Agenda item: LWRP Consistency Review and EAF Part II Review for the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.
Environmental review, 24 pages. Attached to agenda item: “LWRP Consistency Review and EAF Part II Review for the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
DRAFT FEAF PART II - 1 Croton Point Ave Incomplete
Draft Phase II Environmental Site Assessment Report
Environmental Noise Study and Facade Glazing...
Insite Preliminary Wastewater Engineering Report dated...
Insite Preliminary Water Engineering Report dated July...
Insite Stormwater Pollution Prevention Plan dated July...
Insite engineering and landscape architecture plans...
LWRP Lot A - Last Revised 10.16.24
Letter from Kimley Horn dated September 16%2C 2024...
Letter from NYSDOT consenting to the Board of Trustees...
Letter from the Division for Historic Preservation...
Memorandum by Longman Lindsey dated September 10%2C 2024
Extracted text
Environmental, Planning, and Engineering Consultants
34 South Broadway
Suite 300
White Plains, NY 10601
tel: 914 949-7336
fax: 914 949-7559
www.akrf.com
Offices in New York ● New Jersey ● Pennsylvania ● Maryland ● Connecticut
Memorandum
To:
Bryan Healy, Village Manager, Village of Croton-on-Hudson
Mayor Brian Pugh, Village of Croton-on-Hudson
Village of Croton-on-Hudson Board of Trustees
From:
AKRF, Inc. (Aaron Werner, AICP)
Date:
August 19, 2024
Re:
WBP Development LLC - 1 Croton Point (aka Lot A)
cc:
Jason Mencher, AICP (AKRF)
WBP Development LLC; KSCJ Consulting; Insite Engineering (Applicant Team)
Linda Whitehead (Village Attorney)
Dan O’Connor, P.E. (Village Engineer)
AKRF, Inc. has reviewed the following documents and plans for the above referenced application:
•
Cover Letter, from WBP Development LLC, dated July 11, 2024
•
Village Board Special Permit Application, submitted by WBP Development LLC, dated July 10, 2024
•
Full Environmental Assessment Form, Part 1, prepared by KSCJ Consulting, dated July 16, 2024
•
Site Plan Set (7 sheets), prepared by Insite Engineering, Surveying, & Landscape Architecture, P.C.,
dated July 11, 2024
•
Architectural Plan Set (6 sheets), prepared by Arketekcher, dated July 17, 2024
•
Preliminary Water Engineering Report, prepared by Insite Engineering, Surveying, & Landscape
Architecture, P.C., dated July 11, 2024
•
Preliminary Wastewater Engineering Report, prepared by Insite Engineering, Surveying, & Landscape
Architecture, P.C., dated July 11, 2024
•
Preliminary Stormwater Pollution Prevention Plan (SWPPP), prepared by Insite Engineering,
Surveying, & Landscape Architecture, P.C., dated July 11, 2024
Village of Croton-on-Hudson Board of Trustees
August 19, 2024
A. BACKGROUND / PROJECT DESCRIPTION
The Applicant, WBP Development, LLC, is seeking special use permit approval from the Village of Croton-
on-Hudson (the “Village”) Board of Trustees to construct a proposed 5-story, 100-unit affordable
homeownership project with amenity space and on-site parking (the “proposed project”) at the intersection
of Croton Point Avenue and Veterans Plaza. The proposed project involves an assemblage of three existing
tax parcels totaling approximately 1.76 acres (the “project site”): 79-17-1-3 (aka Lot 3), 79-17-1-4 (aka Lot
4) and 79-17-1-5 (aka Lot 5). Village-owned Lot 5, fronting on Croton Point Avenue, was most recently
utilized as a parking lot for the Metro-North Railroad (MNR) Croton-Harmon station (commonly referred
to as the “parking lot A”). Lot 4 is currently owned by Croton Point Realty, Inc., has frontage along Croton
Point Avenue and contains portions of a two-story commercial building currently occupied by a law office.
Village-owned Lot 3 is located to the rear of Lot 4 and contains portions of the two-story commercial
building noted above, and a parking lot. The owner of Lot 4, Croton Point Realty, Inc. has had a long-term
land lease with the Village for the uses on Village-owned Lot 3. The Applicant has been selected by the
Village as the purchaser of Lots 3 and 5 currently owned by the Village, and is in contract to purchase Lot
4 from Croton Point Realty, Inc.
In November 2022, the Village adopted Local Law No. 14 of 2022 to amend the provisions of the Zoning
Code to allow for transit-oriented mixed-use and multifamily residential buildings in a specific portion of
the LI zoning district including the project site. Local Law No. 14 of 2022 was considered simultaneously
with Local Law No. 13 of 2022, which amended provisions of the Zoning Code to expand the area of, and
modify the zoning regulations for and related to, the Harmon/South Riverside Gateway Area located
generally to the northeast of the project site. Local Law No. 14 of 2022 permits the project site to be
redeveloped (through issuance of a special permit from the Village Board of Trustees) with transit-oriented
multifamily housing or multifamily housing over ground floor commercial uses at a maximum Floor Area
Ratio (FAR) of 1.2, a maximum height of up to 5-stories, and a parking ratio of 1 space per residential unit
and 1 space per 400 square feet of commercial floor area. Following the adoption of Local Law 14 of 2022,
the Village released a Request for Proposals (RFP) for Village-owned Lot 5, which in addition to requesting
mixed-use development proposals with affordable housing solely for Lot 5, indicated that the Village was
also willing to review alternative schemes that assume a larger land assemblage by incorporating adjacent
lots 3 and 4.
