Exhibit I - Traffic Impact Study
correspondence
82 pages
Meeting: portal event 969 (no meeting page on file)
Agenda item: Presentation from 1 HMB Property Owner LLC regarding their zoning petition to permit multifamily housing at 1 Half Moon Bay Drive.
Correspondence, 82 pages. Attached to agenda item: “Presentation from 1 HMB Property Owner LLC regarding their zoning petition to permit multifamily housing at 1 Half Moon Bay Drive.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
.01 1 Half Moon Bay Drive - Cover Letter
.02 1 Half Moon Bay Drive - Petition for Zoning Text Amendment
1 Half Moon Bay Drive Jul 18 FINAL
Exhibit A - Location Map
Exhibit B - Aerial Map
Exhibit C - Zoning Map
Exhibit D - Local Law 14 of 2022
Exhibit E - EAF
Exhibit F - Coastal Assessment Form
Exhibit G - Public School Children Analysis
Exhibit H - Economic and Fiscal Impacts Assessment
Exhibit J - Local Law
Extracted text
TRAFFIC IMPACT STUDY
Proposed Mid-Rise Residential
1 Half Moon Bay Drive
Croton-on-Hudson, NY
Prepared for
1 HMB Property Owner, LLC
595 Madison Avenue, Suite 1903
New York, NY 10022
Prepared by
DTS Provident Design Engineering, LLP
1 North Broadway
White Plains, New York
July 9, 2024
DTS Provident Project No. 1027
TABLE OF CONTENTS
SECTION
DESCRIPTION
PAGE
SECTION 1 – EXECUTIVE SUMMARY ................................................................................................................ 1
1.0
PROJECT DESCRIPTION .......................................................................................................................... 1
1.1
FINDINGS ................................................................................................................................................... 2
1.2
RECOMMENDATIONS ............................................................................................................................. 3
1.3
CONCLUSIONS ......................................................................................................................................... 4
SECTION 2 – TRAFFIC CONDITIONS AND PROJECTIONS ........................................................................... 5
2.0
STUDY METHODOLOGY ........................................................................................................................ 5
2.1
DESCRIPTION OF EXISTING ROADWAY NETWORK ........................................................................ 6
2.2
2023 EXISTING TRAFFIC VOLUMES ..................................................................................................... 7
2.3
2026 NO-BUILD TRAFFIC VOLUMES .................................................................................................... 8
2.4
SITE-GENERATED TRAFFIC VOLUMES............................................................................................... 9
2.5
ARRIVAL/DEPARTURE DISTRIBUTION ............................................................................................ 10
2.6
2026 BUILD TRAFFIC VOLUMES ......................................................................................................... 10
SECTION 3 – ANALYSIS ........................................................................................................................................ 11
3.0
DESCRIPTION OF ANALYSIS ............................................................................................................... 11
3.1
LOCATION NO. 1 – CROTON EXPY SOUTHBOUND RAMP & MUNICIPAL PLACE ..................... 12
3.2
LOCATION NO. 2 – CROTON EXPY NORTHBOUND RAMP & MUNICIPAL PLACE ..................... 13
3.3
LOCATION NO. 3 – SOUTH RIVERSIDE AVENUE AND MUNICIPAL PLACE ............................... 14
3.4
LOCATION NO. 4 – SOUTH RIVERSIDE AVENUE AND MUNICIPAL PLACE ............................... 15
SECTION 4 –CONCLUSIONS ................................................................................................................................ 16
4.0
CONCLUSIONS ....................................................................................................................................... 16
APPENDICES
APPENDIX A
LEVEL OF SERVICE STANDARDS
APPENDIX B
FIGURES
APPENDIX C
LEVEL OF SERVICE TABLES
APPENDIX D
CAPACITY ANALYSES
APPENDIX E
ACCIDENT DATA SUMMARY
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 1
Job No. 1027
July 9, 2024
SECTION 1 – EXECUTIVE SUMMARY
1.0
PROJECT DESCRIPTION
The Applicant proposes to redevelop an existing Warehouse use with a multi-family
housing building at 1 Half Moon Drive in the village of Croton-on-Hudson, Westchester
County, New York. The proposed Project will consist of a total of 280 dwelling units.
DTS Provident Design Engineering, LLP (DTS Provident) has been retained to analyze
any potential traffic impacts associated with the proposed Project and to identify roadway
improvements, if required, to mitigate any adverse impact. The scope of this study was
based upon our understanding of the potential traffic impacts and anticipated trip
distributions.
This Traffic Impact Study uses standard Traffic Engineering methodology and has been
prepared to document the findings and conclusions of the analysis undertaken to measure
the traffic impacts associated with the proposed Project. For the purposes of this Study, it
is anticipated that the proposed Project will be completed and occupied by the Year 2026.
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 2
Job No. 1027
July 9, 2024
1.1
FINDINGS
Based on field observations and detailed analyses undertaken in preparation of this Traffic
Impact Study, the following findings are presented:
• The proposed project is provided good regional and local vehicular access via Croton
Expressway State Route 9 Northbound and Southbound ramps leading onto Municipal
Place for direct access to the site.
• Access to the site will be provided via two unsignalized access points along Half Moon
Bay Drive, as well as a gated emergency access driveway.
• Based upon the Institute of Transportation Engineers’ (ITE) “Trip Generation Manual
11th Edition”, it is anticipated that the proposed Project when compared to the existing
Warehouse use will generate approximately 79 and 73 additional vehicles during the
Peak Weekday AM Hour and Peak Weekday PM Hour, respectively.
• Table No. 1.1 below summarizes the results of the capacity analyses conducted for each
intersection included in the Traffic Study. Average delay, expressed in seconds per
vehicle, is listed below each Level of Service.
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 3
Job No. 1027
July 9, 2024
TABLE NO. 1.1
OVERALL LEVEL OF SERVICE SUMMARY
INTERSECTION
PEAK WEEKDAY AM
HOUR
PEAK WEEKDAY PM
HOUR
No-Build
Build
No-Build
Build
LOS
Delay
LOS
Delay
LOS
Delay
LOS
Delay
Croton Expressway Southbound
Ramp & Municipal Place
c
18.6
c
19.4
b
12.5
b
12.7
Croton Expressway Northbound
Ramp & Municipal Place
b
11.4
b
11.5
b
11.9
b
13.7
South Riverside Avenue &
Municipal Place
B
17.7
B
17.6
B
17.5
B
17.4
Half Moon Bay Drive & Site
Driveway
a
9.2
a
9.6
a
9.7
a
10.0
NOTE:
Average delay is represented in seconds per vehicle.
Lowercase letters represent an unsignalized intersection.
Delay of unsignalized intersections is reported as the highest delayed approach.
• All analyzed intersections will continue to operate at acceptable Levels of Service with
the proposed Project. Therefore, no additional roadway improvements are required as
a result of the proposed Project.
1.2
RECOMMENDATIONS
No additional roadway improvements are recommended at any of the study locations in
conjunction with the proposed Project.
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 4
Job No. 1027
July 9, 2024
1.3
CONCLUSIONS
It is the considered professional opinion of DTS Provident that the additional traffic
generated by the proposed Project will not have a significant impact on the adjacent
roadway network. Safe and efficient traffic operations will be maintained.
DTS PROVIDENT DESIGN ENGINEERING, LLP
Carlito Holt, P.E., P.T.O.E.
Partner
https://divneytungschwalbe.sharepoint.com/sites/DTSP/Shared Documents/General/PDE Q/PROJECTS-DTSP/1027 - Monday Properties -
Croton/Reports/Traffic Impact Study/1027 - TIS - Monday Properties Croton-on-Hudson July 2024.docx
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 5
Job No. 1027
July 9, 2024
SECTION 2 – TRAFFIC CONDITIONS AND PROJECTIONS
2.0
STUDY METHODOLOGY
DTS Provident has been retained to analyze the traffic impact associated with the proposed
multi-family residential building at 1 Half Moon Bay Drive.
The existing traffic volumes were collected by representatives of DTS Provident at
adjacent roadways in the vicinity of the Site on November 28, 2023. The existing base
traffic volumes were projected to the Design Year of 2026 utilizing a 1.5% growth rate
compounded per year to which the site-generated traffic from the Project was added,
resulting in the 2026 No-Build and 2026 Build Traffic Volumes respectively. Utilizing the
2026 No-Build and Build Traffic Volumes, DTS Provident performed detailed capacity
analyses of the key intersections to identify the operational characteristics and to measure
the traffic impact of the proposed Project on the adjacent roadway system. Based upon the
results of the analysis, comparisons of the 2026 No-Build and Build conditions for the
proposed Project were made. If significant impacts were experienced, mitigation was
proposed.
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 6
Job No. 1027
July 9, 2024
2.1
DESCRIPTION OF EXISTING ROADWAY NETWORK
The following are brief descriptions of the roadways located in the vicinity of the Site:
The Croton Expressway Southbound Ramp is a one-way lane that stems from the
Expressway (US Route 9). Vehicles are directed to decrease their speed from the 55 mph
Expressway to the village speed limit of 30 mph. There are both yellow and white edge
line markings. This Ramp is under jurisdiction of the New York State Department of
Transportation (NYSDOT).
The Croton Expressway Northbound Ramp is a one-way lane that stems from the
Expressway (US Route 9). Vehicles are directed to decrease their speed from the 55 mph
Expressway to the village speed limit of 30 mph. There are both yellow and white edge
line markings. This Ramp is under jurisdiction of the New York State Department of
Transportation (NYSDOT).
Municipal Place has two lanes in each direction between South Riverside Avenue and the
Croton Expressway Southbound Ramp. One lane is left-turn only westbound approaching
the Southbound Ramp and the other becomes right-turn only lane eastbound approaching
South Riverside Avenue. There is road striping present with double yellow lines in the
center of the roadway and white line edge marking. This road has a village speed limit of
30 mph. Municipal Place is under the local jurisdiction of the Village of Croton-on-
Hudson.
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 7
Job No. 1027
July 9, 2024
South Riverside Avenue (State Route 9A) is a two-way road with one lane in each
direction. There is road striping present with double yellow lines in the center of the
roadway and white line edge marking. This road has a speed limit of 30 mph and is under
the jurisdiction of the New York State Department of Transportation (NYSDOT).
2.2
2023 EXISTING TRAFFIC VOLUMES
After reviewing the potential traffic impacts and anticipated trip distributions, the
following study locations were identified:
1.
Croton Expressway Southbound Ramp & Municipal Place
2.
Croton Expressway Northbound Ramp & Municipal Place
3.
South Riverside Avenue & Municipal Place
4.
Half Moon Bay Drive & Site Driveway
Representatives of DTS Provident conducted turning movement traffic counts on Tuesday
November 28, 2023, from 6:30 AM to 9:30 AM and 3:30 PM to 6:30 PM. Based upon the
traffic counts conducted, the following Peak Roadway Hours were determined:
Peak Weekday AM Roadway Hour – 7:15 AM to 8:15 AM
Peak PM Weekday Roadway Hour - 4:00 PM to 5:00 PM
The 2023 Existing Traffic Volumes are illustrated on Figure No. 2 in Appendix B.
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 8
Job No. 1027
July 9, 2024
2.3
2026 NO-BUILD TRAFFIC VOLUMES
In order to project to the future 2026 design year, a compounded annual growth rate of
1.5% per year was applied to the existing traffic volumes. The 2026 Grown Traffic
Volumes are illustrated on Figure No. 3. Based upon information obtained from the
NYSDOT and DTS Provident’s ATR data, this is a more than conservative growth rate. In
addition to the growth rate, volumes from the following nearby adjacent developments
were included in the background traffic:
• 25 South Riverside
• 325 South Riverside
• 41-51 Maple Street
The Adjacent Development Traffic Volumes are illustrated on Figure Nos. 4 through 6.
These volumes were combined with the 2026 Grown Traffic Volumes to form the 2026
No-Build Traffic Volumes illustrated on Figure No. 7. It should be noted that the proposed
Lot A development at the Croton-Harmon Station Parking Lot was also considered as a
potential adjacent development; however, based on that project’s potential trip generation
and location it would not be a major traffic generator within the proposed Project’s study
area. Therefore, the background growth rate adequately accounts for the potential Lot A
development.
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 9
Job No. 1027
July 9, 2024
2.4
SITE-GENERATED TRAFFIC VOLUMES
The ability of any roadway network to accommodate anticipated traffic volumes is
measured by comparing Peak Hour Traffic Volumes to roadway capacities. Thus, it is
essential to determine the hourly traffic volumes to be generated by the proposed Project
and add them to the No-Build Traffic Volumes to determine the Build Traffic Volumes.
The Site-generated traffic volumes attributable to the proposed Project was determined
based upon the trip generation rates contained in ITE’s report entitled, “Trip Generation”,
11th Edition, utilizing Land Use Code 221 Multi-family housing (Mid-rise). These values
are compared to that of Land Use Code 150 Warehousing as this is the current development
on site. The estimated Site-generated traffic volumes and difference between trips of the
current and proposed developments are outlined in Table No. 2.1 below.
