1 Half Moon Bay Drive Jul 18 FINAL
correspondence
39 pages
Meeting: portal event 969 (no meeting page on file)
Agenda item: Presentation from 1 HMB Property Owner LLC regarding their zoning petition to permit multifamily housing at 1 Half Moon Bay Drive.
Correspondence, 39 pages. Attached to agenda item: “Presentation from 1 HMB Property Owner LLC regarding their zoning petition to permit multifamily housing at 1 Half Moon Bay Drive.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
.01 1 Half Moon Bay Drive - Cover Letter
.02 1 Half Moon Bay Drive - Petition for Zoning Text Amendment
Exhibit A - Location Map
Exhibit B - Aerial Map
Exhibit C - Zoning Map
Exhibit D - Local Law 14 of 2022
Exhibit E - EAF
Exhibit F - Coastal Assessment Form
Exhibit G - Public School Children Analysis
Exhibit H - Economic and Fiscal Impacts Assessment
Exhibit I - Traffic Impact Study
Exhibit J - Local Law
Extracted text
1 HALF MOON BAY DRIVE | PRESENTATION 2024
Confidential Information Subject to Change
AGENDA | 2
Introductions
2 Current Site
3 Village Goals
4 Proposed Development
5 Renderings
6 Professional Studies
Confidential Information Subject to Change
EXISTING CONDITIONS | 3
Approximately 120,000-SF Tire Warehouse Logistics Center
> Built in 1974
> No storm water management
> Roughly 90% impervious surface
(concrete and building)
> Metal building for tire storage
and logistics
> Maximum building height – 31’
> 543’ building length
> 5.66 AC
Confidential Information Subject to Change
Confidential Information Subject to Change
CURRENT SITE PHOTOS | 4
Confidential Information Subject to Change
CURRENT SITE PHOTOS | 5
RAIL
RAIL STORAGE
HIGHWAY
RAIL STORAGE
> No direct residential or commercial
neighbors
> The property is surrounded by
transportation and industrial uses:
Route 9, the MTA rail, and
a property used for rail storage
> Surrounded by dense, mature trees
which create natural sound and
view barriers
SITE SURROUNDINGS | 6
Confidential Information Subject to Change
> Walking distance to Municipal Place retail areas
> Walking distance to Maple Avenue and Municipal
Place Bus Station
> Directly adjacent to Senasqua Tunnel for easy
Riverwalk access
> Public sidewalks and bike path
> Excellent proximity to the Croton Harmon Train
Station
> Directly off Route 9
> No community or environmental benefits as is
> Serviced by existing public utilities
CONNECTIVITY / ACCESSIBILITY | 7
Confidential Information Subject to Change
> Enhance and unify the functionality of the two commercial
areas1
> The Village recognizes the visibility of the sites in the
Municipal Place Gateway and has a desire to use the area as a
way to establish a good image for the area
> Improve walkability and aesthetics1
> Look to unify the Municipal Place Gateway area as the “center”
for the village, promoting streetscape improvements, and
overall design improvements
> Determine potential for residential uses1
> A significant concern of many residents and village employees
is that they are being priced out of their own community due to
increasing housing prices
> Examine ways to encourage multi-family dwellings in order to
maintain the demographic diversity of the Village2
1. Municipal Place Gateway and North Riverside Neighborhood Zoning Study, conducted in 2018
2. 2003 Comprehensive Plan and stated again in the 2017 update
VILLAGE GOALS | 8
Confidential Information Subject to Change
> Multifamily housing represents only 1.9% of land usage,
highlighting a significant gap in housing diversity.
> Only 90 new housing units added to the Village of Croton
since 2010.
> Single Family Housing Challenges:
> Typically requires purchase, becoming less accessible as prices
and interest rates rise.
> Residents are increasingly priced out, creating a demand for more
affordable options.
> Multifamily Housing Advantages:
> Provides rental opportunities, offering flexibility and affordability.
> Can meet the needs of various demographic groups, from young
professionals to smaller families.
> Economic and Community Benefits:
> Introducing multifamily housing can elevate property values in the
vicinity by improving and diversifying land use.
> The village retains over 32% of land dedicated to open space,
preserving the quality of life and recreational options for all residents.