The proposed project is a 5-story building with cellar level for parking below grade. It offers 100 residential
units consisting of 46 one-bedroom and 54 two-bedroom units; the proposed FAR is 1.10, where 1.20 is the
maximum allowed. The design includes 103 parking spaces (approx. 1 space per unit), provided via a
combination of surface and below-building parking. No ground floor commercial space is proposed.
Amenities within the building include a community room, fitness center, coworking lounge, bike storage
room, and a rooftop deck. According to the Applicant, the exterior façade combines brick and metal panels
for cladding. Sustainable building design features include full electrification, solar readiness, high
efficiency HVAC equipment (cold climate air source heat pumps) and appliances (Energy Star Multifamily
New Construction Program), Level 2 EV charging stations (1 per 20 parking spaces) and low-flow water
fixtures.
In addition to approval of a special permit from the Village Board of Trustees, other local approvals for the
proposed project include site plan approval from the Village Planning Board, Local Waterfront
Revitalization Program (LWRP) consistency review by the Village Waterfront Advisory Committee, and
visual/aesthetics review and comment by the Village Advisory Board on Visual Environment (following a
referral by the Planning Board). The Village Board of Trustees is serving as the Lead Agency for the
proposed project’s environmental review pursuant to the State Environmental Quality Review Act
(SEQRA).
August 19, 2024
B. COMMENTS
1. PREVIOUS PLANNING FRAMEWORK
1. Prior to the adoption of both Local Laws 13 and 14 of 2022, the Village retained AKRF to conduct a
theoretical buildout analysis for all of the tax parcels (including the project site) to be affected by both
Local Laws, pursuant to the FAR, height, and other development requirements under consideration.
AKRF completed a Full Environmental Assessment Form (FEAF) with supplemental studies to satisfy
the requirements of the State Environmental Quality Review Act (SEQRA) specifically for the
rezoning (the “2022 FEAF”). As noted in the Village’s RFP for the project site, the selected developer
is required to conduct a new site/project-specific environmental review pursuant to SEQRA due to the
discretionary actions before the Village. The Applicant has submitted a project-specific FEAF Part 1
with accompanying narrative. As evident in their submission, the Applicant is relying on AKRF’s prior
analyses and conclusions to the extent possible for certain potential environmental impacts from the
2022 FEAF. To assist the Village in considering if additional studies beyond those completed for the
rezoning are warranted, summaries of the analyses and conclusions related to traffic, public schools,
and visual impacts completed in the 2022 FEAF are provided below. Additional comments related to
the Applicant’s submitted project-specific FEAF and site plan are provided later in this memorandum.
Traffic – 2022 FEAF
2. A traffic impact study (TIS) was completed by AKRF to assess the potential traffic and transportation
impacts related to the theoretical maximum buildout projected under both Local Laws 13 and 14 of
2022, a buildout which was conservatively estimated to be up to 470 residential units, 21,831 sf of
commercial floor area, and 725 off-street parking spaces within the overall rezoning area. The analysis
year assumed for the theoretical buildout was 2042. Of this total buildout, a mixed-use/TOD
scenario containing a total of 87 residential units, 21,831 square feet of ground floor commercial
space, and 142 off-street parking spaces was attributed to the involved parcels at the intersection
of Croton Point Avenue and Veterans Plaza (identified as parcels 48, 49, and 50), which included
the three tax lots comprising the project site as well as the lot opposite the project site on the
south side of Croton Point Avenue.
The 2022 FEAF also noted that parcels 48, 49, and 50 could be redeveloped with multifamily
residential buildings containing no ground floor commercial space. Applying the same parameters for
an all-residential scenario on the three parcels (maximum FAR of 1.2 and maximum height of 5-stories)
yielded estimated net increases of 21 residential units and 21 residential parking spaces (from 87
units/87 parking spaces to 108 units/108 parking spaces); and net decreases of 21,831 square feet of
ground floor commercial space and 55 commercial parking spaces. However, for purposes of
conservative environmental review under SEQRA, particularly with regard to potential traffic impacts,
the Village preferred to assume the mixed-use/TOD scenario described above for these parcels in the
buildout calculations. By comparison, the proposed project consists of 100 units with 100 parking
spaces, and no ground floor commercial space. The net difference between the TIS assumption
for the affected area and the proposed project is +13 units and -21,831 sf of commercial space.
Following a preliminary screening, the following five signalized intersections were ultimately selected
for quantified analysis in the 2022 TIS:
o Croton Point Ave. and Veterans Plaza (signalized)
o Croton Point Ave. and Rt. 9/9A Southbound Ramps (signalized)
o Croton Point Ave. and Rt. 9/9A Northbound Ramps (signalized)
o Croton Point Ave. and S. Riverside Ave. (signalized)
o S. Riverside Ave. and Benedict Blvd (signalized)
August 19, 2024
Turning Movement Counts (TMCs) and Vehicle Classification Counts (VCC) were collected at the
above intersections for the weekday AM (6:30 to 9:30 AM) and PM (4:00 to 6:00 PM) periods in April
2022.