TABLE NO. 2.1
TRIP GENERATION TABLE - ITE 11th EDITION
LAND USE (CODE)
SIZE
UNIT
AM Peak Hour
PM Peak Hour
Enter
Exit
Enter
Exit
Existing
Development
Warehouse (150)
119,000
SF
Proposed
Development
Multi-family Housing (Mid-Rise)
(221)
Dwelling
Units
Difference (Passenger Vehicles)
-4
Note: Trip Generation rates based upon Institute of Transportation Engineers’ (ITE) “Trip Generation Manual”, 11th Edition
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 10
Job No. 1027
July 9, 2024
2.5
ARRIVAL/DEPARTURE DISTRIBUTION
The arrival/departure distribution patterns for traffic to be generated by the proposed
Project were developed based upon the existing traffic volumes, potential destinations, and
the existing roadway network. The resulting arrival and departure distributions are
illustrated on Figure Nos. 8 and 9 in Appendix B.
2.6
2026 BUILD TRAFFIC VOLUMES
The Site-generated Traffic Volumes were distributed to the roadway network in accordance
with the arrival/departure distributions. The Site-generated Traffic Volumes for the
proposed Project are illustrated on Figure No. 10 in Appendix B. The Site-generated
Traffic Volumes for the proposed Project were combined with the 2026 No-Build Traffic
Volumes to form 2026 Build Traffic Volumes illustrated on Figure No. 11 in Appendix B.
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 11
Job No. 1027
July 9, 2024
SECTION 3 – ANALYSIS
3.0
DESCRIPTION OF ANALYSIS
Capacity analyses were conducted at the key intersections to identify any potential traffic
impact associated with the proposed Project. The following section contains a brief
description of the procedure utilized in the preparation of this analysis for all the study
locations listed:
• Capacity analysis is a method by which traffic volumes are compared to calculated
roadway and intersection capacities to evaluate future traffic conditions. The
methodology utilized is described in the Highway Capacity Manual published by the
Transportation Research Board. In general, the term “Level of Service” is used to
provide a qualitative evaluation based on certain quantitative calculations related to
empirical values. The definitions of Level of Service as contained in the Highway
Capacity Manual appear in Appendix A of this Report.
• In general, Level of Service A represents the best traffic operating condition. Levels
of Service for signalized and unsignalized intersections are defined in terms of average
delay. Delay is used as a measure of driver discomfort, frustration, efficiency, etc.
Capacity analyses were performed for the key locations with the 2023 Existing, 2026 No-
Build and 2026 Build Traffic Volumes utilizing Highway Capacity Software (Synchro)
developed for the FHWA. The capacity analyses worksheets are contained in Appendix D
of this Report.
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 12
Job No. 1027
July 9, 2024
3.1
LOCATION NO. 1 – CROTON EXPY SOUTHBOUND RAMP & MUNICIPAL
PLACE
Existing Conditions
This four-legged intersection is unsignalized and is controlled by stop signs on Half
Moon Drive and the Croton Expressway Southbound Ramp approaching the
intersection. Croton Expressway Southbound Ramp provides the one-way southern
approach with one left-turn/through/right-turn lane. Municipal Place provides the
eastern and western approaches with one left-turn only lane and one left-
turn/through lane eastbound and two through lanes westbound.
Capacity Analysis
Capacity analyses were conducted for this location utilizing the 2023 Existing,
2026 No-Build and 2026 Build Traffic Volumes for the Peak Weekday AM and
PM Hours. Due to limitations in the capacity analysis software, and to provide the
most conservative analysis, the intersection was analyzed with all approaches under
STOP control. The results of these analyses are shown in Table C-1 in Appendix
C. As indicated in the table, acceptable Levels of Service are maintained during
the Peak Weekday AM and PM Hours for the No-Build and Build conditions. As
such, no improvements are required at this location as a result of the proposed
Project.
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 13
Job No. 1027
July 9, 2024
3.2
LOCATION NO. 2 – CROTON EXPY NORTHBOUND RAMP & MUNICIPAL
PLACE
Existing Conditions
This four-legged intersection is unsignalized and is controlled by a stop sign on the
Croton Expressway Northbound Ramp approaching the intersection. The Croton
Expressway Northbound Ramp provides a one-way northern approach with one
left-turn/through/right-turn lane. Municipal Place provides the eastern and western
approaches with two lanes in each direction that can be utilized to turn onto the
Croton Expressway Northbound Ramp.
Capacity Analysis
Capacity analyses were conducted for this location utilizing the 2026 Build Traffic
Volumes for the Peak Weekday AM and PM Hours. The results of these analyses
are shown in Table C-2 in Appendix C. As indicated in the table, acceptable Levels
of Service are demonstrated during the Peak Weekday AM and PM Hours for the
Build condition. As such, no improvements are required at this location as a result
of the proposed Project.
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 14
Job No. 1027
July 9, 2024
3.3
LOCATION NO. 3 – SOUTH RIVERSIDE AVENUE AND MUNICIPAL PLACE
Existing Conditions
This four-legged intersection is signalized and controlled by traffic lights. South
Riverside Avenue provides the northern and southern approaches with one left-
turn/through/right-turn lane in each direction. Municipal Place provides the eastern
and western approaches. Eastbound traffic has one left-turn/through/right-turn lane.
Westbound traffic has a left-turn/through lane and a right-turn only lane.
Capacity Analysis
Capacity analyses were conducted for this location utilizing the 2026 Build Traffic
Volumes for the Peak Weekday AM and PM Hours. The results of these analyses
are shown in Table C-3 in Appendix C. As indicated in the table, acceptable Levels
of Service are demonstrated during the Peak Weekday AM and PM Hours for the
Build condition. As such, no improvements are required at this location as a result
of the proposed Project.
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 15
Job No. 1027
July 9, 2024
3.4
LOCATION NO. 4 – SOUTH RIVERSIDE AVENUE AND MUNICIPAL PLACE
Existing Conditions
This three-legged intersection is controlled by a stop sign on the Site Driveway.
Municipal Place turns into Half Moon Bay Drive in the Eastbound direction of the
intersection. Half Moon Bay Drive has one through lane per direction and gives
access to the Site Driveway.
Capacity Analysis
Capacity analyses were conducted for this location utilizing the 2026 Build Traffic
Volumes for the Peak Weekday AM and PM Hours. The results of these analyses
are shown in Table C-4 in Appendix C. As indicated in the table, acceptable Levels
of Service are demonstrated during the Peak Weekday AM and PM Hours for the
Build condition. As such, no improvements are required at this location as a result
of the proposed Project.
Traffic Impact Study
Village of Croton-on-Hudson, New York
DTS Provident Design Engineering, LLP
Page No. 16
Job No. 1027
July 9, 2024
SECTION 4 –CONCLUSIONS
4.0
CONCLUSIONS
It is the considered professional opinion of DTS Provident that the traffic volumes
associated with the proposed Project will not have an adverse impact upon the adjacent
roadway network. Safe and efficient traffic operating conditions will be provided for
through traffic as well as traffic destined to and from the Site. No additional infrastructure
improvements are required in conjunction with the proposed Project other than
construction of the Site Driveways.
https://divneytungschwalbe.sharepoint.com/sites/DTSP/Shared Documents/General/PDE Q/PROJECTS-DTSP/1027 - Monday Properties
- Croton/Reports/Traffic Impact Study/1027 - TIS - Monday Properties Croton-on-Hudson July 2024.docx
APPENDIX A
LEVEL OF SERVICE STANDARDS
1.
LEVEL OF SERVICE
CONCEPT
The Highway Capacity Manual, published by the Transportation Research Board of the U.S.
Government, established a system by which highway facilities are examined for their
adequacy to handle traffic volumes. The terminology "Level of Service" is used to provide a
"qualitative" evaluation based on certain "quantitative" calculations which are related to
empirical values.
Intersection Capacity, Delay and resultant Levels of Service are dependent upon a number of
factors, including the following:
•
Area Type
•
Intersection geometrics
•
Traffic volumes
•
Parking conditions
•
Pedestrian activity
•
Vehicle Mix
•
Bus Stop location and activity
•
Peak Hour Factor
•
Traffic Signal operation, if applicable
Ramp and weaving area Densities and resultant Levels of Service are dependent upon a
number of factors, including the following:
•
Number of lanes
•
Configuration of weaving area
•
Length of acceleration/deceleration lanes
•
Vehicle speeds
•
Traffic volumes
•
Vehicle Mix
•
Peak Hour Factor
FACTORS
SIGNALIZED INTERSECTIONS
Level of Service for Signalized Intersections is defined in terms of Delay, which is a measure
of driver discomfort, frustration, fuel consumption, and loss of travel time. Specifically, Level
of Service criteria are stated in terms of the Average Control Delay per vehicle for the peak
15-minute period within the hour analyzed.
Delay is a complex measure and is dependent upon a number of variables, including:
•
Cycle length
•
Ratio of Green time to Cycle length (G/C)
•
Ratio of Volume to Capacity (V/C) for lane group or approach
•
Traffic signal progression
UNSIGNALIZED INTERSECTIONS
Level of Service for Unsignalized Intersections is also defined in terms of Delay. The amount
of Delay is based upon the availability of "gaps" in the mainline traffic stream and the
acceptance of these gaps by motorists waiting on the side street to enter the main street traffic
flow.
RAMP AND RAMP JUNCTIONS
Level of Service for ramp freeway junctions and the ramp proper are defined in terms of
Density (passenger cars per mile per lane). Density is related to the traffic flow in the area of
influence.
WEAVING AREAS
Level of Service for weaving areas is defined in terms of Density (passenger cars per mile per
lane). Density is based on the ratio of weaving vehicles to non-weaving vehicles and on
vehicle speeds in the weaving area of influence
CRITERIA
The criteria for the various Level of Service designations are as follows:
SIGNALIZED
UNSIGNALIZED
LEVEL OF
SERVICE
Average Control Delay
per Vehicle (Seconds)
Average Control Delay
per Vehicle (Seconds)
A
10.0 or less
10.0 or less
B
10.1 to 20.0
10.1 to 15.0
C
20.1 to 35.0
15.1 to 25.0
D
35.1 to 55.0
25.1 to 35.0
E
55.1 to 80.0
35.1 to 50.0
F
80.1 or greater
50.1 or greater
Level of
Service
Ramp-Freeway Junction
Ramp Proper
Weaving Areas
Maximum Density
pc/mi/ln
Density Range
pc/mi/ln
Maximum Density pc/mi/ln
Freeway
Weaving Area
Multi-lane + C-D
Weaving Area
A
<10
<11
<10
<12
B
>10 - 20
>11 – 18
>10 - 20
>12 - 24
C
>20 - 28
>18 – 26
> 20 - 28
>24 - 32
D
>28 - 35
>26 – 35
>28 - 35
>32 - 36
E
>35
>35 – 45
>35 - 43
>36 - 40
F
Demand exceeds capacity
>45
>43
>40
DESCRIPTION
The following is a brief description of each of the six Level of Service designations as defined
by the Highway Capacity Manual:
SIGNALIZED INTERSECTIONS
LEVEL OF SERVICE A
Average Control Delay - 10.0 secs. or less
Describes operations with very low delay. Occurs when progression is extremely favorable
and most vehicles arrive during the Green Phase and do not stop at all. Short cycle lengths
may also contribute to low delay.
LEVEL OF SERVICE B
Average Control Delay - 10.1 to 20.0 secs.
Generally occurs with good progression and/or short cycle lengths. More vehicles stop than
for Level of Service A, causing higher levels of average delay.
LEVEL OF SERVICE C
Average Control Delay - 20.1 to 35.0 secs.
Higher delays may result from fair progression and/or longer cycle lengths. Individual cycle
failures may begin to appear at this Level of Service. The number of vehicles stopping is
significant, although many still pass through the intersection without stopping.
LEVEL OF SERVICE D
Average Control Delay - 35.1 to 55.0 secs.
The influence of congestion becomes more noticeable. Longer delays may result from some
combination of unfavorable progression, long cycle lengths, or high Volume/Capacity (V/C)
Ratios. Many vehicles stop, and the proportion of vehicles not stopping declines. Individual
cycle failures are noticeable.
LEVEL OF SERVICE E
Average Control Delay - 55.1 to 80.0 secs.
The limit of acceptable delay.
Higher delay values generally indicate poor progression, long cycle lengths, and high V/C
Ratios. Individual cycle failures are frequent occurrences.
LEVEL OF SERVICE F
Average Control Delay - in excess of 80.0 secs.
Unacceptable to most drivers.
Occurs with oversaturation, i.e., arrival flow rates exceed the capacity of the intersection. May
also occur at high V/C Ratios below 1.0 with many individual cycle failures. Poor progression
and long cycle lengths may also be major contributing factors.
UNSIGNALIZED INTERSECTIONS
LEVEL OF SERVICE A
Average Control Delay - 10.0 secs. or less
Operations with little or no delay to minor turning movements.
LEVEL OF SERVICE B
Average Control Delay - 10.1 to 15.0 secs.
Operations with short delays on minor turning movements.
LEVEL OF SERVICE C
Average Control Delay - 15.1 to 25.0 secs.
Operations with average delays on minor turning movements.
LEVEL OF SERVICE D
Average Control Delay - 25.1 to 35.0 secs.
Operations with some delays on minor turning movements.
LEVEL OF SERVICE E
Average Control Delay - 35.1 to 50.0 secs.
Operations with long delays on minor turning movements.
LEVEL OF SERVICE F
Average Control Delay - In excess of 50.0 secs.
Operations where demand exceeds capacity. Very long delays with queuing may be
experienced on the minor street approach.
RAMPS AND RAMP JUNCTIONS
LEVEL OF SERVICE A
Maximum Density - 10 pc/mi/ln
Unrestricted operations with no noticeable turbulence in the ramp influence area.
