Contract 25-500 Plans A01 22X34
agreement
3 pages
Meeting: portal event 1071 (no meeting page on file)
Agenda item: New Business — Westchester County Dept. of Public Works - Consider acknowledging receipt of Tree Removal Application from Hugh Greechan Jr., P.E., Commissioner of Public Works and Transportation, Westchester County for the removal of multiple trees for the facilitation of the Quaker Bridge Replacement Project and referring the application, Coastal Assessment Form (CAF) and other support documents to the Waterfront Advisory Committee for a consistency recommendation
Agreement / contract, 3 pages. Attached to agenda item: “New Business — Westchester County Dept. of Public Works - Consider acknowledging receipt of Tree Removal Application from Hugh Greechan Jr., P.E., Commissioner of Public Works and Transportation, Westchester County for t”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
2025 Tree Law Village of Croton
QBR Tree Permit Application - combined
QBR-Coastal assessment 2025
QBRB Chapter 230 Finding Statement
QBRB Wetlands 227 Finding Statement
QBR CAF
QBR Village LWRP Letter
QBR WAP fee waiver request
QBR wetlands activity permit with Joint Permit App
safe print QBR - Tree Removal table and plan
Extracted text
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
07/28/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
7/28/2025
N:\Projects\2024\124-296 Westchester Co - Quaker Bridge Replacement\Working\CADD\dgn connect_2023\124-296_cpb_lap_01.dgn
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
2:56:27 PM
DetriKH
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
WOODS
WOODS
WOODS
CONCRETE RET. WAL
CONCRETE RET. WALL
STONE WING WALL
EDGE OF WATER
STONE WING WALL
EDGE OF WATER
EDGE OF WATER
STONE WALL
POST
POST
STONE RET. WALL
WOODS
WOODS
WOODS
KEY PAD
BOLLARDS
CROTON RIVER
PILLAR
STONE
IRON GATE
WROUGHT
RAIL
GUIDE
WOOD
BRIDGE WING WALL
STONE WALL
ROAD
QUAKER BRIDGE
TO ALBANY POST ROAD
RIDGE ROAD
TO QUAKER
ROAD EAST
QUAKER BRIDGE
ROAD
QUAKER BRIDGE
GRID
NORTH
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD EAST
, STA. LINE, AND H.C.L.
¡
QUAKER BRIDGE ROAD
FLOW
CROTON RIVER
TO RTE 129
80'
1" = 40'
(136) LIVE STAKES 36" Ø
(47) LIVE STAKES 36" Ø
NUMBER
NYDOT ITEM
DESCRIPTION
QUANTITY
UNIT
LANDSCAPING:
611.0114
PLANTING - MAJOR DECIDUOUS TREES – 6' HEIGHT, 2-3" CALIPER
EA
611.19
POST-PLANTING CARE
EA
616.08000024
LIVE STAKE PLANTINGS 1" TO 2"
EA
610.1401
TOPSOIL - REUSE ON-SITE MATERIALS
CY
610.1101
MULCH FOR PLANTING TYPE A,B & D WOOD CHIPS & SHREDDED BARK
CY
610.19
WATERING VEGETATION
0.225
1000 GAL
LAP-01
LANDSCAPE PLAN
(117) LIVE STAKES 36" Ø
56-02-R-217-0
PLANTING LIST
SYMBOL
CODE
QTY
BOTANICAL/COMMON NAME
CONTAINER
REMARKS
TREES
AS
ACER SACCHARUM/SUGAR MAPLE
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
BL
BETULA LENTA/SWEET BIRCH
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
FA
FRAXINUS AMERICANA/WHITE ASH
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
LT
LIRIODENDRON TULIPFERA/TULIP POPLAR
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
PO
PLATANUS OCCIDENTALIS/AMERICAN SYCAMORE
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
QR
QUERCUS RUBRA/NORTHERN RED OAK
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
TC
TSUGA CANADENSIS/EASTERN HEMLOCK
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
UA
ULMUS AMERICANA/AMERICAN ELM
2" CAL. MIN.
6-8' MINIMUM HEIGHT ONCE PLANTED
SYMBOL
CODE
QTY
BOTANICAL/COMMON NAME
CONTAINER
SPACING
REMARKS
SHRUB AREAS
SN
SALIX NIGRA/LIVE STAKES
1" MIN. CAL. LIVE STAKE
36" O.C.
