croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Saturday, August 15, 2026· Aug 15, 2026
Source-linkedCorrections welcomed
Documents

Croton Auto Mall Site Plan 6-21-24

site plan 1 page
Meeting: portal event 981 (no meeting page on file)
Agenda item: Public Hearing — Public hearing on the special permit application for the installation of an integrated energy system at Croton Auto Park, 1 Municipal Place.
Site plan, 1 page. Attached to agenda item: “Public Hearing — Public hearing on the special permit application for the installation of an integrated energy system at Croton Auto Park, 1 Municipal Place.”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: 06-23-2024-13551-Croton Auto Mall Electrical Set 1 Municipal Place Croton Auto Park -survey August 21st Resolution 168-2024 Schedule Public... Auto Park Solar Special Permit Application CRO 24-005 Croton Auto Park Battery Energy Storage... Cover Letter for Croton Board of Trustees Cover letter for Croton Board of Trustees meeting 8.21.24 Crton Auto Mall Site Power Plan rev 8-16-24 LOA from Lou Giordano Memo from PB to VB Power Point Presentation September 11th Resolution 174-2024 1 Municipal Pl...
0.00 AC. 0 SQ. FT. 106.0 M 1215.0404 2539.3696 1231.5613 2531.1352 1470.6342 2216.1682 1464.9973 2480.9974 1277.5109 2470.5989 1368.2007 2351.1194 1424.1159 2277.4539 1445.6039 2527.0832 1422.6315 2507.5518 1415.0740 2478.2285 1435.1183 2440.9069 1354.7143 2108.5096 1354.3264 2124.2589 LOT 24 LOT LO N 38° 19' 00" E 148.24' S 88° 35' 20" E 15.75' 854.7084 2382.0316 N 38° 19' 00" E 148.24' S 52° 27' 50" W 113.67' S 28° 11' 10" W 233.02' Survey N 28° 11' 10" E 276.41' S 41° 43' 14" E 45.36' S 57° 10' 00" W 36.33' 25.30' 76.94' 25.00' [229.51' Deed] S 52° 48' 00" E 395.44' N 85° 59' 14" W 234.30' N 27° 51' 14" W 192.60' N 41° 43' 14" W 341.79' R=89.06' L=90.40' =58° 09' 53" S 88° 35' 20" E 15.75' N 38° 19' 00" E 148.24' S 26° 29' 34" E 1024.9942 2292.0453 1199.0340 2136.8695 1218.7284 2167.3902 1165.1773 2167.0565 1408.8119 2297.6162 BL-Crosscut GDR walk EOP OH8 EOP walk GDR anchor-ab anchor-ab GW GW GDR PT EL walk EOP L ST walk l DC DC walk l ST EOP L EL anchor-ab GW GDR ST PC GDR walk EOP EOP walk GDR GW GW W O S D Y H L ST L RECT-1.2 TCB GDR PT EL walk EOP GW walk PT walk walk EL EOP PC DC DC EOP EOP DC DC EOP PT EL walk ST PC JPN3070 walk walk walk PT EL W O S W O S GW GW cnc ST cnc RECT4 Dr ST Dr Dr Dr Dr Dr Dr Dr Dr Dr WSF 6in pvc cleanot-pipe WSF WSF EL WSF ST WSF Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr EL Dr ST JPN3110 DR Dr Dr cnc cnc RECT6.5 drain-str Dr Dr Dr Dr Dr Dr Dr PC Dr Dr Dr PT Dr GDR ag-pole GDR Dr PC Dr Dr PT EL Dr ST Gas Gas 8in HP Gas EL Gas ST Gas GDR Dr Dr Gas EL Dr GDR Dr Gas Gas Gas Gas-METER Dr PC Dr Dr PT Dr Dr Dr PC L L RECT-4 CONC PAD Dr Dr PT Dr Dr Dr Dr EC L ST L RECT2.5 Sigm-base EC cnc ST cnc RECT3 con-pad cnc ST cnc RECT-5 Dr PC Dr Dr Dr PT Dr Dr W O S Dr PC Dr Dr Dr PT GDR ST Dr GDR EL Dr3211 Dr PC Dr Dr PT EL eor ST eor eor eor eor eor eor eor L ST L RECT2 TCB loose GW GW EOP ST dr ST PC GDR GDR GDR PC EOP SMO EOP GDR L sign 3258 L RECT-.5 GDR ST GDR EL Dr Dr PT Dr PC Dr Dr PT Dr Dr Dr Dr Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge EL L ST parking L L PC L L PT L L PC L L PT L PT CLO L island L1 L1 RECT-.5 sign L L L L L CLO OSW EL BL-Crosscut Corn-Stucco-oh Corn-Stucco-oh PC Corn-Stucco-oh PC bld ST Corn-Stucco-oh Pt BLD BLD metal facade BLD Pier CIR Pier Pier CIR Pier CIR Pier Pier CIR BLD PC BLD BLD PT BLD BLD PC BLD Pier CIR Pier Pier CIR Pier CIR Pier Pier CIR Pier CIR Pier Pier CIR BLD1 ST BLD1 EL BLD1 ST BLD1 BLD1 pc BLD1 BLD1 PT BLD1 BLD1 BLD1 BLD1 L L RECT-.5 sign Pin insight BL-Crosscut Mag-Nail-Tie L ST sign L RECT-1 L post L RECT-1.5 BLD ST BLD BLD BLD BLD EL Pier Pier Pier RECT Pier Pier Pier RECT Pier Pier Pier RECT Corn-Stucco elev elev elev elev elev elev Corn-Conc-apron elev elev elev cnc cnc RECT-8 L CIR L L CIR elev elev