LEVEL OF SERVICE B
Maximum Density - 20 pc/mi/ln
Minimal levels of turbulence exist and speeds of vehicles in the influence area begin to
decline.
LEVEL OF SERVICE C
Maximum Density - 28 pc/mi/ln
Level of turbulence becomes noticeable as average speed within the influence area declines.
Driving conditions are still relatively comfortable at this level.
LEVEL OF SERVICE D
Maximum Density - 35 pc/mi/ln
.
Turbulence levels become intrusive. Queues may form on some high volume on-ramps but
freeway operation remains stable.
LEVEL OF SERVICE E
Maximum Density - >35 pc/mi/ln
.
Conditions approaching and reaching capacity. Speeds are reduced and turbulence of
merging/diverging vehicles becomes intrusive to all vehicles in the influence area. Flow
levels approach capacity limits and minor changes in demand can cause ramp and freeway
queues to occur.
LEVEL OF SERVICE F
Maximum Density – Demand flow exceeds limits
Unstable, or breakdown, operation. Approaching demand flows exceed the discharge
capacity of the downstream freeway or ramp. Queues are visibly formed on the freeway and
on-ramps and will continue to grow as long as the approaching demand exceeds the discharge
capacity.
TRAFFIC FIGURES
Site Location
Figure No.
Project No. 1027
C:\Users\Lortega\DC\ACCDocs\DTSP\1027_ Monday Properties- Croton\Project Files\PDE\Traffic\1027 TrafficFigures June 2024.dwg
1 Half Moon Bay Drive
Croton-On-Hudson, Westchester County, NY
DTS Provident Design Engineering, LLP
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
DTS PROVIDENT
u
Intelligent Land Use
Site Location
Croton Expy Northbound Ramp
Croton Expy Southbound Ramp
Half Moon Bay Drive
Municipal Place
N
Municipal Place
SB Croton
Expy Ramp
NB Croton
Expy Ramp
Municipal Place
South Riverside Ave
NOT TO SCALE
N
Site Driveway
Half Moon Bay Dr
Figure No.
Project No. 1027
C:\Users\Lortega\DC\ACCDocs\DTSP\1027_ Monday Properties- Croton\Project Files\PDE\Traffic\1027 TrafficFigures June 2024.dwg
1 Half Moon Bay Drive
Croton-On-Hudson, Westchester County, NY
DTS Provident Design Engineering, LLP
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
DTS PROVIDENT
u
Intelligent Land Use
Existing Traffic Volumes
Municipal Place
SB Croton
Expy Ramp
NB Croton
Expy Ramp
Municipal Place
South Riverside Ave
NOT TO SCALE
N
Site Driveway
Half Moon Bay Dr
Figure No.
Project No. 1027
C:\Users\Lortega\DC\ACCDocs\DTSP\1027_ Monday Properties- Croton\Project Files\PDE\Traffic\1027 TrafficFigures June 2024.dwg
1 Half Moon Bay Drive
Croton-On-Hudson, Westchester County, NY
DTS Provident Design Engineering, LLP
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
DTS PROVIDENT
u
Intelligent Land Use
Figure No.
Project No. 1027
C:\Users\Lortega\DC\ACCDocs\DTSP\1027_ Monday Properties- Croton\Project Files\PDE\Traffic\1027 TrafficFigures June 2024.dwg
1 Half Moon Bay Drive
Croton-On-Hudson, Westchester County, NY
DTS Provident Design Engineering, LLP
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
DTS PROVIDENT
u
Intelligent Land Use
Grown Traffic Volumes
Municipal Place
SB Croton
Expy Ramp
NB Croton
Expy Ramp
Municipal Place
South Riverside Ave
NOT TO SCALE
N
Site Driveway
Half Moon Bay Dr
Figure No.
Project No. 1027
C:\Users\Lortega\DC\ACCDocs\DTSP\1027_ Monday Properties- Croton\Project Files\PDE\Traffic\1027 TrafficFigures June 2024.dwg
1 Half Moon Bay Drive
Croton-On-Hudson, Westchester County, NY
DTS Provident Design Engineering, LLP
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
DTS PROVIDENT
u
Intelligent Land Use
Adjacent Development - 25 South Riverside
Municipal Place
SB Croton
Expy Ramp
NB Croton
Expy Ramp
Municipal Place
South Riverside Ave
NOT TO SCALE
N
Site Driveway
Half Moon Bay Dr
Figure No.
Project No. 1027
C:\Users\Lortega\DC\ACCDocs\DTSP\1027_ Monday Properties- Croton\Project Files\PDE\Traffic\1027 TrafficFigures June 2024.dwg
1 Half Moon Bay Drive
Croton-On-Hudson, Westchester County, NY
DTS Provident Design Engineering, LLP
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
DTS PROVIDENT
u
Intelligent Land Use
Adjacent Development - 325 South Riverside
Municipal Place
SB Croton
Expy Ramp
NB Croton
Expy Ramp
Municipal Place
South Riverside Ave
NOT TO SCALE
N
Site Driveway
Half Moon Bay Dr
Figure No.
Project No. 1027
C:\Users\Lortega\DC\ACCDocs\DTSP\1027_ Monday Properties- Croton\Project Files\PDE\Traffic\1027 TrafficFigures June 2024.dwg
1 Half Moon Bay Drive
Croton-On-Hudson, Westchester County, NY
DTS Provident Design Engineering, LLP
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
DTS PROVIDENT
u
Intelligent Land Use
Adjacent Development - 4151 Maple Street
Municipal Place
SB Croton
Expy Ramp
NB Croton
Expy Ramp
Municipal Place
South Riverside Ave
NOT TO SCALE
N
Site Driveway
Half Moon Bay Dr
Figure No.
Project No. 1027
C:\Users\Lortega\DC\ACCDocs\DTSP\1027_ Monday Properties- Croton\Project Files\PDE\Traffic\1027 TrafficFigures June 2024.dwg
1 Half Moon Bay Drive
Croton-On-Hudson, Westchester County, NY
DTS Provident Design Engineering, LLP
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
DTS PROVIDENT
u
Intelligent Land Use
No-Build Traffic Volumes
Municipal Place
SB Croton
Expy Ramp
NB Croton
Expy Ramp
Municipal Place
South Riverside Ave
100%
15%
75%
10%
85%
10%
NOT TO SCALE
N
Site Driveway
Half Moon Bay Dr
100%
Arrival Distribution
Figure No.
Project No. 1027
C:\Users\Lortega\DC\ACCDocs\DTSP\1027_ Monday Properties- Croton\Project Files\PDE\Traffic\1027 TrafficFigures June 2024.dwg
1 Half Moon Bay Drive
Croton-On-Hudson, Westchester County, NY
DTS Provident Design Engineering, LLP
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
DTS PROVIDENT
u
Intelligent Land Use
Municipal Place
SB Croton
Expy Ramp
NB Croton
Expy Ramp
Municipal Place
South Riverside Ave
10%
75%
15%
25%
10%
NOT TO SCALE
N
Site Driveway
Half Moon Bay Dr
100%
100%
Figure No.
Project No. 1027
C:\Users\Lortega\DC\ACCDocs\DTSP\1027_ Monday Properties- Croton\Project Files\PDE\Traffic\1027 TrafficFigures June 2024.dwg
1 Half Moon Bay Drive
Croton-On-Hudson, Westchester County, NY
DTS Provident Design Engineering, LLP
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
DTS PROVIDENT
u
Intelligent Land Use
Departure Distribution
Municipal Place
SB Croton
Expy Ramp
NB Croton
Expy Ramp
Municipal Place
South Riverside Ave
NOT TO SCALE
N
Site Driveway
Half Moon Bay Dr
Site Generated Traffic Volumes
Figure No.
Project No. 1027
C:\Users\Lortega\DC\ACCDocs\DTSP\1027_ Monday Properties- Croton\Project Files\PDE\Traffic\1027 TrafficFigures June 2024.dwg
1 Half Moon Bay Drive
Croton-On-Hudson, Westchester County, NY
DTS Provident Design Engineering, LLP
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
DTS PROVIDENT
u
Intelligent Land Use
Municipal Place
SB Croton
Expy Ramp
NB Croton
Expy Ramp
Municipal Place
South Riverside Ave
NOT TO SCALE
N
Site Driveway
Half Moon Bay Dr
Build Traffic Volumes
Figure No.
Project No. 1027
C:\Users\Lortega\DC\ACCDocs\DTSP\1027_ Monday Properties- Croton\Project Files\PDE\Traffic\1027 TrafficFigures June 2024.dwg
1 Half Moon Bay Drive
Croton-On-Hudson, Westchester County, NY
DTS Provident Design Engineering, LLP
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
DTS PROVIDENT
u
Intelligent Land Use
APPENDIX C
LEVEL OF SERVICE SUMMARY
TABLES
LOS
LOS
LOS
LOS
LOS
LOS
DELAY (sec) DELAY (sec) DELAY (sec) DELAY (sec) DELAY (sec) DELAY (sec)
b
b
b
a
b
b
11.2
11.6
12.2
9.9
10.2
10.5
a
a
a
a
a
a
9.0
9.1
10.0
8.6
9.0
9.2
c
c
c
b
b
b
17.1
18.6
19.4
12.0
12.5
12.7
a
a
a
a
a
a
8.5
8.7
8.8
8.5
8.6
9.3
c
c
c
b
b
b
16.0
15.8
17.8
11.3
11.7
11.6
b
b
b
b
b
b
13.9
14.8
14.9
10.4
10.7
10.8
TABLE C-1
PEAK HOUR LEVEL OF SERVICE SUMMARY TABLE
Croton Expy Southbound Ramp & Municipal Place
APPROACH
PM PEAK HOUR
EXISTING
NO-BUILD
BUILD
AM PEAK HOUR
EXISTING
NO-BUILD
BUILD
Croton Expy Southbound Ramp
SB
LTR
Municipal Place
EB
TR
L
INTERSECTION
Overall
WB
T
LOS
LOS
LOS
LOS
LOS
LOS
DELAY (sec) DELAY (sec) DELAY (sec) DELAY (sec) DELAY (sec) DELAY (sec)
b
b
b
b
b
b
10.8
11.4
11.5
11.4
11.9
13.7
a
a
a
a
a
a
9.3
9.5
9.5
8.4
8.5
8.5
a
a
a
a
a
a
0.1
0.2
0.3
0.1
0.2
0.2
a
a
a
a
a
a
0.7
0.7
1.2
0.9
1.1
1.1
-
-
-
-
-
-
0.0
0.0
0.0
0.0
0.0
0.0
a
a
a
a
a
a
2.6
2.9
3.0
3.8
4.0
4.9
EB
TABLE C-1
PEAK HOUR LEVEL OF SERVICE SUMMARY TABLE
Croton Expy Northbound Ramp and Municipal Place
APPROACH
PM PEAK HOUR
EXISTING
NO-BUILD
BUILD
AM PEAK HOUR
EXISTING
NO-BUILD
BUILD
T
WB
TR
INTERSECTION
Municipal Place
L
Croton Expy Northbound Ramp
NB
LTR
Overall
LOS
LOS
LOS
LOS
LOS
LOS
DELAY (sec) DELAY (sec) DELAY (sec) DELAY (sec) DELAY (sec) DELAY (sec)
D
D
D
D
D
D
36.6
35.8
35.8
36.0
35.1
35.1
D
D
D
C
C
C
36.9
35.9
35.9
32.3
31.1
31.1
A
A
A
A
A
A
5.9
6.7
6.8
6.9
7.9
7.9
A
A
A
A
A
A
5.1
5.8
5.8
6.0
6.8
6.8
A
A
A
A
A
A
5.6
6.4
6.5
6.6
7.5
7.6
A
A
A
A
A
A
6.0
6.9
6.9
6.9
8.0
8.0
B
B
B
B
B
B
17.3
17.7
17.6
17.1
17.5
17.4
TABLE C-1
PEAK HOUR LEVEL OF SERVICE SUMMARY TABLE
South Riverside and Municipal Place
APPROACH
PM PEAK HOUR
EXISTING
NO-BUILD
BUILD
AM PEAK HOUR
EXISTING
NO-BUILD
BUILD
South Riverside Ave
SB
TOTAL
Municipal Place
LT
EB
INTERSECTION
NB
TOTAL
WB
TOTAL
R
Overall
LOS
LOS
LOS
LOS
LOS
LOS
DELAY (sec) DELAY (sec) DELAY (sec) DELAY (sec) DELAY (sec) DELAY (sec)
a
a
a
a
a
a
9.1
9.2
9.6
9.6
9.7
10.0
-
-
-
-
-
-
0.0
0.0
0.0
0.0
0.0
0.0
-
-
-
-
-
-
0.0
0.0
0.0
0.0
0.0
0.0
a
a
a
a
a
a
1.0
0.7
3.9
1.4
1.4
1.5
Half Moon Bay Drive
EB
TR
WB
LT
Site Driveway
NB
LR
INTERSECTION
TABLE C-1
PEAK HOUR LEVEL OF SERVICE SUMMARY TABLE
Site Driveway and Half Moon Bay Drive
APPROACH
AM PEAK HOUR
PM PEAK HOUR
EXISTING
NO-BUILD
BUILD
EXISTING
NO-BUILD
BUILD
APPENDIX D
CAPACITY ANALYSIS SHEETS
HCM 7th AWSC
1: Croton Expy SB Ramp & Half Moon Bay Drive/Municipal Place
03/28/2024
Scenario 1 - Existing AM Job No. 1027_Monday Properties 2:52 pm 01/12/2024 2023 Existing
Synchro 12 Report
LO
Intersection
Intersection Delay, s/veh
13.9
Intersection LOS
B
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
EB
WB
SB
Opposing Approach
WB
EB
Opposing Lanes
Conflicting Approach Left
SB
WB
Conflicting Lanes Left
Conflicting Approach Right
SB
EB
Conflicting Lanes Right
HCM Control Delay, s/veh
11.2
HCM LOS
A
C
B
Lane
EBLn1 WBLn1 WBLn2
SBLn1
Vol Left, %
0%
100%
0%
94%
Vol Thru, %
76%
0%
100%
1%
Vol Right, %
24%
0%
0%
5%
Sign Control
Stop
Stop
Stop
Stop