For the 2022 TIS, it was conservatively assumed that the future design year (i.e., the future year by
which the full theoretical buildout from the rezoning would occur) would be 2042 (2022 + 20 years).
Future 2042 grown traffic volumes were developed by increasing the Existing 2022 traffic volumes in
the study area by a 1 percent per year compounded growth rate. This growth rate reflected increases in
background traffic growth that would be expected to occur with or without the rezoning. 2042 Future
Build traffic volumes were developed by adding the trips estimated to be generated by the rezoning to
the 2042 grown traffic volumes.
Potential impacts of the adoption of both Local Laws were analyzed using methodologies based on the
Highway Capacity Manual, 6th Edition (HCM 6) methodology (Synchro 11 software) to calculate
existing and future traffic operating conditions (Level of Service (“LOS”) and total delay) at each of
the intersections studied. LOS is based on a grading scale of “A” through “F” with “A” representing
optimum traffic conditions and “F” representing poor traffic conditions (LOS D or better is typically
considered acceptable operating conditions).
Under the 2042 Build condition, absent any additional improvements, the 2022 TIS concluded there
would be impacts expected at the following locations:
o Croton Point Avenue and Veterans Plaza-the southbound approach would deteriorate from
LOS E to LOS F during the Weekday AM peak hour and within LOS F during the Weekday
PM peak hour.
o Croton Point Avenue and Route 9/9A Northbound1 Ramps-the northbound approach would
deteriorate within LOS F during the Weekday AM and PM peak hours.
o South Riverside Avenue and Benedict Boulevard-the westbound approach would
deteriorate from LOS D to LOS E during the Weekday PM peak hour. The southbound
approach would deteriorate within LOS F during the Weekday AM and PM peak hours.
For the potentially impacted locations described above, potential mitigation measures were identified,
as follows:
o Croton Point Avenue and Veterans Plaza—Signal timing adjustments
o Croton Point Avenue and Route 9/9A Northbound Ramps—Signal timing adjustments
o South Riverside Avenue and Benedict Boulevard—Signal timing adjustments and
pavement/lane restriping and/or narrowing of the median of Benedict Boulevard to provide
two lanes at each approach to South Riverside Avenue.
It is AKRF’s opinion that the 2022 TIS was a comparable and conservative analysis that can be relied
upon for the proposed project’s assessment of potential traffic impacts and recommended mitigation
under SEQRA, for the following reasons:
o The traffic counts were completed within the last three years, which is acceptable to
NYSDOT.
1 The 2022 TIS referenced Croton Point Avenue and the Route 9/9A “Southbound” Ramps as the potentially impacted
intersection, which has since been identified as a typo in the report. The Route 9/9A Northbound Ramps is where
the potential impact was identified with Croton Point Avenue as reported in the supporting tables of the report and
capacity analysis results. As noted in the report’s tables and capacity analysis, the northbound approach at this
intersection would deteriorate within LOS F during the Weekday AM and PM peak hours.
August 19, 2024
o AKRF’s impact assessment on the full buildout of the rezoning area utilized a 2042 build
year (20-year timeframe), which reflected continued background traffic growth over a 20-
year period.
o The buildout for the three LI TOD parcels assumed ground floor commercial space, and
the proposed project (to be constructed on two of those three parcels) does not propose any
commercial space.
In addition, the recommended mitigation measures identified in the 2022 TIS for South Riverside
Avenue and Benedict Boulevard should not be necessary solely as a result of this proposed project,
since that potential mitigation was driven by the increased volumes attributable to the theoretical
buildout resulting from the HSRG zoning amendments, which assumed new multifamily residential
uses on several parcels along the South Riverside Avenue corridor (a considerable distance from the
project site). AKRF recommends that the signal timing adjustments for the two affected intersections
on Croton Point Avenue be coordinated among the Applicant and NYSDOT to mitigate the potential
for traffic impacts at these intersections. The specific details of the signal timing adjustments proposed
should be provided to the Village and AKRF for review.
While the traffic counts utilized in the 2022 TIS were collected within the most recent three-year
timeframe acceptable to NYSDOT, the Village has expressed concerns about increases in traffic to and
from the Croton-Harmon Train Station over the course of the pandemic recovery since 2022. It is
AKRF’s position that the 2022 TIS provided a conservative analysis which included 20 years of
background growth. However, to address the concern identified above and to ensure appropriate
signal timings are being developed as part of the signal timing mitigation, we recommend that
updated traffic counts be conducted for the two signalized intersections to be mitigated as part
of this project, Croton Point Avenue and Veterans Plaza and Croton Point Avenue and Route
9/9A Northbound Ramps, as well as the Croton Point Avenue and Route 9/9A Southbound ramps
given its proximity to the two other signals. The counts should be collected during the fall while
schools are in session.
