Updated Visual Analysis %E2%80%93 Simulations for 6 View Point (both leaf on and leaf off conditions) by Arketekcher dated September 6%2C 2024
application
13 pages
Meeting: portal event 987 (no meeting page on file)
Agenda item: Review of the Environment Assessment Form Part II related to the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.
Application, 13 pages. Attached to agenda item: “Review of the Environment Assessment Form Part II related to the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Draft Phase II Environmental Site Assessment Report
Environmental Noise Study and Facade Glazing...
FEAF Part II - to be completed September 25%2C 2024
Fire Apparatus Access Study Drawing from Insite...
Insite Preliminary Wastewater Engineering Report dated...
Insite Preliminary Water Engineering Report dated July...
Insite Stormwater Pollution Prevention Plan dated July...
Insite engineering and landscape architecture plans...
Letter from Insite Engineering regarding revised Site...
Letter from Kimley Horn dated September 16%2C 2024...
Letter from NYSDOT consenting to the Board of Trustees...
Letter from the Division for Historic Preservation...
Extracted text
PROJECT
DATE
No.
09.06.24
SK-001
VISUAL ANALYSIS
1 CROTON POINT
PROJECT
DATE
No.
VIEW POINT 1 PRESENTS THE SOUTH-FACING VIEW TOWARDS PARCELS 48-50 FROM THE
OFF-RAMP AT THE EXIT FOR CROTON POINT AVENUE FROM SOUTHBOUND ROUTE 9.
09.06.24
VIEW POINT 1 - LEAF ON
SK-002
VIEW POINT 1 - ARK SIMULATION
VIEW POINT 1 - GOOGLE EARTH GEOLOCATION
VIEW POINT 1 - EXISTING
VIEW POINT 1 - AKRF SIMULATION
PROJECT
DATE
No.
VIEW POINT 1 PRESENTS THE SOUTH-FACING VIEW TOWARDS PARCELS 48-50 FROM THE
OFF-RAMP AT THE EXIT FOR CROTON POINT AVENUE FROM SOUTHBOUND ROUTE 9.
09.06.24
VIEW POINT 1 - LEAF OFF
SK-003
VIEW POINT 1 - ARK SIMULATION
VIEW POINT 1 - GOOGLE EARTH GEOLOCATION
VIEW POINT 1 - EXISTING
VIEW POINT 1 - AKRF SIMULATION
PROJECT
DATE
No.
VIEW POINT 2 PRESENTS THE NORTHWESTERLY VIEW TOWARDS PARCELS 48-50 FROM
VETERANS PLAZA, A STREET THAT EXTENDS SOUTH FROM CROTON POINT AVENUE AND
IS SURROUNDED ON BOTH SIDES BY THE VILLAGE OWNED MNR “SOUTH LOT”.
09.06.24
VIEW POINT 2 - ARK SIMULATION
VIEW POINT 2 - GOOGLE EARTH GEOLOCATION
VIEW POINT 2 - EXISTING
VIEW POINT 2 - LEAF ON
SK-004
VIEW POINT 2 - AKRF SIMULATION
PROJECT
DATE
No.
VIEW POINT 2 PRESENTS THE NORTHWESTERLY VIEW TOWARDS PARCELS 48-50 FROM
VETERANS PLAZA, A STREET THAT EXTENDS SOUTH FROM CROTON POINT AVENUE AND
IS SURROUNDED ON BOTH SIDES BY THE VILLAGE OWNED MNR “SOUTH LOT”.
09.06.24
VIEW POINT 2 - ARK SIMULATION
VIEW POINT 2 - GOOGLE EARTH GEOLOCATION
VIEW POINT 2 - EXISTING
VIEW POINT 2 - LEAF OFF
SK-005
VIEW POINT 2 - AKRF SIMULATION
PROJECT
DATE
No.
VIEW POINT 3 PRESENTS THE WESTERLY VIEW OF PARCELS 48-50 FROM THE
INTERSECTION OF CROTON POINT AVENUE AND THE OFF-RAMP EXITING NORTHBOUND
ROUTE 9.
09.06.24
VIEW POINT 3 - ARK SIMULATION
VIEW POINT 3 - GOOGLE EARTH GEOLOCATION
VIEW POINT 3 - EXISTING
VIEW POINT 3 - LEAF ON
SK-005
VIEW POINT 3 - AKRF SIMULATION
PROJECT
DATE
No.
