CROTON AUTO PARK SITE PLAN 9-25-24
site plan
1 page
Meeting: portal event 985 (no meeting page on file)
Agenda item: Public Hearing — Fields, Maria, Sprocket Power - 1 Municipal Place (78.12-3-2) Amended Site Plan - Croton Auto Park for Battery Energy Storage System
Site plan, 1 page. Attached to agenda item: “Public Hearing — Fields, Maria, Sprocket Power - 1 Municipal Place (78.12-3-2) Amended Site Plan - Croton Auto Park for Battery Energy Storage System”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Amended Site Plan Application Redacted
CRO 24-005 Croton Auto Park Battery Energy Storage...
CROTON AUTO PARK 9-30-24
Cover letter for Croton Board of Trustees meeting 9.12.24
SP Sprocket Special Permit
Extracted text
0 AC.
Q. FT.
106.0
M
1215.0404
2539.3696
1231.5613
2531.1352
1470.6342
2216.1682
1464.9973
2480.9974
1476.9475
2529.5483
1266.0166
2605.7164
1277.5109
2470.5989
1368.2007
2351.1194
1424.1159
2277.4539
1445.6039
2527.0832
1422.6315
2507.5518
1415.0740
2478.2285
1435.1183
2440.9069
1354.7143
2108.5096
1354.3264
2124.2589
126.36'
Village of Croton
Village of Croton 15
N 28°11'10" E
LOT 24
LOT 2
LOT 2
N 38° 19' 00" E
148.24'
88° 35' 20" E
15.75'
838.3
854.7084
2382.0316
N 38° 19' 00" E
148.24'
S 52° 27' 50" W
113.67'
S 28° 11' 10" W
233.02' Survey
N 28° 11' 10" E
276.41'
S 41° 43' 14" E
45.36'
S 57° 10' 00" W
36.33'
25.30'
76.94'
25.00'
[229.51' Deed]
S 52° 48' 00" E
395.44'
N 85° 59' 14" W
234.30'
N 27° 51' 14" W
192.60'
3' 14" W
341.79'
06'
90.40'
58° 09' 53"
S 88° 35' 20" E
15.75'
N 38° 19' 00" E
148.24'
S 26° 29' 34" E
1024.9942
2292.0453
1199.0340
2136.8695
1218.7284
2167.3902
1165.1773
2167.0565
1408.8119
2297.6162
BL-Crosscut
EOP
walk
GDR
anchor-ab
anchor-ab
GW
GW
GDR PT EL
walk
EOP
L ST
walk l
DC
DC
walk l ST
EOP
L EL
anchor-ab
GW
GDR ST PC
GDR
walk
EOP
EOP
walk
GDR
GW
GW
W
O
S
D
Y
H
L ST
L RECT-1.2 TCB
GDR PT EL
walk
EOP
GW
walk PT
walk
walk EL
EOP PC
DC
DC
EOP
EOP
DC
DC
EOP PT EL
walk ST PC JPN3070
walk
walk
walk PT EL
W
O
S
W
O
S
GW
GW
cnc ST
cnc RECT4
Dr ST
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
WSF
6in pvc cleanot-pipe
WSF
WSF EL
WSF ST
WSF
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr EL
Dr ST JPN3110
DR
Dr
Dr
cnc
cnc RECT6.5 drain-str
Dr
Dr
Dr
Dr
Dr
Dr
Dr PC
Dr
Dr
Dr PT
Dr
GDR
ag-pole
GDR
Dr PC
Dr
Dr PT EL
Dr ST
Gas
Gas 8in HP
Gas EL
Gas ST
Gas
GDR
Dr
Dr
Gas EL
Dr
GDR
Dr
Gas
Gas
Gas
Gas-METER
Dr PC
Dr
Dr PT
Dr
Dr
Dr PC
L
L RECT-4 CONC PAD
Dr
Dr PT
Dr
Dr
Dr
Dr
EC
L ST
L RECT2.5 Sigm-base
EC
cnc ST
cnc RECT3 con-pad
cnc ST
cnc RECT-5
Dr PC
Dr
Dr
Dr PT
Dr
Dr
W
O
S
Dr PC
Dr
Dr
Dr PT
GDR ST
Dr
GDR EL
Dr3211
Dr PC
Dr
Dr PT EL eor ST
eor
eor
eor
eor
eor
eor
eor
L ST
L RECT2 TCB loose
GW
GW
EOP ST dr ST PC
GDR
GDR
GDR PC
EOP SMO
EOP
GDR
GDR PT
EOP
GW
L sign 3258
L RECT-.5
GDR ST
GDR EL
Dr
Dr PT
Dr PC
Dr
Dr PT
Dr
Dr
Dr
Dr
Dr
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge EL
L ST parking
L
L PC
L
L PT
L
L PC
L
L PT
L PT CLO
L island
L1
L1 RECT-.5 sign
L
L
L
L
L CLO
OSW EL
BL-Crosscut
Corn-Stucco-oh
Corn-Stucco-oh PC
Corn-Stucco-oh PC
bld ST Corn-Stucco-oh Pt
BLD
BLD metal facade
BLD
Pier CIR
Pier
Pier CIR
Pier CIR
Pier