Visual Impacts of 5-Story Buildings on Lot A – 2022 FEAF
3. As part of its review of the 2022 zoning changes, the potential visual impacts of constructing a 1.2
FAR, 5-story building on each of the three LI TOD parcels (including the project site) were evaluated
using computer software to construct three-dimensional models to simulate the general massing of a
theoretical mixed-use building on each parcel. The model was then superimposed on a series of
photographs taken from a total of six publicly accessible viewpoints during both leaf-on (summer) and
leaf-off (winter) conditions. In the absence of actual development plans for these parcels, the
conceptual massing was highly generalized, and therefore, conservative. The conceptually modeled
massing for the LI TOD parcels (including the project site) was most visible during leaf-off conditions
from Croton Point Avenue (from the site extending eastward to the vicinity of the Route 9 overpass)
and from Veterans Plaza looking north. However, the analysis demonstrated that from these vantage
points, a five-story building would not overwhelm the observer nor block the views of pedestrians or
motorists toward any aesthetically prominent features. The Village Board, in the Negative Declaration
adopted as part of the rezoning process, concluded that no significant adverse impacts visual or
aesthetic impacts were anticipated from the potential placement of 1.2 FAR, 5-story mixed-use
buildings on the three proposed LI TOD parcels.
The Village can request more detailed renderings of the proposed project when viewed from Croton
Point Avenue and Veterans Plaza to confirm the prior assessment. In addition to the proposed building,
renderings should include proposed landscaping, lighting, and parking areas, as well as existing
adjacent conditions that are expected to remain for context (e.g., other structures, street trees, utility
wires, etc.). Renderings should also include a key/legend identifying the vantage point of the rendering.
4. As a supplement to the photo simulations, which focused on publicly accessible viewpoints, as part of
the 2022 zoning review, two cross-sectional profiles (one covering Parcels 48 and 50 and another
covering Parcel 49) were developed using ESRI ArcGIS Pro to illustrate the intervening topography
Village of Croton-on-Hudson Board of Trustees
August 19, 2024
and land cover between the three parcels and private residences along Young Avenue and Wayne Street
(the residential neighborhoods closest to the three parcels).
The key map from the 2022 FEAF illustrating the two profile lines (profiles A and B) extending
southwest from Young Avenue through Parcels 48-50 is shown below.
Cross-sectional views of profiles A and B are shown below. The two cross sections illustrate the
topographic relationship and potential visibility of a 5-story building on Parcels 48-50 from private
residential properties along Young Avenue and Wayne Street. The horizontal distance covered by
profiles A and B is approximately 1,200 feet, and labels are provided for intervening properties,
structures, and roadways covered within each profile (shown at a representative scale).
As shown above, the difference in existing grade elevation between the three LI/TOD parcels analyzed
and residences to the northeast along Young Avenue and Wayne Street is approximately 40 feet, which
would place a 5-story building on each parcel below and outside of the direct line of sight from these
residences. In the absence of actual development plans for these parcels, including grading plans with
finished floor elevations, the conceptual 5-story massing shown in each profile was highly generalized,
and therefore conservative. Based on this analysis, that includes a mathematically modeled
representation of the topographic profile between each location, it was concluded that the construction
of 1.2 FAR mixed-use buildings with a roof height of 5-stories and approximately 50 feet above grade
in this area of the Village would not present a significant adverse visual impact when viewed from the
upland residential neighborhoods.
August 19, 2024
The Village can request more detailed renderings of the proposed project when viewed from the upland
residential neighborhoods as well as from the vicinity of Croton Point Avenue and Veterans Plaza to
confirm the prior assessment. In addition to the proposed building, renderings from the vicinity of
Croton Point Avenue and Veterans Plaza should include proposed landscaping, lighting, and parking
areas, as well as existing adjacent conditions (expected to remain) for context (other structures, street
trees, utility wires, etc.). Renderings should also include a key/legend identifying the vantage point of
the rendering.
School-aged Children – 2022 FEAF
5. Using the 2006 Rutgers University Center for Urban Policy Research (CUPR) multipliers2, the 2022
FEAF conservatively estimated 29 to 45 public school aged children (PSAC) could result from the net
increase in residential density permitted by the two local laws. This analysis was based on two
scenarios: one where all units were one-bedroom, and one where half of the units were one-bedroom
and half were two-bedroom. In addition, 10 percent of the units in each scenario were assumed to be
affordable units.
A case study approach was also conducted to provide a supplemental level of analysis for PSAC. The
case study relied on data from the Croton-Harmon Union Free School District (CHUFSD) with respect
to the number of PSAC from the following developments/addresses:
o Mount Airy Woods (12 units): All apartment numbers listed from the following street
addresses: 21, 23, and 25 Mount Airy Woods, Croton-on-Hudson, NY 10520;
o Bari Manor Apartment Homes (82 units): All apartment numbers with an address including
“Bari Manor,” “Bari Manor Apartments,” or a street address of 31 or 31A Old Post Road
South, Croton-on-Hudson, NY 10520;
o 94 Grand Street (31 units): All apartment numbers listed for the address of 94 Grand Street,
Croton-on-Hudson, NY 10520.
The highest recorded combined enrollment from these three properties (28 PSAC from the 2019–2020
school year) resulted in a conservatively derived multiplier of 0.22 PSAC per residential unit. It is also
noted that the developments for which data was available contain larger unit sizes (i.e., some 3-
bedroom units). Applying the 0.22 PSAC per unit multiplier to the incremental build out of both local
laws resulted in an estimated increase of approximately 71 PSAC (K-12) at full build-out.