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
4a
Degree of Util (X)
0.104
0.609
0.084
0.319
Departure Headway (Hd)
5.275
5.718
5.249
5.549
Convergence, Y/N
Yes
Yes
Yes
Yes
Cap
Service Time
3.366
3.485
3.016
3.611
HCM Lane V/C Ratio
0.106
0.61
0.084
0.321
HCM Control Delay, s/veh
17.1
8.5
11.2
HCM Lane LOS
A
C
A
B
HCM 95th-tile Q
0.3
4.1
0.3
1.4
HCM 7th TWSC
2: Croton Expy NB Ramp & Municipal Place
03/27/2024
Scenario 1 - Existing AM Job No. 1027_Monday Properties 2:52 pm 01/12/2024 2023 Existing
Synchro 12 Report
LO
Intersection
Int Delay, s/veh
2.6
Movement
EBL
EBT
EBR
WBL
WBT WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
Free
Free
Free
Free
Free
Free
Stop
Stop
Stop
Stop
Stop
Stop
RT Channelized
-
- None
-
- None
-
- None
-
- None
Storage Length
-
-
-
-
-
-
-
-
-
-
-
-
Veh in Median Storage, #
-
-
-
-
-
-
-
-
Grade, %
-
-
-
-
-
-
-
-
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Major1
Major2
Minor1
Conflicting Flow All
-
-
-
Stage 1
-
-
-
-
-
-
-
Stage 2
-
-
-
-
-
-
-
Critical Hdwy
4.88
-
-
-
-
-
6.9
6.5
7.02
Critical Hdwy Stg 1
-
-
-
-
-
-
5.9
5.5
-
Critical Hdwy Stg 2
-
-
-
-
-
-
5.9
5.5
-
Follow-up Hdwy
2.59
-
-
-
-
-
3.55
3.36
Pot Cap-1 Maneuver
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Platoon blocked, %
-
-
-
Mov Cap-1 Maneuver
-
-
-
-
-
Mov Cap-2 Maneuver
-
-
-
-
-
-
-
Stage 1
-
-
-
-
-
-
-
Stage 2
-
-
-
-
-
-
-
Approach
EB
WB
NB
HCM Control Delay, s/v 0.69
10.79
HCM LOS
B
Minor Lane/Major Mvmt
NBLn1
EBL
EBT
WBT WBR
Capacity (veh/h)
-
-
-
HCM Lane V/C Ratio
0.26 0.017
-
-
-
HCM Control Delay (s/veh)
10.8
9.3
0.1
-
-
HCM Lane LOS
B
A
A
-
-
HCM 95th %tile Q(veh)
0.1
-
-
-
HCM 7th TWSC
4: Site Driveway & Half Moon Bay Drive
03/27/2024
Scenario 1 - Existing AM Job No. 1027_Monday Properties 2:52 pm 01/12/2024 2023 Existing
Synchro 12 Report
LO
Intersection
Int Delay, s/veh
Movement
EBT
EBR
WBL
WBT
NBL
NBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
Free
Free
Free
Free
Stop
Stop
RT Channelized
- None
- None
- None
Storage Length
-
-
-
-
-
Veh in Median Storage, #
-
-
-
Grade, %
-
-
-
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Major1
Major2
Minor1
Conflicting Flow All
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Critical Hdwy
-
-
4.12
-
6.42
6.22
Critical Hdwy Stg 1
-
-
-
-
5.42
-
Critical Hdwy Stg 2
-
-
-
-
5.42
-
Follow-up Hdwy
-
- 2.218
- 3.518 3.318
Pot Cap-1 Maneuver
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Platoon blocked, %
-
-
-
Mov Cap-1 Maneuver
-
-
-
Mov Cap-2 Maneuver
-
-
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Approach
EB
WB
NB
HCM Control Delay, s/v
9.13
HCM LOS
A
Minor Lane/Major Mvmt
NBLn1
EBT
EBR
WBL
WBT
Capacity (veh/h)
-
-
-
HCM Lane V/C Ratio
0.016
-
-
-
-
HCM Control Delay (s/veh)
9.1
-
-
-
HCM Lane LOS
A
-
-
A
-
HCM 95th %tile Q(veh)
-
-
-
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
03/27/2024
Scenario 1 - Existing AM Job No. 1027_Monday Properties 2:52 pm 01/12/2024 2023 Existing
Synchro 12 Report
LO
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q, veh
Lane Width Adj.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Ped-Bike Adj (A_pbT)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Parking Bus Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Work Zone On Approach
No
No
No
No
Lanes Open During Work Zone
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Peak Hour Factor
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
Percent Heavy Veh, %
Opposing Right Turn Influence
Yes
Yes
Yes
Yes
Cap, veh/h
HCM Platoon Ratio
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Prop Arrive On Green
0.69
0.69
0.69
0.69
0.69
0.69
0.20
0.20
0.20
0.20
0.20
0.20
Unsig. Movement Delay
Ln Grp Delay, s/veh
5.9
0.0
5.1
6.0
0.0
0.0
36.6
0.0
0.0
36.9
0.0
0.0
Ln Grp LOS
A
A
A
D
D
Approach Vol, veh/h
Approach Delay, s/veh
5.6
6.0
36.6
36.9
Approach LOS
A
A
D
D
Timer:
Assigned Phs
Case No
8.0
7.0
8.0
8.0
Phs Duration (G+Y+Rc), s
23.1
66.9
23.1
66.9
Change Period (Y+Rc), s
5.0
5.0
5.0
5.0
Max Green (Gmax), s
40.0
40.0
40.0
40.0
Max Allow Headway (MAH), s
5.6
5.0
5.4
5.3
Max Q Clear (g_c+l1), s
17.0
7.8
16.2
8.7
Green Ext Time (g_e), s
1.1
2.6
1.8
2.3
Prob of Phs Call (p_c)
1.00
1.00
1.00
1.00
Prob of Max Out (p_x)
0.00
0.00
0.00
0.00
Left-Turn Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Through Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Right-Turn Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Left Lane Group Data
Assigned Mvmt
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
03/27/2024
Scenario 1 - Existing AM Job No. 1027_Monday Properties 2:52 pm 01/12/2024 2023 Existing
Synchro 12 Report
LO
Lane Assignment
L+T+R
L+T
L+T+R
L+T+R
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
0.8
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
15.0
0.0
5.8
0.0
14.2
0.0
6.7
Perm LT Sat Flow (s_l), veh/h/ln
Shared LT Sat Flow (s_sh), veh/h/ln
Perm LT Eff Green (g_p), s
0.0
18.1
0.0
61.9
0.0
18.1
0.0
61.9
Perm LT Serve Time (g_u), s
0.0
3.9
0.0
55.2
0.0
3.1
0.0
56.1
Perm LT Q Serve Time (g_ps), s
0.0
0.8
0.0
0.0
0.0
0.0
0.0
0.0
Time to First Blk (g_f), s
0.0
1.8
0.0
9.1
0.0
5.0
0.0
44.4
Serve Time pre Blk (g_fs), s
0.0
1.8
0.0
5.8
0.0
5.0
0.0
6.7
Prop LT Inside Lane (P_L)
0.00
0.53
0.00
0.18
0.00
0.17
0.00
0.02
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.65
0.00
0.27
0.00
0.73
0.00
0.27
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
Uniform Delay (d1), s/veh
0.0
34.2
0.0
5.3
0.0
34.3
0.0
5.4
Incr Delay (d2), s/veh
0.0
2.4
0.0
0.6
0.0
2.6
0.0
0.5
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
36.6
0.0
5.9
0.0
36.9
0.0
6.0
1st-Term Q (Q1), veh/ln
0.0
3.9
0.0
1.8
0.0
5.8
0.0
2.1
2nd-Term Q (Q2), veh/ln
0.0
0.2
0.0
0.2
0.0
0.3
0.0
0.2
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
4.1
0.0
2.0
0.0
6.1
0.0
2.3
%ile Storage Ratio (RQ%)
0.00
0.38
0.00
0.40
0.00
0.72
0.00
0.14
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Middle Lane Group Data
Assigned Mvmt
Lane Assignment
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Uniform Delay (d1), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Incr Delay (d2), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1st-Term Q (Q1), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
03/27/2024
Scenario 1 - Existing AM Job No. 1027_Monday Properties 2:52 pm 01/12/2024 2023 Existing
Synchro 12 Report
LO
2nd-Term Q (Q2), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Storage Ratio (RQ%)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Right Lane Group Data
Assigned Mvmt
Lane Assignment
R
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
0.0
0.0
2.9
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
0.0
0.0
2.9
0.0
0.0
0.0
0.0
Prot RT Sat Flow (s_R), veh/h/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Prot RT Eff Green (g_R), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Prop RT Outside Lane (P_R)
0.00
0.05
0.00
1.00
0.00
0.47
0.00
0.14
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.00
0.00
0.14
0.00
0.00
0.00
0.00
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
Uniform Delay (d1), s/veh
0.0
0.0
0.0
4.8
0.0
0.0
0.0
0.0
Incr Delay (d2), s/veh
0.0
0.0
0.0
0.3
0.0
0.0
0.0
0.0
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
0.0
0.0
5.1
0.0
0.0
0.0
0.0
1st-Term Q (Q1), veh/ln
0.0
0.0
0.0
0.8
0.0
0.0
0.0
0.0
2nd-Term Q (Q2), veh/ln
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
0.0
0.0
0.8
0.0
0.0
0.0
0.0
%ile Storage Ratio (RQ%)
0.00
0.00
0.00
0.17
0.00
0.00
0.00
0.00
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Intersection Summary
HCM 7th Control Delay, s/veh
17.3
HCM 7th LOS
B
HCM 7th AWSC
1: Croton Expy SB Ramp & Half Moon Bay Drive/Municipal Place
03/28/2024
Scenario 3 - No Build AM Job No. 1027_Monday Properties 4:40 pm 01/15/2024 2026 No Build
Synchro 12 Report
LO
Intersection
Intersection Delay, s/veh
14.8
Intersection LOS
B
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
EB
WB
SB
Opposing Approach
WB
EB
Opposing Lanes
Conflicting Approach Left
SB
WB
Conflicting Lanes Left
Conflicting Approach Right
SB
EB
Conflicting Lanes Right
HCM Control Delay, s/veh
9.1
17.1
11.6
HCM LOS
A
C
B
Lane
EBLn1 WBLn1 WBLn2
SBLn1
Vol Left, %
0%
100%
0%
93%
Vol Thru, %
79%
0%
100%
1%
Vol Right, %
21%
0%
0%
6%
Sign Control
Stop
Stop
Stop
Stop
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
4a
Degree of Util (X)
0.106
0.647
0.107
0.342
Departure Headway (Hd)
5.477
5.759
5.289
5.618
Convergence, Y/N
Yes
Yes
Yes
Yes
Cap
Service Time
3.477
3.534
3.065
3.688
HCM Lane V/C Ratio
0.106
0.648
0.109
0.345
HCM Control Delay, s/veh
9.1
18.6
8.7
11.6
HCM Lane LOS
A
C
A
B
HCM 95th-tile Q
0.4
4.7
0.4
1.5
HCM 7th TWSC
2: Croton Expy NB Ramp & Municipal Place
03/28/2024
Scenario 3 - No Build AM Job No. 1027_Monday Properties 4:40 pm 01/15/2024 2026 No Build
Synchro 12 Report
LO
Intersection
Int Delay, s/veh
2.9
Movement
EBL
EBT
EBR
WBL
WBT WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
Free
Free
Free
Free
Free
Free
Stop
Stop
Stop
Stop
Stop
Stop
RT Channelized
-
- None
-
- None
-
- None
-
- None
Storage Length
-
-
-
-
-
-
-
-
-
-
-
-
Veh in Median Storage, #
-
-
-
-
-
-
-
-
Grade, %
-
-
-
-
-
-
-
-
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Major1
Major2
Minor1
Conflicting Flow All
-
-
-
Stage 1
-
-
-
-
-
-
-
Stage 2
-
-
-
-
-
-
-
Critical Hdwy
4.88
-
-
-
-
-
6.9
6.5
7.02
Critical Hdwy Stg 1
-
-
-
-
-
-
5.9
5.5
-
Critical Hdwy Stg 2
-
-
-
-
-
-
5.9
5.5
-
Follow-up Hdwy
2.59
-
-
-
-
-
3.55
3.36
Pot Cap-1 Maneuver
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Platoon blocked, %
-
-
-
Mov Cap-1 Maneuver
-
-
-
-
-
Mov Cap-2 Maneuver
-
-
-
-
-
-
-
Stage 1
-
-
-
-
-
-
-
Stage 2
-
-
-
-
-
-
-
Approach
EB
WB
NB
HCM Control Delay, s/v 0.68
11.42
HCM LOS
B
Minor Lane/Major Mvmt
NBLn1
EBL
EBT
WBT WBR
Capacity (veh/h)
-
-
-
HCM Lane V/C Ratio
0.302 0.017
-
-
-
HCM Control Delay (s/veh)
11.4
9.5
0.2
-
-
HCM Lane LOS
B
A
A
-
-
HCM 95th %tile Q(veh)
1.3
0.1
-
-
-
HCM 7th TWSC
4: Site Driveway & Half Moon Bay Drive
03/28/2024
Scenario 3 - No Build AM Job No. 1027_Monday Properties 4:40 pm 01/15/2024 2026 No Build
Synchro 12 Report
LO
Intersection
Int Delay, s/veh
0.7
Movement
EBT
EBR
WBL
WBT
NBL
NBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
Free
Free
Free
Free
Stop
Stop
RT Channelized
- None
- None
- None
Storage Length