Pier CIR
BLD PC
BLD
BLD PT
BLD
BLD PC
BLD
Pier CIR
Pier
Pier CIR
Pier CIR
Pier
Pier CIR
Pier CIR
Pier
Pier CIR
BLD1 ST
BLD1 EL
BLD1 ST
BLD1
BLD1 pc
BLD1
BLD1 PT
BLD1
BLD1
BLD1
BLD1
L
L RECT-.5 sign
Pin insight
BL-Crosscut
Mag-Nail-Tie
L ST sign
L RECT-1
L post
L RECT-1.5
BLD ST
BLD
BLD
BLD
BLD EL
Pier
Pier
Pier RECT
Pier
Pier
Pier RECT
Pier
Pier
Pier RECT
Corn-Stucco
elev
elev
elev
elev
elev
elev
Corn-Conc-apron
elev
elev
elev
cnc
cnc RECT-8
L CIR
L
L CIR
elev
elev
BL-Crosscut
Corn-Conc-Blk
int
Corn-Conc-Blk
Corn-Shed-roof
cnc ST
cnc
cnc
Corn-Conc-Blk
BL-Crosscut
BL-Crosscut
BLD ST
BLD
BLD
BL-Crosscut 3500
GAS
GAS
GAS
GAS
GAS
GAS
METAL
EDGE
O
OVERHEAD
ASPHALT
PARKING
AREA
CONCRETE APRON
COVERED
ROOF
Metal Storage Container
(Moveable)
L E D G E
R O C K
NO PHYSICAL BOUNDS
CONCRETE
APRON
SIGN
HIGH ONE STORY
STUCCO AND CONCRETE BLOCK
BUILDING
Roof
Line
Pier
LIGHT
POLE
DRAIN
DRAIN
LIGHT
LIGHT
DRAIN
GUY WIRE
WIRE
DROP
CURB
TRAFFIC
POLE
CROSSWALK
POLE
GUY
GUY WIRE
AD
SERVICE
WIRES
METAL
GUARD
RAIL
METAL GUARD RAIL
METAL GUARD RAIL
T
T
T
ASPHALT
PARKING
AREA
CONCRETE
APRON
Roof
Line
Pier
Conc.Base
PIN FOUND
ASPHALT
PARKING
AREA
ASPHALT
PARKING
AREA
GRAVEL
AREA
DRAIN
DRAIN
CONCRETE
APRON
Garage Bay
Garage Bay
Garage Bays
Garage Bay
Garage Bays
ONE STORY
CONCRETE
PAD
DRAIN INLET
SIGN
Island
Grass
REMAINS OF STOCKADE
FENCE
UTILITY
POLE WITH LIGHTS
UTILITY
POLE WITH LIGHTS
UTILITY
POLE WITH LIGHTS
Pier
Pier
SIGN
SIGN
FLAG POLE
COVER
METAL
TRAFFIC
SIGN
CO
META
CONC
PAD
SIGN
LIGHT
LIGHT
LIGHT
N 49° 00' 09" W
67.21'
S 82° 25' 09" W
249.70'
N 39° 32' 52" W
396.49'
S 83° 20' 19" E
331.49'
S 38° 29' 48" E
355.75'
N 73° 26' 35" E
401.73'
Pier
Pier
Pier
Pier
CONCRETE
SIDEWALK
Conc Ramp
DRAIN
Pier
Gas Meter
Gas Markings on
Pavement
UTILITY
POLE
/ LIGHT
UTILITY
POLE
UTILITY
POLE
UTILITY
POLE
UTILITY
POLE
/ LIGHT
GUY WIRE
UTILITY
POLE
DRAIN
16.4'
DRAIN
Conc Pad
GUY WIRE
Metal
Anchor
Metal
Anchor
40.4'
10.5'±
17.5'±
OVERHEAD
SERVICE
WIRES
0 AC.
Q. FT.
106.0
M
1215.0404
2539.3696
1231.5613
2531.1352
1470.6342
2216.1682
1464.9973
2480.9974
1476.9475
2529.5483
1266.0166
2605.7164
1277.5109
2470.5989
1368.2007
2351.1194
1424.1159
2277.4539
1445.6039
2527.0832
1422.6315
2507.5518
1415.0740
2478.2285
1435.1183
2440.9069
1354.7143
2108.5096
1354.3264
2124.2589
126.36'
Village of Croton
Village of Croton 15
N 28°11'10" E
LOT 24
LOT 2
LOT 2
N 38° 19' 00" E
148.24'
88° 35' 20" E
15.75'
838.3
854.7084
2382.0316
N 38° 19' 00" E
148.24'
S 52° 27' 50" W
113.67'
S 28° 11' 10" W
233.02' Survey
N 28° 11' 10" E
276.41'
S 41° 43' 14" E
45.36'
S 57° 10' 00" W
36.33'
25.30'
76.94'
25.00'
[229.51' Deed]
S 52° 48' 00" E
395.44'
N 85° 59' 14" W
234.30'
N 27° 51' 14" W
192.60'
3' 14" W
341.79'
06'
90.40'
58° 09' 53"
S 88° 35' 20" E
15.75'
N 38° 19' 00" E
148.24'
S 26° 29' 34" E
1024.9942
2292.0453
1199.0340
2136.8695
1218.7284
2167.3902
1165.1773
2167.0565
1408.8119
2297.6162
BL-Crosscut
EOP
walk
GDR
anchor-ab
anchor-ab
GW
GW
GDR PT EL
walk
EOP
L ST
walk l
DC
DC
walk l ST
EOP
L EL
anchor-ab
GW
GDR ST PC
GDR
walk
EOP
EOP
walk
GDR
GW
GW
W
O
S
D
Y
H
L ST
L RECT-1.2 TCB
GDR PT EL
walk
EOP
GW
walk PT
walk
walk EL
EOP PC
DC