APPLICATION
1-2" DIAMETER, 2-6' LONG DEPENDING ON SITE
A1
M 1+26.29
PC
M 2+54.22
PCC
M 2+90.48
PT
M 3+97.40
PC
M 4+50.79
PT
M 1+00.00
P.I. STA
M 1+00
M 2+00
M 3+00
M 4+00
M 5+00
S 1+00
S 2+00
(BK)
1+00.00
STA
(AH) =
S 1+00.00
STA
S 1+00
S 2+00
BEGIN RECONSTRUCTION
END RECONSTRUCTION
#13 KV
P.P.
W 57 13 KV
P.P.
W 5
P.P.
SE.INV.=36.82
N.INV.=38.47
T.F.=39.57
C.B.
W/LIGHT
P.P.
P.P.
7/18/25
KSE
QUANTITY REVISION
E
E
X
C
R
S
L
IO
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
07/28/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
7/28/2025
N:\Projects\2024\124-296 Westchester Co - Quaker Bridge Replacement\Working\CADD\dgn connect_2023\124-296_cpb_lan_01.dgn
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
2:57:34 PM
DetriKH
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
LANDSCAPING NOTES
LAN-01
SCHEDULE (LOCATION TO BE DETERMINED BY TOWN)
THE REMAINING 28 TREES WILL NEED TO BE PLANTED OFF-SITE. RECOMMENDED SPECIES TO BE SELECTED FROM PLANT
AT THE 2:1 RATIO, 19 TREES WERE REMOVED, 10 TREES HAVE BEEN SITED FOR REPLACEMENT ON SITE.
TOWN OF CORTLANDT TREES
AT THE 1:1 RATIO, 35 OF THE 35 REMOVED TREES HAVE BEEN SITED FOR REPLACEMENT ON SITE.
SCHEDULE (LOCATION TO BE DETERMINED BY VILLAGE)
THE REMAINING 41 TREES WILL NEED TO BE PLANTED OFF-SITE. RECOMMENDED SPECIES TO BE SELECTED FROM PLANT
AT THE 2:1 RATIO, 22 TREES WERE REMOVED, 3 TREES HAVE BEEN SITED FOR REPLACEMENT ON SITE.
VILLAGE OF CROTON ON HUDSON TREES
REPLACED ON CORTLANDT SIDE
CONTRACTOR TO NOTIFY ENGINEER IF FIELD CONDITIONS PREVENT REQUIRED NUMBER OF TREES TO BE PLANTREES
TREE PLACEMENT TO BE FIELD VERIFIED BY CONTRACTOR AND APPROVED BY ENGINEER PRIOR TO INSTALLATION.
6.
THE SITE LEFT IN A NEAT AND ACCEPTABLE CONDITION AS APPROVED BY THE LANDSCAPE ARCHITECT.
MATERIAL, EQUIPMENT, AND DEBRIS RESULTING FROM HIS/HER WORK. ALL PAVED AREAS SHALL BE BROOM CLEANED AND
UPON THE COMPLETION OF ALL PLANTING WORK AND BEFORE FINAL ACCEPTANCE, THE CONTRACTOR SHALL REMOVE ALL
5.
NO TREE WRAPPING, STAKING, OR GUYING IS PERMITTED UNLESS AUTHORIZED BY THE LANDSCAPE ARCHITECT.
4.
UNIFORM FINISHED SURFACE.
IMMEDIATELY AFTER PLANTING. THOROUGHLY WATER MULCHED AREAS. AFTER WATERING, RAKE MULCH TO PROVIDE A
MULCHING: MULCH TREE, SHRUB PLANTING PITS, AND PERENNIAL BEDS WITH REQUIRED MULCH MATERIAL 3" DEEP
3.
REMOVE ALL BURLAP, ROPES, AND WIRES FROM THE TOP 1/3 OF BALLS AFTER ONE YEAR GUARANTEE PERIOD.
a.
FILL ALL VOIDS.
AFTER BALLED AND BURLAPPED PLANTS ARE SET, MUDDLE PLANTING SOIL MIXTURE AROUND THE BASES OF BALLS AND
2.