-
-
-
-
-
Veh in Median Storage, #
-
-
-
Grade, %
-
-
-
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Major1
Major2
Minor1
Conflicting Flow All
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Critical Hdwy
-
-
4.12
-
6.42
6.22
Critical Hdwy Stg 1
-
-
-
-
5.42
-
Critical Hdwy Stg 2
-
-
-
-
5.42
-
Follow-up Hdwy
-
- 2.218
- 3.518 3.318
Pot Cap-1 Maneuver
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Platoon blocked, %
-
-
-
Mov Cap-1 Maneuver
-
-
-
Mov Cap-2 Maneuver
-
-
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Approach
EB
WB
NB
HCM Control Delay, s/v
9.18
HCM LOS
A
Minor Lane/Major Mvmt
NBLn1
EBT
EBR
WBL
WBT
Capacity (veh/h)
-
-
-
HCM Lane V/C Ratio
0.012
-
-
-
-
HCM Control Delay (s/veh)
9.2
-
-
-
HCM Lane LOS
A
-
-
A
-
HCM 95th %tile Q(veh)
-
-
-
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
03/28/2024
Scenario 3 - No Build AM Job No. 1027_Monday Properties 4:40 pm 01/15/2024 2026 No Build
Synchro 12 Report
LO
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q, veh
Lane Width Adj.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Ped-Bike Adj (A_pbT)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Parking Bus Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Work Zone On Approach
No
No
No
No
Lanes Open During Work Zone
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Peak Hour Factor
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
Percent Heavy Veh, %
Opposing Right Turn Influence
Yes
Yes
Yes
Yes
Cap, veh/h
HCM Platoon Ratio
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Prop Arrive On Green
0.67
0.67
0.67
0.67
0.67
0.67
0.22
0.22
0.22
0.22
0.22
0.22
Unsig. Movement Delay
Ln Grp Delay, s/veh
6.7
0.0
5.8
6.9
0.0
0.0
35.8
0.0
0.0
35.9
0.0
0.0
Ln Grp LOS
A
A
A
D
D
Approach Vol, veh/h
Approach Delay, s/veh
6.4
6.9
35.8
35.9
Approach LOS
A
A
D
D
Timer:
Assigned Phs
Case No
8.0
7.0
8.0
8.0
Phs Duration (G+Y+Rc), s
24.8
65.2
24.8
65.2
Change Period (Y+Rc), s
5.0
5.0
5.0
5.0
Max Green (Gmax), s
40.0
40.0
40.0
40.0
Max Allow Headway (MAH), s
5.6
5.0
5.4
5.3
Max Q Clear (g_c+l1), s
18.6
8.6
17.5
9.8
Green Ext Time (g_e), s
1.2
2.8
2.0
2.5
Prob of Phs Call (p_c)
1.00
1.00
1.00
1.00
Prob of Max Out (p_x)
0.00
0.00
0.00
0.00
Left-Turn Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Through Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Right-Turn Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Left Lane Group Data
Assigned Mvmt
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
03/28/2024
Scenario 3 - No Build AM Job No. 1027_Monday Properties 4:40 pm 01/15/2024 2026 No Build
Synchro 12 Report
LO
Lane Assignment
L+T+R
L+T
L+T+R
L+T+R
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
1.1
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
16.6
0.0
6.6
0.0
15.5
0.0
7.8
Perm LT Sat Flow (s_l), veh/h/ln
Shared LT Sat Flow (s_sh), veh/h/ln
Perm LT Eff Green (g_p), s
0.0
19.8
0.0
60.2
0.0
19.8
0.0
60.2
Perm LT Serve Time (g_u), s
0.0
4.3
0.0
52.4
0.0
3.2
0.0
53.6
Perm LT Q Serve Time (g_ps), s
0.0
1.1
0.0
0.0
0.0
0.0
0.0
0.0
Time to First Blk (g_f), s
0.0
1.9
0.0
9.3
0.0
5.5
0.0
43.1
Serve Time pre Blk (g_fs), s
0.0
1.9
0.0
6.6
0.0
5.5
0.0
7.8
Prop LT Inside Lane (P_L)
0.00
0.51
0.00
0.18
0.00
0.16
0.00
0.02
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.66
0.00
0.29
0.00
0.74
0.00
0.30
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
Uniform Delay (d1), s/veh
0.0
33.3
0.0
6.0
0.0
33.4
0.0
6.2
Incr Delay (d2), s/veh
0.0
2.5
0.0
0.7
0.0
2.5
0.0
0.6
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
35.8
0.0
6.7
0.0
35.9
0.0
6.9
1st-Term Q (Q1), veh/ln
0.0
4.2
0.0
2.2
0.0
6.3
0.0
2.5
2nd-Term Q (Q2), veh/ln
0.0
0.2
0.0
0.2
0.0
0.3
0.0
0.2
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
4.4
0.0
2.4
0.0
6.6
0.0
2.7
%ile Storage Ratio (RQ%)
0.00
0.41
0.00
0.46
0.00
0.96
0.00
0.17
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Middle Lane Group Data
Assigned Mvmt
Lane Assignment
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Uniform Delay (d1), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Incr Delay (d2), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1st-Term Q (Q1), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
03/28/2024
Scenario 3 - No Build AM Job No. 1027_Monday Properties 4:40 pm 01/15/2024 2026 No Build
Synchro 12 Report
LO
2nd-Term Q (Q2), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Storage Ratio (RQ%)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Right Lane Group Data
Assigned Mvmt
Lane Assignment
R
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
0.0
0.0
3.2
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
0.0
0.0
3.2
0.0
0.0
0.0
0.0
Prot RT Sat Flow (s_R), veh/h/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Prot RT Eff Green (g_R), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Prop RT Outside Lane (P_R)
0.00
0.05
0.00
1.00
0.00
0.45
0.00
0.13
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.00
0.00
0.14
0.00
0.00
0.00
0.00
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
Uniform Delay (d1), s/veh
0.0
0.0
0.0
5.5
0.0
0.0
0.0
0.0
Incr Delay (d2), s/veh
0.0
0.0
0.0
0.3
0.0
0.0
0.0
0.0
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
0.0
0.0
5.8
0.0
0.0
0.0
0.0
1st-Term Q (Q1), veh/ln
0.0
0.0
0.0
0.9
0.0
0.0
0.0
0.0
2nd-Term Q (Q2), veh/ln
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
0.0
0.0
1.0
0.0
0.0
0.0
0.0
%ile Storage Ratio (RQ%)
0.00
0.00
0.00
0.19
0.00
0.00
0.00
0.00
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Intersection Summary
HCM 7th Control Delay, s/veh
17.7
HCM 7th LOS
B
HCM 7th AWSC
1: Croton Expy SB Ramp & Half Moon Bay Drive/Municipal Place
06/13/2024
Scenario 5 - Build AM Job No. 1027_Monday Properties 4:37 pm 01/16/2024 2026 Build
Synchro 12 Report
LO
Intersection
Intersection Delay, s/veh
14.9
Intersection LOS
B
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
EB
WB
SB
Opposing Approach
WB
EB
Opposing Lanes
Conflicting Approach Left
SB
WB
Conflicting Lanes Left
Conflicting Approach Right
SB
EB
Conflicting Lanes Right
HCM Control Delay, s/veh
17.8
12.2
HCM LOS
A
C
B
Lane
EBLn1 WBLn1 WBLn2
SBLn1
Vol Left, %
0%
100%
0%
93%
Vol Thru, %
49%
0%
100%
1%
Vol Right, %
51%
0%
0%
6%
Sign Control
Stop
Stop
Stop
Stop
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
4a
Degree of Util (X)
0.233
0.658
0.104
0.359
Departure Headway (Hd)
5.33
5.972
5.501
5.894
Convergence, Y/N
Yes
Yes
Yes
Yes
Cap
Service Time
3.344
3.672
3.201
3.894
HCM Lane V/C Ratio
0.232
0.661
0.107
0.357
HCM Control Delay, s/veh
19.4
8.8
12.2
HCM Lane LOS
A
C
A
B
HCM 95th-tile Q
0.9
4.9
0.3
1.6
HCM 7th TWSC
2: Croton Expy NB Ramp & Municipal Place
06/13/2024
Scenario 5 - Build AM Job No. 1027_Monday Properties 4:37 pm 01/16/2024 2026 Build
Synchro 12 Report
LO
Intersection
Int Delay, s/veh
Movement
EBL
EBT
EBR
WBL
WBT WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
Free
Free
Free
Free
Free
Free
Stop
Stop
Stop
Stop
Stop
Stop
RT Channelized
-
- None
-
- None
-
- None
-
- None
Storage Length
-
-
-
-
-
-
-
-
-
-
-
-
Veh in Median Storage, #
-
-
-
-
-
-
-
-
Grade, %
-
-
-
-
-
-
-
-
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Major1
Major2
Minor1
Conflicting Flow All
-
-
-
Stage 1
-
-
-
-
-
-
-
Stage 2
-
-
-
-
-
-
-
Critical Hdwy
4.88
-
-
-
-
-
6.9
6.5
7.02
Critical Hdwy Stg 1
-
-
-
-
-
-
5.9
5.5
-
Critical Hdwy Stg 2
-
-
-
-
-
-
5.9
5.5
-
Follow-up Hdwy
2.59
-
-
-
-
-
3.55
3.36
Pot Cap-1 Maneuver
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Platoon blocked, %
-
-
-
Mov Cap-1 Maneuver
-
-
-
-
-
Mov Cap-2 Maneuver
-
-
-
-
-
-
-
Stage 1
-
-
-
-
-
-
-
Stage 2
-
-
-
-
-
-
-
Approach
EB
WB
NB
HCM Control Delay, s/v
1.2
11.53
HCM LOS
B
Minor Lane/Major Mvmt
NBLn1
EBL
EBT
WBT WBR
Capacity (veh/h)
-
-
-
HCM Lane V/C Ratio
0.304 0.033
-
-
-
HCM Control Delay (s/veh)
11.5
9.5
0.3
-
-
HCM Lane LOS
B
A
A
-
-
HCM 95th %tile Q(veh)
1.3
0.1
-
-
-
HCM 7th TWSC
4: Site Driveway & Half Moon Bay Drive
06/13/2024
Scenario 5 - Build AM Job No. 1027_Monday Properties 4:37 pm 01/16/2024 2026 Build
Synchro 12 Report
LO
Intersection
Int Delay, s/veh
3.9
Movement
EBT
EBR
WBL
WBT
NBL
NBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
Free
Free
Free
Free
Stop
Stop
RT Channelized
- None
- None
- None
Storage Length
-
-
-
-
-
Veh in Median Storage, #
-
-
-
Grade, %
-
-
-
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Major1
Major2
Minor1
Conflicting Flow All
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Critical Hdwy
-
-
4.12
-
6.42
6.22
Critical Hdwy Stg 1
-
-
-
-
5.42
-
Critical Hdwy Stg 2
-
-
-
-
5.42
-
Follow-up Hdwy
-
- 2.218
- 3.518 3.318
Pot Cap-1 Maneuver
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Platoon blocked, %
-
-
-
Mov Cap-1 Maneuver
-
-
-
Mov Cap-2 Maneuver
-
-
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Approach
EB
WB
NB
HCM Control Delay, s/v
9.62
HCM LOS
A
Minor Lane/Major Mvmt
NBLn1
EBT
EBR
WBL
WBT
Capacity (veh/h)
-
-
-
HCM Lane V/C Ratio
0.108
-
-
-
-
HCM Control Delay (s/veh)
9.6
-
-
-
HCM Lane LOS
A
-
-
A
-
HCM 95th %tile Q(veh)
0.4
-
-
-
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
06/13/2024
Scenario 5 - Build AM Job No. 1027_Monday Properties 4:37 pm 01/16/2024 2026 Build
Synchro 12 Report
LO
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q, veh
Lane Width Adj.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Ped-Bike Adj (A_pbT)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Parking Bus Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Work Zone On Approach
No
No
No
No
Lanes Open During Work Zone
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Peak Hour Factor
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
Percent Heavy Veh, %
Opposing Right Turn Influence
Yes
Yes
Yes
Yes
Cap, veh/h
HCM Platoon Ratio
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Prop Arrive On Green
0.67
0.67
0.67
0.67
0.67
0.67
0.22
0.22
0.22
0.22
0.22
0.22
Unsig. Movement Delay
Ln Grp Delay, s/veh
6.8
0.0
5.8
6.9
0.0
0.0
35.8
0.0
0.0
35.9
0.0
0.0
Ln Grp LOS
A
A
A
D
D
Approach Vol, veh/h
Approach Delay, s/veh
6.5
6.9
35.8
35.9
Approach LOS
A
A
D
D
Timer:
Assigned Phs
Case No
8.0
7.0
8.0
8.0
Phs Duration (G+Y+Rc), s
24.8
65.2
24.8
65.2
Change Period (Y+Rc), s
5.0
5.0
5.0
5.0
Max Green (Gmax), s
40.0
40.0
40.0
40.0
