) THE REMAINING 21 TREES WILL NEED TO BE PLANTED OFF-SITE. RECOMMENDED SPECIES TO BE SELECTED FROM PLANT AT THE 2:1 RATIO, 12 TREES WERE REMOVED, 3TREES HAVE BEEN SITED FOR REPLACEMENT ON SITE. REPLACED ON CORTLANDT SIDE CONTRACTOR TO NOTIFY ENGINEER IF FIELD CONDITIONS PREVENT REQUIRED NUMBER OF TREES TO BE PLANTREES TREE PLACEMENT TO BE FIELD VERIFIED BY CONTRACTOR AND APPROVED BY ENGINEER PRIOR TO INSTALLATION. 6. THE SITE LEFT IN A NEAT AND ACCEPTABLE CONDITION AS APPROVED BY THE LANDSCAPE ARCHITECT. MATERIAL, EQUIPMENT, AND DEBRIS RESULTING FROM HIS/HER WORK. ALL PAVED AREAS SHALL BE BROOM CLEANED AND UPON THE COMPLETION OF ALL PLANTING WORK AND BEFORE FINAL ACCEPTANCE, THE CONTRACTOR SHALL REMOVE ALL 5. NO TREE WRAPPING, STAKING, OR GUYING IS PERMITTED UNLESS AUTHORIZED BY THE LANDSCAPE ARCHITECT. 4. UNIFORM FINISHED SURFACE. IMMEDIATELY AFTER PLANTING. THOROUGHLY WATER MULCHED AREAS. AFTER WATERING, RAKE MULCH TO PROVIDE A MULCHING: MULCH TREE, SHRUB PLANTING PITS, AND PERENNIAL BEDS WITH REQUIRED MULCH MATERIAL 3" DEEP 3. REMOVE ALL BURLAP, ROPES, AND WIRES FROM THE TOP 1/3 OF BALLS AFTER ONE YEAR GUARANTEE PERIOD. a. FILL ALL VOIDS. AFTER BALLED AND BURLAPPED PLANTS ARE SET, MUDDLE PLANTING SOIL MIXTURE AROUND THE BASES OF BALLS AND 2. EDGE OF EACH PLANTING PIT TO RETAIN WATER. PLANTING MIXTURE. DO NOT USE FROZEN OR MUDDY MIXTURES FOR BACKFILLING. FORM A RING OF SOIL AROUND THE 3" ABOVE THE FINISH GRADE. NO FILLING WILL BE PERMITTED AROUND TRUNKS OR STEMS. BACKFILL THE PIT WITH FACED TO GIVE THE BEST APPEARANCE OR RELATIONSHIP TO OTHER OR ADJACENT STRUCTURE. SET PLANT MATERIAL 2- SET PLANT MATERIAL IN THE PLANTING PIT TO PROPER GRADE AND ALIGNMENT. SET PLANTS UPRIGHT, PLUMB, AND 1. CONTRACTOR SHALL ALSO APPLY A PREEMERGIENT TO ALL LANDSCAPE BEDS AT THE CONTRACTOR'S EXPENSE. PREPARATION, ALL WEEDS AND GRASSES SHALL BE DUG OUT BY THE ROOTS AT THE CONTRACTOR'S EXPENSE. THE WEEDING - BEFORE AND DURING PRELIMINARY GRADING AND FINISH GRADING, FINISH GRADING AND PLANTING BED 7. RESET THE GRADES IN THIS AREA, IF REQUIRED, TO THE FINAL GRADES SHOWN ON THE GRADING PLAN. GRADING PLAN TO ANTICIPATE SETTLEMENT OVER THE FIRST YEAR. AT THE END OF THE PLANTING GUARANTEE PERIOD, PLANTING MIX OR TOPSOIL. ALLOW THE FINISHED GRADES TO REMAIN 50-75 MM (2-3") HIGHER THAN THE GRADES ON THE OVER ALL MULCHED BED AREAS DESIGNATED ON THE DRAWINGS AND ROTOTILL INTO THE TOP 100 MM (4") OF THE FINAL GRADING AND INSTALLATION OF TREE, SHRUB, OR FLOWER PLANTINGS, SPREAD 100 MM (4") OF ORGANIC MATTER INSTALL ORGANIC MATTER LAYER - AFTER THE SPECIFIED TOPSOIL OR PLANTING MIX IS INSTALLED AND JUST PRIOR TO 6. TYPE "A" FOR EACH CU. YD. OF MIXTURE OR APPROVED EQUAL. ) LB. PLANT FERTILIZER 2 1 EXISTING SOIL, TWO (2) PARTS PLANTING TOPSOIL, ONE (1) PART PEAT MOSS, AND ONE-HALF ( PROVIDE PLANTING MIXTURE TO USE AROUND THE BALLS AND ROOTS OF ALL PLANTS CONSISTING OF THREE (3) PARTS 5. INDIVIDUAL TREES WILL BE CONSISTENT IN SIZE THROUGHOUT THE PROJECT AREAS. TREE BALLS. MULCH BEDS ARE TO BE PROVIDED FOR ALL LANDSCAPE MASSINGS. CIRCULAR MULCH AREAS FOR EXCAVATE TREE PITS TO THE DEPTH OF THE TREE BALL AND BACK FILL IN PLANTING MIX TO CORRECT ELEVATION FOR IN BEDS. PROVIDE TREE AND SHRUB PITS AT LEAST TWO (2) TIMES GREATER THAN THE DIAMETER OF THE ROOT SYSTEM. EXCAVATED CIRCULAR PLANT PITS WITH VERTICAL SIDES, EXCEPT FOR PLANTS SPECIFICALLY INDICATED TO BE PLANTED 4. OPERATIONS UNTIL ALTERNATE PLANT LOCATIONS HAVE BEEN SELECTED AND APPROVED BY LANDSCAPE ARCHITECT. OBSTRUCTIONS ARE ENCOUNTERED THAT ARE NOT SHOWN ON THE DRAWINGS, DO NOT PROCEED WITH PLANTING CONTRACTOR TO LOCATE PLANTS IN THE FIELD BY STAKING. LANDSCAPE ARCHITECT TO APPROVE LOCATIONS. IF 3. SUPERVISION OF A QUALIFIED SUPERVISOR. PLANTING SHALL BE PERFORMED ONLY BY EXPERIENCED WORKMEN FAMILIAR WITH PLANTING PROCEDURES UNDER THE 2. PLANTING TIMES SHALL BE APPROVED BY LANDSCAPE ARCHITECT. d. FALL PLANTING: SEPTEMBER 15TH THROUGH OCTOBER 15TH c. SPRING PLANTING: MARCH 15TH THROUGH MAY 15TH b. LEAF, THEY SHALL BE SPRAYED WITH AN ANTI-DESICCANT PRIOR TO PLANTING OPERATION. DECIDUOUS MATERIAL: PLANT DECIDUOUS MATERIAL IN A DORMANT CONDITION. IF DECIDUOUS TREES ARE PLANTED IN- a. TIME OF PLANTING: 1. LANDSCAPE SPECIFICATIONS: WARRANTY MATERIALS ACCESSORIES WATER ON SITE. CONTRACTOR WILL PROVIDE WATER: FREE OF SUBSTANCES HARMFUL TO PLANT GROWTH. HOSES OR OTHER METHODS OF TRANSPORTATION FURNISHED BY CONTRACTOR. 6. MULCH: TREES, SHRUBS, AND PERENNIAL BEDS - SHREDDED HARDWOOD MULCH FURNISHED IN BAGS OR BULK. 5. ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. MIXED AND APPLIED IN ANTI-DESICCANT: PROTECTIVE FILM EMULSION PROVIDING A PROTECTIVE FILM OVER PLANT SURFACES; PERMEABLE TO PERMIT TRANSPIRATION, 4. AMMONIA SALT, AND ONE-HALF IN FORM OF ORGANIC NITROGEN OR EQUAL. POTASH BY WEIGHT. ONE-FOURTH OF NITROGEN IN THE FORM OF NITRATES, ONE-FOURTH IN FORM OF PHOSPHORIC ACID, AND 12 PERCENT FERTILIZER: TYPE "A": COMMERCIAL TYPE APPROVED BY THE LANDSCAPE ARCHITECT, CONTAINING 12 PERCENT NITROGEN, 12 PERCENT 3. PERCENT MINERAL ON A DRY BASIS. PEAT MOSS: BROWN TO BLACK IN COLOR, WEED AND SEED FREE GRANULATED RAW PEAT OR BALED PEAT, CONTAINING NOT MORE THAN 9 2. PROVIDE TOPSOIL FREE OF SUBSTANCES HARMFUL TO THE PLANTS WHICH WILL BE GROWN IN THE SOIL. b. IDENTIFY SOURCE LOCATION OF TOPSOIL PROPOSED FOR USE ON THE PROJECT. a. OTHER FOREIGN MATERIALS. ARABLE SITE, REASONABLY FREE FROM CLAY, LUMPS, COARSE SANDS, STONES, PLANTS, ROOTS, STICKS, AND OBTAINED FROM A WELL-DRAINED TOPSOIL FOR PLANTING BEDS; FERTILE, FRIABLE, NATURAL TOPSOIL OF LOAMY CHARACTER, WITHOUT ADMIXTURE OF SUBSOIL MATERIAL, 1. 4) PLANTS SHALL BE IN A MOIST, VIGOROUS CONDITION, FREE FROM DEAD WOOD, BRUISES, OR OTHER ROOT OR BRANCH INJURIES. 3) SIDE BRANCHES SHALL BE GENEROUS, WELL-TWIGGED, AND THE PLANT AS A WHOLE WELL-BUSHED TO THE GROUND. 2) SINGLE STEMMED OR THIN PLANTS WILL NOT BE ACCEPTED. THE LONGEST BRANCH. 1) THE MEASUREMENT FOR HEIGHT SHALL BE TAKEN FROM THE GROUND LEVEL TO THE AVERAGE HEIGHT OF THE TOP OF THE PLANT AND NOT SHRUBS AND SMALL PLANTS SHALL MEET THE REQUIREMENTS FOR A SPREAD AND HEIGHT INDICATED IN THE PLANT LIST. f. 1) IF THE USE OF LARGER PLANTS IS ACCEPTABLE, INCREASE THE SPREAD OF ROOTS OR ROOTBALL IN PROPORTION TO THE SIZE OF THE PLANT. PLANTS LARGER THAN THOSE SPECIFIED IN THE PLANT LIST MAY BE USED WHEN ACCEPTABLE TO THE LANDSCAPE ARCHITECT. e. PLANTS PLANTED IN ROWS OR MASS SHALL BE MATCHED IN FORM. d. PROVIDE TREE SPECIES WITH A SINGLE MAIN TRUNK. TREES THAT HAVE THE MAIN TRUNK FORMING A "Y" SHAPE ARE NOT ACCEPTABLE. c. 2) CONTAINER STOCK SHALL NOT BE POT BOUND. 1) NO PLANTS SHALL BE LOOSE IN CONTAINER. WHOLE. SOIL TOGETHER, FIRM AND CONTAINER GROWN STOCK: GROWN IN A CONTAINER FOR SUFFICIENT LENGTH OF TIME FOR THE ROOT SYSTEM TO HAVE DEVELOPED TO HOLD ITS b. ACCEPTABLE. COMPLYING WITH THE LATEST EDITION OF THE "AMERICAN STANDARD FOR NURSERY STOCK". CRACKED OR MUSHROOMED BALLS ARE NOT FIBROUS AND FEEDING ROOT SYSTEM NECESSARY FOR FULL RECOVER OF THE PLANT. PROVIDE BALL SIZES DEPTH TO ENCOMPASS THE BALLED AND BURLAPPED PLANTS: DIG BALLED AND BURLAPPED PLANTS WITH FIRM NATURAL BALLS OF EARTH OF SUFFICIENT DIAMETER AND a. DURING STORAGE. FULLY DEVELOPED FORM WITHOUT VOIDS AND OPEN SPACES. PLANTS HELD IN STORAGE WILL BE REJECTED IF THEY SHOW SIGNS OF GROWTH CRACKS, ABRASIONS OF THE BARK, PLANT DISEASES, INSECT EGGS, BORERS, AND ALL FORMS OF INFESTATION. ALL PLANTS SHALL HAVE A SOUND, HEALTHY, VIGOROUS PLANTS FREE FROM DEFECTS, DISFIGURING KNOTS, SUN SCALD INJURIES, FROST ROOT SYSTEMS. PROVIDE ONLY PLANTS: PROVIDE PLANTS TYPICAL OF THEIR SPECIES OR VARIETY; WITH NORMAL, DENSELY-DEVELOPED BRANCHES AND VIGOROUS, FIBROUS 1. DURING THE INITIAL PLANTING INSTALLATION. REPRESENTATIVE) TO BE UNSATISFACTORY REMOVE AND IMMEDIATELY REPLACE ALL PLANTS, AS DETERMINED BY THE LANDSCAPE ARCHITECT (OR ENGINEER AUTHORIZED 4. TYPICAL OF PLANTING AREA, ACTS OF VANDALISM, OR NEGLIGENCE ON THE PART OF THE OWNER. MILES PER HOUR, WINTER KILL CAUSED BY EXTREME COLD AND SEVER WINTER CONDITIONS NOT LIGHTNING STORMS, OR WINDS OVER 75 WARRANTY SHALL NOT INCLUDE DAMAGE OR LOSS OF TREES, PLANTS, OR GROUND COVER CAUSED BY FIRES, FLOODS, FREEZING RAINS, 3. APPARENT AND WEATHER AND SEASON PERMIT. REPLACEMENT PLANTS FOR 1 YEAR AFTER INSTALLATION. CORRECT DEFECTIVE WORK AS SOON AS POSSIBLE AFTER DEFICIENCIES BECOME CAUSES DUE TO THE CONTRACTOR'S NEGLIGENCE. THE COST OF SUCH REPLACEMENT(S) IS AT CONTRACTOR'S EXPENSE. WARRANT ALL OR UNSIGHTLY CONDITION, AND HAVE LOST THEIR NATURAL SHAPE DUE TO DEAD BRANCHES, OR OTHER ARCHITECT, ARE IN AN UNHEALTHY REPLACE, IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS, ALL PLANTS THAT ARE DEAD OR, AS DETERMINED BY THE LANDSCAPE 2. AREA. PROJECT AREAS WILL BE ACCEPTED UPON FULL COMPLETION OF PROJECT SITE. ACCEPTANCE OF EACH PROJECT WARRANT PLANT MATERIAL TO REMAIN ALIVE AND BE IN HEALTHY, VIGOROUS CONDITION FOR A PERIOD OF 1 YEAR AFTER COMPLETION AND 1. PREPARATION INSTALLATION PER COMMENTS RECEIVED BY CORTLANDT 56-02-R-219-0 ROLLED EROSION CONTROL MAT THE SELECTED ROLLED EROSION CONTROL PRODUCT SHALL BE BIODEGRADABLE. 2. INCORPORATED INTO THE WORK. ESTABLISHED AND HAVE A ROLLED EROSION CONTROL PRODUCT, CLASS I TYPE A, SHORT TERM ALL SLOPES STEEPER THAN 25% THAT ARE NOT PROTECTED BY STONE FILL SHALL HAVE TURF 1. E E X C R S L IO CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:35:48 AM morrimm 20 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W TM 79.06-2-3 DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 VILLAGE OF CROTON ON HUDSON LANDS N/F OF WOODS STRUCTURE CONCRETE STONE WING WALL EDGE OF WATER STONE WING WALL L L A W G NI W E G DI R B ASPHALT ASPHALT DRAINAGE RIP RAP POST POST WOODS SIGN CORTLANDT TOWN OF LIMIT 30 VIL. SPEED 15 TONS & WEIGHT LIMIT STONE LINED DITCH PARKING NO SIGN STREET BRIDGE WING WALL BORING BORING BORING BORING 0 10 20 30 40' 10 1" = 20' ROAD QUAKER BRIDGE POST ROAD TO ALBANY RIDGE ROAD TO QUAKER ROAD EAST QUAKER BRIDGE TO RTE 129 TO BE REMOVED SUPERSTRUCTURE EXISTING STA. M 2+95.00 BRGS. ¡ STA. 3+95.00 BRGS. ¡ UTILITIES REMAIN EXISTING OVERHEAD BRGS. ¡ BRGS. TO ¡ 100'-0" PLAN ELEVATION A-A ROAD QUAKER BRIDGE CONCRETE BARRIER (TYP.) PROPOSED SINGLE SLOPE GRID NORTH , STA. LINE, AND H.C.L. ¡ QUAKER BRIDGE ROAD EAST STA M 2+92.25 BEGIN BRIDGE STA M 3+97.25 END BRIDGE , STA. LINE, AND H.C.L. ¡ QUAKER BRIDGE ROAD STA. 3+95.00 EXP. BRGS. ¡ ORGINAL GROUND CONCRETE WINGWALL (TYP.) PROPOSED CAST-IN-PLACE FLOW CROTON RIVER STA. 2+95.00 FIX BRGS. ¡ A A GENERAL PLAN AND ELEVATION DATUM EL. 10.00 CONCRETE WINGWALL (TYP.) PROPOSED CAST-IN-PLACE CONCRETE BARRIER (TYP.) PROPOSED SINGLE SLOPE 5'-0" SHOULDER TRAVEL WAY 11'-0" TRAVEL WAY 11'-0" OUT TO OUT 31'-4" CLEAR 28'-0" BOT. FTG EL. 21.25 BOT. FTG EL. 25.25 SEAT EL. 39.49 SEAT EL. 42.58 EL. 36.66 100'-0" SPAN 1'-0" SHOULDER AZ. 132°15'0.26" AZ. 42°15'0.22" PROPOSED GRADE INVENTORY OPERATING LOAD RATING (LRFR) HL-93 HL-93 RF=** RF=** ** TO BE PROVIDED BY TRUSS MANUFACTURER LOW CHORD EL. 41.44 ITEM 551.30 (TYP.) PROPOSED MICROPILES, HYDRAULIC DATA DRAINAGE AREA RECURRENCY INTERVAL (YEARS) PEAK DISCHARGE / POINT OF MAX. BACKWATER HIGH WATER ELEVATION AT EXISTING PROPOSED FLOOD BASIC FLOOD DESIGN 100 50 377 SQ. MILES 34.6 33.2 34.6 33.2 (FT. S) r 15,600 13,080 AVG. VELOCITY THRU STRUCT. @ DESIGN FLOOD 14.6 FT./SEC. OF TRUSS (TYP.) ¡ ITEM 568.70 (TYP.) TRANSITION BRIDGE RAILING, DHW EL. 33.2 (50 - YR STORM) FILL LIMITS APPROXIMATE ITEM 620.03 STONE FILLING (LIGHT) ITEM 620.05 STONE FILLING (HEAVY) LEGEND: ABUTMENT (TYP.) PROPOSED CAST-IN-PLACE ENDS STA. M 2+67.25 APPROACH PAVEMENT BEGINS STA. M 4+27.17 APPROACH PAVEMENT TO BE REPLACED EXISTING CULVERT BEGINS STA. S 2+05.74 APPROACH PAVEMENT TO BE REMOVED (TYP.) EXISTING SUBSTRUCTURE ST-01 (STONE BEDDING) (TYP.) APPROACH DRAINAGE CONCRETE FOOTING (TYP.) PROPOSED CAST-IN-PLACE 2 1 4 1 OHW EL. 28.25 OHW EL. 28.25' OHW EL. 28.25' 35'-6" ¡ TRUSS TO ¡ TRUSS 56-02-R-221-0 CONCRETE PILES, ITEM 551.11 (TYP.) PROPOSED CAST-IN-PLACE 13'-6" EL. 25.00 EL. 28.75 8'-0" EL. 26.00 EL. 30.00 1 ON 1.5 1 ON 1.5 AZ. 42°15'0.22" STRUCTURE EXCAVATION ITEM PROPOSED GRADE UNDER THE TO BE REMOVED TO 2 FT BELOW EXISTING STONE WINGWALL AND DRAINAGE GUTTER (TYP.) FILL BETWEEN WINGWALL PROPOSED LIGHT STONE M 2+54.22 PCC M 2+90.48 PT M 3+97.40 PC M 4+50.79 PT M 2+00 M 3+00 M 4+00 S 2+00 S 2+00 HEAD WALL CONC. W 5 P.P. =46.62 INV. =49.95 INV. =43.13 INV. =43.20 INV. INV.=44.40 GRATE=45.80 SLOT DRAIN VAULT DRAINAGE 12" PVC 15" CMP 18" CMP =41.7 INV. E E X C R S L IO CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:35:51 AM morrimm 21 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W WEARING SURFACE WITH INTEGRAL SUPERSTRUCTURE SLAB T.G.L. S.B. 2'-3" SHLD 1'-0" TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" VARIES (TYP.) S.B. 2'-3" SHOULDER 5'-0" 28'-0" APPROACH SLAB 2.0% T.G.L. RAIL (TYP.) BRIDGE TRANSITION GROUND ORIGINAL ITEM 557.1012 12" - APPROACH SLAB QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. ¡ QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. ¡ ITEM 569.04 BARRIER (TYP.) CONCRETE SINGLE SLOPE SHOULDER 5'-0" TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" OUT-TO-OUT 31'-4" 2.0% 2.0% 2.0% TYPICAL BRIDGE SECTION ST-02 ITEM 564.81020016 SUPERSTRUCTURE GALVANIZED TRUSS TYPICAL BRIDGE SECTIONS 1.5% 1.5% 6" (TYP.) ITEM 555.0021 (TYP.) CONCRETE WINGWALL CAST-IN-PLACE 2 1 2 1 8" (TYP.) (LIGHT), ITEM 620.03 (TYP.) 1'-0" STONE FILLING STA. M 2+91.86 TO STA. M 3+97.36 TYPICAL BRIDGE APPROACH SECTION STA. M 3+97.36 TO STA. M 4+26.67 STA. M 2+68.85 TO STA. M 2+91.86 2.0% 1'-0" SHOULDER 14'-6" MIN VERTICAL CLEARANCE 1'-8" (TYP.) 3'-6" STRUCTURE DEPTH 2.0% ITEM 304.12 12" - SUBBASE COURSE TYPE II ITEM 203.24010017 (TYP.) SHOULDER BACK UP MATERIAL, ITEM 620.0801 (TYP.) 9" BEDDING MATERAIL ITEM 609.0302 (TYP.) STONE CURB (TYPE A), ROUND 4' V.C. (TYP.) 3'-6" ON BARRIER (TYP.) AESTHETIC TREATMENT 0 2 4 6 8' 2 3/16" = 1' 56-02-R-222-0 ITEM 203.03 (TYP.) EMBANKMENT IN PLACE E E X C R S L IO (TYP.) 3'-0" (TYP.) 1'-0" (TYP.) 1'-0" CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:36:45 AM morrimm 31 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W TM 79.06-2-3 DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 6 LIBER 757 VILLAGE OF CR LAND TM 68.18-3- CONTROL NO. 59 LINDA HAMILT LANDS N/F O WOODS WOODS STRUCTURE CONCRETE CONCRETE RET EDGE OF WATER EDGE OF WATE EDGE OF WATER ASPHALT ASPHALT DRAINAGE RIP RAP POST POST WOODS STONE LINED DITCH BORING BORING BORING BORING ROAD QUAKER BRIDGE POST ROAD TO ALBANY RIDGE ROAD TO QUAKER ROAD EAST QUAKER BRIDGE TO RTE 129 ITEM 202.120001 TO BE REMOVED, SUPERSTRUCTURE EXISTING STA. M 2+95.00 BRGS. ¡ STA. M 3+95.00 BRGS. ¡ UTILITIES TO REMAIN EXISTING OVERHEAD EARTHWORK PLAN ROAD QUAKER BRIDGE , STA. LINE, AND H.C.L. ¡ QUAKER BRIDGE ROAD EAST STA M 2+92.25 BEGIN BRIDGE STA M 3+97.25 END BRIDGE , STA. LINE, AND H.C.L. ¡ PROPOSED QUAKER BRIDGE ROAD FLOW CROTON RIVER AZ. 132°15'0.26" ITEM 203.03 EMBANKMENT IN PLACE ITEM 620.03 STONE FILLING, (LIGHT) ITEM 206.01 EXCAVATION LIMIT OF STRUCTURE ITEM 209.13 SILT FENCE ITEM 207.26 STRUCTURAL DRAIN PREFABRICATED COMPOSITE ITEM 203.21 SELECT STRUCTURAL FILL TYPE I, ITEM 620.0801 BEDDING MATERIAL, ITEM 620.05 STONE FILLING, (HEAVY) CX ITEM 202.19 SUBSTRUCTURES REMOVAL OF 553.020002 ITEMS 553.020001 & COFFERDAM (TYPE 2) EXCAVATION, ITEM 206.0201 TRENCH AND CULVERT 0 10 20 30 40' 10 1" = 20' ST-12 EARTHWORK PLAN (SEE DWG. ST-14) PILE WALL SOE WALL #2 SOLDIER EXCAVATION ITEM (TYP.) STRUCTURE COST INCLUDED IN TO BE REMOVED EXISTING DRAINAGE AND DWG. ST-15) PILE WALL (SEE NOTE 6 SOE WALL #1 SOLDIER TO BE REMOVED (TYP.) EXISTING SUBSTRUCTURE AT SUBGRADE LIMITS OF EMBANKMENT 3'-0" (TYP.) (TYP.) 3'-0" GRID NORTH LEGEND: ITEM 209.1501 TURBIDIDTY CURTAIN, STRUCTURE EXCAVATION ITEM PROPOSED GRADE UNDER THE BE REMOVED TO 2 FT BELOW EXISTING STONE WALL TO C1 C1 C1 C1 C1 C1 C1 ST-13 D ST-13 B ST-13 A ST-13 C LAGGING WALL NOTES ST-13 D ST-13 C PROPOSAL TO BE CONSIDERED BY THE COUNTY. THE PROPERTY OWNER TO FACILITATE A VALUE ENGINEERING PROPERTY. CONTRACTOR MAY PURSUE A GRADING RELEASE WITH THE INTENT OF THE SOE WALL #1 IS TO AVOID IMPACTING PRIVATE 6. DO NOT USE WEATHERING STEEL (ASTM A588) FOR SOLDIER PILES. 5. EQUIPMENT AND/OR PROCEDURES. NO EXTRA PAYMENT WILL BE MADE FOR SPECIAL SPECIAL EQUIPMENT AND/OR PROCEDURES. EARTH FOR SOLDIER PILE AND LAGGING WALL, ITEM MAY REQUIRE DUE TO THE PRESENCE OF BOULDERS, PROGRESSING THE HOLES IN 4. EXTRA PAYMENT WILL BE MADE FOR THE CASING. HOLES IN EARTH FOR SOLDIER PILE AND LAGGING WALLS. NO TEMPORARY SLEEVES OR CASINGS ARE REQUIRED FOR ITEM 3. ASTM A572 GRADE 50 STEEL. PROVIDE SOLDIER PILE SECTIONS MEETING THE REQUIREMENTS OF 2. OF 2'-0" BELOW FINAL GROUND SURFACE. SURFACE. CUT OFF AND REMOVE SOLDIER PILES TO A MINIMUM REMOVE LAGGING TO A MINIMUM OF 2'-0" BELOW FINAL GROUND WHEN NO LONGER NECESSARY FOR EXCAVATION SUPPORT, 1. NOTE: UNDER NYSDOT SPECIFICATION SECTION 614. BID DOCUMENTS. EXISTING TREE REMOVAL SHALL BE AS SPECIFIED REFER TO THE LANDSCAPING PLAN AND THE SPECIAL NOTES IN THE FOR INFORMATION REGARDING EXISTING TREES TO BE REMOVED, 1. FOR DETAILS CULVERT, SEE DWG. MSD-01 PROPOSED DRAINAGE HEAVY STONE FILL LIMITS OF PROPOSED HEAVY STONE FILL LIMITS OF PROPOSED C1 C1 C1 C1 C1 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 HEADWALL TO REMAIN EXISTING CONCRETE FOR DETAILS CULVERT, SEE DWG. MSD-01 PROPOSED DRAINAGE FOR DETAILS CULVERT, SEE DWG. MSD-01 PROPOSED DRAINAGE 56-02-S-232-0 STRUCTURE EXCAVATION ITEM (TYP.) THROUGH THE WORK SITE. COST TO BE INCLUDE IN THE CONTRACTOR SHALL DEVELOP A PLANT TO CONVEY DRAINAGE M 2+54.22 PCC M 2+90.48 PT M 3+97.40 PC M 4+50.79 PT M 2+00 M 3+00 M 4+00 M 5+00 S 2+00 S 2+00 ENDR #13 KV P.P. HEAD WALL CONC. W 5 P.P. SE.INV.=36.82 N.INV.=38.47 T.F.=39.57 C.B. E E X C R S L IO CONSULTANT SEAL INFORMATION CONSULTANT M. HUNT K. SCHUMAN-EKES K. DETRICK BIN# 3348560 WESTCHESTER COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION DIVISION OF ENGINEERING AS SHOWN 06/24/2025 56 25-500 PROJECT COORDINATOR SIGNATURE TITLE NAME DATE CONTRACTOR SIGNATURE TITLE NAME DATE AS BUILT - NO CHANGES AS BUILT - CHANGES AS NOTED RECORD DRAWING CERTIFICATION REVISION NUMBER DATE MADE BY APP'D BY REVISION CHECKED BY IN CHARGE OF MADE BY SHEET NO. OF NUMBER SHEET NUMBER CONTRACT SCALE: DATE: DPW FILE NO. REV. NO. 0 TOWN OF CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE 6/25/2025 $FILE$ FILE NAME = USER = DATE/TIME = PLOT = NY_PDF.pltcfg 9:36:49 AM morrimm 32 N OI S S E F O . K R O Y W N E F O E T A T S M A T T H E J H U N T 0 8 5 3 9 8 R E E N I G N E L A R P D E S N E C I L W BOT. FTG. EL. 21.25 BOT. FTG. EL. 21.25 BOT. FTG. EL. 25.25 ST-12 A BEGIN ABUTMENT EARTHWORK SECTION ST-12 B END ABUTMENT EARTHWORK SECTION ST-12 C EARTHWORK SECTION ST-12 D EARTHWORK SECTION BOT. FTG. EL. 25.25 ITEM 203.03 EMBANKMENT IN PLACE ITEM 620.03 STONE FILLING, (LIGHT) EXCAVATION, ITEM 206.01 LIMIT OF STRUCTURE ITEM 207.26 STRUCTURAL DRAIN PREFABRICATED COMPOSITE ITEM 203.21 SELECT STRUCTURAL FILL TYPE I, ITEM 620.0801 BEDDING MATERIAL, ITEM 620.05 STONE FILLING, (HEAVY) ITEM 202.19 SUBSTRUCTURE REMOVAL OF ITEM 206.01 EXCAVATION, FOR STRUCTURE PAYMENT LIMITS 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 1.5 1 1.5 1 1.5 1 1.5 1 ITEM 207.26 (TYP.) STRUCTURAL DRAIN, PREFABRICATED COMPOSITE ITEM 207.26 (TYP.) STRUCTURAL DRAIN, PREFABRICATED COMPOSITE LAGGING WALL ORIGNAL GROUND ORIGNAL GROUND PROPOSED GRADE PROPOSED GRADE PROPOSED GRADE THE SAME TIME LINE SHALL BE PLACED AT OF THIS VERTICAL PAYMENT MATERIALS ON BOTH SIDES THE SAME TIME LINE SHALL BE PLACE AT OF THIS VERTICAL PAYMENT MATERIALS ON BOTH SIDES ROADWAY SUBGRADE BOTTOM OF LEGEND: EARTHWORK SECTIONS ST-13 0 5 10 15 20' 5 1" = 10' LAGGING WALL ORIGNAL GROUND VARIES 1 SOIL AT TOE PROPOSED FINISHED GROUND LINE 5'-0" 4'-0" 0 (TYP.) STREAMBED EXISTING TOE OF SLOPE FILLING MATERIAL UNDER STONE 9" THICK BEDDING 0" (HEAVY) 2'-6" STONE FILLING NOTE: EXISTING SUBSTRUCTURE DIMENSIONS ARE ASSUMED. 