EDGE OF EACH PLANTING PIT TO RETAIN WATER.
PLANTING MIXTURE. DO NOT USE FROZEN OR MUDDY MIXTURES FOR BACKFILLING. FORM A RING OF SOIL AROUND THE
3" ABOVE THE FINISH GRADE. NO FILLING WILL BE PERMITTED AROUND TRUNKS OR STEMS. BACKFILL THE PIT WITH
FACED TO GIVE THE BEST APPEARANCE OR RELATIONSHIP TO OTHER OR ADJACENT STRUCTURE. SET PLANT MATERIAL 2-
SET PLANT MATERIAL IN THE PLANTING PIT TO PROPER GRADE AND ALIGNMENT. SET PLANTS UPRIGHT, PLUMB, AND
1.
BE REMOVED HAVE BEEN MARKED IN THE FIELD.
EXISTING TREES SHAL BE REMOVED INCLUDING THE ROOTS UNDER ITEM 201.06 - CLEARING AND GRUBBING. ALL TREES TO
8.
CONTRACTOR SHALL ALSO APPLY A PREEMERGIENT TO ALL LANDSCAPE BEDS AT THE CONTRACTOR'S EXPENSE.
PREPARATION, ALL WEEDS AND GRASSES SHALL BE DUG OUT BY THE ROOTS AT THE CONTRACTOR'S EXPENSE. THE
WEEDING - BEFORE AND DURING PRELIMINARY GRADING AND FINISH GRADING, FINISH GRADING AND PLANTING BED
7.
RESET THE GRADES IN THIS AREA, IF REQUIRED, TO THE FINAL GRADES SHOWN ON THE GRADING PLAN.
GRADING PLAN TO ANTICIPATE SETTLEMENT OVER THE FIRST YEAR. AT THE END OF THE PLANTING GUARANTEE PERIOD,
PLANTING MIX OR TOPSOIL. ALLOW THE FINISHED GRADES TO REMAIN 50-75 MM (2-3") HIGHER THAN THE GRADES ON THE
OVER ALL MULCHED BED AREAS DESIGNATED ON THE DRAWINGS AND ROTOTILL INTO THE TOP 100 MM (4") OF THE
FINAL GRADING AND INSTALLATION OF TREE, SHRUB, OR FLOWER PLANTINGS, SPREAD 100 MM (4") OF ORGANIC MATTER
INSTALL ORGANIC MATTER LAYER - AFTER THE SPECIFIED TOPSOIL OR PLANTING MIX IS INSTALLED AND JUST PRIOR TO
6.
TYPE "A" FOR EACH CU. YD. OF MIXTURE OR APPROVED EQUAL.
) LB. PLANT FERTILIZER
EXISTING SOIL, TWO (2) PARTS PLANTING TOPSOIL, ONE (1) PART PEAT MOSS, AND ONE-HALF (
PROVIDE PLANTING MIXTURE TO USE AROUND THE BALLS AND ROOTS OF ALL PLANTS CONSISTING OF THREE (3) PARTS
5.
INDIVIDUAL TREES WILL BE CONSISTENT IN SIZE THROUGHOUT THE PROJECT AREAS.
TREE BALLS. MULCH BEDS ARE TO BE PROVIDED FOR ALL LANDSCAPE MASSINGS. CIRCULAR MULCH AREAS FOR
EXCAVATE TREE PITS TO THE DEPTH OF THE TREE BALL AND BACK FILL IN PLANTING MIX TO CORRECT ELEVATION FOR
IN BEDS. PROVIDE TREE AND SHRUB PITS AT LEAST TWO (2) TIMES GREATER THAN THE DIAMETER OF THE ROOT SYSTEM.
EXCAVATED CIRCULAR PLANT PITS WITH VERTICAL SIDES, EXCEPT FOR PLANTS SPECIFICALLY INDICATED TO BE PLANTED
4.
OPERATIONS UNTIL ALTERNATE PLANT LOCATIONS HAVE BEEN SELECTED AND APPROVED BY LANDSCAPE ARCHITECT.