BL-Crosscut Corn-Conc-Blk int Corn-Conc-Blk Corn-Shed-roof cnc ST cnc cnc Corn-Conc-Blk BL-Crosscut BL-Crosscut BLD ST BLD BLD BL-Crosscut 3500 GAS GAS GAS GAS GAS GAS METAL EDGE ASP PARKING AREA CONCRETE APRON COVERED ROOF Metal Storage Container (Moveable) L E D G E R O C K NO PHYSICAL BOUNDS CONCRETE APRON SIGN HIGH ONE STORY STUCCO AND CONCRETE BLOCK BUILDING Roof Line Pier LIGHT POLE DRAIN DRAIN LIGHT LIGHT DRAIN WIRE DROP CURB TRAFFIC POLE CROSSWALK POLE GUY GUY WIRE OVERHEAD SERVICE WIRES METAL GUARD RAIL METAL GUARD RAIL METAL GUARD RAIL T T T ASPHALT PARKING AREA CONCRETE APRON Roof Line Pier Conc.Base PIN FOUND ASPHALT PARKING AREA ASPHALT PARKING AREA GRAVEL AREA DRAIN DRAIN CONCRETE APRON Garage Bay Garage Bay Garage Bays Garage Bay Garage Bays ONE STORY CONCRETE PAD DRAIN INLET SIGN Island Grass REMAINS OF STOCKADE FENCE UTILITY POLE WITH LIGHTS UTILITY POLE WITH LIGHTS UTILITY POLE WITH LIGHTS Pier Pier SIGN SIGN FLAG POLE COVER METAL TRAFFIC SIGN COVER METAL CONC PAD SIGN LIGHT LIGHT LIGHT N 49° 00' 09" W 67.21' S 82° 25' 09" W 249.70' N 39° 32' 52" W 396.49' S 83° 20' 19" E 331.49' S 38° 29' 48" E 355.75' N 73° 26' 35" E 401.73' Pier Pier Pier Pier CONCRETE SIDEWALK Conc Ramp DRAIN Pier Gas Meter Gas Markings on Pavement UTILITY POLE / LIGHT UTILITY POLE UTILITY POLE UTILITY POLE UTILITY POLE / LIGHT GUY WIRE UTILITY POLE DRAIN 16.4' DRAIN Conc Pad GUY WIRE Metal Anchor Metal Anchor 40.4' 10.5'± 17.5'± OVERHEAD SERVICE WIRES 2-2" C 19.2 KW L2 WALL MOUNTED EV CHARGERS 12 KW INVERTER 60A NEMA-3R INVERTER DISCONNECT 180 KW DCFC CHARGER DCFC CHARGER DISCONNECT CANOPY PNL NEMA 3R 400A 60A NEMA-3R INVERTER DISCONNECT WORKING CLEARANCES 48" X 36" CHARGER CONCRETE PAD 24' X 20' PV MODULE EV PARKING SPACES SAFETY BOLLARDS BY OTHER (TYP) 600A PANEL NEW UNDERGROUND PRIMARY 150KVA STEP DOWN TRANSFORMER BESS COMBINER PANEL 480V, 800A, 3Ø, 4W 800A MAIN DISCONNECT SAFTEY BOLLARDS BY OTHER TYP PADMOUNT TRANSFORMER AND VAULT 7' TALL FENCE 1-4" C EXISTING CON ED METER 6' WIDE GATES 6'-7' SPRUCE EVERGREEN TREES MIN. 42" WORKING CLEARANCE BESS DISCONNECT 28" X 11" CLASS 5 CUSTOMER POLE NEW UTILITY POLE UTILITY OVERHEAD PRIMARY LINE TO BE DEMOLISHED BY CON EDISON PRIMARY OVERHEAD NEW UNDERGROUND PRIMARY +/- 8.0' O.C 1-2 1 2" CAP EMPTY 2-1/2" CONDUIT 1-4" C 400APNL 1-3" C DCFC (L3) 1-2" CONTROLS 24' X 20' CANOPY MOUNTED PV PANELS 1#1/0-1"C GROUNDING BUS BAR GROUND BOND TO DOMESTIC SUPPLY EXISTING INCOMING DOMESTIC WATER SUPPLY 0.00 AC. 0 SQ. FT. 106.0 M 1215.0404 2539.3696 1231.5613 2531.1352 1470.6342 2216.1682 1464.9973 2480.9974 1277.5109 2470.5989 1368.2007 2351.1194 1424.1159 2277.4539 1445.6039 2527.0832 1422.6315 2507.5518 1415.0740 2478.2285 1435.1183 2440.9069 1354.7143 2108.5096 1354.3264 2124.2589 LOT 24 LOT LO N 38° 19' 00" E 148.24' S 88° 35' 20" E 15.75' 854.7084 2382.0316 N 38° 19' 00" E 148.24' S 52° 27' 50" W 113.67' S 28° 11' 10" W 233.02' Survey N 28° 11' 10" E 276.41' S 41° 43' 14" E 45.36' S 57° 10' 00" W 36.33' 25.30' 76.94' 25.00' [229.51' Deed] S 52° 48' 00" E 395.44' N 85° 59' 14" W 234.30' N 27° 51' 14" W 192.60' N 41° 43' 14" W 341.79' R=89.06' L=90.40' =58° 09' 53" S 88° 35' 20" E 15.75' N 38° 19' 00" E 148.24' S 26° 29' 34" E 1024.9942 2292.0453 1199.0340 2136.8695 1218.7284 2167.3902 1165.1773 2167.0565 1408.8119 2297.6162 BL-Crosscut GDR walk EOP OH8 EOP walk GDR anchor-ab anchor-ab GW GW GDR PT EL walk EOP L ST walk l DC DC walk l ST EOP L EL anchor-ab GW GDR ST PC GDR walk EOP EOP walk GDR GW GW W O S D Y H L ST L RECT-1.2 TCB GDR PT EL walk EOP GW walk PT walk walk EL EOP PC DC DC EOP EOP DC DC EOP PT EL walk ST PC JPN3070 walk walk walk PT EL W O S W O S GW GW cnc ST cnc RECT4 Dr ST Dr Dr Dr Dr Dr Dr Dr Dr Dr WSF 6in pvc cleanot-pipe WSF WSF EL WSF ST WSF Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr EL Dr ST JPN3110 DR Dr Dr cnc cnc RECT6.5 drain-str Dr Dr Dr Dr Dr Dr Dr PC Dr Dr Dr PT Dr GDR ag-pole GDR Dr PC Dr