DC
EOP
EOP
DC
DC
EOP PT EL
walk ST PC JPN3070
walk
walk
walk PT EL
W
O
S
W
O
S
GW
GW
cnc ST
cnc RECT4
Dr ST
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
WSF
6in pvc cleanot-pipe
WSF
WSF EL
WSF ST
WSF
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr EL
Dr ST JPN3110
DR
Dr
Dr
cnc
cnc RECT6.5 drain-str
Dr
Dr
Dr
Dr
Dr
Dr
Dr PC
Dr
Dr
Dr PT
Dr
GDR
ag-pole
GDR
Dr PC
Dr
Dr PT EL
Dr ST
Gas
Gas 8in HP
Gas EL
Gas ST
Gas
GDR
Dr
Dr
Gas EL
Dr
GDR
Dr
Gas
Gas
Gas
Gas-METER
Dr PC
Dr
Dr PT
Dr
Dr
Dr PC
L
L RECT-4 CONC PAD
Dr
Dr PT
Dr
Dr
Dr
Dr
EC
L ST
L RECT2.5 Sigm-base
EC
cnc ST
cnc RECT3 con-pad
cnc ST
cnc RECT-5
Dr PC
Dr
Dr
Dr PT
Dr
Dr
W
O
S
Dr PC
Dr
Dr
Dr PT
GDR ST
Dr
GDR EL
Dr3211
Dr PC
Dr
Dr PT EL eor ST
eor
eor
eor
eor
eor
eor
eor
L ST
L RECT2 TCB loose
GW
GW
EOP ST dr ST PC
GDR
GDR
GDR PC
EOP SMO
EOP
GDR
GDR PT
EOP
GW
L sign 3258
L RECT-.5
GDR ST
GDR EL
Dr
Dr PT
Dr PC
Dr
Dr PT
Dr
Dr
Dr
Dr
Dr
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge EL
L ST parking
L
L PC
L
L PT
L
L PC
L
L PT
L PT CLO
L island
L1
L1 RECT-.5 sign
L
L
L
L
L CLO
OSW EL
BL-Crosscut
Corn-Stucco-oh
Corn-Stucco-oh PC
Corn-Stucco-oh PC
bld ST Corn-Stucco-oh Pt
BLD
BLD metal facade
BLD
Pier CIR
Pier
Pier CIR
Pier CIR
Pier
Pier CIR
BLD PC
BLD
BLD PT
BLD
BLD PC
BLD
Pier CIR
Pier
Pier CIR
Pier CIR
Pier
Pier CIR
Pier CIR
Pier
Pier CIR
BLD1 ST
BLD1 EL
BLD1 ST
BLD1
BLD1 pc
BLD1
BLD1 PT
BLD1
BLD1
BLD1
BLD1
L
L RECT-.5 sign
Pin insight
BL-Crosscut
Mag-Nail-Tie
L ST sign
L RECT-1
L post
L RECT-1.5
BLD ST
BLD
BLD
BLD
BLD EL
Pier
Pier
Pier RECT
Pier
Pier
Pier RECT
Pier
Pier
Pier RECT
Corn-Stucco
elev
elev
elev
elev
elev
elev
Corn-Conc-apron
elev
elev
elev
cnc
cnc RECT-8
L CIR
L
L CIR
elev
elev
BL-Crosscut
Corn-Conc-Blk
int
Corn-Conc-Blk
Corn-Shed-roof
cnc ST
cnc
cnc
Corn-Conc-Blk
BL-Crosscut
BL-Crosscut
BLD ST
BLD
BLD
BL-Crosscut 3500
GAS
GAS
GAS
GAS
GAS
GAS
METAL
EDGE
O
OVERHEAD
ASPHALT
PARKING
AREA
CONCRETE APRON
COVERED
ROOF
Metal Storage Container
(Moveable)
L E D G E
R O C K
NO PHYSICAL BOUNDS
CONCRETE
APRON
SIGN
HIGH ONE STORY
STUCCO AND CONCRETE BLOCK
BUILDING
Roof
Line
Pier
LIGHT
POLE
DRAIN
DRAIN
LIGHT
LIGHT
DRAIN
GUY WIRE
WIRE
DROP
CURB
TRAFFIC
POLE
CROSSWALK
POLE
GUY
GUY WIRE
AD
SERVICE
WIRES
METAL
GUARD
RAIL
METAL GUARD RAIL
METAL GUARD RAIL
T
T
T
ASPHALT
PARKING
AREA
CONCRETE
APRON
Roof
Line
Pier
Conc.Base
PIN FOUND
ASPHALT
PARKING
AREA
ASPHALT
PARKING
AREA
GRAVEL
AREA
DRAIN
DRAIN
CONCRETE
APRON
Garage Bay
Garage Bay
Garage Bays
Garage Bay
Garage Bays
ONE STORY
CONCRETE
PAD
DRAIN INLET
SIGN
Island
Grass
REMAINS OF STOCKADE
FENCE
UTILITY
POLE WITH LIGHTS
UTILITY
POLE WITH LIGHTS
UTILITY
POLE WITH LIGHTS
Pier
Pier
SIGN
SIGN
FLAG POLE
COVER
METAL
TRAFFIC
SIGN
CO
META
CONC
PAD
SIGN
LIGHT
LIGHT
LIGHT
N 49° 00' 09" W
67.21'
S 82° 25' 09" W
249.70'
N 39° 32' 52" W
396.49'
S 83° 20' 19" E
331.49'
S 38° 29' 48" E
355.75'
N 73° 26' 35" E
401.73'
Pier
Pier
Pier
Pier
CONCRETE
SIDEWALK
Conc Ramp
DRAIN
Pier
Gas Meter
Gas Markings on
Pavement
UTILITY
POLE
/ LIGHT
UTILITY
POLE
UTILITY
POLE
UTILITY
POLE
UTILITY
POLE
/ LIGHT
GUY WIRE
UTILITY
POLE
DRAIN
16.4'
DRAIN
Conc Pad
GUY WIRE
Metal
Anchor
Metal
Anchor
40.4'