The 2022 FEAF identified a trend of declining enrollment in the district. An increase of up to 71 PSAC
over the 2022–2023 projected enrollment of 1,536 students, in addition to other background growth to
occur over several years, would result in enrollment well below the District’s peak enrollment of 1,752
students in the 2009–2010 school year. Furthermore, the estimated additional students would not be
introduced all at once, but rather be incrementally introduced and distributed across the district’s three
schools (13 grades).
Refer to Comments #8 and #9 under “Project Specific Environmental Review Considerations” below
for recommendations on addressing potential impacts to the school district from the proposed project.
2 As part of the 2022 FEAF, AKRF reviewed the Rutgers CUPR November 2018 report titled “Updated New Jersey
Demographic Multipliers – The Profile of Occupants of Residential Development in New Jersey” and it was
determined that the 2006 CUPR multipliers yielded PSAC estimates that were higher than those derived from the
2018 updates. Therefore, to ensure conservative analysis the 2006 CUPR multipliers were used in the 2022 FEAF.
August 19, 2024
2. PROPOSED SITE PLAN / CODE COMPLIANCE
1. The following bulk and area requirements were added to the Village Zoning Code for the TOD/LI
overlay through Local Law 14 of 2022 (assessment of the Applicant’s proposal provided in italics
beneath each):
a. Minimum lot area: 10,000 square feet
The project site measures approximately 1.76 acres
b. Setbacks: As determined by the Village Board during review of the Special Permit
To be determined by the Village Board
c. Off-street parking per residential unit: 1 space per unit
The proposed project provides 103 spaces for 100 units
d. Floor area ratio: 1.20
The proposed project’s FAR is 1.10
e. Building height (stories): 5
The proposed project is 5 stories
f. Bedrooms: Studio, 1- and 2-bedroom units only
The building is currently proposing 46 one-bedroom units and 54 two-bedroom units.
2. The following design/development requirements for the project site were outlined in the RFP issued
by the Village Board (assessment of the Applicant’s proposal provided in italics beneath each):
a. Access and circulation: the existing curb cut at the signalized intersection of Croton Point
Avenue and Veterans Plaza must be retained in a manner such that the entrance and exit is
controlled by the existing traffic light.
The proposed project’s main entrance utilizes the existing curb cut and aligns with the
existing signalized intersection of Croton Point Avenue and Veterans Plaza. Additional
comments on access are provided later in this memorandum.
b. Affordable housing: A minimum of 20 percent of the residential units proposed must be
reserved as affordable housing. The Village is looking for a mix of income requirements
for the affordable units; an example of a breakdown could be 40% of units at 30% AMI,
40% of units at 60% AMI and 20% of units at 80% AMI. Other requirements of Section
230-48 of the Village Code must also be met.
The Applicant is currently proposing for all 100 units to be affordable homeownership
units funded through NYSHCR’s Affordable Homeownership Opportunity Program
(AHOP).
c. Amenities: Public benefits and amenities should be part of any new development, including
outdoor greenspace and an attached or separate indoor facility for community and
recreational use by all Croton residents.
Amenities proposed within the building include a community room, fitness center,
coworking lounge, bike storage room, and a rooftop deck. The Applicant should clarify if
any of these amenities are intended for use by the general public, and further
explain/identify the public benefits and public amenities being included in the Proposed
Project (it should be noted that the RFP for the project required public benefits and
amenities).
d. Sustainability: Use of sustainable energy sources (EV charging stations, solar panels, etc.).
The Village has adopted the NYStretch Energy Code-2020.
August 19, 2024
Sustainable building design features proposed include full electrification, solar readiness,
high efficiency HVAC equipment (cold climate air source heat pumps) and appliances
(Energy Star Multifamily New Construction Program), Level 2 EV charging stations (1 per
20 parking spaces) and low-flow water fixtures.
e. Noise attenuation: Use of noise-attenuating construction materials to address rail noise
from the nearby MNR station.
According to the Applicant, the exterior façade combines brick and metal panels for
cladding. Additional information on existing ambient noise conditions at the site will be
required in order to ensure that the proposed façade construction provide acceptable
interior noise levels for residential uses (see comments below).
3. AKRF defers to the Village Engineer for review of the Applicant’s water and wastewater engineering
reports, SWPPP, and other aspects of the site/building design required by the Zoning Code. It is also
noted that the Westchester County Department of Environmental Facilities (WCDEF) will need to
review and approve the engineering reports and the proposed connection to the sanitary sewer system
on Croton Point Avenue.
3. PROPOSED PROJECT - LWRP CONSISTENCY REVIEW
1. The project site is located within the boundaries of the Village’s amended Local Waterfront
Revitalization Program (LWRP), adopted by the Village Board of Trustees on August 14, 2023 and
approved by the New York State Department of State on March 26, 2024.3 The Applicant completed
and submitted the Village’s Coastal Assessment Form (CAF) as an attachment to the FEAF Part 1. The
submitted CAF appears to be the CAF completed by AKRF for the 2022 rezoning (which had some
notations added that are not applicable to this action). The Applicant should download and complete a
clean version of the CAF and re-submit it to the Village.