Max Allow Headway (MAH), s
5.6
5.0
5.4
5.3
Max Q Clear (g_c+l1), s
18.6
8.8
17.5
9.8
Green Ext Time (g_e), s
1.2
2.8
2.0
2.5
Prob of Phs Call (p_c)
1.00
1.00
1.00
1.00
Prob of Max Out (p_x)
0.00
0.00
0.00
0.00
Left-Turn Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Through Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Right-Turn Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Left Lane Group Data
Assigned Mvmt
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
06/13/2024
Scenario 5 - Build AM Job No. 1027_Monday Properties 4:37 pm 01/16/2024 2026 Build
Synchro 12 Report
LO
Lane Assignment
L+T+R
L+T
L+T+R
L+T+R
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
1.1
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
16.6
0.0
6.8
0.0
15.5
0.0
7.8
Perm LT Sat Flow (s_l), veh/h/ln
Shared LT Sat Flow (s_sh), veh/h/ln
Perm LT Eff Green (g_p), s
0.0
19.8
0.0
60.2
0.0
19.8
0.0
60.2
Perm LT Serve Time (g_u), s
0.0
4.3
0.0
52.4
0.0
3.2
0.0
53.3
Perm LT Q Serve Time (g_ps), s
0.0
1.1
0.0
0.0
0.0
0.0
0.0
0.0
Time to First Blk (g_f), s
0.0
1.9
0.0
9.6
0.0
5.5
0.0
43.1
Serve Time pre Blk (g_fs), s
0.0
1.9
0.0
6.8
0.0
5.5
0.0
7.8
Prop LT Inside Lane (P_L)
0.00
0.51
0.00
0.17
0.00
0.16
0.00
0.02
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.66
0.00
0.30
0.00
0.74
0.00
0.30
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
Uniform Delay (d1), s/veh
0.0
33.3
0.0
6.1
0.0
33.4
0.0
6.2
Incr Delay (d2), s/veh
0.0
2.5
0.0
0.7
0.0
2.5
0.0
0.6
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
35.8
0.0
6.8
0.0
35.9
0.0
6.9
1st-Term Q (Q1), veh/ln
0.0
4.2
0.0
2.2
0.0
6.3
0.0
2.5
2nd-Term Q (Q2), veh/ln
0.0
0.2
0.0
0.2
0.0
0.3
0.0
0.2
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
4.4
0.0
2.4
0.0
6.6
0.0
2.7
%ile Storage Ratio (RQ%)
0.00
0.41
0.00
0.48
0.00
0.96
0.00
0.17
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Middle Lane Group Data
Assigned Mvmt
Lane Assignment
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Uniform Delay (d1), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Incr Delay (d2), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1st-Term Q (Q1), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
06/13/2024
Scenario 5 - Build AM Job No. 1027_Monday Properties 4:37 pm 01/16/2024 2026 Build
Synchro 12 Report
LO
2nd-Term Q (Q2), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Storage Ratio (RQ%)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Right Lane Group Data
Assigned Mvmt
Lane Assignment
R
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
0.0
0.0
3.2
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
0.0
0.0
3.2
0.0
0.0
0.0
0.0
Prot RT Sat Flow (s_R), veh/h/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Prot RT Eff Green (g_R), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Prop RT Outside Lane (P_R)
0.00
0.05
0.00
1.00
0.00
0.45
0.00
0.13
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.00
0.00
0.14
0.00
0.00
0.00
0.00
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
Uniform Delay (d1), s/veh
0.0
0.0
0.0
5.5
0.0
0.0
0.0
0.0
Incr Delay (d2), s/veh
0.0
0.0
0.0
0.3
0.0
0.0
0.0
0.0
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
0.0
0.0
5.8
0.0
0.0
0.0
0.0
1st-Term Q (Q1), veh/ln
0.0
0.0
0.0
0.9
0.0
0.0
0.0
0.0
2nd-Term Q (Q2), veh/ln
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
0.0
0.0
1.0
0.0
0.0
0.0
0.0
%ile Storage Ratio (RQ%)
0.00
0.00
0.00
0.19
0.00
0.00
0.00
0.00
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Intersection Summary
HCM 7th Control Delay, s/veh
17.6
HCM 7th LOS
B
HCM 7th AWSC
1: Croton Expy SB Ramp & Half Moon Bay Drive/Municipal Place
03/27/2024
Scenario 2 - Existing PM Job No. 1027_Monday Properties 4:43 pm 01/15/2024 2023 Existing
Synchro 12 Report
LO
Intersection
Intersection Delay, s/veh
10.4
Intersection LOS
B
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
EB
WB
SB
Opposing Approach
WB
EB
Opposing Lanes
Conflicting Approach Left
SB
WB
Conflicting Lanes Left
Conflicting Approach Right
SB
EB
Conflicting Lanes Right
HCM Control Delay, s/veh
8.6
11.3
9.9
HCM LOS
A
B
A
Lane
EBLn1 WBLn1 WBLn2
SBLn1
Vol Left, %
0%
100%
0%
89%
Vol Thru, %
69%
0%
100%
2%
Vol Right, %
31%
0%
0%
9%
Sign Control
Stop
Stop
Stop
Stop
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
4a
Degree of Util (X)
0.152
0.398
0.097
0.242
Departure Headway (Hd)
4.721
5.566
5.166
5.165
Convergence, Y/N
Yes
Yes
Yes
Yes
Cap
Service Time
2.77
3.309
2.908
3.207
HCM Lane V/C Ratio
0.153
0.398
0.098
0.244
HCM Control Delay, s/veh
8.6
8.5
9.9
HCM Lane LOS
A
B
A
A
HCM 95th-tile Q
0.5
1.9
0.3
0.9
HCM 7th TWSC
2: Croton Expy NB Ramp & Municipal Place
03/27/2024
Scenario 2 - Existing PM Job No. 1027_Monday Properties 4:43 pm 01/15/2024 2023 Existing
Synchro 12 Report
LO
Intersection
Int Delay, s/veh
3.8
Movement
EBL
EBT
EBR
WBL
WBT WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
Free
Free
Free
Free
Free
Free
Stop
Stop
Stop
Stop
Stop
Stop
RT Channelized
-
- None
-
- None
-
- None
-
- None
Storage Length
-
-
-
-
-
-
-
-
-
-
-
-
Veh in Median Storage, #
-
-
-
-
-
-
-
-
Grade, %
-
-
-
-
-
-
-
-
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Major1
Major2
Minor1
Conflicting Flow All
-
-
-
Stage 1
-
-
-
-
-
-
-
Stage 2
-
-
-
-
-
-
-
Critical Hdwy
4.1
-
-
-
-
-
7.02
6.5
6.96
Critical Hdwy Stg 1
-
-
-
-
-
-
6.02
5.5
-
Critical Hdwy Stg 2
-
-
-
-
-
-
6.02
5.5
-
Follow-up Hdwy
2.2
-
-
-
-
-
3.61
3.33
Pot Cap-1 Maneuver
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Platoon blocked, %
-
-
-
Mov Cap-1 Maneuver
-
-
-
-
-
Mov Cap-2 Maneuver
-
-
-
-
-
-
-
Stage 1
-
-
-
-
-
-
-
Stage 2
-
-
-
-
-
-
-
Approach
EB
WB
NB
HCM Control Delay, s/v 0.87
11.38
HCM LOS
B
Minor Lane/Major Mvmt
NBLn1
EBL
EBT
WBT WBR
Capacity (veh/h)
-
-
-
HCM Lane V/C Ratio
0.369 0.018
-
-
-
HCM Control Delay (s/veh)
11.4
8.4
0.1
-
-
HCM Lane LOS
B
A
A
-
-
HCM 95th %tile Q(veh)
1.7
0.1
-
-
-
HCM 7th TWSC
4: Site Driveway & Half Moon Bay Drive
03/27/2024
Scenario 2 - Existing PM Job No. 1027_Monday Properties 4:43 pm 01/15/2024 2023 Existing
Synchro 12 Report
LO
Intersection
Int Delay, s/veh
0.4
Movement
EBT
EBR
WBL
WBT
NBL
NBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
Free
Free
Free
Free
Stop
Stop
RT Channelized
- None
- None
- None
Storage Length
-
-
-
-
-
Veh in Median Storage, #
-
-
-
Grade, %
-
-
-
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Major1
Major2
Minor1
Conflicting Flow All
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Critical Hdwy
-
-
4.12
-
6.42
6.22
Critical Hdwy Stg 1
-
-
-
-
5.42
-
Critical Hdwy Stg 2
-
-
-
-
5.42
-
Follow-up Hdwy
-
- 2.218
- 3.518 3.318
Pot Cap-1 Maneuver
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Platoon blocked, %
-
-
-
Mov Cap-1 Maneuver
-
-
-
Mov Cap-2 Maneuver
-
-
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Approach
EB
WB
NB
HCM Control Delay, s/v
9.47
HCM LOS
A
Minor Lane/Major Mvmt
NBLn1
EBT
EBR
WBL
WBT
Capacity (veh/h)
-
-
-
HCM Lane V/C Ratio
0.011
-
-
-
-
HCM Control Delay (s/veh)
9.5
-
-
-
HCM Lane LOS
A
-
-
A
-
HCM 95th %tile Q(veh)
-
-
-
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
03/27/2024
Scenario 2 - Existing PM Job No. 1027_Monday Properties 4:43 pm 01/15/2024 2023 Existing
Synchro 12 Report
LO
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q, veh
Lane Width Adj.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Ped-Bike Adj (A_pbT)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Parking Bus Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Work Zone On Approach
No
No
No
No
Lanes Open During Work Zone
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Peak Hour Factor
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
Percent Heavy Veh, %
Opposing Right Turn Influence
Yes
Yes
Yes
Yes
Cap, veh/h
HCM Platoon Ratio
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Prop Arrive On Green
0.66
0.66
0.66
0.66
0.66
0.66
0.22
0.22
0.22
0.22
0.22
0.22
Unsig. Movement Delay
Ln Grp Delay, s/veh
6.9
0.0
6.0
6.9
0.0
0.0
36.0
0.0
0.0
32.3
0.0
0.0
Ln Grp LOS
A
A
A
D
C
Approach Vol, veh/h
Approach Delay, s/veh
6.6
6.9
36.0
32.3
Approach LOS
A
A
D
C
Timer:
Assigned Phs
Case No
8.0
7.0
8.0
8.0
Phs Duration (G+Y+Rc), s
25.2
64.8
25.2
64.8
Change Period (Y+Rc), s
5.0
5.0
5.0
5.0
Max Green (Gmax), s
40.0
40.0
40.0
40.0
Max Allow Headway (MAH), s
5.4
5.0
5.4
5.4
Max Q Clear (g_c+l1), s
18.6
8.6
13.1
9.4
Green Ext Time (g_e), s
1.6
2.9
1.4
2.4
Prob of Phs Call (p_c)
1.00
1.00
1.00
1.00
Prob of Max Out (p_x)
0.00
0.00
0.00
0.00
Left-Turn Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Through Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Right-Turn Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Left Lane Group Data
Assigned Mvmt
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
03/27/2024
Scenario 2 - Existing PM Job No. 1027_Monday Properties 4:43 pm 01/15/2024 2023 Existing
Synchro 12 Report
LO
Lane Assignment
L+T+R
L+T
L+T+R
L+T+R
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
5.5
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
16.6
0.0
6.6
0.0
11.1
0.0
7.4
Perm LT Sat Flow (s_l), veh/h/ln
Shared LT Sat Flow (s_sh), veh/h/ln
Perm LT Eff Green (g_p), s
0.0
20.2
0.0
59.8
0.0
20.2
0.0
59.8
Perm LT Serve Time (g_u), s
0.0
9.1
0.0
52.4
0.0
3.6
0.0
53.2
Perm LT Q Serve Time (g_ps), s
0.0
5.5
0.0
0.0
0.0
0.0
0.0
0.0
Time to First Blk (g_f), s
0.0
1.7
0.0
5.7
0.0
5.7
0.0
35.1
Serve Time pre Blk (g_fs), s
0.0
1.7
0.0
5.7
0.0
5.7
0.0
7.4
Prop LT Inside Lane (P_L)
0.00
0.43
0.00
0.26
0.00
0.21
0.00
0.04
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.72
0.00
0.30
0.00
0.55
0.00
0.29
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
Uniform Delay (d1), s/veh
0.0
33.5
0.0
6.2
0.0
31.2
0.0
6.3
Incr Delay (d2), s/veh
0.0
2.5
0.0
0.7
0.0
1.1
0.0
0.6
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
36.0
0.0
6.9
0.0
32.3
0.0
6.9
1st-Term Q (Q1), veh/ln
0.0
5.5
0.0
2.2
0.0
4.4
0.0
2.4
2nd-Term Q (Q2), veh/ln
0.0
0.3
0.0
0.2
0.0
0.1
0.0
0.2
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
5.8
0.0
2.4
0.0
4.5
0.0
2.6
%ile Storage Ratio (RQ%)
0.00
0.54
0.00
0.47
0.00
0.52
0.00
0.16
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Middle Lane Group Data
Assigned Mvmt
Lane Assignment
