QBR wetlands activity permit with Joint Permit App
environmental
187 pages
Meeting: portal event 1071 (no meeting page on file)
Agenda item: New Business — Westchester County Dept. of Public Works - Consider acknowledging receipt of Tree Removal Application from Hugh Greechan Jr., P.E., Commissioner of Public Works and Transportation, Westchester County for the removal of multiple trees for the facilitation of the Quaker Bridge Replacement Project and referring the application, Coastal Assessment Form (CAF) and other support documents to the Waterfront Advisory Committee for a consistency recommendation
Environmental review, 187 pages. Attached to agenda item: “New Business — Westchester County Dept. of Public Works - Consider acknowledging receipt of Tree Removal Application from Hugh Greechan Jr., P.E., Commissioner of Public Works and Transportation, Westchester County for t”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
2025 Tree Law Village of Croton
Contract 25-500 Plans A01 22X34
QBR Tree Permit Application - combined
QBR-Coastal assessment 2025
QBRB Chapter 230 Finding Statement
QBRB Wetlands 227 Finding Statement
QBR CAF
QBR Village LWRP Letter
QBR WAP fee waiver request
safe print QBR - Tree Removal table and plan
Extracted text
Civil, Environmental and Transportation Design Services
OSPA Engineering Services, PC
800 Route 146, Bldg. 200, Suite 280
Clifton Park, NY 12065
Phone: 518.636.9956
E-Mail ospa@ospaengineering.com
Web site WWW.OSPAENGINEERING.COM
July 1, 2025
United States Army Corps of Engineers
Jacob K. Javits Federal Building
26 Federal Plaza
New York, NY 10278-0090
NYSDEC Region 3 Permits
21 South Putt Corners Road
New Paltz, NY 12561-1620
Re: Quaker Bridge Replacement, Town of Cortlandt and Village of Croton-On-Hudson,
Westchester County, NY
Dear Sir or Madame:
OSPA Engineering Services, PC has been contracted to submit the following permit
application for activity for the county funded proposed Quaker Bridge Road Bridge
Replacement Project. A location map is attached. The project is located at the following
coordinates:
Project Coordinates NAD 27:
N 41.211976
W -73.869054
The project proposes the replacement of the Quaker Bridge Road Bridge with a new
structure. The Croton River is a NYSDEC Class B stream and is mapped and classified as a
USFWS riverine wetland.
The bridge was closed to traffic in the fall of 2024 based on the bridge condition. All prudent
and feasible alternatives to avoid and minimize the impacts upon the bridge have been
explored. The deterioration and condition of the bridge is too severe for rehabilitation.
The project site is designated SHPO Consultation Project 17PR02639. The Quaker Bridge
Road Bridge is a late nineteenth century Pratt Truss bridge built in 1894, eligible for listing on
the National Register of Historic Places. The County proposes to remove the Quaker Bridge
Road Bridge and replace it with a two-lane, truss bridge made of galvanized steel, built on
the existing alignment with the new bridge being approximately 12 feet wider to allow for 2-
way vehicular traffic as well as 2-way pedestrian passage. Two fee conveyance areas and
two permanent easements will be required for the proposed project. Coordination with SHPO
regarding a Memorandum of Agreement has been started and will continue upon receipt of
a USACE contact.
There is the potential for the federally endangered Northern Long-eared Bat (Myotis
septentrionalis), the federally endangered Indiana Bat (Myotis sodalis), the federally
threatened Bog Turtle (Glyptemys muhlenbergii), the federally proposed endangered
Quaker Bridge Road over Croton River Replacement
OSPA Engineering Services, PC
800 Route 146, Bldg. 200, Suite 280
Clifton Park, NY 12065
Phone:
518.636.9956
E-Mail ospa@ospaengineering.com
Web site WWW.OSPAENGINEERING.COM
Tricolored Bat (Perimyotis subflavus), and the federally proposed threatened Monarch
Butterfly (Danaus plexippus) to occur within the project area. Approximately 76 trees with a
diameter at breast height (DBH) equal to or greater than 2 inches are expected to be removed
within the clearing window, November 1st – March 31st. The nearest hibernacula is located
approximately 10.7 miles from the project site. The EAF Mapper indicates the project is within
the Westchester County, County and State Park Lands Critical Environmental Area for its
exceptional or unique character. The EAF Mapper indicates that there are no other known
records of federally or state-listed rare or endangered animals or plants or significant natural
communities, at the project site or in its immediate vicinity. The project site was evaluated
for Bog turtle habitat and it was determined that habitat for the Bog Turtle is not present.
A completed Joint Application Form and attachments, including project plans and additional
pertinent documentation are included in this submission. If you have any questions, please
contact me at 518-636-9956 or at mosterhout@ospaengineering.com.
Melanie Osterhout, P.E.
President
Enclosures
c:
Creighton Manning Engineering
file
LETTER .............................................................................................................................................. 1
TABLE OF CONTENTS ......................................................................................................................... 3
JOINT PERMIT APPLICATION .............................................................................................................. 5
TABLE OF CONTENTS
ATTACHMENTS
1.
Project Database Mapping, Wetland Delineation Report and FEAF
2.
Plans
3.
SHPO Documentation
7/5/25
ATTACHMENT A: PROJECT DATABASE MAPPING,
WETLAND DELINEATION REPORT AND FEAF
USGS Topographic Map
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
NOT TO SCALE
Project Location
Google Earth Site Location Map
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
Site Aerial
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
NYSDEC Environmental Resource Mapper
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
USFWS NWI Mapper
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
NYSHPO CRIS Mapper
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
FEMA Floodplains Mapper
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
USDA Soils Map
NOT TO SCALE
Project Location
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
WETLAND AND ORDINARY HIGH WATER
DELINEATION REPORT
Quaker Bridge Replacement
Town of Cortlandt, Westchester County
November 2024
Prepared for:
By:
800 Route 146, Bldg. 200
Suite 280, Clifton Park
NY 12065
(518) 636-9956
Westchester County Department of Public
Works and Transportation
148 Martine Ave. Room 512
White Plains, NY 10601
Quaker Bridge Replacement, Town of Cortlandt November 2024
US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report
Page ii
OSPA Engineering Services, P.C.
1.0
INTRODUCTION ................................................................................................... 1
2.0
EXISTING CONDITIONS ...................................................................................... 1
2.1
Topography ........................................................................................................ 1
2.2
Soils ................................................................................................................... 1
2.3
Hydrology ........................................................................................................... 1
2.4
Vegetative Communities .................................................................................... 2
2.5
Wetland Mapping ............................................................................................... 2
3.0
METHODOLOGY AND RESULTS ........................................................................ 2
4.0
WETLAND AND WATERWAY IMPACTS ............................................................. 3
LIST OF APPENDICES
APPENDIX A:
PROJECT DATABASE MAPPING
APPENDIX B:
PRELIMINARY ORDINARY HIGH WATER DELINEATION WITH
DATA POINT
APPENDIX C:
WETLAND DETERMINATION DATA FORMS
Quaker Bridge Replacement, Town of Cortlandt November 2024
US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report
OSPA Engineering Services, P.C.
1.0
INTRODUCTION
This Wetland and Ordinary High Water (OHW) Delineation Report was prepared for a project site
located where Quaker Bridge Road crosses the Croton River in the Town of Cortlandt,
Westchester County, New York. The “Site Location Map”, in Appendix A – Project Database
Mapping, illustrates the site location.
2.0
EXISTING CONDITIONS
2.1
Topography
Surface water generally drains to the south by channel or sheet flow. The New York State
Department of Environmental Conservation (NYSDEC) Environmental Resource Mapper
(ERM), United State Department of Agriculture (USDA) Soil Survey Map, and the United
States Geological Survey (USGS) topographic mapping do not identify wetlands within the
project area. The United States Fish and Wildlife Service (USFWS) National Wetlands
Inventory (NWI) Map and the NYSDEC ERM both identify a river within the project site.
2.2
Soils
The following is a description of the soil found on the site. The Soil Survey Mapping with
the approximate project boundaries is included in Appendix A.
Charlton fine sandy loam, 15 to 25 percent slopes (ChD): This series is comprised of
well drained, coarse loamy melt out till derived from granite, gneiss and/or schist.
Charlton loam, 35 to 45 percent slopes, very stones (CIF): This series is comprised of
well drained, acid loamy till derived mainly from schist, gneiss, or granite.
2.3
Hydrology
Surface water generally drains to the south by channel or sheet flow which enters the
Croton River (NYSDEC Class B), and eventually the Hudson River (NYSDEC Class SB).
The best usage for Class B water is swimming and contact recreation, not suitable for
drinking. The best usage for Class SB water is swimming, contact recreation, and fishing.
Additionally, Flood Emergency Management Act (FEMA) floodplain maps (36119C0128F,
2007) were reviewed to identify any potential flood risk to the project site. The project site
in the vicinity of the crossing is located within the regulatory floodway and in the 100-year
floodplain of the Croton River.
A review of the National Resources Conservation Service (NRCS) Wetland Determination
Climate Data (WETS Table.36119. WESTCHESTER CO AP) for Westchester County
indicates that the 20-year average annual rainfall is 58.44 inches per year.
Quaker Bridge Replacement, Town of Cortlandt November 2024
US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report
OSPA Engineering Services, P.C.
2.4
Vegetative Communities
Wetland plant communities follow the Cowardin system as identified in the “Classification
of Wetlands and Deepwater Habitats of the United States” as utilized by the United States
Fish and Wildlife Services (USFWS) National Wetland Inventory (NWI) mapping. The
NWI mapping identifies a riverine, tidal, unconsolidated bottom, permanently flooded- tidal
riverine community (R1UBV) within the project site.
Based on the site visit, the subject property has one waterbody (Croton River). The project
corridor is currently comprised of forested tree and shrub cover with an understory of
herbaceous cover. The tree cover included Red Maple (Acer rubrum), American Beech
(Fagus grandfolia), Eastern Hemlock (Tsuga canadensis), Eastern Sycamore (Platanus
occidentalis), and Tulip Tree (Liriodendron tulipfera). The shrub layer included Burning
Bush (Euonymus alatus), Witch Hazel (Hamamelis virginiana), and Ironwood (Ostrya
virginiana). The herbaceous cover included Christmas Fern (Polystichum acrostichoides),
Marginal Wood Fern (Dryopteris marginalis), Shagbark Hickory (Carya ovata), Bitternut
Hickory (Carya cordiformis), and Slender Goldenrod (Solidago erecta).
2.5
Wetland Mapping
The NYSDEC ERM identifies the approximate locations of the wetlands, streams, and
other environmental features on or near the project site that are regulated by the NYSDEC
(Appendix A). According to the NYSDEC ERM, there are no state-regulated wetlands on
the project site. There is one mapped NYSDEC river (Croton River). Additionally, the
NWI mapping for the project site, located in Appendix A, identifies a riverine vegetative
community on the site (Croton River).
3.0
METHODOLOGY AND RESULTS
The ordinary high water (OHW) determination for the area of investigation was conducted on
November 18th, 2024. The delineation was performed using the three-parameter approach
described in the United States Army Corps of Engineers’ (USACE) Wetland Delineation Manual
and the Northcentral and Northeast Regional Supplement.
Data was collected within the regulated areas and uplands at representative points to document
the existing vegetation, soils and hydrology. Data sampling protocols followed the USACE
Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Northcentral and
Northeast guidance for vegetation analysis. The sampling plot sizes were selected to ensure an
accurate assessment of the vegetation present within the existing wetland boundaries. A 20’ x
60’ plot (1200 sf) was utilized for both tree and shrub strata, and a 5’ x 20’ plot (100 sf) was utilized
for the herb stratum. These plots sizes were selected based on the narrow rectangular shape of
the subject property, the site vegetation composition, and the relative vegetation density in each
of the strata.
Using a soil auger, soil samples were taken approximately 12 inches below the ground surface to
characterize soils. Soil colors were documented using a Munsell Soil Color Chart. Hydrology
was assessed by evaluating for inundation, saturation, and other site conditions.
Quaker Bridge Replacement, Town of Cortlandt November 2024
US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report
OSPA Engineering Services, P.C.
Vegetation found at the sampling locations was identified in terms of the dominant species in the
tree, shrub/sapling, herbaceous, and vine layers. The indicator status of the dominant plant
species was determined using the “The National Wetland Plant List - Northcentral and Northeast
Region 1” (Lichvar, R.W., 2016).
Following the establishment of the OHW boundaries in the field, the boundary was collected by
hand-held GPS and plotted on the field sketch. This OHW line and approximate property
boundary is included within Appendix B (“Preliminary Ordinary High Water and Delineation with
Data Point”) and includes the location of a representative data point. The information collected
at the data point locations is included in this report as Appendix C – Wetland Determination Data
Forms.
The field efforts identified one (1) perennial river (Croton River), the OHW was delineated as a
flag series of LB (1-16) and RB (1-27). No wetlands were identified during the site visit.
The upland areas are generally dominated by maintained right of way, residential homes and
maintained lawns, forested shrub and tree cover.
4.0
WETLAND AND WATERWAY IMPACTS
It was concluded that Stream LB (1-16) and RB (1-27) will be regulated by the USACE and the
NYSDEC as a Class B waterbody.
While the site is currently in preliminary design, impacts to regulated waterbodies will be
minimized as part of the proposed bridge replacement. It is anticipated that a USACE Section
404 Nationwide Permit 3 will be required based on the anticipated impacts (less than 0.5 acres).
In addition, a NYSDEC Article 15 Protection of Waters Permit and a NYSDEC Section 401 Water
Quality Certification would be required.
Ultimately, the exact permitting pathway can only be confirmed through coordination with the
USACE and the NYSDEC.
Quaker Bridge Replacement, Town of Cortlandt November 2024
US Army Corps of Engineers/NYS Department of Environmental Conservation Wetland Delineation Report
OSPA Engineering Services, P.C.
References
U.S. Army Corps of Engineers. 1987. Wetlands Delineation Manual.
U.S. Army Corps of Engineers. 2012. Regional Supplement to the Corps of Engineers
Wetland Delineation Manual: Northcentral and Northeast Region (Version 2.0)
National Wetland Inventory Map, USFWS.
USDA Natural Resource Conservation Service. Soil Survey for Westchester County, New
York.
USDA Natural Resources Conservation Service. National Cooperative Soil Survey.
Official Soil Descriptions from the National Soils Database.
U.S. Geological Survey. Bridgeport, NY Quadrangle. 2023.
Federal Emergency Management Agency. Flood Insurance Rate Map. Map Number
36119C0128F, 2007.
Lichvar, R.W. 2016. The National Wetland Plant List - Northcentral and Northeast Region
1. U.S. Army Corps of Engineers, Cold Regions Research and Engineering
Laboratory.
Project Database Mapping
DATABASE MAPPING PROVIDED PREVIOUSLY
Appendix B
Preliminary Wetland and Ordinary High Water Delineation with
Data Point
Preliminary Wetland and Ordinary High Water Delineation with Data Points
NOT TO SCALE
Quaker Bridge Replacement
Town of Cortlandt
Westchester County
Appendix C
Wetland Determination Data Forms
Project/Site:
Sampling Date:
Applicant/Owner:
State:
Sampling Point:
Investigator(s):
Subregion (LRR or MLRA):
Lat:
Long:
Datum:
Soil Map Unit Name:
NWI classification:
Are Vegetation
, Soil
, or Hydrology
Are Vegetation
, Soil
, or Hydrology
SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc.
If yes, optional Wetland Site ID:
Secondary Indicators (minimum of two required)
Wetland Hydrology Present?
Crayfish Burrows (C8)
Hydrogen Sulfide Odor (C1)
No
Yes
Depth (inches):
X
X
X
Depth (inches):
X
Depth (inches):
Saturation Visible on Aerial Imagery (C9)
Stunted or Stressed Plants (D1)
Geomorphic Position (D2)
Sparsely Vegetated Concave Surface (B8)
Saturation Present?
Saturation (A3)
Water Marks (B1)
Iron Deposits (B5)
Inundation Visible on Aerial Imagery (B7)
Presence of Reduced Iron (C4)
Recent Iron Reduction in Tilled Soils (C6)
Other (Explain in Remarks)
Oxidized Rhizospheres on Living Roots (C3)
Sediment Deposits (B2)
Drift Deposits (B3)
Surface Water (A1)
FAC-Neutral Test (D5)
X
Shallow Aquitard (D3)
Microtopographic Relief (D4)
Remarks:
(includes capillary fringe)
Yes
No
No
Yes
Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available:
Field Observations:
Water Table Present?
High Water Table (A2)
WETLAND DETERMINATION DATA FORM – Northcentral and Northeast Region
X
X
Westchester County
No
41.211978°
Charlton laom, 35 to 45 percent slopes, very stony
11/18/2024
DP-RBU
Quaker Bridge Replacement
Westchester County
City/County:
NY
73.869444°
Yes
No
X
No
X
Yes
Remarks: (Explain alternative procedures here or in a separate report.)
Yes
HYDROLOGY
Surface Soil Cracks (B6)
Aquatic Fauna (B13)
Drainage Patterns (B10)
Moss Trim Lines (B16)
Dry-Season Water Table (C2)
No
No
X
X
No
Yes
No
NAD 83
Wetland Hydrology Indicators:
Wetland Hydrology Present?
Is the Sampled Area
within a Wetland?
Data point was sampled on streambank, upland.
Primary Indicators (minimum of one is required; check all that apply)
Yes
Yes
Hydrophytic Vegetation Present?
Hydric Soil Present?
Water-Stained Leaves (B9)
Slope (%):
Landform (hillside, terrace, etc.):
Are climatic / hydrologic conditions on the site typical for this time of year?
significantly disturbed?
Are “Normal Circumstances” present?
naturally problematic?
Surface Water Present?
Section, Township, Range:
Concave
Local relief (concave, convex, none):
Yes
Algal Mat or Crust (B4)
(If needed, explain any answers in Remarks.)
Thin Muck Surface (C7)
N. Laing, G. Koetzle
LRR R, MLRA 144A
(If no, explain in Remarks.)
Streambank
Marl Deposits (B15)
US Army Corps of Engineers
Northcentral and Northeast Region – Version 2.0
Sampling Point:
(Plot size:
1.
2.
3.
4.
5.
6.
(A/B)
7.
Sapling/Shrub Stratum (Plot size:
x 1 =
1.
x 2 =
2.
x 3 =
3.
x 4 =
4.
x 5 =
5.
Column Totals:
(B)
6.
7.
Herb Stratum
(Plot size:
1.
2.
4 - Morphological Adaptations1 (Provide supporting
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
(Plot size:
1.
2.
3.
4.
– Use scientific names of plants.
OBL species
FACW species
FAC species
FACU species
UPL species
DP-RBU
Liriodendron tulipifera
Platanus occidentalis
Betula populifolia
Quercus coccinea
FACU
30'x30'
Total Number of Dominant
Species Across All Strata:
)
Dominance Test worksheet:
Number of Dominant Species
That Are OBL, FACW, or FAC:
No
Acer rubrum
data in Remarks or on a separate sheet)
Acer rubrum
Euonymus alatus
Hydrophytic Vegetation Indicators:
Multiply by:
50.0%
Percent of Dominant Species
That Are OBL, FACW, or FAC:
Total % Cover of:
Prevalence Index worksheet:
No
FAC
FACU
Yes
No
FAC
Yes
No
No
FACU
FACU
FACU
FAC
Yes
Ostrya virginiana
No
No
Yes
No
Tree – Woody plants 3 in. (7.6 cm) or more in diameter
at breast height (DBH), regardless of height.
Definitions of Vegetation Strata:
Herb – All herbaceous (non-woody) plants, regardless
of size, and woody plants less than 3.28 ft tall.
Hydrophytic
Vegetation
Present?
Woody vines – All woody vines greater than 3.28 ft in
height.
Yes
No
Sapling/shrub – Woody plants less than 3 in. DBH
and greater than or equal to 3.28 ft (1 m) tall.
=Total Cover
)
5'x5'
=Total Cover
=Total Cover
)
Carya cordiformis
Solidago erecta
Botrychium multifidum
FACU
FACU
FACU
Equisetum arvense
Fraxinus americana
Polystichum acrostichoides
FACU
Indicator
Status
Absolute
% Cover
Yes
Yes
FACW
FACU
No
UPL
Dominant
Species?
Euonymus alatus
15'x15'
Tsuga canadensis
3.64
No
Problematic Hydrophytic Vegetation1 (Explain)
VEGETATION
(A)
(B)
(A)
Prevalence Index = B/A =
Tree Stratum
Woody Vine Stratum
Remarks: (Include photo numbers here or on a separate sheet.)
1 - Rapid Test for Hydrophytic Vegetation
2 - Dominance Test is >50%
3 - Prevalence Index is ≤3.01
)
=Total Cover
FACU
1Indicators of hydric soil and wetland hydrology must
be present, unless disturbed or problematic.
US Army Corps of Engineers
Northcentral and Northeast Region – Version 2.0
Sampling Point:
Polyvalue Below Surface (S8) (LRR K, L)
Thin Dark Surface (S9) (LRR K, L)
Iron-Manganese Masses (F12) (LRR K, L, R)
3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic.
Sandy Gleyed Matrix (S4)
Depleted Dark Surface (F7)
Redox Depressions (F8)
Redox Dark Surface (F6)
Hydrogen Sulfide (A4)
Stratified Layers (A5)
Thick Dark Surface (A12)
Sandy Mucky Mineral (S1)
Loamy Mucky Mineral (F1) (LRR K, L)
Loamy Gleyed Matrix (F2)
High Chroma Sands (S11) (LRR K, L)
Type:
Thin Dark Surface (S9) (LRR R, MLRA 149B)
5 cm Mucky Peat or Peat (S3) (LRR K, L, R)
Sandy Redox (S5)
Dark Surface (S7)
Mesic Spodic (TA6) (MLRA 144A, 145, 149B)
Piedmont Floodplain Soils (F19) (MLRA 149B)
Red Parent Material (F21)
Depleted Matrix (F3)
Black Histic (A3)
Coast Prairie Redox (A16) (LRR K, L, R)
2Location: PL=Pore Lining, M=Matrix.
Hydric Soil Indicators:
Polyvalue Below Surface (S8) (LRR R,
%
Matrix
Histic Epipedon (A2)
MLRA 149B)
Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)
Histosol (A1)
Indicators for Problematic Hydric Soils3:
2 cm Muck (A10) (LRR K, L, MLRA 149B)
Redox Features
Depth
(inches)
Color (moist)
2.5YR 3/1
0-8
DP-RBU
SOIL
Type1
%
This data form is revised from Northcentral and Northeast Regional Supplement Version 2.0 to reflect the NRCS Field Indicators of Hydric Soils
version 7.0 March 2013 Errata. (http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_051293.docx)
Remarks:
Stripped Matrix (S6)
Restrictive Layer (if observed):
Rock
No
Depleted Below Dark Surface (A11)
X
Depth (inches):
Yes
Hydric Soil Present?