Land Use
Acres
Percent
Single Family Residential
1032.8
34.7%
Two/Three Family
37.7
1.3%
Multifamily
56.6
1.9%
Commercial/Retail
41.0
1.4%
Office
5.7
0.2%
Industrial and warehouses
14.7
0.5%
Mixed-use
8.1
0.3%
Institutional
118.6
4.0%
Open Space and Recreation
959.3
32.2%
Vacant/Undeveloped
129.3
4.3%
Transportation, Communication
and Utilities
244.4
8.3%
Rights of Way
330.0
11.1%
Total
2978.2
100.0%
Source: Westchester County GIS, BFJ Planning
LACK OF HOUSING DIVERSITY | 9
Confidential Information Subject to Change
ZONING PETITION REQUESTS | 10
> Amendment to section 230-18(C)(9) of the zoning code to allow transit-oriented
development in the Light Industrial LI District on properties with frontage on Half
Moon Bay Drive and within 1 mile of the Metro-North Croton-Harmon Train Station
> Amendment to section 230-37(B) of the zoning code to permit a small portion of the
building reaching a 6-story building height, which will not exceed 5% of the total
habitable floor area at the property
> Amendment to 230-37(B) of the zoning code to allow for a 3-bedroom unit type
Confidential Information Subject to Change
PROPOSED SITE PLAN | 11
PROJECT DATA
Site Area:
5.65 Acres (Approx. 246,381 SF)
Zoning District:
L1 - Light Industrial
Max FAR:
1.2 = 295,657 GSF Residential
Proposed FAR: 1.2 = 294,804 GFA (HSF + Lobby + Amenity)
Building Height:
Approx. 58 ft (69 ft portion)
RESIDENTIAL AREA
Corridor / Mech / Stairs:
47,991 SF
Leasable Unit Area (HSF):
276,225 SF
Lobby / Leasing
5,043 SF
Amenity:
13,536 SF
FAR SF:
294,804 SF (Leasable HSF + Lobby + Amenity)
TOTAL GROSS RESIDENTIAL AREA 342,795 GRSF
Average Unit Size:
994 HSF @ 80% eff.
Affordable Unit Count (AFFH):
28 @ 60% AMI
Total Market Rate:
Total Number of Units:
PARKING CALCULATIONS
Parking Ratio:
1.52
Structured Parking Spaces:
Surface Parking Spaces:
Total Parking Spaces:
PROPOSED UNIT MIX
Studio
1 Bedroom
2 Bedrooms
3 Bedrooms
Total
4.29%
46.07%
43.93%
5.71%
100.0%
Confidential Information Subject to Change
TRAIN TRACKS
LOCAL ROADS
LOCAL HIGHWAY
HUDSON RIVER
SITE LAYOUT CONSIDERATIONS IN CONTEXT | 12
1 > Historical Significance
2 > Geometric Influence
3 > Focal Node
4 > Maximize Views
5 > Respectful Integration
Confidential Information Subject to Change
Half Moon Bay Dr
Route 9 Highway
VIEWS
SITE LAYOUT BENEFITS | 13
Railway geometry and our design
is anchored through a central
spine that allows elements to
split off and become their own
fingers reaching out towards the
industrial railway and riverfront.
Confidential Information Subject to Change
MATERIALITY INSPIRATION | 14
e
Confidential Information Subject to Change
SOUTHEAST CORNER – ENTRANCE VIEW | 15
CONCEPT FOR DISCUSSION
Confidential Information Subject to Change
ELEVATED OUTDOOR AMENITIES | 16
Confidential Information Subject to Change
CONTEXT AERIAL (Photo taken fall 2023) | 17
Existing mature trees taller
than proposed building
Trees block majority of
building from Riverwalk
Confidential Information Subject to Change
CONTEXT AERIAL (Photo taken fall 2023) | 18
Confidential Information Subject to Change
CONTEXT AERIAL (Photo taken fall 2023) | 19
Existing mature trees taller
than proposed building
Confidential Information Subject to Change
HUDSON VIEWSHED DIAGRAM | 20
The Hudson River viewshed
extends beyond 3.5 miles,
ensuring that all residents
retain views of the Hudson
River. This is largely due to the
area’s steep topography and
dense tree coverage.