2. Attachment B to this memorandum contains the LWRP policy review worksheet utilized by the
Village’s Waterfront Advisory Committee (WAC). The Applicant should review the worksheet as a
guide to preparing a draft assessment of the project’s consistency with the applicable policies, utilizing
information on the proposed project’s design and construction. The draft assessment should be
submitted for review by AKRF and Village staff. The draft assessment will assist the Village Board
and the WAC on reviewing the proposed project against the LWRP policies. AKRF defers to the
Village Board of Trustees for the final determination of consistency.
4. PROJECT-SPECIFIC ENVIRONMENTAL REVIEW (SEQRA) CONSIDERATIONS
1. FEAF Part 1 comments:
a. In Section A, revise footnote to reflect that the owner of Tax Lot 3 is the Village; Tax Lot
4 is owned by Croton Point Realty, Inc. AKRF understands that Croton Point Realty, Inc.
has had a long-term land lease with the Village for the uses on Village-owned Lot 3.
b. Section D.2.c.iii. It is noted that potential extension of the Wayne Street water main to
Croton Point Avenue could be completed to serve the project. Additional information
should be provided in the narrative accompanying FEAF Part I, based on feedback from
the Village Engineer.
c. Section E.1.d. Revise response to “Yes” and identify Happy Hearts Take Two, 365 S
Riverside Ave, Croton-On-Hudson, NY 10520 (approximately 0.3-miles from the project
site).
2. Noise: The project site is within close proximity to the MNR Croton-Harmon station and associated
rail yards. The Applicant should submit a noise study with readings taken over a 24-hour weekday
3 croton_on_hudson_lwrp_amdmt_and_app_a-e_sos_approved.pdf (crotononhudson-ny.gov)
August 19, 2024
period to provide information on existing ambient noise conditions at the project site, in order to
determine the appropriate level of building facade (window-wall) attenuation necessary to maintain an
interior noise level of 45 A-weighted decibels (dBA). One on-site noise monitoring location should be
sufficient, ideally closer to the rail line. If the anticipated funding from NYSHCR will include HUD
sources of funding, it is advisable that the noise study include information from HUD’s DNL calculator
in addition to noise readings, for comparative purposes.
3. Hazardous Materials: Given the location of the project site within an industrially zoned area, its land
use history and surrounding uses, the Applicant should submit a recent Phase I Environmental Site
Assessment (ESA) and any additional Phase II subsurface sampling reports for review.
4. Visual/Aesthetics: The submitted Architecture Plan Set (Sheet T-001.00) includes a rendering of the
proposed building. The Village can request more detailed renderings of the proposed project when
viewed from Croton Point Avenue and Veterans Plaza. In addition to the proposed building, renderings
should include proposed landscaping, lighting, and parking areas, as well as existing adjacent
conditions expected to remain for context (e.g., other structures, street trees, utility wires, etc.).
Renderings should also include a key/legend identifying the vantage point of the rendering.
5. Historic Resources: The submitted FEAF Part 1, which was generated using the NYSDEC EAF
Mapper, indicates that the project site is in an area sensitive for archaeological resources. The proposed
project would result in disturbance of over 1 acre. Even though the site has been previously disturbed
and developed, the Applicant should consult with the New York State Office of Parks, Recreation, and
Historic Preservation (OPRHP) for an impact determination on the project to satisfy the Village’s
obligations under SEQRA. Consultations through OPRHP’s Cultural Resource Information System
(CRIS) take approximately 30 days for a response.
6. Threatened/Endangered Species: The submitted FEAF Part 1, which was generated using the
NYSDEC EAF Mapper, indicates that habitat for the northern harrier, bald eagle, Atlantic sturgeon
and shortnose sturgeon may be present at the site. Since the project site is located inland from the
Hudson River shoreline, contains a paved parking lot, a commercial structure, sparse vegetation and is
framed on either side by active transportation and industrial uses, it is not considered suitable habitat
for these species and no further assessment is required.
7. Traffic: In addition to the recommendations provided in the conclusions of Comment #2 under
“Previous Planning Framework” above, the following items should be updated in the submitted FEAF
Part 1 narrative: (1) the second bullet on page 5 should be changed to “Croton Point Avenue and Route
9/9A Northbound ramps”, (2) the ITE Land Use code and respective trip generation numbers should
be revised so they are based on the ITE data for ITE Land Use 221 “Multifamily Housing (Mid-Rise)”.
In order to improve vehicular, pedestrian, and bicycle safety, it is recommended that the Applicant
eliminate the eastern one-way site driveway along Croton Point Avenue. For internal vehicle
circulation safety, it is recommended that the Applicant consider relocating the proposed tree at the
southeast corner of the building to improve sight lines from the adjacent parking spaces. The location
of the surface parking lot space adjacent to the garage entrance (on the east side of the building)
provides limited sight distance between a vehicle backing out to leave that parking space and any
vehicle coming from under the building. It is recommended that this parking space is relocated to
another location on the site to maintain the total number of required parking spaces on site. A set of
truck turning path analysis (“AutoTURN”) drawings should be provided to demonstrate how the
largest anticipated fire, garbage, and delivery vehicles would enter, exit, and navigate the project site.
