Traffic Impact Study Report from Kimley-Horn dated September 25%2C 2024

application 113 pages
Meeting: portal event 987 (no meeting page on file)
Agenda item: Review of the Environment Assessment Form Part II related to the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.
Application, 113 pages. Attached to agenda item: “Review of the Environment Assessment Form Part II related to the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Draft Phase II Environmental Site Assessment Report Environmental Noise Study and Facade Glazing... FEAF Part II - to be completed September 25%2C 2024 Fire Apparatus Access Study Drawing from Insite... Insite Preliminary Wastewater Engineering Report dated... Insite Preliminary Water Engineering Report dated July... Insite Stormwater Pollution Prevention Plan dated July... Insite engineering and landscape architecture plans... Letter from Insite Engineering regarding revised Site... Letter from Kimley Horn dated September 16%2C 2024... Letter from NYSDOT consenting to the Board of Trustees... Letter from the Division for Historic Preservation...
kimley-horn.com 1 North Lexington Avenue, Suite 505, White Plains, NY 10601 914-368-9200 September 25, 2024 Mr. John R. Bainlardi, Vice President WBP Development LLC 480 Bedford Road, Chappaqua, NY 10514 Re: Professional Transportation Engineering Services 1-3 Croton Point Avenue Town of Croton-on-Hudson, New York Dear Mr. Bainlardi, As detailed herein, the proposed development by WBP Development, LLC, with 100 below-market-rate residential units and no commercial space (the “Project”), will have a lower impact on traffic compared to the theoretical maximum buildout scenario outlined in the 2022 AKRF Traffic Impact Study (TIS). The project will generate approximately 1 trip every 2 minutes in the busiest hour and will not have any significant impact on traffic operating conditions. Consistent with the AKRF study findings, with some signal timing adjustments to better accommodate the projected prevailing peak-hour traffic volumes, potential unrelated lengthy delays at the NYS Tout 9 off-ramp intersections with Croton Point Avenue can be avoided. Finaly, the site has been designed to easily accommodate delivery and trash removals (and to separate the largest deliveries and trash removal form the balance of activity on the site). Project Understanding The subject property is located at 1-3 Croton Point Avenue on the north side of Croton Point Avenue, generally north of Veterans Plaza and west of State Route 9, in the Village of Croton-on-Hudson, NY. It is proposed to convert the existing parking lot serving daily commuters into a below-market-rate multifamily residential building with amenity space and on-site parking. Access to the property will be provided via three (3) driveways on the south side of the subject building via Croton Point Avenue. The first driveway, on the southeast corner of the property, has been proposed as a right-turn entrance only serving the drop-off area in front of the building, project parking and the fire access road along the east side of the property1. The second driveway, in the middle of the property, across the Veterans Plaza, will be a two-way driveway under the control of the existing traffic signal. The last driveway, all the way to the west on the south side of the property, will mainly be used by the MTA to continue to access their property to the north (through an easement agreement). However, it will also be used for Project trash removal and larger deliveries (primarily move ins and move outs). 1 It is understood that the Town’s traffic consultant has suggested that this entrance be eliminated and replaced with a connection between the second and third driveways but that this decision will not be reached until input from the fire department and school district are received as part of the Site Plan process. The traffic analysis conducted for this report assumed that all site-generated traffic would enter or exit via the second/middle driveway, which is the most conservative approach. kimley-horn.com 1 North Lexington Avenue, Suite 505, White Plains, NY 10601 914 368 9200 Traffic Impact Study This Traffic Impact Study presents the detailed traffic analysis that was completed to assess the potential traffic impacts related to the proposed development at 1-3 Croton Point Avenue. Prior to the preparation of the TIS, Kimley-Horn prepared a Traffic Impact Analysis (TIA) letter which identified how many net new trips will be added to the neighborhood, compared to the study that AKRF completed in 2022. Kimley-Horn collected Turning Movement Counts (TMCs) at the following locations for the weekday AM (7:00 AM to 9:00 AM) and weekday PM (4:00 PM to 6:30 PM) peak periods in September 2024: 1. Croton Point Avenue and Veterans Plaza 2. Croton Point Avenue and Route 9/9A Southbound Ramps 3. Croton Point Avenue and Route 9/9A Northbound Ramps Signal timing plans were obtained from the New York State Department of Transportation (NYSDOT). After reviewing the data, the following peak hours are selected2: · 7:00 AM to 8:00 AM Peak Hour · 5:30 PM to 6:30 PM Peak Hour 2024 Existing Condition Volumes The peak-hour traffic volumes were balanced between intersections and the Existing condition traffic volumes are presented in Figures 1 and 2. 2 It is noted that a review of the data indicated that the levels of traffic activity before 7:00 a.m. and after 6:30 p.m. were likely the same or lower than those from 7:45 to 8:00 a.m. and from 5:30 to 5:45 p.m. indicating that the surveys captured the true peak hours. < < $ ! $ ! $ ! > > > = : # ; = : # ; " " " ? ? ? Croton Point Avenue Veterans Plaza SB On/Off Ramp NB On/Off Ramp Croton Point Avenue Croton Point Avenue Figure 1 Exisitng 2024 AM Traffic Volumes 1-3 Croton Point Avenue Croton-On-Hudson, NY SITE < < $ ! $ ! $ ! > > > = : # ; = : # ; " " " ? ? ? Croton Point Avenue Veterans Plaza SB On/Off Ramp NB On/Off Ramp Croton Point Avenue Croton Point Avenue Figure 2 Exisitng 2024 PM Traffic Volumes 1-3 Croton Point Avenue Croton-On-Hudson, NY SITE kimley-horn.com 1 North Lexington Avenue, Suite 505, White Plains, NY 10601 914 368 9200 2027 No Build Condition Volumes For the purpose of this analysis, it was assumed that the proposed 100 new residential units would be built and occupied by the end 2027. Applying this assumption, existing traffic volumes were grown by a 1% per year compounded growth rate. This growth rate reflected increases in background traffic growth that would be expected to occur with or without the proposed development (and was the same as the growth rate used in the previous AKRF study). To further refine the analysis, the trips projected to be generated by the redevelopment of the other properties that were recently rezoned by the Village (excluding the 1-3 Croton Point Avenue property), were obtained from the 2022 AKRF Traffic Study. These Vicinity Development trips were added to the existing grown volumes to determine the 2027 No-Build Volumes as depicted in Figures 3 and 4. < < $ ! $ ! $ ! > > > = : # ; = : # ; " " " ? ? ? Croton Point Avenue Veterans Plaza SB On/Off Ramp NB On/Off Ramp Croton Point Avenue Croton Point Avenue Figure 3 No-Build 2027 AM Traffic Volumes 1-3 Croton Point Avenue Croton-On-Hudson, NY SITE < < $ ! $ ! $ ! > > > = : # ; = : # ; " " " ? ? ? Croton Point Avenue Veterans Plaza SB On/Off Ramp NB On/Off Ramp Croton Point Avenue Croton Point Avenue Figure 4 No-Build 2027 PM Traffic Volumes 1-3 Croton Point Avenue Croton-On-Hudson, NY SITE kimley-horn.com 1 North Lexington Avenue, Suite 505, White Plains, NY 10601 914 368 9200 2027 Build Condition Volumes WBP Development, LLC has been selected by the Village of Croton-on-Hudson as the purchaser and developer of Village Parking Lot A (Tax Lots 3 and 5) and is in contract to purchase Tax Lot 4 from Croton Point Realty, Inc. Collectively, the subject property is proposed to be developed with a 5-story, 100 unit, below-market-rate multifamily building with amenity space and on-site parking. Units are proposed to be in condominium ownership. A review of the Institute of Transportation Engineers (ITE) publication, Trip Generation Manual, 11th Edition, revealed a similar Land Use Code (LUC) to the site’s proposed use: Multifamily Housing (Mid-Rise; LUC 221). The trip projections for the proposed use were based on this Land Use for a General Suburban environment and Not Close to Rail. As presented in Table 1, ITE data indicate that a 100-unit development would generate 33 trips in the AM peak hour and 39 trips in the PM peak hour (and also 39 trips in the Saturday peak hour). To account for the fact that the proposed development is near the train station (and the stores and restaurants on South Riverside Avenue), it was assumed that four (4) of the AM, PM and Saturday trips would be made on foot, as opposed to by vehicle. As a result, the proposed development is projected to generate 29 trips in the AM peak hour and 35 trips in the PM peak hour (and also 35 trips in the Saturday peak hour). This methodology is consistent with that conducted by AKRF for their environmental review of traffic impacts dated July 6, 2022, although the volume of traffic generated by the currently proposed development will be considerably less than projected by AKRF in the 2022 study (approximately half)3. Table 1 Proposed Development Trip Generation Figures 5 and 6 illustrate the Project Generated trips for AM and PM peak hour. The arrival and departure patterns used were the same as for the 2022 TIS. 2027 Build Condition Volumes were determined by adding the Project generated trips to the 2027 No Build Condition Volumes which are illustrated in Figures 7 and 8. 