1. THE SAME TIME LINE SHALL BE PLACE AT OF THIS VERTICAL PAYMENT MATERIALS ON BOTH SIDES THE SAME TIME LINE SHALL BE PLACED AT OF THIS VERTICAL PAYMENT MATERIALS ON BOTH SIDES 1'-0" 1'-0" ORIGNAL GROUND (NOT SCALE) 56-02-S-233-0 2 1 PROPOSED GRADE BOTTOM OF ROADWAY LAGGING WALL ATTACHMENT C: SHPO DOCUMENTATION Division for Historic Preservation P.O. Box 189, Waterford, New York 12188-0189 • (518) 237-8643 • www.nysparks.com ANDREW M. CUOMO ROSE HARVEY Governor Commissioner May 8, 2017 Mr. Matt Hunt Creighton Manning 2 Winners Circle Albany, NY 12205 Re: DOT Quaker Bridge Road Bridge Study Quaker Bridge Rd, Cortlandt, NY 17PR02639 Dear Mr. Hunt: Thank you for requesting the comments of the Division for Historic Preservation of the Office of Parks, Recreation and Historic Preservation (OPRHP). We have reviewed the submitted materials in accordance with the New York State Historic Preservation Act of 1980 (section 14.09 of the New York Parks, Recreation and Historic Preservation Law). These comments are those of the Division for Historic Preservation and relate only to Historic/Cultural resources. They do not include potential environmental impacts to New York State Parkland that may be involved in or near your project. Such impacts must be considered as part of the environmental review of the project pursuant to the State Environmental Quality Review Act (NY Environmental Conservation Law Article 8) and its implementing regulations (6NYCRR Part 617). We note that the Quaker Road Bridge is eligible for listing in the State and National Registers of Historic Places, and that the project area is located in an archaeologically sensitive area. Please see attached, the Resource Evaluation for the property. We understand that the proposed work entails a study of repair vs. replacement of the bridge. We would remind you that Section 14.09 of the State Historic Preservation Act is clear that demolition of a historic resource is deemed an Adverse Impact, and we advocate for repair of the bridge rather than replacement. In order to continue our review, please provide the following additional information: 1. Please provide a description and map of the proposed Area of Potential Effect 2. Please provide a description of any evidence of the extent of prior ground disturbance, as well as a description of the proposed ground disturbance. Based on this, OPRHP will make further recommendations with regard to archaeology. 3. Please provide the name and contact information of the DOT contact person for this project We would appreciate if the requested information could be provided via our Cultural Resource Information System (CRIS) at www.nysparks.com/shpo/online-tools/ Once on the CRIS site, you can log in as a guest and choose "submit" at the very top menu. Next choose "submit new information for an existing project". You will need this project number and your e-mail address. If you have any questions, I can be reached at (518) 268-2182. Sincerely, Olivia Brazee Historic Site Restoration Coordinator olivia.brazee@parks.ny.gov via e-mail only ENGINEERS Creighton PLANNERS Manning SURVEYORS May 25, 2017 Ms. Olivia Brazee New York State Parks, Recreation & Historic Preservation Peebles Island State Park, P.O. Box 189 Waterford, NY 12188-0189 RE: BIN 3348560 — Quaker Bridge Road Bridge over Croton River; Town of Cortlandt, Westchester County: 17PR02639 Dear Ms. Brazee, This letter is in response to your request for more information in the initial project review letter dated May 8, 2017. The 2010 ‘as-built’ rehabilitation plans, previously uploaded to CRIS, were referenced to locate previous deep excavation limits in lieu of unavailable original construction plans. The previous deep excavation limits have been established by projecting a 1 vertical to 2 horizontal line from the bottom of existing abutments, wing walls, and retaining walls. Approach roadway areas were assumed to be previously disturbed along with the rip rap drainage and asphalt driveways found along the bridge approaches. The intent of this study is to evaluate rehabilitation and replacement options. For the bridge rehabilitation alternative, there is potential for disturbance outside previous limits for the construction of a temporary bridge and/or temporary staging area upstream. Bridge replacement alternatives currently include a new bridge on existing, parallel adjacent, or diagonal alignments. For the adjacent and diagonal alignment alternatives, the new bridge will be constructed upstream of the existing. Approximate limits of proposed disturbance for the northwest bank approach will extend 180 ft upstream of the existing bridge and comprise a 40 ft wide area from the stream edge. Additionally, approximate limits of proposed disturbance for the southeast bank will extend 110 ft upstream of the existing bridge and comprise a 45 ft wide area from the stream edge. Proposed disturbance is delineated on the attached figure (area contained within the dashed red line). The roadway reconstruction associated with the bridge replacement will tie into the existing approaches within the limits of proposed disturbance shown in the figure. If deemed necessary, temporary shoring and/or retaining walls will be utilized to avoid impacts to existing structures during excavation and construction of new substructures. As we discussed during a phone call on May 8, 2017, the NYSDOT is not the lead agency for this project. The study and eventual rehabilitation or replacement is being progressed by Westchester County, and construction is anticipated to be completed with 100% county funds. The County’s contact for this project is R. Scott Donnelly (rsd1@westchestergov.com). There will be State and Federal involvement in the form of environmental permits from NYSDEC and the US Army Corps of Engineers, respectively. Sincergly, Matt Hunt, PE 2 Winners Circle Lead Project Engineer Albany, NY 12205 518.446.0396 (p) CC: Bud Nicoletti & R. Scott Donnelly, Westchester DPW 518.446.0397 (f) www.cmellp.com LEGEND: ROADWAY AND/OR PATH CONSTRUCTION APPROXIMATE LIMIT OF ROADWAY FILL OR EXCAVATION FOR PREVIOUS STRUCTURE CONSTRUCTION APPROXIMATE LIMIT OF PREVIOUS FILL OR EXCAVATION FOR MISC. BASE OF FOUNDATION) AND/OR BACKFILL (LIMITS BASED ON A 1V:2H PROJECTION FROM THE APPROXIMATE LIMIT OF PREVIOUS DEEP ABUTMENT EXCAVATION 0 15 30 45 60' 15 1" = 30' PROJECT: DATE: 116-043 FIGURE: 1 USER = N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\graphics\116-043_cpb_shpo_pln_01.dgn 5/25/2017 lshort FILE NAME = DATE/TIME = AREA OF POTENTIAL EFFECT MAP GRID NORTH CONSTRUCTION AREA OF POTENTIAL EFFECT FOR BRIDGE AND APPROACH ROADWAY CONSTRUCTION ON PREVIOUSLY UNDISTURBED SOIL AREA OF POTENTIAL EFFECT FOR BRIDGE AND APPROACH ROADWAY BRIDGE FLOW SHPO # 17PR02639 CROTON RIVER BRIDGE STUDY QUAKER BRIDGE ROAD BRIDGE OVER 5/2017 TM 68.18-1-42 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 79.06-2-3 BK. PG. DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-4 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-3-10 BK. PG. CHAO DAI LOUIS V. PINKHAM AND LANDS N/F OF TM 68.18-3-11 LIBER 11069, PAGE 103 MICHAEL I. WEINTRAUB CROTON TRUST AS TRUSTEES OF THE ANITA B. WEINTRAUB AND SANFORD WEINTRAUB LANDS N/F OF WOODS WOODS WOODS STRUCTURE CONCRETE CONCRETE RET. W CONCRETE RET. WALL #13 KV P.P. STONE WING WALL EDGE OF WATER STONE WING WALL EDGE OF WATER AREA RIP RAP SLOT DRAIN ASPHALT ASPHALT DRAINAGE RIP RAP ELEV.=40.82 IN HEAD WALL BOX CUT B.M. HEAD WALL CONC. POST POST W 5 P.P. STONE RET. WALL WOODS WOODS WOODS KEY PAD BOLLARDS CROTON RIVER 8" CMP INV.=20.98 15" CMP SE.INV.=21.85 N.INV.=23.50 T.F.=24.60 C.B. =31.65 INV. =34.98 INV. PARKING NO W/LIGHT P.P. PILLAR STONE INV.=46.54 12" CMP 46.54 INV.= P.P. IRON GATE WROUGHT RAIL GUIDE WOOD BRIDGE ONE LANE SIGN CORTLANDT TOWN OF VAULT DRAINAGE LIMIT 30 VIL. SPEED 15 TONS & WEIGHT LIMIT LIMIT 30 & SPEED NO PARKING STONE LINED DITCH PARKING NO SIGN STREET QUAKER BRIDGE ROAD EAST Division for Historic Preservation P.O. Box 189, Waterford, New York 12188-0189 • (518) 237-8643 • www.nysparks.com ANDREW M. CUOMO ROSE HARVEY Governor Commissioner June 15, 2017 Mr. Matt Hunt, PE Creighton Manning 2 Winners Circle Albany, NY 12205 Re: USACE Quaker Bridge Road Bridge Study Quaker Bridge Rd, Cortlandt, NY 17PR02639 Dear Mr. Hunt: Thank you for requesting the comments of the New York State Historic Preservation Office (SHPO). We have reviewed the provided documentation in accordance with Section 106 of the National Historic Preservation Act of 1966. These comments are those of the SHPO and relate only to Historic/Cultural resources. They do not include other environmental impacts to New York State Parkland that may be involved in or near your project. Such impacts must be considered as part of the environmental review of the project pursuant to the National Environmental Policy Act and/or the State Environmental Quality Review Act (NY Environmental Conservation Law Article 8). We have reviewed your letter and the accompanying map of the Area of Potential Effect (APE) that was provided to our office on May 25th, 2017. Based upon our office’s review, we have no concerns with regards to archaeological resources. However, from the provided map it appears that the National Register eligible Quaker Bridge Road bridge is not included in the APE. Under section 106 regulations, the APE must include all identified historic and cultural resources that may be directly or indirectly affected by the proposed undertaking. For this undertaking, the APE must include the Quaker Bridge Road bridge and the project must evaluate the potential direct physical impacts resulting from replacement and/or the potential indirect visual and setting impacts resulting from any new construction adjacent to the bridge. We look forward to continued consultation as the project progresses and the specific nature of the undertaking is determined. We would appreciate if the requested information could be provided via our Cultural Resource Information System at www.nysparks.com/shpo/online-tools/ Once on the CRIS site, you can log in as a guest and choose "submit" at the very top menu. Next choose "submit new information for an existing project". You will need this project number and your e-mail address. If you have any questions, I can be reached at (518) 268-2182. Sincerely, Olivia Brazee Historic Site Restoration Coordinator olivia.brazee@parks.ny.gov via e-mail only DRAFT MEMORANDUM ENGINEERS PLANNERS SURVEYORS Date: November 17, 2017 To: Phil Abenavoli, P.E. Westchester County Dept. of Public Works and Transportation 148 Martine Avenue White Plains, NY 10601 From: Charles Tutunjian, P.E. Creighton Manning Engineering, LLP Project: Quaker Bridge Road over Croton River (BIN 3348560) Bridge Replacement Study Town of Cortlandt, Westchester County, NY Re: Draft Scope Summary Memorandum 1. Introduction The purpose of this memorandum is to summarize the feasible replacement options, identify the scope of work, document the existing conditions, establish project objectives, and document environmental concerns for the above referenced project. The Quaker Bridge Road Bridge over the Croton River is located approximately 1.25 miles southwest of the Croton Dam at the border of the Town of Cortlandt and the Village of Croton on Hudson. The project area is primarily residential with significant elevation changes within a wooded setting. Quaker Bridge Road is a winding two-lane road that connects Rt. 129 to the west and Old Albany Post Road to the east of the bridge. The asphalt roadway width is approximately 26 ft north of the bridge and 20 ft south of the bridge. Originally built in 1894, the existing bridge is a 98 ft. single span steel through-truss structure on stone abutments founded on soil or bedrock. The existing structure is oriented perpendicular to the river and has no skew. The clear bridge roadway width is 15’-6” and therefore functions as a single-lane bridge as it is less than 16’-0”. “One lane bridge” signs are present on all approaches to the bridge. Quaker Bridge Rd over Croton River Draft Scope Summary Memorandum November 17, 2017 Page 2 of 11 2. Conditions A bridge rehabilitation project was conducted in 2010 that provided various steel member retrofits in addition to providing a new paint system. Despite this recent rehabilitation, the Quaker Bridge Road Bridge is currently load posted for 15 tons. The NYSDOT has determined that the bridge should be posted for 12 tons, and there is an outstanding Yellow Flag for this inconsistent posting. The bridge has a long history of Yellow and Red Structural Flags with some of the most recent Yellow Flags being for the inconsistent load posting noted above, a cracked cover plate weld on a fracture critical floor beam 1, and a missing nut at the pin connection on the fracture critical lower chord. In addition to the Yellow Flags noted above, the bridge superstructure exhibits widespread deterioration. Various truss members have deterioration approaching 25% of the cross-sectional member area. In most locations on the bridge, previous corrosion was cleaned and painted over during the 2010 rehabilitation project. Additionally, both the left and right end chords are slightly twisted and bowed upward, indicating a past incident of being overstressed. The 2010 rehabilitation also retrofit the vertical members, which consisted of thin forged-eye tension rods, with steel cables looped around the top and bottom chords. This was necessary to keep the bridge open to traffic, as numerous tension members were cracked around the forge lines at the connection to the bottom chord. The failure of these types of members would result in complete failure of the bridge. The deck consists of open steel grating with concrete filled sections above the truss floor beams. The steel grating is in fair condition, but concrete infill present at the floorbeams, is severely deteriorated and crumbled. The presence of the concrete has resulted in trapped water in those areas, leading to corrosion of the floor beams. While not yet deteriorated, the steel stringers spanning between floorbeams exhibit significant deflection under live loading. The bridge is posted for a vertical clearance of 11’-5”, which is significantly less than the standard of 14’-0” and restricts some vehicles from using the bridge. There is evidence of past impacts to the upper bracing members of the end portal. Both stone abutments are overall in good condition. No undermining or scour is present, but without original as-built plans, the NYSDOT has flagged this structure as a potential scour critical bridge due to its unknown foundation type. The approaches of the bridge are in poor condition. The east approach has up to 1.25” of differential settlement at the joint between the bridge deck and the pavement, and a slot drain located within the roadway at the west end of the bridge is clogged and not performing as originally intended. Approach guide rail consists of w-rail and is in fair condition with minor deformations due field bending of the rail and impact damage. Cracked cover plate weld Missing nut on bottom chord. Also shows retrofit attachment to floorbeams Truss diagonal bowed due to overstress (right of photo) Existing truss members retrofit with steel cables Quaker Bridge Rd over Croton River Draft Scope Summary Memorandum November 17, 2017 Page 3 of 11 3. Project Objective  Provide a structurally and geometrically sufficient structure meeting current NYSDOT standards with a 75+ year design life. 4. Design Criteria The design criteria for this project are based on the NYSDOT Highway Design Manual, Chapter 2 and the NYSDOT Bridge Design Manual, 2014. The project is being designed for an anticipated annual average daily traffic (AADT) of 800 vpd for the design year 2048, and an urban local road classification with a design speed of 30 mph. 4.1 Critical Design Elements Table 4.1-A - Critical Design Elements for Quaker Bridge Road over Croton River Route No. & Name: Quaker Bridge Road Project Type: Bridge Replacement Roadway Classification: Urban Local ETC+30 AADT (2048): 800 Element Standard Existing Condition Proposed Condition 1 Design Speed 30 mph – HDM 2.7.4.3 30 mph 30 mph 2 Lane Width 9 ft Min. - BM Table R and N, Appendix 2A 7.8 ft 11 ft(1) Approach Lane Width 13 ft NW 9 ft SE 11 ft 3 Shoulder Width 3 ft Min. - BM Table R and N, Appendix 2A 0 ft 1 ft (LT shldr.)* 5 ft (RT shldr.) Approach Shoulder Width 0 ft 1 ft (LT shldr.)* 5 ft (RT shldr) 4 Horizontal Curvature 188 ft. - HDM Sect 2.7.4.3, Exhibit 2-8 58 ft.* 38 ft.* 5 Superelevation Rate 4% Max. – HDM Sect 2.7.4.3, Exhibit 2-8 None* None* 6 Stopping Site Distance 175 ft. – HDM Sect 2.7.4.3, Exhibit 2-8 78 ft* 63 ft* 7 Grade 15% Max – HDM Sect 2.7.4.3, Exhibit 2-8 10% 11.2% 8 Cross Slope 1.5% Min. - 3% Max. – HDM Sect 2.7.4.3, Exhibit 2-8 0.0% 2.0% 9 Vertical Clearance 14.5 ft. - BM Sect 2.4 11.5 ft.* Unlimited 10 Structural Capacity AASHTO HL-93 Live Load - BM Sect 2.6.1 12 Tons* HL-93 11 ADA Compliance HDM Chapter 18 N/A 5 ft shoulder(2) 12 Freeboard Q50 + 2 ft (BM 2.4.3) 9.2 ft 7.5 ft * Non-Standard Feature (1) 11’-0” lane widths are proposed at the request of Westchester County (2) 5 ft shoulder accommodates two-way pedestrian traffic Quaker Bridge Rd over Croton River Draft Scope Summary Memorandum November 17, 2017 Page 4 of 11 5. Alternatives Considered 5.1 Recommended Alternative - Replacement on Existing Alignment with Road Closure - (Alt. 2A) This alternative will replace the existing bridge with a new 100 ft. single span on the existing alignment. The bridge roadway will consist of two 11 ft wide travel lanes, a 5 ft wide shoulder on the downstream side, and a 1 ft wide shoulder on the upstream side of the bridge. The 5 ft wide shoulder is proposed on the downstream side of the bridge to accommodate two-way pedestrian traffic in the vicinity of the Croton Gorge Trail. The rail-to-rail clear bridge roadway width of 28 ft (12.5 ft increase over existing) and an out to out bridge width of 31’-4”. The proposed structure type will be evaluated and selected in a subsequent phase of this project, but superstructure options include either steel or prestressed concrete beams with a composite concrete deck or a precast concrete twin-leaf arch. Factors to be considered in selecting the superstructure type include long-term maintenance, initial cost, and aesthetic treatment options. Superstructure types will also be contingent upon the feasibility of delivering superstructure components to the site. After evaluating the shipping route, it is anticipated that delivery of full length beams or precast arch units associated with this alternative is feasible from the north approach. The substructures will consist of cast-in-place conventional cantilever concrete abutments supported by a spread footing founded on bedrock. The precast concrete arch structure only requires a cast-in-place concrete footing founded on bedrock. The proposed west abutment will be located in the same location as the existing abutment while the east abutment will be set approximately 2 ft back from the centerline of bearings of the existing abutment. The proposed bridge will be perpendicular to the stream with non- skewed substructures. Retaining walls in addition to abutment wingwalls will be required to retain the northeast and southeast approach roadways. The retaining wall along the northeast approach roadway will replace an existing laid up stone wall, while the wall along the southeast approach will accommodate a slight change in roadway geometry at the top of a very steep embankment slope (1.3H to 1.0V). The retaining wall type will be selected in a subsequent phase of this project, but wall options include precast fill type walls, Geosynthetically reinforced soil walls, or cast-in-place concrete cantilever walls. The proposed horizontal alignment of the new bridge and its approaches will closely match the existing roadway on the north side and be modified on the south side. The north approach roadway alignment will consist a compound curve with radii of 180 ft and 38 ft connecting into a tangent across the bridge. The tangent then connects to a curve on the south approach with a radii of 51 ft followed by another tangent section continuing along Quaker Bridge Road. Quaker Bridge Road East consists of a single tangent intersecting into the Quaker Bridge Road alignment. The modifications to the alignment on the south approach creates a through-movement pattern for Quaker Bridge Road. The proposed vertical alignment will consist of a 3.0% grade across the bridge that will tie into the south approach at the reconstruction limit and will tie into the reconstructed Quaker Bridge Road/Quaker Bridge Road East roadway. The proposed vertical profile will raise the south end of the bridge approximately 1 ft. The approaches will be reconstructed for approximately 165 ft and 225 ft to the north and south of the bridge, respectively. See the Alternative Comparison Table in the appendices. This alternative will have Right-of-Way (ROW) impacts due to the increased bridge roadway width, embankment construction, and close proximity of existing highway boundary to the existing structure. See the ROW section of this report for additional details. Overhead utilities are located within the project area, it is anticipated that these lines will need to be temporarily relocated to facilitate erection of the new beams and demolition of the existing bridge. Quaker Bridge Rd over Croton River Draft Scope Summary Memorandum November 17, 2017 Page 5 of 11 The bridge will be closed during construction and traffic detoured via an offsite detour route. The full length detour from one side of the bridge to the other side will be 5.7 miles long and add approximately 11 minutes to travel times. The detour route will utilize Rt. 129, Rt. 9, and Old Albany Post Road. Construction is anticipated to last 6 months. This Alternative will meet most current NYSDOT geometric and structural standards while providing a 75+ year design life. This alternative is a feasible replacement solution while balancing total costs and impacts to adjacent properties. The total cost of Alternative 2A which includes design, ROW acquisition, construction, and construction inspection is approximately $7,100,000. 