Dr PT EL Dr ST Gas Gas 8in HP Gas EL Gas ST Gas GDR Dr Dr Gas EL Dr GDR Dr Gas Gas Gas Gas-METER Dr PC Dr Dr PT Dr Dr Dr PC L L RECT-4 CONC PAD Dr Dr PT Dr Dr Dr Dr EC L ST L RECT2.5 Sigm-base EC cnc ST cnc RECT3 con-pad cnc ST cnc RECT-5 Dr PC Dr Dr Dr PT Dr Dr W O S Dr PC Dr Dr Dr PT GDR ST Dr GDR EL Dr3211 Dr PC Dr Dr PT EL eor ST eor eor eor eor eor eor eor L ST L RECT2 TCB loose GW GW EOP ST dr ST PC GDR GDR GDR PC EOP SMO EOP GDR L sign 3258 L RECT-.5 GDR ST GDR EL Dr Dr PT Dr PC Dr Dr PT Dr Dr Dr Dr Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge EL L ST parking L L PC L L PT L L PC L L PT L PT CLO L island L1 L1 RECT-.5 sign L L L L L CLO OSW EL BL-Crosscut Corn-Stucco-oh Corn-Stucco-oh PC Corn-Stucco-oh PC bld ST Corn-Stucco-oh Pt BLD BLD metal facade BLD Pier CIR Pier Pier CIR Pier CIR Pier Pier CIR BLD PC BLD BLD PT BLD BLD PC BLD Pier CIR Pier Pier CIR Pier CIR Pier Pier CIR Pier CIR Pier Pier CIR BLD1 ST BLD1 EL BLD1 ST BLD1 BLD1 pc BLD1 BLD1 PT BLD1 BLD1 BLD1 BLD1 L L RECT-.5 sign Pin insight BL-Crosscut Mag-Nail-Tie L ST sign L RECT-1 L post L RECT-1.5 BLD ST BLD BLD BLD BLD EL Pier Pier Pier RECT Pier Pier Pier RECT Pier Pier Pier RECT Corn-Stucco elev elev elev elev elev elev Corn-Conc-apron elev elev elev cnc cnc RECT-8 L CIR L L CIR elev elev BL-Crosscut Corn-Conc-Blk int Corn-Conc-Blk Corn-Shed-roof cnc ST cnc cnc Corn-Conc-Blk BL-Crosscut BL-Crosscut BLD ST BLD BLD BL-Crosscut 3500 GAS GAS GAS GAS GAS GAS METAL EDGE ASP PARKING AREA CONCRETE APRON COVERED ROOF Metal Storage Container (Moveable) L E D G E R O C K NO PHYSICAL BOUNDS CONCRETE APRON SIGN HIGH ONE STORY STUCCO AND CONCRETE BLOCK BUILDING Roof Line Pier LIGHT POLE DRAIN DRAIN LIGHT LIGHT DRAIN WIRE DROP CURB TRAFFIC POLE CROSSWALK POLE GUY GUY WIRE OVERHEAD SERVICE WIRES METAL GUARD RAIL METAL GUARD RAIL METAL GUARD RAIL T T T ASPHALT PARKING AREA CONCRETE APRON Roof Line Pier Conc.Base PIN FOUND ASPHALT PARKING AREA ASPHALT PARKING AREA GRAVEL AREA DRAIN DRAIN CONCRETE APRON Garage Bay Garage Bay Garage Bays Garage Bay Garage Bays ONE STORY CONCRETE PAD DRAIN INLET SIGN Island Grass REMAINS OF STOCKADE FENCE UTILITY POLE WITH LIGHTS UTILITY POLE WITH LIGHTS UTILITY POLE WITH LIGHTS Pier Pier SIGN SIGN FLAG POLE COVER METAL TRAFFIC SIGN COVER METAL CONC PAD SIGN LIGHT LIGHT LIGHT N 49° 00' 09" W 67.21' S 82° 25' 09" W 249.70' N 39° 32' 52" W 396.49' S 83° 20' 19" E 331.49' S 38° 29' 48" E 355.75' N 73° 26' 35" E 401.73' Pier Pier Pier Pier CONCRETE SIDEWALK Conc Ramp DRAIN Pier Gas Meter Gas Markings on Pavement UTILITY POLE / LIGHT UTILITY POLE UTILITY POLE UTILITY POLE UTILITY POLE / LIGHT GUY WIRE UTILITY POLE DRAIN 16.4' DRAIN Conc Pad GUY WIRE Metal Anchor Metal Anchor 40.4' 10.5'± 17.5'± OVERHEAD SERVICE WIRES 2-2" C 19.2 KW L2 WALL MOUNTED EV CHARGERS 12 KW INVERTER 60A NEMA-3R INVERTER DISCONNECT 180 KW DCFC CHARGER DCFC CHARGER DISCONNECT CANOPY PNL NEMA 3R 400A 60A NEMA-3R INVERTER DISCONNECT WORKING CLEARANCES 48" X 36" CHARGER CONCRETE PAD 24' X 20' PV MODULE EV PARKING SPACES SAFETY BOLLARDS BY OTHER (TYP) 600A PANEL NEW UNDERGROUND PRIMARY 150KVA STEP DOWN TRANSFORMER BESS COMBINER PANEL 480V, 800A, 3Ø, 4W 800A MAIN DISCONNECT SAFTEY BOLLARDS BY OTHER TYP PADMOUNT TRANSFORMER AND VAULT 7' TALL FENCE 1-4" C EXISTING CON ED METER 6' WIDE GATES 6'-7' SPRUCE EVERGREEN TREES MIN. 42" WORKING CLEARANCE BESS DISCONNECT 28" X 11" CLASS 5 CUSTOMER POLE NEW UTILITY POLE UTILITY OVERHEAD PRIMARY LINE TO BE DEMOLISHED BY CON EDISON PRIMARY OVERHEAD NEW UNDERGROUND PRIMARY +/- 8.0' O.C 1-2 1 2" CAP EMPTY 2-1/2" CONDUIT 1-4" C 400APNL 1-3" C DCFC (L3) 1-2" CONTROLS 24' X 20' CANOPY MOUNTED PV PANELS 1#1/0-1"C GROUNDING BUS BAR GROUND BOND TO DOMESTIC SUPPLY EXISTING INCOMING DOMESTIC WATER SUPPLY 0.00 AC. 0 SQ. FT. 106.0 M 1215.0404 2539.3696 1231.5613 2531.1352 1470.6342 2216.1682 1464.9973 2480.9974 1277.5109 2470.5989 1368.2007 2351.1194 1424.1159 2277.4539 