3 29 trips in the AM peak hour vs the 42 previously projected, 35 trips in the PM peak hour vs the 79 trips previously projected and 35 trips in the Saturday peak hour vs the 75 trips previously projected. Code # Land Use In Out Total In Out Total In Out Total -1 -3 -4 -2 -2 -4 -2 -2 -4 Weekday PM Peak Hour Saturday Midday Peak Hour Building Component Zoning Component Land Use Description ITE Land Use Size Weekday AM Peak Hour LI TOD Multifamily Housing Multifamily Housing (Mid Rise) - Not Close to Rail Transit Mass Transit Credit Total Trip Generation < < $ ! $ ! $ ! > > > = : # ; = : # ; " " " ? ? ? Croton Point Avenue Veterans Plaza SB On/Off Ramp NB On/Off Ramp Croton Point Avenue Croton Point Avenue Figure 5 Project Generated AM Traffic Volumes 1-3 Croton Point Avenue Croton-On-Hudson, NY SITE < < $ ! $ ! $ ! > > > = : # ; = : # ; " " " ? ? ? Croton Point Avenue Veterans Plaza SB On/Off Ramp NB On/Off Ramp Croton Point Avenue Croton Point Avenue Figure 6 Project Generated PM Traffic Volumes 1-3 Croton Point Avenue Croton-On-Hudson, NY SITE < < $ ! $ ! $ ! > > > = : # ; = : # ; " " " ? ? ? NB On/Off Ramp Croton Point Avenue Croton Point Avenue Croton Point Avenue Veterans Plaza SB On/Off Ramp Figure 7 Build 2027 AM Traffic Volumes 1-3 Croton Point Avenue Croton-On-Hudson, NY SITE < < $ ! $ ! $ ! > > > = : # ; = : # ; " " " ? ? ? NB On/Off Ramp Croton Point Avenue Croton Point Avenue Croton Point Avenue Veterans Plaza SB On/Off Ramp Figure 8 Build 2027 PM Traffic Volumes 1-3 Croton Point Avenue Croton-On-Hudson, NY SITE kimley-horn.com 1 North Lexington Avenue, Suite 505, White Plains, NY 10601 914 368 9200 Intersection Capacity Analysis An intersection analysis was conducted using the Existing, No-Build and Build peak-hour volumes in the respective figure to assess the quality of the traffic flow at the study intersections. The criteria used to analyze the study intersections is based on the evaluation criteria contained in the Transportation Research Board’s Highway Capacity Manual (“HCM”) 6th Edition. The term “Level of Service” (“LOS”) is used to denote the different operating conditions that occur at an intersection under various traffic volume loads. It is a qualitative measure that considers a number of factors including roadway geometry, speed, travel delay, and freedom to maneuver. LOS provides an index to the operational qualities of a roadway segment or an intersection. LOS designations range from A to F, with LOS A representing the best operating conditions and LOS F representing the worst operating conditions. Synchro 12 software was used to model the three signalized study intersections based on the parameters mentioned above. Synchro 12 software is widely used by traffic engineering professionals, is approved for use by the NYSDOT and is consistent with the procedures in the HCM. The LOS designations, which are based on delay, are reported differently for signalized and unsignalized intersections. For signalized intersections, LOS is based on the average control delay per vehicle for the various lane group movements within the intersection. For the purposes of this analysis, control delay is defined as the total elapsed time that includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. The average control delay for any particular minor movement is a function of the service rate or capacity of the approach and the degree of saturation. The control delay criteria for the range of service levels for signalized intersections are shown in Table 2 below. Source: Transportation Research Board. Highway Capacity Manual. The results of the intersection capacity analysis for the Existing, No-Build and Build volume conditions for the peak hours are summarized in Table 3. The Synchro worksheets are provided in the appendix. Table 2 – Level of Service Criteria Signalized Intersection Control Delay Per Vehicle Level of Service (LOS) ≤10.0 seconds A > 10.0 seconds and ≤ 20.0 seconds B > 20.0 seconds and ≤ 35.0 seconds C > 35.0 seconds and ≤ 55.0 seconds D > 55.0 seconds and ≤ 80.0 seconds E > 80.0 seconds F kimley-horn.com 1 North Lexington Avenue, Suite 505, White Plains, NY 10601 914 368 9200 Table 3 Intersection Capacity Analysis Results Observations Our findings indicate that the 2022 AKRF traffic study conclusion remains well founded. The proposed Project will not have a significant impact on the motoring public4 and signal timing changes can be made, to better accommodate future traffic volumes. As seen in the analysis results, under full rezoning buildout, the additional traffic generated by the 100 new residential units at 1-3 Croton Point Avenue, will increase delay for the motoring public by less than 1 second in all instances but one and there will not be any changes in LOS for the motoring public5. Further, increases in delays to the non-site-driveway movements at the driveway’s intersection with Croton Point Avenue are all projected to be less than one second. The one exception noted above is the northbound off-ramp movement from Route 9/9A to Croton Point Avenue in the PM peak hour. The analysis indicates that this movement will be operating with delays in excess of 120 seconds (LOS “F”) in 2027 without the Project and that the addition of 8 vehicles in the PM peak hour will increase delay by 14.7 seconds. 4 Motoring public describes all non-project generated traffic. 5 A considerable increase in delay is projected for vehicles exiting the subject site, however, the number of exiting vehicles is minimal, and they will be project residents or visitors, not the general motoring public. Delay (secs) LOS Delay (secs) LOS Delay (secs) LOS Delay (secs) LOS Delay (secs) LOS Delay (secs) LOS EB LTR 21.4 C 8.8 A 23.4 C 10.3 B 23.6 C 11.1 B WB LTR 16.6 B 5.3 A 18.7 B 5.8 A 19.3 B 6.0 A NB LTR 11.9 B 15.4 B 11.7 B 14.8 B 11.9 B 15.2 B SB LTR 59.0 E 1.9 A 59.0 E 1.8 A 63.0 E 78.9 E Intersection 16.3 B 11.3 B 18.0 B 11.3 B 19.1 B 12.6 B EB TR 22.0 C 29.4 C 23.2 C 32.5 C 23.9 C 33.3 C WB LT 9.9 A 3.0 A 13.1 B 3.7 A 13.5 B 3.8 A SB LTR 65.9 E 64.5 E 67.0 E 61.9 E 67.0 E 62.1 E Intersection 28.7 C 23.8 C 29.9 C 25.4 C 30.1 C 25.7 C EB LTR 3.4 A 6.2 A 3.7 A 8.1 A 3.5 A 8.1 A WB LTR 9.3 A 9.4 A 10.4 B 10.3 B 10.4 B 10.4 B NB LTR 103.4 F 78.8 E 247.4 F 121.8 F 248.0 F 136.5 F SB LTR 26.6 C 0.0 A 22.8 C 26.1 C 22.8 C 26.1 C Intersection 41.4 D 30.7 C 85.5 F 45.5 D 85.2 F 50.4 D Notes: 1. SB LTR approach is the exiting project resident traffic, therefore does not affect the public or constitute a significant traffic impact. Existing Conditions No-Build Conditions Build Conditions AM Peak Hour PM Peak Hour Croton Point Avenue & Veterans Plaza (Signalized) Croton Point Avenue & SB On/Off Ramps (Signalized) Croton Point Avenue & NB On/Off Ramps (Signalized) Intersection Approach AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour kimley-horn.com 1 North Lexington Avenue, Suite 505, White Plains, NY 10601 914 368 9200 A comparison of the results of the analysis summarized in Table 3 with the analysis results contained in Table 1 of the 2022 AKRF traffic impact study indicates that 2027 traffic operating conditions are generally projected to be better than projected in the AKRF study, especially during the PM peak hour. Given the low number of trips added, the underlying conditions, and the fact that the increase in delay will not precipitate a change in Level of Service, this increase is not considered to be significant. However, we have determined that modifications could be made to the signal timings to prevent this increase in delay from occurring (and to restore operating conditions to “E” Levels of Service or better). The need to adjust the signal timings to optimize conditions for the prevailing future traffic volumes is applicable to both peak hours, which can reduce all LOS “F” conditions significantly and result in an overall LOS “C” or better conditions for all study intersections, as seen in Table 4 below. Table 4 Intersection Capacity Analysis with Signal Timing Changes It is noted that these signal timing changes will be needed with or without the Project and are typically the responsibility of the signal owner (NYSDOT) as part of their periodic signal maintenance and upkeep. kimley-horn.com 1 North Lexington Avenue, Suite 505, White Plains, NY 10601 914 368 9200 Conclusion As indicated herein, the additional traffic generated by the proposed 100 below-market-rate residential units is projected to increase delays to the motoring public at the site driveway by less than 1 second and there will be no changes in Level of Service for movements serving the general public. The analysis results are generally consistent with or slightly better than projected in the 2022 AKRF study. Finally, with the recommended signal timing changes, all underlying Level of Service “F” conditions can be restored to LOS “E” or better conditions. Based on these findings, it is concluded that the proposed 100-unit residential development will not have a significant adverse impact on traffic operating conditions. Please contact me if you have any questions. KIMLEY-HORN Engineering and ASSOCIATES By: John Canning, P.E. Associate Synchro Reports Existing AM Conditions Existing AM Peak Hour Existing Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/24/2024 Existing AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 2% 10% -2% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 1.00 0.99 1.00 0.98 0.99 Frt 0.986 0.999 0.856 0.850 Flt Protected 0.950 0.986 0.998 0.950 Satd. Flow (prot) Flt Permitted 0.694 0.866 0.992 0.536 Satd. Flow (perm) Right Turn on Red No Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 6.6 4.1 13.3 14.5 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 0% 14% 44% 1% 2% 0% 0% 0% 4% 0% 0% 0% Adj. Flow (vph) Shared Lane