Color (moist)
Marl (F10) (LRR K, L)
Other (Explain in Remarks)
Loc2
Texture
Remarks
Loamy/Clayey
Very Shallow Dark Surface (TF12)
1Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains.
US Army Corps of Engineers
Northcentral and Northeast Region – Version 2.0
Project/Site:
Sampling Date:
Applicant/Owner:
State:
Sampling Point:
Investigator(s):
Subregion (LRR or MLRA):
Lat:
Long:
Datum:
Soil Map Unit Name:
NWI classification:
Are Vegetation
, Soil
, or Hydrology
Are Vegetation
, Soil
, or Hydrology
SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc.
If yes, optional Wetland Site ID:
Secondary Indicators (minimum of two required)
Wetland Hydrology Present?
Crayfish Burrows (C8)
Hydrogen Sulfide Odor (C1)
No
Yes
Depth (inches):
X
X
X
Depth (inches):
X
Depth (inches):
Saturation Visible on Aerial Imagery (C9)
Stunted or Stressed Plants (D1)
Geomorphic Position (D2)
Sparsely Vegetated Concave Surface (B8)
Saturation Present?
Saturation (A3)
Water Marks (B1)
Iron Deposits (B5)
Inundation Visible on Aerial Imagery (B7)
Presence of Reduced Iron (C4)
Recent Iron Reduction in Tilled Soils (C6)
Other (Explain in Remarks)
Oxidized Rhizospheres on Living Roots (C3)
Sediment Deposits (B2)
Drift Deposits (B3)
Surface Water (A1)
FAC-Neutral Test (D5)
X
Shallow Aquitard (D3)
Microtopographic Relief (D4)
Remarks:
(includes capillary fringe)
Yes
No
No
Yes
Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available:
Field Observations:
Water Table Present?
High Water Table (A2)
WETLAND DETERMINATION DATA FORM – Northcentral and Northeast Region
X
X
Westchester County
No
41.212078°
Charlton laom, 35 to 45 percent slopes, very stony
11/18/2024
DP-LBU
Quaker Bridge Replacement
Westchester County
City/County:
NY
73.868333°
Yes
No
X
No
X
Yes
Remarks: (Explain alternative procedures here or in a separate report.)
Yes
HYDROLOGY
Surface Soil Cracks (B6)
Aquatic Fauna (B13)
Drainage Patterns (B10)
Moss Trim Lines (B16)
Dry-Season Water Table (C2)
No
No
X
X
No
Yes
No
NAD 83
Wetland Hydrology Indicators:
Wetland Hydrology Present?
Is the Sampled Area
within a Wetland?
Data point was sampled on streambank, upland.
Primary Indicators (minimum of one is required; check all that apply)
Yes
Yes
Hydrophytic Vegetation Present?
Hydric Soil Present?
Water-Stained Leaves (B9)
Slope (%):
Landform (hillside, terrace, etc.):
Are climatic / hydrologic conditions on the site typical for this time of year?
significantly disturbed?
Are “Normal Circumstances” present?
naturally problematic?
Surface Water Present?
Section, Township, Range:
Concave
Local relief (concave, convex, none):
Yes
Algal Mat or Crust (B4)
(If needed, explain any answers in Remarks.)
Thin Muck Surface (C7)
N. Laing, G. Koetzle
LRR R, MLRA 144A
(If no, explain in Remarks.)
Streambank
Marl Deposits (B15)
US Army Corps of Engineers
Northcentral and Northeast Region – Version 2.0
Sampling Point:
(Plot size:
1.
2.
3.
4.
5.
6.
(A/B)
7.
Sapling/Shrub Stratum (Plot size:
x 1 =
1.
x 2 =
2.
x 3 =
3.
x 4 =
4.
x 5 =
5.
Column Totals:
(B)
6.
7.
Herb Stratum
(Plot size:
1.
2.
4 - Morphological Adaptations1 (Provide supporting
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
(Plot size:
1.
2.
3.
4.
– Use scientific names of plants.
OBL species
FACW species
FAC species
FACU species
UPL species
DP-LBU
Fragus grandifolia
Tsuga canadensis
Acer rubrum
FAC
30'x30'
Total Number of Dominant
Species Across All Strata:
)
Dominance Test worksheet:
Number of Dominant Species
That Are OBL, FACW, or FAC:
No
data in Remarks or on a separate sheet)
Euonymus alatus
Fagus grandifolia
Hydrophytic Vegetation Indicators:
Multiply by:
0.0%
Percent of Dominant Species
That Are OBL, FACW, or FAC:
Total % Cover of:
Prevalence Index worksheet:
FACU
Yes
No
FACU
Yes
No
No
No
FACU
FACU
FACU
UPL
Yes
Quercus rubra
No
Yes
Yes
Tree – Woody plants 3 in. (7.6 cm) or more in diameter
at breast height (DBH), regardless of height.
Definitions of Vegetation Strata:
Herb – All herbaceous (non-woody) plants, regardless
of size, and woody plants less than 3.28 ft tall.
Hydrophytic
Vegetation
Present?
Woody vines – All woody vines greater than 3.28 ft in
height.
Yes
No
Sapling/shrub – Woody plants less than 3 in. DBH
and greater than or equal to 3.28 ft (1 m) tall.
=Total Cover
)
5'x5'
=Total Cover
=Total Cover
)
Carya ovata
Carya cordiformis
FACU
FACU
Fagus grandifolia
Acer rubrum
Hamamelis virginiana
Dryopteris marginalis
FACU
Indicator
Status
Absolute
% Cover
Yes
Yes
FACU
FACU
Dominant
Species?
Polystichum acrostichoides
15'x15'
Fraxinus americana
4.05
No
Problematic Hydrophytic Vegetation1 (Explain)
VEGETATION
(A)
(B)
(A)
Prevalence Index = B/A =
Tree Stratum
Woody Vine Stratum
Remarks: (Include photo numbers here or on a separate sheet.)
1 - Rapid Test for Hydrophytic Vegetation
2 - Dominance Test is >50%
3 - Prevalence Index is ≤3.01
)
=Total Cover
FAC
FACU
1Indicators of hydric soil and wetland hydrology must
be present, unless disturbed or problematic.
US Army Corps of Engineers
Northcentral and Northeast Region – Version 2.0
Sampling Point:
Polyvalue Below Surface (S8) (LRR K, L)
Thin Dark Surface (S9) (LRR K, L)
Iron-Manganese Masses (F12) (LRR K, L, R)
3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic.
Sandy Gleyed Matrix (S4)
Depleted Dark Surface (F7)
Redox Depressions (F8)
Redox Dark Surface (F6)
Hydrogen Sulfide (A4)
Stratified Layers (A5)
Thick Dark Surface (A12)
Sandy Mucky Mineral (S1)
Loamy Mucky Mineral (F1) (LRR K, L)
Loamy Gleyed Matrix (F2)
High Chroma Sands (S11) (LRR K, L)
Type:
Thin Dark Surface (S9) (LRR R, MLRA 149B)
5 cm Mucky Peat or Peat (S3) (LRR K, L, R)
Sandy Redox (S5)
Dark Surface (S7)
Mesic Spodic (TA6) (MLRA 144A, 145, 149B)
Piedmont Floodplain Soils (F19) (MLRA 149B)
Red Parent Material (F21)
Depleted Matrix (F3)
Black Histic (A3)
Coast Prairie Redox (A16) (LRR K, L, R)
2Location: PL=Pore Lining, M=Matrix.
Hydric Soil Indicators:
Polyvalue Below Surface (S8) (LRR R,
%
Matrix
Histic Epipedon (A2)
MLRA 149B)
Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.)
Histosol (A1)
Indicators for Problematic Hydric Soils3:
2 cm Muck (A10) (LRR K, L, MLRA 149B)
Redox Features
Depth
(inches)
Color (moist)
7.5YR 3/1
0-3
DP-LBU
SOIL
Type1
%
This data form is revised from Northcentral and Northeast Regional Supplement Version 2.0 to reflect the NRCS Field Indicators of Hydric Soils
version 7.0 March 2013 Errata. (http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_051293.docx)
Remarks:
Stripped Matrix (S6)
Restrictive Layer (if observed):
Rock
No
Depleted Below Dark Surface (A11)
X
Depth (inches):
Yes
Hydric Soil Present?
Color (moist)
Marl (F10) (LRR K, L)
Other (Explain in Remarks)
Loc2
Texture
Remarks
Loamy/Clayey
Very Shallow Dark Surface (TF12)
1Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains.
US Army Corps of Engineers
Northcentral and Northeast Region – Version 2.0
Full Environmental Assessment Form
Part 1 - Project and Setting
Instructions for Completing Part 1
Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding,
are subject to public review, and may be subject to further verification.
Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to
any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist,
or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to
update or fully develop that information.
Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that
must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the
answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any
additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information
contained in Part 1is accurate and complete.
Project Location (describe, and attach a general location map):
Brief Description of Proposed Action (include purpose or need):
E-Mail:
State:
Project Contact (if not same as sponsor; give name and title/role):
E-Mail:
State:
E-Mail:
State:
Quaker Bridge Road Bridge Replacement (RB03W)
Quaker Bridge Road over Croton River, Town of Cortlandt and Village of Croton-On-Hudson, Westchester County, NY
Replacement of the steel truss bridge which carries Quaker Bridge Road over the Croton River. Constructed in 1894, it is a 98-foot long, single-lane bridge
with stone abutments that is now closed due to structural deficiencies. The new bridge will be also be a truss bridge made of galvanized steel and built on
the existing alignment, but will be approximately 12 feet wider to allow for 2-way vehicular traffic as well as 2-way pedestrian passage. Scope of work will
include new concrete abutments and the removal of trees to accommodate construction staging areas and overhead construction activities, such as those
utilizing cranes for pile and bridge installation, wingwall installation and site grading. Project limits will be Quaker bridge and approximately 200 feet along
the south approach and 500 feet along the north approach to the bridge to accommodate the bridge replacement and reconstructing the roadway impacted
by the construction activities, including excavation for the bridge abutment removal and reconstruction. An overhead electrical line may need to be
relocated to accommodate overhead construction activities.
914-995-2000
148 Martine Avenue
White Plains
NY
Hugh J. Greechan, Jr., P.E., Commissioner of Westchester County PW&T
914-995-2546
hjg7@westchestercountyny.gov
Department of Public Works and Transportation, 148 Martine Avenue, Room 512
White Plains
NY
Bridge owned by County; riverbanks & roads owned by Town of Cortlandt, Village of Croton & NYS
B. Government Approvals
B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial
assistance.)
i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway?
ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program?
iii. Is the project site within a Coastal Erosion Hazard Area?
Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the
9 Yes 9 No
only approval(s) which must be granted to enable the proposed action to proceed?
•
If Yes, complete sections C, F and G.
•
If No, proceed to question C.2 and complete all remaining sections and questions in Part 1
C.2. Adopted land use plans.
a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site
9 Yes 9 No
where the proposed action would be located?
If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action
9 Yes 9 No
would be located?
b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway;
Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan;
c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, 9 Yes 9 No
or an adopted municipal farmland protection plan?
(Village of Croton)
Village of Croton-on-Hudson (property transfer &
easement); Town of Cortlandt (various)
Coordination ongoing
Water Control Commission (Wetland permit)
Waterfront Advisory Committee (LWRP review)
TBD
Westchester County Board of Legislators (project
authorization and funding)
June 2025 (projected)
NYSDEC Section 401/Article 15
NYSHPO (consultation)
TBD
USACE NWP#3, USFWS (consultation)
TBD
Both Town of Cortlandt and Village of Croton-on-Hudson are Greenway Compact Communities. Site is within the County's Critical Environmental Areas
under County and State Park Lands and Croton Point Park. Part of the project area is also within the Village of Croton-on-Hudson's LWRP.
C.3. Zoning
a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance.
If Yes, what is the zoning classification(s) including any applicable overlay district?
b. Is the use permitted or allowed by a special or conditional use permit?
c. Is a zoning change requested as part of the proposed action?
If Yes,
i. What is the proposed new zoning for the site? ___________________________________________________________________
C.4. Existing community services.
a. In what school district is the project site located? ________________________________________________________________
b. What police or other public protection forces serve the project site?
c. Which fire protection and emergency medical services serve the project site?
a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all
components)?
b. a. Total acreage of the site of the proposed action?
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor?
c. Is the proposed action an expansion of an existing project or use?
i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units,
square feet)? % ____________________
Units: ____________________
d. Is the proposed action a subdivision, or does it include a subdivision?
If Yes,
i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types)
iv. Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________
9 Yes 9 No
_____ months
_____
_____ month _____ year
e. Will the proposed action be constructed in multiple phases?
•
Total number of phases anticipated
•
Anticipated commencement date of phase 1 (including demolition)
•
Anticipated completion date of final phase
_____ month _____year
•
Generally describe connections or relationships among phases, including any contingencies where progress of one phase may
determine timing or duration of future phases: _______________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
Croton: PRE-1 Park Recreation and Education and RA-25 One Family Residence; Cortlandt: R-80 Single Family Residential
Croton-Harmon Union Free School District
Croton-on-Hudson Police Department, NYS Police and Westchester County Public Safety
The Croton Fire District and Westchester Emergency Medical Services
N/A
1.2
0.50
0.60
1,200 SF increase in deck
Infrastructural (transportation)
f. Does the project include new residential uses?
g. Does the proposed action include new non-residential construction (including expansions)?
If Yes,
i. Total number of structures ___________
ii. Dimensions (in feet) of largest proposed structure: ________height; ________width; and _______ length
iii. Approximate extent of building space to be heated or cooled: ______________________ square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any
9 Yes 9 No
liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
If Yes,
i. Purpose of the impoundment: ________________________________________________________________________________
ii. If a water impoundment, the principal source of the water: 9 Ground water 9 Surface water streams 9 Other specify:
iii. If other than water, identify the type of impounded/contained liquids and their source.
Volume: ____________ million gallons; surface area: ____________ acres
v. Dimensions of the proposed dam or impounding structure: ________ height; _______ length
vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):
a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both?
(Not including general site preparation, grading or installation of utilities or foundations where all excavated
materials will remain onsite)
If Yes:
i .What is the purpose of the excavation or dredging? _______________________________________________________________
ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
•
Volume (specify tons or cubic yards): ____________________________________________
•
Over what duration of time? ____________________________________________________
iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.
iv. Will there be onsite dewatering or processing of excavated materials?
v. What is the total area to be dredged or excavated? _____________________________________acres
vi. What is the maximum area to be worked at any one time? _______________________________ acres
vii. What would be the maximum depth of excavation or dredging? __________________________ feet
viii. Will the excavation require blasting?
ix. Summarize site reclamation goals and plan: _____________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment
9 Yes 9 No
into any existing wetland, waterbody, shoreline, beach or adjacent area?
If Yes:
i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic
description): ______________________________________________________________________________________________
_________________________________________________________________________________________________________
N/A
Suitable materials to be reused for wider roadway or will be disposed of in off-site location approved by engineer in charge.
Dewatering may be required for full depth removal of abutments.
0.1
0.1
Site will be restored to existing conditions.
Croton River
ii.
iii.
Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or
alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres:
Will the proposed action cause or result in disturbance to bottom sediments?
iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation?
If Yes:
•
acres of aquatic vegetation proposed to be removed: ___________________________________________________________
•
expected acreage of aquatic vegetation remaining after project completion:________________________________________
•
purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________
____________________________________________________________________________________________________
•
proposed method of plant removal: ________________________________________________________________________
•
if chemical/herbicide treatment will be used, specify product(s): _________________________________________________
v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________
_________________________________________________________________________________________________________
c. Will the proposed action use, or create a new demand for water?
If Yes:
i. Total anticipated water usage/demand per day: __________________________ gallons/day
ii. Will the proposed action obtain water from an existing public water supply?
If Yes:
•
Name of district or service area: _________________________________________________________________________
•
Does the existing public water supply have capacity to serve the proposal?
•
Is the project site in the existing district?
•
Is expansion of the district needed?
•
Do existing lines serve the project site?
iii. Will line extension within an existing district be necessary to supply the project?
If Yes:
•
Describe extensions or capacity expansions proposed to serve this project: ________________________________________
____________________________________________________________________________________________________
•
Source(s) of supply for the district: ________________________________________________________________________
iv. Is a new water supply district or service area proposed to be formed to serve the project site?
•
Applicant/sponsor for new district: ________________________________________________________________________
•
Date application submitted or anticipated: __________________________________________________________________
•
Proposed source(s) of supply for new district: _______________________________________________________________
v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________
_________________________________________________________________________________________________________
vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: _______ gallons/minute.
d. Will the proposed action generate liquid wastes?
If Yes:
i. Total anticipated liquid waste generation per day: _______________ gallons/day
ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
approximate volumes or proportions of each): __________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
iii. Will the proposed action use any existing public wastewater treatment facilities?
If Yes:
•
Name of wastewater treatment plant to be used: _____________________________________________________________
•
Name of district: ______________________________________________________________________________________
•
Does the existing wastewater treatment plant have capacity to serve the project?
•
Is the project site in the existing district?
•
Is expansion of the district needed?
Croton River, less than 0.1 acres of permanent impacts. New wing walls will be constructed on both banks, with site grading and
placement of riprap on banks.
9 Yes 9 No
•
Do existing sewer lines serve the project site?
•
Will a line extension within an existing district be necessary to serve the project?
If Yes:
•
Describe extensions or capacity expansions proposed to serve this project: ____________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
iv. Will a new wastewater (sewage) treatment district be formed to serve the project site?
If Yes:
•
Applicant/sponsor for new district: ____________________________________________________________________
•
Date application submitted or anticipated: _______________________________________________________________
•
What is the receiving water for the wastewater discharge? __________________________________________________
v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed
receiving water (name and classification if surface discharge or describe subsurface disposal plans):
vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point
9 Yes 9 No
sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point
source (i.e. sheet flow) during construction or post construction?
If Yes:
i. How much impervious surface will the project create in relation to total size of project parcel?
_____ Square feet or _____ acres (impervious surface)
_____ Square feet or _____ acres (parcel size)
ii. Describe types of new point sources. __________________________________________________________________________
_________________________________________________________________________________________________________
iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties,
groundwater, on-site surface water or off-site surface waters)?
•
If to surface waters, identify receiving water bodies or wetlands: ________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
•
Will stormwater runoff flow to adjacent properties?
iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater?
f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel
9 Yes 9 No
combustion, waste incineration, or other processes or operations?
i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles)
ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers)
iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation)
g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit,
9 Yes 9 No
or Federal Clean Air Act Title IV or Title V Permit?
If Yes:
i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet
9 Yes 9 No
ambient air quality standards for all or some parts of the year)
ii. In addition to emissions as calculated in the application, the project will generate:
•
___________Tons/year (short tons) of Carbon Dioxide (CO2)
•
___________Tons/year (short tons) of Nitrous Oxide (N2O)
•
___________Tons/year (short tons) of Perfluorocarbons (PFCs)
•
___________Tons/year (short tons) of Sulfur Hexafluoride (SF6)
•
___________Tons/year (short tons) of Carbon Dioxide equivalent of Hydroflourocarbons (HFCs)
•
___________Tons/year (short tons) of Hazardous Air Pollutants (HAPs)
h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants,
9 Yes 9 No
landfills, composting facilities)?
If Yes:
i. Estimate methane generation in tons/year (metric): ________________________________________________________________
ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or
electricity, flaring): ________________________________________________________________________________________
_________________________________________________________________________________________________________
i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as
9 Yes 9 No
quarry or landfill operations?
If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust):
j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial
9 Yes 9 No
new demand for transportation facilities or services?
If Yes:
i. When is the peak traffic expected (Check all that apply):
Randomly between hours of __________ to ________.
ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): _____________
iii.
iv.
v.
Does the proposed action include any shared use parking? Yes No
9 Yes 9 No
vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site?
vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric
9 Yes 9 No
or other alternative fueled vehicles?
viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing
9 Yes 9 No
pedestrian or bicycle routes?
k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand
9 Yes 9 No
for energy?
If Yes:
i. Estimate annual electricity demand during operation of the proposed action: ____________________________________________
_________________________________________________________________________________________________________
ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or
other):
iii. Will the proposed action require a new, or an upgrade, to an existing substation?
l. Hours of operation. Answer all items which apply.
•
Monday - Friday: _________________________
•
Monday - Friday: ____________________________
•
Saturday: ________________________________
•
Saturday: ___________________________________
•
Sunday: _________________________________
•
Sunday: ____________________________________
•
Holidays: ________________________________
•
Holidays: ___________________________________
If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe:
7am-5pm
N/A
N/A
N/A
N/A
m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction,
9 Yes 9 No
operation, or both?
If yes:
i. Provide details including sources, time of day and duration:
ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen?
n. W
th
ill
prop
e
os
actio
ed
hav
n
e outd
ligh
oor
ting?
If yes:
i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures:
ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen?
o. Does the proposed action have the potential to produce odors for more than one hour per day?
If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest
occupied structures: ______________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
p.
Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons)
or chemical products 185 gallons in above ground storage or any amount in underground storage?
If Yes:
ii. Volume(s) ______ per unit time ___________ (e.g., month, year)
q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides,
9 Yes 9 No
insecticides) during construction or operation?
If Yes:
ii. Will the proposed action use Integrated Pest Management Practices?
r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal
9 Yes 9 No
of solid waste (excluding hazardous materials)?
If Yes:
i. Describe any solid waste(s) to be generated during construction or operation of the facility:
•
Construction: ____________________ tons per ________________ (unit of time)
•
Operation : ____________________ tons per ________________ (unit of time)
ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:
•
Construction: ________________________________________________________________________________________
____________________________________________________________________________________________________
•
Operation: __________________________________________________________________________________________
____________________________________________________________________________________________________
iii. Proposed disposal methods/facilities for solid waste generated on-site:
•
Construction: ________________________________________________________________________________________
____________________________________________________________________________________________________
•
Operation: __________________________________________________________________________________________
____________________________________________________________________________________________________
During construction only for the hours previously listed.
s. Does the proposed action include construction or modification of a solid waste management facility?
If Yes:
i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or
other disposal activities): ___________________________________________________________________________________
ii. Anticipated rate of disposal/processing:
•
________ Tons/month, if transfer or other non-combustion/thermal treatment, or
•
________ Tons/hour, if combustion or thermal treatment
iii. If landfill, anticipated site life: ________________________________ years
t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous 9 Yes 9 No
waste?
If Yes:
i. Name(s) of all hazardous wastes or constituents to be generated, handled or managed at facility: ___________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
ii. Generally describe processes or activities involving hazardous wastes or constituents: ___________________________________
_________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii. Specify amount to be handled or generated _____ tons/month
iv. Describe any proposals for on-site minimization, recycling or reuse of hazardous constituents: ____________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility?