1445.6039 2527.0832 1422.6315 2507.5518 1415.0740 2478.2285 1435.1183 2440.9069 1354.7143 2108.5096 1354.3264 2124.2589 LOT 24 LOT LO N 38° 19' 00" E 148.24' S 88° 35' 20" E 15.75' 854.7084 2382.0316 N 38° 19' 00" E 148.24' S 52° 27' 50" W 113.67' S 28° 11' 10" W 233.02' Survey N 28° 11' 10" E 276.41' S 41° 43' 14" E 45.36' S 57° 10' 00" W 36.33' 25.30' 76.94' 25.00' [229.51' Deed] S 52° 48' 00" E 395.44' N 85° 59' 14" W 234.30' N 27° 51' 14" W 192.60' N 41° 43' 14" W 341.79' R=89.06' L=90.40' =58° 09' 53" S 88° 35' 20" E 15.75' N 38° 19' 00" E 148.24' S 26° 29' 34" E 1024.9942 2292.0453 1199.0340 2136.8695 1218.7284 2167.3902 1165.1773 2167.0565 1408.8119 2297.6162 BL-Crosscut GDR walk EOP OH8 EOP walk GDR anchor-ab anchor-ab GW GW GDR PT EL walk EOP L ST walk l DC DC walk l ST EOP L EL anchor-ab GW GDR ST PC GDR walk EOP EOP walk GDR GW GW W O S D Y H L ST L RECT-1.2 TCB GDR PT EL walk EOP GW walk PT walk walk EL EOP PC DC DC EOP EOP DC DC EOP PT EL walk ST PC JPN3070 walk walk walk PT EL W O S W O S GW GW cnc ST cnc RECT4 Dr ST Dr Dr Dr Dr Dr Dr Dr Dr Dr WSF 6in pvc cleanot-pipe WSF WSF EL WSF ST WSF Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr EL Dr ST JPN3110 DR Dr Dr cnc cnc RECT6.5 drain-str Dr Dr Dr Dr Dr Dr Dr PC Dr Dr Dr PT Dr GDR ag-pole GDR Dr PC Dr Dr PT EL Dr ST Gas Gas 8in HP Gas EL Gas ST Gas GDR Dr Dr Gas EL Dr GDR Dr Gas Gas Gas Gas-METER Dr PC Dr Dr PT Dr Dr Dr PC L L RECT-4 CONC PAD Dr Dr PT Dr Dr Dr Dr EC L ST L RECT2.5 Sigm-base EC cnc ST cnc RECT3 con-pad cnc ST cnc RECT-5 Dr PC Dr Dr Dr PT Dr Dr W O S Dr PC Dr Dr Dr PT GDR ST Dr GDR EL Dr3211 Dr PC Dr Dr PT EL eor ST eor eor eor eor eor eor eor L ST L RECT2 TCB loose GW GW EOP ST dr ST PC GDR GDR GDR PC EOP SMO EOP GDR L sign 3258 L RECT-.5 GDR ST GDR EL Dr Dr PT Dr PC Dr Dr PT Dr Dr Dr Dr Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge EL L ST parking L L PC L L PT L L PC L L PT L PT CLO L island L1 L1 RECT-.5 sign L L L L L CLO OSW EL BL-Crosscut Corn-Stucco-oh Corn-Stucco-oh PC Corn-Stucco-oh PC bld ST Corn-Stucco-oh Pt BLD BLD metal facade BLD Pier CIR Pier Pier CIR Pier CIR Pier Pier CIR BLD PC BLD BLD PT BLD BLD PC BLD Pier CIR Pier Pier CIR Pier CIR Pier Pier CIR Pier CIR Pier Pier CIR BLD1 ST BLD1 EL BLD1 ST BLD1 BLD1 pc BLD1 BLD1 PT BLD1 BLD1 BLD1 BLD1 L L RECT-.5 sign Pin insight BL-Crosscut Mag-Nail-Tie L ST sign L RECT-1 L post L RECT-1.5 BLD ST BLD BLD BLD BLD EL Pier Pier Pier RECT Pier Pier Pier RECT Pier Pier Pier RECT Corn-Stucco elev elev elev elev elev elev Corn-Conc-apron elev elev elev cnc cnc RECT-8 L CIR L L CIR elev elev BL-Crosscut Corn-Conc-Blk int Corn-Conc-Blk Corn-Shed-roof cnc ST cnc cnc Corn-Conc-Blk BL-Crosscut BL-Crosscut BLD ST BLD BLD BL-Crosscut 3500 GAS GAS GAS GAS GAS GAS METAL EDGE ASP PARKING AREA CONCRETE APRON COVERED ROOF Metal Storage Container (Moveable) L E D G E R O C K NO PHYSICAL BOUNDS CONCRETE APRON SIGN HIGH ONE STORY STUCCO AND CONCRETE BLOCK BUILDING Roof Line Pier LIGHT POLE DRAIN DRAIN LIGHT LIGHT DRAIN WIRE DROP CURB TRAFFIC POLE CROSSWALK POLE GUY GUY WIRE OVERHEAD SERVICE WIRES METAL GUARD RAIL METAL GUARD RAIL METAL GUARD RAIL T T T ASPHALT PARKING AREA CONCRETE APRON Roof Line Pier Conc.Base PIN FOUND ASPHALT PARKING AREA ASPHALT PARKING AREA GRAVEL AREA DRAIN DRAIN CONCRETE APRON Garage Bay Garage Bay Garage Bays Garage Bay Garage Bays ONE STORY CONCRETE PAD DRAIN INLET SIGN Island Grass REMAINS OF STOCKADE FENCE UTILITY POLE WITH LIGHTS UTILITY POLE WITH LIGHTS UTILITY POLE WITH LIGHTS Pier Pier SIGN SIGN FLAG POLE COVER METAL TRAFFIC SIGN COVER METAL CONC PAD SIGN LIGHT LIGHT LIGHT N 49° 00' 09" W 67.21' S 82° 25' 09" W 249.70' N 39° 32' 52" W 396.49' S 83° 20' 19" E 331.49' S 38° 29' 48" E 355.75' N 73° 26' 35" E 401.73' Pier Pier Pier Pier CONCRETE SIDEWALK Conc Ramp DRAIN Pier Gas Meter Gas Markings on Pavement UTILITY POLE / LIGHT UTILITY POLE UTILITY POLE UTILITY POLE UTILITY POLE / LIGHT GUY WIRE