Traffic (%) 24% 49% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 0.94 1.02 1.11 1.11 1.22 1.28 1.22 1.17 1.19 0.84 1.19 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Existing AM Peak Hour Existing Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/24/2024 Existing AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type NA pm+pt NA pm+pt NA pm+ov pm+pt NA Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 11.0 31.0 31.0 31.0 11.0 31.0 31.0 Total Split (s) 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 Total Split (%) 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% Maximum Green (s) 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lag Lag Lead Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.5 3.0 3.0 3.5 Recall Mode C-Max C-Max None C-Max None None None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 88.5 128.6 128.6 17.4 57.5 17.4 Actuated g/C Ratio 0.54 0.78 0.78 0.11 0.35 0.11 v/c Ratio 0.11 0.56 0.52 0.48 0.20 0.01 Control Delay (s/veh) 21.4 7.6 7.1 18.6 5.2 59.0 Queue Delay 0.0 10.1 8.4 0.0 0.0 0.0 Total Delay (s/veh) 21.4 17.8 15.5 18.6 5.2 59.0 LOS C B B B A E Approach Delay (s/veh) 21.4 16.6 11.9 59.0 Approach LOS C B B E Intersection Summary Area Type: Other Cycle Length: 164 Actuated Cycle Length: 164 Offset: 0 (0%), Referenced to phase 6:EBWB, Start of Yellow Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.56 Intersection Signal Delay (s/veh): 16.3 Intersection LOS: B Intersection Capacity Utilization 59.4% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 1: Veterans Plaza/Driveway & Croton Point Avenue Existing AM Peak Hour Existing Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Existing AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 0% 2% -1% -3% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95 Ped Bike Factor 0.99 1.00 Frt 0.950 0.884 0.850 Flt Protected 0.987 0.989 Satd. Flow (prot) Flt Permitted 0.763 0.989 Satd. Flow (perm) Right Turn on Red No Yes Yes No Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 4.1 9.0 16.1 20.6 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles (%) 0% 8% 3% 7% 1% 0% 0% 0% 0% 9% 0% 1% Adj. Flow (vph) Shared Lane Traffic (%) 44% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.09 1.09 1.09 1.11 1.11 1.11 0.99 0.99 0.99 0.98 0.98 0.98 Turning Speed (mph) Number of Detectors Detector Template Thru Left Thru Left Thru Right Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Existing AM Peak Hour Existing Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Existing AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Existing AM Peak Hour Existing Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Existing AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA pm+pt NA Perm NA Perm Protected Phases 2 8 6 8 Permitted Phases 6 8 Detector Phase 2 8 6 8 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 22.0 24.0 24.0 24.0 Total Split (s) 26.0 36.0 36.0 36.0 Total Split (%) 21.3% 29.5% 29.5% 29.5% Maximum Green (s) 20.0 30.0 30.0 30.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 Total Lost Time (s) 6.0 6.0 Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) Flash Don't Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) 59.2 85.2 24.8 24.8 Actuated g/C Ratio 0.49 0.70 0.20 0.20 v/c Ratio 0.20 0.49 0.81 0.81 Control Delay (s/veh) 19.4 9.6 66.0 65.8 Queue Delay 2.6 0.3 0.0 0.0 Total Delay (s/veh) 22.0 9.9 66.0 65.8 LOS C A E E Approach Delay (s/veh) 22.0 9.9 65.9 Approach LOS C A E Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.09 Intersection Signal Delay (s/veh): 28.7 Intersection LOS: C Intersection Capacity Utilization 71.2% ICU Level of Service C Analysis Period (min) 15 Existing AM Peak Hour Existing Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Existing AM Peak Hour Synchro 12 Report Kimley-Horn Splits and Phases: 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue Existing AM Peak Hour Existing Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Existing AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 10.0 5.0 5.0 10.0 5.0 Minimum Split (s) 31.0 31.0 20.0 31.0 20.0 Total Split (s) 40.0 36.0 20.0 66.0 20.0 Total Split (%) 33% 30% 16% 54% 16% Maximum Green (s) 34.0 30.0 15.0 60.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 2.5 3.0 3.0 3.0 3.0 Recall Mode Max None None C-Max None Walk Time (s) 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary Existing AM Peak Hour Existing Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Existing AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 5% -2% -4% Lane Util. Factor 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 0.99 1.00 1.00 0.99 Frt 0.960 0.999 0.953 0.919 Flt Protected 0.998 0.969 0.990 Satd. Flow (prot) Flt Permitted 0.884 0.928 0.801 0.960 Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 9.0 5.8 12.2 2.8 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 50% 8% 10% 7% 2% 33% 2% 0% 8% 0% 0% 67% Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 1.11 1.02 1.13 1.13 1.03 0.99 0.99 0.99 0.97 0.97 0.97 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Existing AM Peak Hour Existing Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Existing AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Existing AM Peak Hour Existing Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Existing AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 1 2 4 4 6 Permitted Phases 1 2 4 4 6 Detector Phase 1 2 4 1 2 4 4 6 4 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 31.0 31.0 Total Split (s) 36.0 36.0 36.0 36.0 Total Split (%) 29.5% 29.5% 29.5% 29.5% Maximum Green (s) 30.0 30.0 30.0 30.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -1.0 0.0 Total Lost Time (s) 5.0 6.0 Lead/Lag Lead Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 80.0 81.0 31.0 30.0 Actuated g/C Ratio 0.66 0.66 0.25 0.25 v/c Ratio 0.15 0.33 1.09 0.02 Control Delay (s/veh) 3.4 9.3 102.5 26.6 Queue Delay 0.0 0.0 0.9 0.0 Total Delay (s/veh) 3.4 9.3 103.4 26.6 LOS A A F C Approach Delay (s/veh) 3.4 9.3 103.4 26.6 Approach LOS A A F C Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.09 Intersection Signal Delay (s/veh): 41.4 Intersection LOS: D Intersection Capacity Utilization 68.7% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue Existing AM Peak Hour Existing Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Existing AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 10.0 5.0 10.0 5.0 5.0 Minimum Split (s) 22.0 31.0 20.0 31.0 24.0 20.0 Total Split (s) 26.0 40.0 20.0 66.0 36.0 20.0 Total Split (%) 21% 33% 16% 54% 30% 16% Maximum Green (s) 20.0 34.0 15.0 60.0 30.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 2.5 3.0 3.0 3.0 3.0 Recall Mode None Max None C-Max None None Walk Time (s) 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary Existing PM Conditions Existing PM Peak Hour Existing Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/24/2024 Existing PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 2% 10% -2% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 1.00 0.99 0.99 0.99 0.99 0.98 Frt 0.995 0.995 0.853 0.850 0.975 Flt Protected 0.950 0.978 0.999 0.961 Satd. Flow (prot) Flt Permitted 0.616 0.779 0.996 0.269 Satd. Flow (perm) Right Turn on Red No Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 5.0 4.1 13.3 14.5 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Heavy Vehicles (%) 0% 2% 0% 2% 3% 20% 50% 0% 0% 14% 0% 0% Adj. Flow (vph) Shared Lane Traffic (%) 33% 50% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 0.94 1.02 1.11 1.11 1.22 1.28 1.22 1.17 1.19 0.84 1.19 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Existing PM Peak Hour Existing Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/24/2024 Existing PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type NA pm+pt NA pm+pt NA pm+ov pm+pt NA Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 11.0 31.0 31.0 31.0 11.0 31.0 31.0 Total Split (s) 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 Total Split (%) 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% Maximum Green (s) 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lag Lag Lead Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.5 3.0 3.0 3.5 Recall Mode C-Max C-Max None C-Max None None None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 118.9 128.5 128.5 17.5 27.1 17.5 Actuated g/C Ratio 0.73 0.78 0.78 0.11 0.17 0.11 v/c Ratio 0.16 0.19 0.17 0.77 0.65 0.10 Control Delay (s/veh) 8.8 4.5 4.3 19.6 11.1 1.9 Queue Delay 0.0 0.5 1.3 0.0 0.0 0.0 Total Delay (s/veh) 8.8 5.0 5.6 19.6 11.1 1.9 LOS A A A B B A Approach Delay (s/veh) 8.8 5.3 15.4 1.9 Approach LOS A A B A Intersection Summary Area Type: Other Cycle Length: 164 Actuated Cycle Length: 164 Offset: 0 (0%), Referenced to phase 6:EBWB, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay (s/veh): 11.3 Intersection LOS: B Intersection Capacity Utilization 70.3% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 1: Veterans Plaza/Driveway & Croton Point Avenue Existing PM Peak Hour Existing Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Existing PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 0% 2% -1% -3% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95 Ped Bike Factor 0.98 1.00 1.00 Frt 0.945 0.984 0.850 Flt Protected 0.971 0.957 Satd. Flow (prot) Flt Permitted 0.521 0.957 Satd. Flow (perm) Right Turn on Red No Yes Yes No Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 4.1 9.0 16.1 20.6 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Heavy Vehicles (%) 0% 0% 2% 1% 3% 0% 0% 0% 0% 3% 0% 1% Adj. Flow (vph) Shared Lane Traffic (%) 10% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.09 1.09 1.09 1.11 1.11 1.11 0.99 0.99 0.99 0.98 0.98 0.98 Turning Speed (mph) Number of Detectors Detector Template Thru Left Thru Left Thru Right Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Existing PM Peak Hour Existing Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Existing PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Existing PM Peak Hour Existing Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Existing PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA pm+pt NA Perm NA Perm Protected Phases 2 8 6 8 Permitted Phases 6 8 Detector Phase 2 8 6 8 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 22.0 24.0 24.0 24.0 Total Split (s) 26.0 36.0 36.0 36.0 Total Split (%) 21.3% 29.5% 29.5% 29.5% Maximum Green (s) 20.0 30.0 30.0 30.