If Yes: provide name and location of facility: _______________________________________________________________________
________________________________________________________________________________________________________
If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility:
E.1. Land uses on and surrounding the project site
a. Existing land uses.
i. Check all uses that occur on, adjoining and near the project site.
b. Land uses and covertypes on the project site.
Current
Acreage
Acreage After
Project Completion
Change
(Acres +/-)
•
Roads, buildings, and other paved or impervious
surfaces
•
Forested
•
Meadows, grasslands or brushlands (non-
agricultural, including abandoned agricultural)
•
Agricultural
(includes active orchards, field, greenhouse etc.)
•
Surface water features
(lakes, ponds, streams, rivers, etc.)
•
Wetlands (freshwater or tidal)
•
Non-vegetated (bare rock, earth or fill)
•
Other
Describe: _______________________________
________________________________________
Shoreline
0.20
0.21
+0.01
0.50
0.19
-0.31
0.30
+0.30
0.40
0.39
-0.01
0.10
0.11
+0.01
c. Is the project site presently used by members of the community for public recreation?
d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed
9 Yes 9 No
day care centers, or group homes) within 1500 feet of the project site?
If Yes,
i. Identify Facilities:
e. Does the project site contain an existing dam?
If Yes:
•
Dam height:
•
Dam length:
•
Surface area:
•
Volume impounded: _______________________________ gallons OR acre-feet
ii. Dam=s existing hazard classification: _________________________________________________________________________
iii. Provide date and summarize results of last inspection:
f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility,
9 Yes 9 No
or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility?
If Yes:
•
If yes, cite sources/documentation: _______________________________________________________________________
ii. Describe the location of the project site relative to the boundaries of the solid waste management facility:
iii. Describe any development constraints due to the prior solid waste activities: __________________________________________
_______________________________________________________________________________________________________
g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin
9 Yes 9 No
property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste?
If Yes:
i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred:
h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any
9 Yes 9 No
remedial actions been conducted at or adjacent to the proposed site?
If Yes:
i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site
9 Yes 9 No
Remediation database? Check all that apply:
ii. If site has been subject of RCRA corrective activities, describe control measures:_______________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database?
iv. If yes to (i), (ii) or (iii) above, describe current status of site(s):
Pedestrian use for Croton Gorge Trail Access
v. Is the project site subject to an institutional control limiting property uses?
•
If yes, DEC site ID number: ____________________________________________________________________________
•
Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________
•
Describe any use limitations: ___________________________________________________________________________
•
Describe any engineering controls: _______________________________________________________________________
•
Will the project affect the institutional or engineering controls in place?
•
Explain: ____________________________________________________________________________________________
___________________________________________________________________________________________________
___________________________________________________________________________________________________
E.2. Natural Resources On or Near Project Site
a. What is the average depth to bedrock on the project site?
b. Are there bedrock outcroppings on the project site?
If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________%
c. Predominant soil type(s) present on project site:
d. What is the average depth to the water table on the project site? Average: _________ feet
e. Drainage status of project site soils: 9 Well Drained:
f. Approximate proportion of proposed action site with slopes: 9 0-10%:
g. Are there any unique geologic features on the project site?
i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers,
9 Yes 9 No
ponds or lakes)?
ii. Do any wetlands or other waterbodies adjoin the project site?
If Yes to either i or ii, continue. If No, skip to E.2.i.
iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal,
9 Yes 9 No
state or local agency?
iv. For each identified regulated wetland and waterbody on the project site, provide the following information:
•
Streams:
•
Lakes or Ponds: Name ____________________________________________ Classification _______________________
•
Wetlands:
•
Wetland No. (if regulated by DEC) _____________________________
v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired
9 Yes 9 No
waterbodies?
If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________
___________________________________________________________________________________________________________
i. Is the project site in a designated Floo dway?
j. Is the project site in the 100-year Floodplain?
k. Is the project site in the 500-year Floodplain?
l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer?
If Yes:
>7
Charlton loam (ClF)
98.3
Paxton fine Sandy loam (PnB)
1.7
>6
1.7
98.3
B
864-68
Federal Waters, Federal Waters, Federal Waters,...
Principal Aquifer, Primary Aquifer
m. Identify the predominant wildlife species that occupy or use the project site:
n. Does the project site contain a designated significant natural community?
If Yes:
i. Describe the habitat/community (composition, function, and basis for designation): _____________________________________
________________________________________________________________________________________________________
ii. Source(s) of description or evaluation: ________________________________________________________________________
iii. Extent of community/habitat:
•
Currently:
•
Following completion of project as proposed: _____________________ acres
•
Gain or loss (indicate + or -):
o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as
9 Yes 9 No
endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species?
p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of
9 Yes 9 No
special concern?
q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing?
If yes, give a brief description of how the proposed action may affect that use: ___________________________________________
________________________________________________________________________________________________________
E.3. Designated Public Resources On or Near Project Site
a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to
9 Yes 9 No
Agriculture and Markets Law, Article 25-AA, Section 303 and 304?
If Yes, provide county plus district name/number: _________________________________________________________________
b. Are agricultural lands consisting of highly productive soils present?
i. If Yes: acreage(s) on project site? ___________________________________________________________________________
ii. Source(s) of soil rating(s): _________________________________________________________________________________
c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National
9 Yes 9 No
Natural Landmark?
If Yes:
ii. Provide brief description of landmark, including values behind designation and approximate size/extent: ___________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
d. Is the project site located in or does it adjoin a state listed Critical Environmental Area?
If Yes:
If Yes:
i.
If Yes:
Consultant observed: Grey Squirrel
Nearby eBird sitings: Canada Goose
Prior observations: Bass, Minnows,
Bald Eagle, Mallard, White-tailed Deer
Tufted Titmouse, Common Merganser
Chubs, Shiners, American Eel, Herons,
Common Grackle, Dark-eyed Junco
Green Frogs,Chipmunks, Raccons
Croton River is used for fishing and is accessible at multiple locations beyond the project area, which will not be impacted.
County & State Park Lands
Exceptional or unique character
Agency:Westchester County, Date:1-31-90
e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district
9 Yes 9 No
which is listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYS
Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places?
If Yes:
i. Nature of historic/archaeological resource: 9 Archaeological Site
9 Historic Building or District
ii. Name: _________________________________________________________________________________________________
iii. Brief description of attributes on which listing is based:
f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for
9 Yes 9 No
archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
g. Have additional archaeological or historic site(s) or resources been identified on the project site?
If Yes:
i. Describe possible resource(s): _______________________________________________________________________________
ii. Basis for identification: ___________________________________________________________________________________
h.
Is the project site within fives miles of any officially designated and publicly accessible federal, state, or local
scenic or aesthetic resource?
If Yes:
i. Identify resource: _________________________________________________________________________________________
ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail or scenic byway,
etc.): ___________________________________________________________________________________________________
iii. Distance between project and resource: _____________________ miles.
i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers
9 Yes 9 No
Program 6 NYCRR 666?
If Yes:
i. Identify the name of the river and its designation: ________________________________________________________________
ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666?
F. Additional Information
Attach any additional information which may be needed to clarify your project.
If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any
measures which you propose to avoid or minimize them.
G. Verification
I certify that the information provided is true to the best of my knowledge.
Applicant/Sponsor Name ___________________________________ Date_______________________________________
Signature________________________________________________ Title_______________________________________
Eligible property:Quaker Bridge. BIN 3348560, Old Croton Aqueduct
Bridge is architecturally significant, recognizing it as a rare and outstanding example of a late nineteenth-century Pratt Truss bridge.
Black Rock Park, Silver Lake Park, Croton Gorge Trail, Croton Gorge Park, Old Croton Aqueduct State Historic Park
Local, County and State parks and trails
0 - 0.1
County of Westchester
April 15, 2025 (Revised: June 26, 2025)
Assistant Commissioner
EAF Mapper Summary Report
Thursday, November 21, 2024 11:39 AM
Disclaimer: The EAF Mapper is a screening tool intended to assist
project sponsors and reviewing agencies in preparing an environmental
assessment form (EAF). Not all questions asked in the EAF are
answered by the EAF Mapper. Additional information on any EAF
question can be obtained by consulting the EAF Workbooks. Although
the EAF Mapper provides the most up-to-date digital data available to
DEC, you may also need to contact local or other data sources in order
to obtain data not provided by the Mapper. Digital data is not a
substitute for agency determinations.
Yes
B.i.ii [Local Waterfront Revitalization Area]
Yes
C.2.b. [Special Planning District]
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
Listed]
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
Site]
No
E.2.g [Unique Geologic Features]
No
E.2.h.i [Surface Water Features]
Yes
E.2.h.ii [Surface Water Features]
Yes
E.2.h.iii [Surface Water Features]
Yes - Digital mapping information on local and federal wetlands and
waterbodies is known to be incomplete. Refer to EAF Workbook.
E.2.h.iv [Surface Water Features - Stream
Name]
864-68
E.2.h.iv [Surface Water Features - Stream
Classification]
B
E.2.h.iv [Surface Water Features - Wetlands
Name]
Federal Waters
E.2.h.v [Impaired Water Bodies]
No
E.2.i. [Floodway]
Yes
E.2.j. [100 Year Floodplain]
Yes
E.2.k. [500 Year Floodplain]
Yes
Full Environmental Assessment Form - EAF Mapper Summary Report
E.2.l. [Aquifers]
Yes
E.2.l. [Aquifer Names]
No
E.2.o. [Endangered or Threatened Species]
No
E.2.p. [Rare Plants or Animals]
No
E.3.a. [Agricultural District]
No
E.3.c. [National Natural Landmark]
No
E.3.d [Critical Environmental Area]
Yes
E.3.d [Critical Environmental Area - Name]
County & State Park Lands
E.3.d.ii [Critical Environmental Area -
Reason]
Yes - Digital mapping data for archaeological site boundaries are not
available. Refer to EAF Workbook.
E.3.e.ii [National or State Register of Historic
Places or State Eligible Sites - Name]
Eligible property:Quaker Bridge. BIN 3348560, Old Croton Aqueduct
E.3.f. [Archeological Sites]
Yes
E.3.i. [Designated River Corridor]
No
Full Environmental Assessment Form - EAF Mapper Summary Report
Full Environmental Assessment Form
Part 2 - Identification of Potential Project Impacts
Part 2 is to be completed by the lead agency. Part 2 is designed to help the lead agency inventory all potential resources that could
be affected by a proposed project or action. We recognize that the lead agency=s reviewer(s) will not necessarily be environmental
professionals. So, the questions are designed to walk a reviewer through the assessment process by providing a series of questions that
can be answered using the information found in Part 1. To further assist the lead agency in completing Part 2, the form identifies the
most relevant questions in Part 1 that will provide the information needed to answer the Part 2 question. When Part 2 is completed, the
lead agency will have identified the relevant environmental areas that may be impacted by the proposed activity.
If the lead agency is a state agency and the action is in any Coastal Area, complete the Coastal Assessment Form before proceeding
with this assessment.
Tips for completing Part 2:
•
Review all of the information provided in Part 1.
•
Review any application, maps, supporting materials and the Full EAF Workbook.
•
Answer each of the 18 questions in Part 2.
•
If you answer “Yes” to a numbered question, please complete all the questions that follow in that section.
•
If you answer “No” to a numbered question, move on to the next numbered question.
•
Check appropriate column to indicate the anticipated size of the impact.
•
Proposed projects that would exceed a numeric threshold contained in a question should result in the reviewing agency
checking the box “Moderate to large impact may occur.”
•
The reviewer is not expected to be an expert in environmental analysis.
•
If you are not sure or undecided about the size of an impact, it may help to review the sub-questions for the general
question and consult the workbook.
•
When answering a question consider all components of the proposed activity, that is, the Awhole action@.
•
Consider the possibility for long-term and cumulative impacts as well as direct impacts.
•
Answer the question in a reasonable manner considering the scale and context of the project.
1.
Impact on Land
Proposed action may involve construction on, or physical alteration of,
NO
YES
the land surface of the proposed site. (See Part 1. D.1)
If “Yes”, answer questions a - j. If “No”, move on to Section 2.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may involve construction on land where depth to water table is
less than 3 feet.
E2d
b. The proposed action may involve construction on slopes of 15% or greater.
E2f
c. The proposed action may involve construction on land where bedrock is exposed, or
generally within 5 feet of existing ground surface.
E2a
d. The proposed action may involve the excavation and removal of more than 1,000 tons
of natural material.
D2a
e. The proposed action may involve construction that continues for more than one year
or in multiple phases.
D1e
f. The proposed action may result in increased erosion, whether from physical
disturbance or vegetation removal (including from treatment by herbicides).
D2e, D2q
g. The proposed action is, or may be, located within a Coastal Erosion hazard area.
B1i
h. Other impacts: _______________________________________________________
___________________________________________________________________
Agency Use Only [If applicable]
Project :
Date :
FEAF 2019
RB03W
June 2025
2.
Impact on Geological Features
The proposed action may result in the modification or destruction of, or inhibit
access to, any unique or unusual land forms on the site (e.g., cliffs, dunes,
NO
YES
minerals, fossils, caves). (See Part 1. E.2.g)
If “Yes”, answer questions a - c. If “No”, move on to Section 3.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. Identify the specific land form(s) attached: ________________________________
___________________________________________________________________
E2g
b. The proposed action may affect or is adjacent to a geological feature listed as a
registered National Natural Landmark.
Specific feature: _____________________________________________________
E3c
c. Other impacts: ______________________________________________________
___________________________________________________________________
3.
Impacts on Surface Water
The proposed action may affect one or more wetlands or other surface water
NO
YES
bodies (e.g., streams, rivers, ponds or lakes). (See Part 1. D.2, E.2.h)
If “Yes”, answer questions a - l. If “No”, move on to Section 4.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may create a new water body.
D2b, D1h
b. The proposed action may result in an increase or decrease of over 10% or more than a
10 acre increase or decrease in the surface area of any body of water.
D2b
c. The proposed action may involve dredging more than 100 cubic yards of material
from a wetland or water body.
D2a
d. The proposed action may involve construction within or adjoining a freshwater or
tidal wetland, or in the bed or banks of any other water body.
E2h
e. The proposed action may create turbidity in a waterbody, either from upland erosion,
runoff or by disturbing bottom sediments.
D2a, D2h
f. The proposed action may include construction of one or more intake(s) for withdrawal
of water from surface water.
D2c
g. The proposed action may include construction of one or more outfall(s) for discharge
of wastewater to surface water(s).
D2d
h. The proposed action may cause soil erosion, or otherwise create a source of
stormwater discharge that may lead to siltation or other degradation of receiving
water bodies.
D2e
i. The proposed action may affect the water quality of any water bodies within or
downstream of the site of the proposed action.
E2h
j. The proposed action may involve the application of pesticides or herbicides in or
around any water body.
D2q, E2h
k. The proposed action may require the construction of new, or expansion of existing,
wastewater treatment facilities.
D1a, D2d
l. Other impacts: _______________________________________________________
___________________________________________________________________
4.
Impact on groundwater
The proposed action may result in new or additional use of ground water, or
NO
YES
may have the potential to introduce contaminants to ground water or an aquifer.
(See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t)
If “Yes”, answer questions a - h. If “No”, move on to Section 5.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may require new water supply wells, or create additional demand
on supplies from existing water supply wells.
D2c
b. Water supply demand from the proposed action may exceed safe and sustainable
withdrawal capacity rate of the local supply or aquifer.
Cite Source: ________________________________________________________
D2c
c. The proposed action may allow or result in residential uses in areas without water and
sewer services.
D1a, D2c
d. The proposed action may include or require wastewater discharged to groundwater.
D2d, E2l
e. The proposed action may result in the construction of water supply wells in locations
where groundwater is, or is suspected to be, contaminated.
D2c, E1f,
E1g, E1h
f. The proposed action may require the bulk storage of petroleum or chemical products
over ground water or an aquifer.
D2p, E2l
g. The proposed action may involve the commercial application of pesticides within 100
feet of potable drinking water or irrigation sources.
E2h, D2q,
E2l, D2c
h. Other impacts: ______________________________________________________
__________________________________________________________________
5.
Impact on Flooding
The proposed action may result in development on lands subject to flooding.
NO
YES
(See Part 1. E.2)
If “Yes”, answer questions a - g. If “No”, move on to Section 6.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may result in development in a designated floodway.
E2i
b. The proposed action may result in development within a 100 year floodplain.
E2j
c. The proposed action may result in development within a 500 year floodplain.
E2k
d. The proposed action may result in, or require, modification of existing drainage
patterns.
D2b, D2e
e. The proposed action may change flood water flows that contribute to flooding.
D2b, E2i,
E2j, E2k
f. If there is a dam located on the site of the proposed action, is the dam in need of repair,
or upgrade?
E1e
g. Other impacts: ______________________________________________________
___________________________________________________________________
6.
Impacts on Air
NO
YES
The proposed action may include a state regulated air emission source.
(See Part 1. D.2.f., D.2.h, D.2.g)
If “Yes”, answer questions a - f. If “No”, move on to Section 7.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. If the proposed action requires federal or state air emission permits, the action may
also emit one or more greenhouse gases at or above the following levels:
i. More than 1000 tons/year of carbon dioxide (CO2)
ii. More than 3.5 tons/year of nitrous oxide (N2O)
iii. More than 1000 tons/year of carbon equivalent of perfluorocarbons (PFCs)
iv. More than .045 tons/year of sulfur hexafluoride (SF6)
v. More than 1000 tons/year of carbon dioxide equivalent of
hydrochloroflourocarbons (HFCs) emissions
vi. 43 tons/year or more of methane
D2g
D2g
D2g
D2g
D2g
D2h
b. The proposed action may generate 10 tons/year or more of any one designated
hazardous air pollutant, or 25 tons/year or more of any combination of such hazardous
air pollutants.
D2g
c. The proposed action may require a state air registration, or may produce an emissions
rate of total contaminants that may exceed 5 lbs. per hour, or may include a heat
source capable of producing more than 10 million BTU=s per hour.
D2f, D2g
d. The proposed action may reach 50% of any of the thresholds in “a” through “c”,
above.
D2g
e. The proposed action may result in the combustion or thermal treatment of more than 1
ton of refuse per hour.
D2s
f. Other impacts: ______________________________________________________
__________________________________________________________________
7.
Impact on Plants and Animals
The proposed action may result in a loss of flora or fauna. (See Part 1. E.2. m.-q.)
NO
YES
If “Yes”, answer questions a - j. If “No”, move on to Section 8.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may cause reduction in population or loss of individuals of any
threatened or endangered species, as listed by New York State or the Federal
government, that use the site, or are found on, over, or near the site.
E2o
b. The proposed action may result in a reduction or degradation of any habitat used by
any rare, threatened or endangered species, as listed by New York State or the federal
government.
E2o
c. The proposed action may cause reduction in population, or loss of individuals, of any
species of special concern or conservation need, as listed by New York State or the
Federal government, that use the site, or are found on, over, or near the site.
E2p
d. The proposed action may result in a reduction or degradation of any habitat used by
any species of special concern and conservation need, as listed by New York State or
the Federal government.
E2p
e. The proposed action may diminish the capacity of a registered National Natural
Landmark to support the biological community it was established to protect.
E3c
f. The proposed action may result in the removal of, or ground disturbance in, any
portion of a designated significant natural community.
Source: ____________________________________________________________
E2n
g. The proposed action may substantially interfere with nesting/breeding, foraging, or
over-wintering habitat for the predominant species that occupy or use the project site.
E2m
h. The proposed action requires the conversion of more than 10 acres of forest,
grassland or any other regionally or locally important habitat.
Habitat type & information source: ______________________________________
__________________________________________________________________
E1b
i. Proposed action (commercial, industrial or recreational projects, only) involves use of
herbicides or pesticides.
D2q
j. Other impacts: ______________________________________________________
__________________________________________________________________
8.
Impact on Agricultural Resources
The proposed action may impact agricultural resources. (See Part 1. E.3.a. and b.)
NO
YES
If “Yes”, answer questions a - h. If “No”, move on to Section 9.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may impact soil classified within soil group 1 through 4 of the
NYS Land Classification System.
E2c, E3b
b. The proposed action may sever, cross or otherwise limit access to agricultural land
(includes cropland, hayfields, pasture, vineyard, orchard, etc).
E1a, Elb
c. The proposed action may result in the excavation or compaction of the soil profile of
active agricultural land.
E3b
d. The proposed action may irreversibly convert agricultural land to non-agricultural
uses, either more than 2.5 acres if located in an Agricultural District, or more than 10
acres if not within an Agricultural District.
E1b, E3a
e. The proposed action may disrupt or prevent installation of an agricultural land
management system.
El a, E1b
f. The proposed action may result, directly or indirectly, in increased development
potential or pressure on farmland.
C2c, C3,
D2c, D2d
g. The proposed project is not consistent with the adopted municipal Farmland
Protection Plan.
C2c
h. Other impacts: ________________________________________________________
The project will require the removal of approximately 76 trees with DBH of 2
inches or greater; of which 45 are between 6-inch to 32-inch DBH.
9.
Impact on Aesthetic Resources
The land use of the proposed action are obviously different from, or are in
NO
YES
sharp contrast to, current land use patterns between the proposed project and
a scenic or aesthetic resource. (Part 1. E.1.a, E.1.b, E.3.h.)
If “Yes”, answer questions a - g. If “No”, go to Section 10.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. Proposed action may be visible from any officially designated federal, state, or local
scenic or aesthetic resource.
E3h
b. The proposed action may result in the obstruction, elimination or significant
screening of one or more officially designated scenic views.
E3h, C2b
c. The proposed action may be visible from publicly accessible vantage points:
i. Seasonally (e.g., screened by summer foliage, but visible during other seasons)
ii. Year round
E3h
d. The situation or activity in which viewers are engaged while viewing the proposed
action is:
i. Routine travel by residents, including travel to and from work
ii. Recreational or tourism based activities
E3h
E2q,
E1c
e. The proposed action may cause a diminishment of the public enjoyment and
appreciation of the designated aesthetic resource.
E3h
f. There are similar projects visible within the following distance of the proposed
project:
0-1/2 mile
½ -3 mile
3-5 mile
5+ mile
D1a, E1a,
D1f, D1g
g. Other impacts: ______________________________________________________
__________________________________________________________________
10. Impact on Historic and Archeological Resources
The proposed action may occur in or adjacent to a historic or archaeological
NO
YES
resource. (Part 1. E.3.e, f. and g.)
If “Yes”, answer questions a - e. If “No”, go to Section 11.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
E3e
b. The proposed action may occur wholly or partially within, or substantially contiguous
to, an area designated as sensitive for archaeological sites on the NY State Historic
Preservation Office (SHPO) archaeological site inventory.