5.2 Dismissed Alternatives Several additional alternatives were evaluated with respect to bridge location, span length, feasible superstructure types, approach reconstruction work, impact to Right-of-Way, and constructability. A summary of Alternatives in tabular format and schematic level plan details are contained in the Alternatives Comparison Table included in the appendices. They are as follows: Alternatives 1A & 1B Bridge Rehabilitation was studied due to the historic eligibility of the bridge and to serve as a cost comparison to the other alternatives. Both of these alternatives will keep the existing truss and substructures, thus retaining the existing nonstandard geometric features and load carrying capacity. The majority of the work involved with these alternatives would consist of steel repairs and strengthening, deck replacement, painting and the reconstruction of the approach pavement. The traffic maintenance plan for Alternative 1A would consist of a road closure with an offsite detour, while Alternative 1B would maintain traffic on an onsite temporary detour structure. Closing the road during construction would be the most efficient and least expensive traffic maintenance plan while providing a temporary bridge to maintain traffic on site would add cost and complexity to the project. The total cost of Alternative 1A which includes design, ROW acquisition, construction, and construction inspection is approximately $5,700,000. The total cost of Alternative 1B which includes design, ROW acquisition, construction, and construction inspection is approximately $7,000,000. Reason for Dismissal These alternatives although lower in the initial construction cost, will retain non-standard bridge roadway width, vertical clearance, and substandard load carrying capacity. In addition, the design service life for this alternative is expected to be less than 20 years and require greater continued complex and costly maintenance efforts on fracture-critical members when compared to a replacement structure. Since the project objectives will not be achieved, alternatives 1A and 1B have been dismissed. Alternative 2B Alternative 2B is the same as the recommended Alternative 2A, except traffic is detoured on site with a temporary bridge. See the Alternative 2A write up for a description of new the alignment and structure. Alternative 2B will construct temporary abutments upstream of the new bridge location and install a temporary bridge to maintain traffic through the site. Temporary GRSS walls and additional fill will be required to build up the approach roadway over the steep side slopes. The total cost of Alternative 2B which includes design, ROW acquisition, construction, and construction inspection is approximately $8,400,000. Reason for Dismissal This alternative has been dismissed due to the more significant ROW acquisitions and higher construction costs relative to Alternative 2A. Quaker Bridge Rd over Croton River Draft Scope Summary Memorandum November 17, 2017 Page 6 of 11 Alternative 3 The Replacement on Adjacent Alignment alternative will construct a new parallel structure upstream from the existing bridge. A new 115 ft. single span structure will provide the same clear bridge width as described in Alternative 2A and will be constructed while maintaining traffic on the existing bridge. The approach configuration will not change significantly from the existing. Right-of-way impacts with this alternative will be significantly greater than Alternative 2A, as it will be constructed entirely outside of the existing highway boundary. The feasible superstructure type is limited to spliced steel beams due to geometric constraints of the delivery route. The total cost of Alternative 3 which includes design, ROW acquisition, construction, and construction inspection is approximately $7,500,000. Reason for Dismissal This alternative has more significant ROW acquisitions and higher construction costs relative to Alternative 2A. The possible feasible superstructure types are also limited when compared to the preferred alternative. For these reasons alternate 3 has been dismissed. Alternatives 4 & 5 Both of the Replacement on a Diagonal Alignment alternatives will construct a new 140 ft. structure on a 20° skew across the river from the north quadrant to the south quadrant. The new structure will provide the same clear bridge width as described in Alternative 2A and will improve the horizontal alignment by providing increased curve radii at each approach. Right-of-way impacts will be significantly greater than Alternative 2A, as a majority of the new structure will be constructed outside of the existing highway boundary. Alternative 4 would include a roadway alignment shifted to the north of the existing bridge to allow traffic to be maintained on the existing bridge during construction of the new bridge. Shifting the entire bridge upstream of the existing structure results in more significant ROW acquisitions in the form of Fee takings, and would necessitate temporary staging walls to maintain traffic on the approaches while raising the profile for the new bridge. The roadway alignment for Alternative 5 would overlap with the existing bridge alignment, resulting in the bridge being closed and traffic being detoured around the site similar to Alternative 2A. Closing the road during construction will allow the new structure to be partially built within the existing bridge footprint but ROW impacts are still significantly greater than Alternative 2A. The total cost of Alternative 4 which includes design, ROW acquisition, construction, and construction inspection is approximately $7,900,000. The total cost of Alternative 5 which includes design, ROW acquisition, construction, and construction inspection is approximately $7,600,000. Reason for Dismissal These alternatives have more significant ROW acquisitions and higher construction costs relative to Alternative 2A. The possible feasible superstructure types are also very limited due to the larger span length. For these reasons alternate 4 & 5 has been dismissed. See the Alternatives Comparison Table & Plans in the appendix of the memo for further details of each alternative evaluated within this bridge study. 6. Recommended Alternative Alternative 2A is the preferred alternative, as it meets all of the project objectives while having the least ROW impacts and lowest anticipated construction cost of all concepts evaluated except the rehabilitation concept. 7. Geotechnical At least one (1) soil boring and rock core will be progressed at each proposed abutment location. Additional borings and rock cores should be taken if soldier pile and lagging walls will be utilized during Quaker Bridge Rd over Croton River Draft Scope Summary Memorandum November 17, 2017 Page 7 of 11 construction or incorporated into the final substructures. The borings will be progressed using a standard rotary drill rig equipped with a hollow stem auger until refusal on bedrock and then progress a rock core. Soil borings will be scheduled as soon as the final location of the proposed abutments have been finalized. The subsurface soil profile/boring logs will be prepared by Atlantic Testing Laboratories. 8. Hydraulics The hydraulic model was developed using the as-built record plans, inspection reports for the existing bridge (BIN 3348560), NYS stream stats, USGS gauge stations, and FEMA maps. The Croton River is a relatively straight flowing river with several manmade features built within the river channel including the Black Rock Dam located approximately 650 ft upstream of the Quaker Bridge Road Bridge. The most notable manmade feature affecting stream flow data is the Croton Dam. The hydraulic model determines the water surface elevations for the 50- and 100-yr storm events as required per NYSDOT Bridge Manual 2.4.3. Flow data for the 50- and 100-yr storm events came from NYS Stream Stats and are 10,800 cf and 12,800 cf respectively. As part of testing and calibrating the model to ensure accuracy, flow data for the Hurricane Irene storm event measured by an upstream USGS gauging station was entered in the model. The Irene storm event produced a flow of 22,600 cf, and the hydraulic model was adjusted to reflect water surface elevations similar to documented observations. The hydraulic analysis for the existing Quaker Bridge Road Bridge over the Croton River indicates water surface elevations at the structure inlet of 31.7 ft and 33.0 ft for the 50- and 100-yr storms respectively. With the low chord at elevation 40.9 ft for the existing structure, there is 9.2 ft and 7.9 ft of freeboard provided for each respective storm event. Summary of Existing Hydraulics Drainage Area, 377 square miles Design Flood Base Flood Recurrence Interval (years) 50 100 Peak Discharge (ft3/s) 10,800 12,800 WSE at Structure Inlet (ft) 31.7 33.0 Freeboard Provided (ft) 9.2 7.9 Average Velocity thru Structure (ft/s) 13.8 14.6 Hydraulic analyses were performed for both a proposed structure utilizing conventional concrete abutments and beams and a twin-leaf arch structure. The low chord for the proposed conventional structure is set at 39.2 ft and the arch crown is at 41.1 ft. Based on the analyses, the water surface elevations for the conventional structure did not change from the existing. For the arch structure, the water surface elevations were 31.7 ft and 33.1 ft respectively for the 50- and 100-yr storm event. Water surface elevation for the 100 yr storm increased slightly when compared to existing for the arch superstructure option. Freeboard provided by the conventional structure is at 7.5 ft and 6.2 ft respectively for the 50- and 100-yr storm event. For the arch, freeboard provided is at 9.4 ft and 8.0 ft respectively for the 50- and 100-yr storm event. See tables below for a summary of the hydraulic information. Quaker Bridge Rd over Croton River Draft Scope Summary Memorandum November 17, 2017 Page 8 of 11 Summary of Proposed Hydraulics – Steel Superstructure Drainage Area, 377 square miles Design Flood Base Flood Recurrence Interval (years) 50 100 Peak Discharge (ft3/s) 10,800 12,800 WSE at Structure Inlet (ft) 31.7 33.0 Freeboard Provided (ft) 7.5 6.2 Average Velocity thru Structure (ft/s) 13.8 14.6 Summary of Proposed Hydraulics – Twin-leaf Arch Drainage Area, 377 square miles Design Flood Base Flood Recurrence Interval (years) 50 100 Peak Discharge (ft3/s) 10,800 12,800 WSE at Structure Inlet (ft) 31.7 33.1 Freeboard Provided (ft) @ arch crown 9.4 8.0 @ face of abutments -1.5 -2.9 Average Velocity thru Structure (ft/s) 14.0 15.1 9. Utilities Overhead utilities are located within the project area along the upstream side of the existing bridge. Utility lines are approximately 35 ft to 45 ft away from the upstream fascia. The utilities consist of electric and telephone/cable lines owned by Con Edison and Verizon respectively. It is anticipated that these lines will need to be temporarily relocated to facilitate erection of the new beams. Quaker Bridge Rd over Croton River Draft Scope Summary Memorandum November 17, 2017 Page 9 of 11 10. Right of Way Right-of-way acquisitions are required in Alternative 2A. There are four properties owned by the Village of Croton on Hudson surrounding the highway boundary on the north end of the bridge. In the northeast quadrant, there is a private property owned by Louis Pinkham and Chao Dai, and in the southeast quadrant, there is a parcel of land owned by NYSDEC. It is anticipated that FEE takings will be required from all four of the Village of Croton on Hudson parcels, and one Temporary Easement Taking will be required from the private parcel. Table 10.1-A - Summary of ROW Acquisitions Tax Map # Property Owner Area (SF) Type of Acquisition 68.18-1-42 & 79.06-1-2 Village of Croton On Hudson 2500 FEE Taking 68.18-2-4 Village of Croton On Hudson 400 FEE Taking 68.18-2-1 Village of Croton On Hudson 2000 FEE Taking 68.18-3-10 Louis V. Pinkham & Chao Dai 3090 Temporary Easement 11. Environmental 11.1 SEQR Westchester County is the SEQR lead agency. In accordance with 6 NYCRR, Part 617, “Procedures for Implementation of State Environmental Quality Review Act”, the project is a SEQR Type II Action, therefore no further SEQR processing is required. 11.2 SHPO A consultation with the New York State Historic Preservation Office has been initiated for the Quaker Bridge Road Bridge Study. The initial screening on the NYSHPO website did not identify any other cultural resources located within or immediately adjacent to the project site other than the bridge itself, which is eligible for National Register listing. Hartgen Archeological Associates, Inc. has completed a Historic American Engineering Record (HAER) Level II Documentation package. No determination has been made at this time. 11.3 Environmental Screenings An environmental screening of the project area was performed and it has been determined that the proposed construction will not have an impact nor adverse affect on any of the following:  Floodplains (Flood elevations remain the same);  Prime or unique agricultural land;  Agricultural districts, when more than one acre may be affected;  Water resources, including lakes, reservoirs, rivers and streams;  Water supply sources; Quaker Bridge Rd over Croton River Draft Scope Summary Memorandum November 17, 2017 Page 10 of 11  Designated wild, scenic and recreational rivers;  Unique ecological, natural wooded or scenic areas;  Rare, threatened or endangered species;  Any area designated as a critical environmental area pursuant to 6 NYCRR, Part 617 11.3.1 Wetlands An initial review on the NYSDEC Environmental Resource Mapper, accessed on August 15, 2017, indicates there are no NYSDEC regulated freshwater wetlands within the project area. It is anticipated that no impacts to wetlands will occur as a result of this project. 11.3.2 Surface Waterbodies and Watercourses The Croton River is classified by the NYSDEC as a class B stream through the project site. The best usage for Class “B” water is for swimming and other contact recreational uses, but not for drinking water. This construction project will require substructure work that will occur in the stream. Stream work, as well as any work that may result in suspension of sediment, can be accomplished any time of the year with no seasonal restriction dates. 11.3.3 Endangered and Threatened Species The USFWS IPAC system, accessed August 16, 2017, indicates one endangered and one threatened species within the project area. The endangered species include the Indiana Bat and the threatened species is the Northern Long-eared Bat. Since this project will likely require a federal permit from the US Army Corp of Engineers, the regulations enforced by the USFWS to protect endangered and threatened species are mandatory to follow. The Indiana Bat is known to occur at elevations below 900’ NGVD within 10 to 40 miles away from the nearest hibernaculum. Their roosting habitat is in trees greater than 4” in diameter. The project site has an approximate elevation of 45’ NGVD and is located approximately 20 miles from the nearest hibernaculum located at Williams Lake Roost Site. The Northern Long-Eared Bat whose range encompasses all of New York State, is proposed for inclusion on the USFWS Endangered Species List. To ensure that this project will not adversely impact the Indiana or Northern Long-eared bat populations, tree removals shall occur between October 1 and March 31. 11.4 Anticipated Environmental Permits The proposed project will require a New York Department of Environmental Conversation (NYSDEC) permits for stream disturbance and 401 water quality certification. In addition, a Temporary Revocable Permit from NYSDEC will be required for temporary access to NYSDEC land during construction. It is anticipated that project will proceed under the U.S. Army Corps of Engineers (ACOE) Nationwide Permit #3. Quaker Bridge Rd over Croton River Draft Scope Summary Memorandum November 17, 2017 Page 11 of 11 12. Project Schedule Project Schedule Milestone Date Stakeholder Meeting February 2018 Address Stakeholder Comments April 2018 Final Report May 2018 ACCEPTANCE OF FINAL REPORT: _________________________________ DATE: _________________ Responsible Local Official Appendices Preferred Alternative Preliminary Plans Preferred Alternative Estimate Alternative Comparison Table Dismissed Alternative Plan Views WOODS WOODS STRUCTURE CONCRETE CONCRETE RET. WALL #13 KV P.P. EDGE OF WATER EDGE OF WATER EDGE OF WATER ASPHALT ASPHALT DRAINAGE RIP RAP W 5 P.P. WOODS SE.INV.=36.82 N.INV.=38.47 T.F.=39.57 C.B. STONE LINED DITCH ELEV.=55.80 IN HEAD WALL BOX CUT B.M. M 2+00 M 3+00 M 4+00 M 5+00 M 2+54.22 PCC M 2+90.59 PT M 3+91.07 PC M 4+53.35 PT S 1+00 S 2+00 S 2+20 S 2+20 S 1+00.00 POB S 2+20.34 POE N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_01.dgn 11/17/2017 mhunt APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS 25 25 30 30 30 30 30 30 30 30 30 30 30 35 35 35 35 35 35 35 35 35 35 35 35 35 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 45 45 45 45 45 45 45 45 45 50 50 50 50 50 50 50 50 55 55 55 55 55 55 55 60 60 60 60 60 60 65 65 65 65 65 70 TM 68.18-1-42 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 79.06-2-3 BK. PG. DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-1 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-4 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-3-10 BK. PG. CHAO DAI LOUIS V. PINKHAM AND LANDS N/F OF M 1+26.29 PC 35 40 50 W 57 13 KV P.P. DITCH M 5+42 M 5+42 M 5+41.86 POE 35 40 45 50 55 60 65 70 75 80 100'-0" SPAN TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" 5'-0" SHLDR. 1'-0" SHLDR. OUT TO OUT 31'-4" CLEAR WIDTH 28'-0" TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" 5'-0" SHLDR. SHLDR. 1'-0" TO RTE 129 POST ROAD TO ALBANY ROAD EAST QUAKER BRIDGE CURVE #2 CURVE #3 ROAD QUAKER BRIDGE STA. M 2+04.50 BRGS. c STA M 2+92.25 BEGIN BRIDGE STA. 3+96.75 END BRIDGE GRID NORTH CURVE #1 R L T = = = = Dc = = STA. = STA. R L T = = = = Dc = = STA. = STA. CONCRETE WINGWALL (TYP.) PROPOSED CAST-IN-PLACE 1'-0" SHLDR. 1'-0" SHLDR. , STA. LINE, AND H.C.L. c PROPOSED QUAKER BRIDGE ROAD WALL (TYP.) PROPOSED RETAINING , STA. LINE, AND H.C.L. c BRIDGE ROAD EAST PROPOSED QUAKER TO BE REMOVED EXISTING SUPERSTRUCTURE AZ 41°9'46" AZ 41°9'46" CROTON RIVER BRIDGE ROAD TO QUAKER END SECTION (TYP.) GALVANIZED STRUCTURE (TYP.) PROPOSED DRAINAGE CULVERT PIPE (TYP.) PROPOSED CROSS RECONSTRUCTION BEGIN FULL DEPTH STA. S 1+10.00 RECONSTRUCTION BEGIN FULL DEPTH STA. M 1+26.00 ROAD EAST QUAKER BRIDGE ST-1 1 PROPOSED PLAN R L T = = = = Dc = CURVE 1 = STA. = STA. PC PCC 40°43'16.22" 180.00' 127.92 66.80' CURVE 2 PCC PT 38.00' 150°46'42.12" 36.37' 19.72 54°50'38.67" CURVE 3 PT 27.42' M 1+26.9 M 2+54.22 M 2+54.22 M 2+90.59 CURVE #3 PC M 3+91.07 M 4+53.35 51.00' 62.28' 0 10 20 30 40' 10 1" = 20' LANE TRAVEL VARIES LANE TRAVEL VARIES STA. 3+94.50 BRGS. c STA. M 5+42.00 RECONSTRUCTION END FULL DEPTH GUTTER CONCRETE PROPOSED ASPHALT CURB PROPOSED 58'29.36'' n AZ 238 N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_elv_01.dgn 10/5/2017 dborjas APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS DATUM EL. 10.00 100'-0" SPAN STA. M 2+94.50 BRGS. c STA. M 3+94.50 BRGS. c ORIGINAL GROUND ABUTMENT (TYP.) CONCRETE CANTILEVER PROPOSED CAST-IN-PLACE WINGWALL (TYP.) PROPOSED CONCRETE M 4+22.53 & S 2+20.34 EQUALITY STATION RAILING (FOUR-RAIL) PROPOSED STEEL BRIDGE TRANSITION RAIL (TYP.) PROPOSED BRIDGE RECONSTRUCTION BEGIN FULL DEPTH STA. M 1+26.00 (TYP.) BEAM GUIDERAIL PROPOSED BOX GRADE PROPOSED (STEEL BEAMS SHOWN) TYPE TO BE EVALUATED PROPOSED SUPERSTRUCTURE DHW EL. 31.7 HYDRAULIC DATA EXIST PROP. 100 YR FLOOD DESIGN FLOOD BASE RECURRENCY INTERVAL @ PT. OF MAX BACKWATER HIGH WATER ELEVATION PEAK DISCHARGE cfs 2 50 YR 10,800 12,800 31.7 33.0 0 10 20 30 40' 10 1" = 20' ST-2 2 PROPOSED ELEVATIONS DATUM EL. 10.00 ORIGINAL GROUND TRANSITION RAIL (TYP.) PROPOSED BRIDGE RECONSTRUCTION BEGIN FULL DEPTH STA. M 1+26.00 (TYP.) BEAM GUIDERAIL PROPOSED BOX GRADE PROPOSED RAILING (FOUR-RAIL) PROPOSED STEEL BRIDGE M 4+22.53 & S 2+20.34 EQUALITY STATION 100'-0" SPAN STA. M 2+94.50 BEGIN OPENING STA. M 3+94.50 END OPENING DHW EL. 31.7 FOUNDATION (TYP.) CONCRETE FOOTING PROPOSED CAST-IN-PLACE WALL (TYP.) PRECAST SPANDREL STEEL SUPERSTRUCTURE ELEVATION HYDRAULIC DATA EXIST PROP. 100 YR FLOOD DESIGN FLOOD BASE RECURRENCY INTERVAL @ PT. OF MAX BACKWATER HIGH WATER ELEVATION PEAK DISCHARGE cfs 2 50 YR 10,800 12,800 31.7 33.0 WINGWALL (TYP.) PROPOSED CONCRETE 31.7 33.1 33.0 31.7 DRAINAGE AREA = 337 mi DRAINAGE AREA = 337 mi TWIN-LEAF ARCH SUPERSTRUCTURE ELEVATION FREEBOARD 9.2' LEAF ARCH SHOWN) (PRECAST CONCRETE TWIN TYPE TO BE EVALUATED PROPOSED SUPERSTRUCTURE FREEBOARD 9.4' FREEBOARD -1.5' @ DESIGN FLOOD = 13.8 ft/s AVG. VELOCITY THRU STRUCTURE @ DESIGN FLOOD = 14.0 ft/s AVG. VELOCITY THRU STRUCTURE SHLDR. 5'-0" WEARING SURFACE WITH INTEGRAL SUPERSTRUCTURE SLAB 2.0% 2.0% T.G.L. (TYP.) RAILING (FOUR-RAIL) PROPOSED STEEL BRIDGE TYPICAL BRIDGE SECTION SHLDR. 1'-0" TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" SHLDR. 