OBSTRUCTIONS ARE ENCOUNTERED THAT ARE NOT SHOWN ON THE DRAWINGS, DO NOT PROCEED WITH PLANTING
CONTRACTOR TO LOCATE PLANTS IN THE FIELD BY STAKING. LANDSCAPE ARCHITECT TO APPROVE LOCATIONS. IF
3.
SUPERVISION OF A QUALIFIED SUPERVISOR.
PLANTING SHALL BE PERFORMED ONLY BY EXPERIENCED WORKMEN FAMILIAR WITH PLANTING PROCEDURES UNDER THE
2.
PLANTING TIMES SHALL BE APPROVED BY LANDSCAPE ARCHITECT.
d.
FALL PLANTING: SEPTEMBER 15TH THROUGH OCTOBER 15TH
c.
SPRING PLANTING: MARCH 15TH THROUGH MAY 15TH
b.
LEAF, THEY SHALL BE SPRAYED WITH AN ANTI-DESICCANT PRIOR TO PLANTING OPERATION.
DECIDUOUS MATERIAL: PLANT DECIDUOUS MATERIAL IN A DORMANT CONDITION. IF DECIDUOUS TREES ARE PLANTED IN-
a.
TIME OF PLANTING:
1.
LANDSCAPE SPECIFICATIONS:
WARRANTY
MATERIALS
ACCESSORIES
WATER ON SITE.
CONTRACTOR WILL PROVIDE
WATER: FREE OF SUBSTANCES HARMFUL TO PLANT GROWTH. HOSES OR OTHER METHODS OF TRANSPORTATION FURNISHED BY CONTRACTOR.
6.
MULCH: TREES, SHRUBS, AND PERENNIAL BEDS - SHREDDED HARDWOOD MULCH FURNISHED IN BAGS OR BULK.
5.
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
MIXED AND APPLIED IN
ANTI-DESICCANT: PROTECTIVE FILM EMULSION PROVIDING A PROTECTIVE FILM OVER PLANT SURFACES; PERMEABLE TO PERMIT TRANSPIRATION,
4.
AMMONIA SALT, AND ONE-HALF IN FORM OF ORGANIC NITROGEN OR EQUAL.
POTASH BY WEIGHT. ONE-FOURTH OF NITROGEN IN THE FORM OF NITRATES, ONE-FOURTH IN FORM OF
PHOSPHORIC ACID, AND 12 PERCENT
FERTILIZER: TYPE "A": COMMERCIAL TYPE APPROVED BY THE LANDSCAPE ARCHITECT, CONTAINING 12 PERCENT NITROGEN, 12 PERCENT
3.
PERCENT MINERAL ON A DRY BASIS.
PEAT MOSS: BROWN TO BLACK IN COLOR, WEED AND SEED FREE GRANULATED RAW PEAT OR BALED PEAT, CONTAINING NOT MORE THAN 9
2.
PROVIDE TOPSOIL FREE OF SUBSTANCES HARMFUL TO THE PLANTS WHICH WILL BE GROWN IN THE SOIL.
b.
IDENTIFY SOURCE LOCATION OF TOPSOIL PROPOSED FOR USE ON THE PROJECT.
a.
OTHER FOREIGN MATERIALS.
ARABLE SITE, REASONABLY FREE FROM CLAY, LUMPS, COARSE SANDS, STONES, PLANTS, ROOTS, STICKS, AND
OBTAINED FROM A WELL-DRAINED
TOPSOIL FOR PLANTING BEDS; FERTILE, FRIABLE, NATURAL TOPSOIL OF LOAMY CHARACTER, WITHOUT ADMIXTURE OF SUBSOIL MATERIAL,
1.
4) PLANTS SHALL BE IN A MOIST, VIGOROUS CONDITION, FREE FROM DEAD WOOD, BRUISES, OR OTHER ROOT OR BRANCH INJURIES.
3) SIDE BRANCHES SHALL BE GENEROUS, WELL-TWIGGED, AND THE PLANT AS A WHOLE WELL-BUSHED TO THE GROUND.
2) SINGLE STEMMED OR THIN PLANTS WILL NOT BE ACCEPTED.
THE LONGEST BRANCH.