E3f
c. The proposed action may occur wholly or partially within, or substantially contiguous
to, an archaeological site not included on the NY SHPO inventory.
Source: ____________________________________________________________
E3g
a. The proposed action may occur wholly or partially within, or substantially contiguous
to, any buildings, archaeological site or district which is listed on the National or
State Register of Historical Places, or that has been determined by the Commissioner
of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for
listing on the State Register of Historic Places.
d. Other impacts: ______________________________________________________
__________________________________________________________________
e. If any of the above (a-d) are answered “Moderate to large impact may
occur”, continue with the following questions to help support conclusions in Part 3:
i.
The proposed action may result in the destruction or alteration of all or part
of the site or property.
ii.
The proposed action may result in the alteration of the property’s setting or
integrity.
iii. The proposed action may result in the introduction of visual elements which
are out of character with the site or property, or may alter its setting.
E3e, E3g,
E3f
E3e, E3f,
E3g, E1a,
E1b
E3e, E3f,
E3g, E3h,
C2, C3
11. Impact on Open Space and Recreation
The proposed action may result in a loss of recreational opportunities or a
NO
YES
reduction of an open space resource as designated in any adopted
municipal open space plan.
(See Part 1. C.2.c, E.1.c., E.2.q.)
If “Yes”, answer questions a - e. If “No”, go to Section 12.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may result in an impairment of natural functions, or “ecosystem
services”, provided by an undeveloped area, including but not limited to stormwater
storage, nutrient cycling, wildlife habitat.
D2e, E1b
E2h,
E2m, E2o,
E2n, E2p
b. The proposed action may result in the loss of a current or future recreational resource.
C2a, E1c,
C2c, E2q
c. The proposed action may eliminate open space or recreational resource in an area
with few such resources.
C2a, C2c
E1c, E2q
d. The proposed action may result in loss of an area now used informally by the
community as an open space resource.
C2c, E1c
e. Other impacts: _____________________________________________________
_________________________________________________________________
12. Impact on Critical Environmental Areas
The proposed action may be located within or adjacent to a critical
NO
YES
environmental area (CEA). (See Part 1. E.3.d)
If “Yes”, answer questions a - c. If “No”, go to Section 13.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may result in a reduction in the quantity of the resource or
characteristic which was the basis for designation of the CEA.
E3d
b. The proposed action may result in a reduction in the quality of the resource or
characteristic which was the basis for designation of the CEA.
E3d
c. Other impacts: ______________________________________________________
__________________________________________________________________
The project will remove a structure that is eligible for listing.
13. Impact on Transportation
The proposed action may result in a change to existing transportation systems.
NO
YES
(See Part 1. D.2.j)
If “Yes”, answer questions a - f. If “No”, go to Section 14.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. Projected traffic increase may exceed capacity of existing road network.
D2j
b. The proposed action may result in the construction of paved parking area for 500 or
more vehicles.
D2j
c. The proposed action will degrade existing transit access.
D2j
d. The proposed action will degrade existing pedestrian or bicycle accommodations.
D2j
e.The proposed action may alter the present pattern of movement of people or goods.
D2j
f. Other impacts: ______________________________________________________
__________________________________________________________________
14. Impact on Energy
The proposed action may cause an increase in the use of any form of energy.
NO
YES
(See Part 1. D.2.k)
If “Yes”, answer questions a - e. If “No”, go to Section 15.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action will require a new, or an upgrade to an existing, substation.
D2k
b. The proposed action will require the creation or extension of an energy transmission
or supply system to serve more than 50 single or two-family residences or to serve a
commercial or industrial use.
D1f,
D1q, D2k
c. The proposed action may utilize more than 2,500 MWhrs per year of electricity.
D2k
d. The proposed action may involve heating and/or cooling of more than 100,000 square
feet of building area when completed.
D1g
e. Other Impacts: ________________________________________________________
____________________________________________________________________
15. Impact on Noise, Odor, and Light
The proposed action may result in an increase in noise, odors, or outdoor lighting.
NO
YES
(See Part 1. D.2.m., n., and o.)
If “Yes”, answer questions a - f. If “No”, go to Section 16.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may produce sound above noise levels established by local
regulation.
D2m
b. The proposed action may result in blasting within 1,500 feet of any residence,
hospital, school, licensed day care center, or nursing home.
D2m, E1d
c. The proposed action may result in routine odors for more than one hour per day.
D2o
Temporary detour required during construction. Project will restore a
pre-existing vehicular travel route with added pedestrian accommodations.
d. The proposed action may result in light shining onto adjoining properties.
D2n
e. The proposed action may result in lighting creating sky-glow brighter than existing
area conditions.
D2n, E1a
f. Other impacts: ______________________________________________________
__________________________________________________________________
16. Impact on Human Health
The proposed action may have an impact on human health from exposure
NO
YES
to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. f. g. and h.)
If “Yes”, answer questions a - m. If “No”, go to Section 17.
Relevant
Part I
Question(s)
No,or
small
impact
may cccur
Moderate
to large
impact may
occur
a. The proposed action is located within 1500 feet of a school, hospital, licensed day
care center, group home, nursing home or retirement community.
E1d
b. The site of the proposed action is currently undergoing remediation.
E1g, E1h
c. There is a completed emergency spill remediation, or a completed environmental site
remediation on, or adjacent to, the site of the proposed action.
E1g, E1h
d. The site of the action is subject to an institutional control limiting the use of the
property (e.g., easement or deed restriction).
E1g, E1h
e. The proposed action may affect institutional control measures that were put in place
to ensure that the site remains protective of the environment and human health.
E1g, E1h
f. The proposed action has adequate control measures in place to ensure that future
generation, treatment and/or disposal of hazardous wastes will be protective of the
environment and human health.
D2t
g. The proposed action involves construction or modification of a solid waste
management facility.
D2q, E1f
h. The proposed action may result in the unearthing of solid or hazardous waste.
D2q, E1f
i. The proposed action may result in an increase in the rate of disposal, or processing, of
solid waste.
D2r, D2s
j. The proposed action may result in excavation or other disturbance within 2000 feet of
a site used for the disposal of solid or hazardous waste.
E1f, E1g
E1h
k. The proposed action may result in the migration of explosive gases from a landfill
site to adjacent off site structures.
E1f, E1g
l. The proposed action may result in the release of contaminated leachate from the
project site.
D2s, E1f,
D2r
m. Other impacts: ______________________________________________________
__________________________________________________________________
17. Consistency with Community Plans
The proposed action is not consistent with adopted land use plans.
NO
YES
(See Part 1. C.1, C.2. and C.3.)
If “Yes”, answer questions a - h. If “No”, go to Section 18.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action’s land use components may be different from, or in sharp
contrast to, current surrounding land use pattern(s).
C2, C3, D1a
E1a, E1b
b. The proposed action will cause the permanent population of the city, town or village
in which the project is located to grow by more than 5%.
C2
c. The proposed action is inconsistent with local land use plans or zoning regulations.
C2, C2, C3
d. The proposed action is inconsistent with any County plans, or other regional land use
plans.
C2, C2
e. The proposed action may cause a change in the density of development that is not
supported by existing infrastructure or is distant from existing infrastructure.
C3, D1c,
D1d, D1f,
D1d, Elb
f. The proposed action is located in an area characterized by low density development
that will require new or expanded public infrastructure.
C4, D2c, D2d
D2j
g. The proposed action may induce secondary development impacts (e.g., residential or
commercial development not included in the proposed action)
C2a
h. Other: _____________________________________________________________
__________________________________________________________________
18. Consistency with Community Character
The proposed project is inconsistent with the existing community character.
NO
YES
(See Part 1. C.2, C.3, D.2, E.3)
If “Yes”, answer questions a - g. If “No”, proceed to Part 3.
Relevant
Part I
Question(s)
No, or
small
impact
may occur
Moderate
to large
impact may
occur
a. The proposed action may replace or eliminate existing facilities, structures, or areas
of historic importance to the community.
E3e, E3f, E3g
b. The proposed action may create a demand for additional community services (e.g.
schools, police and fire)
C4
c. The proposed action may displace affordable or low-income housing in an area where
there is a shortage of such housing.
C2, C3, D1f
D1g, E1a
d. The proposed action may interfere with the use or enjoyment of officially recognized
or designated public resources.
C2, E3
e. The proposed action is inconsistent with the predominant architectural scale and
character.
C2, C3
f. Proposed action is inconsistent with the character of the existing natural landscape.
C2, C3
E1a, E1b
E2g, E2h
g. Other impacts: ______________________________________________________
__________________________________________________________________
PRINT FULL FORM
Full Environmental Assessment Form
Part 3 - Evaluation of the Magnitude and Importance of Project Impacts
and
Determination of Significance
Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question
in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular
element of the proposed action will not, or may, result in a significant adverse environmental impact.
Based on the analysis in Part 3, the lead agency must decide whether to require an environmental impact statement to further assess
the proposed action or whether available information is sufficient for the lead agency to conclude that the proposed action will not
have a significant adverse environmental impact. By completing the certification on the next page, the lead agency can complete its
determination of significance.
Reasons Supporting This Determination:
To complete this section:
•
Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity,
size or extent of an impact.
•
Assess the importance of the impact. Importance relates to the geographic scope, duration, probability of the impact
occurring, number of people affected by the impact and any additional environmental consequences if the impact were to
occur.
•
The assessment should take into consideration any design element or project changes.
•
Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where
there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse
environmental impact.
•
Provide the reason(s) why the impact may, or will not, result in a significant adverse environmental impact
•
For Conditional Negative Declarations identify the specific condition(s) imposed that will modify the proposed action so that
no significant adverse environmental impacts will result.
•
Attach additional sheets, as needed.
Determination of Significance - Type 1 and Unlisted Actions
SEQR Status:
Type 1
Unlisted
Identify portions of EAF completed for this Project: Part 1
Part 2
Part 3
Agency Use Only [IfApplicable]
Project :
Date :
FEAF 2019
Impact on Land/Water: Steep slopes of 50% or more exist throughout the project site, extending both down the banks to the stream as well as on the
upland side along the approaches. Temporary soldier pile retaining walls will be installed to limit the extent of disturbance needed for construction. Erosion
and sediment controls during construction will include silt fencing, coffer dams and turbidity curtains, among other controls as may be required by
NYSDEC. NYSDOT Environmental Ground and Water Protection specifications will also be followed during demolition and construction. Site restoration
will include biodegradeable erosion control matting and live staking where appropriate.
Impact on Flooding: Hydraulic analyses were performed for the existing and proposed bridges, which determined that the water surface elevation for both
the 50- and 100-year storm events are unchanged. As such, the new bridge will not result in any new flooding impacts.
Impact on Plants and Animals: The project will disturb between approximately 40 - 80 feet of the land area next to the bridge, which includes a mix of
young and mature trees. Of the 76 trees that must be removed to enable construction, 31 are less than 6 inches DBH and only 5 are equal to or above
20-inch DBH. Tree removals will be offset by the planting of 99 new trees. Since part of the project area must remain cleared for continued access and
maintenance of the bridge, approximately half of the trees will be planted offsite. To prevent potential impacts to endangered bats that may be roosting in
these trees, all tree removals will occur between November 1st and March 31st in accordance NYSDEC guidelines.
Impact on Historic and Archeological Resources: SHPO concurred that the bridge must be replaced for long-term safety and has no concerns regarding
archaeological resources. A Historic American Engineering Record Level II Documentation has been prepared for the bridge. In addition, the historic
plaque and certain components of the original bridge will be salvaged and set aside for preservation options. The new bridge will replicate the truss design.
The project is not adjacent to and will not affect the Old Croton Aqueduct.
Impact on Open Space: While there will be no reduction in open space, a village trail that connects to Croton Gorge Trail will not be accessible during
construction. The trail connection will be restored following construction, which is targeted to begin in the fall and conclude by the following summer.
Impact on Critical Environmental Areas (CEA): The project area is in the County's Croton Point Park and River CEA, which was designated for its
geological, archaeological and ecological significance. It also encompasses an underlying aquifer that provides drinking water to the Village of Croton. As
the project involves replacement of a bridge in its existing location with appropriate construction mitigation and restoration, there will be no significant
adverse impacts as it relates to the CEA and is consistent in general with the Village of Croton's LWRP.
Impact on Transportation: The bridge replacement will restore a vital corridor between the Town and Village, reducing extended travel times currently
experienced by school buses and emergency vehicles due to the closure of the existing bridge, along with reducing associated energy consumption and
carbon emissions. Widening of the bridge to provide 2-way traffic as well as pedestrian lanes will improve safety and encourage non-motorized uses.
RB03W
June 2025
Upon review of the information recorded on this EAF, as noted, plus this additional support information
and considering both the magnitude and importance of each identified potential impact, it is the conclusion of the
as lead agency that:
A. This project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact
statement need not be prepared. Accordingly, this negative declaration is issued.
B. Although this project could have a significant adverse impact on the environment, that impact will be avoided or
substantially mitigated because of the following conditions which will be required by the lead agency:
There will, therefore, be no significant adverse impacts from the project as conditioned, and, therefore, this conditioned negative
declaration is issued. A conditioned negative declaration may be used only for UNLISTED actions (see 6 NYCRR 617.7(d)).
C. This Project may result in one or more significant adverse impacts on the environment, and an environmental impact
statement must be prepared to further assess the impact(s) and possible mitigation and to explore alternatives to avoid or reduce those
impacts. Accordingly, this positive declaration is issued.
Name of Action:
Name of Lead Agency:
Name of Responsible Officer in Lead Agency:
Title of Responsible Officer:
Signature of Responsible Officer in Lead Agency:
Date:
Signature of Preparer (if different from Responsible Officer)
Date:
For Further Information:
Contact Person:
Telephone Number:
E-mail:
For Type 1 Actions and Conditioned Negative Declarations, a copy of this Notice is sent to:
Chief Executive Officer of the political subdivision in which the action will be principally located (e.g., Town / City / Village of)
Other involved agencies (if any)
Applicant (if any)
Environmental Notice Bulletin: http://www.dec.ny.gov/enb/enb.html
Quaker Bridge Road Bridge Replacement (RB03W)
Malika Vanderberg
Clerk and Chief Administrative Officer, Westchester County Board of Legislators
June 26, 2025
David S. Kvinge, Assistant Commissioner, Westchester County Department of Planning
148 Martine Avenue, White Plains, NY 10601
914-995-2089
dsk2@WestchesterCountyNY.gov
PRINT FULL FORM
ATTACHMENT B: PLANS
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
(ANSI B) 11X17
06/06/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/5/2025
N:\Projects\2024\124-296 Westchester Co - Quaker Bridge Replacement\Working\CADD\dgn connect_2023\124-296_cpb_gen_01.dgn
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
2:46:16 PM
morrimm
TM 79.06-2-3
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
WOODS
STRUCTURE
CONCRETE
STONE WING WALL
EDGE OF WATER
STONE WING WALL
L
L
A
W
G
NI
W
E
G
DI
R
B
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
POST
POST
WOODS
SIGN
CORTLANDT
TOWN OF
LIMIT 30
VIL. SPEED
15 TONS &
WEIGHT LIMIT
STONE LINED DITCH
PARKING
NO
SIGN
STREET
BRIDGE WING WALL
BORING
BORING
BORING
BORING
40'
1" = 20'
ROAD
QUAKER BRIDGE
POST ROAD
TO ALBANY
RIDGE ROAD
TO QUAKER
ROAD EAST
QUAKER BRIDGE
TO RTE 129
TO BE REMOVED
SUPERSTRUCTURE
EXISTING
STA. M 2+94.61
BRGS.
¡
STA. 3+94.61
BRGS.
¡
UTILITIES REMAIN
EXISTING OVERHEAD
BRGS.
¡
BRGS. TO
¡
100'-0"
PLAN
ELEVATION A-A
ROAD
QUAKER BRIDGE
CONCRETE BARRIER (TYP.)
PROPOSED SINGLE SLOPE
GRID
NORTH
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD EAST
STA M 2+91.86
BEGIN BRIDGE
STA M 3+97.36
END BRIDGE
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD
STA. 3+94.61
EXP. BRGS.
¡
ORGINAL GROUND
CONCRETE WINGWALL (TYP.)
PROPOSED CAST-IN-PLACE
FLOW
CROTON RIVER
STA. 2+94.61
FIX BRGS.
¡
A
A
GENERAL PLAN AND ELEVATION
DATUM EL. 10.00
CONCRETE WINGWALL (TYP.)
PROPOSED CAST-IN-PLACE
CONCRETE BARRIER (TYP.)
PROPOSED SINGLE SLOPE
5'-0" SHOULDER
TRAVEL WAY
11'-0"
TRAVEL WAY
11'-0"
OUT TO OUT
31'-4"
CLEAR
28'-0"
BOT. FTG EL. 21.25
BOT. FTG EL. 25.25
SEAT EL. 39.53
SEAT EL. 42.60
EL. 36.50
100'-0" SPAN
1'-0" SHOULDER
AZ. 132°15'0.26"
AZ. 42°15'0.22"
PROPOSED GRADE
INVENTORY
OPERATING
LOAD RATING (LRFR)
HL-93
HL-93
RF=**
RF=**
** TO BE PROVIDED BY TRUSS MANUFACTURER
LOW CHORD EL. 41.44
ITEM 551.30 (TYP.)
PROPOSED MICROPILES,
HYDRAULIC DATA
DRAINAGE AREA
RECURRENCY INTERVAL
(YEARS)
PEAK DISCHARGE
/
POINT OF MAX. BACKWATER
HIGH WATER ELEVATION AT
EXISTING
PROPOSED
FLOOD
BASIC
FLOOD
DESIGN
377 SQ. MILES
34.6
33.2
34.6
34.51
(FT. S)
r
15,600
13,080
AVG. VELOCITY THRU STRUCT. @ DESIGN FLOOD 14.6 FT./SEC.
OF TRUSS (TYP.)
¡
ITEM 568.70 (TYP.)
TRANSITION BRIDGE RAILING,
DHW EL. 33.2 (50 - YR STORM)
FILL LIMITS
APPROXIMATE
ITEM 620.03
STONE FILLING (LIGHT)
ITEM 620.05
STONE FILLING (HEAVY)
LEGEND:
ABUTMENT (TYP.)
PROPOSED CAST-IN-PLACE
ENDS STA. M 2+68.85
APPROACH PAVEMENT
BEGINS STA. M 4+26.67
APPROACH PAVEMENT
TO BE REPLACED
EXISTING CULVERT
BEGINS STA. S 2+07.07
APPROACH PAVEMENT
TO BE REMOVED (TYP.)
EXISTING SUBSTRUCTURE
TO REMAIN
EXISTING CULVERT
ST-01
(STONE BEDDING) (TYP.)
APPROACH DRAINAGE
CONCRETE FOOTING (TYP.)
PROPOSED CAST-IN-PLACE
OHW EL. 28.25
OHW EL. 28.25'
OHW EL. 28.25'
35'-6"
¡ TRUSS TO ¡ TRUSS
56-02-R-221-0
CONCRETE PILES, ITEM 551.11 (TYP.)
PROPOSED CAST-IN-PLACE
13'-6"
EL. 25.00
EL. 28.75
8'-0"
EL. 26.00
EL. 30.00
1 ON 1.5
1 ON 1.5
AZ. 42°15'0.22"
M 2+54.22
PCC
M 2+90.48
PT
M 3+97.40
PC
M 4+50.79
PT
M 2+00
M 3+00
M 4+00
S 2+00
S 2+00
HEAD WALL
CONC.
W 5
P.P.
=46.62
INV.
=49.95
INV.
=43.13
INV.
=43.20
INV.
INV.=44.40
GRATE=45.80
SLOT DRAIN
VAULT
DRAINAGE
12" PVC
15" CMP
18" CMP
=41.7
INV.
PERMANENT
IMPACTS
BELOW OHW
BUFFER
LINE
ORDINARY
HIGH
WATER LINE
TEMPORARY
IMPACTS
BELOW OHW
PERMANENT
BUFFER
IMPACTS
TEMPORARY
BUFFER
IMPACTS
3348560)
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:34:41 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
¢
£
¡
§
¡
E
EMH
G
GP
GSB
GV
HYD
LP
LPG
PP
SA
SMH
ST
T
TCB
TELBOX
TEL P
TMH
CTV
W
WSB
WV
AHEAD
AZIMUTH
BACK
BASELINE
BEARING
CENTERLINE
CURVE TO SPIRAL
SUPERELEVATION RATE (CROSS SLOPE)
EQUALITY
EXTERNAL
HORIZONTAL CONTROL LINE
HEADLIGHT SIGHT DISTANCE
LENGTH OF CIRCULAR CURVE
LENGTH OF SPIRAL
LENGTH OF VERTICAL CURVE
CENTER CORRECTION OF VERTICAL CURVE
MAIN LINE
POINT OF CURVATURE
POINT OF INTERSECTION
POINT ON LINE
PASSING SIGHT DISTANCE
POINT OF TANGENT
POINT OF VERTICAL CURVE
POINT OF VERTICAL INTERSECTION
POINT OF VERTICAL TANGENT
RADIUS
SPIRAL TO CURVE
STOPPING SIGHT DISTANCE
SPIRAL TO TANGENT
STATION
TANGENT LENGTH
THEORETICAL GRADE LINE
TANGENT TO SPIRAL
VERTICAL CURVE
ELECTRIC
ELECTRIC MANHOLE
GAS
GUY POLE
GAS SERVICE BOX (HOUSE LINE)
GAS VALVE (MAIN LINE)
HYDRANT
LIGHT POLE
LOW PRESSURE GAS
POWER POLE
SANITARY SEWER
SANITARY MANHOLE
STORM SEWER
TELEPHONE
TRAFFIC CONTROL BOX
TELEPHONE BOX
TELEPHONE POLE
TELEPHONE MANHOLE
CABLE TELEVISION
WATER
WATER SERVICE BOX (HOUSE LINE)
WATER VALVE (MAIN LINE)
ALIGNMENT
SUBSURFACE EXPLORATION
HAND AUGER
DRILLING MUD
HOLLOW FLIGHT AUGER
POWER AUGER
PROBE
PERCOLATION TEST HOLE
TO BE DEFINED AT THE TIME OF EXPLORATION
SEISMIC POINT
TEST PIT
BRIDGE
CUT
DAM
FILL
CULVERT
WALL
AH
CP
DA
DM
DN
FH
PA
PH
PT
SP
B
C
D
F
K
W
X
IS MADE
BE DEFINED AT THE TIME THE EXPLORATION
TO BE USED IF ONE OF THE ABOVE CANNOT
ABUT
AOBE
ASPH
BDY
BLDG
BM
CC
CONC
CONST
CR
D
DM
DWY
EP
ES
FP
FD
FL
GAR
GR
HO
HWY
IP
MB
MON
N&W
OG
O/H
P
PAV'T
PE
PED POLE
POR
RR
RTE
ROW
FEE WO/A
ABUTMENT
AS ORDERED BY ENGINEER
ASPHALT
BOUNDARY
BUILDING
BENCH MARK
CENTER TO CENTER
CONCRETE
CONSTRUCTION
COUNTY ROAD
DEED DISTANCE
DIRECT MEASUREMENT
DRIVEWAY
EDGE OF PAVEMENT
EDGE OF SHOULDER
FENCE POST
FOUNDATION
FENCE LINE
GARAGE
GRAVEL
HOUSE
HIGHWAY
IRON PIN OR IRON PIPE
MAILBOX
MONUMENT
NAIL AND WASHER
ORIGINAL GROUND
OVERHEAD
PARCEL
PAVEMENT
PERMANENT EASEMENT
PEDESTRIAN POLE
PROPERTY LINE
PORCH
RAILROAD
ROUTE
RIGHT OF WAY
TOPOGRAPHY (MISCELLANEOUS)
RW
SH
SHLDR
RETAINING WALL
STATE HIGHWAY
SHOULDER
BOTTOM OF BANK (STREAM)
BOTTOM OF CURB
BOTTOM OF OPENING
CORRUGATED ALUMINUM PIPE
CATCH BASIN
CAST IRON PIPE
CENTERLINE OF STREAM
CORRUGATED METAL PIPE
CONCRETE PIPE
BB
BC
BO
CAP
CB
CIP
CMP
CP
CORRUGATED STEEL PIPE
CULVERT
DIAMETER
DRAINAGE MANHOLE
DRAINAGE STRUCTURE PIPE
DITCH CROSSING
EXTREME HIGH WATER
ELEVATION
ELEVATION
EXTREME LOW WATER
END SECTION
HEADWALL
INVERT
MANHOLE
MEAN HIGH WATER
ORDINARY HIGH WATER
ORDINARY LOW WATER
REINFORCED CONCRETE PIPE
TOP OF BANK (STREAM)
TOP OF CURB
TOP OF GRATE
VITRIFIED CLAY PIPE
CSP
CULV
DIA
DMH
DS
D'XING
EHW
EL
ELEV
ELW
ES
HW
INV
MH
MHW
OHW
OLW
RCP
TB
TC
TG
VCP
SPK
ST
STK
STY
SW
TE
TO
U/G
WW
SPIKE
STREET
STAKE
STORY
SIDEWALK
TEMPORARY EASEMENT
TEMPORARY OCCUPANCY
UNDERGROUND
WING WALL
AH
AZ
BK
BRG
CS
e
EQ
EXT
HCL
HSD
L
LS
LVC
E
PC
PI
POL
PSD
PT
PVC
PVI
PVT
R
SC
SSD
ST
STA
T
TGL
TS
VC
FEE ACQUISITION WITHOUT ACCESS
FEE
FEE ACQUISITION
ABBR.
