Cover letter for Croton Board of Trustees meeting 8.21.24
application
1 page
Meeting: portal event 981 (no meeting page on file)
Agenda item: Public Hearing — Public hearing on the special permit application for the installation of an integrated energy system at Croton Auto Park, 1 Municipal Place.
Application, 1 page. Attached to agenda item: “Public Hearing — Public hearing on the special permit application for the installation of an integrated energy system at Croton Auto Park, 1 Municipal Place.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
06-23-2024-13551-Croton Auto Mall Electrical Set
1 Municipal Place Croton Auto Park -survey
August 21st Resolution 168-2024 Schedule Public...
Auto Park Solar Special Permit Application
CRO 24-005 Croton Auto Park Battery Energy Storage...
Cover Letter for Croton Board of Trustees
Croton Auto Mall Site Plan 6-21-24
Crton Auto Mall Site Power Plan rev 8-16-24
LOA from Lou Giordano
Memo from PB to VB
Power Point Presentation
September 11th Resolution 174-2024 1 Municipal Pl...
Extracted text
292 Katonah Ave., Suite 400, Katonah, NY 10536
Maria Fields
Sprocket Power
2 Depot Plaza
Bedford Hills, NY 10507
Village of Croton-on-Hudson Board of Trustees
1 Van Wyck Street
Croton-on-Hudson, NY 10520
August 16, 2024
Dear Board of Trustees,
This letter accompanies a revised site plan for the integrated energy system to be installed at Croton
Auto Park at 1 Municipal Place in Croton-on-Hudson. This revision is in response to the meeting of the
Planning Board of the Village of Croton-on-Hudson on August 6, 2024, the feedback provided at the
meeting and the memo with reference # 79-12-3-2 containing recommendations from that meeting.
As recommended, Sprocket Power has revised the plan to move the BESS and other non-utility
equipment to a location near the proposed solar canopy car port and EV charging. In addition, we
explored with Con Edison whether there was any flexibility in the placement of the 480V transformer
that is required to supply the DCFC chargers being installed to meet Stellantis mandates. Con Edison
generally has limitations on equipment placements as they are mostly driven by the layout of the local
grid. In this case, we did arrive at a placement of the transformer and incoming service that would
address some of the Planning Board concerns. As you see, the transformer will be placed on the north
side of the driveway. Due to the topography there, the transformer and utility-related equipment will be
below the grade of sidewalk/road.
We look forward to discussing the project and these revisions at the upcoming meeting and answering
any questions you may have.
Maria Fields
CEO and Cofounder
Sprocket Power