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 Total Lost Time (s) 6.0 6.0 Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) Flash Don't Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) 53.8 98.4 11.6 11.6 Actuated g/C Ratio 0.44 0.81 0.10 0.10 v/c Ratio 0.59 0.29 0.54 0.53 Control Delay (s/veh) 27.6 2.8 64.4 64.6 Queue Delay 1.8 0.2 0.0 0.0 Total Delay (s/veh) 29.4 3.0 64.4 64.6 LOS C A E E Approach Delay (s/veh) 29.4 3.0 64.5 Approach LOS C A E Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.02 Intersection Signal Delay (s/veh): 23.8 Intersection LOS: C Intersection Capacity Utilization 68.3% ICU Level of Service C Analysis Period (min) 15 Existing PM Peak Hour Existing Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Existing PM Peak Hour Synchro 12 Report Kimley-Horn Splits and Phases: 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue Existing PM Peak Hour Existing Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Existing PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 10.0 5.0 5.0 10.0 5.0 Minimum Split (s) 31.0 31.0 20.0 31.0 20.0 Total Split (s) 40.0 36.0 20.0 66.0 20.0 Total Split (%) 33% 30% 16% 54% 16% Maximum Green (s) 34.0 30.0 15.0 60.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 2.5 3.0 3.0 3.0 3.0 Recall Mode None None None C-Max None Walk Time (s) 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary Existing PM Peak Hour Existing Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Existing PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 5% -2% -4% Lane Util. Factor 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 0.99 1.00 0.99 Frt 0.943 0.895 Flt Protected 0.989 0.989 Satd. Flow (prot) Flt Permitted 0.712 0.923 Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 9.0 5.8 12.2 2.8 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 6% 0% 0% 0% 0% 0% Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 1.11 1.02 1.13 1.13 1.03 0.99 0.99 0.99 0.97 0.97 0.97 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Existing PM Peak Hour Existing Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Existing PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Existing PM Peak Hour Existing Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Existing PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Turn Type NA Perm NA Perm NA Protected Phases 1 2 4 4 6 Permitted Phases 1 2 4 4 6 Detector Phase 1 2 4 1 2 4 4 6 4 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 31.0 31.0 Total Split (s) 36.0 36.0 36.0 36.0 Total Split (%) 29.5% 29.5% 29.5% 29.5% Maximum Green (s) 30.0 30.0 30.0 30.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 Total Lost Time (s) 6.0 6.0 Lead/Lag Lead Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 80.0 81.0 30.0 Actuated g/C Ratio 0.66 0.66 0.25 v/c Ratio 0.26 0.32 1.02 Control Delay (s/veh) 5.6 9.4 78.8 Queue Delay 0.5 0.0 0.0 Total Delay (s/veh) 6.2 9.4 78.8 LOS A A E Approach Delay (s/veh) 6.2 9.4 78.8 Approach LOS A A E Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.02 Intersection Signal Delay (s/veh): 30.7 Intersection LOS: C Intersection Capacity Utilization 70.3% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue Existing PM Peak Hour Existing Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Existing PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 10.0 5.0 10.0 5.0 5.0 Minimum Split (s) 22.0 31.0 20.0 31.0 24.0 20.0 Total Split (s) 26.0 40.0 20.0 66.0 36.0 20.0 Total Split (%) 21% 33% 16% 54% 30% 16% Maximum Green (s) 20.0 34.0 15.0 60.0 30.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 2.5 3.0 3.0 3.0 3.0 Recall Mode None None None C-Max None None Walk Time (s) 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary No Build AM Conditions No Build AM Peak Hour No Build Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/24/2024 No Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 2% 10% -2% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 1.00 1.00 1.00 0.98 0.99 Frt 0.986 0.999 0.855 0.850 Flt Protected 0.950 0.985 0.998 0.950 Satd. Flow (prot) Flt Permitted 0.690 0.858 0.992 0.488 Satd. Flow (perm) Right Turn on Red No Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 6.6 4.1 13.3 14.5 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 0% 14% 44% 1% 2% 0% 0% 0% 4% 0% 0% 0% Adj. Flow (vph) Shared Lane Traffic (%) 25% 49% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 0.94 1.02 1.11 1.11 1.22 1.28 1.22 1.17 1.19 0.84 1.19 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) No Build AM Peak Hour No Build Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/24/2024 No Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type NA pm+pt NA pm+pt NA pm+ov pm+pt NA Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 11.0 31.0 31.0 31.0 11.0 31.0 31.0 Total Split (s) 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 Total Split (%) 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% Maximum Green (s) 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lag Lag Lead Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.5 3.0 3.0 3.5 Recall Mode C-Max C-Max None C-Max None None None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 81.7 128.6 128.6 17.4 64.3 17.4 Actuated g/C Ratio 0.50 0.78 0.78 0.11 0.39 0.11 v/c Ratio 0.12 0.59 0.56 0.51 0.20 0.01 Control Delay (s/veh) 23.4 8.2 7.7 18.6 5.0 59.0 Queue Delay 0.0 11.1 10.5 0.0 0.0 0.0 Total Delay (s/veh) 23.4 19.3 18.2 18.6 5.0 59.0 LOS C B B B A E Approach Delay (s/veh) 23.4 18.7 11.7 59.0 Approach LOS C B B E Intersection Summary Area Type: Other Cycle Length: 164 Actuated Cycle Length: 164 Offset: 0 (0%), Referenced to phase 6:EBWB, Start of Yellow Natural Cycle: 125 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.59 Intersection Signal Delay (s/veh): 18.0 Intersection LOS: B Intersection Capacity Utilization 61.6% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 1: Veterans Plaza/Driveway & Croton Point Avenue No Build AM Peak Hour No Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 No Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 0% 2% -1% -3% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95 Ped Bike Factor 0.99 1.00 Frt 0.952 0.889 0.850 Flt Protected 0.985 0.987 Satd. Flow (prot) Flt Permitted 0.731 0.987 Satd. Flow (perm) Right Turn on Red No Yes Yes No Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 4.1 9.0 16.1 20.6 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles (%) 0% 8% 3% 7% 1% 0% 0% 0% 0% 9% 0% 1% Adj. Flow (vph) Shared Lane Traffic (%) 43% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.09 1.09 1.09 1.11 1.11 1.11 0.99 0.99 0.99 0.98 0.98 0.98 Turning Speed (mph) Number of Detectors Detector Template Thru Left Thru Left Thru Right Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) No Build AM Peak Hour No Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 No Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) No Build AM Peak Hour No Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 No Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA pm+pt NA Perm NA Perm Protected Phases 2 8 6 8 Permitted Phases 6 8 Detector Phase 2 8 6 8 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 22.0 24.0 24.0 24.0 Total Split (s) 26.0 36.0 36.0 36.0 Total Split (%) 21.3% 29.5% 29.5% 29.5% Maximum Green (s) 20.0 30.0 30.0 30.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 Total Lost Time (s) 6.0 6.0 Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) Flash Don't Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) 58.4 84.4 25.6 25.6 Actuated g/C Ratio 0.48 0.69 0.21 0.21 v/c Ratio 0.22 0.61 0.83 0.83 Control Delay (s/veh) 20.0 12.9 67.3 66.8 Queue Delay 3.2 0.3 0.0 0.0 Total Delay (s/veh) 23.2 13.1 67.3 66.8 LOS C B E E Approach Delay (s/veh) 23.2 13.1 67.0 Approach LOS C B E Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.44 Intersection Signal Delay (s/veh): 29.9 Intersection LOS: C Intersection Capacity Utilization 76.4% ICU Level of Service D Analysis Period (min) 15 No Build AM Peak Hour No Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 No Build AM Peak Hour Synchro 12 Report Kimley-Horn Splits and Phases: 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue No Build AM Peak Hour No Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 No Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 10.0 5.0 5.0 10.0 5.0 Minimum Split (s) 31.0 31.0 20.0 31.0 20.0 Total Split (s) 40.0 36.0 20.0 66.0 20.0 Total Split (%) 33% 30% 16% 54% 16% Maximum Green (s) 34.0 30.0 15.0 60.