REPLACE ABBREVIATION "AB" WITH:
ABBR.
ABBR.
ABBR.
ABBR.
UTILITIES
TOPOGRAPHY (DRAINAGE)
4 INCHES CASED DRILL HOLE
1 INCH SAMPLER (RETRACTABLE PLUG)
2‚ INCHES CASED DRILL HOLE
SICPP
SMOOTH INTERIOR CORRUGATED POLYETHYLENE PIPE
STRM
RP
TP
SQUARE FEET
GALLON
'
mi
lb
LB
MI
(PLANS)
SYMBOL
STANDARD
(SPECS/PROPOSAL)
NOMENCLATURE:
EQUIVALENT
ftq
YDr
CUBIC YARD
CY
MILES
ACRES
LINEAR FEET
TON
TON
TON
GAL
POUND
GAL
SF
AC
AC
QUANTITIES SHEET
ESTIMATE OF
ITEM PAYMENT UNIT:
"
-
INCHES
YDq
SQUARE YARD
SY
LF
CONE PENETROMETER
DA, DM, DN, AND FH WITH:
ABBREVIATION "C" IN CATEGORIES:
INDEX AND ABBREVATIONS
IND-01
56-02-G-203-0
NO.
SHEET
DESCRIPTION
NUMBER
DWG
NUMBER
DPW
COVER SHEET
COV
56-02-T-202-0
INDEX & ABBREVIATIONS
IND-01
56-02-G-203-0
LEGEND POINT SYMBOLS
LEG-01
56-02-G-204-0
LEGEND LINE SYMBOLS
LEG-02
56-02-G-205-0
GENERAL NOTES - 1
GNN-01
56-02-G-206-0
GENERAL NOTES - 2
GNN-02
56-02-G-207-0
ESTIMATE OF QUANTITIES & BASELINE TIES
BLT-01
56-02-G-208-0
MAINTENANCE JURISTICTION PLAN AND TABLE
MJP-01
56-02-R-209-0
WORK ZONE TRAFFIC CONTROL NOTES
MPP-01
56-02-R-210-0
DETOUR PLAN
MPP-02
56-02-R-211-0
HIGHWAY GENERAL PLAN
GNP-01
56-02-R-212-0
HIGHWAY TYPICAL SECTIONS
TYP-01
56-02-R-213-0
PROFILE - QUAKER BRIDGE ROAD
PRO-01
56-02-R-214-0
PROFILE - QUAKER BRIDGE ROAD EAST
PRO-02
56-02-R-215-0
GRADING PLAN
GRD-01
56-02-R-216-0
LANDSCAPE PLAN
LAP-01
56-02-R-217-0
LANDSCAPING DETAILS
LAD-01
56-02-R-218-0
LANDSCAPING NOTES
LAN-01
56-02-R-219-0
MISCELLANEOUS DETAILS & TABLES
MSD-01
56-02-R-220-0
GENERAL PLAN AND ELEVATION
ST-01
56-02-R-221-0
TYPICAL BRIDGE SECTIONS
ST-02
56-02-R-222-0
BORING LOCATION PLAN
ST-03
56-02-B-223-0
BORING LOGS (1 OF 8)
ST-04
56-02-B-224-0
BORING LOGS (2 OF 8)
ST-05
56-02-B-225-0
BORING LOGS (3 OF 8)
ST-06
56-02-B-226-0
BORING LOGS (4 OF 8)
ST-07
56-02-B-227-0
BORING LOGS (5 OF 8)
ST-08
56-02-B-228-0
BORING LOGS (6 OF 8)
ST-09
56-02-B-229-0
BORING LOGS (7 OF 8)
ST-10
56-02-B-230-0
BORING LOGS (8 OF 8)
ST-11
56-02-B-231-0
EARTHWORK PLAN
ST-12
56-02-S-232-0
EARTHWORK SECTIONS
ST-13
56-02-S-233-0
EXCAVATION SUPPORT WALL PLAN AND ELEVATION (1 OF 2)
ST-14
56-02-S-234-0
EXCAVATION SUPPORT WALL PLAN AND ELEVATION (2 OF 2)
ST-15
56-02-S-235-0
ABUTMENT PILE LAYOUT PLAN
ST-16
56-02-S-236-0
BEGIN ABUTMENT PLAN AND ELEVATION
ST-17
56-02-S-237-0
BEGIN ABUTMENT REINFORCEMENT PLAN AND SECTION
ST-18
56-02-S-238-0
END ABUTMENT PLAN AND ELEVATION
ST-19
56-02-S-239-0
END ABUTMENT REINFORCEMENT PLAN AND SECTION
ST-20
56-02-S-240-0
ABUTMENT DETAILS (1 OF 2)
ST-21
56-02-S-241-0
ABUTMENT DETAILS (2 OF 2)
ST-22
56-02-S-242-0
WINGWALL SECTIONS
ST-23
56-02-S-243-0
ELASTOMERIC FIXED BEARINGS
ST-24
56-02-S-244-0
ELASTOMERIC EXPANSION BEARINGS
ST-25
56-02-S-245-0
TRANSVERSE SECTION
ST-26
56-02-S-246-0
TRUSS FRAMING PLAN
ST-27
56-02-S-247-0
TRUSS DETAILS
ST-28
56-02-S-248-0
SUPERSTRUCTURE SLAB PLAN
ST-29
56-02-S-249-0
APPROACH SLAB PLAN
ST-30
56-02-S-250-0
BARRIER AND RAILING PLAN
ST-31
56-02-S-251-0
SINGLE SLOPE CONCRETE BARRIER DETAILS (1 OF 3)
ST-32
56-02-S-252-0
SINGLE SLOPE CONCRETE BARRIER DETAILS (2 OF 3)
ST-33
56-02-S-253-0
SINGLE SLOPE CONCRETE BARRIER DETAILS (3 OF 3)
ST-34
56-02-S-254-0
TRANSITION RAIL DETAILS (1 OF 2)
ST-35
56-02-S-255-0
TRANSITION RAIL DETAILS (2 OF 2)
ST-36
56-02-S-256-0
DRAINAGE DETAILS
ST-37
56-02-S-257-0
INDEX
TOTAL NUMBER OF SHEETS: 56
STANDARD SHEETS
203-04
603-01
604-02
619-02
619-12
655-06
203-05
603-02
606-09
619-10
655-04
685-01
402-01
603-04
619-01
619-11
E
E
X
C
R
S
L
IO
CBP
CBPOL
CBSP
CBTP
ACC
ACOGO
ACS
AEQN
AEQNAHD
AEQNBK
AEVT
APC
APCC
API
APOB
APOC
APOE
APOL
APOS
APOT
APOVC
APOVT
APRC
APT
APVC
APVCC
APVI
APVRC
APVT
ASC
ASPI
ASTS
AVEVT
AVHIGH
AVLOW
CENTER OF CURVATURE
COGO
CURVE TO SPIRAL
EQUATION
EQUATION AHEAD
EQUATION BACK
EVENT STATION
SPIRAL TO CURVE
SPIRAL TO SPIRAL
SPIRAL TO TANGENT
TANGENT TO SPIRAL
DRILL HOLE
ELEVATION, SPOT
FLAG POLE
MAILBOX
PAPER BOX
ROCK, BOULDER
SHRUB, CONIFEROUS
SHRUB, DECIDUOUS
TREE, CONIFEROUS
TREE, DECIDUOUS
TREE, STUMP
SINGLE POST
DELINEATORS
REFERENCE MARKERS
GDH
LELS
LFP
LMB
LPB
LPST
LRB
LSHC
LSHD
LTC
LTD
LTS
LUKP
SDEL
SRM
S
CABINET & PAD
CCTV SITE
CDPD TRANSCEIVER
CELL PHONE TOWER
CONDUIT JACK OR BORING
CONTROLLER CABINET
COMMUNICATION PULL BOX
CONDUIT TURNING DOWN
CONDUIT TURNING UP
DEFAULT
TRANSMITTAL READER
FUSION SPLICE
HAR ADVISORY SIGN
HAR SITE
LOAD CENTER
MECHANICAL SPLICE
PEDESTRIAN SIGNAL HEAD
RAMP METER
SOLAR PANEL
WEIGHT IN MOTION DETECTOR
WIRELESS VIDEO REPEATER
WIRELESS VIDEO RECEIVER
WIRELESS VIDEO TRANSMITTER
PERM. OVERHEAD VMS
PERM. VMS
ACCOU. SPEED/COUNT SNSR.S
IASCTS
ICABPAD
ICCTV
ICDPD
ICELLT
ICJB
ICNTLCAB
ICPB
ICTD
ICTU
ICVTRT
IEZR
IEZTR
IFOXCAB
IFUSSPL
IHARADV
IHARST
IMECSPL
IMSCS
IMSCTS
IMT
IOVHVMS
IPASCS
IPEDS
IPSS
IPVMS
IRM
IRWIS
ISP
ISST
ITDB
ITP
IVTRT
IWIMD
IWVR
IWVTT
IWVRC
ILC
SPM
PARKING METER
SPREAD SPECT. TRANSCEIVER
TELEPHONE DEMARCATION BLK
SUBSURFACE TEMP. PROBE
MICRO SPEED & COUNT SENSOR
POST, SINGLE
PT., WALL LOCATION
PT., TREE W/ WIRE
PT., STAKE
PT., RAILROAD SPIKE
PT., SPIKE
PT., NAIL
PT., MONUMENT, MISC.
PT., MONUMENT
PT., IRON ROD
PT., IRON PIPE
PT., FENCE LOCATION
PT., DRILL HOLE
HISTORICAL, BLDG. CORNERS
HIGHWAY BNDRY., APPROX.
HIGHWAY BNDRY, PT.
DEED LINE, TYPE 1
DEED LINE, TYPE 2
DEED LINE, TYPE 3
DEED LINE, TYPE 4
DEED LINE, TYPE 5
EASEMENT, EXISTING
BOX, JUNCTION
BOX, PULL BOX
BOX, SPLICE
MICROCOMPUTER CABINET
PED POLE
SIGNAL HEADS
SIGNAL POLE
MDL1P
MHBCP
MPCC
MPDH
MPF
MPIP
MPIR
MPM
MPMM
MPN
MPRS
MPSP
MPST
MPTW
MPWL
TCMC
TCPP
TCSH
TCSP
C
MJCP
PT., JURIS. CITY
PT., CROSS CUT
IDEFAULT
POINT OF CURVATURE
POINT OF INTERSECTION
POINT OF BEGINNING
POINT OF CURVATURE
POINT OF END
POINT ON LINE
POINT ON SPIRAL
POINT ON TANGENT
POINT ON VERTICAL CURVE
POINT ON VERTICAL TANGENT
POINT ON REVERSE CURVE
POINT OF TANGENCY
POINT OF VERTICAL CURVATURE
POINT OF VERT. INTERSECTION
POINT OF VERT. REVERSE CURVE
POINT OF VERTICAL TANGENCY
SPIRAL POINT OF INTERSECTION
VERTICAL EVENT POINT
VERTICAL HIGH POINT
BASELINE, POINT
BASELINE, POINT ON LINE
UNKNOWN POINT
COMM. VEH. ROAD TRANSCEIVER
E-ZPASS READER
MICROWAVE TRANSCEIVER
PORT. ACCOU. SPD & CNT. SENSOR
VEHICLE TO RDWY TRANSCEIVER
PORT. SPEED & COUNT SENSOR
FIBER OPTIC X-CONNECT CABINET
PAVEMENT SURFACE SENSOR
RDWY WEATHER INFO. SENSOR
GUIDE RAIL, ANCHOR
GUIDE POST, SINGLE
RGA
RGP
CPBM
BENCHMARK
POINT, HORIZ. PHOTOGRAMMETRY
POINT, SURVEY MARKER, PERM.
CPV
CPSM
CPH
ATS
AST
MDL2P
MDL3P
MDL4P
MDL5P
MEEP
MHBP
TCBJ
TCBP
TCBS
POINT OF C0MPOUND CURVATURE
POINT OF VERT. CMPND CURVE
VERTICAL LOW POINT
BASELINE, SPUR POINT
BASELINE, TIE POINT
MHBAP
POINT, VERT., PHOTOGRAMMETRY
WETLAND FLAG
EWFG
RFM
A
B
A
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:34:45 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
BRIDGE, SCUPPER
EASEMENT, PERM., SHAPE
EASEMENT, PERM., APPROX.
EASEMENT, PERM., BACK LINE
EASEMENT, PERM., BACK LINE
MEPAP_P
EIOP_P
ADPI_P
DETOUR, POINT OF INTERSECT.
DETOUR, POINT ON LINE
BSC
LTW_P
TREE, WELL OR WALL
SINGLE POST, PROPOSED
BACK TO BACK, PROPOSED
SRSC3
SRSC4
SRSCT2
SRSCT4
SRSI
SRSN2
SRSN3
SRSS2
SRSS3
SRSS4
FEE ACQUISITION, SHAPE
MPBC
PT., BUILDING CORNER
MFS_P_T
MEPS_P_T
EASEMENT, PERMANENT
METS_P_T
EASEMENT, TEMPORARY
METS_P_T
OCCUPANCY, TEMPORARY
MFS_P_T
FEE ACQUISITION
TWZBCD_P
RES_P
ELEVATION, SPOT
TWZCMS_P
CHANGEABLE MESSAGE SIGN (PVMS)
TWZFLG_P
FLAGGER
TWZFT_P
FLAG TREE
TWZIA_P
TWZSDT_P
TWZAP_P
ARROW PANEL
TWZAPC_P
ARROW PANEL, CAUTION MODE
TWZAPT_P
ARROW PANEL, TRAILER OR SUPPORT
TWZWVA_P
SYMBOL, DIRECTION OF TRAFFIC
TWZSDTD_P
LUMINAIRE (TEMPORARY)
TWZSGN_P
SIGN (TEMPORARY)
TWZSIG_P
TWZWL_P
WARNING LIGHT
TWZWV_P
WORK VEHICLE
BARRICADE (TYPE III)
TWZLUM_P
S_P
SB_P
SHLD, INTERSTATE
SHLD, NATIONAL, 2 DIG.
SHLD, NATIONAL, 3 DIG.
SHLD, STATE, 2 DIG.
SHLD, STATE, 3 DIG.
SHLD, STATE, 4 DIG.
SHLD, CTY, 123 DIG.
SHLD, CTY, 4 DIG.
SHLD, CTY TOUR, 1-2 DIG.
SHLD, CTY TOUR, 3-4 DIG.
STR., INLET PROT., GRAVEL BAG
STR., INLET PROT., FILTER LOG
STR., INLET PROT., PREFAB.
STR., INLET PROT., SILT FENCE
STR., INLET, OUTLET PROT.
MEPP_P
MEPSP_P
MFAP_P
MFP_P
MFSP_P
EIPGB_P
EIPEFL_P
EIPP_P
EIPSF_P
ADPL_P
FEE ACQUISITION, BACK LINE
FEE ACQUISITION, APPROX.
FEE ACQUISITION W/O ACCESS
CRASH CUSHION (TEMPORARY)
IMPACT ATTENUATOR /
TRAFFIC DETOUR
SYMBOL, DIRECTION OF TEMPORARY
(TEMPORARY)
SIGNAL, TRAFFIC OR PEDESTRIAN
MOUNTED ATTENUATOR
WORK VEHICLE WITH TRUCK
ALIGNMENT
TRAP, SEDIMENT
LANDSCAPE
GEOTECHNICAL
ENVIRONMENTAL
ITS
ROW MAPPING
TRAFFIC CONTROL
UTILITIES
ETRS_P
CELL
DESCRIPTION
CELL
CELL
CELL
DESCRIPTION
DESCRIPTION
DESCRIPTION
RISER, CONCRETE BOX
ERCB
NAME
NAME
NAME
NAME
DESCRIPTION
NAME
CELL
CELL
NAME
DESCRIPTION
ROW ACQUISITION
BRIDGE
CONTROL
TRAFFIC WORK ZONE
ROADWAY
SIGNS
DRAINAGE
GB
CULV
FL
PRFB
SF
CDPD
C
C
EZ
EZ-T
XC
H
M
RM
SS
TC
TP
WVR
V
V
A
A
P1
M1
FEE
PE
M1
P1
TE
M1
P1
TO
M1
P1
FEE WO/A
M1
P1
LEGEND POINT SYMBOLS
LEG-01
56-02-G-204-0
DINV
DS
STRUCTURE, RECTANGULAR
INVERT
ANTENNAS
IANT_P
GAS, METER
GAS, MANHOLE
GAS, LINE MARKER
GAS/FUEL PUMP
GAS, VALVE
GAS, VENT
LIGHTING, POLE
LIGHTING, POLE, MEDIAN
LIGHTING, POLE, PED.
MISC. FILLER CAP
OIL, LINE MARKER
TELEPHONE, LINE MARKER
TELEPHONE, MANHOLE
CABLE TV, LINE MARKER
CABLE TV, PULL BOX
UNKNOWN, MANHOLE
UNKNOWN, VALVE
WATER, FIRE HYDRANT
WATER, METER
WATER, MANHOLE
WATER, VALVE
WATER, WELL
UGM
UGMH
UGLM
UGP
UGV
UGVT
ULP
ULPM
ULPP
UMFC
UOLM
UP
UPD
UPL
USMH
UTB
UTLM
UTMH
UTVPB
UUJB
UUMH
UUVL
UWFH
UWM
UWMH
UWV
UWW
UNKNOWN, JUNCTION BOX
UTVLM
UUB
UNKNOWN, BOX
UUPB
UNKNOWN, PULL BOX
UUVT
UNKNOWN, VENT
UUW
UNKNOWN, WELL
ELECTRIC, BOX
ELECTRIC, METER
ELECTRIC, MANHOLE
ELECTRIC, POLE, TRANS.
UEB
UEM
UEMH
UEPT
DSMTXX_P
POLE, WITH UTILITY
POLE, DEAD (NO UTILITY)
POLE, WITH LIGHT
SANITARY SEWER MANHOLE
TELEPHONE, BOOTH
DSI
STRUCTURE, INVERT
DSM
STRUCTURE, MANHOLE
DSR
STRUCTURE, ROUND
DST"X"CB_P
STRUCTURE, RECT., TYPE "X"
DST"X"_P
"XX" = 48, 60, 72, 84, 96
TYPE "XX"
STRUCTURE, MANHOLE,
TYPE "X"
STRUCTURE, RECT., WITH CURB
"X" = I, K, L, M, O, P, U
"X" = F, G, N, O, P, R
G
T
W
FP
E
E
G
C
A
A
P
LC
PM
M
VMS
PA
PVMS
RWIS
WIM
E
O
S
P
T
C
U
W
W
G
E
E
X
C
R
S
L
IO
AC
CONTROL (CENTERLINE)
CB
CBPR
ESFL
ECT
EDMC
CURTAIN, TURBIDITY
BASELINE
BASELINE, PROJECTION
SHEET PILING
EFNS
EFNV
EWFS
EWM
EWS
WETLAND, STATE
WETLAND, MITIGATION AREA
WETLAND, FEDERAL
FENCE, VEGETATION
FENCE, SILT
LABL
LAHR
LAPB
LAWA
LAWE
LFNC
LTRC
LTRD
LWR
LWS
AREA, BRUSH LINE
AREA, HEDGE ROW
AREA, PLANTING BED
AREA, WATERS EDGE
FENCE
TREE ROW, CONIFEROUS
WALL, RETAINING
TREE ROW, DECIDUOUS
WALL, STONE
MDL
MEE
HIGHWAY BOUNDARY, W/ ACCESS
EASEMENT, EXISTING
DEED LINE
RG
RRPSS
BROKEN LINE
TCSW
SIGNAL, SPAN WIRE
SM
SSO
SSOC
MULTIPLE POST
STRUCTURE, OVERHEAD
RRS
RUMBLE STRIP
STB*
EWF
BR
RAIL
BSHT
FENCE, SILT & VEGETATION
EFNSV
WETLAND, FEDERAL AND STATE
SBLB
BILLBOARDS
STRUCTURE, OVHD. CANTILEVER
AREA, WOODED AREA OUTLINE
LWH
WALL, H PILE
MHB
MHBA
HIGHWAY BOUNDARY, APPROX.