RIDGE ROAD VIEWPOINT
HUDSON RIVER
CURRENT HUDSON RIVER VIEW
CURRENT WAREHOUSE
CURRENT HUDSON RIVER VIEWSHED
RIDGE ROAD VIEWPOINT
CURRENT WAREHOUSE
HUDSON RIVER
HUDSON RIVER VIEWSHED
Confidential Information Subject to Change
VIEWSHED SITE SELECTION | 21
Dense trees run along the hillside, Route 9, and Half Moon Bay Drive.
Our proposed building is lower than the dense trees, therefore not affecting private viewsheds.
RIDGE ROAD
SIGHT LINE
EXISTING BUILDING
ROUTE 9
HALF MOON BAY DR
PROPERTY LINE
PROPERTY LINE
RAIL WAY
HIKE/BIKE TRAIL
INTERNAL DRIVEWAY
RIVER BANK
ELLIOTT WAY
ROUTE 9
SIGHT LINE
RIDGE ROAD
ROUTE 9
ROUTE 9
HALF MOON BAY DR
P PROPERTY LINE
INTERNAL DRIVEWAY
PROPERTY LINE
RAILWAY
ELLIOTT WAY
HIKE/BIKE TRAIL
RIVER BANK
SITE LINE
SITE LINE
Ridge Road to Hudson River
Approx. 0.3 Miles
Hudson River
Approx. 3.4 Miles to Hudson
River Greenway Trailhead
Confidential Information Subject to Change
9 minutes
20 minutes
3 minutes
1.1 miles to Croton
Harmon Train Station
TRANSIT-ORIENTED DEVELOPMENT INITIATIVES | 22
Confidential Information Subject to Change
The Goal of Transit-Oriented Development (TOD) is to create
sustainable, vibrant, and walkable communities that maximize
access to public transportation while reducing reliance on personal
vehicles. The 8 principles of TOD are walk, cycle, connect, transit,
mix, densify, compact and shift.
> Uninterrupted sidewalks and pedestrian- & bike-friendly pathways
promote walking throughout the village to shops, services, recreational
areas, and transport hubs.
> Secure bike storage, mechanical area, and extensive bike lanes
encourage non-motorized transport.
> Close proximity to Maple Ave. & Municipal Place bus stop (0.2 miles)
allows for convenient local and county-wide transportation.
> The MTA Station is just 1 mile away, accessible by a 20-minute walk,
9-minute bike ride, or 3-minute shuttle.
> Our proposed shuttle provides a convenient option that eases and
promotes the use of the Croton Train Station.
> Residential development with a variety of unit types and amenities,
including 10% AFFH affordable housing, supports diverse
activities and demographics.
> Pedestrian, cyclist and shuttle infrastructure reduces car dependency
with easy access to public transit.
> Direct access to the Senasqua tunnel allows quick access to the
Riverwalk, enhancing recreational opportunities and connectivity.
Impact Type
Jobs
Wages
Output
Direct Effect
$69,186,045
$115,519,566
Total Effect
1,124
$85,532,527
$159,237,607
Multiplier
1.23
$1.24
$1.38
Source: 2024 Minnesota IMPLAN Group, Inc.
Table 1: Two-Year Construction Impact Study
Impact
Employment
Labor Income
Output
Total
$9,999,327
$26,956,898
Source: 2024 Minnesota IMPLAN Group, Inc., Urbanomics
Table 2: Annual Operations Impact Summary 2030 & Thereafter
> 1 Half Moon Bay Project would generate a total of $159.2 million of economic
activity to Westchester County over the two-year construction period.
> For every dollar spent on construction, another $0.38 will be spent on
goods and services supporting the construction work and workers.
> 280 new units will generate $27.0 million in economic activity in
Westchester County each year.
> The Fiscal benefits of the redevelopment will include adding $83.0 million in
market value to the property.