5'-0" SCALE: 1/8" = 1'-0" 28'-0" APPROACH SLAB 2.0% 2.0% T.G.L. (TYP.) TRANSITION RAIL PROPOSED BRIDGE GROUND ORIGINAL (TYPE 2 FRICTION) WEARING SURFACE SLAB WITH INTEGRAL 1'-0" CONCRETE APPROACH TYPE II 12" SUBBASE COURSE SCALE: 1/8" = 1'-0" TYPICAL BRIDGE APPROACH SECTION SHLDR. 2'-3" SHLDR. 5'-0" SHLDR. 2'-3" BREAK BREAK SHLDR. 1'-0" 2.0% T.G.L. 2.0% 6.0% 6.0% TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. c PROPOSED (TYP.) BEAM GUIDERAIL PROPOSED BOX 31'-4" OUT-TO-OUT TYPE II 12" SUBBASE COURSE 80 SERIES COMPACTION 1•" 9.5 F3 TOP COURSE HMA, 80 SERIES COMPACTION 2•" 19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION 5" 37.5 F9 BASE COURSE HMA, (TYP.) TURF (ROADSIDE) 4" TOPSOIL & ESTABLISH GROUND ORIGINAL SCALE: 1/8" = 1'-0" TYPICAL HIGHWAY SECTION SHLDR. 1'-0" SHLDR. 2'-3" BREAK VARIES SHLDR. TRAVEL LANE 11'-0" 6.0% 2.0% T.G.L. 2.0% 6.0% SHLDR. 1'-0" (TYP.) WINGWALL CONCRETE PROPOSED SCALE: 1/8" = 1'-0" 2 1 TURF (ROADSIDE) 4" TOPSOIL & ESTABLISH GROUND ORIGINAL TO REMAIN RETAINING WALL EXISTING CONCRETE 80 SERIES COMPACTION 1•" 9.5 F3 TOP COURSE HMA, 80 SERIES COMPACTION 2•" 19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION 5" 37.5 F9 BASE COURSE HMA, TYPE II COURSE 12" SUBBASE TYPICAL HIGHWAY SECTION ST-3 3 TYPICAL SECTIONS - 01 TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. c PROPOSED QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. c PROPOSED TRAVEL LANE 11'-0" QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. c PROPOSED TYPE TO BE EVALUATED PROPOSED SUPERSTRUCTURE (TYP.) BEAM GUIDERAIL PROPOSED BOX RETAINING WALL 5'-0" STA. M 1+26.00 TO STA. M 1+80.00 STA. M 1+80.00 TO STA. M 2+77.00 T.G.L. 80 SERIES COMPACTION 1•" 9.5 F3 TOP COURSE HMA, 80 SERIES COMPACTION 2•" 19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION 5" 37.5 F9 BASE COURSE HMA, 2.0% 6.0% BREAK SHLDR. 2'-3" SHLDR. 1'-0" (TYP.) TURF (ROADSIDE) 4" TOPSOIL & ESTABLISH 2.0% QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. c PROPOSED SHLDR. 2'-3" BREAK 6.0% (TYP.) BEAM GUIDERAIL PROPOSED BOX SHLDR. 1'-0" TRAVEL LANE VARIES TRAVEL LANE VARIES TYPE II COURSE 12" SUBBASE 2 1 SCALE: 1/8" = 1'-0" TYPICAL HIGHWAY SECTION STA. M 4+40.00 TO STA. M 5+42.00 2.0% N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_typ_01.dgn 10/5/2017 dborjas APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS ST-4 4 TYPICAL SECTIONS - 02 SHLDR. 1'-0" SHLDR. 2'-3" BREAK 6.0% 2.0% SHLDR. 1'-0" 2.0% (TYP.) BEAM GUIDERAIL PROPOSED BOX GROUND ORIGINAL 80 SERIES COMPACTION 1•" 9.5 F3 TOP COURSE HMA, 80 SERIES COMPACTION 2•" 19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION 5" 37.5 F9 BASE COURSE HMA, TYPE II COURSE 12" SUBBASE (TYP.) TURF (ROADSIDE) & ESTABLISH 4" TOPSOIL SCALE: 1/8" = 1'-0" TYPICAL HIGHWAY SECTION 1 VARIES QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. c PROPOSED TRAVEL LANE 9'-0" PROPOSED RETAINING WALL TRAVEL LANE 9'-0" ASPHALT CURB 5'-0" CONCRETE GUTTER STA. S 1+10.00 TO STA. S 1+84.00 SHLDR. 1'-0" SHLDR. 2'-3" BREAK 6.0% 2.0% SHLDR. 1'-0" 2.0% (TYP.) BEAM GUIDERAIL PROPOSED BOX GROUND ORIGINAL 80 SERIES COMPACTION 1•" 9.5 F3 TOP COURSE HMA, 80 SERIES COMPACTION 2•" 19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION 5" 37.5 F9 BASE COURSE HMA, TYPE II COURSE 12" SUBBASE (TYP.) TURF (ROADSIDE) & ESTABLISH 4" TOPSOIL SCALE: 1/8" = 1'-0" TYPICAL HIGHWAY SECTION 1 VARIES QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. c PROPOSED ASPHALT CURB CONCRETE GUTTER STA. S 1+84.00 TO STA. S 2+20.00 TRAVEL LANE VARIES VARIES PROPOSED WINGWALL TRAVEL LANE VARIES N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_typ_02.dgn 10/5/2017 dborjas APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS 0 20 40 60 80' HORIZONTAL SCALE 0 10 20' VERTICAL SCALE ST-5 5 PROFILE THEORETICAL GRADE LINE (T.G.L.) LEVEL -4.00% -6.00% -2.00% +2.00% +4.00% +6.00% LT. E.O.P. (e=-2.00%) LEVEL -4.00% -6.00% -2.00% +2.00% +4.00% +6.00% BANKING DIAGRAM RT. E.O.P. (e=-2.00%) 15 20 25 30 35 40 45 50 55 60 65 65 15 20 25 30 35 40 45 50 55 60 65 65 M 1+00 M 1+00 M 2+00 M 3+00 M 4+00 M 5+00 M 6+00 41.05 40.97 42.39 43.89 45.39 46.89 50.44 56.05 PVI M 1+26.00 PVC M 1+53.06 ELEV 40.99 LOW M 1+77.07 ELEV 40.75 PVI M 1+83.06 ELEV 40.39 L = 60.00' G1 = -2.00% G2 = 3.00% E= 0.37' HSD = 108' PVT M 2+13.06 ELEV 41.29 PVC M 4+00.00 ELEV 46.89 PVI M 4+25.00 ELEV 47.64 L = 50.00' G1 = 3.00% G2 = 11.21% E= 0.51' HSD = 63' PVT M 4+50.00 ELEV 50.44 -2.00% 3.00% 11.21% PROPOSED GRADE ORGINAL GROUND QUAKER BRIDGE ROAD 42.07 41.03 55.75 51.21 41.30 40.43 STATION EQUALITY STA. M 4+22.53 & S 2+20.34 ELEV. 47.98 ELEV 41.53 BEGIN FULL DEPTH RECONSTRUCTION PVI M 5+42.00 ELEV 60.74 RECONSTRUCTION END FULL DEPTH N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_pro_01.dgn 10/5/2017 dborjas APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS 0 20 40 60 80' HORIZONTAL SCALE 0 10 20' VERTICAL SCALE ST-6 6 PROFILE THEORETICAL GRADE LINE (T.G.L.) LEVEL -4.00% -6.00% -2.00% +2.00% +4.00% +6.00% LT. E.O.P. (e=-2.00%) LEVEL -4.00% -6.00% -2.00% +2.00% +4.00% +6.00% RT. E.O.P. (e=-2.00%) BANKING DIAGRAM - QUAKER ROAD EAST N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_pro_02.dgn 10/5/2017 dborjas APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS 35 40 45 50 55 60 65 65 35 40 45 50 55 60 65 65 S 1+00 S 1+00 S 2+00 S 3+00 58.15 53.33 49.51 58.15 PVC S 1+52.69 ELEV 53.07 PVI S 1+72.69 ELEV 51.15 L = 40.00' G1 = -9.64% G2 = -6.00% E= 0.18' HSD = 144' PVT S 1+92.69 ELEV 49.95 -9.64% -6.00% -8.43% ORGINAL GROUND PROPOSED GRADE QUAKER BRIDGE ROAD EAST 53.48 49.61 STATION EQUALITY STA. M 4+22.53 & S 2+20.34 ELEV. 47.98 ELEV 57.22 BEGIN FULL DEPTH RECONSTRUCTION STA S 1+10.00 N:\Projects\2016\116-043 Quaker Bridge\comps\estimate\Prelim_Est2A - Replace on Existing - Offsite Detour 10/6/2017 Item No. Description Unit Quantity Unit Price Total Cost 201.06 CLEARING AND GRUBBING LS 1 $50,000.00 $50,000.00 202.120001 REMOVING EXISTING SUPERSTRUCTURES LS 1 $400,000.00 $400,000.00 202.19 REMOVAL OF SUBSTRUCTURES CY 278 $500.00 $139,000.00 203.02 UNCLASSIFIED EXCAVATION AND DISPOSAL CY 670 $75.00 $50,250.00 203.03 EMBANKMENT IN PLACE CY 429 $50.00 $21,450.00 203.21 SELECT STRUCTURE FILL CY 289 $115.00 $33,235.00 206.01 STRUCTURE EXCAVATION CY 1865 $75.00 $139,875.00 209.1801 ROLLED EROSION CONTROL PRODUCT, CLASS I TYPE A, SHORT TERM SY 56 $10.00 $560.00 304.12 SUBBASE COURSE, TYPE 2 CY 452 $100.00 $45,200.00 402.128903 12.5 F9 TOP COURSE HMA, SHOULDER COURSE,80 SERIES COMPACTION TON 95 $250.00 $23,750.00 402.198903 19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION TON 164 $250.00 $41,000.00 402.378903 37.5 F9 BASE COURSE HMA, 80 SERIES COMPACTION TON 338 $250.00 $84,500.00 552.2101 ROCK SOCKETS FOR SOLDIER PILE AND LAGGING WALL LF 259 $2,250.00 $582,750.00 552.2201 SOLDIER PILES FOR SOLDIER PILE AND LAGGING WALL LF 689 $325.00 $223,925.00 552.230301 PRECAST CONCRETE PANEL LAGGING FOR SOLDIER PILE AND LAGGING WALL SF 5418 $75.00 $406,350.00 555.08 FOOTING CONCRETE, CLASS HP CY 151 $800.00 $120,800.00 555.09 CONCRETE FOR STRUCTURES, CLASS HP CY 249 $1,600.00 $398,400.00 556.03 STUD SHEAR CONNECTORS FOR BRIDGES EACH 2583 $5.00 $12,915.00 557.0102 SUPERSTRUCTURE SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM FORMWORK REQUIRED - TYPE 2 FRICT SY 364 $425.00 $154,700.00 557.2002 STRUCTURAL APPROACH SLAB WITH INTEGRAL WEARING SURFACE - TYP E 2 FRICTION SY 63 $325.00 $20,475.00 558.02 LONGITUDINAL SAWCUT GROOVING OF STRUCTURAL SLAB SURFACE SY 388 $15.00 $5,820.00 564.0501 STRUCTURAL STEEL, TYPE 1 LS 1 $590,000.00 $590,000.00 564.20010008 HOT-DIP GALVANIZING OF STRUCTURAL STEEL LB 116020 $1.00 $116,020.00 565.2022 TYPE E.B. FIXED BEARING (56 TO 111 KIPS) EACH 4 $5,000.00 $20,000.00 565.2032 TYPE E.B EXPANSION BEARING (56 TO 111 KIPS) EACH 4 $5,000.00 $20,000.00 568.51 STEEL BRIDGE RAILING (FOUR RAIL) LF 212 $250.00 $53,000.00 568.70 TRANSITION BRIDGE RAILING LF 128 $175.00 $22,400.00 603.171316 GALVANIZED STEEL END SECTIONS-PIPE (2-2/3" X 1/2" CORRUGATIONS) 21 INCH DIAMETER, 16 GAUGE EACH 3 $500.00 $1,500.00 603.9815 SMOOTH INTERIOR CORRUGATED POLYETHYLENE CULVERT AND STORM DRAIN 15 INCH DIAMETER LF 130 $60.00 $7,800.00 604.300611 RECTANGULAR DRAINAGE STRUCTURE TYPE F FOR #11 WELDED FRAME LF 20 $1,500.00 $30,000.00 606.10 BOX BEAM GUIDE RAILING LF 342 $40.00 $13,680.00 606.120101 BOX BEAM END PIECE EACH 1 $600.00 $600.00 619.01 BASIC WORK ZONE TRAFFIC CONTROL LS 1 $200,000.00 $200,000.00 620.05 STONE FILLING (HEAVY) CY 311 $120.00 $37,320.00 625.01 SURVEY OPERATIONS LS 1 $40,000.00 $40,000.00 637.12----25 ENGINEER'S FIELD OFFICE - TYPE 2 MNTH 9 $5,000.00 $45,000.00 637.34 OFFICE TECHNOLOGY AND SUPPLIES DC 10000 $1.00 $10,000.00 Construction Cost $4,163,000 Wetland Mitigation $0 Incidentals (25%) $1,041,000 Subtotal 1 $5,204,000 Field Change Order $261,000 Subtotal 2 $5,465,000 Mobilization (4%) $219,000 Subtotal 3 $5,684,000 Design $750,000 Construction Inspection $500,000 ROW Costs $100,000 Total Cost $7,100,000 Oct-17 QUAKER BRIDGE ROAD OVER CROTON RIVER CME#: 116-043 Preliminary Engineer's Estimate - Alternative 2A Replacement on existing alignment with detour Quaker Bridge Road over Croton River Town of Cortlandt Westchester County Revised 10/6/2017 Page 1 Alternatives Comparison Table Description Bridge Span & Road- way Width Maintenance of Traffic Right-of- Way SHPO General Constructability Concerns Structure Type Options Total Project Cost Pros Cons 1A Bridge Rehabilitation (Road Closure) 98'-0" 15’-6” Road Closed Offsite Detour None • Retains historic register eligible truss • No new ground disturbance • Use existing approaches for staging • No utility Relocation • Existing truss to remain $5.7M • No new ground disturbance • Lowest cost alternative • Road Closed • Retains non- standard bridge features • Less than 20-yr design life • Ongoing maintenance costs higher than replacement alternatives 1B Bridge Rehabilitation (Temporary Bridge) 98'-0" 15’-6” Onsite with temporary bridge 2 TEs: • Village of Croton on Hudson • Private property (Louis Pinkham) • Retains historic register eligible truss • New ground disturbance anticipated for construction of temporary bridge substructures • GRSS wall substructures lengthened to create a staging area. • Steep grades and lack of open space around site pose a challenge to launching or lifting a temporary bridge. • Utility relocation required for temporary bridge • Existing truss to remain $7.0M • Low traffic impact • Retains non- standard bridge features • Less than 20-yr design life • New ground disturbance anticipated • Temporary bridge (added cost) • Utility conflicts with temporary bridge • ROW Required • Ongoing maintenance costs higher than replacement alternatives Quaker Bridge Road over Croton River Town of Cortlandt Westchester County Revised 10/6/2017 Page 2 Alternatives Comparison Table Description Bridge Span & Road- way Width Maintenance of Traffic Right-of- Way SHPO General Constructability Concerns Structure Type Options Total Project Cost Pros Cons 2A Replacement on Existing Alignment (Road Closure) 100'-0" 28’-0” Road Closed Offsite Detour 4 Fees: • Village of Croton on Hudson (3) • Private property (Louis Pinkham) • Removes historic register eligible truss and substructures • No new ground disturbance • Existing approaches used for material storage and crane setup • New beam length limited to 100 FT +/- for pre- stressed concrete box beams due to shipping route. • Steel I-beam can be erected with a splice for shorter individual beam lengths • Utility relocation required for erection • Pre- stressed concrete box beam units • Twin Leaf Arch • Steel I- Beam $7.1M • No new ground disturbance • Standard bridge roadway width • Lowest cost replacement alternative • 75+ year design life • Road closed • Utility conflict for erection of beams • No roadway geometry improvements 2B Replacement on Existing Alignment (Temporary Bridge) 100'-0" 26’-0” Onsite with temporary bridge 4 Fees: • Village of Croton on Hudson • Private property (Louis Pinkham) • Removes historic register eligible truss and substructures • New ground disturbance anticipated for a temporary bridge substructure • GRSS Wall required for staging • Short duration road closures during erection of superstructure elements. • Steep grades and lack of open space around site pose a challenge to launching or lifting a temporary bridge • New beam length limited to 100 FT +/- for pre- stressed concrete box beams due to shipping route. • Steel I-beam can be erected with a splice for shorter individual beam lengths • Pre- stressed concrete box beam units • Twin Leaf Arch • Steel I- Beam $8.4M • Standard bridge roadway width • 75+ year design life • Utility conflicts with temporary bridge • New ground disturbance anticipated • ROW Required • Temporary bridge (added cost) • Limited construction staging areas/access (added costs) • No roadway geometry improvements Quaker Bridge Road over Croton River Town of Cortlandt Westchester County Revised 10/6/2017 Page 3 Alternatives Comparison Table Description Bridge Span & Road- way Width Maintenance of Traffic Right-of- Way SHPO General Constructability Concerns Structure Type Options Total Project Cost Pros Cons 3 Replacement on Adjacent Alignment (Upstream) 115'-0" 26’-0” Onsite utilizing existing bridge 3 Fees and 3 TEs: • Village of Croton on Hudson (2) • Private property (Louis Pinkham) • Removes historic register eligible truss and substructures, but has the potential to retain, if required. • New ground disturbance anticipated for a new bridge substructure • GRSS Wall required for staging • Short duration road closures during construction superstructure elements. • New beam segments limited to 100 FT +/- for shipping (Splice Required) • Utility relocation required for new bridge • Steel I- Beam $7.5M • Standard bridge roadway width • 75+ year design life • Utility conflicts with new bridge location • New ground disturbance anticipated • ROW Required • Limited construction staging areas/access (added costs) • Impact to retaining wall on NW approach 4 Replacement on a Diagonal Alignment (Upstream) 140'-0" 26’-0” Onsite utilizing existing bridge 2 Fees and 2 TEs: • Village of Croton on Hudson • Private property (Louis Pinkham) • Removes historic register eligible truss and substructures, but has the potential to retain, if required. • New ground disturbance anticipated for new bridge substructure • GRSS Wall required for staging • Short duration road closures during construction superstructure elements. • New beam segments limited to 100 FT +/- for shipping (Splice Required) • Utility relocation required for new bridge • Steel I- Beam $7.9M • Standard bridge roadway width • Improves horizontal approach radius and increases stream opening • 75+ year design life • Utility conflicts with new bridge location • New ground disturbance anticipated • ROW Required • Limited construction staging areas/access (added costs) • Longer structure (added costs) Quaker Bridge Road over Croton River Town of Cortlandt Westchester County Revised 10/6/2017 Page 4 Alternatives Comparison Table Description Bridge Span & Road- way Width Maintenance of Traffic Right-of- Way SHPO General Constructability Concerns Structure Type Options Total Project Cost Pros Cons 5 Replacement on a Diagonal Alignment (Road Closure) 140'-0" 26’-0” Road Closed Offsite Detour 2 Fees: • Village of Croton on Hudson • Private property (Louis Pinkham) • Removes historic register eligible truss and substructures. • New ground disturbance anticipated for new bridge substructure • Existing approaches used for material storage and crane setup. • New beam segments limited to 100 FT +/- for shipping (Splice Required) • Steel I- Beam $7.6M • Improves horizontal approach radius and increases stream opening • Standard bridge roadway width • Best roadway geometry • 75+ year design life • Road Closed • ROW Required • Utility conflicts with new bridge • New ground disturbance anticipated • Limited construction staging areas/access (added costs) • Longer structure (added costs) PROJECT: DATE: FIGURE: USER = N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_01.dgn 6/16/2017 MHunt FILE NAME = DATE/TIME = GRID NORTH 0 10 20 30 40' 10 1" = 20' 116-043 1 CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE R1 = 35' R3 = 70' ELECTRIC LINES EXISTING OVERHEAD R2 = 180' ROAD CLOSURE (ALT 1A) BRIDGE REHABILITATION - JUNE 2017 DECK STEEL GRATE PROPOSED NEW 98'-0" SPAN CLEAR ROADWAY 15'-6" OUT-TO-OUT 17'-0" TRUSS OF c TRUSS OF c RECONSTRUCTION LIMITS OF ROADWAY WOODS WOODS STRUCTURE CONCRETE CONCRETE RET. WALL #13 KV P.P. STONE WING WALL EDGE OF WATER STONE WING WALL EDGE OF WATER SLOT DRAIN L L A W G NI W E G DI R B ASPHALT ASPHALT DRAINAGE RIP RAP ELEV.=40.82 IN HEAD WALL BOX CUT B.M. HEAD WALL CONC. POST POST W 5 P.P. STONE RET. W WOODS 8" CMP INV.=20.98 15" CMP SE.INV.=21.85 N.INV.=23.50 T.F.=24.60 C.B. =31.65 INV. =34.98 INV. SIGN CORTLANDT TOWN OF VAULT DRAINAGE LIMIT 30 VIL. SPEED 15 TONS & WEIGHT LIMIT LIMIT 30 & SPEED NO PARKING STONE LINED DITCH PARKING NO SIGN STREET QUAKER BRIDGE ROAD EAST BRIDGE WING WALL TM 68.18-1-42 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 79.06-2-3 BK. PG. DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-1 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-4 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-3-10 BK. PG. CHAO DAI LOUIS V. PINKHAM AND LANDS N/F OF DRAFT PROJECT: DATE: FIGURE: USER = N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_02.dgn 6/16/2017 MHunt FILE NAME = DATE/TIME = GRID NORTH 0 10 20 30 40' 10 1" = 20' 116-043 2 CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE 110'-0" GRSS WALL (TYP.) PROPOSED TEMPORARY R3 = 70' R1 = 35' AREA (TYP.) TEMPORARY STAGING PROPOSED POSSIBLE RELOCATED ELECTRIC LINES TO BE EXISTING OVERHEAD BRIDGE TEMPORARY PROPOSED R2 = 180' TEMPORARY BRIDGE (ALT 1B) BRIDGE REHABILITATION - DECK STEEL GRATE PROPOSED NEW CLEAR ROADWAY 15'-6" OUT-TO-OUT 17'-0" 98'-0" SPAN TRUSS OF c TRUSS OF c RECONSTRUCTION LIMITS OF ROADWAY CLEAR 24'-0" (MIN.) TRAVEL LANE 12'-0" TRAVEL LANE 12'-0" JUNE 2017 WOODS WOODS STRUCTURE CONCRETE CONCRETE RET. WALL #13 KV P.P. STONE WING WALL EDGE OF WATER STONE WING WALL EDGE OF WATER SLOT DRAIN L L A W G NI W E G DI R B ASPHALT ASPHALT DRAINAGE RIP RAP ELEV.=40.82 IN HEAD WALL BOX CUT B.M. HEAD WALL CONC. POST POST W 5 P.P. STONE RET. W WOODS 8" CMP INV.=20.98 15" CMP SE.INV.=21.85 N.INV.=23.50 T.F.=24.60 C.B. =31.65 INV. =34.98 INV. SIGN CORTLANDT TOWN OF VAULT DRAINAGE LIMIT 30 VIL. SPEED 15 TONS & WEIGHT LIMIT LIMIT 30 & SPEED NO PARKING STONE LINED DITCH PARKING NO SIGN STREET QUAKER BRIDGE ROAD EAST BRIDGE WING WALL TM 68.18-1-42 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 79.06-2-3 BK. PG. DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-1 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-4 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-3-10 BK. PG. CHAO DAI LOUIS V. PINKHAM AND LANDS N/F OF DRAFT PROJECT: DATE: FIGURE: USER = N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_04.dgn 6/16/2017 MHunt FILE NAME = DATE/TIME = GRID NORTH 0 10 20 30 40' 10 1" = 20' 116-043 4 CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE 110'-0" BRIDGE PROPOSED TEMPORARY AREA (TYP.) TEMPORARY STAGING PROPOSED POSSIBLE GRSS WALL (TYP.) PROPOSED TEMPORARY R3 = 80' R1 = 35' 100'-0" SPAN TRAVEL 9'-0" TRAVEL 9'-0" SHLDR. 5'-0" SHLDR. 3'-0" RELOCATED ELECTRIC LINE TO BE EXISTING OVERHEAD R2 = 180' ALIGNMENT (ALT 2B) ALIGNMENT - TEMPORARY BRIDGE BRIDGE REPLACEMENT ON EXISTING CLEAR ROADWAY 26'-0" LANE LANE TRAVEL LANE 12'-0" TRAVEL LANE 12'-0" CLEAR 24'-0" (MIN.) JUNE 2017 WOODS WOODS STRUCTURE CONCRETE CONCRETE RET. WALL #13 KV P.P. STONE WING WALL EDGE OF WATER STONE WING WALL EDGE OF WATER SLOT DRAIN L L A W G NI W E G DI R B ASPHALT ASPHALT DRAINAGE RIP RAP ELEV.=40.82 IN HEAD WALL BOX CUT B.M. HEAD WALL CONC. POST POST W 5 P.P. STONE RET. W WOODS 8" CMP INV.=20.98 15" CMP SE.INV.=21.85 N.INV.=23.50 T.F.=24.60 C.B. =31.65 INV. =34.98 INV. SIGN CORTLANDT TOWN OF VAULT DRAINAGE LIMIT 30 VIL. SPEED 15 TONS & WEIGHT LIMIT LIMIT 30 & SPEED NO PARKING STONE LINED DITCH PARKING NO SIGN STREET QUAKER BRIDGE ROAD EAST BRIDGE WING WALL TM 68.18-1-42 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 79.06-2-3 BK. PG. DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-1 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-4 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-3-10 BK. PG. CHAO DAI LOUIS V. PINKHAM AND LANDS N/F OF DRAFT PROJECT: DATE: FIGURE: USER = N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_05.dgn 6/16/2017 MHunt FILE NAME = DATE/TIME = GRID NORTH 0 10 20 30 40' 10 1" = 20' 116-043 5 CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AREA (TYP.) TEMPORARY STAGING PROPOSED POSSIBLE R1 = 48' R2 = 70' TRAVEL 9'-0" TRAVEL 9'-0" SHLDR. 3'-0" SHLDR. 5'-0" 115'-0" SPAN RELOCATED ELECTRIC LINE TO BE EXISTING OVEHEAD ADJACENT ALIGNMENT (ALT 3) BRIDGE REPLACEMENT ON UPSTREAM CLEAR ROADWAY 26'-0" LANE LANE JUNE 2017 BRIDGE CAN REMAIN EXISTING TRUSS WOODS WOODS STRUCTURE CONCRETE CONCRETE RET. WALL #13 KV P.P. STONE WING WALL EDGE OF WATER STONE WING WALL EDGE OF WATER SLOT DRAIN L L A W G NI W E G DI R B ASPHALT ASPHALT DRAINAGE RIP RAP ELEV.