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 2.5 3.0 3.0 3.0 3.0 Recall Mode Max None None C-Max None Walk Time (s) 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary No Build AM Peak Hour No Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 No Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 5% -2% -4% Lane Util. Factor 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 0.99 1.00 1.00 0.99 Frt 0.962 0.999 0.949 0.927 Flt Protected 0.996 0.970 0.986 Satd. Flow (prot) Flt Permitted 0.864 0.894 0.796 0.917 Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 9.0 5.8 12.2 2.8 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 50% 8% 10% 7% 2% 33% 2% 0% 8% 0% 0% 67% Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 1.11 1.02 1.13 1.13 1.03 0.99 0.99 0.99 0.97 0.97 0.97 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 No Build AM Peak Hour No Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 No Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) No Build AM Peak Hour No Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 No Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 1 2 4 4 6 Permitted Phases 1 2 4 4 6 Detector Phase 1 2 4 1 2 4 4 6 4 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 31.0 31.0 Total Split (s) 36.0 36.0 36.0 36.0 Total Split (%) 29.5% 29.5% 29.5% 29.5% Maximum Green (s) 30.0 30.0 30.0 30.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -1.0 0.0 Total Lost Time (s) 5.0 6.0 Lead/Lag Lead Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 80.0 81.0 31.0 30.0 Actuated g/C Ratio 0.66 0.66 0.25 0.25 v/c Ratio 0.18 0.42 1.44 0.08 Control Delay (s/veh) 3.7 10.4 247.4 22.8 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 3.7 10.4 247.4 22.8 LOS A B F C Approach Delay (s/veh) 3.7 10.4 247.4 22.8 Approach LOS A B F C Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.44 Intersection Signal Delay (s/veh): 85.5 Intersection LOS: F Intersection Capacity Utilization 76.3% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue No Build AM Peak Hour No Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 No Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 10.0 5.0 10.0 5.0 5.0 Minimum Split (s) 22.0 31.0 20.0 31.0 24.0 20.0 Total Split (s) 26.0 40.0 20.0 66.0 36.0 20.0 Total Split (%) 21% 33% 16% 54% 30% 16% Maximum Green (s) 20.0 34.0 15.0 60.0 30.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 2.5 3.0 3.0 3.0 3.0 Recall Mode None Max None C-Max None None Walk Time (s) 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary No Build PM Conditions No Build PM Peak Hour No Build Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/24/2024 No Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 2% 10% -2% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 1.00 0.99 0.99 0.99 0.99 0.98 Frt 0.994 0.995 0.853 0.850 0.975 Flt Protected 0.950 0.977 0.999 0.961 Satd. Flow (prot) Flt Permitted 0.601 0.757 0.997 0.279 Satd. Flow (perm) Right Turn on Red No Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 5.0 4.1 13.3 14.5 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Heavy Vehicles (%) 0% 2% 0% 2% 3% 20% 50% 0% 0% 14% 0% 0% Adj. Flow (vph) Shared Lane Traffic (%) 34% 50% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 0.94 1.02 1.11 1.11 1.22 1.28 1.22 1.17 1.19 0.84 1.19 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) No Build PM Peak Hour No Build Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/24/2024 No Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type NA pm+pt NA pm+pt NA pm+ov pm+pt NA Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 11.0 31.0 31.0 31.0 11.0 31.0 31.0 Total Split (s) 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 Total Split (%) 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% Maximum Green (s) 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lag Lag Lead Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.5 3.0 3.0 3.5 Recall Mode C-Max C-Max None C-Max None None None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 116.4 128.0 128.0 18.0 29.6 18.0 Actuated g/C Ratio 0.71 0.78 0.78 0.11 0.18 0.11 v/c Ratio 0.18 0.22 0.20 0.78 0.65 0.10 Control Delay (s/veh) 10.3 4.8 4.7 19.3 10.1 1.8 Queue Delay 0.0 0.6 1.5 0.0 0.0 0.0 Total Delay (s/veh) 10.3 5.4 6.1 19.3 10.1 1.8 LOS B A A B B A Approach Delay (s/veh) 10.3 5.8 14.8 1.8 Approach LOS B A B A Intersection Summary Area Type: Other Cycle Length: 164 Actuated Cycle Length: 164 Offset: 0 (0%), Referenced to phase 6:EBWB, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay (s/veh): 11.3 Intersection LOS: B Intersection Capacity Utilization 71.1% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 1: Veterans Plaza/Driveway & Croton Point Avenue No Build PM Peak Hour No Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 No Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 0% 2% -1% -3% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95 Ped Bike Factor 0.99 1.00 1.00 Frt 0.948 0.989 0.850 Flt Protected 0.971 0.956 Satd. Flow (prot) Flt Permitted 0.524 0.956 Satd. Flow (perm) Right Turn on Red No Yes Yes No Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 4.1 9.0 16.1 20.6 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Heavy Vehicles (%) 0% 0% 2% 1% 3% 0% 0% 0% 0% 3% 0% 1% Adj. Flow (vph) Shared Lane Traffic (%) 10% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.09 1.09 1.09 1.11 1.11 1.11 0.99 0.99 0.99 0.98 0.98 0.98 Turning Speed (mph) Number of Detectors Detector Template Thru Left Thru Left Thru Right Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) No Build PM Peak Hour No Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 No Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) No Build PM Peak Hour No Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 No Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA pm+pt NA Perm NA Perm Protected Phases 2 8 6 8 Permitted Phases 6 8 Detector Phase 2 8 6 8 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 22.0 24.0 24.0 24.0 Total Split (s) 26.0 36.0 36.0 36.0 Total Split (%) 21.3% 29.5% 29.5% 29.5% Maximum Green (s) 20.0 30.0 30.0 30.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 Total Lost Time (s) 6.0 6.0 Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) Flash Don't Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) 54.3 95.9 14.1 14.1 Actuated g/C Ratio 0.45 0.79 0.12 0.12 v/c Ratio 0.63 0.36 0.62 0.46 Control Delay (s/veh) 28.3 3.4 64.8 57.7 Queue Delay 4.2 0.2 0.0 0.0 Total Delay (s/veh) 32.5 3.7 64.8 57.7 LOS C A E E Approach Delay (s/veh) 32.5 3.7 61.9 Approach LOS C A E Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.16 Intersection Signal Delay (s/veh): 25.4 Intersection LOS: C Intersection Capacity Utilization 71.7% ICU Level of Service C Analysis Period (min) 15 No Build PM Peak Hour No Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 No Build PM Peak Hour Synchro 12 Report Kimley-Horn Splits and Phases: 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue No Build PM Peak Hour No Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 No Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 10.0 5.0 5.0 10.0 5.0 Minimum Split (s) 31.0 31.0 20.0 31.0 20.0 Total Split (s) 40.0 36.0 20.0 66.0 20.0 Total Split (%) 33% 30% 16% 54% 16% Maximum Green (s) 34.0 30.0 15.0 60.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 2.5 3.0 3.0 3.0 3.0 Recall Mode None None None C-Max None Walk Time (s) 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary No Build PM Peak Hour No Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 No Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 5% -2% -4% Lane Util. Factor 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 0.99 1.00 0.99 Frt 0.949 0.999 0.894 0.923 Flt Protected 0.989 0.990 0.986 Satd. Flow (prot) Flt Permitted 0.847 0.683 0.926 0.860 Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 9.0 5.8 12.2 2.8 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 6% 0% 0% 0% 0% 0% Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 1.11 1.02 1.13 1.13 1.03 0.99 0.99 0.99 0.97 0.97 0.97 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 No Build PM Peak Hour No Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 No Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) No Build PM Peak Hour No Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 No Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 1 2 4 4 6 Permitted Phases 1 2 4 4 6 Detector Phase 1 2 4 1 2 4 4 6 4 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 31.0 31.0 Total Split (s) 36.0 36.0 36.0 36.0 Total Split (%) 29.5% 29.5% 29.5% 29.5% Maximum Green (s) 30.0 30.0 30.0 30.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -1.0 0.0 Total Lost Time (s) 5.0 6.0 Lead/Lag Lead Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 80.0 81.0 31.0 30.0 Actuated g/C Ratio 0.66 0.66 0.25 0.25 v/c Ratio 0.35 0.40 1.16 0.02 Control Delay (s/veh) 7.4 10.3 121.8 26.1 Queue Delay 0.8 0.0 0.0 0.0 Total Delay (s/veh) 8.1 10.3 121.8 26.1 LOS A B F C Approach Delay (s/veh) 8.1 10.3 121.8 26.1 Approach LOS A B F C Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.16 Intersection Signal Delay (s/veh): 45.5 Intersection LOS: D Intersection Capacity Utilization 86.0% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue No Build PM Peak Hour No Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 No Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 10.0 5.0 10.0 5.0 5.0 Minimum Split (s) 22.0 31.0 20.0 31.0 24.0 20.0 Total Split (s) 26.0 40.0 20.0 66.0 36.0 20.0 Total Split (%) 21% 33% 16% 54% 30% 16% Maximum Green (s) 20.0 34.0 15.0 60.0 30.