> Economic tax breakdown – Total estimated taxes – $2.5M
> Village – Approx $798,000
> County/Town – Approx $228,000
> School District – Approx $1.5M
> Represents a net increase of $2.4M
ECONOMIC IMPACT STUDY | 23
Table 12: Base Year Property Tax Impacts
Current Conditions*
Proposed Action**
Net Gain from Proposed Action
Village
Town/County
School District
Village
Town/County
School District
Village
Town/County
School District
Market Value
$7,327,532
$90,732,997
$83,405,465
Assessed Value
$ 231,550
$ 92,025
$ 92,025
$ 2,867,163
$ 1,139,606
$ 1,139,606
$ 2,635,613
$ 1,047,581
$ 1,047,581
Taxable Value
$ 231,550
$ 92,025
$ 92,025
$ 2,867,163
$ 1,139,606
$ 1,139,606
$ 2,635,613
$ 1,047,581
$ 1,047,581
Tax Rate
278.43
200.69
1322.39
278.43
200.69
1322.39
278.43
200.69
1322.39
Estimated Taxes
$ 64,472
$ 18,468
$ 121,693
$ 798,318
$ 228,708
$ 1,507,004
$ 733,847
$ 210,239
$ 1,385,311
Sources: Village of Croton-on-Hudson Tax Bill 2023-2024, 2023 School District Tax Bill Detail Report, Urbanomics.
Notes: (*): Market, assessed, taxable value, and tax generation drawn from FY 2023-2024 tax bills. (**): Market, assessed, taxable value, and tax generation drawn from FY 2028-2029 estimates.
Confidential Information Subject to Change
SCHOOL DISTRICT ANALYSIS | 24
> 1 Half Moon Bay Project would result in the addition of
an estimated 15‐17 additional public school students and
would not result in negative impacts to school
enrollment.
> The project will have a fiscal benefit to the School District
through the generation of additional tax dollars to be paid
to the School District well in excess of the additional
cost to educate the estimated 15‐17 additional students.
> In summary, the proposed 1 Half Moon Bay project will
not have a significant impact on the School District.
> School District Taxes
> Approx $1.5M goes to school district
> Estimated cost to educate 17 kids –
$473,000-$503,000
> Net Benefit – $1M - $1.1M
School Year
Enrollment
Change from Previous Year
Total
Percent
2013-14
1,701
—
—
2014-15
1,656
-45
-2.6%
2015-16
1,636
-20
-1.2%
2016-17
1,637
0.1%
2017-18
1,608
-29
-1.8%
2018-19
1,573
-35
-2.2%
2019-20
1,584
0.7%
2020-21
1,524
-60
-3.8%
2021-22
1,533
0.6%
2022-23
1,525
-8
-0.5%
Change 2013-14 to 2022-23
-176
-10.3%
Source: New York State Education Dept.
Table 9: Croton-Harmon Union Free School District Enrollment
New York State Births, 1999-2019*
Westchester County Births, 1999-2019*
Births
270,000
260,000
250,000
240,000
230,000
220,000
210,000
19*
Year
* 2019 birth data is provisional
Births
14,000
13,000
12,000
11,000
10,000
9,000
19*
Year
* 2019 County birth data is provisional
Confidential Information Subject to Change
TRAFFIC ANALYSIS | 25
> Nominal increase in traffic when compared to
existing use.
> Proposed site to be served by two driveways with
additional emergency access only driveway
> All levels of service and vehicle delays maintained
between No-build and Build conditions.
> No significant traffic impacts on surrounding
roadway network.
AM Peak Hr PM Peak Hr
Land Use (code)
Size
Unit
Enter
Exit
Enter
Exit
Existing
Warehouse (150)
119,000
SF
Development
Proposed
Multifamily Housing (150)
Dwelling
Development
(Mid-rise) (221)
Difference (Passenger Vehicles)
-4
Note: Trip Generation rates based upon Institute of Transportation Engineers’ (ITE) “Trip Generation Manual”,
11th Edition
Table 2.1: Trip Generation Table - ITE 11th Edition
Peak Weekday Hour Peak Weekday Hour
No-Build
Build
No-Build
Build
LOS
LOS
LOS
LOS
Intersection
Delay
Delay
Delay
Delay
Croton Expressway Southbound
c
c
b
b
Ramp & Municipal Place
18.6
19.4
12.5
12.7
Croton Expressway Northbound
b
b
b
b
Ramp & Municipal Place
11.4
11.5
11.9
13.7
South Riverside Avenue &
B
B
B
B
Municipal Place
17.7
17.6
17.5
17.4
Half Moon Bay Drive & Site
a
a
a
a
Driveway
9.2
9.6
9.7
10.0
Note: Average delay is represented in seconds per vehicle.
Lowercase letters represent an unsignalized intersection.
Delay of unsignalized intersections is reported as the highest delayed approach.
