DPW Quarterly Report - 3Q FY22
report
2 pages
Meeting: portal event 749 (no meeting page on file)
Agenda item: Quarterly Departmental Reports
Report / study, 2 pages. Attached to agenda item: “Quarterly Departmental Reports”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Engineering Quarterly Report - 3Q FY22
Justice Court Report - 3Q FY22
Manager Quarterly Report - 3Q FY22
Parking Quarterly Report - 3Q FY22
Police Department Report - 3Q FY22
Recreation Department Report - 3Q FY22
Treasurer Report - 3Q FY22
Village Clerk Quarterly Report - 3Q FY22
Extracted text
Quarterly Report
PUBLIC WORKS QUARTERLY REPORT
Fiscal Year 2021/2022
Third Quarter: December 1, 2021 – February 28, 2022
Highway
•
Cleared approximately 20 inches of snow, and .6 inches of ice during 15 winter events
•
Swept 80 miles of roadway
•
Completed the leaf removal program throughout the Village
•
Removed and replaced banners for various Village events
•
Supplied equipment/materials for Eagle Fest
•
Removed fall lights and installed holiday lights throughout the Village
•
Cleaned out 12 catch basins
•
Repaired 2 catch basins
•
Weekly asphalt maintenance (potholes and water patches)
•
Striped parking spots located on North Riverside Avenue
•
Clean up of brush and dead trees on Gouveia property
•
Trimmed approximately 20 trees
•
Removed 5 trees
•
Grinding of stumps left over from trees that were removed
Sanitation:
•
Collected approximately 795 tons of refuse
•
Collected approximately 540 tons of organic waste
•
Collected approximately 11 tons of metal and electronic waste
•
Weekly collection of Village co-mingled, paper and metal recycling
Building Maintenance:
•
Continued work on the Police Department renovations
•
Weekly maintenance and cleaning of Nordica pump station
•
Preventative maintenance for all Village generators
Water Department:
•
Repaired hydrant at 1280 Albany Post Road
•
Responded to 6 water leaks throughout the Village
•
Responded to 79 code-53-mark outs
•
Submission of monthly reports to Westchester County
•
Updated comprehensive monitoring plan for WCDOH
•
Repaired chlorine system at Well #3 and Well #1
•
VFD installation at UNHBPS
•
Continued fluoridone sampling at Village wells
•
NYSDEC water withdrawal report
•
Backflow paperwork for renewing operation of devices
•
Certified Village emergency response plan
Department of Public Works
Quarterly Report
Parks Department:
•
Litter removal in Village parks and fields
•
Winter preparation of Village Fields and parks
•
Assist with DPW snow removal operations
Repair Facility:
•
Emergency plow and salt spreader repairs throughout the season
•
Repaired rear axle in front line salt truck
•
Weekly inspection and maintenance of all police vehicles
•
Assist Fire Department with vehicle maintenance
•
Repair of sanitation vehicles
•
Repaired Village street sweeper and placed back into service
Capital Projects:
•
Assisted with Washington Engine solar panel RFP
•
Review and final comments on Nordica Drive sanitary sewer pump station project
•
Review and comment on DPW facility water filtration system
•
Continues with the design and construction of the Village Police Department
•
Review and comments on Half Moon Bay Bridge reconstruction
Machine-extracted for search and reference — the original PDF is the authoritative version.