1) THE MEASUREMENT FOR HEIGHT SHALL BE TAKEN FROM THE GROUND LEVEL TO THE AVERAGE HEIGHT OF THE TOP OF THE PLANT AND NOT
SHRUBS AND SMALL PLANTS SHALL MEET THE REQUIREMENTS FOR A SPREAD AND HEIGHT INDICATED IN THE PLANT LIST.
f.
1) IF THE USE OF LARGER PLANTS IS ACCEPTABLE, INCREASE THE SPREAD OF ROOTS OR ROOTBALL IN PROPORTION TO THE SIZE OF THE PLANT.
PLANTS LARGER THAN THOSE SPECIFIED IN THE PLANT LIST MAY BE USED WHEN ACCEPTABLE TO THE LANDSCAPE ARCHITECT.
e.
PLANTS PLANTED IN ROWS OR MASS SHALL BE MATCHED IN FORM.
d.
PROVIDE TREE SPECIES WITH A SINGLE MAIN TRUNK. TREES THAT HAVE THE MAIN TRUNK FORMING A "Y" SHAPE ARE NOT ACCEPTABLE.
c.
2) CONTAINER STOCK SHALL NOT BE POT BOUND.
1) NO PLANTS SHALL BE LOOSE IN CONTAINER.
WHOLE.
SOIL TOGETHER, FIRM AND
CONTAINER GROWN STOCK: GROWN IN A CONTAINER FOR SUFFICIENT LENGTH OF TIME FOR THE ROOT SYSTEM TO HAVE DEVELOPED TO HOLD ITS
b.
ACCEPTABLE.
COMPLYING WITH THE LATEST EDITION OF THE "AMERICAN STANDARD FOR NURSERY STOCK". CRACKED OR MUSHROOMED BALLS ARE NOT
FIBROUS AND FEEDING ROOT SYSTEM NECESSARY FOR FULL RECOVER OF THE PLANT. PROVIDE BALL SIZES
DEPTH TO ENCOMPASS THE
BALLED AND BURLAPPED PLANTS: DIG BALLED AND BURLAPPED PLANTS WITH FIRM NATURAL BALLS OF EARTH OF SUFFICIENT DIAMETER AND
a.
DURING STORAGE.
FULLY DEVELOPED FORM WITHOUT VOIDS AND OPEN SPACES. PLANTS HELD IN STORAGE WILL BE REJECTED IF THEY SHOW SIGNS OF GROWTH
CRACKS, ABRASIONS OF THE BARK, PLANT DISEASES, INSECT EGGS, BORERS, AND ALL FORMS OF INFESTATION. ALL PLANTS SHALL HAVE A
SOUND, HEALTHY, VIGOROUS PLANTS FREE FROM DEFECTS, DISFIGURING KNOTS, SUN SCALD INJURIES, FROST
ROOT SYSTEMS. PROVIDE ONLY
PLANTS: PROVIDE PLANTS TYPICAL OF THEIR SPECIES OR VARIETY; WITH NORMAL, DENSELY-DEVELOPED BRANCHES AND VIGOROUS, FIBROUS
1.
DURING THE INITIAL PLANTING INSTALLATION.
REPRESENTATIVE) TO BE UNSATISFACTORY
REMOVE AND IMMEDIATELY REPLACE ALL PLANTS, AS DETERMINED BY THE LANDSCAPE ARCHITECT (OR ENGINEER AUTHORIZED
4.
TYPICAL OF PLANTING AREA, ACTS OF VANDALISM, OR NEGLIGENCE ON THE PART OF THE OWNER.
MILES PER HOUR, WINTER KILL CAUSED BY EXTREME COLD AND SEVER WINTER CONDITIONS NOT
LIGHTNING STORMS, OR WINDS OVER 75
WARRANTY SHALL NOT INCLUDE DAMAGE OR LOSS OF TREES, PLANTS, OR GROUND COVER CAUSED BY FIRES, FLOODS, FREEZING RAINS,
3.
APPARENT AND WEATHER AND SEASON PERMIT.
