2021-12-02 Croton TOD - Visual Profile Sections AKRF
report
2 pages
Meeting: portal event 730 (no meeting page on file)
Agenda item: Update from AKRF on the South Riverside Area Zoning Study.
Report / study, 2 pages. Attached to agenda item: “Update from AKRF on the South Riverside Area Zoning Study.”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
2021.11.19 HSRG parcels - MF Residential Buildout
2021.11.19 TOD parcels Buildout Scenarios - all residential
2021.11.19 TOD parcels Buildout Scenarios - ground...
Fig1 - Project Location and Zoning
Fig2 - Aerial Overview
Fig3 - HSRG Common Ownership Parcels
Viewpoints Key Leaf On Sept 2021
Extracted text
Environmental, Planning, and Engineering Consultants
34 South Broadway
Suite 300
White Plains, NY 10601
tel: 914 949-7336
fax: 914 949-7559
www.akrf.com
Offices in New York ● New Jersey ● Pennsylvania ● Maryland ● Connecticut
December 2, 2021
Mr. Bryan Healy
Village Manager
Village of Croton on Hudson
1 Van Wyck Street
Croton on Hudson, NY 10520
Email: bhealy@crotononhudson-ny.gov
Re:
Extra Work Authorization for PO# 2200156 (Croton Zoning Study - TOD Parcels Visual
Assessment)
Dear Mr. Healy:
Per the discussion that took place during the Village Board of Trustees work session held on November 22,
2021, we understand the Village would like to amend AKRF’s scope of work for the potential transit-
oriented development (TOD) buildout of Parcels 48-50 to include section drawings that extends from the
three TOD parcels to the upland residential area to the northeast. AKRF would prepare two profile sections
(one covering parcels 48 and 50 and another covering parcel 49) to illustrate the intervening topography
and land cover between the three TOD parcels and the homes along Young Avenue and Wayne Street (the
closest single-family residential neighborhood) (see Figure 1). The profile sections would illustrate the
topographic relationship and potential visibility of a 4- or 5-story building on each of the TOD parcels from
homes along Young Avenue and Wayne Street. An example of the final work product, referencing work
completed for the 41-51 Maple Street project’s public review process, is shown in Figure 2.
Figure 1- Proposed Profile Sections
Mr. Bryan Healy, Village Manager
December 2, 2021
+
AKRF estimates this additional task could be completed for a lump sum fee of $5,000. If this proposal is
acceptable, we would request that the $12,300 budget established through PO# 2200156, which covers the
previously authorized TOD sensitivity analysis and visual simulations, be increased to $17,300.
Upon authorization, we will prepare to deliver drafts of the TOD profile sections and previously authorized
photo simulations by January 6, 2022, for discussion at the Village Board of Trustees work session
scheduled for January 10, 2022.
As always, thank you for reaching out to AKRF for assistance. We look forward to hearing from you.
AKRF, Inc.
Nina Peek, AICP
Vice President, Hudson Valley Office Director
Aaron Werner, AICP
Technical Director/Project Manager
Figure 2- Example Profile Section from 41-51 Maple Street project