MHBW
HWY BOUNDARY, FACE OF WALL
MHBWOA
HIGHWAY BOUNDARY, W/O ACCESS
MJC
JURISDICTION, CITY
MJCY
JURISDICTION, COUNTY
MJHD
JURISDICTION, HISTORIC DISTRICT
MJLL
JURIS., (GREAT, MILITARY) LOT LINE
MJN
JURISDICTION, NATION
MJPB
JURISDICTION, PUBLIC LANDS
MJS
JURISDICTION, STATE
MJT
JURISDICTION, TOWN
MJV
JURISDICTION, VILLAGE
MPL
PROPERTY LOT LINE
PROPERTY LOT LINE, APPROXIMATE
MPLA
MSL
SUB LOT LINE
GUIDE RAIL, MISCELLANEOUS
RGB
GUIDE RAIL, BOX BEAM
RGBM
GUIDE RAIL, BOX BEAM, MEDIAN
RGC
GUIDE RAIL, CABLE
RGCB
GUIDE RAIL, CONCRETE BARRIER
RGW
GUIDE RAIL, W BEAM
RGWM
GUIDE RAIL, W BEAM, MEDIAN
RPB
PARKING BUMPER
RRC
RAIL ROAD, CATENARY
RRER
RAIL ROAD, 3RD RAIL
RAIL, PHOTO, SMALL SCALE
RRSSS
RAIL, SURVEY, SMALL SCALE
DOUBLE BROKEN LINE
STDB*
STDL*
DOTTED LINE LONG
STDS*
DOTTED LINE SHORT
STFB*
FULL BARRIER LINE
STH*
HATCH LINE
STRCT
ROUNDABOUT, CAT TRACKS
STRYL
ROUNDABOUT, YIELD LINE
STSB
STOP BAR
SOLID, EDGE
X WALK, LADDER LINE
* = W (WHITE) OR Y (YELLOW)
FILTER, SEDIMENT LOG
STSE*
MHA
HISTORICAL, ACQUISITION
STXLB
X WALK, LADDER BAR LINE
STXL
DAM, COFFER
FL
FW
FW
SW
WM
SW
PE
HB
AHB
HB W / OA
PL
PL
A
Z
3R
L
B
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:34:46 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
LIGHTS
BARRIER, TEMPORARY, W/ WARNING
COVERING
PAVEMENT MARKING REMOVAL OR
DO NOT HAVE CORRESPONDING EXISTING FEATURES.
FEATURES SHOWN AT THE HEAVIER WEIGHT ARE PROPOSED ONLY AND
6.
SHOULD BE LABELED ON THE PLANS.
SYMBOLOGY (SUCH AS THE PAVEMENT EDGE, PAVEMENT EDGE OF TRAVEL WAY) AND
MAPPING FEATURES NOT INCLUDED ON THE LEGEND SHEET DO NOT HAVE A UNIQUE
5.
ON B SIZE DRAWINGS).
EXCLUDING LINE WEIGHT. LINE WEIGHT FOR PROPOSED FEATURES IS THICKER (0.015 in
PROPOSED FEATURE SYMBOLOGY IS IDENTICAL TO EXISTING FEATURE SYMBOLOGY
4.
PROPOSED FEATURES.
FEATURES SHOWN ON THE LEGEND AS EXISTING FEATURES ALSO HAVE CORRESPONDING
3.
UTILITY LINES, ETC.) OR POINT (SIGN, UTILITY POLE, ETC.).
FEATURES ARE SHOWN AS EITHER LINEAR (ROADWAY GUIDERAIL, ROADWAY SIDEWALK,
2.
THE LEGEND ILLUSTRATES MAPPING FEATURES (EXISTING AND PROPOSED).
1.
ALIGNMENT
CONTROL
DRAINAGE
ENVIRONMENTAL
LANDSCAPE
ROW MAPPING
STRIPING
TRAFFIC CONTROL
AD_P
AT_P
DETOUR
DDG_P
DDP_P
DDS_P
DFL_P
FLOW LINE
DITCH, STONE LINED
DITCH, PAVED INVERT
DITCH, GRASS LINED
EWAA_P
WETLAND, ADJACENT AREA
EDMEC_P
EDMPC_P
EDMSC_P
LFILL_P
FILL LIMIT
RRPLS_P
RRSLS_P
TRANSITION CONTROL
SIGNS
STYLE
NAME
DESCRIPTION
BRIDGE
DESCRIPTION
NAME
STYLE
MEP_P
EASEMENT, PERMANENT
MEPA_P
EASEMENT, PERMANENT, APPROX.
MET_P
EASEMENT, TEMPORARY
META_P
EASEMENT. TEMPORARY, APPROX.
MF_P
MFA_P
FEE ACQUISITION, APPROXIMATE
MFS_P
FEE ACQUISITION, SHAPE
ROADWAY
DESCRIPTION
NAME
STYLE
GUIDE POST
RAIL, PHOTO, LARGE SCALE
RAIL, SURVEY, LARGE SCALE
RGP_P
STPB*
PARTIAL BARRIER LINE
UTILITIES
FEE ACQUISITION, W/ ACCESS
LCUT_P
CUT LIMIT
STYLE
NAME
DESCRIPTION
RCZ_P
BARRIER, TEMPORARY
TRAFFIC WORK ZONE
TWZBT_P
CHANNELIZING DEVICE
TWZCD_P
TWZPMRC_P
TWZBTWL_P
MFWOA_P
FEE ACQUISITION, W/O ACCESS
CLEAR ZONE
EDMGSC_P
DAM, EARTHEN CHECK
BAG CHECK
DAM, GRAVEL BAG/SAND
DAM, PREFABRICATED CHECK
DAM, STONE CHECK
AA
PE
APE
TE
ATE
FEE
AFEE
FEE W / OA
CZ
LEGEND LINE SYMBOLS
LEG-02
56-02-G-205-0
DCP
DCP_P
CULVERT PIPE (DIR)
CULVERT PIPE
UC
DSSD
SLOTTED DRAIN
CONDUIT, UNDERGROUND
UCH
CONDUIT, HANGING
UCO
CONDUIT, OVERHEAD
UE
ELECTRIC LINE, UNDERGROUND
UEH
ELECTRIC LINE, HANGING
UEO
ELECTRIC LINE, OVERHEAD
UESS
ELECTRIC, SUBSTATIONS
UFO
FIBER OPTIC, UNDERGROUND
UFOH
FIBER OPTIC, HANGING
UFOO
FIBER OPTIC, OVERHEAD
UG
GAS, UNDERGROUND
UGH
GAS, HANGING
UGO
GAS, OVERHEAD
UIC
INFORM CABLE, UNDERGROUND
UICH
INFORM CABLE, HANGING
OIL LINE, UNDERGROUND
UO
UOH
OIL LINE, HANGING
UPBP
POLE, BRACE, PUSH BRACE
POLE, GUY WIRE
USA
USAH
SANITARY SEWER, HANGING
SANITARY SEWER, UNDERGROUND
UT
TELEPHONE, UNDERGROUND
UTH
TELEPHONE, HANGING
UTO
TELEPHONE, OVERHEAD
UUU
UNKNOWN, UNDERGROUND
UUH
UNKNOWN, HANGING
UUO
UNKNOWN, OVERHEAD
UW
WATER LINE, UNDERGROUND
UWH
WATER LINE, HANGING
UWO
WATER LINE, OVERHEAD
UETO
ELECTRIC TRANSMISSION, OVERHEAD
USAF
SANITARY SEWER, FORCE MAIN, UGND
USAFH
SANITARY SEWER, FORCE MAIN, HANG
UTV
UTVH
UTVO
CABLE TV, UNDERGROUND
CABLE TV, HANGING
CABLE TV, OVERHEAD
UPGW
UNDERDRAIN
DUD_P
ST
ST
UD
C
C
OC
E
E
OE
OET
FO
FO
OFO
G
G
OG
IC
IC
O
O
SA
SA
SAF
SAF
T
T
OT
CTV
CTV
OCTV
UU
UU
OUU
W
W
OW
] [
[
]
] [
] [
] [
] [
] [
]
[
] [
]
[
] [
] [
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:34:47 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
HIGH VOLTAGE ELECTRICAL LINES ARE IN PROXIMITY TO THIS BRIDGE.
CONTAINING MATERIALS HAVE BEEN INDICATED IN THE CONTRACT DOCUMENTS.
PLANS OF THE STRUCTURE(S) AND/OR ENCOUNTERED DURING FIELD INSPECTIONS. ALL KNOWN ASBESTOS
STRUCTURES CONTAINED IN THIS CONTRACT. THESE MATERIALS WERE NOTED ON THE ORIGINAL CONTRACT
MATERIALS CONTAINING ASBESTOS ARE BELIEVED TO EXIST AT VARIOUS LOCATIONS ON OR IN CERTAIN
ALL SHOP DRAWINGS FOR THIS PROJECT SHALL BE PREPARED IN U.S. CUSTOMARY UNITS.
FULLY DIMENSIONED.
VISUAL CLARITY. ALL OTHER DETAILS FOR WHICH NO SCALE IS SHOWN ARE DRAWN PROPORTIONALLY AND ARE
DETAILS ON THE DRAWINGS LABELED AS "NOT TO SCALE" ARE INTENTIONALLY DRAWN NOT TO SCALE FOR
DESIGN LIVE LOAD: AASHTO HL - 93.
THE LOAD RATINGS ARE IN ACCORDANCE WITH THE AASHTO MANUAL FOR BRIDGE EVALUATION.
VERSION OF THE AASHTO MAINTENANCE MANUAL FOR ROADWAYS AND BRIDGES.
THIS BRIDGE SHALL BE MAINTAINED IN ACCORDANCE WITH THE GUIDELINES CONTAINED IN THE CURRENT
ALL PROVISIONS IN EFFECT AS OF JUNE 2025.
CONSTRUCTION SPECIFICATIONS: NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION AND MATERIALS WITH
SLABS AT 28 DAYS: f'c = 4,000 psi.)
JUNE 2025 (FOR DESIGN PURPOSES, COMPRESSIVE STRENGTH OF CONCRETE FOR SUBSTRUCTURES AND DECK
DESIGN SPECIFICATIONS: NYSDOT LRFD BRIDGE DESIGN SPECIFICATIONS WITH ALL PROVISIONS IN EFFECT AS OF
GENERAL NOTES:
FOUNDATION NOTES:
UNIT PRICE BID FOR ITEM 203.03 - EMBANKMENT IN PLACE.
THE COST OF WATER USED FOR COMPACTION OF EMBANKMENT IN PLACE MATERIAL SHALL BE INCLUDED IN THE
PRICE BID FOR ITEM 203.21 - SELECT STRUCTURE FILL.
THE COST OF WATER USED FOR COMPACTION OF THE SELECT STRUCTURAL FILL SHALL BE INCLUDED IN THE UNIT
SIMULTANEOUSLY, ON BOTH SIDES OF THE VERTICAL PAYMENT LINE.
EMBANKMENT IN PLACE, ITEM 203.03, AND SELECT STRUCTURE FILL, ITEM 203.21, SHALL BE PLACED
SUBSTRUCTURE NOTES:
CONTRACT.
EXPANSION JOINTS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS CONCRETE ITEMS IN THE
THE COST OF ALL JOINT MATERIAL AND WATERSTOPS AT CONCRETE CONSTRUCTION JOINTS, CONTRACTION AND
ABUTMENTS AND/OR WINGWALLS SHOULD PREFERABLY BE PLACED MIDWAY BETWEEN THE PEDESTALS.
BE PROVIDED WITH SHEAR KEYS AND WATERSTOPS. VERTICAL CONSTRUCTION JOINTS INTRODUCED IN THE
THE ABUTMENTS AND/OR WINGWALLS AT LOCATIONS NOT SHOWN IN THE PLANS. CONSTRUCTION JOINTS SHALL
THE CONTRACTOR, WITH THE APPROVAL OF THE COUNTY, MAY ELECT TO INTRODUCE CONSTRUCTION JOINTS IN
CONTRACTOR SHALL INCLUDE COSTS FOR THIS WORK IN THE UNIT PRICE BID FOR THE APPROACH SLAB ITEM.
SIDES), §728-06, SHALL BE PLACED ON THE TOP OF THE BACKWALLS OF FIXED AND EXPANSION ABUTMENTS. THE
TOP OF BACKWALLS SHALL BE STEEL TROWEL FINISHED. TWO SHEETS OF SHEET GASKET (TREATED BOTH
COFFERDAM AND HYDRAULIC NOTES:
ELEVATION RATHER THAN A COMPUTED ONE.
PREVALENT DURING ONE CONSTRUCTION SEASON FOR MORE THAN 25% OF THE TIME. IT IS AN OBSERVED
LOW WATER IS ESTIMATED TO BE 24.30 FT. LOW WATER IS DEFINED AS THE NORMAL LOW WATER ELEVATION
RATHER THAN A COMPUTED ONE.
IS ALWAYS LESS THAN THE ORDINARY HIGH-WATER ELEVATION AND IT IS USUALLY AN OBSERVED ELEVATION
ELEVATION LIKELY TO BE ENCOUNTERED DURING ONE CONSTRUCTION SEASON (EXCLUDING MAJOR FLOODS). IT
ORDINARY WATER IS ESTIMATED TO BE 25.75 FT. ORDINARY WATER IS DEFINED AS THE HIGHEST SURFACE WATER
OF 2.33 YEARS.
SURFACE ELEVATION FOR THE MEAN ANNUAL FLOOD, WHICH IS THE FLOOD THAT HAS A RECURRENCE INTERVAL
ORDINARY HIGH-WATER IS ESTIMATED TO BE 28.25 FT. ORDINARY HIGH-WATER IS DEFINED AS THE WATER
DETERMINED BY THE ENGINEER. NO SETTLEMENT BASIN SHALL BE CONSTRUCTED.
AND WATER POLLUTION CONTROL, SUCH AS SEDIMENT FILTER LOGS OR APPROVED EQUAL, MAY BE REQUIRED AS
THE STREAMBED AS SHOWN IN THE PLANS AND/OR APPROVED BY THE ENGINEER. TEMPORARY SOIL EROSION
DEWATER THE COFFERDAM BY PUMPING THE WATER TO AN APPROVED UPLAND VEGETATED AREA OUTSIDE OF
SHALL BE BASED ON ALL OF THE APPLICABLE COFFERDAM ITEMS INDICATED IN THE PLANS.
IF MULTIPLE COFFERDAMS ARE REPLACED BY A SINGLE SYSTEM, WHEN APPROVED BY THE COUNTY,PAYMENT
MEANS WHEN THE WATER ELEVATION EXCEEDS 28.25 FT.
THE COFFERDAM AND TREMIE SYSTEM SHALL BE DESIGNED TO AUTOMATICALLY FLOOD BY NON-MECHANICAL
THE CONTRACTOR SHALL SUBMIT THE CHANGES TO THE COUNTY FOR REVIEW AND APPROVAL.
SHOULD FIELD CONDITIONS REQUIRE A CHANGE IN THE TYPE OF COFFERDAM SYSTEM CALLED FOR IN THE PLANS,
SOURCE OF WATER, SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE COFFERDAM ITEM.
WHEN A COFFERDAM IS USED, THE COST OF DEWATERING THE ENTIRE EXCAVATION, REGARDLESS OF THE
WATER FROM ENTERING THE EXCAVATION SHALL BE FURNISHED AND PLACED AT NO COST TO THE COUNTY.
EXCAVATION REQUIRING A COFFERDAM, ANY REQUIRED EXTENSIONS TO THE COFFERDAM NECESSARY TO KEEP
SHOULD THE CONTRACTOR ELECT TO LAY BACK A PORTION OF THE EXISTING EARTH ADJACENT TO AN
SUPERSTRUCTURE NOTES:
ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM A709, GRADE 50.
GALVANIZING NOTES:
THE BOLTS.
DRILLED HOLES SHALL BE CLEANED OF ALL EXCESS MATERIAL THAT PREVENTS THE PROPER INSTALLATION OF
CONSTRUCTION MANUAL.
ALL BOLTS, NUTS, AND WASHERS SHALL BE GALVANIZED IN ACCORDANCE WITH THE NEW YORK STATE STEEL
565.2025 AND 565.2035.
PLATE, SHALL BE METALIZED. THE COST OF METALIZING SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEMS
ALL EXPOSED STEEL COMPONENTS OF BRIDGE BEARINGS, INCLUDING THE SOLE PLATE AND THE MASONRY
COST TO THE COUNTY.
DETERMINED TO BE CAUSED BY IMPROPER STORAGE OR SHIPPING OF HDG MATERIALS SHALL BE REPAIRED AT NO
SHALL BE REPAIRED IN ACCORDANCE WITH THE NYS STEEL CONSTRUCTION MANUAL. WHITE RUST THAT IS
DETRIMENTAL TO THE INTENDED USE OF THE MEMBER OR HAVE A NEGATIVE VISUAL IMPACT ON THE STRUCTURE
EXAMPLES OF NON-RESINOUS WOODS ARE: POPLAR, ASH AND SPRUCE. WHITE RUST THAT IS DETERMINED TO BE
SPACERS TO ALLOW VENTILATION AND AVOID MOISTURE BUILD UP, INCLINE MEMBERS TO ALLOW DRAINAGE.
FOLLOWS: STORE MATERIALS OFF OF THE GROUND AWAY FROM ALL VEGETATION, USE NON-RESINOUS WOODEN
AVOIDED. IF OUTDOOR STORAGE IS UNAVOIDABLE, EXAMPLES OF REASONABLE ACCOMMODATIONS ARE AS
SHOULD BE AVOIDED. STORAGE (OR SHIPPING) OF HDG MATERIALS IN CONTACT WITH ONE ANOTHER SHALL BE
GALVANIZED (HDG) MATERIALS SHALL BE PROVIDED AT ALL TIMES. STORAGE OF HDG MATERIALS OUTDOORS
REASONABLE ACCOMMODATIONS FOR THE PREVENTION OF WET STORAGE STAINING (WHITE RUST) OF HOT-DIP
WORKERS.
PLAN SHALL SPECIFY THE TYPE OF WALKING/WORKING PRECAUTIONS TO BE IMPLEMENTED TO PROTECT THE
STUD SHEAR CONNECTORS SHALL BE INSTALLED PRIOR TO GALVANIZING. THE CONTRACTOR'S WORKER SAFETY
STEEL ERECTION NOTES:
NEW YORK STATE PROFESSIONAL ENGINEER AND SUBMITTED TO THE COUNTY IN ACCORDANCE WITH THE SCM.
CALCULATIONS. THE ERECTION DRAWINGS AND STABILITY CALCULATIONS SHALL BE SEALED BY A REGISTERED
SHALL BE DOCUMENTED ON THE ERECTION DRAWINGS AND INCLUDED IN THE SUPPORTING STABILITY
HAVE BEEN ERECTED AND CROSS FRAMES INSTALLED. THE MEANS AND METHODS USED BY THE CONTRACTOR
ALTERNATE PICKING POINTS, OR BY USE OF A HOLDING CRANE UNTIL A SUFFICIENT NUMBER OF FLOORBEAMS
BY USE OF FALSEWORK, TEMPORARY BRACING, COMPRESSION FLANGE STIFFENING TRUSSES, CHOOSING
STEEL CONSTRUCTION MANUAL (SCM). THE TRUSSES FOR THIS BRIDGE SHALL BE STABILIZED DURING ERECTION
ERECTION AND CONSTRUCTION, IN ACCORDANCE WITH SECTION 2, SUBSECTION 204 OF THE NEW YORK STATE
THE CONTRACTOR SHALL PROVIDE FOR THE STABILITY OF STRUCTURAL STEEL DURING ALL PHASES OF
STEEL CONSTRUCTION NOTES:
ACCORDING TO THE AISC MANUAL.
DIMENSIONS FOR THICKNESSES OF STEEL ROLLED ANGLE SHAPES AND STRUCTURAL TUBING ARE SHOWN
TENSION COMPONENTS OF LIFTING BOXES AND LIFTING FRAMES
-
END PORTAL FRAMES
-
SWAY FRAMES
-
TOP AND BOTTOM LATERAL BRACING
-
VERTICAL GUSSET PLATES
-
SPLICE PLATES
-
CANTILEVER BRACKETS AND TIE PLATES
-
TENSION FLANGES AND WEBS PLATES OF BASCULE GIRDERS
-
MINIMUM CHARPY V-NOTCH FRACTURE TOUGHNESS REQUIREMENTS:
STANDARD SPECIFICATIONS - CONSTRUCTION AND MATERIALS, THE FOLLOWING ELEMENTS SHALL MEET THE
IN ADDITION TO THE STRUCTURAL STEEL ELEMENTS LISTED IN §715-01 - STRUCTURAL STEEL OF THE NYSDOT
SUPERSTRUCTURE SLAB NOTES:
TARPS OR OTHER BARRIER-TYPE MEANS TO THE SATISFACTION OF THE EIC.
THE SEALER OR BY PHYSICALLY ISOLATING THE AREA TO BE SPRAYED FROM THE WATERWAY BY THE USE OF
WATERWAY. CARE SHALL BE TAKEN TO PREVENT SPRAYED SEALER FROM ENTERING THE WATERWAY BY ROLLING
SURFACE, SUCH AS SCUPPERS OR OPEN DRAINS SHALL BE COVERED TO PREVENT CONTAMINATION OF THE
APPLICATION OF THE SEALER, ANY OPENINGS IN THE SURFACE OF THE BRIDGE DECK OR IN THE WALKING
AVAILABLE FOR IMMEDIATE USE MATERIALS TO SOAK UP OR CONTAIN ANY ACCIDENTAL SPILLS. PRIOR TO THE
IN A MANNER THAT WILL PREVENT CONTAMINATION OF THE WATERWAY. THE CONTRACTOR SHALL HAVE
MANUFACTURER'S INSTRUCTIONS REQUIRE MIXING OF THE SEALER PRIOR TO APPLICATION, MIXING SHALL OCCUR
CARE SHALL BE TAKEN TO PREVENT CONTAMINATION OF THE WATERWAY BY THE SEALER. IF THE
DAYS FOR EACH SUBMISSION, WILL BE ALLOWED UPON RECEIPT OF THE SUBMISSION.
AND MATERIALS SHALL APPLY. A REVIEW TIME OF TWO DAYS PER PLACEMENT DRAWING, WITH A MINIMUM OF 15
PROVISIONS OF §557-3.17 - NO BARLIST PROVIDED, OF THE NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION
BARLISTS ARE NOT PROVIDED FOR SUPERSTRUCTURE SLABS, APPROACH SLABS, AND/OR SUBSTRUCTURES. THE
NEW BRIDGE DECKS AND BRIDGE DECK OVERLAYS. ONLY PENETRATING TYPE SEALERS SHALL BE USED.