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 2.5 3.0 3.0 3.0 3.0 Recall Mode None None None C-Max None None Walk Time (s) 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary Build AM Conditions Build AM Peak Hour Build Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/24/2024 Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 2% 10% -2% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 1.00 1.00 1.00 0.99 0.99 1.00 Frt 0.986 0.998 0.856 0.850 0.994 Flt Protected 0.950 0.985 0.998 0.960 Satd. Flow (prot) Flt Permitted 0.690 0.859 0.992 0.586 Satd. Flow (perm) Right Turn on Red No Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 6.6 4.1 13.3 14.5 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 0% 14% 44% 1% 2% 0% 0% 0% 4% 0% 0% 0% Adj. Flow (vph) Shared Lane Traffic (%) 25% 49% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 0.94 1.02 1.11 1.11 1.22 1.28 1.22 1.17 1.19 0.84 1.19 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Build AM Peak Hour Build Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/24/2024 Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type NA pm+pt NA pm+pt NA pm+ov pm+pt NA Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 11.0 31.0 31.0 31.0 11.0 31.0 31.0 Total Split (s) 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 Total Split (%) 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% Maximum Green (s) 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lag Lag Lead Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.5 3.0 3.0 3.5 Recall Mode C-Max C-Max None C-Max None None None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 81.1 128.4 128.4 17.6 64.9 17.6 Actuated g/C Ratio 0.49 0.78 0.78 0.11 0.40 0.11 v/c Ratio 0.12 0.59 0.56 0.51 0.20 0.18 Control Delay (s/veh) 23.6 8.2 7.8 18.9 4.9 63.0 Queue Delay 0.0 11.3 11.2 0.0 0.0 0.0 Total Delay (s/veh) 23.6 19.5 19.1 18.9 4.9 63.0 LOS C B B B A E Approach Delay (s/veh) 23.6 19.3 11.9 63.0 Approach LOS C B B E Intersection Summary Area Type: Other Cycle Length: 164 Actuated Cycle Length: 164 Offset: 0 (0%), Referenced to phase 6:EBWB, Start of Yellow Natural Cycle: 125 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.59 Intersection Signal Delay (s/veh): 19.1 Intersection LOS: B Intersection Capacity Utilization 63.3% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 1: Veterans Plaza/Driveway & Croton Point Avenue Build AM Peak Hour Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 0% 2% -1% -3% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95 Ped Bike Factor 0.99 1.00 Frt 0.951 0.889 0.850 Flt Protected 0.985 0.987 Satd. Flow (prot) Flt Permitted 0.721 0.987 Satd. Flow (perm) Right Turn on Red No Yes Yes No Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 4.1 9.0 16.1 20.6 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles (%) 0% 8% 3% 7% 1% 0% 0% 0% 0% 9% 0% 1% Adj. Flow (vph) Shared Lane Traffic (%) 43% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.09 1.09 1.09 1.11 1.11 1.11 0.99 0.99 0.99 0.98 0.98 0.98 Turning Speed (mph) Number of Detectors Detector Template Thru Left Thru Left Thru Right Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Build AM Peak Hour Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Build AM Peak Hour Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA pm+pt NA Perm NA Perm Protected Phases 2 8 6 8 Permitted Phases 6 8 Detector Phase 2 8 6 8 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 22.0 32.0 32.0 32.0 Total Split (s) 26.0 36.0 36.0 36.0 Total Split (%) 21.3% 29.5% 29.5% 29.5% Maximum Green (s) 20.0 30.0 30.0 30.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 Total Lost Time (s) 6.0 6.0 Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) Flash Don't Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) 58.3 84.3 25.7 25.7 Actuated g/C Ratio 0.48 0.69 0.21 0.21 v/c Ratio 0.24 0.61 0.84 0.83 Control Delay (s/veh) 20.2 13.3 67.4 66.5 Queue Delay 3.8 0.3 0.0 0.0 Total Delay (s/veh) 23.9 13.5 67.4 66.5 LOS C B E E Approach Delay (s/veh) 23.9 13.5 67.0 Approach LOS C B E Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.44 Intersection Signal Delay (s/veh): 30.1 Intersection LOS: C Intersection Capacity Utilization 76.6% ICU Level of Service D Analysis Period (min) 15 Build AM Peak Hour Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Build AM Peak Hour Synchro 12 Report Kimley-Horn Splits and Phases: 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue Build AM Peak Hour Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 10.0 5.0 5.0 10.0 5.0 Minimum Split (s) 31.0 31.0 20.0 31.0 20.0 Total Split (s) 40.0 36.0 20.0 66.0 20.0 Total Split (%) 33% 30% 16% 54% 16% Maximum Green (s) 34.0 30.0 15.0 60.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 2.5 3.0 3.0 3.0 3.0 Recall Mode Max None None C-Max None Walk Time (s) 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary Build AM Peak Hour Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 5% -2% -4% Lane Util. Factor 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 0.99 1.00 1.00 0.99 Frt 0.962 0.999 0.950 0.927 Flt Protected 0.996 0.970 0.986 Satd. Flow (prot) Flt Permitted 0.864 0.893 0.796 0.917 Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 9.0 5.8 12.2 2.8 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 50% 8% 10% 7% 2% 33% 2% 0% 8% 0% 0% 67% Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 1.11 1.02 1.13 1.13 1.03 0.99 0.99 0.99 0.97 0.97 0.97 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Build AM Peak Hour Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Build AM Peak Hour Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 1 2 4 4 6 Permitted Phases 1 2 4 4 6 Detector Phase 1 2 4 1 2 4 4 6 4 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 31.0 31.0 Total Split (s) 36.0 36.0 36.0 36.0 Total Split (%) 29.5% 29.5% 29.5% 29.5% Maximum Green (s) 30.0 30.0 30.0 30.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -1.0 0.0 Total Lost Time (s) 5.0 6.0 Lead/Lag Lead Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 80.0 81.0 31.0 30.0 Actuated g/C Ratio 0.66 0.66 0.25 0.25 v/c Ratio 0.19 0.43 1.44 0.08 Control Delay (s/veh) 3.5 10.4 248.0 22.8 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 3.5 10.4 248.0 22.8 LOS A B F C Approach Delay (s/veh) 3.5 10.4 248.0 22.8 Approach LOS A B F C Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.44 Intersection Signal Delay (s/veh): 85.2 Intersection LOS: F Intersection Capacity Utilization 76.8% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue Build AM Peak Hour Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 10.0 5.0 10.0 5.0 5.0 Minimum Split (s) 22.0 31.0 20.0 31.0 32.0 20.0 Total Split (s) 26.0 40.0 20.0 66.0 36.0 20.0 Total Split (%) 21% 33% 16% 54% 30% 16% Maximum Green (s) 20.0 34.0 15.0 60.0 30.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 2.5 3.0 3.0 3.0 3.0 Recall Mode None Max None C-Max None None Walk Time (s) 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary Build PM Conditions Build PM Peak Hour Build Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/24/2024 Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 2% 10% -2% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 1.00 0.99 0.99 0.98 0.99 0.99 Frt 0.994 0.984 0.856 0.850 0.992 Flt Protected 0.950 0.980 0.999 0.961 Satd. Flow (prot) Flt Permitted 0.611 0.779 0.993 0.213 Satd. Flow (perm) Right Turn on Red No Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 5.0 4.1 13.3 14.5 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Heavy Vehicles (%) 0% 2% 0% 2% 3% 20% 50% 0% 0% 14% 0% 0% Adj. Flow (vph) Shared Lane Traffic (%) 31% 49% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 0.94 1.02 1.11 1.11 1.22 1.28 1.22 1.17 1.19 0.84 1.19 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Build PM Peak Hour Build Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/24/2024 Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Perm NA pm+pt NA pm+pt NA pm+ov pm+pt NA Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 11.0 31.0 31.0 31.0 11.0 31.0 31.0 Total Split (s) 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 Total Split (%) 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% Maximum Green (s) 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lag Lag Lead Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.5 3.0 3.0 3.5 Recall Mode C-Max C-Max None C-Max None None None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 114.7 127.6 127.6 18.4 31.3 18.4 Actuated g/C Ratio 0.70 0.78 0.78 0.11 0.19 0.11 v/c Ratio 0.18 0.23 0.21 0.79 0.65 0.35 Control Delay (s/veh) 11.1 5.0 4.8 20.7 9.6 78.9 Queue Delay 0.0 0.7 1.6 0.0 0.0 0.0 Total Delay (s/veh) 11.1 5.7 6.4 20.7 9.6 78.9 LOS B A A C A E Approach Delay (s/veh) 11.1 6.0 15.2 78.9 Approach LOS B A B E Intersection Summary Area Type: Other Cycle Length: 164 Actuated Cycle Length: 164 Offset: 0 (0%), Referenced to phase 6:EBWB, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay (s/veh): 12.6 Intersection LOS: B Intersection Capacity Utilization 71.9% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 1: Veterans Plaza/Driveway & Croton Point Avenue Build PM Peak Hour Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 0% 2% -1% -3% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95 Ped Bike Factor 0.99 1.00 1.00 Frt 0.947 0.989 0.850 Flt Protected 0.972 0.956 Satd. Flow (prot) Flt Permitted 0.523 0.956 Satd. Flow (perm) Right Turn on Red No Yes Yes No Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 4.1 9.0 16.1 20.6 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Heavy Vehicles (%) 0% 0% 2% 1% 3% 0% 0% 0% 0% 3% 0% 1% Adj. Flow (vph) Shared Lane Traffic (%) 10% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.09 1.09 1.09 1.11 1.11 1.11 0.99 0.99 0.99 0.98 0.98 0.98 Turning Speed (mph) Number of Detectors Detector Template Thru Left Thru Left Thru Right Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Build PM Peak Hour Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Build PM Peak Hour Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA pm+pt NA Perm NA Perm Protected Phases 2 8 6 8 Permitted Phases 6 8 Detector Phase 2 8 6 8 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 22.0 31.0 31.0 31.0 Total Split (s) 26.0 36.0 36.0 36.0 Total Split (%) 21.3% 29.5% 29.5% 29.5% Maximum Green (s) 20.0 30.0 30.0 30.