10.5'±
17.5'±
OVERHEAD
SERVICE
WIRES
0 AC.
Q. FT.
106.0
M
1215.0404
2539.3696
1231.5613
2531.1352
1470.6342
2216.1682
1464.9973
2480.9974
1476.9475
2529.5483
1266.0166
2605.7164
1277.5109
2470.5989
1368.2007
2351.1194
1424.1159
2277.4539
1445.6039
2527.0832
1422.6315
2507.5518
1415.0740
2478.2285
1435.1183
2440.9069
1354.7143
2108.5096
1354.3264
2124.2589
126.36'
Village of Croton
Village of Croton 15
N 28°11'10" E
LOT 24
LOT 2
LOT 2
N 38° 19' 00" E
148.24'
88° 35' 20" E
15.75'
838.3
854.7084
2382.0316
N 38° 19' 00" E
148.24'
S 52° 27' 50" W
113.67'
S 28° 11' 10" W
233.02' Survey
N 28° 11' 10" E
276.41'
S 41° 43' 14" E
45.36'
S 57° 10' 00" W
36.33'
25.30'
76.94'
25.00'
[229.51' Deed]
S 52° 48' 00" E
395.44'
N 85° 59' 14" W
234.30'
N 27° 51' 14" W
192.60'
3' 14" W
341.79'
06'
90.40'
58° 09' 53"
S 88° 35' 20" E
15.75'
N 38° 19' 00" E
148.24'
S 26° 29' 34" E
1024.9942
2292.0453
1199.0340
2136.8695
1218.7284
2167.3902
1165.1773
2167.0565
1408.8119
2297.6162
BL-Crosscut
EOP
walk
GDR
anchor-ab
anchor-ab
GW
GW
GDR PT EL
walk
EOP
L ST
walk l
DC
DC
walk l ST
EOP
L EL
anchor-ab
GW
GDR ST PC
GDR
walk
EOP
EOP
walk
GDR
GW
GW
W
O
S
D
Y
H
L ST
L RECT-1.2 TCB
GDR PT EL
walk
EOP
GW
walk PT
walk
walk EL
EOP PC
DC
DC
EOP
EOP
DC
DC
EOP PT EL
walk ST PC JPN3070
walk
walk
walk PT EL
W
O
S
W
O
S
GW
GW
cnc ST
cnc RECT4
Dr ST
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
WSF
6in pvc cleanot-pipe
WSF
WSF EL
WSF ST
WSF
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr EL
Dr ST JPN3110
DR
Dr
Dr
cnc
cnc RECT6.5 drain-str
Dr
Dr
Dr
Dr
Dr
Dr
Dr PC
Dr
Dr
Dr PT
Dr
GDR
ag-pole
GDR
Dr PC
Dr
Dr PT EL
Dr ST
Gas
Gas 8in HP
Gas EL
Gas ST
Gas
GDR
Dr
Dr
Gas EL
Dr
GDR
Dr
Gas
Gas
Gas
Gas-METER
Dr PC
Dr
Dr PT
Dr
Dr
Dr PC
L
L RECT-4 CONC PAD
Dr
Dr PT
Dr
Dr
Dr
Dr
EC
L ST
L RECT2.5 Sigm-base
EC
cnc ST
cnc RECT3 con-pad
cnc ST
cnc RECT-5
Dr PC
Dr
Dr
Dr PT
Dr
Dr
W
O
S
Dr PC
Dr
Dr
Dr PT
GDR ST
Dr
GDR EL
Dr3211
Dr PC
Dr
Dr PT EL eor ST
eor
eor
eor
eor
eor
eor
eor
L ST
L RECT2 TCB loose
GW
GW
EOP ST dr ST PC
GDR
GDR
GDR PC
EOP SMO
EOP
GDR
GDR PT
EOP
GW
L sign 3258
L RECT-.5
GDR ST
GDR EL
Dr
Dr PT
Dr PC
Dr
Dr PT
Dr
Dr
Dr
Dr
Dr
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge EL
L ST parking
L
L PC
L
L PT
L
L PC
L
L PT
L PT CLO
L island
L1
L1 RECT-.5 sign
L
L
L
L
L CLO
OSW EL
BL-Crosscut
Corn-Stucco-oh
Corn-Stucco-oh PC
Corn-Stucco-oh PC
bld ST Corn-Stucco-oh Pt
BLD
BLD metal facade
BLD
Pier CIR
Pier
Pier CIR
Pier CIR
Pier
Pier CIR
BLD PC
BLD
BLD PT
BLD
BLD PC
BLD
Pier CIR
Pier
Pier CIR
Pier CIR
Pier
Pier CIR
Pier CIR
Pier
Pier CIR
BLD1 ST
BLD1 EL
BLD1 ST
BLD1
BLD1 pc
BLD1
BLD1 PT
BLD1
BLD1
BLD1
BLD1
L
L RECT-.5 sign
Pin insight
BL-Crosscut
Mag-Nail-Tie
L ST sign
L RECT-1
L post
L RECT-1.5
BLD ST
BLD
BLD
BLD
BLD EL
Pier
Pier
Pier RECT
Pier
Pier
Pier RECT
Pier
Pier
Pier RECT
Corn-Stucco
elev
elev
elev
elev
elev
elev
Corn-Conc-apron
elev
elev
elev
cnc
cnc RECT-8
L CIR
L
L CIR
elev
elev
BL-Crosscut
Corn-Conc-Blk
int
Corn-Conc-Blk
Corn-Shed-roof
cnc ST
cnc
cnc
Corn-Conc-Blk
BL-Crosscut
BL-Crosscut
BLD ST
BLD
BLD
BL-Crosscut 3500
GAS
GAS
GAS
GAS
GAS
GAS
METAL
EDGE
O
OVERHEAD
ASPHALT
PARKING
AREA
CONCRETE APRON
COVERED
ROOF
Metal Storage Container
(Moveable)
L E D G E
R O C K
NO PHYSICAL BOUNDS
CONCRETE
APRON
SIGN
HIGH ONE STORY
STUCCO AND CONCRETE BLOCK
BUILDING
Roof
Line
Pier
LIGHT
POLE
DRAIN
DRAIN
LIGHT
LIGHT
DRAIN
GUY WIRE
WIRE
DROP
CURB
TRAFFIC
POLE
CROSSWALK
POLE
GUY
GUY WIRE
AD
SERVICE
WIRES
METAL
GUARD
RAIL
METAL GUARD RAIL
METAL GUARD RAIL
T
T
T
ASPHALT
PARKING
AREA
CONCRETE
APRON
Roof
Line
Pier
Conc.Base
PIN FOUND
ASPHALT
PARKING
AREA
ASPHALT
PARKING
AREA
GRAVEL
AREA
DRAIN
DRAIN
CONCRETE
APRON
Garage Bay
Garage Bay
Garage Bays
Garage Bay
Garage Bays
ONE STORY
CONCRETE
PAD
DRAIN INLET
SIGN
Island
Grass
REMAINS OF STOCKADE
FENCE
UTILITY
POLE WITH LIGHTS
UTILITY
POLE WITH LIGHTS
UTILITY
POLE WITH LIGHTS
Pier
Pier
SIGN
SIGN
FLAG POLE
COVER
METAL
TRAFFIC
SIGN
CO
META
CONC
PAD
SIGN
LIGHT
LIGHT
LIGHT
N 49° 00' 09" W
67.21'
S 82° 25' 09" W
249.70'
N 39° 32' 52" W
396.49'
S 83° 20' 19" E
331.49'
S 38° 29' 48" E
355.75'
N 73° 26' 35" E
401.73'
Pier
Pier
Pier
Pier
CONCRETE
SIDEWALK
Conc Ramp
DRAIN
Pier
Gas Meter
Gas Markings on
Pavement
UTILITY
POLE
/ LIGHT
UTILITY
POLE
UTILITY
POLE
UTILITY
POLE
UTILITY
POLE
/ LIGHT
GUY WIRE
UTILITY
POLE
DRAIN
16.4'
DRAIN
Conc Pad
GUY WIRE
Metal
Anchor
Metal
Anchor
40.4'