REPLACEMENT PLANTS FOR 1 YEAR AFTER INSTALLATION. CORRECT DEFECTIVE WORK AS SOON AS POSSIBLE AFTER DEFICIENCIES BECOME
CAUSES DUE TO THE CONTRACTOR'S NEGLIGENCE. THE COST OF SUCH REPLACEMENT(S) IS AT CONTRACTOR'S EXPENSE. WARRANT ALL
OR UNSIGHTLY CONDITION, AND HAVE LOST THEIR NATURAL SHAPE DUE TO DEAD BRANCHES, OR OTHER
ARCHITECT, ARE IN AN UNHEALTHY
REPLACE, IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS, ALL PLANTS THAT ARE DEAD OR, AS DETERMINED BY THE LANDSCAPE
2.
AREA. PROJECT AREAS WILL BE ACCEPTED UPON FULL COMPLETION OF PROJECT SITE.
ACCEPTANCE OF EACH PROJECT
WARRANT PLANT MATERIAL TO REMAIN ALIVE AND BE IN HEALTHY, VIGOROUS CONDITION FOR A PERIOD OF 1 YEAR AFTER COMPLETION AND
1.
PREPARATION
INSTALLATION
56-02-R-219-0
ROLLED EROSION CONTROL MAT
THE SELECTED ROLLED EROSION CONTROL PRODUCT SHALL BE BIODEGRADABLE.
2.
INCORPORATED INTO THE WORK.
ESTABLISHED AND HAVE A ROLLED EROSION CONTROL PRODUCT, CLASS I TYPE A, SHORT TERM
ALL SLOPES STEEPER THAN 25% THAT ARE NOT PROTECTED BY STONE FILL SHALL HAVE TURF
1.
A1
7/18/25
KSE
NOTE REVISION
E
E
X
C
R
S
L
IO
3B
3A
CONSULTANT SEAL
INFORMATION
CONSULTANT
M. HUNT
K. SCHUMAN-EKES
K. DETRICK
BIN# 3348560
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
AS SHOWN
06/24/2025
25-500
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CONTRACTOR
SIGNATURE
TITLE
NAME
DATE
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
REVISION
NUMBER
DATE
MADE
BY
APP'D
BY
REVISION
CHECKED BY
IN CHARGE OF
MADE BY
SHEET NO. OF
NUMBER
SHEET
NUMBER
CONTRACT
SCALE:
DATE:
DPW FILE NO.
REV.
NO.
TOWN OF CORTLANDT, NEW YORK
OVER CROTON RIVER (BIN 3348560)
REPLACEMENT OF QUAKER BRIDGE ROAD BRIDGE
6/25/2025
$FILE$
FILE NAME =
USER =
DATE/TIME =
PLOT = NY_PDF.pltcfg
9:35:33 AM
morrimm
N
OI
S
S
E
F
O
.
K
R
O
Y
W
N
E
F
O
E
T
A
T
S
M
A
T
T
H
E
J
H
U
N
T
R
E
E
N
I
G
N
E
L
A
R
P
D
E
S
N
E
C
I
L
W
LANDSCAPING DETAILS
LAD-01
FOR TREE PLANTING.
SEE SHEET LAP-01 FOR PAY ITEMS
2.
SEASON.
ETC. AFTER ONE GROWING
REMOVE GUYING, TREE WRAP,
1.
PLAN VIEW OF STAKING
FLUORESECNT FLAGGING ON WIRE.
3.
CUT LEADERS.
BRANCHES. DO NOT
PROVIDE MINIMAL PRUNING. ONLY TO CORRECT DAMAGED
2.
SLOPE.
THIS DETAIL SHALL APPLY TO ALL TREES PLANTED ON A
1.
TREE HEIGHT
APPROX 2 / 3
STAKE W/ CENTERED
1" x 2" x 18" WOOD
" SISAL ROPE
5" ABOVE FINAL GRADE
NATURAL ROOT COLLAR 3" -
TRUNK)
NOT TO BE IN CONTACT WITH TREE
HARDWOOD MULCH MIN. (MULCH
3" LAYER OF SHREDDED
AREA ABOVE ROOT BALL
PROVIDE 6" RADIUS UNMULCHED
4" HIGH WATER BERM
COMPACT FILL TO BE BENCHED IN
PLANTING PIT
FINISHED GRADE
1/2 OF WIRE BASKET ( FROM ROOT BALL AND PIT.)