UTILITY POLE DRAIN 16.4' DRAIN Conc Pad GUY WIRE Metal Anchor Metal Anchor 40.4' 10.5'± 17.5'± OVERHEAD SERVICE WIRES 2-2" C 19.2 KW L2 WALL MOUNTED EV CHARGERS 12 KW INVERTER 60A NEMA-3R INVERTER DISCONNECT 180 KW DCFC CHARGER DCFC CHARGER DISCONNECT CANOPY PNL NEMA 3R 400A 60A NEMA-3R INVERTER DISCONNECT WORKING CLEARANCES 48" X 36" CHARGER CONCRETE PAD 24' X 20' PV MODULE EV PARKING SPACES SAFETY BOLLARDS BY OTHER (TYP) 600A PANEL NEW UNDERGROUND PRIMARY 150KVA STEP DOWN TRANSFORMER BESS COMBINER PANEL 480V, 800A, 3Ø, 4W 800A MAIN DISCONNECT SAFTEY BOLLARDS BY OTHER TYP PADMOUNT TRANSFORMER AND VAULT 7' TALL FENCE 1-4" C EXISTING CON ED METER 6' WIDE GATES 6'-7' SPRUCE EVERGREEN TREES MIN. 42" WORKING CLEARANCE BESS DISCONNECT 28" X 11" CLASS 5 CUSTOMER POLE NEW UTILITY POLE UTILITY OVERHEAD PRIMARY LINE TO BE DEMOLISHED BY CON EDISON PRIMARY OVERHEAD NEW UNDERGROUND PRIMARY +/- 8.0' O.C 1-2 1 2" CAP EMPTY 2-1/2" CONDUIT 1-4" C 400APNL 1-3" C DCFC (L3) 1-2" CONTROLS 24' X 20' CANOPY MOUNTED PV PANELS 1#1/0-1"C GROUNDING BUS BAR GROUND BOND TO DOMESTIC SUPPLY EXISTING INCOMING DOMESTIC WATER SUPPLY 0.00 AC. 0 SQ. FT. 106.0 M 1215.0404 2539.3696 1231.5613 2531.1352 1470.6342 2216.1682 1464.9973 2480.9974 1277.5109 2470.5989 1368.2007 2351.1194 1424.1159 2277.4539 1445.6039 2527.0832 1422.6315 2507.5518 1415.0740 2478.2285 1435.1183 2440.9069 1354.7143 2108.5096 1354.3264 2124.2589 LOT 24 LOT LO N 38° 19' 00" E 148.24' S 88° 35' 20" E 15.75' 854.7084 2382.0316 N 38° 19' 00" E 148.24' S 52° 27' 50" W 113.67' S 28° 11' 10" W 233.02' Survey N 28° 11' 10" E 276.41' S 41° 43' 14" E 45.36' S 57° 10' 00" W 36.33' 25.30' 76.94' 25.00' [229.51' Deed] S 52° 48' 00" E 395.44' N 85° 59' 14" W 234.30' N 27° 51' 14" W 192.60' N 41° 43' 14" W 341.79' R=89.06' L=90.40' =58° 09' 53" S 88° 35' 20" E 15.75' N 38° 19' 00" E 148.24' S 26° 29' 34" E 1024.9942 2292.0453 1199.0340 2136.8695 1218.7284 2167.3902 1165.1773 2167.0565 1408.8119 2297.6162 BL-Crosscut GDR walk EOP OH8 EOP walk GDR anchor-ab anchor-ab GW GW GDR PT EL walk EOP L ST walk l DC DC walk l ST EOP L EL anchor-ab GW GDR ST PC GDR walk EOP EOP walk GDR GW GW W O S D Y H L ST L RECT-1.2 TCB GDR PT EL walk EOP GW walk PT walk walk EL EOP PC DC DC EOP EOP DC DC EOP PT EL walk ST PC JPN3070 walk walk walk PT EL W O S W O S GW GW cnc ST cnc RECT4 Dr ST Dr Dr Dr Dr Dr Dr Dr Dr Dr WSF 6in pvc cleanot-pipe WSF WSF EL WSF ST WSF Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr EL Dr ST JPN3110 DR Dr Dr cnc cnc RECT6.5 drain-str Dr Dr Dr Dr Dr Dr Dr PC Dr Dr Dr PT Dr GDR ag-pole GDR Dr PC Dr Dr PT EL Dr ST Gas Gas 8in HP Gas EL Gas ST Gas GDR Dr Dr Gas EL Dr GDR Dr Gas Gas Gas Gas-METER Dr PC Dr Dr PT Dr Dr Dr PC L L RECT-4 CONC PAD Dr Dr PT Dr Dr Dr Dr EC L ST L RECT2.5 Sigm-base EC cnc ST cnc RECT3 con-pad cnc ST cnc RECT-5 Dr PC Dr Dr Dr PT Dr Dr W O S Dr PC Dr Dr Dr PT GDR ST Dr GDR EL Dr3211 Dr PC Dr Dr PT EL eor ST eor eor eor eor eor eor eor L ST L RECT2 TCB loose GW GW EOP ST dr ST PC GDR GDR GDR PC EOP SMO EOP GDR L sign 3258 L RECT-.5 GDR ST GDR EL Dr Dr PT Dr PC Dr Dr PT Dr Dr Dr Dr Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge Dr ledge EL L ST parking L L PC L L PT L L PC L L PT L PT CLO L island L1 L1 RECT-.5 sign L L L L L CLO OSW EL BL-Crosscut Corn-Stucco-oh Corn-Stucco-oh PC Corn-Stucco-oh PC bld ST Corn-Stucco-oh Pt BLD BLD metal facade BLD Pier CIR Pier Pier CIR Pier CIR Pier Pier CIR BLD PC BLD BLD PT BLD BLD PC BLD Pier CIR Pier Pier CIR Pier CIR Pier Pier CIR Pier CIR Pier Pier CIR BLD1 ST BLD1 EL BLD1 ST BLD1 BLD1 pc BLD1 BLD1 PT BLD1 BLD1 BLD1 BLD1 L L RECT-.5 sign Pin insight BL-Crosscut Mag-Nail-Tie L ST sign L RECT-1 L post L RECT-1.5 BLD ST BLD BLD BLD BLD EL Pier Pier Pier RECT Pier Pier Pier RECT Pier Pier Pier RECT Corn-Stucco elev elev elev elev elev elev Corn-Conc-apron elev elev elev cnc cnc RECT-8 L CIR L L CIR elev elev BL-Crosscut Corn-Conc-Blk int Corn-Conc-Blk