10.5'±
17.5'±
OVERHEAD
SERVICE
WIRES
0 AC.
Q. FT.
106.0
M
1215.0404
2539.3696
1231.5613
2531.1352
1470.6342
2216.1682
1464.9973
2480.9974
1476.9475
2529.5483
1266.0166
2605.7164
1277.5109
2470.5989
1368.2007
2351.1194
1424.1159
2277.4539
1445.6039
2527.0832
1422.6315
2507.5518
1415.0740
2478.2285
1435.1183
2440.9069
1354.7143
2108.5096
1354.3264
2124.2589
126.36'
Village of Croton
Village of Croton 15
N 28°11'10" E
LOT 24
LOT 2
LOT 2
N 38° 19' 00" E
148.24'
88° 35' 20" E
15.75'
838.3
854.7084
2382.0316
N 38° 19' 00" E
148.24'
S 52° 27' 50" W
113.67'
S 28° 11' 10" W
233.02' Survey
N 28° 11' 10" E
276.41'
S 41° 43' 14" E
45.36'
S 57° 10' 00" W
36.33'
25.30'
76.94'
25.00'
[229.51' Deed]
S 52° 48' 00" E
395.44'
N 85° 59' 14" W
234.30'
N 27° 51' 14" W
192.60'
3' 14" W
341.79'
06'
90.40'
58° 09' 53"
S 88° 35' 20" E
15.75'
N 38° 19' 00" E
148.24'
S 26° 29' 34" E
1024.9942
2292.0453
1199.0340
2136.8695
1218.7284
2167.3902
1165.1773
2167.0565
1408.8119
2297.6162
BL-Crosscut
EOP
walk
GDR
anchor-ab
anchor-ab
GW
GW
GDR PT EL
walk
EOP
L ST
walk l
DC
DC
walk l ST
EOP
L EL
anchor-ab
GW
GDR ST PC
GDR
walk
EOP
EOP
walk
GDR
GW
GW
W
O
S
D
Y
H
L ST
L RECT-1.2 TCB
GDR PT EL
walk
EOP
GW
walk PT
walk
walk EL
EOP PC
DC
DC
EOP
EOP
DC
DC
EOP PT EL
walk ST PC JPN3070
walk
walk
walk PT EL
W
O
S
W
O
S
GW
GW
cnc ST
cnc RECT4
Dr ST
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
WSF
6in pvc cleanot-pipe
WSF
WSF EL
WSF ST
WSF
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr
Dr EL
Dr ST JPN3110
DR
Dr
Dr
cnc
cnc RECT6.5 drain-str
Dr
Dr
Dr
Dr
Dr
Dr
Dr PC
Dr
Dr
Dr PT
Dr
GDR
ag-pole
GDR
Dr PC
Dr
Dr PT EL
Dr ST
Gas
Gas 8in HP
Gas EL
Gas ST
Gas
GDR
Dr
Dr
Gas EL
Dr
GDR
Dr
Gas
Gas
Gas
Gas-METER
Dr PC
Dr
Dr PT
Dr
Dr
Dr PC
L
L RECT-4 CONC PAD
Dr
Dr PT
Dr
Dr
Dr
Dr
EC
L ST
L RECT2.5 Sigm-base
EC
cnc ST
cnc RECT3 con-pad
cnc ST
cnc RECT-5
Dr PC
Dr
Dr
Dr PT
Dr
Dr
W
O
S
Dr PC
Dr
Dr
Dr PT
GDR ST
Dr
GDR EL
Dr3211
Dr PC
Dr
Dr PT EL eor ST
eor
eor
eor
eor
eor
eor
eor
L ST
L RECT2 TCB loose
GW
GW
EOP ST dr ST PC
GDR
GDR
GDR PC
EOP SMO
EOP
GDR
GDR PT
EOP
GW
L sign 3258
L RECT-.5
GDR ST
GDR EL
Dr
Dr PT
Dr PC
Dr
Dr PT
Dr
Dr
Dr
Dr
Dr
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge
Dr ledge EL
L ST parking
L
L PC
L
L PT
L
L PC
L
L PT
L PT CLO
L island
L1
L1 RECT-.5 sign
L
L
L
L
L CLO
OSW EL
BL-Crosscut
Corn-Stucco-oh
Corn-Stucco-oh PC
Corn-Stucco-oh PC
bld ST Corn-Stucco-oh Pt
BLD
BLD metal facade
BLD
Pier CIR
Pier
Pier CIR
Pier CIR
Pier
Pier CIR
BLD PC
BLD
BLD PT
BLD
BLD PC
BLD
Pier CIR
Pier
Pier CIR
Pier CIR
Pier
Pier CIR
Pier CIR
Pier
Pier CIR
BLD1 ST
BLD1 EL
BLD1 ST
BLD1
BLD1 pc
BLD1
BLD1 PT
BLD1
BLD1
BLD1
BLD1
L
L RECT-.5 sign
Pin insight
BL-Crosscut
Mag-Nail-Tie
L ST sign
L RECT-1
L post
L RECT-1.5
BLD ST
BLD
BLD
BLD
BLD EL
Pier
Pier
Pier RECT
Pier
Pier
Pier RECT
Pier
Pier
Pier RECT
Corn-Stucco
elev
elev
elev
elev
elev
elev
Corn-Conc-apron
elev
elev
elev
cnc
cnc RECT-8
L CIR
L
L CIR
elev
elev
BL-Crosscut
Corn-Conc-Blk
int
Corn-Conc-Blk
Corn-Shed-roof
cnc ST
cnc
cnc
Corn-Conc-Blk
BL-Crosscut
BL-Crosscut
BLD ST
BLD
BLD
BL-Crosscut 3500
GAS
GAS
GAS
GAS
GAS
GAS
METAL
EDGE
O
OVERHEAD
ASPHALT
PARKING
AREA
CONCRETE APRON
COVERED
ROOF
Metal Storage Container
(Moveable)
L E D G E
R O C K
NO PHYSICAL BOUNDS
CONCRETE
APRON
SIGN
HIGH ONE STORY
STUCCO AND CONCRETE BLOCK
BUILDING
Roof
Line
Pier
LIGHT
POLE
DRAIN
DRAIN
LIGHT
LIGHT
DRAIN
GUY WIRE
WIRE
DROP
CURB
TRAFFIC
POLE
CROSSWALK
POLE
GUY
GUY WIRE
AD
SERVICE
WIRES
METAL
GUARD
RAIL
METAL GUARD RAIL
METAL GUARD RAIL
T
T
T
ASPHALT
PARKING
AREA
CONCRETE
APRON
Roof
Line
Pier
Conc.Base
PIN FOUND
ASPHALT
PARKING
AREA
ASPHALT