The drawings should also identify the proposed location of the trash receptacle(s) that would be
accessed by the garbage trucks. See Attachment A for additional references/depictions of the
comments listed above.
8. Fiscal / Economic Analysis: The Village should request a quantified assessment of the project’s
potential effects on the fiscal health of the Village, the Croton Harmon School District, and other
directly affected taxing jurisdictions. The assessment should include: 1) identification of all applicable
taxing jurisdictions; 2) quantification of property taxes generated from the project site in the existing
Village of Croton-on-Hudson Board of Trustees
August 19, 2024
conditions; 3) estimated changes in tax revenue with the project, including new property tax revenues
generated by the project’s built improvements as well as any reduction in property tax revenues
associated with the displacement of the existing built improvement(s); 4) estimated number of project
residents and estimate per capita and total costs to the applicable taxing jurisdictions as a result of the
project. For the Croton-Harmon School District, estimate a per-pupil cost for existing students, and
apply that cost to projected school-aged children associated with the project (see #9 below). The
assessment should describe the approach used to derive the project’s assessed value and per-unit costs
and note key assumptions.
9. Public Schools: Based on the 0.22 public school-aged children (PSAC) per dwelling unit ratio from
Table 9 of the 2022 FEAF (based on Village apartment building-level data), the proposed project would
include households with an estimated 22 PSAC. The Applicant should supplement this estimate using
the 2018 Rutgers Study “Who Lives in New Jersey Housing,” to derive alternative estimates under the
following two scenarios: 1) 100% affordable home ownership; and 2) a rental scenario that has 80%
market rate units and 20% affordable units. For the rental scenario, provide assumptions related to unit
size (e.g., 1BR, 2BR) for both market rate and affordable units. The Applicant should also estimate the
per-pupil cost for existing Croton-Harmon School District students and apply that cost to the estimated
PSAC associated with the project. Finally, the applicant should speak to regional demographic trends
and enrollment trends in the Croton-Harmon School District, to the extent the data is available.
C. RECOMMENDATIONS
At the August 21, 2024 Village Board meeting and/or August 28, 2024 Village Board workshop, AKRF
recommends that the Village Board declare itself as Lead Agency for the coordinated review under SEQRA,
and discuss the application and the comments / requests for additional information contained in this initial
memorandum.
Eliminate eastern entrance driveway to improve
vehicular, pedestrian, and bicycle safety. With
this removal, the sidewalk and bike lane along
Croton Point Avenue can remain contiguous
and a crosswalk would no longer be necessary.
The parking space at this location provides
limited sight distance between vehicles backing
out of this parking space and vehicles exiting
the garage. It is recommended that this parking
space is relocated to another location on-site to
maintain the required number of parking spaces
for the proposed project.
Consider removal/relocation of tree/vegetation
at this location to improve sight lines from
adjacent parking spaces.
Figure A-1
Site Plan Comments - Traffic
LOCAL WATERFRONT REVITALIZATION PROGRAM ‐ POLICY REVIEW SHEET
□WATERFRONT ADVISORY COMMITTEE (date__________) Lead Agency: □VILLAGE BOARD/□PLANNING/□ZONING BOARD OF APPEALS (date__________)
Policy
LWRP POLICIES
WAC WAC Lead
Agency
Lead
Agency
COMMENTS
Applicable
Consistent
Applicable
Consistent
yes/no
yes/no yes/no
yes/no
DEVELOPMENT POLICIES
Restore, revitalize, and redevelop deteriorated and underutilized waterfront
areas for commercial, industrial, cultural, recreational and other compatible uses
1A
Encourage integrated development of Village property to assure fulfillment of
requirements relating to parking and accessory uses of Metro-North train station,
while facilitating public access to the bay area and recreational use.
1B
Encourage restoration of deteriorating structures related to railroad use and assure
appropriate maintenance and screening to reduce visual impact.
1C
Encourage the appropriate re-use of the old sewage treatment plant site at the
intersection of Route 9A and Municipal Place.
Facilitate the siting of water dependent uses and facilities on or adjacent to coastal
waters
2A Encourage water-enhanced commercial uses where such uses complement
water dependent uses and do not result in displacement of such uses.
Further develop the State’s existing major ports of Albany, Buffalo, New York,
Ogdensburg and Oswego as centers of commerce and industry, and encourage the
siting, in these port areas, including those under the jurisdiction of State public
authorities, of land use and development which is essential to, or in support of,
waterborne transportation of cargo and people.
Strengthen the economic base of smaller harbor areas by encouraging the
development and enhancement of those traditional uses and activities which have
provided such areas with their unique maritime identity.
Encourage the location of development in areas where public services and facilities
essential to such development are adequate.
ATTACHMENT B
LOCAL WATERFRONT REVITALIZATION PROGRAM ‐ POLICY REVIEW SHEET
□WATERFRONT ADVISORY COMMITTEE (date__________) Lead Agency: □VILLAGE BOARD/□PLANNING/□ZONING BOARD OF APPEALS (date__________)
Policy
LWRP POLICIES
WAC WAC Lead
Agency
Lead
Agency
COMMENTS
Applicable
Consistent
Applicable
Consistent
yes/no
yes/no yes/no
yes/no
5A
When feasible, development within the Village should be directed within the current
service area of existing water and sewer facilities or in close proximity to areas where
distribution lines currently exist.