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 Total Lost Time (s) 6.0 6.0 Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) Flash Don't Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) 54.4 95.9 14.1 14.1 Actuated g/C Ratio 0.45 0.79 0.12 0.12 v/c Ratio 0.64 0.37 0.62 0.48 Control Delay (s/veh) 28.4 3.5 64.8 58.4 Queue Delay 4.9 0.2 0.0 0.0 Total Delay (s/veh) 33.3 3.8 64.8 58.4 LOS C A E E Approach Delay (s/veh) 33.3 3.8 62.1 Approach LOS C A E Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.19 Intersection Signal Delay (s/veh): 25.7 Intersection LOS: C Intersection Capacity Utilization 72.0% ICU Level of Service C Analysis Period (min) 15 Build PM Peak Hour Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Build PM Peak Hour Synchro 12 Report Kimley-Horn Splits and Phases: 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue Build PM Peak Hour Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/24/2024 Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 10.0 5.0 5.0 10.0 5.0 Minimum Split (s) 31.0 31.0 20.0 31.0 20.0 Total Split (s) 40.0 36.0 20.0 66.0 20.0 Total Split (%) 33% 30% 16% 54% 16% Maximum Green (s) 34.0 30.0 15.0 60.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 2.5 3.0 3.0 3.0 0.2 Recall Mode None None None C-Max None Walk Time (s) 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary Build PM Peak Hour Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 5% -2% -4% Lane Util. Factor 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 0.99 1.00 0.99 Frt 0.949 0.999 0.895 0.923 Flt Protected 0.989 0.989 0.986 Satd. Flow (prot) Flt Permitted 0.847 0.683 0.922 0.863 Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 9.0 5.8 12.2 2.8 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 6% 0% 0% 0% 0% 0% Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 1.11 1.02 1.13 1.13 1.03 0.99 0.99 0.99 0.97 0.97 0.97 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Build PM Peak Hour Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Build PM Peak Hour Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 1 2 4 4 6 Permitted Phases 1 2 4 4 6 Detector Phase 1 2 4 1 2 4 4 6 4 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 31.0 31.0 Total Split (s) 36.0 36.0 36.0 36.0 Total Split (%) 29.5% 29.5% 29.5% 29.5% Maximum Green (s) 30.0 30.0 30.0 30.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -1.0 0.0 Total Lost Time (s) 5.0 6.0 Lead/Lag Lead Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 80.0 81.0 31.0 30.0 Actuated g/C Ratio 0.66 0.66 0.25 0.25 v/c Ratio 0.36 0.41 1.19 0.02 Control Delay (s/veh) 7.3 10.4 136.5 26.1 Queue Delay 0.8 0.0 0.0 0.0 Total Delay (s/veh) 8.1 10.4 136.5 26.1 LOS A B F C Approach Delay (s/veh) 8.1 10.4 136.5 26.1 Approach LOS A B F C Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.19 Intersection Signal Delay (s/veh): 50.4 Intersection LOS: D Intersection Capacity Utilization 86.7% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue Build PM Peak Hour Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/24/2024 Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 10.0 5.0 10.0 5.0 5.0 Minimum Split (s) 22.0 31.0 20.0 31.0 31.0 20.0 Total Split (s) 26.0 40.0 20.0 66.0 36.0 20.0 Total Split (%) 21% 33% 16% 54% 30% 16% Maximum Green (s) 20.0 34.0 15.0 60.0 30.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 2.5 3.0 3.0 3.0 0.2 Recall Mode None None None C-Max None None Walk Time (s) 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary Mitigation Build AM Conditions Mitigation Build AM Peak Hour Mitigation Build Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/25/2024 Mitigation Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 2% 10% -2% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 1.00 1.00 1.00 0.99 0.99 1.00 Frt 0.986 0.998 0.856 0.850 0.994 Flt Protected 0.950 0.985 0.998 0.960 Satd. Flow (prot) Flt Permitted 0.690 0.859 0.992 0.586 Satd. Flow (perm) Right Turn on Red No Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 6.6 4.1 13.3 14.5 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 0% 14% 44% 1% 2% 0% 0% 0% 4% 0% 0% 0% Adj. Flow (vph) Shared Lane Traffic (%) 25% 49% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 0.94 1.02 1.11 1.11 1.22 1.28 1.22 1.17 1.19 0.84 1.19 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Mitigation Build AM Peak Hour Mitigation Build Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/25/2024 Mitigation Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type NA pm+pt NA pm+pt NA pm+ov pm+pt NA Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 11.0 31.0 31.0 31.0 11.0 31.0 31.0 Total Split (s) 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 Total Split (%) 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% Maximum Green (s) 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lag Lag Lead Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.5 3.0 3.0 3.5 Recall Mode C-Max C-Max None C-Max None None None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 81.1 128.4 128.4 17.6 64.9 17.6 Actuated g/C Ratio 0.49 0.78 0.78 0.11 0.40 0.11 v/c Ratio 0.12 0.59 0.56 0.51 0.20 0.18 Control Delay (s/veh) 23.6 8.2 7.8 18.9 4.9 63.0 Queue Delay 0.0 11.3 11.2 0.0 0.0 0.0 Total Delay (s/veh) 23.6 19.5 19.1 18.9 4.9 63.0 LOS C B B B A E Approach Delay (s/veh) 23.6 19.3 11.9 63.0 Approach LOS C B B E Intersection Summary Area Type: Other Cycle Length: 164 Actuated Cycle Length: 164 Offset: 0 (0%), Referenced to phase 6:EBWB, Start of Yellow Natural Cycle: 125 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.59 Intersection Signal Delay (s/veh): 19.1 Intersection LOS: B Intersection Capacity Utilization 63.3% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 1: Veterans Plaza/Driveway & Croton Point Avenue Mitigation Build AM Peak Hour Mitigation Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/25/2024 Mitigation Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 0% 2% -1% -3% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95 Ped Bike Factor 0.99 1.00 Frt 0.951 0.889 0.850 Flt Protected 0.985 0.987 Satd. Flow (prot) Flt Permitted 0.724 0.987 Satd. Flow (perm) Right Turn on Red No Yes Yes No Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 4.1 9.0 16.1 20.6 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles (%) 0% 8% 3% 7% 1% 0% 0% 0% 0% 9% 0% 1% Adj. Flow (vph) Shared Lane Traffic (%) 43% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.09 1.09 1.09 1.11 1.11 1.11 0.99 0.99 0.99 0.98 0.98 0.98 Turning Speed (mph) Number of Detectors Detector Template Thru Left Thru Left Thru Right Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Mitigation Build AM Peak Hour Mitigation Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/25/2024 Mitigation Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Mitigation Build AM Peak Hour Mitigation Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/25/2024 Mitigation Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA pm+pt NA Perm NA Perm Protected Phases 2 8 6 8 Permitted Phases 6 8 Detector Phase 2 8 6 8 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 22.0 32.0 32.0 32.0 Total Split (s) 18.0 51.0 51.0 51.0 Total Split (%) 14.8% 41.8% 41.8% 41.8% Maximum Green (s) 12.0 45.0 45.0 45.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 Total Lost Time (s) 6.0 6.0 Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) Flash Don't Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) 64.1 82.1 27.9 27.9 Actuated g/C Ratio 0.53 0.67 0.23 0.23 v/c Ratio 0.22 0.65 0.77 0.76 Control Delay (s/veh) 17.2 10.7 57.8 57.4 Queue Delay 2.7 0.1 0.0 0.0 Total Delay (s/veh) 20.0 10.8 57.8 57.4 LOS B B E E Approach Delay (s/veh) 20.0 10.8 57.6 Approach LOS B B E Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.99 Intersection Signal Delay (s/veh): 25.3 Intersection LOS: C Intersection Capacity Utilization 76.6% ICU Level of Service D Analysis Period (min) 15 Mitigation Build AM Peak Hour Mitigation Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/25/2024 Mitigation Build AM Peak Hour Synchro 12 Report Kimley-Horn Splits and Phases: 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue Mitigation Build AM Peak Hour Mitigation Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/25/2024 Mitigation Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 10.0 5.0 5.0 10.0 5.0 Minimum Split (s) 31.0 31.0 20.0 31.0 20.0 Total Split (s) 36.0 51.0 17.0 54.0 17.0 Total Split (%) 30% 42% 14% 44% 14% Maximum Green (s) 30.0 45.0 12.0 48.0 12.0 Yellow Time (s) 4.0 4.0 3.5 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 2.5 3.0 3.0 3.0 3.0 Recall Mode Max None None C-Max None Walk Time (s) 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary Mitigation Build AM Peak Hour Mitigation Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/25/2024 Mitigation Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 5% -2% -4% Lane Util. Factor 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 0.99 1.00 1.00 0.99 Frt 0.962 0.999 0.950 0.927 Flt Protected 0.996 0.970 0.986 Satd. Flow (prot) Flt Permitted 0.861 0.892 0.796 0.877 Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 9.0 5.8 12.2 2.8 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 50% 8% 10% 7% 2% 33% 2% 0% 8% 0% 0% 67% Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 1.11 1.02 1.13 1.13 1.03 0.99 0.99 0.99 0.97 0.97 0.97 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Mitigation Build AM Peak Hour Mitigation Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/25/2024 Mitigation Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Mitigation Build AM Peak Hour Mitigation Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/25/2024 Mitigation Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 1 2 4 4 6 Permitted Phases 1 2 4 4 6 Detector Phase 1 2 4 1 2 4 4 6 4 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 31.0 31.0 Total Split (s) 51.0 51.0 51.0 51.0 Total Split (%) 41.8% 41.8% 41.8% 41.8% Maximum Green (s) 45.0 45.0 45.0 45.