PARKING
AREA
GRAVEL
AREA
DRAIN
DRAIN
CONCRETE
APRON
Garage Bay
Garage Bay
Garage Bays
Garage Bay
Garage Bays
ONE STORY
CONCRETE
PAD
DRAIN INLET
SIGN
Island
Grass
REMAINS OF STOCKADE
FENCE
UTILITY
POLE WITH LIGHTS
UTILITY
POLE WITH LIGHTS
UTILITY
POLE WITH LIGHTS
Pier
Pier
SIGN
SIGN
FLAG POLE
COVER
METAL
TRAFFIC
SIGN
CO
META
CONC
PAD
SIGN
LIGHT
LIGHT
LIGHT
N 49° 00' 09" W
67.21'
S 82° 25' 09" W
249.70'
N 39° 32' 52" W
396.49'
S 83° 20' 19" E
331.49'
S 38° 29' 48" E
355.75'
N 73° 26' 35" E
401.73'
Pier
Pier
Pier
Pier
CONCRETE
SIDEWALK
Conc Ramp
DRAIN
Pier
Gas Meter
Gas Markings on
Pavement
UTILITY
POLE
/ LIGHT
UTILITY
POLE
UTILITY
POLE
UTILITY
POLE
UTILITY
POLE
/ LIGHT
GUY WIRE
UTILITY
POLE
DRAIN
16.4'
DRAIN
Conc Pad
GUY WIRE
Metal
Anchor
Metal
Anchor
40.4'
10.5'±
17.5'±
OVERHEAD
SERVICE
WIRES
2-2" C
19.2 KW L2 WALL MOUNTED
EV CHARGERS
LEARANCES
ARGER CONCRETE PAD
MODULE
SPACES
OPY MOUNTED PV PANELS
BESS DISCONNECT
BESS
800A COMBINER PANEL
10 KW SOLAR PVINVERTER
1-2 1
2" CAP FOR EMPTY
CONDUIT
24' X 20' PV MODULE
EV PARKING SPACE
89-L-3 60A NEMA-3R INVERTER
DISCONNECT
150KVA TRANSFORMER
CONCRETE PAD
CON ED METER
89-L-1 800A MAIN SERVICE
DISCONNECT SWITCH
CONCRETE PAD
NEW PRIMARY PAD MOUNTED
CONED TRANSFORMER
SAFETY BOLLARDS BY OHTER (TYP)
60A NEMA-3R INVERTER DISCONNECT
CANOPY PNL NEMA 3R 400A
400A NEMA 3R DCFC CHARGER DISCONNECT
48 X 36" CHARGER CONCRETE PAD
180 KW DCFC FAST CHARGER
EV PARKING SPACE
19.2 KW L2 WALL MOUNTED
EV CHARGERS
1#1/0-1"C
GROUNDING BUS BAR
GROUND BOND TO DOMESTIC SUPPLY
EXISTING INCOMING DOMESTIC
WATER SUPPLY
19.2 KW L2 WALL MOUNTED
EV CHARGERS
1#1/0-1"C
GROUNDING BUS BAR
GROUND BOND TO DOMESTIC SUPPLY
EXISTING INCOMING DOMESTIC
WATER SUPPLY
19.2 KW L2 WALL MOUNTED
EV CHARGERS
1#1/0-1"C
GROUNDING BUS BAR
GROUND BOND TO DOMESTIC SUPPLY
EXISTING INCOMING DOMESTIC
WATER SUPPLY
19.2 KW L2 WALL MOUNTED
EV CHARGERS
1#1/0-1"C
GROUNDING BUS BAR
GROUND BOND TO DOMESTIC SUPPLY
EXISTING INCOMING DOMESTIC
WATER SUPPLY
UTILITY OVERHEAD PRIMARY LINE
TO BE DEMOLISHED BY CON EDISON
DATE:
SCALE:
Sheet
of
No.
Date
Comments:
Yorktown Heights, NY 10598
www.sitedesignconsultants.com
Fax: (914) 962-7386
Land Planners
Engineer:
NYS Lic. No. 64431
Joseph C. Riina, P.E.
251-F Underhill Avenue,
Civil Engineers
(914) 962-4488 -
NOTE:
1.
THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN
TAKEN FROM SURVEY MAP PREPARED BY JRL LAND SURVEYING, DATED 12/01/2023.
THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
COPYRIGHT © 2020 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
SAFE DIG
Before You Dig, Drill or Blast!
CALL US TOLL FREE 811 or 1-800-962-7962
NY Industrial Code Rule 753 requires no less
than two working days notice, but not more
than ten days notice.
www.digsafelynewyork.com
F:\2024\24-08 RED ROCK - CROTON AUTO PARK, CROTON\ENGINEERING\CAD\C3D-24-08 RED ROCK CROTON AUTO PARK\24-08 SITE 3-15-24.DWG 3/22/2024 11:00:37 AM
6/19/24
Plan Updates
Westchester Co., New York
Town of Croton On Hudson
1 MUNICIPAL PLACE
PROJECT LOCATION
SITE DATA:
OWNER / DEVELOPER:
CROTON AUTO PARK
1 MUNICIPAL PLACE, CROTON-ON-HUDSON,
NY 10520
PROJECT LOCATION:
1 MUNICIPAL PLACE, CROTON-ON-HUDSON,
NY 10520
EXISTING TOWN ZONING:
C-2, GENERAL COMMERCIAL
PROPOSED USE:
ADDITION OF BESS AND SOLAR CARPORT CANOPY
SYSTEM TO EXISTING AUTOMOTIVE DEALERSHIP
TOWN TAX MAP DATA:
SECTION 78.12, BLOCK 3, LOT 2
SITE AREA :
4.9 ACRES (213,444 SF)
1"=30'
PROJECT #
SITE PLAN
PREPARED FOR
CROTON AUTO PARK
SITE PLAN
3-18-24
JP
24-08
SCALE: 1"=30'-0"
GENERAL REQUIREMENTS:
A BUILDING PERMIT SHALL BE REQUIRED FOR INSTALLATION OF ALL SOLAR ENERGY SYSTEMS.