Table 1.1: Overall Level of Service Summary
Confidential Information Subject to Change
SUSTAINABILITY | 26
STORMWATER MANAGEMENT
BEST PRACTICES
> Significant reduction in impervious coverage
> Almost 20% reduction
> Over ¾ of an acre reduction
> Significant reduction in stormwater runoff
> Upgraded stormwater management techniques
> Low impact development best practices to create
functional and appealing site drainage, including:
– Rain gardens
– Infiltration trenches
– Bioretention
Confidential Information Subject to Change
GREEN BUILDING INITIATIVES
a Energy Star Certification
a STC / Energy Efficient Windows
a Solar Canopies
a Heat Pumps Insulate Fresh Air
a Greenhouse in Resident Amenity Spaces
a Shuttle Service
a Low Flow Plumbing Features
a Low VOC Materials
a Dark Sky Compliant Lighting
a EV Chargers
a Bike Storage
OTHER COMMUNITY BENEFITS | 27
> Senasqua Tunnel
> Essential Access Point:
The Senasqua Tunnel is a crucial connector to the Riverwalk.
> Current Condition Concerns:
Recent photos reveal deterioration of the tunnel as well as
surrounding walkway.
> Graffiti Issue:
The tunnel frequently suffers from graffiti vandalism.
> Dog Park
> Public Bark Park
> Community Meeting Space
> Public Meeting Areas
Confidential Information Subject to Change
PROJECT BENEFITS FOR THE VILLAGE | 28
Economy stimulus for
local stores,
restaurants, and other
retail establishments
Positive fiscal impact
for schools
Increase overall housing
and choice of housing
Beautify the waterfront –
2 of the 3 connections to
the Riverwalk are next to
the property
Beautify the walkway
and the surrounding area
to the tunnel
Replace tire logistics use
State-of-the-art
stormwater management
system will improve
terrestrial runoff
Confidential Information Subject to Change
Sustainability
Best Practices
EV
CONCEPT APPROVAL TIMELINE & PROJECT SCHEDULE | 29
Confidential Information Subject to Change
Q3 2024
Q4
Q1 2025
Q2
Q3
Q4
Q1 2026
Q2
Q3
Q4
Q1 2027
Q2
Q3
Q4
Q1 2028
Q2
Q3
Q4
Q1 2029
Q2
Q3
Q4
CONSTRUCTION
FINAL DESIGN/
PERMITTING/
CONSTRUCTION
PRICING
SITE PLAN/
SPECIAL
PERMIT
APPROVAL
ZONING
PETITION/
SEQRA
LEASE-UP
Base Building
Substantial Completion
Full Occupancy
Ground Breaking
| 30
> Q&A
Confidential Information Subject to Change
| 31
> APPENDIX
Confidential Information Subject to Change
GROUND LEVEL • PARKING | 32
139 SURACE PARKING SPACES
LOBBY /
LEASING
10' DRAINAGE EASEMENT
287 STRUCTURED PARKING SPACES
SERVICE AREA
SERVICE
AREA
LOADING
AREA
MEP
DROP OFF
MEP
MEP
MEP
PACKAGE
DROP OFF
AD4
STOR.