SYNTHETIC MATERIAL. CUT AND REMOVE UPPER
CUT AND REMOVE UPPER 1/3 OF BURLAP. NO
MIXTURE AS SPECIFIED
BACKFILL PLANTING SOIL
UNDISTURBED SOIL
SET BALL ON
PLAN VIEW OF STAKING
TREE PIT 2X
ROOTBALL DIA.
MIN. 6" DEPTH
INTO UNDISTURBED SOIL
LODGE POLES EXTEND 2'
UNDISTURBED SOIL
PLANTING MIX AS SPEC'D
AROUND TOPE 1/3 OF BALL
BURLAP AND WIRE BASKETS
LOOSEN AND FOLD BACK
3" SAUCER AROUND TREE
3" SHREDDED BARK MULCH
2" ABOVE FINISH GRADE
SET TOP OF ROOT BALL
HOSE OVER #12 GALV. WIRE
1/ 2" FABRIC BEARING RUBBER
#12 GALV. WIRE
ALTERNATE STAKING
2" x 2" STAKES, 2 GUYS PER TREE
2 1 /2" OR LARGER (10' OR LARGER)
PRUNE 1 / 4 TO 1 / 3 BRANCHES
NOTES:
TREE PIT 2X
ROOTBALL DIA.
SLOPE TREE PLANTING DETAIL
(NOT TO SCALE)
TREE PLANTING DETAIL
(NOT TO SCALE)
(NOT TO SCALE)
SLOPE INSTALLATION GUIDELINES:
12" INTERVALS.
THE END OF BLANKET MUST BE SECURED IN A 6"x6" TRENCH WITH A ROW OF STAPLES PLACED AT
7.
PLACED 4" BELOW IN A STAGGERED PATTERN. THEN CONTINUE WITH GENERAL INSTALLATION.
ROW OF STAPLES 4" APART ALONG ENTIRE WIDTH OF THE SLOPE. A SECOND ROW SHOULD BE
FOR MAXIMUM PERFORMANCE A CHECK SLOT SHOULD BE PLACED AT 25'-40' INTERVALS. PLACE A
6.
APPROXIMATELY 12" APART ACROSS THE WIDTH OF BLANKETS.
STYLE IN THE DIRECTION OF WATER FLOW. CONNECT THE BLANKETS BY PLACING STAPLES
ADDITIONAL VERTICAL BLANKETS CAN BE JOINED USING A MINIMUM 4" OVERLAPPING OF SHINGLE
5.
STAPLES PLACED APPROXIMATELY 3'-0" APART.
PARALLEL BLANKETS MUST BE OVERLAPPED BY A MINIMUM OF 4", AND SECURED WITH A ROW OF
4.
PATTERN BELOW, SPECIFIED BY SLOPE.
ROLL THE BLANKET VERTICALLY DOWN THE SLOPE. SECURE USING THE APPROPRIATE STAPLE
3.
WITH A ROW OF STAPLES PLACED 12" APART ACROSS THE WIDTH OF THE BLANKET.
BACKFILL AND COMPACT THE TRENCH. APPLY SEED, AND FOLD THE BLANKET OVER SOIL, SECURE
SECURE THE BLANKET AT THE BOTTOM OF THE TRENCH WITH STAPLES PLACED 12" APART.
BEGIN BY PLACING THE BLANKET A MINIMUM OF 12" DOWN-SLOPE OF THE UP-SLOPE TRENCH.
2.
APPLIED. PREPARE THE SLOPE SOIL SURFACE (RAKING, SEEDING AND FERTILIZING).
DIG A 6" BY 6" TRENCH BOTH UP-SLOPE AND DOWN-SLOPE OF THE AREA THE MATTING IS TO BE
1.
PRODUCT AND ALL ASSOCIATED LABOR AND MATERIALS SHALL BE PAID FOR UNDER ITEM 209.1801.
BE CONFIRMED WITH YOUR LOCAL DISTRIBUTOR. PAYMENT FOR ROLLED EROSION CONTROL
THESE GUIDELINES ARE RECOMMENDATIONS ONLY, ANY QUESTIONS WITH THE INSTALLATION SHOULD
SLOPE APPLICATION
6"
6"
12"
2"-5"
3"
ROLLED EROSION CONTROL PRODUCT DETAIL
NOTES:
56-02-R-218-0
Machine-extracted for search and reference — the original PDF is the authoritative version.