PRIOR TO THE ISSUANCE OF A BUILDING PERMIT, CONSTRUCTION AND/ OR SITE PLAN DOCUMENTS, SIGNED
AND STAMPED BY A LICENSED PROFESSIONAL ENGINEER OR REGISTERED ARCHITECT SHALL BE SUBMITTED TO
THE ENGINEERING DEPARTMENT.
ALL VILLAGE BOARDS ARE ENCOURAGED TO CONDITION THEIR APPROVAL OF PROPOSED DEVELOPMENTS ON
SITES ADJACENT TO SOLAR ENERGY SYSTEMS SO AS TO PROTECT THEIR ACCESS TO SUFFICIENT SUNLIGHT TO
REMAIN ECONOMICALLY FEASIBLE OVER TIME.
ALL SOLAR ENERGY SYSTEMS SHALL BE DESIGNED, ERECTED, AND INSTALLED IN ACCORDANCE WITH ALL
APPLICABLE CODES, REGULATIONS, AND INDUSTRY STANDARDS AS REFERENCED IN THE NEW YORK STATE
UNIFORM FIRE PREVENTION AND BUILDING CODE ( BUILDING CODE), THE NEW YORK STATE ENERGY
CONSERVATION CODE ( ENERGY CODE), AND THE VILLAGE CODE.
PERMITTING REQUIREMENTS FOR TIER 1 SOLAR ENERGY SYSTEMS. ALL TIER 1 SOLAR ENERGY SYSTEMS SHALL
BE PERMITTED IN ALL ZONING DISTRICTS AS AN ACCESSORY USE AND SHALL BE EXEMPT FROM SITE PLAN
REVIEW, SUBJECT TO THE FOLLOWING CONDITIONS FOR EACH TYPE OF SOLAR ENERGY SYSTEM:
ROOF-MOUNTED SOLAR ENERGY SYSTEMS.
ROOF-MOUNTED SOLAR ENERGY SYSTEMS SHALL INCORPORATE, WHEN FEASIBLE, THE FOLLOWING DESIGN
REQUIREMENTS:
ROOF-MOUNTED SOLAR PANELS MUST BE ATTACHED OR BALLASTED TO A LAWFULLY PERMITTED BUILDING OR
STRUCTURE, WHICH MAY BE AN ACCESSORY STRUCTURE.
ALL ROOF-MOUNTED SOLAR ENERGY SYSTEMS SHALL BE SUBJECT TO THE MAXIMUM HEIGHT REGULATIONS
SPECIFIED FOR PRINCIPAL AND ACCESSORY BUILDINGS WITHIN THE UNDERLYING ZONING DISTRICT, WITH THE
HEIGHT EXEMPTIONS AS PROVIDED FOR BUILDING- MOUNTED MECHANICAL DEVICES OR EQUIPMENT.
GLARE. ALL SOLAR PANELS SHALL HAVE ANTIREFLECTIVE COATING( S).
BUILDING- INTEGRATED SOLAR ENERGY SYSTEMS AND CANOPY- MOUNTED SOLAR ENERGY SYSTEMS SHALL BE
SHOWN ON THE PLANS SUBMITTED FOR THE BUILDING PERMIT APPLICATION FOR THE BUILDING OR PROPERTY
CONTAINING THE SYSTEM. APPLICANTS FOR CANOPY-MOUNTED SOLAR ENERGY SYSTEMS SHALL SUBMIT ALL
STUDIES AS REQUIRED BY THE VILLAGE ENGINEER OR BUILDING INSPECTOR.
SOLAR ENERGY EQUIPMENT SHALL BE LOCATED IN A MANNER TO REASONABLY AVOID AND/OR MINIMIZE
BLOCKAGE OF VIEWS FROM SURROUNDING PROPERTIES AND SHADING OF PROPERTY TO THE NORTH, WHILE
STILL PROVIDING ADEQUATE SOLAR ACCESS.
ALL MECHANICAL EQUIPMENT OF THE SOLAR ENERGY SYSTEM, INCLUDING ANY PAD- MOUNTED STRUCTURE
FOR BATTERIES, SWITCHBOARD, TRANSFORMERS, OR STORAGE CELLS.
FENCING. ALL MECHANICAL EQUIPMENT, INCLUDING ANY STRUCTURE FOR STORAGE BATTERIES, SHALL BE
ENCLOSED BY A FENCE, AS REQUIRED BY NEC, WITH A SELF-LOCKING GATE TO PREVENT UNAUTHORIZED ACCESS.
WARNING SIGNS WITH THE OWNER OR OPERATOR' S CONTACT INFORMATION SHALL BE PLACED ON THE
ENTRANCE AND PERIMETER OF THE FENCING. THE TYPE AND HEIGHT OF FENCING SHALL BE DETERMINED AS
PART OF THE SITE PLAN AND SPECIAL PERMIT REVIEW. THE FENCING AND THE SYSTEM MAY BE FURTHER
SCREENED BY ANY LANDSCAPING NEEDED TO AVOID ADVERSE AESTHETIC IMPACTS.
LIGHTING. LIGHTING OF THE SOLAR ENERGY SYSTEMS SHALL BE LIMITED TO THAT MINIMALLY REQUIRED FOR
SAFETY AND OPERATIONAL PURPOSES, SHALL BE REASONABLY SHIELDED AND DOWNCAST FROM ABUTTING
PROPERTIES AND SHALL MINIMIZE IMPACTS ON NOCTURNAL ANIMALS WHERE PRACTICABLE.