SHALL BE SEALED IN ACCORDANCE WITH ITEM 559.01 - PROTECTIVE SEALING OF STRUCTURAL CONCRETE ON
TOP SURFACES OF NEW SIDEWALKS AND EXPOSED SURFACES OF NEW CONCRETE PARAPETS OR BARRIERS
559.01 - PROTECTIVE SEALING OF STRUCTURAL CONCRETE ON NEW BRIDGE DECKS AND BRIDGE DECK OVERLAYS.
TOP SURFACES OF NEW BRIDGE DECKS AND APPROACH SLABS SHALL BE SEALED IN ACCORDANCE WITH ITEM
PRICE BID FOR THE BARRIER ITEM.
COST OF BARRIER AND ANCHORAGE REINFORCEMENT ORIGINATING IN THE SLAB SHALL BE INCLUDED IN THE UNIT
THE DETAILS FOR THE BARRIER REINFORCEMENT ARE FOR THE SLIP-FORMED OR CAST-IN-PLACE OPTION ONLY.
PERMISSION OF THE ENGINEER.
THE CONTRACTOR SHALL MAKE NO DEVIATIONS FROM THE HAUNCH DETAILS SHOWN IN THE PLANS WITHOUT THE
REMOVAL NOTES:
OF THE STRUCTURE'S PAINT PRIOR TO SUBMITTING A BID.
REQUIRED. BECAUSE OF THE ABOVE-MENTIONED CONDITION, THE CONTRACTOR SHALL EXAMINE THE CONDITION
ON THE ALTERNATIVE CHOSEN, THE TREATMENT AND DISPOSAL OF PAINT REMOVAL WASTE ITEM MAY BE
THE USE OF ENVIRONMENTAL GROUND AND/OR WATERWAY PROTECTION ITEMS WILL BE REQUIRED. DEPENDING
FOR THE SUPERSTRUCTURE REMOVAL ITEM(S) (OR THE UNIT PRICE BID FOR THE SUBSTRUCTURE REMOVAL ITEM.)
OPERATIONS. THE COST OF REMEDIATING THIS CONDITION SHALL BE INCLUDED IN THE LUMP SUM PRICE(S) BID
PRIOR TO REMOVAL, ENCAPSULATING THE LOOSE PAINT OR REMOVAL OF LOOSE PAINT PRIOR TO DISMANTLING
COULD INCLUDE TRANSPORTING AFFECTED MEMBERS IN CLOSED TRUCKS, WRAPPING AFFECTED MEMBERS
WORKER LEAD PROTECTION IN ACCORDANCE WITH 29 CFR 1926.62 SHALL BE SATISFIED. REMEDIATION METHODS
SHALL FORMULATE AND SUBMIT A METHOD OF REMEDIATING THE CONDITION FOR APPROVAL BY THE ENGINEER.
OR DURING TRANSPORTATION FROM THE SITE UNLESS APPROPRIATE MEASURES ARE TAKEN. THE CONTRACTOR
LOOSE AND/OR PEELING PAINT ON STEEL SURFACES MAY BECOME DISLODGED DURING REMOVAL OPERATIONS
SHALL BE DISPOSED OF USING THE TREATMENT AND DISPOSAL OF PAINT REMOVAL WASTE ITEM.
SHALL BE COLLECTED USING THE ENVIRONMENTAL GROUND AND/OR WATERWAY PROTECTION ITEM(S). WASTE
PRICE BID FOR THE SUBSTRUCTURE REMOVAL ITEM). PAINT WASTE NOT COLLECTED BY VACUUM METHODS
SHALL BE INCLUDED IN THE LUMP SUM PRICE(S) BID FOR THE SUPERSTRUCTURE REMOVAL ITEM(S) (OR THE UNIT
CONSTRUCTION AND MATERIALS. AND §574 OF THE STANDARD SPECIFICATIONS. THE COST OF PAINT REMOVAL
SHALL MEET THE PROVISIONS OF §202-3.01 - GENERAL, OF THE NYSDOT STANDARD SPECIFICATIONS -
LIMITS AND METHODS FOR THE REMOVAL OF PAINT AT LOCATIONS OF FASTENER REMOVAL OR FLAME CUTTING
RECORD PLANS FOR THIS STRUCTURE ARE NOT AVAILABLE.
DISPOSED OF USING THE TREATMENT AND DISPOSAL OF PAINT REMOVAL WASTE ITEM.
COLLECTED USING THE ENVIRONMENTAL GROUND AND/OR WATERWAY PROTECTION ITEM(S). WASTE SHALL BE
BID FOR THE SUBSTRUCTURE REMOVAL ITEM). PAINT WASTE NOT COLLECTED BY VACUUM METHODS SHALL BE
SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE SUPERSTRUCTURE REMOVAL ITEM(S) (OR THE UNIT PRICE
OF THE NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION AND MATERIALS. THE COST OF PAINT REMOVAL
SUPERSTRUCTURE REMOVAL SHALL MEET THE PROVISIONS OF §202-3.01 GENERAL AND SAFETY REQUIREMENTS,
ENGINEER THIRTY (30) DAYS PRIOR TO BEGINNING THE DEMOLITION.
PLAN, SEALED BY A REGISTERED NEW YORK STATE PROFESSIONAL ENGINEER, SHALL BE SUBMITTED TO THE
REQUIREMENTS, OF THE NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION AND MATERIALS. A REMOVAL
SUPERSTRUCTURE REMOVAL SHALL MEET THE PROVISIONS OF §202-3.01 - GENERAL AND SAFETY
SUPERSTRUCTURES.
EXISTING SUPERSTRUCTURE SHALL BE REMOVED UNDER ITEM 202.120001 - REMOVING EXISTING
REMOVAL OF SUBSTRUCTURES..
EXISTING SUBSTRUCTURE SHALL BE REMOVED WITHIN THE PAY LIMITS SHOWN IN THE PLANS UNDER ITEM 202.19 -
GENERAL NOTES - 1
GNN-01
56-02-G-206-0
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:34:49 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
RECONSTRUCTION NOTES:
GENERAL NOTES - 2
PROTECT IT DURING CONSTRUCTION OR REMOVE AND REMOUNT IT AFTER CONSTRUCTION IS COMPLETED.
IF THE STRUCTURE HAS A BRIDGE IDENTIFICATION NUMBER (B.I.N.) PLATE ATTACHED, THE CONTRACTOR SHALL
1.
CASTING NEW PEDESTALS AND INSTALLING THE NEW BEARINGS.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TOP OF PEDESTAL ELEVATIONS PRIOR TO
7.
ITEMS IN THE CONTRACT.
SCREENS OR OTHER PROTECTIVE DEVICES SHALL BE INCLUDED IN THE UNIT PRICE BID USING THE APPROPRIATE
THE COST OF FURNISHING, INSTALLING, MAINTAINING, REMOVING AND DISPOSING OF ALL PLATFORMS, NETS,
6.
DISPOSED OF BY THE CONTRACTOR AT NO COST TO THE COUNTY.
ALL MATERIAL FALLING ON THE AREA BELOW AND ADJACENT TO THE BRIDGE SHALL BE REMOVED AND
5.
ADEQUATE PROTECTION IS PROVIDED.
MATERIAL. IF ADEQUATE PROTECTIVE DEVICES ARE NOT BEING EMPLOYED, THE WORK WILL BE STOPPED UNTIL
OF MATERIAL. PLATFORMS, NETS, SCREENS OR OTHER PROTECTIVE DEVICES SHALL BE USED TO CATCH THE
MATERIAL TO THE AREA BELOW THE BRIDGE EXCEPT WHERE THE PLANS SPECIFICALLY PERMIT THE DROPPING
DURING REMOVAL OPERATIONS, THE CONTRACTOR SHALL NOT DROP WASTE CONCRETE, DEBRIS, AND OTHER
4.
BID FOR THOSE ITEMS.
SUPPLYING A DISPOSAL AREA AND TRANSPORTATION TO THAT AREA SHALL BE INCLUDED IN THE UNIT PRICES
WHEN ITEMS IN THE CONTRACT REQUIRE MATERIALS TO BE REMOVED AND DISPOSED OF, THE COST OF
3.
ENGINEER AT THE EXPENSE OF THE CONTRACTOR.
STATE, THE DAMAGED MATERIALS SHALL BE REPAIRED OR REPLACED IN A MANNER SATISFACTORY TO THE
DAMAGES ANY MATERIALS WHICH ARE TO REMAIN IN PLACE OR WHICH ARE TO REMAIN THE PROPERTY OF THE
PLACE, OR WHICH ARE TO REMAIN THE PROPERTY OF THE STATE, WILL NOT BE DAMAGED. IF THE CONTRACTOR
THE CONTRACTOR SHALL PERFORM ALL WORK WITH CARE SO THAT ANY MATERIALS WHICH ARE TO REMAIN IN
2.
CONTRACTOR SHALL PERFORM THE WORK IN ACCORDANCE WITH FIELD CONDITIONS.
FIELD CONDITIONS MAY REQUIRE MODIFICATIONS TO CONSTRUCTION DETAILS AND WORK QUANTITIES. THE
BEEN PREPARED BASED ON FIELD INSPECTION AND OTHER INFORMATION AVAILABLE AT THE TIME. ACTUAL
BE ACCURATELY DETERMINED PRIOR TO THE COMMENCEMENT OF WORK. THE CONTRACT DOCUMENTS HAVE
DUE TO THE NATURE OF RECONSTRUCTION PROJECTS, THE EXACT EXTENT OF RECONSTRUCTION WORK CANNOT
1.
MISCELLANEOUS NOTE:
RIVER/STREAM PROTECTION PLAN TO THE ENGINEER FOR APPROVAL PRIOR TO THE COMMENCEMENT OF WORK.
SHALL BE MADE UNDER THE VARIOUS ITEMS IN THIS CONTRACT. THE CONTRACTOR SHALL SUBMIT A
PROTECT AND MAINTAIN WATER RIGHTS AND TO SUSTAIN FISH LIFE DOWNSTREAM. PAYMENT FOR ALL THIS WORK
USES WATER FROM A STREAM, THE CONTRACTOR SHALL CONSTRUCT AN INTAKE OR TEMPORARY DAM TO
STREAM TO BECOME POLLUTED WITH SAND, SILT, CEMENT, OIL, OR OTHER IMPURITIES. IF THE CONTRACTOR
WATER WHICH HAS BEEN USED FOR WASH PURPOSES OR OTHER SIMILAR OPERATIONS WHICH CAUSE THE
EQUIPMENT IN OR NEAR SUCH STREAMS. THE CONTRACTOR SHALL NOT RETURN DIRECTLY TO A STREAM ANY
SEDIMENT, CONSTRUCTION MATERIALS OR OTHER FOREIGN MATERIALS, OR FROM THE OPERATION OF
AS TO PREVENT OR REDUCE TO A MINIMUM ANY DAMAGE TO ANY STREAM FROM POLLUTION BY DEBRIS,
DURING THE COURSE OF CONSTRUCTION, THE CONTRACTOR SHALL CONDUCT OPERATIONS IN SUCH A MANNER
1.
STREAM PROTECTION NOTE
GNN-02
B.I.N. PLATE NOTE:
56-02-G-207-0
Alignment Name: Quaker Bridge Road
Alignment Description:
Alignment Style: Alignment\AC_P
Station
Northing
Easting
Element: Linear
START
( START )
M 1+00.000
867255.78
665717.18
EQNBK
867255.78
665717.18
EQNAHD
M 1+00.000
867255.78
665717.18
PC
( PC )
M 1+26.291
867237.76
665698.04
Tangential Direction:
S46.728°W
Tangential Length:
26.291
Element: Circular
PC
( PC )
M 1+26.291
867237.76
665698.04
HPI
( HPI )
M 1+93.091
867191.97
665649.4
CC
( CC )
867106.7
665821.42
PCC
( PCC )
M 2+54.220
867125.54
665642.41
Radius:
Delta:
40.72 Left
Degree of Curvature (Arc):
31.83
Length:
127.929
Tangent:
66.8
Chord:
125.254
Middle Ordinate:
11.246
External:
11.996
Back Tangent Direction:
S46.728°W
Back Radial Direction:
N43.272°W
Chord Direction:
S26.367°W
Ahead Radial Direction:
N83.993°W
Ahead Tangent Direction:
S6.007°W
Element: Circular
PCC
( PCC )
M 2+54.220
867125.54
665642.41
HPI
( HPI )
M 2+73.745
867106.08
665640.74
CC
( CC )
867122.16
665681.73
PT
( PT )
M 2+90.483
867092.95
665655.19
Radius:
39.469
Delta:
52.64 Left
Degree of Curvature (Arc):
145.17
Length:
36.263
Tangent:
19.525
Chord:
35.001
Middle Ordinate:
4.092
External:
4.565
Back Tangent Direction:
S4.906°W
Back Radial Direction:
N85.094°W
Chord Direction:
S21.415°E
Ahead Radial Direction:
S42.263°W
Ahead Tangent Direction:
S47.737°E
Element: Linear
PT
( PT )
M 2+90.483
867092.95
665655.19
PC
( PC )
M 3+97.398
867021.06
665734.33
Tangential Direction:
S47.750°E
Tangential Length:
106.915
Element: Circular
PC
( PC )
M 3+97.398
867021.06
665734.33
HPI
( HPI )
M 4+27.922
867000.54
665756.92
CC
( CC )
866988.44
665704.7
PT
( PT )
M 4+50.791
866972.17
665745.66
Radius:
44.076
Delta:
69.41 Right
Degree of Curvature (Arc):
129.99
Length:
53.393
Tangent:
30.524
Chord:
50.188
Middle Ordinate:
7.841
External:
9.537
Back Tangent Direction:
S47.750°E
Back Radial Direction:
S42.250°W
Chord Direction:
S13.046°E
Ahead Radial Direction:
N68.343°W
Ahead Tangent Direction:
S21.657°W
Element: Linear
PT
( PT )
M 4+50.791
866972.17
665745.66
HPI
( HPI )
M 5+19.475
866908.1
665720.9
Tangential Direction:
S21.130°W
Tangential Length:
68.684
Element: Linear
HPI
( HPI )
M 5+19.475
866908.1
665720.9
END
( END )
M 5+41.583
866887.92
665711.87
Tangential Direction:
S24.103°W
Tangential Length:
22.109
Alignment Name: Quaker Bridge Road East
Alignment Description:
Alignment Style: Alignment\AC_P
Station
Northing
Easting
Element: Linear
START
( START )
S 1+00.000
867061.33
665850.59
EQNBK
1+00.000
867061.33
665850.59
EQNAHD
S 1+00.000
867061.33
665850.59
END
( END )
S 2+20.063
867000.46
665747.1
Tangential Direction:
S59.540°W
Tangential Length:
120.063
CONSULTANT SEAL
INFORMATION
CONSULTANT
BIN# 3348560
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
03/06/2025
XX
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
5/1/2025
N:\Projects\2024\124-296 Westchester Co - Quaker Bridge Replacement\Working\CADD\dgn connect_2023\124-296_cph_gnn-02.dgn
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
3:32:18 PM
DetriKH
RECONSTRUCTION NOTES:
GENERAL NOTES - 2
PROTECT IT DURING CONSTRUCTION OR REMOVE AND REMOUNT IT AFTER CONSTRUCTION IS COMPLETED.
IF THE STRUCTURE HAS A BRIDGE IDENTIFICATION NUMBER (B.I.N.) PLATE ATTACHED, THE CONTRACTOR SHALL
CASTING NEW PEDESTALS AND INSTALLING THE NEW BEARINGS.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TOP OF PEDESTAL ELEVATIONS PRIOR TO
ITEMS IN THE CONTRACT.
SCREENS OR OTHER PROTECTIVE DEVICES SHALL BE INCLUDED IN THE UNIT PRICE BID USING THE APPROPRIATE
THE COST OF FURNISHING, INSTALLING, MAINTAINING, REMOVING AND DISPOSING OF ALL PLATFORMS, NETS,
DISPOSED OF BY THE CONTRACTOR AT NO COST TO THE COUNTY.
ALL MATERIAL FALLING ON THE AREA BELOW AND ADJACENT TO THE BRIDGE SHALL BE REMOVED AND
ADEQUATE PROTECTION IS PROVIDED.
MATERIAL. IF ADEQUATE PROTECTIVE DEVICES ARE NOT BEING EMPLOYED, THE WORK WILL BE STOPPED UNTIL
OF MATERIAL. PLATFORMS, NETS, SCREENS OR OTHER PROTECTIVE DEVICES SHALL BE USED TO CATCH THE
MATERIAL TO THE AREA BELOW THE BRIDGE EXCEPT WHERE THE PLANS SPECIFICALLY PERMIT THE DROPPING
DURING REMOVAL OPERATIONS, THE CONTRACTOR SHALL NOT DROP WASTE CONCRETE, DEBRIS, AND OTHER
BID FOR THOSE ITEMS.
SUPPLYING A DISPOSAL AREA AND TRANSPORTATION TO THAT AREA SHALL BE INCLUDED IN THE UNIT PRICES
WHEN ITEMS IN THE CONTRACT REQUIRE MATERIALS TO BE REMOVED AND DISPOSED OF, THE COST OF
ENGINEER AT THE EXPENSE OF THE CONTRACTOR.
STATE, THE DAMAGED MATERIALS SHALL BE REPAIRED OR REPLACED IN A MANNER SATISFACTORY TO THE
DAMAGES ANY MATERIALS WHICH ARE TO REMAIN IN PLACE OR WHICH ARE TO REMAIN THE PROPERTY OF THE
PLACE, OR WHICH ARE TO REMAIN THE PROPERTY OF THE STATE, WILL NOT BE DAMAGED. IF THE CONTRACTOR
THE CONTRACTOR SHALL PERFORM ALL WORK WITH CARE SO THAT ANY MATERIALS WHICH ARE TO REMAIN IN
CONTRACTOR SHALL PERFORM THE WORK IN ACCORDANCE WITH FIELD CONDITIONS.
FIELD CONDITIONS MAY REQUIRE MODIFICATIONS TO CONSTRUCTION DETAILS AND WORK QUANTITIES. THE
BEEN PREPARED BASED ON FIELD INSPECTION AND OTHER INFORMATION AVAILABLE AT THE TIME. ACTUAL
BE ACCURATELY DETERMINED PRIOR TO THE COMMENCEMENT OF WORK. THE CONTRACT DOCUMENTS HAVE
DUE TO THE NATURE OF RECONSTRUCTION PROJECTS, THE EXACT EXTENT OF RECONSTRUCTION WORK CANNOT
MICELLANEOUS NOTE:
PROTECT AND MAINTAIN WATER RIGHTS AND TO SUSTAIN FISH LIFE DOWNSTREAM.
USES WATER FROM A STREAM, THE CONTRACTOR SHALL CONSTRUCT AN INTAKE OR TEMPORARY DAM TO
STREAM TO BECOME POLLUTED WITH SAND, SILT, CEMENT, OIL, OR OTHER IMPURITIES. IF THE CONTRACTOR
WATER WHICH HAS BEEN USED FOR WASH PURPOSES OR OTHER SIMILAR OPERATIONS WHICH CAUSE THE
EQUIPMENT IN OR NEAR SUCH STREAMS. THE CONTRACTOR SHALL NOT RETURN DIRECTLY TO A STREAM ANY
SEDIMENT, CONSTRUCTION MATERIALS OR OTHER FOREIGN MATERIALS, OR FROM THE OPERATION OF
AS TO PREVENT OR REDUCE TO A MINIMUM ANY DAMAGE TO ANY STREAM FROM POLLUTION BY DEBRIS,
DURING THE COURSE OF CONSTRUCTION, THE CONTRACTOR SHALL CONDUCT OPERATIONS IN SUCH A MANNER
STREAM PROTECTION NOTE
GNN-02
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:10 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
TM 68.18-1-42
LIBER 6502, PAGE 289
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
LIBER 7575, PAGE 439
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
CONTROL NO. 593163545
LINDA HAMILTON
LANDS N/F OF
TM 68.18-3-12
CONTROL NO. 512863213
NICHOLAS KAPLAN
MICHAEL A. KAPLAN AND
LANDS N/F OF
TM 68.18-3-11
LIBER 11069, PAGE 103
MICHAEL I. WEINTRAUB CROTON TRUST
AS TRUSTEES OF THE
ANITA B. WEINTRAUB AND SANFORD WEINTRAUB
LANDS N/F OF
(FILED MAP 19964)
PARCEL D
(FILED MAP 19964)
PARCEL C
WOODS
WOODS
WOODS
STRUCTURE
CONCRETE
CONCRETE RET. WALL
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
AREA
RIP RAP
EDGE OF WATER
L
L
A
W
G
NI
W
E
G
DI
R
B
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
MAPLE
18"
STONE WALL
DITCH
POST
POST
STONE RET. WALL
WOODS
WOODS
WOODS
BOLLARDS
CROTON RIVER
RAIL
GUIDE
WOOD
STONE LINED DITCH
BRIDGE WING WALL
BORING
FOUND
PIPE
IRON
ROCK
X-CUT IN
STONE WALL
DITCH
BORING
BORING
BORING
BORING
BORING
GNP-01
HIGHWAY GENERAL PLAN
80'
1" = 40'
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
5'-0" SHOULDER
1'-0" SHOULDER
TRAVEL LANE
9'-0"
TRAVEL LANE
9'-0"
1'-0" SHOULDER
1'-0" SHOULDER
TRAVEL LANE
9'-0"
TRAVEL LANE
9'-0"
1'-0" SHOULDER
1'-0" SHOULDER
56-02-R-212-0
CUTTING PAVEMENT
ITEM 627.50140008
ACQUIRED BY COUNTY
LIMITS OF TO BE
THE PROJECT
ACCESS AT COMPLETION OF
REESTABLISH WALKING TRAIL
EASEMENT
LIMITS OF PERMANENT
CUTTING PAVEMENT
ITEM 627.50140008
CUTTING PAVEMENT
ITEM 627.50140008
FOLLOWING LOCATIONS.
FINAL ROAD STRIPING SHALL BE INSTALLED IN THE
1.
NOTE:
START STA. END STA. ITEM NO.
DESCIPTION
M 2+25.00
M 2+25.00
M 1+26.29
M 4+00.00
M 4+00.00
M 4+00.00
685.1102
685.1102
685.1202
SINGLE WHITE LT. SHLDR.
SINGLE WHITE RT. SHLDR.