=40.82 IN HEAD WALL BOX CUT B.M. HEAD WALL CONC. POST POST W 5 P.P. STONE RET. WALL WOODS 8" CMP INV.=20.98 15" CMP SE.INV.=21.85 N.INV.=23.50 T.F.=24.60 C.B. =31.65 INV. =34.98 INV. SIGN CORTLANDT TOWN OF VAULT DRAINAGE LIMIT 30 VIL. SPEED 15 TONS & WEIGHT LIMIT LIMIT 30 & SPEED NO PARKING STONE LINED DITCH PARKING NO SIGN STREET QUAKER BRIDGE ROAD EAST BRIDGE WING WALL TM 68.18-1-42 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 79.06-2-3 BK. PG. DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-1 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-4 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-3-10 BK. PG. CHAO DAI LOUIS V. PINKHAM AND LANDS N/F OF DRAFT PROJECT: DATE: FIGURE: USER = N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_06.dgn 6/16/2017 MHunt FILE NAME = DATE/TIME = GRID NORTH 0 10 20 30 40' 10 1" = 20' 116-043 6 CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE 140'-0" SPAN 20°0'0.0" SKEW SHLDR. 3'-0" SHLDR. 5'-0" TRAVEL 9'-0" TRAVEL 9'-0" R1 = 55' R1 = 50' GRSS WALLS AND FILL (TYP.) STAGING AREA BUILT WITH PROPOSED POSSIBLE TEMPORARY LINE TO BE RELOCATED EXISTING OVERHEAD ELECTRIC DIAGONAL ALIGNMENT (ALT 4) BRIDGE REPLACEMENT ON UPSTREAM LANE LANE CLEAR ROADWAY 26'-0" JUNE 2017 REMAIN BRIDGE CAN EXISING TRUSS RECONSTRUCTION LIMIT OF ROADWAY WOODS WOODS STRUCTURE CONCRETE CONCRETE RET. WALL #13 KV P.P. STONE WING WALL EDGE OF WATER STONE WING WALL EDGE OF WATER SLOT DRAIN L L A W G NI W E G DI R B ASPHALT POST POST W 5 P.P. STONE RET. WALL WOODS 8" CMP INV.=20.98 15" CMP SE.INV.=21.85 N.INV.=23.50 T.F.=24.60 C.B. =31.65 INV. BRIDGE ONE LANE SIGN CORTLANDT TOWN OF VAULT DRAINAGE LIMIT 30 VIL. SPEED 15 TONS & WEIGHT LIMIT STONE LINED DITCH PARKING NO SIGN STREET QUAKER BRIDGE ROAD EAST BRIDGE WING WALL TM 68.18-1-42 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 79.06-1-2 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-1 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-4 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-3-10 BK. PG. CHAO DAI LOUIS V. PINKHAM AND LANDS N/F OF DRAFT PROJECT: DATE: FIGURE: USER = N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_07.dgn 6/16/2017 MHunt FILE NAME = DATE/TIME = GRID NORTH 0 10 20 30 40' 10 1" = 20' 116-043 7 CORTLANDT, NEW YORK OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE SHLDR. 3'-0" SHLDR. 5'-0" TRAVEL 9'-0" 140'-0" SPAN R1 = 68' TRAVEL 9'-0" 20°0'0.0" SKEW R1 = 110' LINE TO BE RELOCATED EXISTING OVERHEAD ELECTRIC (ALT 5) DIAGONAL ALIGNMENT - ROAD CLOSURE BRIDGE REPLACEMENT ON UPSTREAM CLEAR ROADWAY 26'-0" LANE LANE JUNE 2017 REMOVED BRIDGE TO BE EXISTING TRUSS RECONSTRUCTION LIMIT OF ROADWAY WOODS WOODS STRUCTURE CONCRETE CONCRETE RET. WALL #13 KV P.P. STONE WING WALL EDGE OF WATER STONE WING WALL EDGE OF WATER SLOT DRAIN L L A W G NI W E G DI R B ASPHALT ASPHALT DRAINAGE RIP RAP HEAD WALL CONC. POST POST W 5 P.P. STONE RET. WALL WOODS 8" CMP INV.=20.98 15" CMP SE.INV.=21.85 N.INV.=23.50 T.F.=24.60 C.B. =31.65 INV. =34.98 INV. SIGN CORTLANDT TOWN OF VAULT DRAINAGE LIMIT 30 VIL. SPEED 15 TONS & WEIGHT LIMIT STONE LINED DITCH PARKING NO SIGN STREET QUAKER BRIDGE ROAD EAST BRIDGE WING WALL TM 68.18-1-42 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 79.06-2-3 BK. PG. DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-1 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-4 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-3-10 BK. PG. CHAO DAI LOUIS V. PINKHAM AND LANDS N/F OF DRAFT LEGEND: ROADWAY AND/OR PATH CONSTRUCTION APPROXIMATE LIMIT OF ROADWAY FILL OR EXCAVATION FOR PREVIOUS STRUCTURE CONSTRUCTION APPROXIMATE LIMIT OF PREVIOUS FILL OR EXCAVATION FOR MISC. BASE OF FOUNDATION) AND/OR BACKFILL (LIMITS BASED ON A 1V:2H PROJECTION FROM THE APPROXIMATE LIMIT OF PREVIOUS DEEP ABUTMENT EXCAVATION 0 15 30 45 60' 15 1" = 30' PROJECT: DATE: 116-043 FIGURE: 1 USER = N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\graphics\116-043_cpb_shpo_pln_01.dgn 11/15/2017 mhunt FILE NAME = DATE/TIME = AREA OF POTENTIAL EFFECT MAP GRID NORTH CONSTRUCTION AREA OF POTENTIAL EFFECT FOR BRIDGE AND APPROACH ROADWAY CONSTRUCTION ON PREVIOUSLY UNDISTURBED SOIL AREA OF POTENTIAL EFFECT FOR BRIDGE AND APPROACH ROADWAY BRIDGE FLOW SHPO # 17PR02639 CROTON RIVER BRIDGE STUDY QUAKER BRIDGE ROAD BRIDGE OVER 11/2017 TM 68.18-1-42 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 79.06-2-3 BK. PG. DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-1 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-4 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-3-10 BK. PG. CHAO DAI LOUIS V. PINKHAM AND LANDS N/F OF TM 68.18-3-11 LIBER 11069, PAGE 103 MICHAEL I. WEINTRAUB CROTON TRUST AS TRUSTEES OF THE ANITA B. WEINTRAUB AND SANFORD WEINTRAUB LANDS N/F OF WOODS WOODS WOODS STRUCTURE CONCRETE CONCRETE RET. W CONCRETE RET. WALL #13 KV P.P. STONE WING WALL EDGE OF WATER STONE WING WALL EDGE OF WATER AREA RIP RAP ASPHALT ASPHALT DRAINAGE RIP RAP HEAD WALL CONC. POST POST W 5 P.P. STONE RET. WALL WOODS WOODS WOODS KEY PAD BOLLARDS CROTON RIVER 8" CMP INV.=35.96 15" CMP SE.INV.=36.82 N.INV.=38.47 T.F.=39.57 C.B. =46.62 INV. =49.95 INV. PARKING NO W/LIGHT P.P. PILLAR STONE 61.51 INV.= P.P. IRON GATE WROUGHT RAIL GUIDE WOOD BRIDGE ONE LANE SIGN CORTLANDT TOWN OF LIMIT 30 VIL. SPEED 15 TONS & WEIGHT LIMIT LIMIT 30 & SPEED NO PARKING STONE LINED DITCH PARKING NO SIGN STREET QUAKER BRIDGE ROAD EAST BRIDGE WING WALL ELEV.=55.80 IN HEAD WALL BOX CUT B.M. 12" CMP =43.13 INV. =43.20 INV. INV.=44.40 GRATE=45.80 SLOT DRAIN VAULT DRAINAGE 12" PVC 15" CMP 18" CMP =41.7 INV. HAER Level II Documentation Quaker Bridge Road Bridge Town of Cortlandt, Westchester County, New York. (BIN 3348560) NYS OPRHP 17PR02639 (HAA #5157-61) Sponsored by: Westchester County Department of Public Works and Transportation Prepared By: WALTER RICHARD WHEELER HARTGEN ARCHEOLOGICAL ASSOCIATES, INC. 1744 Washington Avenue Extension Rensselaer, New York 12144 PHONE (518) 283-0534 FAX (518) 283-6276 email: wwheeler@hartgen.com www.hartgen.com AN ACRA MEMBER FIRM www.acra-crm.org October 2017 Quaker Bridge Road Bridge HAER No. NY- Town of Cortlandt Westchester County New York OUTLINE FORM REPORT Historic American Engineering Record National Park Service Department of the Interior Washington, D. C. 20240 HISTORIC AMERICAN ENGINEERING RECORD QUAKER BRIDGE ROAD BRIDGE HAER No. NY- Location: The Quaker Bridge Road Bridge is located approximately 6,500 feet southwest of the Croton Dam, in the Town of Cortlandt, New York. The bridge carries Quaker Bridge Road over the Croton River. USGS Tarrytown, NY Quadrangle UTM Zone 18N 594802 Easting 4562908 Northing Owner: Westchester County, New York Significance: J. A. Bonafide of the NYSOPRHP wrote the following statement of significance in 1994: The Quaker Bridge Road Bridge (BIN 3348560) is architecturally significant as a rare and outstanding example of a late nineteenth century Pratt Truss bridge. Built by the New York City firm of Dean and Westbrook, the bridge retains an outstanding degree of integrity. The bridge is further distinguished as the earliest example of its type in the county. PART I. HISTORICAL INFORMATION A. Physical History: 1. Date of erection: The bridge was constructed in 1894. 2. Architect: Bridge designers and contractors Dean & Westbrook of New York city designed and built the bridge. QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 2) 3. Original and subsequent owners, occupants, uses: The bridge was initially owned by the Town of Croton; at an unknown date ownership was transferred to Westchester County. 4. Builder, Contractor, suppliers: Dean & Westbrook, with materials provided by the Phoenix Iron Works, in Phoenixville, PA. Some of the principal structural members of the bridge bear the embossed mark of that firm. 5. Original plans and construction: Unlocated. 6. Alterations and additions: The bridge was altered by the replacement of its original latticed guard rails in c. 1938. At that time the original wood decking, stringers and wheel guards were removed and replaced with new wood decking consisting of 4” x 10” creosoted planks, with ¼” spacing between. Over these ¼” thick rolled steep traffic treads were laid. Some of the lattice bars in the vertical columns, top chord and end post were replaced in-kind at that time. This scope of work is recorded in contract documents from the period; the annual report to the Board of Supervisors described a slightly different scope of work: This contract consisted of the removal of old steel bars, replacement of new bars, and the painting of the bridge. The award was made on August 29th, 1938, to the lowest bidder, Vitale, Gagliardi, Pisani and Company, from bids submitted August 24th, 1938, at the contract bid of $1,820.00 (Proceedings 1939: 650). The work was reported complete as of 19 December 1938, and, according to a “final estimate” had cost $1,784.25 (Proceedings 1939: 650). Repairs to the framing in the summer of 1951 are recorded in embossed dates on the flanges of principal members, some of which also record engineer’s initials. Despite this, in the summer of 1954 it was reported that the bridge was “soon to be replaced by a modern structure” (Hunt 1954: 88). This did not come to pass. The next recorded alterations and repairs to the bridge occurred c. 1977. In that year drawings were generated which detailed the replacement of the wood deck with new concrete-filled 3” steel grid decking, and the installation of corrugated bridge rails, with associated outriggers, stringers, and guide rail supports. This work was largely replaced in 1994, under the direction of Maser Sosinski & Associates, NYC, engineers, when new steel stringers, new outriggers, and new steel grid decking was installed. The corrugated beam type bridge railings installed in 1977 were reused in the new work. In 2009, the bridge was rehabilitated. Work undertaken at that time included painting, repairs to the wing walls and abutments, and some structural repairs and minor QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 3) replacements. This work was accomplished under the direction of Lockwood, Kessler & Bartlett, Inc., consulting engineers of Syosset, New York. B. Historical Context: The Quaker Bridge for which Quaker Bridge Road was named, and which was replaced by the current structure, was a covered bridge initially constructed in 1847. The early history of this span has been recorded in a recent publication by the Croton-on-Hudson Historical Society. In 1807, New York State created the Croton Turnpike Company, which called for the building of roads and bridges. By 1809, a new bridge carried Albany Post Road traffic across the Croton River. The bridge was later rebuilt in 1830 by local Quaker preacher William Purdy. He named the structure Quaker Bridge. The dam collapse of 1841 swept the bridge away, but it was replaced again in 1847 (Croton-on- Hudson Historical Society: 42). A brief biography of the firm that designed and built the bridge, Dean & Westbrook, was published in 1894, the same year the Quaker Bridge was built. This firm have [sic] become widely and justly celebrated for reliability and skill as bridge engineers and contractors. They established their business in 1871, and the reputation they enjoy has been secured upon the legitimate basis of superior workmanship and the substantial character of all construction. They are engineers, designers and contractors for both railroad, highway, iron and steel, and stone bridges, making a specialty of high-class work, and are recognized as authority upon all matters pertaining to bridge building. They built the first electric drawbridge in the United states [sic], at Bridgeport, Conn.; also one at Wilmington, Del.; a magnificent stone arch bridge at New Brunswick, N. J., across the Raritan River; over fifty bridges for Monmouth County. N. J., and thirty for Bergen County. N. J.; the Washington Bridge between Stratford and Milford, Conn., for the counties of New Haven and Fairfield, Connecticut; the Princess Louise Bridge at Winnipeg, Manitoba, the first iron bridge built in the Canadian Northwest; three other bridges at Winnipeg, and one at Emerson, Manitoba; a highway bridge at Harrisburg, Pa., over the Susquehanna River, seven-eighths of a mile long: a bridge for the Passaic Park Company at Passaic, N. J.; and one at Woonsocket. R. I.: while they have also designed and built several bridges for the Brazilian Government, and are now engaged in designing a number of important bridges for the Engineering Department of the State of New York, and their services are in constant and important requisition throughout the country. The firm are earnest and unremitting in their efforts to afford entire satisfaction to all their patrons, and are actuated in all their undertakings by a laudable spirit of enterprise and an ambition to excel. The co-partners. Messrs. C. W. Dean and J. A. Westbrook, are eminent in their QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 4) profession and thoroughly practical in all their methods. Mr. Dean is a native of Milan. O., a well-known resident of New York, and a member of the Ohio Society and Colonial Club. Mr. Westbrook is a Pennsylvanian by birth, a citizen of Englewood, N. J., and a director of the People's Bridge Company of Harrisburg, Pa (New York 1894: 140). Dean & Westbrook were responsible for the design of other Westchester County bridges, including a concrete span at Harrison in 1890, and Pines Bridge over the Croton Lake, in 1896 (Supervisor 1891; Proceedings 1897:498). The Phoenix Bridge Company, headquartered in New York City, has sometimes been attributed as the builders of the Quaker Bridge Road Bridge (Croton-on- Hudson Historical Society: 42). It may be that that firm, which appears to have had a close working relationship with Dean & Westbrook, undertook the actual assembly of the bridge on site. PART II. ARCHITECTURAL INFORMATION A. General statement: 1. Architectural Character: The Quaker Bridge Road Bridge is a Pratt through-truss type bridge constructed of cast and wrought iron elements. It is a representative example of what was once a large group of vehicular bridges constructed in the late 19th and early 20th century, but from which an ever-decreasing number of examples survive. 2. Condition of fabric: The bridge is in a fair state of repair. B. Description: 1. Superstructure: The superstructure of the bridge is comprised of two Pratt trusses consisting of seven truss panels, each 14’-0” in length, for an overall length of 98’-0”. The trusses are spaced 19’-2” apart, center-to-center. The deck width measures 16’-0” in width, and there is a posted vertical clearance of 11’-5”. The portals are 16’-0” high. 2. Abutments and wingwalls: The west (called north) abutment measures approximately 29’-6” in width. Wingwalls extend approximately 59 feet and 64 feet from either side this abutment. The east (called south) abutment measures 26’-3” in width; wingwalls measuring approximately 29’-6” and 36 feet extend from this abutment. The abutments consist of local granitic stone laid in mortar; the wingwalls are of the same material, dry laid. QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 5) 3. Plaques: Construction plaques remain in situ at both portals of the bridge. That on the south portal reads, from left to right: Committee: Jas. F. Lawrence, Wm. R. Torne, Chas. W. Underhill. Built on the site of the old “Quaker Bridge” by order of the Board of Supervisors of Westchester County. Built by Dean & Westbrook, Engineers & Contractors, New York. A date plaque, affixed to the east side of the south portal, bears the date 1894. The north portal plaques are of similar form, although the larger plaque lacks the decorative cresting which is retained at the south. The construction plaque and the date plaque bear the same information as recorded on those affixed to the south portal. C. Site: 1. Setting: The Quaker Bridge Road Bridge is in a rural setting, located within a shallow valley created by the Croton River. The adjacent areas are largely overgrown with second- growth trees and underbrush. A hiking trail is located to the north and west of the bridge site. PART III. SOURCES OF INFORMATION A. Architectural drawings: No drawings are known to survive for the initial construction of the bridge. Drawings dating from as early as 1930 and as recently as 2009 exist. These include as-built drawings by Lockwood, Kessler & Bartlett, Inc., of Syosset, New York, and are on file with the Westchester County Department of Public Works and Transportation. B. Early Views: Postcard views, reproduced here in the Supplemental Material section of this report, were generated at the turn of the 19th century. QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 6) C. Bibliography: Croton-on-Hudson Historical Society 2001 Croton-on-Hudson. Charleston, SC: Arcadia Publishing. Hunt, Elliot Baldwin 1954 “Quaker Bridge,” The Quarterly Bulletin [Westchester County Historical Society] 30: 3 (Summer 1954), 83-89. New York 1894 New York, 1894, Illustrated. New York: A. F. Parsons Publishing Co. Proceedings 1897 Proceedings of the Board of Supervisors of Westchester County, N. Y. Session of 1896. White Plains, NY: Press of The Westchester County Reporter. 1939 Proceedings of the Board of Supervisors of Westchester County, N. Y. Session of 1938. White Plains, NY: Artcraft Press. Supervisor 1891 “Supervisor’s and Town Officers’ Reports. Town of Harrison, 1890,” The Eastern State Journal (White Plains, NY), 4 April 1891, 1. D. Likely Sources Not Yet Investigated: None known. QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 7) E. Supplemental Material: Figure 1. The previous bridge on the site of the Quaker Bridge Road Bridge (Collection Westchester County Historical Society). QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 8) Figure 2. Postcard dating between 1901 and 1906, from a photograph by J. A. Given. Printed by the Albertype Company of Brooklyn, NY. QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 9) Figure 3. C. 1910 postcard view. QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 10) Figure 4. Postcard view dating to c. 1914, published by Frank L. Simone. QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 11) Figure 5. Postcard view, c. 1930. This view shows the original railings in place, and the original location of the date plaque, which was attached to the bottom of the portal lintel. QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 12) Figure 6. Elevation view, 1930 (Westchester County Department of Public Works and Transportation). QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 13) Figure 7. Plan and elevation of the bridge, as-builts, 2010 (Lockwood, Kessler & Bartlett, Inc., on file at Westchester County Department of Public Works and Transportation). QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 14) Figure 8. Plan and elevation of the bridge, as-builts, 2010 (Lockwood, Kessler & Bartlett, Inc., on file at Westchester County Department of Public Works and Transportation). QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 15) F. Location Map QUAKER BRIDGE ROAD BRIDGE HAER NY- (page 16) PART IV. PROJECT INFORMATION This report was assembled by Walter Richard Wheeler. Mr. Wheeler wrote all sections of the documentation. A site visit was undertaken on 18 July 2017 by Mr. Wheeler and Stephen Penson Ross, who executed the HAER photography. HISTORIC AMERICAN BUILDINGS SURVEY QUAKER BRIDGE ROAD BRIDGE HAER No. NY- INDEX TO PHOTOGRAPHS Photographer: Stephen Penson Ross 18 July 2017 1. Bridge approach, looking south 2. Bridge approach, looking north 3. South portal, looking northwest, with scale stick 4. South portal, looking southeast 5. East façade, looking north, with scale stick 6. Detail, showing screw pin shackles, cables, outriggers and guide rail supports, looking northwest 7. Undercarriage of bridge, deck, and north abutment, looking northwest 8. South abutment and west façade, looking east 9. North abutment, looking northeast 10. General view, looking southwest from Croton River bed Bridge approach, looking south Bridge approach, looking north South portal, looking northwest, with scale stick South portal, looking southeast East façade, looking north, with scale stick Detail, showing screw pin shackles, cables, outriggers and guide rail supports, looking northwest Undercarriage of bridge, deck, and north abutment, looking northwest South abutment and west façade, looking east North abutment, looking northeast General view, looking southwest from Croton River bed ANDREW M. CUOMO ROSE HARVEY Governor Commissioner January 9, 2018 Mr. Matt Hunt, P.E. Creighton Manning 2 Winners Circle Albany, NY 12205 Re: USACE Quaker Bridge Road Bridge Study Quaker Bridge Rd, Cortlandt, NY 17PR02639 Dear Mr. Hunt: Thank you for continuing to consult with the New York State Historic Preservation Office (SHPO). We have reviewed the provided documentation in accordance with Section 106 of the National Historic Preservation Act of 1966. These comments are those of the SHPO and relate only to Historic/Cultural resources. They do not include other environmental impacts to New York State Parkland that may be involved in or near your project. We have reviewed the revised APE map, the memorandum and alternatives analysis dated November 17th, 2017, and the HAER Level II documentation provided to our office on December 12th, 2017. We understand that demolition of the bridge is being proposed. As such, by definition under applicable state and federal historic preservation laws, demolition would be considered an Adverse Effect. Before our office can concur with the proposal it must be demonstrated that all reasonable alternatives to demolition have been considered. Based upon our review of the memorandum and alternatives analysis, it appears that all reasonable alternatives have not been satisfactorily explored. Specifically, we would request that the project team look at two additional alternatives: 1. Retrofitting the bridge to meet current performance standards while retaining some or all of the components of the historic truss. For example, retaining the truss but inserting a new bridge deck supported on new abutments. 