Corn-Shed-roof cnc ST cnc cnc Corn-Conc-Blk BL-Crosscut BL-Crosscut BLD ST BLD BLD BL-Crosscut 3500 GAS GAS GAS GAS GAS GAS METAL EDGE ASP PARKING AREA CONCRETE APRON COVERED ROOF Metal Storage Container (Moveable) L E D G E R O C K NO PHYSICAL BOUNDS CONCRETE APRON SIGN HIGH ONE STORY STUCCO AND CONCRETE BLOCK BUILDING Roof Line Pier LIGHT POLE DRAIN DRAIN LIGHT LIGHT DRAIN WIRE DROP CURB TRAFFIC POLE CROSSWALK POLE GUY GUY WIRE OVERHEAD SERVICE WIRES METAL GUARD RAIL METAL GUARD RAIL METAL GUARD RAIL T T T ASPHALT PARKING AREA CONCRETE APRON Roof Line Pier Conc.Base PIN FOUND ASPHALT PARKING AREA ASPHALT PARKING AREA GRAVEL AREA DRAIN DRAIN CONCRETE APRON Garage Bay Garage Bay Garage Bays Garage Bay Garage Bays ONE STORY CONCRETE PAD DRAIN INLET SIGN Island Grass REMAINS OF STOCKADE FENCE UTILITY POLE WITH LIGHTS UTILITY POLE WITH LIGHTS UTILITY POLE WITH LIGHTS Pier Pier SIGN SIGN FLAG POLE COVER METAL TRAFFIC SIGN COVER METAL CONC PAD SIGN LIGHT LIGHT LIGHT N 49° 00' 09" W 67.21' S 82° 25' 09" W 249.70' N 39° 32' 52" W 396.49' S 83° 20' 19" E 331.49' S 38° 29' 48" E 355.75' N 73° 26' 35" E 401.73' Pier Pier Pier Pier CONCRETE SIDEWALK Conc Ramp DRAIN Pier Gas Meter Gas Markings on Pavement UTILITY POLE / LIGHT UTILITY POLE UTILITY POLE UTILITY POLE UTILITY POLE / LIGHT GUY WIRE UTILITY POLE DRAIN 16.4' DRAIN Conc Pad GUY WIRE Metal Anchor Metal Anchor 40.4' 10.5'± 17.5'± OVERHEAD SERVICE WIRES 2-2" C 19.2 KW L2 WALL MOUNTED EV CHARGERS 12 KW INVERTER 60A NEMA-3R INVERTER DISCONNECT 180 KW DCFC CHARGER DCFC CHARGER DISCONNECT CANOPY PNL NEMA 3R 400A 60A NEMA-3R INVERTER DISCONNECT WORKING CLEARANCES 48" X 36" CHARGER CONCRETE PAD 24' X 20' PV MODULE EV PARKING SPACES SAFETY BOLLARDS BY OTHER (TYP) 600A PANEL NEW UNDERGROUND PRIMARY 150KVA STEP DOWN TRANSFORMER BESS COMBINER PANEL 480V, 800A, 3Ø, 4W 800A MAIN DISCONNECT SAFTEY BOLLARDS BY OTHER TYP PADMOUNT TRANSFORMER AND VAULT 7' TALL FENCE 1-4" C EXISTING CON ED METER 6' WIDE GATES (SELF LOCKING) 6'-7' SPRUCE EVERGREEN TREES MIN. 42" WORKING CLEARANCE BESS DISCONNECT 28" X 11" CLASS 5 CUSTOMER POLE NEW UTILITY POLE UTILITY OVERHEAD PRIMARY LINE TO BE DEMOLISHED BY CON EDISON PRIMARY OVERHEAD NEW UNDERGROUND PRIMARY +/- 8.0' O.C 1-2 1 2" CAP EMPTY 2-1/2" CONDUIT 1-4" C 400APNL 1-3" C DCFC (L3) 1-2" CONTROLS 24' X 20' CANOPY MOUNTED PV PANELS 1#1/0-1"C GROUNDING BUS BAR GROUND BOND TO DOMESTIC SUPPLY EXISTING INCOMING DOMESTIC WATER SUPPLY 10' MIN. LINE POST CORNER POST BRACE POST 1'-4" CONCRETE PIER 10" MIN. 1-4" CONCRETE (3/8" MIN) TRUSS ROD BRACE STRETCHER BAR TOP RAIL TRUSS ROD (3/8" MIN) BRACE EXPANSION COUPLING 21'-0" O.C MAX 10'-0" 10'-0" 3" 3'-1" 2" 7'-0" HIGH 3'-6" 8" 10'-0" WITH TOP RAIL MULTIPLES OF END BAY 10'-0" 1'-4" CONC. FOR POSTS 4"Ø OR LESS 2'-0" CONC. FOR POSTS OVER 4"Ø NO. 6 COILED SPRING REINFORCING WIRE NOTES: 1. Chain link fence shall be 6 ft in height. 2. Fence fabric shall be black in color. 3. Privacy slats shall be installed for the full height of the fence. Privacy slat color shall be selected by the Owner. 4. Fence shall installed plumb and level and in accordance with local industry standards. 5. If the fence is to be installed on the precast segmental retaining wall, the Contractor has the option of core drilling the wall for fence post installation. If this method is used, the annular space between the core and the fence post must be filled with an epoxy grout upon completion. CHAIN LINK FENCE DETAIL NOT TO SCALE F-1 CHAIN LINK FABRIC WITH PRIVACY SLATS (TYP) DATE: SCALE: Sheet of No. Date Comments: Yorktown Heights, NY 10598 www.sitedesignconsultants.com Fax: (914) 962-7386 Land Planners Engineer: NYS Lic. No. 64431 Joseph C. Riina, P.E. 251-F Underhill Avenue, Civil Engineers (914) 962-4488 - NOTE: 1. THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN TAKEN FROM SURVEY MAP PREPARED BY JRL LAND SURVEYING, DATED 12/01/2023. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. COPYRIGHT © 2020 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW. SAFE DIG Before You Dig, Drill or Blast! CALL US TOLL FREE 811 or 1-800-962-7962 NY Industrial Code Rule 753 requires no less than two working days notice, but not more than ten days notice. www.digsafelynewyork.com F:\2024\24-08 RED ROCK - CROTON AUTO PARK, CROTON\ENGINEERING\CAD\C3D-24-08 RED ROCK CROTON AUTO PARK\24-08 SITE 3-15-24.DWG 3/22/2024 11:00:37 AM 6/19/24 Plan Updates Westchester Co., New York Town of Croton On Hudson 1 MUNICIPAL PLACE PROJECT LOCATION SITE DATA: OWNER / DEVELOPER: CROTON AUTO PARK 1 MUNICIPAL PLACE, CROTON-ON-HUDSON, NY 10520 PROJECT LOCATION: 1 MUNICIPAL PLACE, CROTON-ON-HUDSON, NY 10520 EXISTING TOWN ZONING: C-2, GENERAL COMMERCIAL PROPOSED USE: ADDITION OF BESS AND SOLAR CARPORT CANOPY SYSTEM TO EXISTING AUTOMOTIVE DEALERSHIP TOWN TAX MAP DATA: SECTION 78.12, BLOCK 3, LOT 2 SITE AREA : 4.9 ACRES (213,444 SF) 1"=30' PROJECT # SITE PLAN PREPARED FOR CROTON AUTO PARK SITE PLAN 3-18-24 JP 24-08 SCALE: 1"=30'-0" GENERAL REQUIREMENTS: A BUILDING PERMIT SHALL BE REQUIRED FOR INSTALLATION OF ALL SOLAR ENERGY SYSTEMS. PRIOR TO THE ISSUANCE OF A BUILDING PERMIT, CONSTRUCTION AND/ OR SITE PLAN DOCUMENTS, SIGNED AND STAMPED BY A LICENSED PROFESSIONAL ENGINEER OR REGISTERED ARCHITECT SHALL BE SUBMITTED TO THE ENGINEERING DEPARTMENT. ALL VILLAGE BOARDS ARE ENCOURAGED TO CONDITION THEIR APPROVAL OF PROPOSED DEVELOPMENTS ON SITES ADJACENT TO SOLAR ENERGY SYSTEMS SO AS TO PROTECT THEIR ACCESS TO SUFFICIENT SUNLIGHT TO REMAIN ECONOMICALLY FEASIBLE OVER TIME. ALL SOLAR ENERGY SYSTEMS SHALL BE DESIGNED, ERECTED, AND INSTALLED IN ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND INDUSTRY STANDARDS AS REFERENCED IN THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE ( BUILDING CODE), THE NEW YORK STATE ENERGY CONSERVATION CODE ( ENERGY CODE), AND THE VILLAGE CODE. PERMITTING REQUIREMENTS FOR TIER 1 SOLAR ENERGY SYSTEMS. ALL TIER 1 SOLAR ENERGY SYSTEMS SHALL BE PERMITTED IN ALL ZONING DISTRICTS AS AN ACCESSORY USE AND SHALL BE EXEMPT FROM SITE PLAN REVIEW, SUBJECT TO THE FOLLOWING CONDITIONS FOR EACH TYPE OF SOLAR ENERGY SYSTEM: ROOF-MOUNTED SOLAR ENERGY SYSTEMS. ROOF-MOUNTED SOLAR ENERGY SYSTEMS SHALL INCORPORATE, WHEN FEASIBLE, THE FOLLOWING DESIGN REQUIREMENTS: ROOF-MOUNTED SOLAR PANELS MUST BE ATTACHED OR BALLASTED TO A LAWFULLY PERMITTED BUILDING OR STRUCTURE, WHICH MAY BE AN ACCESSORY STRUCTURE. ALL ROOF-MOUNTED SOLAR ENERGY SYSTEMS SHALL BE SUBJECT TO THE MAXIMUM HEIGHT REGULATIONS SPECIFIED FOR PRINCIPAL AND ACCESSORY BUILDINGS WITHIN THE UNDERLYING ZONING DISTRICT, WITH THE HEIGHT EXEMPTIONS AS PROVIDED FOR BUILDING- MOUNTED MECHANICAL DEVICES OR EQUIPMENT. GLARE. ALL SOLAR PANELS SHALL HAVE ANTIREFLECTIVE COATING( S). BUILDING- INTEGRATED SOLAR ENERGY SYSTEMS AND CANOPY- MOUNTED SOLAR ENERGY SYSTEMS SHALL BE SHOWN ON THE PLANS SUBMITTED FOR THE BUILDING PERMIT APPLICATION FOR THE BUILDING OR PROPERTY CONTAINING THE SYSTEM. APPLICANTS FOR CANOPY-MOUNTED SOLAR ENERGY SYSTEMS SHALL SUBMIT ALL STUDIES AS REQUIRED BY THE VILLAGE ENGINEER OR BUILDING INSPECTOR. SOLAR ENERGY EQUIPMENT SHALL BE LOCATED IN A MANNER TO REASONABLY AVOID AND/OR MINIMIZE BLOCKAGE OF VIEWS FROM SURROUNDING PROPERTIES AND SHADING OF PROPERTY TO THE NORTH, WHILE STILL PROVIDING ADEQUATE SOLAR ACCESS. ALL MECHANICAL EQUIPMENT OF THE SOLAR ENERGY SYSTEM, INCLUDING ANY PAD- MOUNTED STRUCTURE FOR BATTERIES, SWITCHBOARD, TRANSFORMERS, OR STORAGE CELLS. FENCING. ALL MECHANICAL EQUIPMENT, INCLUDING ANY STRUCTURE FOR STORAGE BATTERIES, SHALL BE ENCLOSED BY A FENCE, AS REQUIRED BY NEC, WITH A SELF-LOCKING GATE TO PREVENT UNAUTHORIZED ACCESS. WARNING SIGNS WITH THE OWNER OR OPERATOR' S CONTACT INFORMATION SHALL BE PLACED ON THE ENTRANCE AND PERIMETER OF THE FENCING. THE TYPE AND HEIGHT OF FENCING SHALL BE DETERMINED AS PART OF THE SITE PLAN AND SPECIAL PERMIT REVIEW. THE FENCING