MEP
OUTLINE OF POOL ABOVE
B10
B10
5' - 0"
BD8
B10
B11
A1
B11
A1
A1
A1
Confidential Information Subject to Change
2ND FLOOR • INDOOR & OUTDOOR AMENITY SPACES | 33
SCALE: 1”
80”
HALF MOON BAY DRIVE
STATE ROUTE 9 / CROTON EXPRESS WAY
MUNICIPAL PLACE
ROUTE 9 CONCRETE ENTRANCE
RIVER WALK ACCESS TRAIL
ROUTE 9 CONCRETE EXIT
METRO NORTH RAILROAD
POOL
COURTYARD
COURTYARD #1
COURTYARD #2
POOL
AMENITY
C1
B6
A2
A1
BD1
B1
B1
AD3
BD3
B5
C2
B3
B8
AD1
B2
BD2
C3
S2
B4
B2
B2
BD6
B2
A5
B1
B1
B9
S1
A5
S1
BD10
B1
BD10
A5
223' - 8"
260' - 9 7/8"
181' - 8"
10' DRAINAGE EASEMENT
PROPERTY LINE
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
AD2
AD2
B3
B3
A3
A3
AD2
AD2
A3
A3
A3
BD5
C4
Confidential Information Subject to Change
TYPICAL FLOOR PLAN | 34
C1
B3
B3
HALF MOON BAY DRIVE
STATE ROUTE 9 / CROTON EXPRESS WAY
MUNICIPAL PLACE
ROUTE 9 CONCRETE ENTRANCE
RIVER WALK ACCESS TRAIL
ROUTE 9 CONCRETE EXIT
METRO NORTH RAILROAD
B3
A4
A4
BD1
B5
BD3
C2
B3
B7
BD2
C3
A1
S2
B4
BD4
BD6
B1
A5
B9
A5
BD10
BD10
MEP
MEP
COURTYARD #1
BELOW
COURTYARD #2
BELOW
POOL
COURTYARD
BELOW
POOL
223' - 8"
260' - 9 7/8"
181' - 8"
10' DRAINAGE EASEMENT
PROPERTY LINE
AD3
A2
A1
B1
B2
B2
A1
A1
A1
A1
A1
A1
A1
A3
A3
AD2
AD2
A3
A3
B6
B1
B5
AD1
B2
B2
A5
B1
B1
S1
S1
B1
A1
A1
A1
AD2
AD2
A3
A3
A6
BD9
B3
BD3
AD2
C4
Confidential Information Subject to Change
6TH FLOOR SLIVER + ROOFTOP OBSERVATION LOUNGE | 35
HALF MOON BAY DRIVE
STATE ROUTE 9 / CROTON EXPRESS WAY
MUNICIPAL PLACE
ROUTE 9 CONCRETE ENTRANCE
RIVER WALK ACCESS TRAIL
ROUTE 9 CONCRETE EXIT
METRO NORTH RAILROAD
AMENITY
TERRACE
B5
A1
BD4
A5
BD7
STOR.
STOR.
POOL
ROOF BELOW
ROOF BELOW
252' - 4"
10' DRAINAGE EASEMENT
PROPERTY LINE
223' - 8"
181' - 8"
260' - 9 7/8"
B11
A3
A3
A6
BD9
B3
Confidential Information Subject to Change
As seen in the map, the pedestrian infrastructure is
good, as most of the streets have sidewalks on at least
one side. Generally, the sidewalk width is approximately
three to four feet wide and the sidewalk condition is
well-maintained poured concrete precast concrete unit
pavers.
Our site already has pedestrian circulation on all sides.
PEDESTRIAN CIRCULATION | 36
Confidential Information Subject to Change
We are proposing development in an area that allows for seamless living with walkability, cycling, and multi-modal transit access,
complemented by proximity to the Riverwalk and local retail.
TOD Principle
Description
How Our Project Fulfills It
Walk
Develop neighborhoods that
Uninterrupted sidewalks and pedestrian-friendly pathways ensure safe and convenient walkability within the
promote walking
development and around the village to local shops, restaurants, and transit hubs. Direct access to the Senasqua
tunnel allows quick access to the Riverwalk and its various parks and recreation areas.
Cycle
Promote nonmotorized transport
Secure bike storage and surrounding bike lanes encourage cycling as a viable and safe transportation option. The
networks
project is fully surrounded by bike paths that connect to various local destinations.
Connect
Create dense networks of streets
An integrated network of streets and paths prioritizes pedestrians and cyclists, enhancing connectivity and flexibility
and paths
for residents. The development is surrounded by sidewalks and bike lanes, ensuring safe and flexible travel routes.
Transit
Locate development near
We are located 0.2 miles from the Maple bus station, with routs running from Peekskill to White Plains and numerous
high-quality public transport
local stops (routes 0010 and 0014). Our resident shuttle provides a 3-minute ride to the train station with frequent
service aligned with train schedules to ensure convenient access and encourage public transport use.
Mix
Plan for mixed uses, income, and
Our apartments offer a mix of studios to 3 bedrooms, meeting the needs of different types of renters, 10% of the
demographics
units are AFFH affordable housing, promoting inclusivity. Includes state-of-the-art indoor and outdoor amenities,
such as an outdoor pool deck and a public dog park.
Densify
Optimize density and match transit
Concentration of residential units and amenities supports optimal density, making the development self-sustaining
capacity
and transit-supportive without overcrowding. The project includes 280 units, balancing density with high-quality
living spaces.