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Uniform Delay (d1), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Incr Delay (d2), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1st-Term Q (Q1), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
03/27/2024
Scenario 2 - Existing PM Job No. 1027_Monday Properties 4:43 pm 01/15/2024 2023 Existing
Synchro 12 Report
LO
2nd-Term Q (Q2), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Storage Ratio (RQ%)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Right Lane Group Data
Assigned Mvmt
Lane Assignment
R
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
0.0
0.0
3.4
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
0.0
0.0
3.4
0.0
0.0
0.0
0.0
Prot RT Sat Flow (s_R), veh/h/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Prot RT Eff Green (g_R), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Prop RT Outside Lane (P_R)
0.00
0.04
0.00
1.00
0.00
0.35
0.00
0.19
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.00
0.00
0.15
0.00
0.00
0.00
0.00
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
Uniform Delay (d1), s/veh
0.0
0.0
0.0
5.6
0.0
0.0
0.0
0.0
Incr Delay (d2), s/veh
0.0
0.0
0.0
0.3
0.0
0.0
0.0
0.0
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
0.0
0.0
6.0
0.0
0.0
0.0
0.0
1st-Term Q (Q1), veh/ln
0.0
0.0
0.0
1.0
0.0
0.0
0.0
0.0
2nd-Term Q (Q2), veh/ln
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
0.0
0.0
1.1
0.0
0.0
0.0
0.0
%ile Storage Ratio (RQ%)
0.00
0.00
0.00
0.21
0.00
0.00
0.00
0.00
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Intersection Summary
HCM 7th Control Delay, s/veh
17.1
HCM 7th LOS
B
HCM 7th AWSC
1: Croton Expy SB Ramp & Half Moon Bay Drive/Municipal Place
03/28/2024
Scenario 4 - No Build PM Job No. 1027_Monday Properties 12:00 am 01/17/2024 2026 No Build
Synchro 12 Report
LO
Intersection
Intersection Delay, s/veh
10.7
Intersection LOS
B
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
EB
WB
SB
Opposing Approach
WB
EB
Opposing Lanes
Conflicting Approach Left
SB
WB
Conflicting Lanes Left
Conflicting Approach Right
SB
EB
Conflicting Lanes Right
HCM Control Delay, s/veh
11.7
10.2
HCM LOS
A
B
B
Lane
EBLn1 WBLn1 WBLn2
SBLn1
Vol Left, %
0%
100%
0%
89%
Vol Thru, %
62%
0%
100%
2%
Vol Right, %
38%
0%
0%
10%
Sign Control
Stop
Stop
Stop
Stop
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
4a
Degree of Util (X)
0.194
0.424
0.109
0.264
Departure Headway (Hd)
4.742
5.633
5.233
5.273
Convergence, Y/N
Yes
Yes
Yes
Yes
Cap
Service Time
2.801
3.386
2.985
3.325
HCM Lane V/C Ratio
0.195
0.425
0.11
0.265
HCM Control Delay, s/veh
12.5
8.6
10.2
HCM Lane LOS
A
B
A
B
HCM 95th-tile Q
0.7
2.1
0.4
1.1
HCM 7th TWSC
2: Croton Expy NB Ramp & Municipal Place
03/28/2024
Scenario 4 - No Build PM Job No. 1027_Monday Properties 12:00 am 01/17/2024 2026 No Build
Synchro 12 Report
LO
Intersection
Int Delay, s/veh
Movement
EBL
EBT
EBR
WBL
WBT WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
Free
Free
Free
Free
Free
Free
Stop
Stop
Stop
Stop
Stop
Stop
RT Channelized
-
- None
-
- None
-
- None
-
- None
Storage Length
-
-
-
-
-
-
-
-
-
-
-
-
Veh in Median Storage, #
-
-
-
-
-
-
-
-
Grade, %
-
-
-
-
-
-
-
-
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Major1
Major2
Minor1
Conflicting Flow All
-
-
-
Stage 1
-
-
-
-
-
-
-
Stage 2
-
-
-
-
-
-
-
Critical Hdwy
4.1
-
-
-
-
-
7.02
6.5
6.96
Critical Hdwy Stg 1
-
-
-
-
-
-
6.02
5.5
-
Critical Hdwy Stg 2
-
-
-
-
-
-
6.02
5.5
-
Follow-up Hdwy
2.2
-
-
-
-
-
3.61
3.33
Pot Cap-1 Maneuver
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Platoon blocked, %
-
-
-
Mov Cap-1 Maneuver
-
-
-
-
-
Mov Cap-2 Maneuver
-
-
-
-
-
-
-
Stage 1
-
-
-
-
-
-
-
Stage 2
-
-
-
-
-
-
-
Approach
EB
WB
NB
HCM Control Delay, s/v 1.05
11.86
HCM LOS
B
Minor Lane/Major Mvmt
NBLn1
EBL
EBT
WBT WBR
Capacity (veh/h)
-
-
-
HCM Lane V/C Ratio
0.401 0.024
-
-
-
HCM Control Delay (s/veh)
11.9
8.5
0.2
-
-
HCM Lane LOS
B
A
A
-
-
HCM 95th %tile Q(veh)
0.1
-
-
-
HCM 7th TWSC
4: Site Driveway & Half Moon Bay Drive
03/28/2024
Scenario 4 - No Build PM Job No. 1027_Monday Properties 12:00 am 01/17/2024 2026 No Build
Synchro 12 Report
LO
Intersection
Int Delay, s/veh
1.4
Movement
EBT
EBR
WBL
WBT
NBL
NBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
Free
Free
Free
Free
Stop
Stop
RT Channelized
- None
- None
- None
Storage Length
-
-
-
-
-
Veh in Median Storage, #
-
-
-
Grade, %
-
-
-
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Major1
Major2
Minor1
Conflicting Flow All
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Critical Hdwy
-
-
4.12
-
6.42
6.22
Critical Hdwy Stg 1
-
-
-
-
5.42
-
Critical Hdwy Stg 2
-
-
-
-
5.42
-
Follow-up Hdwy
-
- 2.218
- 3.518 3.318
Pot Cap-1 Maneuver
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Platoon blocked, %
-
-
-
Mov Cap-1 Maneuver
-
-
-
Mov Cap-2 Maneuver
-
-
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Approach
EB
WB
NB
HCM Control Delay, s/v
9.67
HCM LOS
A
Minor Lane/Major Mvmt
NBLn1
EBT
EBR
WBL
WBT
Capacity (veh/h)
-
-
-
HCM Lane V/C Ratio
0.041
-
-
-
-
HCM Control Delay (s/veh)
9.7
-
-
-
HCM Lane LOS
A
-
-
A
-
HCM 95th %tile Q(veh)
0.1
-
-
-
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
03/28/2024
Scenario 4 - No Build PM Job No. 1027_Monday Properties 12:00 am 01/17/2024 2026 No Build
Synchro 12 Report
LO
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q, veh
Lane Width Adj.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Ped-Bike Adj (A_pbT)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Parking Bus Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Work Zone On Approach
No
No
No
No
Lanes Open During Work Zone
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Peak Hour Factor
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
Percent Heavy Veh, %
Opposing Right Turn Influence
Yes
Yes
Yes
Yes
Cap, veh/h
HCM Platoon Ratio
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Prop Arrive On Green
0.64
0.64
0.64
0.64
0.64
0.64
0.25
0.25
0.25
0.25
0.25
0.25
Unsig. Movement Delay
Ln Grp Delay, s/veh
7.9
0.0
6.8
8.0
0.0
0.0
35.1
0.0
0.0
31.1
0.0
0.0
Ln Grp LOS
A
A
A
D
C
Approach Vol, veh/h
Approach Delay, s/veh
7.5
8.0
35.1
31.1
Approach LOS
A
A
D
C
Timer:
Assigned Phs
Case No
8.0
7.0
8.0
8.0
Phs Duration (G+Y+Rc), s
27.1
62.9
27.1
62.9
Change Period (Y+Rc), s
5.0
5.0
5.0
5.0
Max Green (Gmax), s
40.0
40.0
40.0
40.0
Max Allow Headway (MAH), s
5.5
5.0
5.4
5.4
Max Q Clear (g_c+l1), s
20.4
9.6
14.1
10.4
Green Ext Time (g_e), s
1.8
3.1
1.6
2.5
Prob of Phs Call (p_c)
1.00
1.00
1.00
1.00
Prob of Max Out (p_x)
0.01
0.00
0.00
0.00
Left-Turn Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Through Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Right-Turn Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Left Lane Group Data
Assigned Mvmt
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
03/28/2024
Scenario 4 - No Build PM Job No. 1027_Monday Properties 12:00 am 01/17/2024 2026 No Build
Synchro 12 Report
LO
Lane Assignment
L+T+R
L+T
L+T+R
L+T+R
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
6.3
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
18.4
0.0
7.6
0.0
12.1
0.0
8.4
Perm LT Sat Flow (s_l), veh/h/ln
Shared LT Sat Flow (s_sh), veh/h/ln
Perm LT Eff Green (g_p), s
0.0
22.1
0.0
57.9
0.0
22.1
0.0
57.9
Perm LT Serve Time (g_u), s
0.0
10.1
0.0
49.4
0.0
3.8
0.0
50.3
Perm LT Q Serve Time (g_ps), s
0.0
6.3
0.0
0.0
0.0
0.0
0.0
0.0
Time to First Blk (g_f), s
0.0
1.9
0.0
5.8
0.0
6.0
0.0
34.2
Serve Time pre Blk (g_fs), s
0.0
1.9
0.0
5.8
0.0
6.0
0.0
8.4
Prop LT Inside Lane (P_L)
0.00
0.41
0.00
0.26
0.00
0.21
0.00
0.04
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.73
0.00
0.33
0.00
0.56
0.00
0.32
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
Uniform Delay (d1), s/veh
0.0
32.5
0.0
7.1
0.0
30.0
0.0
7.2
Incr Delay (d2), s/veh
0.0
2.6
0.0
0.8
0.0
1.1
0.0
0.7
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
35.1
0.0
7.9
0.0
31.1
0.0
8.0
1st-Term Q (Q1), veh/ln
0.0
6.0
0.0
2.6
0.0
4.7
0.0
2.8
2nd-Term Q (Q2), veh/ln
0.0
0.3
0.0
0.2
0.0
0.1
0.0
0.2
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
6.3
0.0
2.9
0.0
4.9
0.0
3.1
%ile Storage Ratio (RQ%)
0.00
0.59
0.00
0.55
0.00
0.55
0.00
0.19
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Middle Lane Group Data
Assigned Mvmt
Lane Assignment
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Uniform Delay (d1), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Incr Delay (d2), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1st-Term Q (Q1), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
03/28/2024
Scenario 4 - No Build PM Job No. 1027_Monday Properties 12:00 am 01/17/2024 2026 No Build
Synchro 12 Report
LO
2nd-Term Q (Q2), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Storage Ratio (RQ%)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Right Lane Group Data
Assigned Mvmt
Lane Assignment
R
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
0.0
0.0
3.8
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
0.0
0.0
3.8
0.0
0.0
0.0
0.0
Prot RT Sat Flow (s_R), veh/h/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Prot RT Eff Green (g_R), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Prop RT Outside Lane (P_R)
0.00
0.04
0.00
1.00
0.00
0.33
0.00
0.19
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.00
0.00
0.16
0.00
0.00
0.00
0.00
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
Uniform Delay (d1), s/veh
0.0
0.0
0.0
6.4
0.0
0.0
0.0
0.0
Incr Delay (d2), s/veh
0.0
0.0
0.0
0.3
0.0
0.0
0.0
0.0
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
0.0
0.0
6.8
0.0
0.0
0.0
0.0
1st-Term Q (Q1), veh/ln
0.0
0.0
0.0
1.1
0.0
0.0
0.0
0.0
2nd-Term Q (Q2), veh/ln
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
0.0
0.0
1.2
0.0
0.0
0.0
0.0
%ile Storage Ratio (RQ%)
0.00
0.00
0.00
0.23
0.00
0.00
0.00
0.00
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Intersection Summary
HCM 7th Control Delay, s/veh
17.5
HCM 7th LOS
B
HCM 7th AWSC
1: Croton Expy SB Ramp & Half Moon Bay Drive/Municipal Place
06/13/2024
Scenario 6 - Build PM Job No. 1027_Monday Properties 5:39 pm 01/16/2024 2026 Build
Synchro 12 Report
LO
Intersection
Intersection Delay, s/veh
10.8
Intersection LOS
B
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
EB
WB
SB
Opposing Approach
WB
EB
Opposing Lanes
Conflicting Approach Left
SB
WB
Conflicting Lanes Left