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -1.0 0.0 Total Lost Time (s) 5.0 6.0 Lead/Lag Lead Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 65.0 66.0 46.0 45.0 Actuated g/C Ratio 0.53 0.54 0.38 0.37 v/c Ratio 0.23 0.52 0.99 0.06 Control Delay (s/veh) 9.8 19.4 72.9 15.9 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 9.8 19.4 72.9 15.9 LOS A B E B Approach Delay (s/veh) 9.8 19.4 72.9 15.9 Approach LOS A B E B Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.99 Intersection Signal Delay (s/veh): 34.7 Intersection LOS: C Intersection Capacity Utilization 76.8% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue Mitigation Build AM Peak Hour Mitigation Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/25/2024 Mitigation Build AM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 10.0 5.0 10.0 5.0 5.0 Minimum Split (s) 22.0 31.0 20.0 31.0 32.0 20.0 Total Split (s) 18.0 36.0 17.0 54.0 51.0 17.0 Total Split (%) 15% 30% 14% 44% 42% 14% Maximum Green (s) 12.0 30.0 12.0 48.0 45.0 12.0 Yellow Time (s) 4.0 4.0 3.5 4.0 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 2.5 3.0 3.0 3.0 3.0 Recall Mode None Max None C-Max None None Walk Time (s) 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary Mitigation Build PM Conditions Mitigation Build PM Peak Hour Mitigation Build Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/25/2024 Mitigation Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 2% 10% -2% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 1.00 0.99 0.99 0.98 0.99 0.99 Frt 0.994 0.984 0.856 0.850 0.992 Flt Protected 0.950 0.980 0.999 0.961 Satd. Flow (prot) Flt Permitted 0.611 0.779 0.993 0.213 Satd. Flow (perm) Right Turn on Red No Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 5.0 4.1 13.3 14.5 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Heavy Vehicles (%) 0% 2% 0% 2% 3% 20% 50% 0% 0% 14% 0% 0% Adj. Flow (vph) Shared Lane Traffic (%) 31% 49% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 0.94 1.02 1.11 1.11 1.22 1.28 1.22 1.17 1.19 0.84 1.19 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Mitigation Build PM Peak Hour Mitigation Build Condition 1: Veterans Plaza/Driveway & Croton Point Avenue 09/25/2024 Mitigation Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Perm NA pm+pt NA pm+pt NA pm+ov pm+pt NA Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 11.0 31.0 31.0 31.0 11.0 31.0 31.0 Total Split (s) 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 41.0 Total Split (%) 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% Maximum Green (s) 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 35.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lag Lag Lead Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.5 3.0 3.0 3.5 Recall Mode C-Max C-Max None C-Max None None None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 114.7 127.6 127.6 18.4 31.3 18.4 Actuated g/C Ratio 0.70 0.78 0.78 0.11 0.19 0.11 v/c Ratio 0.18 0.23 0.21 0.79 0.65 0.35 Control Delay (s/veh) 11.1 5.0 4.8 20.7 9.6 78.9 Queue Delay 0.0 0.7 1.6 0.0 0.0 0.0 Total Delay (s/veh) 11.1 5.7 6.4 20.7 9.6 78.9 LOS B A A C A E Approach Delay (s/veh) 11.1 6.0 15.2 78.9 Approach LOS B A B E Intersection Summary Area Type: Other Cycle Length: 164 Actuated Cycle Length: 164 Offset: 0 (0%), Referenced to phase 6:EBWB, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay (s/veh): 12.6 Intersection LOS: B Intersection Capacity Utilization 71.9% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 1: Veterans Plaza/Driveway & Croton Point Avenue Mitigation Build PM Peak Hour Mitigation Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/25/2024 Mitigation Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 0% 2% -1% -3% Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor 1.00 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95 Ped Bike Factor 0.99 1.00 1.00 Frt 0.947 0.989 0.850 Flt Protected 0.972 0.956 Satd. Flow (prot) Flt Permitted 0.516 0.956 Satd. Flow (perm) Right Turn on Red No Yes Yes No Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 4.1 9.0 16.1 20.6 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Heavy Vehicles (%) 0% 0% 2% 1% 3% 0% 0% 0% 0% 3% 0% 1% Adj. Flow (vph) Shared Lane Traffic (%) 10% Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.09 1.09 1.09 1.11 1.11 1.11 0.99 0.99 0.99 0.98 0.98 0.98 Turning Speed (mph) Number of Detectors Detector Template Thru Left Thru Left Thru Right Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Mitigation Build PM Peak Hour Mitigation Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/25/2024 Mitigation Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Mitigation Build PM Peak Hour Mitigation Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/25/2024 Mitigation Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA pm+pt NA Perm NA Perm Protected Phases 2 8 6 8 Permitted Phases 6 8 Detector Phase 2 8 6 8 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 22.0 31.0 31.0 31.0 Total Split (s) 20.0 42.0 42.0 42.0 Total Split (%) 16.4% 34.4% 34.4% 34.4% Maximum Green (s) 14.0 36.0 36.0 36.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 Total Lost Time (s) 6.0 6.0 Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) Flash Don't Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) 59.8 95.9 14.1 14.1 Actuated g/C Ratio 0.49 0.79 0.12 0.12 v/c Ratio 0.58 0.38 0.62 0.48 Control Delay (s/veh) 23.9 3.6 64.6 58.3 Queue Delay 2.7 0.2 0.0 0.0 Total Delay (s/veh) 26.6 3.8 64.6 58.3 LOS C A E E Approach Delay (s/veh) 26.6 3.8 62.0 Approach LOS C A E Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.03 Intersection Signal Delay (s/veh): 22.3 Intersection LOS: C Intersection Capacity Utilization 72.0% ICU Level of Service C Analysis Period (min) 15 Mitigation Build PM Peak Hour Mitigation Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/25/2024 Mitigation Build PM Peak Hour Synchro 12 Report Kimley-Horn Splits and Phases: 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue Mitigation Build PM Peak Hour Mitigation Build Condition 2: State Rte 9 On Ramp/State Rte 9 Off Ramp & Croton Point Avenue 09/25/2024 Mitigation Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø2 Ø3 Ø4 Ø6 Ø8 Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 10.0 5.0 5.0 10.0 5.0 Minimum Split (s) 31.0 31.0 20.0 31.0 20.0 Total Split (s) 40.0 42.0 20.0 60.0 20.0 Total Split (%) 33% 34% 16% 49% 16% Maximum Green (s) 34.0 36.0 15.0 54.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 2.5 3.0 3.0 3.0 0.2 Recall Mode None None None C-Max None Walk Time (s) 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary Mitigation Build PM Peak Hour Mitigation Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/25/2024 Mitigation Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) 3% 5% -2% -4% Lane Util. Factor 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 0.99 1.00 0.99 Frt 0.949 0.999 0.895 0.923 Flt Protected 0.989 0.989 0.986 Satd. Flow (prot) Flt Permitted 0.846 0.681 0.922 0.921 Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) 9.0 5.8 12.2 2.8 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 6% 0% 0% 0% 0% 0% Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor 1.02 1.11 1.02 1.13 1.13 1.03 0.99 0.99 0.99 0.97 0.97 0.97 Turning Speed (mph) Number of Detectors Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Mitigation Build PM Peak Hour Mitigation Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/25/2024 Mitigation Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Mitigation Build PM Peak Hour Mitigation Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/25/2024 Mitigation Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 1 2 4 4 6 Permitted Phases 1 2 4 4 6 Detector Phase 1 2 4 1 2 4 4 6 4 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 31.0 31.0 31.0 31.0 Total Split (s) 42.0 42.0 42.0 42.0 Total Split (%) 34.4% 34.4% 34.4% 34.4% Maximum Green (s) 36.0 36.0 36.0 36.0 Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -1.0 0.0 Total Lost Time (s) 5.0 6.0 Lead/Lag Lead Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None None None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) 74.0 75.0 37.0 36.0 Actuated g/C Ratio 0.61 0.61 0.30 0.30 v/c Ratio 0.38 0.44 1.03 0.01 Control Delay (s/veh) 11.8 13.6 78.5 22.9 Queue Delay 0.8 0.0 0.0 0.0 Total Delay (s/veh) 12.5 13.6 78.5 22.9 LOS B B E C Approach Delay (s/veh) 12.5 13.6 78.5 22.9 Approach LOS B B E C Intersection Summary Area Type: Other Cycle Length: 122 Actuated Cycle Length: 122 Offset: 95 (78%), Referenced to phase 6:WBTL, Start of Yellow Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.03 Intersection Signal Delay (s/veh): 34.2 Intersection LOS: C Intersection Capacity Utilization 86.7% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue Mitigation Build PM Peak Hour Mitigation Build Condition 3: State Rte 9 On/Off Ramp/Parking Lot & Croton Point Avenue 09/25/2024 Mitigation Build PM Peak Hour Synchro 12 Report Kimley-Horn Lane Group Ø1 Ø2 Ø4 Ø6 Ø7 Ø8 Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) 5.0 10.0 5.0 10.0 5.0 5.0 Minimum Split (s) 22.0 31.0 20.0 31.0 31.0 20.0 Total Split (s) 20.0 40.0 20.0 60.0 42.0 20.0 Total Split (%) 16% 33% 16% 49% 34% 16% Maximum Green (s) 14.0 34.0 15.0 54.0 36.0 15.0 Yellow Time (s) 4.0 4.0 3.5 4.0 4.0 3.5 All-Red Time (s) 2.0 2.0 1.5 2.0 2.0 1.5 Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 2.5 3.0 3.0 3.0 0.2 Recall Mode None None None C-Max None None Walk Time (s) 7.0 7.0 Flash Don't Walk (s) 18.0 18.0 Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay (s/veh) Queue Delay Total Delay (s/veh) LOS Approach Delay (s/veh) Approach LOS Intersection Summary