2. An adaptive reuse alternative that would preserve the bridge for pedestrian use Once we have reviewed the additional alternatives analysis and can agree that demolition is the most reasonable approach, we would move to an Agreement that admits the Adverse Effect, identifies mitigation, and includes the signature of the involved parties. We note that the public must be involved in the consultation process, per 106 regulations, and also that at this point review of mitigation such as the submitted HAER documentation is premature. Please provide the additional analysis so that we can continue our review of the proposal and resolution of the project. We also note that for many 106 projects NYS DOT typically forwards a Finding Document to our office for review. Please provide this Finding Document, if available. We would appreciate if the requested information could be provided via our Cultural Resource Information System (CRIS) at www.nysparks.com/shpo/online-tools/ Once on the CRIS site, you Division for Historic Preservation P.O. Box 189, Waterford, New York 12188-0189 • (518) 237-8643 • www.nysparks.com can log in as a guest and choose "submit" at the very top menu. Next choose "submit new information for an existing project". You will need this project number and your e-mail address. If you have any questions, I can be reached at (518) 268-2182. Sincerely, Olivia Brazee Historic Site Restoration Coordinator olivia.brazee@parks.ny.gov via e-mail only ENGINEERS Creighton PLANNERS a Manning SURVEYORS June 1, 2018 Ms. Olivia Brazee New York State Parks, Recreation & Historic Preservation Peebles Island State Park, P.O. Box 189 Waterford, NY 12188-0189 RE: BIN 3348560 — Quaker Bridge Road Bridge over Croton River; Town of Cortlandt, Westchester County: 17PR02639 Dear Ms. Brazee, This letter is in response to the New York State Historic Preservation Office’s (SHPO) letter dated January 9, 2018 requesting additional alternatives be evaluated for the above referenced project. The alternatives SHPO requested to be evaluated included: 1 “Retrofitting the bridge to meet current performance standards while retaining some or all of the components of the historic truss. For example, retaining the truss but inserting a new bridge deck supported on new abutments.” 2. “An adaptive reuse alternative that would preserve the bridge for pedestrian use” After consideration of SHPO’s comments and further consultation with the Westchester County Department of Public Works (WCDPW), the alternatives under consideration for this project have been revised. The revised Scope Summary Memorandum dated June 1, 2018 (attached) includes a detailed evaluation of three (3) feasible alternatives under consideration: one (1) Rehabilitation Alternative, one (1) Replacement Alternative and one (1) Replacement and Rehabilitation Alternative. The Rehabilitation Alternative (Alternative 1 in the attached SSM) addresses the “retrofitting the bridge” evaluation required, and the Replacement and Rehabilitation Alternative (Alternative 7 in the attached SSM) addresses the “adaptive reuse alternative” evaluation request. We respectfully request your review of the attached information and provide SHPO’s opinion on the recommend alternative as identified in the Scope Summary Memorandum. If you have any questions, do not hesitate to reach out to me at ph: 518.689.1821 or ctutunjian@cmellp.com. Sincerely, Charles Tutunjian, PE Project Manager ce: Bud Nicoletti, WCDPW E. Rivas, WCDPW 2 Winners Circle Albany, NY 12205 518.446.0396 (p) 518.446.0397 (f) www.cmellp.com MEMORANDUM ENGINEERS PLANNERS SURVEYORS Date: June 1, 2018 To: Olivia Brazee New York State Parks, Recreation & Historic Preservation Office Peebles Island State Park, P.O. Box 189 Waterford, NY 12188-0189 From: Matt Hunt, P.E. Creighton Manning Engineering, LLP Project: Quaker Bridge Road over Croton River (BIN 3348560) Bridge Replacement Study Town of Cortlandt, Westchester County, NY Re: Scope Summary Memorandum 1. Introduction The Existing Quaker Road Bridge is in a deteriorated state and does not meet many of the modern day standards for roadway bridges. The project proposes to replace the existing bridge with a new structure that meets most current standards and eliminates all existing bridge deficiencies. The purpose of this memorandum is to describe the existing conditions, project objectives, and environmental review, as well as, to summarize the feasible alternatives and identify a preferred alternative for the above referenced project. The Quaker Bridge Road Bridge over the Croton River is located approximately 1.25 miles southwest of the Croton Dam at the border of the Town of Cortlandt and the Village of Croton on Hudson. The project area is primarily residential with significant elevation changes within a wooded setting. Quaker Bridge Road is a winding two-lane road that connects Rt. 129 to the west and Old Albany Post Road to the east of the bridge. The asphalt roadway width is approximately 26 ft north of the bridge and 20 ft south of the bridge. Originally built in 1894, the existing bridge is a 98 ft. single span steel through-truss structure on stone abutments founded on soil or bedrock. The existing structure is oriented perpendicular to the river and has Existing Bridge Elevation View Quaker Bridge Rd over Croton River Bridge Study June 1, 2018 Page 2 of 11 no skew. The clear bridge roadway width is 16’-5” and functions as a single-lane bridge. “One lane bridge” signs are present on all approaches to the bridge. 2. Conditions Westchester County conducted a bridge rehabilitation project in 2010 that provided various steel member retrofits in addition to providing a new paint system. Despite this recent rehabilitation, the Quaker Bridge Road Bridge is currently load posted for 15 tons. The NYSDOT has determined that the bridge should be posted for 12 tons, and there is an outstanding Yellow Flag for this inconsistent posting. The bridge has a long history of Yellow and Red Structural Flags with some of the most recent Yellow Flags being for the inconsistent load posting noted above, a cracked cover plate weld on a fracture critical floor beam 1, and a missing nut at the pin connection on the fracture critical lower chord. In addition to the Yellow Flags noted above, the bridge superstructure exhibits widespread deterioration. Various truss members have deterioration approaching 25% of the cross-sectional member area. In most locations on the bridge, previous corrosion was cleaned and painted over during the 2010 rehabilitation project. Additionally, both the left and right end chords are slightly twisted and bowed upward, indicating a past incident of being overstressed. The 2010 rehabilitation also retrofit the vertical members, which consisted of thin forged-eye tension rods, with steel cables looped around the top and bottom chords. This was necessary to keep the bridge open to traffic, as numerous tension members were cracked around the forge lines at the connection to the bottom chord. The failure of these types of members would result in complete failure of the bridge. The deck consists of open steel grating with concrete filled sections above the truss floor beams. The steel grating is in fair condition, but concrete infill present at the floorbeams is severely deteriorated and crumbled. The presence of the concrete has resulted in trapped water in those areas, leading to corrosion of the floor beams. While not yet deteriorated, the steel stringers spanning between floorbeams exhibit significant deflection under live loading. The bridge is posted for a vertical clearance of 11’-5”, which is significantly less than the standard of 14’-0” and restricts some vehicles from using the bridge. There is evidence of past impacts to the upper bracing members of the end portal. Both stone abutments are overall in good condition. No undermining or scour is present, but without original as-built plans, the NYSDOT flagged this structure as a potential scour critical bridge due to its unknown foundation type. The borings progressed for this study confirm that the abutments are not founded on bedrock and are therefore susceptible to failure due to scour. The approaches of the bridge are in poor condition. The east approach has up to 1.25” of differential settlement at the joint between the bridge deck and the pavement, and a slot drain located within the roadway at the west end of the bridge is clogged and not performing as originally intended. Approach guide rail consists of w-rail and is in fair condition with minor deformations due field bending of the rail and impact damage. Cracked cover plate weld Missing nut on bottom chord. Also shows retrofit attachment to floorbeams Truss diagonal bowed due to overstress (right of photo) Existing truss members retrofit with steel cables Quaker Bridge Rd over Croton River Bridge Study June 1, 2018 Page 3 of 11 3. Project Objective  Provide a structurally sufficient structure meeting current NYSDOT standards with a 75+ year design life. 4. Design Criteria The design criteria are based on the NYSDOT Highway Design Manual, Chapter 2 and the NYSDOT Bridge Design Manual, 2017. The project is being designed for an anticipated annual average daily traffic (AADT) of 800 vpd for the design year 2048, and an urban local road classification with a design speed of 30 mph. 4.1 Critical Design Elements Table 4.1-A - Critical Design Elements for Quaker Bridge Road over Croton River Route No. & Name: Quaker Bridge Road Project Type: Bridge Rehab/Replacement Roadway Classification: Urban Local ETC+30 AADT (2048): 800 Element Standard Existing Condition Alternative 2 1 Design Speed 30 mph – HDM 2.7.4.3 30 mph 30 mph 2 Lane Width 9 ft Min. - BM Table R and N, Appendix 2A 8.2 ft* 11 ft(1) Approach Lane Width 13 ft NW 9 ft SE 11 ft 3 Shoulder Width 3 ft Min. - BM Table R and N, Appendix 2A 0 ft* 1 ft (LT shldr.)* 5 ft (RT shldr.) Approach Shoulder Width 0 ft* 1 ft (LT shldr.)* 5 ft (RT shldr) 4 Horizontal Curvature 188 ft. - HDM Sect 2.7.4.3, Exhibit 2-8 58 ft.* 38 ft.* 5 Superelevation Rate 4% Max. – HDM Sect 2.7.4.3, Exhibit 2-8 None* None* 6 Stopping Site Distance 175 ft. – HDM Sect 2.7.4.3, Exhibit 2-8 78 ft* 63 ft* 7 Grade 15% Max – HDM Sect 2.7.4.3, Exhibit 2-8 10% 11.2% 8 Cross Slope 1.5% Min. - 3% Max. – HDM Sect 2.7.4.3, Exhibit 2-8 0.0% 2.0% 9 Vertical Clearance 14.5 ft. - BM Sect 2.4 12.4 ft.* Unlimited 10 Str Capacity HS-20 Live Load - BM Sect 2.5.2 12 Tons* HL-93 11 ADA Compliance HDM Chapter 18 N/A 5 ft shoulder(2) 12 Freeboard Q50 + 2 ft (BM 2.4.3) 9.2 ft 7.5 ft 13 Design Life N/A 75+ Years * Non-Standard Feature (1) 11’-0” lane widths are proposed at the request of Westchester County (2) 5 ft shoulder accommodates two-way pedestrian traffic Quaker Bridge Rd over Croton River Bridge Study June 1, 2018 Page 4 of 11 5. Feasible Alternatives 5.1 Preferred Alternative - Replacement on Existing Alignment with Road Closure (Alternative 2) This alternative will replace the existing bridge with a new 100 ft. single span on the existing alignment. The bridge roadway will consist of two 11 ft wide travel lanes, a 5 ft wide shoulder on the downstream side, and a 1 ft wide shoulder on the upstream side of the bridge. The 5 ft wide shoulder is proposed on the downstream side of the bridge to accommodate two-way pedestrian traffic in the vicinity of the Croton Gorge Trail. The rail-to-rail clear bridge roadway width is 28 ft (12.5 ft increase over existing) and the out to out bridge width is 31’-4”. See drawing ST2-1 in Appendix A. The proposed structure type will be evaluated and selected in a subsequent phase of this project, but superstructure options include either steel or prestressed concrete beams with a composite concrete deck. Factors to be considered in selecting the superstructure type include long-term maintenance, initial cost, and aesthetic treatment options. Superstructure types will also be contingent upon the feasibility of delivering superstructure components to the site. After evaluating the shipping route, it is anticipated that delivery of full length beams associated with this alternative is feasible from the north approach. See the visual simulations below and drawing ST2-2 in Appendix A for an elevation view of this alternative. Simulated new bridge with concrete barrier Simulated new bridge with steel bridge railing The substructures will consist of cast-in-place conventional cantilever concrete abutments supported by a footing founded on piles bearing on bedrock. Both of the proposed abutments will be located in approximately the same location as the existing abutments. The proposed bridge will be perpendicular to the stream with non-skewed substructures. Retaining walls in addition to abutment wingwalls will be required to retain the northeast and southeast approach roadways. The retaining wall along the northeast approach roadway will replace an existing laid up stone wall, while the wall along the southeast approach will accommodate a slight change in roadway geometry at the top of a very steep embankment slope (1.3H to 1.0V). The retaining wall type will be selected in a subsequent phase of this project, but wall options include precast fill type walls, Geosynthetically reinforced soil walls, or cast-in-place concrete cantilever walls. The proposed horizontal alignment of the new bridge and its approaches will closely match the existing roadway on the north side and will be modified on the south side. The north approach roadway alignment will consist of a compound curve with radii of 180 ft and 38 ft connecting into a tangent across the bridge. The tangent then connects to a curve on the south approach with a radius of 51 ft followed by another tangent section continuing along Quaker Bridge Road. Quaker Bridge Road East consists of a single tangent intersecting into the Quaker Bridge Road alignment. The modifications to the alignment on the south approach creates a through-movement pattern for Quaker Bridge Road. The proposed vertical alignment will consist of a 3.0% grade across the bridge that will tie into the south approach at the reconstruction limit and will tie into the reconstructed Quaker Bridge Road/Quaker Bridge Road East roadway. The proposed vertical profile will raise the south end of the bridge approximately 1 ft. The approaches will be reconstructed for Quaker Bridge Rd over Croton River Bridge Study June 1, 2018 Page 5 of 11 approximately 165 ft and 225 ft to the north and south of the bridge, respectively. See the alternative 2 plans in the Appendix. This alternative will have Right-of-Way (ROW) impacts due to the increased bridge roadway width, embankment construction, and close proximity of existing highway boundary to the existing structure. See the ROW section of this report for additional details. Overhead utilities are located within the project area, it is anticipated that these lines will need to be temporarily relocated to facilitate erection of the new beams and demolition of the existing bridge. The bridge will be closed during construction and traffic detoured via an offsite detour route. The full length detour from one side of the bridge to the other side will be 5.7 miles long and add approximately 11 minutes to travel times. The detour route will utilize Rt. 129, Rt. 9, and Old Albany Post Road. Construction is anticipated to last 8 months. This Alternative will meet most current NYSDOT geometric and structural standards while providing a 75+ year design life. It will; however, remove the historic eligible truss bridge from the site. This alternative is a feasible replacement solution while balancing total costs and impacts to adjacent properties. The total cost of Alternative 2 including design, ROW acquisition, construction, and construction inspection is approximately $7,100,000. 5.2 Dismissed Alternatives Several additional alternatives were evaluated with respect to bridge location, span length, feasible superstructure types, approach reconstruction work, impact to Right-of-Way, and constructability. These additional alternatives were provided in a previous submission and will not be included in this package. Two of the feasible alternatives considered are bridge rehabilitation and bridge replacement with adaptive reuse of the existing bridge. A summary of these feasible alternatives and the reasons for dismissal are as follows: Bridge Rehabilitation – Alternative 1 This alternative will rehabilitate and strengthen the existing bridge to remove the existing load posting and prolong its service life. Geometric improvements to the bridge roadway or the roadway approaches are not feasible with this alternative, as the location of the bridge will not change. The project will retain all of the non-standard features noted in the design criteria table with the exception of the load carrying capacity. The original truss was not designed to carry loads equivalent to modern vehicles, so based on an analysis completed by Creighton Manning, this bridge rehabilitation project will replace and/or strengthen 16 of the 28 members along with the associated pins and other connection elements on each truss (see member summary table in Appendix B). The floorbeams will also be replaced to both ensure adequate strength for the increased bridge load carrying capacity and to eliminate reoccurring yellow flags for cracking floorbeam cover plate welds. See drawing ST1-2 in Appendix A for a visual representation of the members to be replaced. The steel grating deck will be replaced with a cast-in-place concrete exodermic deck with new painted steel bridge railing. This type of deck incorporates steel stringers into the deck, thereby eliminating the need for separate stringers and provides a concrete surface to protect the steel floorbeams below. The bridge roadway width will be reduced by 5”± to 16’-0” to accommodate the new bridge railing and a decorative fencing that will mimic the original 1894 X-patterned railing. Concrete Exodermic Deck Quaker Bridge Rd over Croton River Bridge Study June 1, 2018 Page 6 of 11 The existing substructures will be retained and modified to accept the rehabilitated truss along with new elastomeric bearings. The existing concrete bridge seat will be removed and a new seat will be installed to accommodate taller replacement bearings. In addition to the new bridge seat, the laid-up stone joints in the abutment will be cleaned and repointed. The bridge approaches will be reconstructed in the vicinity of the bridge to ensure the roadway will exactly match the rehabilitated bridge. As previously noted, geometric improvements are not feasible, so the work will be limited to repaving to match the existing roadway widths along with minimal drainage improvements at the ends of the bridge to eliminate the existing trench drains extending across the both approach roadways. See drawing ST1-1 in Appendix A for reconstruction limits. All of the existing steel members will be sandblasted to bare metal and the entire bridge will be painted with a 3-coat paint system after it has been reassembled. This alternative will have temporary Right-of-Way (ROW) impacts to provide the contractor access for construction. It is likely that the entire bridge superstructure will be removed from its abutments and disassembled in order to make the necessary repairs and improvements. The rehabilitated truss will then be reinstalled, which will likely require relocation of the overhead utilities. The bridge will be closed during construction and traffic detoured via an offsite detour route. The full length detour from one side of the bridge to the other side will be 5.7 miles long and add approximately 11 minutes to travel times. The detour route will utilize Rt. 129, Rt. 9, and Old Albany Post Road. Construction is anticipated to last 8-12 