Conflicting Approach Right
SB
EB
Conflicting Lanes Right
HCM Control Delay, s/veh
9.2
11.6
10.5
HCM LOS
A
B
B
Lane
EBLn1 WBLn1 WBLn2
SBLn1
Vol Left, %
0%
100%
0%
84%
Vol Thru, %
59%
0%
100%
2%
Vol Right, %
41%
0%
0%
14%
Sign Control
Stop
Stop
Stop
Stop
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
4a
Degree of Util (X)
0.215
0.428
0.19
0.282
Departure Headway (Hd)
4.8
5.678
5.277
5.353
Convergence, Y/N
Yes
Yes
Yes
Yes
Cap
Service Time
2.869
3.44
3.039
3.414
HCM Lane V/C Ratio
0.217
0.429
0.192
0.284
HCM Control Delay, s/veh
9.2
12.7
9.3
10.5
HCM Lane LOS
A
B
A
B
HCM 95th-tile Q
0.8
2.1
0.7
1.2
HCM 7th TWSC
2: Croton Expy NB Ramp & Municipal Place
06/13/2024
Scenario 6 - Build PM Job No. 1027_Monday Properties 5:39 pm 01/16/2024 2026 Build
Synchro 12 Report
LO
Intersection
Int Delay, s/veh
4.9
Movement
EBL
EBT
EBR
WBL
WBT WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
Free
Free
Free
Free
Free
Free
Stop
Stop
Stop
Stop
Stop
Stop
RT Channelized
-
- None
-
- None
-
- None
-
- None
Storage Length
-
-
-
-
-
-
-
-
-
-
-
-
Veh in Median Storage, #
-
-
-
-
-
-
-
-
Grade, %
-
-
-
-
-
-
-
-
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Major1
Major2
Minor1
Conflicting Flow All
-
-
-
Stage 1
-
-
-
-
-
-
-
Stage 2
-
-
-
-
-
-
-
Critical Hdwy
4.1
-
-
-
-
-
7.02
6.5
6.96
Critical Hdwy Stg 1
-
-
-
-
-
-
6.02
5.5
-
Critical Hdwy Stg 2
-
-
-
-
-
-
6.02
5.5
-
Follow-up Hdwy
2.2
-
-
-
-
-
3.61
3.33
Pot Cap-1 Maneuver
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Platoon blocked, %
-
-
-
Mov Cap-1 Maneuver
-
-
-
-
-
Mov Cap-2 Maneuver
-
-
-
-
-
-
-
Stage 1
-
-
-
-
-
-
-
Stage 2
-
-
-
-
-
-
-
Approach
EB
WB
NB
HCM Control Delay, s/v 1.09
13.73
HCM LOS
B
Minor Lane/Major Mvmt
NBLn1
EBL
EBT
WBT WBR
Capacity (veh/h)
-
-
-
HCM Lane V/C Ratio
0.492 0.025
-
-
-
HCM Control Delay (s/veh)
13.7
8.5
0.2
-
-
HCM Lane LOS
B
A
A
-
-
HCM 95th %tile Q(veh)
2.8
0.1
-
-
-
HCM 7th TWSC
4: Site Driveway
06/13/2024
Scenario 6 - Build PM Job No. 1027_Monday Properties 5:39 pm 01/16/2024 2026 Build
Synchro 12 Report
LO
Intersection
Int Delay, s/veh
1.5
Movement
EBT
EBR
WBL
WBT
NBL
NBR
Lane Configurations
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
Free
Free
Free
Free
Stop
Stop
RT Channelized
- None
- None
- None
Storage Length
-
-
-
-
-
Veh in Median Storage, #
-
-
-
Grade, %
-
-
-
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Major1
Major2
Minor1
Conflicting Flow All
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Critical Hdwy
-
-
4.12
-
6.42
6.22
Critical Hdwy Stg 1
-
-
-
-
5.42
-
Critical Hdwy Stg 2
-
-
-
-
5.42
-
Follow-up Hdwy
-
- 2.218
- 3.518 3.318
Pot Cap-1 Maneuver
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Platoon blocked, %
-
-
-
Mov Cap-1 Maneuver
-
-
-
Mov Cap-2 Maneuver
-
-
-
-
-
Stage 1
-
-
-
-
-
Stage 2
-
-
-
-
-
Approach
EB
WB
NB
HCM Control Delay, s/v
9.95
HCM LOS
A
Minor Lane/Major Mvmt
NBLn1
EBT
EBR
WBL
WBT
Capacity (veh/h)
-
-
-
HCM Lane V/C Ratio
0.059
-
-
-
-
HCM Control Delay (s/veh)
-
-
-
HCM Lane LOS
A
-
-
A
-
HCM 95th %tile Q(veh)
0.2
-
-
-
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
06/13/2024
Scenario 6 - Build PM Job No. 1027_Monday Properties 5:39 pm 01/16/2024 2026 Build
Synchro 12 Report
LO
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q, veh
Lane Width Adj.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Ped-Bike Adj (A_pbT)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Parking Bus Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Work Zone On Approach
No
No
No
No
Lanes Open During Work Zone
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Peak Hour Factor
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
Percent Heavy Veh, %
Opposing Right Turn Influence
Yes
Yes
Yes
Yes
Cap, veh/h
HCM Platoon Ratio
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Prop Arrive On Green
0.64
0.64
0.64
0.64
0.64
0.64
0.25
0.25
0.25
0.25
0.25
0.25
Unsig. Movement Delay
Ln Grp Delay, s/veh
7.9
0.0
6.8
8.0
0.0
0.0
35.1
0.0
0.0
31.1
0.0
0.0
Ln Grp LOS
A
A
A
D
C
Approach Vol, veh/h
Approach Delay, s/veh
7.6
8.0
35.1
31.1
Approach LOS
A
A
D
C
Timer:
Assigned Phs
Case No
8.0
7.0
8.0
8.0
Phs Duration (G+Y+Rc), s
27.1
62.9
27.1
62.9
Change Period (Y+Rc), s
5.0
5.0
5.0
5.0
Max Green (Gmax), s
40.0
40.0
40.0
40.0
Max Allow Headway (MAH), s
5.5
5.0
5.4
5.4
Max Q Clear (g_c+l1), s
20.4
9.6
14.1
10.6
Green Ext Time (g_e), s
1.8
3.1
1.6
2.6
Prob of Phs Call (p_c)
1.00
1.00
1.00
1.00
Prob of Max Out (p_x)
0.01
0.00
0.00
0.00
Left-Turn Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Through Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Right-Turn Movement Data
Assigned Mvmt
Mvmt Sat Flow, veh/h
Left Lane Group Data
Assigned Mvmt
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
06/13/2024
Scenario 6 - Build PM Job No. 1027_Monday Properties 5:39 pm 01/16/2024 2026 Build
Synchro 12 Report
LO
Lane Assignment
L+T+R
L+T
L+T+R
L+T+R
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
6.3
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
18.4
0.0
7.6
0.0
12.1
0.0
8.6
Perm LT Sat Flow (s_l), veh/h/ln
Shared LT Sat Flow (s_sh), veh/h/ln
Perm LT Eff Green (g_p), s
0.0
22.1
0.0
57.9
0.0
22.1
0.0
57.9
Perm LT Serve Time (g_u), s
0.0
10.1
0.0
49.2
0.0
3.8
0.0
50.3
Perm LT Q Serve Time (g_ps), s
0.0
6.3
0.0
0.0
0.0
0.0
0.0
0.0
Time to First Blk (g_f), s
0.0
1.9
0.0
5.8
0.0
6.0
0.0
34.5
Serve Time pre Blk (g_fs), s
0.0
1.9
0.0
5.8
0.0
6.0
0.0
8.6
Prop LT Inside Lane (P_L)
0.00
0.41
0.00
0.25
0.00
0.21
0.00
0.04
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.73
0.00
0.33
0.00
0.56
0.00
0.32
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
Uniform Delay (d1), s/veh
0.0
32.5
0.0
7.1
0.0
30.0
0.0
7.3
Incr Delay (d2), s/veh
0.0
2.6
0.0
0.8
0.0
1.1
0.0
0.7
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
35.1
0.0
7.9
0.0
31.1
0.0
8.0
1st-Term Q (Q1), veh/ln
0.0
6.0
0.0
2.6
0.0
4.7
0.0
2.9
2nd-Term Q (Q2), veh/ln
0.0
0.3
0.0
0.2
0.0
0.1
0.0
0.2
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
6.3
0.0
2.9
0.0
4.9
0.0
3.1
%ile Storage Ratio (RQ%)
0.00
0.59
0.00
0.55
0.00
0.59
0.00
0.20
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Middle Lane Group Data
Assigned Mvmt
Lane Assignment
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Uniform Delay (d1), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Incr Delay (d2), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1st-Term Q (Q1), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
HCM 7th Signalized Intersection Capacity Analysis
3: S Riverside Ave & Municipal Place
06/13/2024
Scenario 6 - Build PM Job No. 1027_Monday Properties 5:39 pm 01/16/2024 2026 Build
Synchro 12 Report
LO
2nd-Term Q (Q2), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Storage Ratio (RQ%)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Right Lane Group Data
Assigned Mvmt
Lane Assignment
R
Lanes in Grp
Grp Vol (v), veh/h
Grp Sat Flow (s), veh/h/ln
Q Serve Time (g_s), s
0.0
0.0
0.0
3.8
0.0
0.0
0.0
0.0
Cycle Q Clear Time (g_c), s
0.0
0.0
0.0
3.8
0.0
0.0
0.0
0.0
Prot RT Sat Flow (s_R), veh/h/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Prot RT Eff Green (g_R), s
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Prop RT Outside Lane (P_R)
0.00
0.04
0.00
1.00
0.00
0.33
0.00
0.19
Lane Grp Cap (c), veh/h
V/C Ratio (X)
0.00
0.00
0.00
0.16
0.00
0.00
0.00
0.00
Avail Cap (c_a), veh/h
Upstream Filter (I)
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
Uniform Delay (d1), s/veh
0.0
0.0
0.0
6.4
0.0
0.0
0.0
0.0
Incr Delay (d2), s/veh
0.0
0.0
0.0
0.3
0.0
0.0
0.0
0.0
Initial Q Delay (d3), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Control Delay (d), s/veh
0.0
0.0
0.0
6.8
0.0
0.0
0.0
0.0
1st-Term Q (Q1), veh/ln
0.0
0.0
0.0
1.1
0.0
0.0
0.0
0.0
2nd-Term Q (Q2), veh/ln
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
3rd-Term Q (Q3), veh/ln
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back of Q Factor (f_B%)
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
%ile Back of Q (50%), veh/ln
0.0
0.0
0.0
1.2
0.0
0.0
0.0
0.0
%ile Storage Ratio (RQ%)
0.00
0.00
0.00
0.23
0.00
0.00
0.00
0.00
Initial Q (Qb), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Final (Residual) Q (Qe), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Delay (ds), s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Q (Qs), veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sat Cap (cs), veh/h
Initial Q Clear Time (tc), h
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Intersection Summary
HCM 7th Control Delay, s/veh
17.4
HCM 7th LOS
B
APPENDIX E
ACCIDENT DATA
CRASH
NUMBER CASE NUMBER CASE YEAR
ACCD DATE
ACCD TIME
ON STREET
CLOSEST CROSS STREET
INTERSECTION INDICATOR
ACCIDENT TYPE
COLLISION TYPE
SEVERITY
NUMBER OF
INJURIES
NUMBER OF
SERIOUS
INJURIES
NUMBER OF
FATALITIES
NUMBER OF
VEHICLES
APPARENT CONTRIBUTING FACTOR
TRAFFIC
CONTROL
LIGHT CONDITION
WEATHER
ROAD
SURFACE
CONDITION
2020-09-03T00:00:00 1:58 PM
MUNICIPAL PL
S RIVERSIDE AVE
AT-INTERSECTION
COLLISION WITH MOTOR VEHICLE
OVERTAKING
PROPERTY DAMAGE 0
V1:(NOT APPLICABLE,NOT APPLICABLE) / V2:(UNSAFE LANE CHANGE,UNKNOWN)
TRAFFIC SIGNAL
DAYLIGHT
CLEAR
DRY
2021-01-08T00:00:00 5:55 PM
[Route] 9
Not an intersection crash
COLLISION WITH MOTOR VEHICLE
RIGHT ANGLE
PROPERTY DAMAGE 0
V1:(UNKNOWN,UNKNOWN) / V2:(NOT ENTERED,NOT ENTERED)
STOP SIGN
DARK-ROAD LIGHTED
CLEAR
DRY
2023-03-05T00:00:00 3:48 PM
MUNICIPAL PLACE UNITED STATES ROUTE 9
Not an intersection crash
COLLISION WITH MOTOR VEHICLE
LEFT TURN (AGAINST OTHER CAR) PROPERTY DAMAGE 0
V1:(UNKNOWN,NOT ENTERED) / V2:(NOT ENTERED,NOT ENTERED)
STOP SIGN
DAYLIGHT
CLEAR
DRY
2023-06-01T00:00:00 12:48 PM
MUNICIPAL PLACE SOUTH RIVERSIDE AVENUE
AT-INTERSECTION
COLLISION WITH MOTOR VEHICLE
OTHER
INJURY
V1:(TRAFFIC CONTROL DEVICES DISREGARDED,NOT APPLICABLE) / V2:(NOT APPLICABLE,NOT APPLICABLE) / V3:(NOT APPLICABLE,NOT APPLICABLE)
TRAFFIC SIGNAL
DAYLIGHT
CLEAR
DRY
2023-06-22T00:00:00 9:25 PM
MUNICIPAL PLACE RAMP
AT-INTERSECTION
COLLISION WITH MOTOR VEHICLE
RIGHT ANGLE
INJURY
V1:(FAILURE TO YIELD RIGHT OF WAY,NOT APPLICABLE) / V2:(UNSAFE SPEED,NOT APPLICABLE)
STOP SIGN
DARK-ROAD UNLIGHTED
CLEAR
DRY
1027 - Monday Properties Croton-on-Hudson 3 Intersection Accident Data
Machine-extracted for search and reference — the original PDF is the authoritative version.