Compact
Create regions with short transit
Integrated transit options and amenities in a space-efficient design ensure short and convenient commutes for
commutes
residents. Proximity to public transportation options and nearby shopping areas reduces travel time and increases
convenience.
Shift
Increase mobility by regulating
Extensive pedestrian and cyclist infrastructure reduces reliance on personal vehicles through proximity to public
parking and road use transit and shuttle service. By promoting walking, cycling, and shuttle use, the project
minimizes the impact of private vehicle traffic on the community.
OPTIMIZING DEVELOPMENT USING TRANSIT-ORIENTED PRINCIPLES | 37
CIVIL ENGINEERING SITE PLAN | 38
0 00
1 00
1 70
0 00
11 00
1 00
3 00
4 00
7 00
2 00
10 00
9 00
8 00
13 00
12 00
13 11
MTA ACCESS
10.0'
10.0'
10.0'
10.0'
20 FT.
EXIT
G R A S S I S L A N D
EMERGENCY ACCESS ROAD
WIDE
ENTRANCE
28'-0"
26'-0"
22'-0"
8.0'
15.0'
SIDEWALK
LOADING
AREA
DROP OFF
WIDE
LOADING
AREA
DRIVEWAY
PROPOSED COURTYARD
(PARKING GARAGE UNDERNEATH)
PROPOSED COURTYARD
(PARKING GARAGE UNDERNEATH)
PROPOSED NEW SIDEWALK
G R A S S I S L A N D
8'
ENT./EXIT
ENT./EXIT
PROPOSED MULTIFAMILY APARTMENT BUILDING
(280 TOTAL UNITS)
2.0'
OUTDOOR
SWIMMING POOL
PICK UP AREA
PLANTERS
PROPOSED SURFACE PARKING AREA
PROPOSED SURFACE PARKING AREA
G R A S S I S L A N D
WALK
WALK
WALK
100 YEAR FLOOD PLAIN LINE
AS PER WESTCHESTER GIS
500 YEAR FLOOD PLAIN LINE
AS PER WESTCHESTER GIS
NEW ADA CURB
RAMP, TYP.
TITLE:
Scale:
Sheet No.:
Date:
Drawn By:
Checked By:
Project No.:
Seal
Dwg. No.:
of
Surveyor
Ward Carpenter Engineers - Land Surveying
76 Mamaroneck Avenue
White Plains, NY 10601
Tel: 914-949-6000
Web: wardcarpenter.com
Architect
BKV Group Architectural Designer
1054 31st Street NW
Canal Square, Suite 410
Washington, DC 20007
Tel: 202-753-3452
Web: bkvgroup.com
Owner
1 HMB Property Owner, LLC
595 Madison Avenue, Suite 1903
New York, NY 10022
Tel: 212-490-7100
Attorney
MULTIFAMILY RESIDENTIAL
DEVELOPMENT
1 HALF MOON BAY DRIVE
VILLAGE OF CROTON-ON-HUDSON
WESTCHESTER COUNTY, NEW YORK
DTS PROVIDENT
DTS Provident Design Engineering, LLP
One North Broadway White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
Under New York State Education Law Article 145
(Engineering), Section 7209 (2), It Is A Violation Of This Law
For Any Person, Unless Acting Under The Direction Of A
Licensed Professional Engineer, To Alter This Document
© DTS Provident Design Engineering, LLP
Certificate Of Authorization #0017846
u
Zarin & Steinmetz, LLP
81 Main Street, Suite 415
White Plains, NY 10601
Tel: 914-682-7800
Web: zarin-steinmetz.com
SITE PLAN
1" = 40'
C-100
7/10/2024
KMM
PJG
PERMIT REVIEW BASED UPON THE BEST LAYOUT FOR THE PARTICULAR LOT.
(b) THE BOARD OF TRUSTEES SHALL HAVE THE DISCRETION TO REQUIRE ADDITIONAL PARKING
FOR RESIDENTIAL UNITS.
(c) THE SIXTH STORY SHALL NOT EXCEED 5% OF THE HABITABLE BUILDING FOOTPRINT
SITE PLAN LEGEND
PROPOSED BUILDING LINE
SETBACK/YARD LINE
EXISTING CURB
PROPOSED CONCRETE SIDEWALK
PROPOSED CURB RAMP
PROPOSED CONC. CURB
PROPERTY LINE
Confidential Information Subject to Change
1 HALF MOON BAY DRIVE