VIEW POINT 3 PRESENTS THE WESTERLY VIEW OF PARCELS 48-50 FROM THE
INTERSECTION OF CROTON POINT AVENUE AND THE OFF-RAMP EXITING NORTHBOUND
ROUTE 9.
09.06.24
VIEW POINT 3 - ARK SIMULATION
VIEW POINT 3 - GOOGLE EARTH GEOLOCATION
VIEW POINT 3 - EXISTING
VIEW POINT 3 - LEAF OFF
SK-006
VIEW POINT 3 - AKRF SIMULATION
PROJECT
DATE
No.
VIEW POINT 4 PRESENTS THE WESTERLY VIEW OF PARCELS 48-50 FROM CROTON
POINT AVENUE, AT THE APPROXIMATE MIDPOINT BETWEEN VIEW POINT 3 AND SOUTH
RIVERSIDE AVENUE.
09.06.24
VIEW POINT 4 - ARK SIMULATION
VIEW POINT 4 - GOOGLE EARTH GEOLOCATION
VIEW POINT 4 - EXISTING
VIEW POINT 4 - AKRF SIMULATION
VIEW POINT 4 - LEAF ON
SK-007
PROJECT
DATE
No.
VIEW POINT 4 PRESENTS THE WESTERLY VIEW OF PARCELS 48-50 FROM CROTON
POINT AVENUE, AT THE APPROXIMATE MIDPOINT BETWEEN VIEW POINT 3 AND SOUTH
RIVERSIDE AVENUE.
09.06.24
VIEW POINT 4 - ARK SIMULATION
VIEW POINT 4 - GOOGLE EARTH GEOLOCATION
VIEW POINT 4 - EXISTING
VIEW POINT 4 - AKRF SIMULATION
VIEW POINT 4 - LEAF OFF
SK-008
PROJECT
DATE
No.
09.06.24
VIEW POINT 5 - ARK SIMULATION
VIEW POINT 5 - GOOGLE EARTH GEOLOCATION
VIEW POINT 5 - EXISTING
VIEW POINT 5 - AKRF SIMULATION
VIEW POINT 5 - LEAF ON
SK-009
VIEW POINT 5 PRESENTS THE SOUTHWESTERLY VIEW TOWARDS PARCELS 48-50 FROM
THE PARKING LOT AT THE END OF BENEDICT BOULEVARD, BETWEEN ROUTE 9 AND
WAYNE STREET.
PROJECT
DATE
No.
09.06.24
VIEW POINT 5 - ARK SIMULATION
VIEW POINT 5 - GOOGLE EARTH GEOLOCATION
VIEW POINT 5 - EXISTING
VIEW POINT 5 - AKRF SIMULATION
VIEW POINT 5 - LEAF OFF
SK-010
VIEW POINT 5 PRESENTS THE SOUTHWESTERLY VIEW TOWARDS PARCELS 48-50 FROM
THE PARKING LOT AT THE END OF BENEDICT BOULEVARD, BETWEEN ROUTE 9 AND
WAYNE STREET.
PROJECT
DATE
No.
09.06.24
VIEW POINT 6 - ARK SIMULATION
VIEW POINT 6 - GOOGLE EARTH GEOLOCATION
VIEW POINT 6 - EXISTING
VIEW POINT 6 PRESENTS THE WESTERLY VIEW TOWARDS PARCELS 48-50 FROM A HIGH
POINT ALONG SOUTH RIVERSIDE AVENUE ADJACENT TO THE SHOPRITE PLAZA.
VIEW POINT 6 - AKRF SIMULATION
VIEW POINT 6 - LEAF ON
SK-011
PROJECT
DATE
No.
09.06.24
VIEW POINT 6 - ARK SIMULATION
VIEW POINT 6 - GOOGLE EARTH GEOLOCATION
VIEW POINT 6 - EXISTING
VIEW POINT 6 PRESENTS THE WESTERLY VIEW TOWARDS PARCELS 48-50 FROM A HIGH
POINT ALONG SOUTH RIVERSIDE AVENUE ADJACENT TO THE SHOPRITE PLAZA.
VIEW POINT 6 - AKRF SIMULATION
VIEW POINT 6 - LEAF OFF
SK-012
Machine-extracted for search and reference — the original PDF is the authoritative version.