months. This Alternative will not improve the geometric characteristics of the bridge and its approaches. It will, however, upgrade the structure to accept HS-20 loading standards and provide an estimated 20-year extension of the bridge service life before additional repairs are required. This alternative is feasible insomuch as it will maintain connectivity between the Village of Croton and Town of Cortlandt. The total cost of Alternative 1 including design, temporary ROW acquisition, construction, and construction inspection is approximately $6,700,000. Reason for Dismissal The design and construction cost of this rehabilitation alternative is estimated to be 94% of the preferred alternative, which is an initial savings of approximately $400,000. While the rehabilitated structure will be able to carry standard highway loading, the non-standard bridge roadway width and vertical clearance will be retained. The bridge service life is also anticipated to be only 20 years (55 years less than the preferred alternative). For these reasons, alternative 1 has been dismissed. New Bridge on Adjacent Alignment and Adaptive Reuse of Existing Bridge for Pedestrians – Alternative 7 This alternative will retain the existing bridge and construct a new bridge on an adjacent parallel alignment upstream from the existing bridge. A new 115 ft. single span structure will provide two 11 ft wide travel lanes, and 3 ft wide shoulders on the each side of the bridge for a clear bridge roadway width of 28 ft (12.5 ft increase over existing). The structure and scope of work for the new bridge will essentially be the same as described in Alternative 3 of the draft scope summary memorandum (SSM) dated November 17, 2017 except the existing bridge will be closed during construction so it can be rehabilitated for use as a pedestrian bridge. The face of the new substructures will utilize a custom formliner and staining to mimic the existing stone abutments, which will also remain in place. Quaker Bridge Rd over Croton River Bridge Study June 1, 2018 Page 7 of 11 In addition to constructing a new bridge, the existing bridge will be rehabilitated to adapt its use to a pedestrian bridge to accommodate users of the nearby Croton Gorge Trail. Pedestrian design criteria requires at least an 8 ft bridge path width and an 8 ft vertical clearance must be provided. The existing bridge deck geometry of 15.5 ft wide by 11.4 ft vertical clearance meets this design criteria, but the load carrying capacity is not sufficient for the standard 80 pounds per square foot live load. The existing bridge will therefore need to be rehabilitated to increase its strength to ensure the ongoing safety of its users. The scope of the bridge rehabilitation portion of this alternative will be the same as described in Alternative 1 in this memorandum. However, the approaches to the rehabilitated existing bridge will be reconfigured to be a 10 ft wide connection to the Croton Gorge Trail on the north end and a 15.5 ft wide connection to Quaker Bridge Rd on the south end. The north end will be entirely shielded from vehicular traffic by new box beam guiderail, while removable bollards will be installed on the south end. Asphalt outside of the new multi- use path will be removed and the areas will be topsoiled and seeded. The total cost of Alternative 7 including design, ROW acquisition, construction, and construction inspection is approximately $11,600,000. Reason for Dismissal This alternative meets the project objective for providing a new vehicular bridge meeting all current structural standards. However, compared to the preferred alternative, this alternative has more significant permanent ROW acquisitions and environmental impacts, a 63% higher ($4.5M) total project cost, and the possible feasible superstructure types are more limited due to the increased span length. Additionally, this alternative will retain the existing structure, which is anticipated to require costly maintenance and/or replacement within 20 years. For these reasons, Alternative 7 has been dismissed from further consideration. 6. Geotechnical Three soil borings were progressed at the project site; two on the Cortlandt end and one on the Croton end. On the Cortlandt side, the soil consists primarily of very compact gravelly sand with a trace amount of silt. Bedrock was encountered at a depth of 54 feet below the roadway surface. Soil characteristics were similar on the Croton end with the soil consisting of gravelly sand with trace silt to a depth of approximately 10 feet below the roadway surface. A gravelly sand mixture with possible weathered rock fragments exists from a depth of 10 ft to 26 ft, where a silver-black-brown-grey schist was encountered. 7. Hydraulics The hydraulic model was developed using the as-built record plans, inspection reports for the existing bridge (BIN 3348560), NYS stream stats, USGS gauge stations, and FEMA maps. The Croton River is a relatively straight flowing river with several manmade features built within the river channel including the Black Rock Dam located approximately 650 ft upstream of the Quaker Bridge Road Bridge. The most notable manmade feature affecting stream flow data is the Croton Dam. The hydraulic model determines the water surface elevations for the 50- and 100-yr storm events as required per NYSDOT Bridge Manual 2.4.3. Flow data for the 50- and 100-yr storm events came from NYS Stream Stats and are 10,800 cf and 12,800 cf respectively. As part of testing and calibrating the model to ensure accuracy, flow data for the Hurricane Irene storm event measured by an upstream USGS gauging station was entered in the model. The Irene storm event produced a flow of 22,600 cf, and the hydraulic model was adjusted to reflect water surface elevations similar to documented observations. Quaker Bridge Rd over Croton River Bridge Study June 1, 2018 Page 8 of 11 The hydraulic analysis for the existing Quaker Bridge Road Bridge over the Croton River indicates water surface elevations at the structure inlet of 31.7 ft and 33.0 ft for the 50- and 100-yr storms respectively. With the low chord at elevation 40.9 ft for the existing structure, there is 9.2 ft and 7.9 ft of freeboard provided for each respective storm event. Summary of Existing Hydraulics Drainage Area = 377 square miles Design Flood Base Flood Recurrence Interval (years) 50 100 Peak Discharge (ft3/s) 10,800 12,800 WSE at Structure Inlet (ft) 31.7 33.0 Freeboard Provided (ft) 9.2 7.9 Average Velocity thru Structure (ft/s) 13.8 14.6 Creighton Manning performed a hydraulic analysis for a conventional concrete abutment and beam type structure. The low chord for the proposed structure is set at 39.2 ft. Based on the analysis, the water surface elevations for the conventional structure did not change from the existing. Freeboard provided by the conventional structure is at 7.5 ft and 6.2 ft respectively for the 50- and 100-yr storm event. See table below for a summary of the hydraulic information. Summary of Proposed Alternative 2 Hydraulics Drainage Area = 377 square miles Design Flood Base Flood Recurrence Interval (years) 50 100 Peak Discharge (ft3/s) 10,800 12,800 WSE at Structure Inlet (ft) 31.7 33.0 Freeboard Provided (ft) 7.5 6.2 Average Velocity thru Structure (ft/s) 13.8 14.6 8. Utilities Overhead utilities are located within the project area along the upstream side of the existing bridge. Utility lines are approximately 35 ft to 45 ft away from the upstream fascia. The utilities consist of electric and telephone/cable lines owned by Con Edison and Verizon respectively. It is anticipated that these lines will need to be temporarily relocated to facilitate erection of the new beams and removal of the existing bridge. Quaker Bridge Rd over Croton River Bridge Study June 1, 2018 Page 9 of 11 9. Right of Way Right-of-way acquisitions are required for Alternatives 2. There are four properties owned by the Village of Croton on Hudson surrounding the highway boundary on the north end of the bridge. In the northeast quadrant, there is a private property owned by Louis Pinkham and Chao Dai, and in the southeast quadrant, there is a parcel of land owned by NYSDEC. The anticipated acquisitions for the preferred alternative are as follows: Table 9.1-A - Summary of ROW Acquisitions Tax Map # Property Owner Alternative 2 68.18-1-42 & 79.06-1-2 Village of Croton On Hudson 2500 SF FEE Taking 68.18-2-4 Village of Croton On Hudson 400 SF FEE Taking 68.18-2-1 Village of Croton On Hudson 2000 SF FEE Taking 68.18-3-10 Louis V. Pinkham & Chao Dai 3100 SF Temporary Easement 10. Work Zone Traffic Control The bridge will be closed during construction and traffic detoured via an offsite detour route. The full length detour from one side of the bridge to the other side will be 5.7 miles long and add approximately 11 minutes to travel times. The detour route will utilize Rt. 129, Rt. 9, and Old Albany Post Road. As an alternative to detouring traffic, the use of a temporary bridge to maintain traffic onsite was investigated. However, this option is estimated to cost $1.3 million more than the detour option and would result in additional right-of-way easements and environmental impacts due to the construction of temporary abutments and roads. For the reasons of cost, ROW, and environmental impacts, this option for traffic management during construction has been dismissed. 11. Environmental 11.1 SEQR Westchester County is the SEQR lead agency. In accordance with 6 NYCRR, Part 617, “Procedures for Implementation of State Environmental Quality Review Act”, the project is a SEQR Type II Action, therefore no further SEQR processing is required. 11.2 SHPO A consultation with the New York State Historic Preservation Office has been initiated for the Quaker Bridge Road Bridge Study. The initial screening on the NYSHPO website did not identify any other cultural resources located within or immediately adjacent to the project site other than the bridge itself, which is eligible for National Register listing. Hartgen Archeological Associates, Inc. has completed a Historic American Engineering Record (HAER) Level II Documentation package. An effect determination has not been made by SHPO at this time regarding the preferred alternative. Quaker Bridge Rd over Croton River Bridge Study June 1, 2018 Page 10 of 11 11.3 Environmental Screenings An environmental screening of the project area was performed and it has been determined that the proposed construction will not have an impact nor adverse affect on any of the following:  Floodplains (Flood elevations remain the same);  Prime or unique agricultural land;  Agricultural districts, when more than one acre may be affected;  Water resources, including lakes, reservoirs, rivers and streams;  Water supply sources;  Designated wild, scenic and recreational rivers;  Unique ecological, natural wooded or scenic areas;  Rare, threatened or endangered species;  Any area designated as a critical environmental area pursuant to 6 NYCRR, Part 617 11.3.1 Wetlands An initial review on the NYSDEC Environmental Resource Mapper, accessed on August 15, 2017, indicates there are no NYSDEC regulated freshwater wetlands within the project area. It is anticipated that no impacts to wetlands will occur as a result of this project. 11.3.2 Surface Waterbodies and Watercourses The Croton River is classified by the NYSDEC as a class B stream through the project site. The best usage for Class “B” water is for swimming and other contact recreational uses, but not for drinking water. This construction project will require substructure work that will occur in the stream. Stream work, as well as any work that may result in suspension of sediment, can be accomplished any time of the year with no seasonal restriction dates. 11.3.3 Endangered and Threatened Species The USFWS IPAC system, accessed August 16, 2017, indicates one endangered and one threatened species within the project area. The endangered species include the Indiana Bat and the threatened species is the Northern Long-eared Bat. Since this project will likely require a federal permit from the US Army Corp of Engineers, the regulations enforced by the USFWS to protect endangered and threatened species are mandatory to follow. The Indiana Bat is known to occur at elevations below 900’ NGVD within 10 to 40 miles away from the nearest hibernaculum. Their roosting habitat is in trees greater than 4” in diameter. The project site has an approximate elevation of 45’ NGVD and is located approximately 20 miles from the nearest hibernaculum located at Williams Lake Roost Site. The Northern Long-Eared Bat whose range encompasses all of New York State, is proposed for inclusion on the USFWS Endangered Species List. To ensure that this project will not adversely impact the Indiana or Northern Long-eared bat populations, tree removals shall occur between October 1 and March 31. 11.4 Anticipated Environmental Permits The proposed project will require a New York Department of Environmental Conversation (NYSDEC) permits for stream disturbance and 401 water quality certification. In addition, a Temporary Revocable Permit from NYSDEC will be required for temporary access to NYSDEC land during construction. It is anticipated that project will proceed under the U.S. Army Corps of Engineers (ACOE) Nationwide Permit #3. Quaker Bridge Rd over Croton River Bridge Study June 1, 2018 Page 11 of 11 12. Project Schedule Project Schedule Milestone Date Stakeholder Meeting July 2018 Address Stakeholder Comments August 2018 Final Report September 2018                 Appendix A  Feasible Alternatives Preliminary Plans  Feasible Alternatives Estimate                  GRID NORTH 98'-0" SPAN TRUSS OF c TRUSS OF c OUT-TO-OUT 19'-2" DECK CLEAR ROADWAY 16'-0" ST1-1 1 STA. 2+95.70 BRGS. c STA. 1+97.70 BRGS. c STA. 2+97.20 END BRIDGE STA. 1+96.20 BEGIN BRIDGE 1+63.93 PCC 1+95.55 PT 2+00 1+00 4+00 3+52.17 PT 3+03.32 PC 3+00 CURVE #3 CURVE #2 CURVE #1 R emax FT./ FT.DN RT L T = = = = = Dc = CURVE 1 = STA. = STA. PC 0+6.29 1+63.93 180.00' 137.64 72.38' PT R emax FT./ FT.DN RT L T = = = = = Dc = CURVE 2 = STA. = STA. PC 1+63.93 1+95.55 35.00' 31.61' 16.98' PT R emax FT./ FT.DN RT L T = = = = = Dc = CURVE 3 = STA. = STA. PC 3+03.32 3+52.17 40.00' 48.85' 27.99' PT EXODERMIC DECK PROPOSED NEW STA. LINE, AND H.C.L. , c, PROPOSED QUAKER BRIDGE ROAD ELECTRIC LINES EXISTING OVERHEAD TO RTE 129 ROAD QUAKER BRIDGE TRAVEL 9'-0" LANE SHLDR. 2'-0" TRAVEL 9'-0" LANE SHLDR. 2'-0" STA. LINE, AND H.C.L. , c, PROPOSED QUAKER BRIDGE ROAD EAST PROPOSED CONCRETE GUTTER PROPOSED DRAINAGE STRUCTURE (TYP.) ROAD TO QUAKER BRIDGE TRAVEL 9'-0" LANE TRAVEL 9'-0" LANE SHLDR. 2'-0" VARIES SHLDR. POST ROAD TO ALBANY ROAD EAST QUAKER BRIDGE 1+00 1+12 1+11.55 PI 1+11.55 POE 0+00.00 PI 0+00 STA. 0+75.00 STA. 3+98.00 RECONSTRUCTION END FULL DEPTH 0 10 10 20 30 40' 1" = 20' STA. 0+98.00 RECONSTRUCTION BEGIN FULL DEPTH GENERAL PLAN ALT 1 - TRUSS REHABILITATION WOODS WOODS STRUCTURE CONCRETE CONCRETE RET. WALL #13 KV P.P. STONE WING WALL EDGE OF WATER STONE WING WALL EDGE OF WATER L L A W G NI W E G DI R B ASPHALT ASPHALT DRAINAGE RIP RAP HEAD WALL CONC. POST POST W 5 P.P. WOODS 8" CMP INV.=35.96 15" CMP SE.INV.=36.82 N.INV.=38.47 T.F.=39.57 C.B. =46.62 INV. =49.95 INV. SIGN CORTLANDT TOWN OF LIMIT 30 VIL. SPEED 15 TONS & WEIGHT LIMIT LIMIT 30 & SPEED NO PARKING STONE LINED DITCH PARKING NO SIGN STREET BRIDGE WING WALL ELEV.=55.80 IN HEAD WALL BOX CUT B.M. =43.13 INV. =43.20 INV. INV.=44.40 GRATE=45.80 SLOT DRAIN VAULT DRAINAGE 12" PVC 15" CMP 18" CMP =41.7 INV. TM 68.18-1-42 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 79.06-2-3 BK. PG. DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-1 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-4 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-3-10 BK. PG. CHAO DAI LOUIS V. PINKHAM AND LANDS N/F OF N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_01a.dgn 6/1/2018 MMorrissey APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS BEGIN FULL DEPTH RECONSTRUCTION 25 30 30 30 30 30 30 30 30 30 30 30 35 35 35 35 35 35 35 35 35 35 35 35 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 45 45 45 45 45 45 45 45 45 50 50 50 50 50 50 50 50 55 55 55 55 55 55 60 60 60 60 60 65 65 65 65 65 U1 U2 73 U4 U5 U6 L0 L1 L2 L3 L4 L5 L6 L7 TRUSS ELEVATION ST1-2 STRENGTHENED/REPLACED (TYP.) END VERTICALS TO BE STRENGTHENED/REPLACED (TYP.) DIAGONALS TO BE STRENGTHEN TOP CHORD (TYP.) COVER PLATE ADDED TO STRENGTHENED/REPLACED (TYP.) FLOOR BEAMS TO BE TO BE STRENGTHEND/REPLACED (TYP.) STRINGERS AND DECK SYTSTEM D.H.W. ELEV. 31.7 STONES TO BE REPOINTED (TYP.) JOINTS BETWEEN ABUTMENT (TYP.) DIAGONALS TO REMAIN ENTIRE SUPERSTRUCTURE CLEAN AND PAINT (TYP.) VERTICALS TO REMAIN ORIGINAL RAILING FENCING TO REPLICATE NEW DECORATIVE BRIDGE RAILING 3-RAIL PAINTED (TYP.) BRIDGE SEAT NEW CONCRETE BACKWALL (TYP.) NEW CONCRETE (TYP.) NEW BEARING CHORD CONNECTION PINS REPLACE TOP AND BOTTOM ELEVATION ALT 1 - TRUSS REHABILITATION N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\figures\116-043_fig_lft_trs_qbr.dgn 6/1/2018 MMorrissey APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS NOT TO SCALE PROPOSED BRIDGE SECTION NOTES: 1. ALL STEEL TO BE SAND BLASTED AND PAINTED. NOT TO SCALE EXISTING BRIDGE SECTION u u 19'-2" GRID FLOORING EXISTING STEEL BRIDGE RAILING CORRUGATED BEAM EXISTING CLEAR BRIDGE WIDTH u 16'-5" u MINIMUM VERTICAL CLEARANCE u 12'-5" u u 19'-2" u MINIMUM VERTICAL CLEARANCE u 12'-6" DECK BRIDGE AND c NEW DECK BRIDGE AND c 16'-0" CLEAR BRIDGE WIDTH NORTH TRUSS c SOUTH TRUSS c NORTH TRUSS c SOUTH TRUSS c STRINGERS INTEGRAL DECK WITH NEW EXODERMIC RAILING TYP.) NEW 3-RAIL BRIDGE ST1-3 ## CHORD (TYP.) EXISTING TOP PORTAL BRACE EXISTING MEMBER VERTICAL EXISTING MEMBER DIAGONAL EXISTING STRINGERS EXISTING FLOORBEAM EXISTING TOP CHORD TO REMAIN EXISTING PORTAL AND ENTIRE SUPERSTRUCTURE CLEAN AND PAINT (TYP.) ALONG TOP CHORD TOP COVER PLATE PROPOSED ADDITIONAL (SEE DWG. ST1A-2) MEMBERS TO REMAIN AND VERTICAL EXISTING DIAGONAL (TYP.) PINS CONNECTION NEW FLOORBEAM NEW PAINTED ORIGINAL RAIL (TYP.) FENCING TO REPLICATE NEW DECORATIVE SECTIONS ALT 1 - TRUSS REHABILITATION (SEE DWG. ST1A-2) VERTICAL MEMBER DIAGONAL OR NEW PAINTED N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\175971_cpb_typ_02.dgn 6/1/2018 MMorrissey APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS WOODS WOODS STRUCTURE CONCRETE CONCRETE RET. WALL #13 KV P.P. EDGE OF WATER EDGE OF WATER EDGE OF WATER ASPHALT ASPHALT DRAINAGE RIP RAP W 5 P.P. WOODS SE.INV.=36.82 N.INV.=38.47 T.F.=39.57 C.B. STONE LINED DITCH ELEV.=55.80 IN HEAD WALL BOX CUT B.M. M 2+00 M 3+00 M 4+00 M 5+00 M 2+54.22 PCC M 2+90.59 PT M 3+91.07 PC M 4+53.35 PT S 1+00 S 2+00 S 2+20 S 2+20 S 1+00.00 POB S 2+20.34 POE N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_gen_01.dgn 6/1/2018 MMorrissey APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS 25 25 30 30 30 30 30 30 30 30 30 30 30 35 35 35 35 35 35 35 35 35 35 35 35 35 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 45 45 45 45 45 45 45 45 45 45 50 50 50 50 50 50 50 50 55 55 55 55 55 55 55 60 60 60 60 60 60 65 65 65 65 65 70 TM 68.18-1-42 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 79.06-2-3 BK. PG. DEPARTMENT OF CONSERVATION STATE OF NEW YORK LANDS N/F OF TM 79.06-1-2 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-1 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-2-4 BK. PG. VILLAGE OF CROTON ON HUDSON LANDS N/F OF TM 68.18-3-10 BK. PG. CHAO DAI LOUIS V. PINKHAM AND LANDS N/F OF M 1+26.29 PC 35 40 50 W 57 13 KV P.P. DITCH M 5+42 M 5+42 M 5+41.86 POE 35 40 45 50 55 60 65 70 75 80 100'-0" SPAN TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" 5'-0" SHLDR. 1'-0" SHLDR. OUT TO OUT 31'-4" CLEAR WIDTH 28'-0" TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" 5'-0" SHLDR. SHLDR. 1'-0" TO RTE 129 POST ROAD TO ALBANY ROAD EAST QUAKER BRIDGE CURVE #2 CURVE #3 ROAD QUAKER BRIDGE STA. M 2+04.50 BRGS. c STA M 2+92.25 BEGIN BRIDGE STA. 3+96.75 END BRIDGE GRID NORTH CURVE #1 R L T = = = = Dc = = STA. = STA. R L T = = = = Dc = = STA. = STA. CONCRETE WINGWALL (TYP.) PROPOSED CAST-IN-PLACE 1'-0" SHLDR. 