AND THE SYSTEM MAY BE FURTHER SCREENED BY ANY LANDSCAPING NEEDED TO AVOID ADVERSE AESTHETIC IMPACTS. LIGHTING. LIGHTING OF THE SOLAR ENERGY SYSTEMS SHALL BE LIMITED TO THAT MINIMALLY REQUIRED FOR SAFETY AND OPERATIONAL PURPOSES, SHALL BE REASONABLY SHIELDED AND DOWNCAST FROM ABUTTING PROPERTIES AND SHALL MINIMIZE IMPACTS ON NOCTURNAL ANIMALS WHERE PRACTICABLE. INTEGRATED PEST MANAGEMENT PRACTICES SHALL BE USED TO REFRAIN FROM OR LIMIT PESTICIDE USE INCLUDING HERBICIDES) FOR LONG-TERM OPERATION AND SITE MAINTENANCE. UNDERGROUND REQUIREMENTS. ALL ON- SITE UTILITY LINES SHALL BE PLACED UNDERGROUND TO THE EXTENT FEASIBLE AND AS PERMITTED BY THE SERVING UTILITY, WITH THE EXCEPTION OF THE MAIN SERVICE CONNECTION AT THE UTILITY COMPANY RIGHT-OF-WAY AND ANY NEW INTERCONNECTION EQUIPMENT, INCLUDING WITHOUT LIMITATION ANY POLES, WITH NEW EASEMENTS AND RIGHT- OF-WAY. NO SIGNAGE OR GRAPHIC CONTENT SHALL BE DISPLAYED ON THE SOLAR ENERGY SYSTEMS EXCEPT THE MANUFACTURER' S NAME, EQUIPMENT SPECIFICATION INFORMATION, SAFETY INFORMATION, AND TWENTY￿FOUR-HOUR EMERGENCY CONTACT INFORMATION. AS REQUIRED BY THE NATIONAL ELECTRIC CODE ( NEC), DISCONNECT AND OTHER EMERGENCY SHUTOFF INFORMATION SHALL BE CLEARLY DISPLAYED ON A LIGHT-REFLECTIVE SURFACE. A CLEARLY VISIBLE WARNING SIGN CONCERNING VOLTAGE SHALL BE PLACED AT THE BASE OF ALL PAD-MOUNTED TRANSFORMERS AND SUBSTATIONS. SAFETY: SOLAR ENERGY SYSTEMS AND SOLAR ENERGY EQUIPMENT SHALL BE CERTIFIED UNDER THE APPLICABLE ELECTRICAL AND/OR BUILDING CODES AS REQUIRED. SOLAR ENERGY SYSTEMS SHALL BE MAINTAINED IN GOOD WORKING ORDER AND IN ACCORDANCE WITH INDUSTRY STANDARDS. SITE ACCESS SHALL BE MAINTAINED, INCLUDING SNOW REMOVAL AT A LEVEL ACCEPTABLE TO THE LOCAL FIRE DEPARTMENT AND, IF THE TIER 3 SOLAR ENERGY SYSTEM IS LOCATED IN AN AMBULANCE DISTRICT, THE LOCAL AMBULANCE CORPS. IF A BATTERY ENERGY STORAGE SYSTEM IS INCLUDED AS PART OF THE SOLAR ENERGY SYSTEM, THEY SHALL MEET THE REQUIREMENTS OF ANY APPLICABLE FIRE PREVENTION AND BUILDING CODE WHEN IN USE AND, WHEN NO LONGER USED, SHALL BE DISPOSED OF IN ACCORDANCE WITH THE LAWS AND REGULATIONS OF THE VILLAGE AND ANY APPLICABLE FEDERAL, STATE, OR COUNTY LAWS OR REGULATIONS. WHERE DEEMED NECESSARY BY THE BOARD OF TRUSTEES OR PLANNING BOARD, EMERGENCY ACCESS TO THE SITE FOR LOCAL FIRST RESPONDERS SHALL BE PROVIDED BY THE INSTALLATION OF AN EMERGENCY LOCK BOX OR A SIMILAR DEVICE, IN A LOCATION SUBJECT TO THE APPROVAL OF THE FIRE CHIEF. BATTERY ENERGY STORAGE SYSTEMS: AUTHORITY. THIS SECTION IS ADOPTED PURSUANT TO §7- 700 THROUGH §7- 704 OF THE VILLAGE LAW AND 10 OF THE MUNICIPAL HOME RULE LAW OF NEW YORK STATE( NYS), WHICH AUTHORIZE THE VILLAGE TO ADOPT ZONING PROVISIONS THAT ADVANCE AND PROTECT THE HEALTH, SAFETY AND WELFARE OF THE COMMUNITY. STATEMENT OF PURPOSE. THIS BATTERY ENERGY STORAGE SYSTEM LAW IS ADOPTED TO ADVANCE AND PROTECT THE PUBLIC HEALTH, SAFETY, WELFARE, AND QUALITY OF LIFE OF THE VILLAGE BY CREATING REGULATIONS FOR THE INSTALLATION AND USE OF BATTERY ENERGY STORAGE SYSTEMS, WITH THE FOLLOWING OBJECTIVES: TO PROVIDE A REGULATORY SCHEME FOR THE DESIGNATION OF PROPERTIES SUITABLE FOR THE LOCATION, CONSTRUCTION AND OPERATION OF BATTERY ENERGY STORAGE SYSTEMS; TO ENSURE COMPATIBLE LAND USES IN THE VICINITY OF THE AREAS AFFECTED BY BATTERY ENERGY STORAGE SYSTEMS; TO MITIGATE THE IMPACTS OF BATTERY ENERGY STORAGE SYSTEMS ON ENVIRONMENTAL RESOURCES SUCH AS CONSERVATION AREAS, WILDLIFE AND OTHER PROTECTED RESOURCES; AND TO CREATE SYNERGY BETWEEN BATTERY ENERGY STORAGE SYSTEM DEVELOPMENT AND THE GOALS OF THE VILLAGE' S COMPREHENSIVE PLAN. BATTERY ENERGY STORAGE SYSTEMS, COMPONENTS, AND ASSOCIATED ANCILLARY EQUIPMENT SHALL HAVE REQUIRED WORKING SPACE CLEARANCES, AND ELECTRICAL CIRCUITRY SHALL BE WITHIN WEATHERPROOF ENCLOSURES MARKED WITH THE ENVIRONMENTAL RATING SUITABLE FOR THE TYPE OF EXPOSURE IN COMPLIANCE WITH NFPA 70.

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.