INTEGRATED PEST MANAGEMENT PRACTICES SHALL BE USED TO REFRAIN FROM OR LIMIT PESTICIDE USE
INCLUDING HERBICIDES) FOR LONG-TERM OPERATION AND SITE MAINTENANCE.
UNDERGROUND REQUIREMENTS. ALL ON- SITE UTILITY LINES SHALL BE PLACED UNDERGROUND TO THE EXTENT
FEASIBLE AND AS PERMITTED BY THE SERVING UTILITY, WITH THE EXCEPTION OF THE MAIN SERVICE
CONNECTION AT THE UTILITY COMPANY RIGHT-OF-WAY AND ANY NEW INTERCONNECTION EQUIPMENT,
INCLUDING WITHOUT LIMITATION ANY POLES, WITH NEW EASEMENTS AND RIGHT- OF-WAY.
NO SIGNAGE OR GRAPHIC CONTENT SHALL BE DISPLAYED ON THE SOLAR ENERGY SYSTEMS EXCEPT THE
MANUFACTURER' S NAME, EQUIPMENT SPECIFICATION INFORMATION, SAFETY INFORMATION, AND
TWENTYFOUR-HOUR EMERGENCY CONTACT INFORMATION.
AS REQUIRED BY THE NATIONAL ELECTRIC CODE ( NEC), DISCONNECT AND OTHER EMERGENCY SHUTOFF
INFORMATION SHALL BE CLEARLY DISPLAYED ON A LIGHT-REFLECTIVE SURFACE. A CLEARLY VISIBLE WARNING
SIGN CONCERNING VOLTAGE SHALL BE PLACED AT THE BASE OF ALL PAD-MOUNTED TRANSFORMERS AND
SUBSTATIONS.
SAFETY:
SOLAR ENERGY SYSTEMS AND SOLAR ENERGY EQUIPMENT SHALL BE CERTIFIED UNDER THE APPLICABLE
ELECTRICAL AND/OR BUILDING CODES AS REQUIRED.
SOLAR ENERGY SYSTEMS SHALL BE MAINTAINED IN GOOD WORKING ORDER AND IN ACCORDANCE WITH
INDUSTRY STANDARDS. SITE ACCESS SHALL BE MAINTAINED, INCLUDING SNOW REMOVAL AT A LEVEL
ACCEPTABLE TO THE LOCAL FIRE DEPARTMENT AND, IF THE TIER 3 SOLAR ENERGY SYSTEM IS LOCATED IN AN
AMBULANCE DISTRICT, THE LOCAL AMBULANCE CORPS.
IF A BATTERY ENERGY STORAGE SYSTEM IS INCLUDED AS PART OF THE SOLAR ENERGY SYSTEM, THEY SHALL
MEET THE REQUIREMENTS OF ANY APPLICABLE FIRE PREVENTION AND BUILDING CODE WHEN IN USE AND,
WHEN NO LONGER USED, SHALL BE DISPOSED OF IN ACCORDANCE WITH THE LAWS AND REGULATIONS OF THE
VILLAGE AND ANY APPLICABLE FEDERAL, STATE, OR COUNTY LAWS OR REGULATIONS.
WHERE DEEMED NECESSARY BY THE BOARD OF TRUSTEES OR PLANNING BOARD, EMERGENCY ACCESS TO
THE SITE FOR LOCAL FIRST RESPONDERS SHALL BE PROVIDED BY THE INSTALLATION OF AN EMERGENCY LOCK
BOX OR A SIMILAR DEVICE, IN A LOCATION SUBJECT TO THE APPROVAL OF THE FIRE CHIEF.
BATTERY ENERGY STORAGE SYSTEMS:
AUTHORITY. THIS SECTION IS ADOPTED PURSUANT TO §7- 700 THROUGH §7- 704 OF THE VILLAGE LAW AND
10 OF THE MUNICIPAL HOME RULE LAW OF NEW YORK STATE( NYS), WHICH AUTHORIZE THE VILLAGE
TO ADOPT ZONING PROVISIONS THAT ADVANCE AND PROTECT THE HEALTH, SAFETY AND WELFARE OF THE
COMMUNITY.
STATEMENT OF PURPOSE. THIS BATTERY ENERGY STORAGE SYSTEM LAW IS ADOPTED TO ADVANCE AND
PROTECT THE PUBLIC HEALTH, SAFETY, WELFARE, AND QUALITY OF LIFE OF THE VILLAGE BY CREATING
REGULATIONS FOR THE INSTALLATION AND USE OF BATTERY ENERGY STORAGE SYSTEMS, WITH THE FOLLOWING
OBJECTIVES:
TO PROVIDE A REGULATORY SCHEME FOR THE DESIGNATION OF PROPERTIES SUITABLE FOR THE LOCATION,
CONSTRUCTION AND OPERATION OF BATTERY ENERGY STORAGE SYSTEMS;
TO ENSURE COMPATIBLE LAND USES IN THE VICINITY OF THE AREAS AFFECTED BY BATTERY ENERGY STORAGE
SYSTEMS;
TO MITIGATE THE IMPACTS OF BATTERY ENERGY STORAGE SYSTEMS ON ENVIRONMENTAL RESOURCES SUCH
AS CONSERVATION AREAS, WILDLIFE AND OTHER PROTECTED RESOURCES; AND
TO CREATE SYNERGY BETWEEN BATTERY ENERGY STORAGE SYSTEM DEVELOPMENT AND THE GOALS OF THE
VILLAGE' S COMPREHENSIVE PLAN.
BATTERY ENERGY STORAGE SYSTEMS, COMPONENTS, AND ASSOCIATED ANCILLARY EQUIPMENT SHALL HAVE
REQUIRED WORKING SPACE CLEARANCES, AND ELECTRICAL CIRCUITRY SHALL BE WITHIN WEATHERPROOF
ENCLOSURES MARKED WITH THE ENVIRONMENTAL RATING SUITABLE FOR THE TYPE OF EXPOSURE IN
COMPLIANCE WITH NFPA 70.
9/25/24
Plan Updates
Machine-extracted for search and reference — the original PDF is the authoritative version.