¡
DOUBLE YELLOW
M 1+26.29
PC
M 2+54.22
PCC
M 2+90.48
PT
M 3+97.40
PC
M 4+50.79
PT
M 1+00.00
P.I. STA
M 1+00
M 2+00
M 3+00
M 4+00
M 5+00
S 1+00
S 2+00
(BK)
1+00.00
STA
(AH) =
S 1+00.00
STA
S 1+00
S 2+00
BEGIN RECONSTRUCTION
END RECONSTRUCTION
M 2+90.48
PT
M 3+97.40
PC
END RECONSTRUCTION
STA. M 5+40.01
#13 KV
P.P.
W 57 13 KV
P.P.
HEAD WALL
CONC.
W 5
P.P.
8" CMP
INV.=35.96
15" CMP
SE.INV.=36.82
N.INV.=38.47
T.F.=39.57
C.B.
=46.62
INV.
=49.95
INV.
61.51
INV.=
12" CMP
=43.13
INV.
=43.20
INV.
12" PVC
15" CMP
18" CMP
=41.7
INV.
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:12 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
SHOULDER
2'-3"
SHOULDER
5'-0"
BREAK
2.0%
T.G.L.
6.0%
6.0%
TRAVEL LANE
11'-0"
TRAVEL LANE
11'-0"
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
¡
PROPOSED
ITEM 606.2702
BEAM GUIDE RAILING
HPBO (MOD.) CORRUGATED
GROUND
ORIGINAL
TYPICAL HIGHWAY SECTION
SHOULDER
2'-3"
TRAVEL LANE
11'-0"
6.0%
2.0%
T.G.L.
6.0%
ITEMS 610.1402 & 610.1601
TURF (ROADSIDE),
4" TOPSOIL & ESTABLISH
GROUND
ORIGINAL
TO REMAIN
RETAINING WALL
EXISTING CONCRETE
ITEM 304.12
COURSE TYPE II,
12" - SUBBASE
TYPICAL HIGHWAY SECTION
TRAVEL LANE
11'-0"
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
¡
PROPOSED
ITEM 606.2702
BEAM GUIDE RAILING
HPBO (MOD.) CORRUGATED
RETAINING WALL
STA. M 1+26.29 TO STA. M 1+80.00
STA. M 1+80.00 TO STA. M 2+67.25
T.G.L.
80 SERIES COMPACTION
" - 9.5 F3 TOP COURSE,
80 SERIES COMPACTION
" - 19 F9 BINDER COURSE,
80 SERIES COMPACTION
5" - 37.5 F9 BASE COURSE,
VARIES
SHOULDER
2'-3"
SHOULDER
2'-3"
ITEM 606.2702
BEAM GUIDE RAILING
HPBO (MOD.) CORRUGATED
TRAVEL LANE
VARIES
TRAVEL LANE
VARIES
TYPICAL HIGHWAY SECTION
STA. M 4+27.17 TO STA. M 5+40.01
2.0%
VARIES
GROUND
ORIGINAL
80 SERIES COMPACTION, ITEM 404.0983
" - 9.5 F3 TOP COURSE,
80 SERIES COMPACTION, ITEM 404.1989
" - 19 F9 BINDER COURSE,
80 SERIES COMPACTION, ITEM 404.3789
5" - 37.5 F9 BASE COURSE,
2.0%
ITEM 304.12
COURSE TYPE II,
12" - SUBBASE
SHOULDER
1'-0"
VARIES
SHOULDER
BREAK
QUAKER BRIDGE ROAD
, STA. LINE, & H.C.L.
¡
PROPOSED
BREAK
BREAK
TYP-01
HIGHWAY TYPICAL SECTIONS
80 SERIES COMPACTION, ITEM 404.0983
" - 9.5 F3 TOP COURSE,
80 SERIES COMPACTION, ITEM 404.1989
" - 19 F9 BINDER COURSE,
80 SERIES COMPACTION, ITEM 404.3789
5" - 37.5 F9 BASE COURSE,
ITEM 304.12
COURSE TYPE II,
12" - SUBBASE
ITEMS 610.1402 & 610.1601
TURF (ROADSIDE),
4" TOPSOIL & ESTABLISH
ITEMS 610.1402 & 610.1601
TURF (ROADSIDE),
4" TOPSOIL & ESTABLISH
T.G.L.
ITEM 304.12
COURSE TYPE II,
12" - SUBBASE
2.0%
SHOULDER
2'-3"
6.0%
VARIES
BREAK
SHOULDER
1'-0"
ITEM 606.2702
BEAM GUIDE RAILING
HPBO (MOD.) CORRUGATED
ITEMS 610.1402 & 610.1601
TURF (ROADSIDE),
4" TOPSOIL & ESTABLISH
QUAKER BRIDGE ROAD EAST
, STA. LINE, & H.C.L.
¡
PROPOSED
80 SERIES COMPACTION, ITEM 404.0983
" - 9.5 F3 TOP COURSE,
80 SERIES COMPACTION, ITEM 404.1989
" - 19 F9 BINDER COURSE,
80 SERIES COMPACTION, ITEM 404.3789
5" - 37.5 F9 BASE COURSE,
TYPICAL HIGHWAY SECTION
STA. S 1+00.00 TO STA. S 2+05.74
TRAVEL LANE
9'-0"
2.0%
SHOULDER
2'-3"
6.0%
BREAK
TRAVEL LANE
9'-0"
SHOULDER
1'-0"
1'-0"
VARIES
8'
3/16" = 1'
ROUND 4' V.C.
ROUND 4' V.C.
56-02-R-213-0
ITEM 407.0102
DILUTED TACK COAT,
ITEM 407.0102
DILUTED TACK COAT,
ITEM 407.0102
DILUTED TACK COAT,
ITEM 407.0102
DILUTED TACK COAT,
EXCAVATION AND DISPOSAL.
SUBBASE TO BE PAID UNDER ITEM 203.02 - UNCLASSIFIED
REMOVAL OF EXISTING PAVEMENT TO BOTTOM OF PROPOSED
1.
NOTE:
42.07
40.43
28.42
46.07
55.79
42.07
40.43
28.42
46.07
55.79
E
E
X
C
R
S
L
IO
ROAD-2
M 1+00
M 1+00
M 2+00
M 3+00
M 4+00
M 5+00
41.53
41.05
40.97
42.40
43.90
45.40
46.90
50.68
56.27
41.53
41.03
40.43
41.30
18.67
51.23
STA. M 3+95.00
EXP. BRGS.
¡
STA. M 2+95.00
FIX BRGS.
¡
41.53
41.05
40.97
42.40
43.90
45.40
46.90
50.68
56.27
41.53
41.03
40.43
41.30
18.67
51.23
STA. S 2+20.06
STA. M 4+21.95
EQUALITY STATION
25'-0"
APPROACH SLAB
100'-0" ¡ BRG. TO ¡ BRG.
25'-0"
APPROACH SLAB
BEGINS STA. M 4+27.17
PPROACH PAVMENT
A
ENDS STA. M 2+67.25
PPROACH PAVMENT
A
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:14 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
PROFILE - QUAKER BRIDGE ROAD
80'
HORIZONTAL SCALE
4'
VERTICAL SCALE
PRO-01
QUAKER BRIDGE ROAD
56-02-R-214-0
40.75
EL
M 1+77.04
-
VLP
-2.00%
+3.00%
+11.17%
40.99
EL
M 1+53.06
-
VPC
41.29
EL
M 2+13.06
-
VPT
46.90
EL
M 4+00.11
-
VPC
50.70
EL
M 4+50.11
-
VPT
PROPOSED GRADE
ORGINAL GROUND
PROPOSED GRADE
EXISTING GRADE
FT.
HSD =
FT.
0.38
E =
+3.00%
G2 =
-2.00%
G1 =
FT.
60.00
L =
SAG
CURVE:
FT.
HSD =
FT.
0.57
E =
G2 = +11.17%
+3.00%
G1 =
FT.
50.00
L =
SAG
CURVE:
40.75
EL
M 1+77.04
-
VLP
-2.00%
+3.00%
+11.17%
40.99
EL
M 1+53.06
-
VPC
41.29
EL
M 2+13.06
-
VPT
46.90
EL
M 4+00.11
-
VPC
50.70
EL
M 4+50.11
-
VPT
41.53
EL
BEGIN RECONSTRUCTION
M 1+26.00
-
VPI
60.74
EL
END RECONSTRUCTION
M 5+40.01
-
VPI
40.39
EL
M 1+83.06
-
VPI
47.65
EL
M 4+25.11
-
VPI
58.15
49.61
58.15
49.61
58.15
49.61
58.15
49.61
E
E
X
C
R
S
L
IO
S 1+00
S 1+00
S 2+00
58.15
53.33
49.51
0.00
58.15
53.33
49.51
0.00
STA. S 2+20.06
STA. M 4+21.95
EQUALITY STATION
58.15
52.50
48.70
58.15
53.48
49.61
58.15
52.50
48.70
58.15
53.48
49.61
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:16 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
80'
HORIZONTAL SCALE
4'
VERTICAL SCALE
PROFILE - QUAKER BRIDGE ROAD EAST
PRO-02
QUAKER BRIDGE ROAD EAST
56-02-R-215-0
ORIGINAL GROUND
PROPOSED GRADE
FT.
HSD =
FT.
0.87
E =
-2.35%
G2 =
-11.37%
G1 =
FT.
77.48
L =
SAG
CURVE:
-11.37%
53.31
EL
S 1+42.58
-
VPC
47.99
EL
S 2+20.06
-
VPT
48.91
EL
S 1+81.32
-
VPI
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:22 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
TM 68.18-1-42
LIBER 6502, PAGE 289
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 79.06-2-3
DEPARTMENT OF CONSERVATION
STATE OF NEW YORK
LANDS N/F OF
TM 79.06-1-2
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-2-1
LIBER 7575, PAGE 439
VILLAGE OF CROTON ON HUDSON
LANDS N/F OF
TM 68.18-3-10
CONTROL NO. 593163545
LINDA HAMILTON
LANDS N/F OF
TM 68.18-3-12
CONTROL NO. 512863213
NICHOLAS KAPLAN
MICHAEL A. KAPLAN AND
LANDS N/F OF
TM 68.18-3-11
LIBER 11069, PAGE 103
MICHAEL I. WEINTRAUB CROTON TRUST
AS TRUSTEES OF THE
ANITA B. WEINTRAUB AND SANFORD WEINTRAUB
LANDS N/F OF
(FILED MAP 19964)
PARCEL D
(FILED MAP 19964)
PARCEL C
WOODS
WOODS
WOODS
CONCRETE RET. WAL
CONCRETE RET. WALL
EDGE OF WATER
EDGE OF WATER
AREA
RIP RAP
EDGE OF WATER
ASPHALT
ASPHALT
DRAINAGE
RIP RAP
MAPLE
18"
STONE WALL
STONE RET. WALL
WOODS
WOODS
WOODS
CROTON RIVER
PILLAR
STONE
IRON GATE
WROUGHT
RAIL
GUIDE
WOOD
FOUND
PIPE
IRON
ROD FOUND
CAPPED IRON
ROCK
X-CUT IN
STONE WALL
M 1+26.29
PC
M 2+54.22
PCC
M 2+90.48
PT
M 3+97.40
PC
M 4+50.79
PT
M 1+00.00
P.I. STA
M 1+00
M 2+00
M 3+00
M 4+00
M 5+00
S 1+00
S 2+00
(BK)
1+00.00
STA
(AH) =
S 1+00.00
STA
S 1+00
S 2+00
BEGIN RECONSTRUCTION
END RECONSTRUCTION
ROAD
QUAKER BRIDGE
TO ALBANY POST ROAD
RIDGE ROAD
TO QUAKER
ROAD EAST
QUAKER BRIDGE
ROAD
QUAKER BRIDGE
GRID
NORTH
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD EAST
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD
FLOW
CROTON RIVER
GRADING PLAN
TO RTE 129
GRD-01
80'
1" = 40'
OHW EL. 28.25
OHW EL. 28.25
56-02-R-216-0
#13 KV
P.P.
W 57 13 KV
P.P.
HEAD WALL
CONC.
W 5
P.P.
W/LIGHT
P.P.
P.P.
#13 KV
P.P.
W 57 13 KV
P.P.
W 5
P.P.
W/LIGHT
P.P.
P.P.
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:25 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
WOODS
WOODS
WOODS
CONCRETE RET. WAL
CONCRETE RET. WALL
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
EDGE OF WATER
STONE WALL
POST
POST
STONE RET. WALL
WOODS
WOODS
WOODS
KEY PAD
BOLLARDS
CROTON RIVER
PILLAR
STONE
IRON GATE
WROUGHT
RAIL
GUIDE
WOOD
BRIDGE WING WALL
STONE WALL
ROAD
QUAKER BRIDGE
TO ALBANY POST ROAD
RIDGE ROAD
TO QUAKER
ROAD EAST
QUAKER BRIDGE
ROAD
QUAKER BRIDGE
GRID
NORTH
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD EAST
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD
FLOW
CROTON RIVER
TO RTE 129
LAP-01
80'
1" = 40'
(136) LIVE STAKES 36" Ø
(47) LIVE STAKES 36" Ø
NUMBER
NYDOT ITEM
DESCRIPTION
QUANTITY
UNIT
LANDSCAPING:
611.0114
PLANTING - MAJOR DECIDUOUS TREES – 6' HEIGHT, 2-3" CALIPER
EA
611.19
POST-PLANTING CARE
EA
616.08000024
LIVE STAKE PLANTINGS 1" TO 2"
EA
610.1401
TOPSOIL - REUSE ON-SITE MATERIALS
CY
610.1101
MULCH FOR PLANTING TYPE A,B & D WOOD CHIPS & SHREDDED BARK
CY
610.19
WATERING VEGETATION
0.225
1000 GAL
LAP-01
LANDSCAPE PLAN
(117) LIVE STAKES 36" Ø
56-02-R-217-0
PLANTING LIST
SYMBOL
CODE
QTY
BOTANICAL/COMMON NAME
CONTAINER
REMARKS
TREES
AS
ACER SACCHARUM/SUGAR MAPLE
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
BL
BETULA LENTA/SWEET BIRCH
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
FA
FRAXINUS AMERICANA/WHITE ASH
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
LT
LIRIODENDRON TULIPFERA/TULIP POPLAR
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
PO
PLATANUS OCCIDENTALIS/AMERICAN SYCAMORE
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
QR
QUERCUS RUBRA/NORTHERN RED OAK
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
TC
TSUGA CANADENSIS/EASTERN HEMLOCK
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
UA
ULMUS AMERICANA/AMERICAN ELM
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
SYMBOL
CODE
QTY
BOTANICAL/COMMON NAME
CONTAINER
SPACING
REMARKS
SHRUB AREAS
SN
SALIX NIGRA/LIVE STAKES
1" MIN. CAL. LIVE STAKE
36" O.C.
APPLICATION
1-2" DIAMETER, 2-6' LONG DEPENDING ON SITE
M 1+26.29
PC
M 2+54.22
PCC
M 2+90.48
PT
M 3+97.40
PC
M 4+50.79
PT
M 1+00.00
P.I. STA
M 1+00
M 2+00
M 3+00
M 4+00
M 5+00
S 1+00
S 2+00
(BK)
1+00.00
STA
(AH) =
S 1+00.00
STA
S 1+00
S 2+00
BEGIN RECONSTRUCTION
END RECONSTRUCTION
#13 KV
P.P.
W 57 13 KV
P.P.
W 5
P.P.
SE.INV.=36.82
N.INV.=38.47
T.F.=39.57
C.B.
W/LIGHT
P.P.
P.P.
E
E
X
C
R
S
L
IO
3B
3A
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:33 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
LANDSCAPING DETAILS
LAD-01
FOR TREE PLANTING.
SEE SHEET LAP-01 FOR PAY ITEMS
2.
SEASON.
ETC. AFTER ONE GROWING
REMOVE GUYING, TREE WRAP,
1.
PLAN VIEW OF STAKING
FLUORESECNT FLAGGING ON WIRE.
3.
CUT LEADERS.
BRANCHES. DO NOT
PROVIDE MINIMAL PRUNING. ONLY TO CORRECT DAMAGED
2.
SLOPE.
THIS DETAIL SHALL APPLY TO ALL TREES PLANTED ON A
1.
TREE HEIGHT
APPROX 2 / 3
STAKE W/ CENTERED
1" x 2" x 18" WOOD
" SISAL ROPE
5" ABOVE FINAL GRADE
NATURAL ROOT COLLAR 3" -
TRUNK)
NOT TO BE IN CONTACT WITH TREE
HARDWOOD MULCH MIN. (MULCH
3" LAYER OF SHREDDED
AREA ABOVE ROOT BALL
PROVIDE 6" RADIUS UNMULCHED
4" HIGH WATER BERM
COMPACT FILL TO BE BENCHED IN
PLANTING PIT
FINISHED GRADE
1/2 OF WIRE BASKET ( FROM ROOT BALL AND PIT.)
SYNTHETIC MATERIAL. CUT AND REMOVE UPPER
CUT AND REMOVE UPPER 1/3 OF BURLAP. NO
MIXTURE AS SPECIFIED
BACKFILL PLANTING SOIL
UNDISTURBED SOIL
SET BALL ON
PLAN VIEW OF STAKING
TREE PIT 2X
ROOTBALL DIA.
MIN. 6" DEPTH
INTO UNDISTURBED SOIL
LODGE POLES EXTEND 2'
UNDISTURBED SOIL
PLANTING MIX AS SPEC'D
AROUND TOPE 1/3 OF BALL
BURLAP AND WIRE BASKETS
LOOSEN AND FOLD BACK
3" SAUCER AROUND TREE
3" SHREDDED BARK MULCH
2" ABOVE FINISH GRADE
SET TOP OF ROOT BALL
HOSE OVER #12 GALV. WIRE
1/ 2" FABRIC BEARING RUBBER
#12 GALV. WIRE
ALTERNATE STAKING
2" x 2" STAKES, 2 GUYS PER TREE
2 1 /2" OR LARGER (10' OR LARGER)
PRUNE 1 / 4 TO 1 / 3 BRANCHES
NOTES:
TREE PIT 2X
ROOTBALL DIA.
SLOPE TREE PLANTING DETAIL
(NOT TO SCALE)
TREE PLANTING DETAIL
(NOT TO SCALE)
(NOT TO SCALE)
SLOPE INSTALLATION GUIDELINES:
12" INTERVALS.
THE END OF BLANKET MUST BE SECURED IN A 6"x6" TRENCH WITH A ROW OF STAPLES PLACED AT
7.
PLACED 4" BELOW IN A STAGGERED PATTERN. THEN CONTINUE WITH GENERAL INSTALLATION.
ROW OF STAPLES 4" APART ALONG ENTIRE WIDTH OF THE SLOPE. A SECOND ROW SHOULD BE
FOR MAXIMUM PERFORMANCE A CHECK SLOT SHOULD BE PLACED AT 25'-40' INTERVALS. PLACE A
6.
APPROXIMATELY 12" APART ACROSS THE WIDTH OF BLANKETS.
STYLE IN THE DIRECTION OF WATER FLOW. CONNECT THE BLANKETS BY PLACING STAPLES
ADDITIONAL VERTICAL BLANKETS CAN BE JOINED USING A MINIMUM 4" OVERLAPPING OF SHINGLE
5.
STAPLES PLACED APPROXIMATELY 3'-0" APART.
PARALLEL BLANKETS MUST BE OVERLAPPED BY A MINIMUM OF 4", AND SECURED WITH A ROW OF
4.
PATTERN BELOW, SPECIFIED BY SLOPE.
ROLL THE BLANKET VERTICALLY DOWN THE SLOPE. SECURE USING THE APPROPRIATE STAPLE
3.
WITH A ROW OF STAPLES PLACED 12" APART ACROSS THE WIDTH OF THE BLANKET.
BACKFILL AND COMPACT THE TRENCH. APPLY SEED, AND FOLD THE BLANKET OVER SOIL, SECURE
SECURE THE BLANKET AT THE BOTTOM OF THE TRENCH WITH STAPLES PLACED 12" APART.
BEGIN BY PLACING THE BLANKET A MINIMUM OF 12" DOWN-SLOPE OF THE UP-SLOPE TRENCH.
2.
APPLIED. PREPARE THE SLOPE SOIL SURFACE (RAKING, SEEDING AND FERTILIZING).
DIG A 6" BY 6" TRENCH BOTH UP-SLOPE AND DOWN-SLOPE OF THE AREA THE MATTING IS TO BE
1.
PRODUCT AND ALL ASSOCIATED LABOR AND MATERIALS SHALL BE PAID FOR UNDER ITEM 209.1801.
BE CONFIRMED WITH YOUR LOCAL DISTRIBUTOR. PAYMENT FOR ROLLED EROSION CONTROL
THESE GUIDELINES ARE RECOMMENDATIONS ONLY, ANY QUESTIONS WITH THE INSTALLATION SHOULD
SLOPE APPLICATION
6"
6"
12"
2"-5"
3"
ROLLED EROSION CONTROL PRODUCT DETAIL
NOTES:
56-02-R-218-0
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:34 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
LANDSCAPING NOTES
LAN-01
10 SHRUBS (3 GALLONS) WILL BE CONSIDERED THE EQUIVALENT OF A TREE
d.
3 LOW MATURING TREES WILL BE CONSIDERED THE EQUIVALENT OF A TREE
c.
6-8 FT ONCE PLANTED
b.
2-3” DBH
a.
REPLANTED TREES SHALL BE AS FOLLOWS:
REMOVED ON SLOPES IN EXCESS OF 25% SHALL BE MITIGATED AT A RATIO OF 2:1.
ANY TREE REMOVED FOR TEMPORARY STAGING AND CONSTRUCTION SHALL BE MITIGATED AT A RATIO OF 1:1. TREES
1.
AT THE 1:1 RATIO, 35 OF THE 35 REMOVED TREES HAVE BEEN SITED FOR REPLACEMENT ON SITE.
TREES REPLACED ON VILLAGE OF CROTON-ON-HUDSON SIDE
SCHEDULE (LOCATION TO BE DETERMINED BY CLIENT)
THE REMAINING 21 TREES WILL NEED TO BE PLANTED OFF-SITE. RECOMMENDED SPECIES TO BE SELECTED FROM PLANT
AT THE 2:1 RATIO, 12 TREES WERE REMOVED, 3TREES HAVE BEEN SITED FOR REPLACEMENT ON SITE.
REPLACED ON CORTLANDT SIDE
CONTRACTOR TO NOTIFY ENGINEER IF FIELD CONDITIONS PREVENT REQUIRED NUMBER OF TREES TO BE PLANTREES
TREE PLACEMENT TO BE FIELD VERIFIED BY CONTRACTOR AND APPROVED BY ENGINEER PRIOR TO INSTALLATION.
6.
THE SITE LEFT IN A NEAT AND ACCEPTABLE CONDITION AS APPROVED BY THE L
[...truncated...]
Machine-extracted for search and reference — the original PDF is the authoritative version.