1'-0" SHLDR. , STA. LINE, AND H.C.L. c PROPOSED QUAKER BRIDGE ROAD WALL (TYP.) PROPOSED RETAINING , STA. LINE, AND H.C.L. c BRIDGE ROAD EAST PROPOSED QUAKER TO BE REMOVED EXISTING SUPERSTRUCTURE AZ 41°9'46" AZ 41°9'46" CROTON RIVER BRIDGE ROAD TO QUAKER END SECTION (TYP.) GALVANIZED STRUCTURE (TYP.) PROPOSED DRAINAGE CULVERT PIPE (TYP.) PROPOSED CROSS RECONSTRUCTION BEGIN FULL DEPTH STA. S 1+10.00 RECONSTRUCTION BEGIN FULL DEPTH STA. M 1+26.00 ROAD EAST QUAKER BRIDGE R L T = = = = Dc = CURVE 1 = STA. = STA. PC PCC 40°43'16.22" 180.00' 127.92 66.80' CURVE 2 PCC PT 38.00' 150°46'42.12" 36.37' 19.72 54°50'38.67" CURVE 3 PT 27.42' M 1+26.9 M 2+54.22 M 2+54.22 M 2+90.59 CURVE #3 PC M 3+91.07 M 4+53.35 51.00' 62.28' 0 10 20 30 40' 10 1" = 20' LANE TRAVEL VARIES LANE TRAVEL VARIES STA. 3+94.50 BRGS. c STA. M 5+42.00 RECONSTRUCTION END FULL DEPTH GUTTER CONCRETE PROPOSED ASPHALT CURB PROPOSED 58'29.36'' n AZ 238 ST2-1 1 ALT 2 - PROPOSED PLAN N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_elv_01.dgn 6/1/2018 MMorrissey APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS DATUM EL. 10.00 100'-0" SPAN STA. M 2+94.50 BRGS. c STA. M 3+94.50 BRGS. c ORIGINAL GROUND ABUTMENT (TYP.) CONCRETE CANTILEVER PROPOSED CAST-IN-PLACE WINGWALL (TYP.) PROPOSED CONCRETE M 4+22.53 & S 2+20.34 EQUALITY STATION RAILING (FOUR-RAIL) PROPOSED STEEL BRIDGE TRANSITION RAIL (TYP.) PROPOSED BRIDGE RECONSTRUCTION BEGIN FULL DEPTH STA. M 1+26.00 (TYP.) BEAM GUIDERAIL PROPOSED BOX GRADE PROPOSED (STEEL BEAMS SHOWN) TYPE TO BE EVALUATED PROPOSED SUPERSTRUCTURE DHW EL. 31.7 0 10 20 30 40' 10 1" = 20' HYDRAULIC DATA EXIST PROP. 100 YR FLOOD DESIGN FLOOD BASE RECURRENCY INTERVAL @ PT. OF MAX BACKWATER HIGH WATER ELEVATION PEAK DISCHARGE cfs 2 50 YR 10,800 12,800 31.7 33.0 33.0 31.7 DRAINAGE AREA = 337 mi FREEBOARD 9.2' @ DESIGN FLOOD = 13.8 ft/s AVG. VELOCITY THRU STRUCTURE ST2-2 2 ALT 2 -PROPOSED ELEVATION ELEVATION SHLDR. 5'-0" WEARING SURFACE WITH INTEGRAL SUPERSTRUCTURE SLAB 2.0% 2.0% T.G.L. (TYP.) RAILING (FOUR-RAIL) PROPOSED STEEL BRIDGE TYPICAL BRIDGE SECTION SHLDR. 1'-0" TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" SHLDR. 5'-0" SCALE: 1/8" = 1'-0" 28'-0" APPROACH SLAB 2.0% 2.0% T.G.L. (TYP.) TRANSITION RAIL PROPOSED BRIDGE GROUND ORIGINAL (TYPE 2 FRICTION) WEARING SURFACE SLAB WITH INTEGRAL 1'-0" CONCRETE APPROACH TYPE II 12" SUBBASE COURSE SCALE: 1/8" = 1'-0" TYPICAL BRIDGE APPROACH SECTION SHLDR. 2'-3" SHLDR. 5'-0" SHLDR. 2'-3" BREAK BREAK SHLDR. 1'-0" 2.0% T.G.L. 2.0% 6.0% 6.0% TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. c PROPOSED (TYP.) BEAM GUIDERAIL PROPOSED BOX 31'-4" OUT-TO-OUT TYPE II 12" SUBBASE COURSE 80 SERIES COMPACTION 1•" 9.5 F3 TOP COURSE HMA, 80 SERIES COMPACTION 2•" 19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION 5" 37.5 F9 BASE COURSE HMA, (TYP.) TURF (ROADSIDE) 4" TOPSOIL & ESTABLISH GROUND ORIGINAL SCALE: 1/8" = 1'-0" TYPICAL HIGHWAY SECTION SHLDR. 1'-0" SHLDR. 2'-3" BREAK VARIES SHLDR. TRAVEL LANE 11'-0" 6.0% 2.0% T.G.L. 2.0% 6.0% SHLDR. 1'-0" (TYP.) WINGWALL CONCRETE PROPOSED SCALE: 1/8" = 1'-0" 2 1 TURF (ROADSIDE) 4" TOPSOIL & ESTABLISH GROUND ORIGINAL TO REMAIN RETAINING WALL EXISTING CONCRETE 80 SERIES COMPACTION 1•" 9.5 F3 TOP COURSE HMA, 80 SERIES COMPACTION 2•" 19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION 5" 37.5 F9 BASE COURSE HMA, TYPE II COURSE 12" SUBBASE TYPICAL HIGHWAY SECTION TRAVEL LANE 11'-0" TRAVEL LANE 11'-0" QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. c PROPOSED QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. c PROPOSED TRAVEL LANE 11'-0" QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. c PROPOSED TYPE TO BE EVALUATED PROPOSED SUPERSTRUCTURE (TYP.) BEAM GUIDERAIL PROPOSED BOX RETAINING WALL 5'-0" STA. M 1+26.00 TO STA. M 1+80.00 STA. M 1+80.00 TO STA. M 2+77.00 T.G.L. 80 SERIES COMPACTION 1•" 9.5 F3 TOP COURSE HMA, 80 SERIES COMPACTION 2•" 19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION 5" 37.5 F9 BASE COURSE HMA, 2.0% 6.0% BREAK SHLDR. 2'-3" SHLDR. 1'-0" (TYP.) TURF (ROADSIDE) 4" TOPSOIL & ESTABLISH 2.0% QUAKER BRIDGE ROAD , STA. LINE, & H.C.L. c PROPOSED SHLDR. 2'-3" BREAK 6.0% (TYP.) BEAM GUIDERAIL PROPOSED BOX SHLDR. 1'-0" TRAVEL LANE VARIES TRAVEL LANE VARIES TYPE II COURSE 12" SUBBASE 2 1 SCALE: 1/8" = 1'-0" TYPICAL HIGHWAY SECTION STA. M 4+40.00 TO STA. M 5+42.00 2.0% ST2-3 3 ALT 2 - TYPICAL SECTIONS - 01 N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_typ_01.dgn 6/1/2018 MMorrissey APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS 0 20 40 60 80' HORIZONTAL SCALE 0 10 20' VERTICAL SCALE THEORETICAL GRADE LINE (T.G.L.) LEVEL -4.00% -6.00% -2.00% +2.00% +4.00% +6.00% LT. E.O.P. (e=-2.00%) LEVEL -4.00% -6.00% -2.00% +2.00% +4.00% +6.00% BANKING DIAGRAM RT. E.O.P. (e=-2.00%) ST2-4 5 ALT 2 - PROFILE 15 20 25 30 35 40 45 50 55 60 65 65 15 20 25 30 35 40 45 50 55 60 65 65 M 1+00 M 1+00 M 2+00 M 3+00 M 4+00 M 5+00 M 6+00 41.05 40.97 42.39 43.89 45.39 46.89 50.44 56.05 PVI M 1+26.00 PVC M 1+53.06 ELEV 40.99 LOW M 1+77.07 ELEV 40.75 PVI M 1+83.06 ELEV 40.39 L = 60.00' G1 = -2.00% G2 = 3.00% E= 0.37' HSD = 108' PVT M 2+13.06 ELEV 41.29 PVC M 4+00.00 ELEV 46.89 PVI M 4+25.00 ELEV 47.64 L = 50.00' G1 = 3.00% G2 = 11.21% E= 0.51' HSD = 63' PVT M 4+50.00 ELEV 50.44 -2.00% 3.00% 11.21% PROPOSED GRADE ORGINAL GROUND QUAKER BRIDGE ROAD 42.07 41.03 55.75 51.21 41.30 40.43 STATION EQUALITY STA. M 4+22.53 & S 2+20.34 ELEV. 47.98 ELEV 41.53 BEGIN FULL DEPTH RECONSTRUCTION PVI M 5+42.00 ELEV 60.74 RECONSTRUCTION END FULL DEPTH N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_pro_01.dgn 6/1/2018 MMorrissey APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS 0 20 40 60 80' HORIZONTAL SCALE 0 10 20' VERTICAL SCALE THEORETICAL GRADE LINE (T.G.L.) LEVEL -4.00% -6.00% -2.00% +2.00% +4.00% +6.00% LT. E.O.P. (e=-2.00%) LEVEL -4.00% -6.00% -2.00% +2.00% +4.00% +6.00% RT. E.O.P. (e=-2.00%) BANKING DIAGRAM - QUAKER ROAD EAST ST2-5 6 ALT 2 - PROFILE N:\Projects\2016\116-043 Quaker Bridge\cadd\dgn\116-043_cpb_pro_02.dgn 6/1/2018 MMorrissey APPLICABLE STATE AND / OR LOCAL LAW S TO THIS DOCUMENT IS A VIOLATION OF UNAUTHORIZED ALTERATION OR ADDITION BY DATE REVISION NO. SHEET NUMBER 6 XXX mm/dd/yy Description 1 DESIGNED: CM No.: CHECKED: DATE: SCALE: AS NOTED of FILE = USER = DATE = CREIGHTON MANNING ENGINEERING, LLP 2 W INNERS CIRCLE - ALBANY - NEW YORK - 12205 P: (518) 446-0396 F: (518) 446-0397 W W W .CMELLP.COM SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, 116-043 DRAW N BY: W HITE PLAINS, NEW YORK 10601 148 MARTINE AVENUE, OF PUBLIC W ORKS W ESTCHESTER COUNTY DEPARTMENT W ESTCHESTER COUNTY, NEW YORK TOW N OF CORTLANDT, BRIDGE REPLACEMENT STUDY OVER CROTON RIVER (BIN 3348560) QUAKER BRIDGE ROAD BRIDGE AUGUST 2017 MJH AJB KHD CONSTRUCTION NOT FOR PRINT PROGRESS 35 40 45 50 55 60 65 65 35 40 45 50 55 60 65 65 S 1+00 S 1+00 S 2+00 S 3+00 58.15 53.33 49.51 58.15 PVC S 1+52.69 ELEV 53.07 PVI S 1+72.69 ELEV 51.15 L = 40.00' G1 = -9.64% G2 = -6.00% E= 0.18' HSD = 144' PVT S 1+92.69 ELEV 49.95 -9.64% -6.00% -8.43% ORGINAL GROUND PROPOSED GRADE QUAKER BRIDGE ROAD EAST 53.48 49.61 STATION EQUALITY STA. M 4+22.53 & S 2+20.34 ELEV. 47.98 ELEV 57.22 BEGIN FULL DEPTH RECONSTRUCTION STA S 1+10.00 Description Unit Quantity Unit Price Total Cost CLEARING AND GRUBBING LS 1 $50,000.00 $50,000.00 REMOVING EXISTING SUPERSTRUCTURES LS 1 $400,000.00 $400,000.00 REINSTALLATION OF REHABILITATED SUPERSTRUCTURE LS 1 $400,000.00 $400,000.00 SUBBASE COURSE, TYPE 2 CY 1000 $100.00 $100,000.00 9.5 F3 TOP COURSE HMA, 80 SERIES COMPACTION TON 40 $250.00 $10,000.00 19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION TON 50 $250.00 $12,500.00 37.5 F9 BASE COURSE HMA, 80 SERIES COMPACTION TON 108 $250.00 $27,000.00 SUPERSTRUCTURE SLAB WITH INTEGRAL WEARING SURFACE - BOTT SY 213 $300.00 $63,900.00 EXODERMIC BRIDGE DECK PANELS SY 213 $450.00 $95,850.00 CLEAN AND REPOINT RUBBLE STONE MASONRY SY 94 $500.00 $47,000.00 STRUCTURAL STEEL, TYPE 1 LS 1 $30,000.00 $30,000.00 STRUCTURAL STEEL REPLACEMENT LB 4100 $15.00 $61,500.00 STRUCTURAL STEEL REPLACEMENT LB 2100 $15.00 $31,500.00 STRUCTURAL STEEL REPLACEMENT LB 1400 $15.00 $21,000.00 STRUCTURAL STEEL REPLACEMENT LB 7000 $15.00 $105,000.00 STRUCTURAL STEEL REPLACEMENT LB 11000 $15.00 $165,000.00 STRUCTURAL STEEL REPLACEMENT - MISCELLANEOUS LB 15000 $15.00 $225,000.00 CLASS A CONTAINMENT FOR PAINT REMOVAL LS 1 $100,000.00 $100,000.00 DISPOSAL OF NON-HAZARDOUS INDUSTRIAL SOLID PAINT WASTE LB 57750 $1.00 $57,750.00 STRUCTURAL STEEL PAINTING FIELD APPLIED, TOTAL REMOVAL LS 1 $750,000.00 $750,000.00 REMOVAL OF RIVETS - REPLACEMENT WITH HIGH STRENGTH BOLTS EACH 1900 $110.00 $209,000.00 BOX BEAM GUIDE RAILING LF 202 $50.00 $10,100.00 REMOVAL OF EXISTING STEEL LB 4300 $20.00 $86,000.00 REMOVAL OF EXISTING STEEL LB 2200 $20.00 $44,000.00 REMOVAL OF EXISTING STEEL LB 1400 $20.00 $28,000.00 REMOVAL OF EXISTING STEEL LB 7300 $20.00 $146,000.00 REMOVAL OF EXISTING STEEL LB 8300 $20.00 $166,000.00 STEEL BRIDGE RAILING (THREE RAIL) LF 204 $175.00 $35,700.00 DECORATIVE RAILING LF 204 $150.00 $30,600.00 BASIC WORK ZONE TRAFFIC CONTROL LS 1 $340,000.00 $340,000.00 SURVEY OPERATIONS LS 1 $80,000.00 $80,000.00 Construction Cost $3,929,000 Wetland Mitigation $0 Incidentals (25%) $983,000 Subtotal 1 $4,912,000 Field Change Order (5%) $246,000 Subtotal 2 $5,158,000 Mobilization (4%) $207,000 Subtotal 3 $5,365,000 Design $750,000 Construction Inspection $500,000 ROW Costs $80,000 Total Cost $6,700,000 Quaker Bridge over Croton River CME#: 116-043 Preliminary Rehabilitation Estimate Jun-18 Bridge Rehabilitation - Offsite Detour Alternative (Alt 1) N:\Projects\2016\116-043 Quaker Bridge\comps\estimate\Prelim_Est 1A - Rehab - Offsite Detour_AB 6/1/2018 Item No. Description Unit Quantity Unit Price Total Cost 201.06 CLEARING AND GRUBBING LS 1 $50,000.00 $50,000.00 202.120001 REMOVING EXISTING SUPERSTRUCTURES LS 1 $400,000.00 $400,000.00 202.19 REMOVAL OF SUBSTRUCTURES CY 278 $500.00 $139,000.00 203.02 UNCLASSIFIED EXCAVATION AND DISPOSAL CY 670 $75.00 $50,250.00 203.03 EMBANKMENT IN PLACE CY 429 $50.00 $21,450.00 203.21 SELECT STRUCTURE FILL CY 289 $115.00 $33,235.00 206.01 STRUCTURE EXCAVATION CY 1865 $75.00 $139,875.00 209.1801 ROLLED EROSION CONTROL PRODUCT, CLASS I TYPE A, SHORT TERM SY 56 $10.00 $560.00 304.12 SUBBASE COURSE, TYPE 2 CY 452 $100.00 $45,200.00 402.128903 12.5 F9 TOP COURSE HMA, SHOULDER COURSE,80 SERIES COMPACTION TON 95 $250.00 $23,750.00 402.198903 19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION TON 164 $250.00 $41,000.00 402.378903 37.5 F9 BASE COURSE HMA, 80 SERIES COMPACTION TON 338 $250.00 $84,500.00 552.2101 ROCK SOCKETS FOR SOLDIER PILE AND LAGGING WALL LF 259 $2,250.00 $582,750.00 552.2201 SOLDIER PILES FOR SOLDIER PILE AND LAGGING WALL LF 689 $325.00 $223,925.00 552.230301 PRECAST CONCRETE PANEL LAGGING FOR SOLDIER PILE AND LAGGING W SF 5418 $75.00 $406,350.00 555.08 FOOTING CONCRETE, CLASS HP CY 151 $800.00 $120,800.00 555.09 CONCRETE FOR STRUCTURES, CLASS HP CY 249 $1,600.00 $398,400.00 556.03 STUD SHEAR CONNECTORS FOR BRIDGES EACH 2583 $5.00 $12,915.00 557.0102 SUPERSTRUCTURE SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM F SY 364 $425.00 $154,700.00 557.2002 STRUCTURAL APPROACH SLAB WITH INTEGRAL WEARING SURFACE - TYP SY 63 $325.00 $20,475.00 558.02 LONGITUDINAL SAWCUT GROOVING OF STRUCTURAL SLAB SURFACE SY 388 $15.00 $5,820.00 564.0501 STRUCTURAL STEEL, TYPE 1 LS 1 $590,000.00 $590,000.00 564.20010008 HOT-DIP GALVANIZING OF STRUCTURAL STEEL LB 116020 $1.00 $116,020.00 565.2022 TYPE E.B. FIXED BEARING (56 TO 111 KIPS) EACH 4 $5,000.00 $20,000.00 565.2032 TYPE E.B EXPANSION BEARING (56 TO 111 KIPS) EACH 4 $5,000.00 $20,000.00 568.51 STEEL BRIDGE RAILING (FOUR RAIL) LF 212 $250.00 $53,000.00 568.70 TRANSITION BRIDGE RAILING LF 128 $175.00 $22,400.00 603.171316 GALVANIZED STEEL END SECTIONS-PIPE (2-2/3" X 1/2" CORRUGATIONS) 21 EACH 3 $500.00 $1,500.00 603.9815 SMOOTH INTERIOR CORRUGATED POLYETHYLENE CULVERT AND STORM LF 130 $60.00 $7,800.00 604.300611 RECTANGULAR DRAINAGE STRUCTURE TYPE F FOR #11 WELDED FRAME LF 20 $1,500.00 $30,000.00 606.10 BOX BEAM GUIDE RAILING LF 342 $40.00 $13,680.00 606.120101 BOX BEAM END PIECE EACH 1 $600.00 $600.00 619.01 BASIC WORK ZONE TRAFFIC CONTROL LS 1 $200,000.00 $200,000.00 620.05 STONE FILLING (HEAVY) CY 311 $120.00 $37,320.00 625.01 SURVEY OPERATIONS LS 1 $40,000.00 $40,000.00 637.12----25 ENGINEER'S FIELD OFFICE - TYPE 2 MNTH 9 $5,000.00 $45,000.00 637.34 OFFICE TECHNOLOGY AND SUPPLIES DC 10000 $1.00 $10,000.00 Construction Cost $4,163,000 Wetland Mitigation $0 Incidentals (25%) $1,041,000 Subtotal 1 $5,204,000 Field Change Order $261,000 Subtotal 2 $5,465,000 Mobilization (4%) $219,000 Subtotal 3 $5,684,000 Design $750,000 Construction Inspection $500,000 ROW Costs $100,000 Total Cost $7,100,000 Jun-18 QUAKER BRIDGE ROAD OVER CROTON RIVER CME#: 116-043 Preliminary Engineer's Estimate - Alternative 2 Replacement on existing alignment with detour N:\Projects\2016\116-043 Quaker Bridge\comps\estimate\Prelim_Est2A - Replace on Existing - Offsite Detour 6/1/2018 Item No. Description Unit Quantity Unit Price Total Cost 201.06 CLEARING AND GRUBBING LS 1 $50,000.00 $50,000.00 202.120001 TEMPORARY BRIDGE SUPPORT SYSTEM LS 1 $500,000.00 $500,000.00 203.02 UNCLASSIFIED EXCAVATION AND DISPOSAL CY 670 $75.00 $50,250.00 203.03 EMBANKMENT IN PLACE CY 429 $50.00 $21,450.00 203.21 SELECT STRUCTURE FILL CY 289 $115.00 $33,235.00 206.01 STRUCTURE EXCAVATION CY 1865 $75.00 $139,875.00 209.1801 ROLLED EROSION CONTROL PRODUCT, CLASS I TYPE A, SHORT TERM SY 56 $10.00 $560.00 304.12 SUBBASE COURSE, TYPE 2 CY 452 $100.00 $45,200.00 402.128903 12.5 F9 TOP COURSE HMA, SHOULDER COURSE,80 SERIES COMPACTION TON 95 $250.00 $23,750.00 402.198903 19 F9 BINDER COURSE HMA, 80 SERIES COMPACTION TON 164 $250.00 $41,000.00 402.378903 37.5 F9 BASE COURSE HMA, 80 SERIES COMPACTION TON 338 $250.00 $84,500.00 551.99420017 MICROPILES (CONTRACTOR DESIGNED) - WITH EXTENDED LENGTHS - DESIGN LOAD LESS THAN 100 TONS EACH 60 $10,000.00 $600,000.00 551.99450017 PERMANENT CASING FOR MICROPILES LF 400 $200.00 $80,000.00 552.2101 ROCK SOCKETS FOR SOLDIER PILE AND LAGGING WALL LF 259 $2,250.00 $582,750.00 552.2201 SOLDIER PILES FOR SOLDIER PILE AND LAGGING WALL LF 689 $325.00 $223,925.00 552.230301 PRECAST CONCRETE PANEL LAGGING FOR SOLDIER PILE AND LAGGING WALL SF 5418 $75.00 $406,350.00 555.08 FOOTING CONCRETE, CLASS HP CY 151 $1,500.00 $226,500.00 555.09 CONCRETE FOR STRUCTURES, CLASS HP CY 249 $2,200.00 $547,800.00 556.03 STUD SHEAR CONNECTORS FOR BRIDGES EACH 2583 $10.00 $25,830.00 557.0101 SUPERSTRUCTURE SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM FORMWORK REQUIRED - TYPE 1 FRICTIO SY 190 $550.00 $104,500.00 557.0102 SUPERSTRUCTURE SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM FORMWORK REQUIRED - TYPE 2 FRICTIO SY 401 $425.00 $170,425.00 557.2002 STRUCTURAL APPROACH SLAB WITH INTEGRAL WEARING SURFACE - TYP E 2 FRICTION SY 63 $375.00 $23,625.00 558.02 LONGITUDINAL SAWCUT GROOVING OF STRUCTURAL SLAB SURFACE SY 577 $20.00 $11,540.00 560.10010007 CLEAN AND REPOINT RUBBLE STONE MASONRY SY 105 $650.00 $68,250.00 564.0501 STRUCTURAL STEEL, TYPE 1 LS 1 $850,000.00 $850,000.00 564.0502 STRUCTURAL STEEL, TYPE 2 LS 1 $87,000.00 $87,000.00 564.700001 STRUCTURAL STEEL REPLACEMENT EACH 1 $15,000.00 $15,000.00 564.700002 STRUCTURAL STEEL REPLACEMENT EACH 2 $50,000.00 $100,000.00 564.700003 STRUCTURAL STEEL REPLACEMENT EACH 1 $15,000.00 $15,000.00 564.700004 STRUCTURAL STEEL REPLACEMENT EACH 1 $75,000.00 $75,000.00 564.700005 STRUCTURAL STEEL REPLACEMENT EACH 4 $50,000.00 $200,000.00 564.700006 STRUCTURAL STEEL REPLACEMENT EACH 7 $15,000.00 $105,000.00 564.700007 STRUCTURAL STEEL REPLACEMENT EACH 2 $30,000.00 $60,000.00 573.010001 STRUCTURAL STEEL PAINTING FIELD APPLIED, TOTAL REMOVAL LS 1 $500,000.00 $500,000.00 565.2021 TYPE E.B. FIXED BEARING (0 TO 55 KIPS) EACH 2 $5,000.00 $10,000.00 565.2031 TYPE E.B EXPANSION BEARING (0 TO 55 KIPS) EACH 2 $5,000.00 $10,000.00 565.2022 TYPE E.B. FIXED BEARING (56 TO 111 KIPS) EACH 4 $2,500.00 $10,000.00 565.2032 TYPE E.B EXPANSION BEARING (56 TO 111 KIPS) EACH 4 $2,500.00 $10,000.00 568.10010011 BIKEWAY WALKWAY FENCE LF 200 $300.00 $60,000.00 568.51 STEEL BRIDGE RAILING (FOUR RAIL) LF 212 $250.00 $53,000.00 568.70 TRANSITION BRIDGE RAILING LF 128 $175.00 $22,400.00 585.01 STRUCTURAL LIFTING OPERATIONS - TYPE A EACH 4 $15,000.00 $60,000.00 585.02 STRUCTURAL LIFTING OPERATIONS - TYPE B EACH 2 $15,000.00 $30,000.00 585.03 STRUCTURAL LIFTING OPERATIONS - TYPE C EACH 1 $15,000.00 $15,000.00 603.171316 GALVANIZED STEEL END SECTIONS-PIPE (2-2/3" X 1/2" CORRUGATIONS) 21 INCH DIAMETER, 16 GAUGE EACH 3 $500.00 $1,500.00 603.9815 SMOOTH INTERIOR CORRUGATED POLYETHYLENE CULVERT AND STORM DRAIN 15 INCH DIAMETER LF 130 $60.00 $7,800.00 604.300611 RECTANGULAR DRAINAGE STRUCTURE TYPE F FOR #11 WELDED FRAME LF 20 $1,500.00 $30,000.00 606.10 BOX BEAM GUIDE RAILING LF 342 $40.00 $13,680.00 606.120101 BOX BEAM END PIECE EACH 1 $600.00 $600.00 607.45120011 ORNAMENTAL STEEL MESH FENCE 4 FT HIGH LF 180 $250.00 $45,000.00 608.71145108 BOLLARD-FIXED SURFACE MOUNTED, WITHOUT LIGHTING, WIDTH OVER 7 TO 9 INCHES, HEIGHT 30 TO 36 INCHES EACH 4 $2,000.00 $8,000.00 619.01 BASIC WORK ZONE TRAFFIC CONTROL LS 1 $500,000.00 $500,000.00 620.05 STONE FILLING (HEAVY) CY 311 $120.00 $37,320.00 625.01 SURVEY OPERATIONS LS 1 $40,000.00 $40,000.00 637.12----25 ENGINEER'S FIELD OFFICE - TYPE 2 MNTH 9 $5,000.00 $45,000.00 637.34 OFFICE TECHNOLOGY AND SUPPLIES DC 10000 $1.00 $10,000.00 Construction Cost $7,088,000 Wetland Mitigation $0 Incidentals (25%) $1,772,000 Subtotal 1 $8,860,000 Field Change Order $443,000 Subtotal 2 $9,303,000 Mobilization (4%) $373,000 Subtotal 3 $9,676,000 Design $1,000,000 Construction Inspection $800,000 ROW Costs $100,000 Total Cost $11,600,000 Jun-18 QUAKER BRIDGE ROAD OVER CROTON RIVER CME#: 116-043 Preliminary Engineer's Estimate - Alternative 7 Replacement on adjacent alignment adaptive use of existing N:\Projects\2016\116-043 Quaker Bridge\comps\estimate\Prelim_Est7 - Replace on Adjacent Adaptive Use Existing 6/1/2018 Appendix B Load Rating Summary Table Quaker Bridge Load Rating Summary Truss Members (Rehabilitated With New Exodermic Deck) All Spans Tension (k) Compression (k) Tension (k) Compression (k) L0‐U1 206.2 ‐ 206.66 ‐ 193.74 FAIL U1‐U2 230.1 ‐ 223.47 ‐ 195.62 PASS U2‐U3 230.1 ‐ 265.15 ‐ 234.45 FAIL U3‐U4 230.1 ‐ 266.84 ‐ 234.52 FAIL U4‐U5 230.1 ‐ 264.80 ‐ 234.10 FAIL U5‐U6 230.1 ‐ 222.70 ‐ 194.84 PASS U6‐U7 206.2 ‐ 205.66 ‐ 192.74 PASS L0‐L1 107.3 136.08 ‐ 117.32 ‐ FAIL L1‐L2 107.3 136.08 ‐ 117.32 ‐ FAIL L2‐L3 136.5 223.47 ‐ 195.62 ‐ FAIL L3‐L4 156.0 259.67 ‐ 222.83 ‐ FAIL L4‐L5 136.5 222.70 ‐ 194.84 ‐ FAIL L5‐L6 107.3 135.42 ‐ 116.66 ‐ FAIL L6‐L7 107.3 135.42 ‐ 116.66 ‐ FAIL L1‐U1 52.0 76.64 ‐ 82.00 ‐ FAIL L2‐U2 93.6 ‐ 82.49 ‐ 69.29 PASS L3‐U3 93.6 ‐ 44.49 ‐ 33.33 PASS L4‐U4 93.6 ‐ 45.30 ‐ 34.14 PASS L5‐U5 93.6 ‐ 82.98 ‐ 69.78 PASS L6‐U6 52.0 76.02 ‐ 81.38 ‐ FAIL U1‐L2 107.3 157.53 ‐ 140.62 ‐ PASS U2‐L3 107.3 107.22 ‐ 89.68 ‐ PASS U3‐L4 39.8 56.72 ‐ 42.04 ‐ FAIL U4‐L5 19.9 5.69 ‐ 3.58 ‐ PASS L2‐U3 19.9 5.84 ‐ 3.73 ‐ PASS L3‐U4 39.8 57.79 ‐ 43.10 ‐ FAIL L4‐U5 107.3 107.87 ‐ 90.33 ‐ FAIL L5‐U6 107.3 157.36 ‐ 140.44 ‐ FAIL Quaker Bridge Load Rating Summary Stringers & Floorbeams (Rehabilitated w/New Exodermic Deck) All Spans Flexure   (k‐ ft) Shear (k) LL Flexure (k‐ ft) Shear (k) LL Flexure (k‐ ft) Shear (k) Stringers ‐ 2 & 5 93.84 46.15 44.11 15.25 31.15 15.51 PASS Floorbeam ‐ 1 431.60 78.42 483.52 95.26 438.97 86.55 FAIL Notes: 1. Analysis assumes all deficent members of the truss has been repaired to full capacity. 2. Analysis assumes no section loss to members 3. No slack eye bar in analysis 4. Analysis assumes all floorbeams are similar 5. All ratings are based off of inventory ratings PASS/FAIL Member Capacity Axle Loading Lane Loading Verticals Diagonals Top Chord Member  Capacity (k) Member Bottom Chord Applied Load ‐ Axle Loading Applied Load ‐ Lane Loading Division for Historic Preservation P.O. Box 189, Waterford, New York 12188-0189 • (518) 237-8643 • www.nysparks.com ANDREW M. CUOMO ROSE HARVEY Governor Commissioner June 19, 2018 Mr. Matt Hunt, P.E. Creighton Manning 2 Winners Circle Albany, NY 12205 Re: USACE Quaker Bridge Road Bridge Study Quaker Bridge Rd, Cortlandt, NY 17PR02639 Dear Mr. Hunt: Thank you for continuing to consult with the New York State Historic Preservation Office (SHPO). We have reviewed the provided documentation in accordance with Section 106 of the National Historic Preservation Act of 1966. These comments are those of the SHPO and relate only to Historic/Cultural resources. They do not include other environmental impacts to New York State Parkland that may be involved in or near your project. We have reviewed the additional Alternatives Analysis information that was provided to our office on June 1st, 2018. Based upon our review, we concur with the determination that the existing bridge must be replaced for long-term safety, performance, and cost reasons. The removal and replacement will have an Adverse Effect on the historic bridge, and therefore, at this time we suggest drafting a Memorandum of Agreement to memorialize the Adverse Effect and stipulate appropriate mitigation measures. Remember that the Advisory Council on Historic Preservation and Tribal Historic Preservation Officers must be consulted on the adverse effect and proposed mitigation under Section 106. We would appreciate if the requested information could be provided via our Cultural Resource Information System (CRIS) at www.nysparks.com/shpo/online-tools/ Once on the CRIS site, you can log in as a guest and choose "submit" at the very top menu. Next choose "submit new information for an existing project". You will need this project number and your e-mail address. If you have any questions, I can be reached at (518) 268-2182. Sincerely, Olivia Brazee Historic Site Restoration Coordinator olivia.brazee@parks.ny.gov via e-mail only

Machine-extracted for search and reference — the original file is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.