Expedite permit procedures in order to facilitate the siting of development activities at
suitable locations
FISH & WILDLIFE POLICIES
Significant coastal fish and wildlife habitats will be protected, preserved, and, where
practical, restored so as to maintain their viability as habitats
7A
The quality of the Croton River and Bay Significant Coastal Fish and Wildlife Habitat and
Haverstraw Bay Significant Fish and Wildlife Habitat shall be protected and improved
for conservation, economic, aesthetic, recreational, and other public uses and values.
Its resources shall be protected from the threat of pollution, misuse, and
mismanagement.
7B
Materials that can degrade water quality and degrade or destroy the ecological system
of the Croton River and Bay Significant Fish and Wildlife Habitat and the Haverstraw
Bay Significant Fish and Wildlife Habitat shall not be disposed of or allowed to drain in,
or on land within, the area of influence in the significant fish and wildlife habitats
7C
Storage of materials that can degrade water quality and degrade or destroy the
ecological system of the Croton River and Bay Significant Fish and Wildlife Habitat or
Haverstraw Bay Significant Fish and Wildlife Habitat shall not be permitted within the
area of influence of the habitat unless best available technology is used to prevent
adverse impacts to the habitat
7D
Restoration of degraded ecological elements of the Croton River and Bay and
Haverstraw Bay Significant Fish and Wildlife Habitats and shorelands shall be included
in any programs for cleanup of any adjacent toxic and hazardous waste sites
LOCAL WATERFRONT REVITALIZATION PROGRAM ‐ POLICY REVIEW SHEET
□WATERFRONT ADVISORY COMMITTEE (date__________) Lead Agency: □VILLAGE BOARD/□PLANNING/□ZONING BOARD OF APPEALS (date__________)
Policy
LWRP POLICIES
WAC WAC Lead
Agency
Lead
Agency
COMMENTS
Applicable
Consistent
Applicable
Consistent
yes/no
yes/no yes/no
yes/no
7E
Runoff from public and private parking lots and from storm sewer overflows shall be
effectively managed so as to prevent oil, grease, and other contaminants from
polluting surface and ground water and impact to the significant fish and wildlife
habitats.
7F
Construction activity of any kind must not cause a measurable increase in erosion or
flooding at the site of such activity, or impact other locations. Construction activity in
the Croton River and Hudson River spawning areas shall be timed so that spawning of
anadromous fish species and shellfish will not be adversely affected.
7G Construction activity of any kind must not cause significant degradation of water
quality or impact identified significant fish and wildlife habitats.
7H
Habitat-related policies identified in the Indian Brook-Croton Gorge Watershed
Conservation Action Plan will be considered in actions proposed for these areas (see
Appendix C).
Protect fish and wildlife resources in the coastal area from the introduction of
hazardous wastes and other pollutants which bio-accumulate in the food chain, or
which cause significant sub-lethal or lethal effect on those resources.
Expand recreational use of fish and wildlife resources in coastal areas by increasing
access to existing resources, supplementing existing stocks, and developing new
resources.
9A
Ensure continued recreational use and public access to the rivers through Village-
owned land adjacent to the railroad parking lot, at Croton Point Park, at Senasqua and
Croton Landing Parks, along the Croton River, and at the Croton Yacht Club. Efforts
should be made to increase opportunities for public access and enjoyment in these
areas.
□WATERFRONT ADVISORY COMMITTEE (date__________) Lead Agency: □VILLAGE BOARD/□PLANNING/□ZONING BOARD OF APPEALS (date__________)
Policy
LWRP POLICIES
WAC WAC Lead
Agency
Lead
Agency
COMMENTS
Applicable
Consistent
Applicable
Consistent
yes/no
yes/no yes/no
yes/no
9B
Encourage passive recreational enjoyment of the wildlife in the designated significant
fish and wildlife habitats, on the Audubon Society sanctuaries, Jane Lytle Arboretum,
Gouveia Park and on other public or private lands within the Village where wildlife
habitats are located, as well as the protection of such resources
Further develop commercial finfish, shellfish and crustacean resources in the coastal
area by encouraging the construction of new, or improvement of existing on-shore
commercial fishing facilities, increasing marketing of the State's seafood products,
maintaining adequate stocks and expanding aquaculture facilities.
Buildings and other structures will be sited in the coastal area so as to minimize
damage to property and the endangering of human lives caused by flooding and
i
Activities or development in the coastal area will be undertaken so as to minimize
damage to natural resources and property from flooding and erosion by protecting
natural protective features including beaches, dunes, barrier islands and bluffs.
12A
Every effort should be made to protect Croton Point, a natural protective barrier to
Croton Bay from activities or development that would increase erosion of or flooding of
the point.
The construction or reconstruction of erosion protection structures shall be undertaken
only if they have a reasonable probability of controlling erosion for at least thirty years
as demonstrated in design and construction standards and/or assured maintenance or
replacement programs.
Activities and development, including the construction or reconstruction of erosion
protection structures, shall be undertaken so that there will be no measurable increase
in erosion or flooding at the site of such activities or development, or at other locations
LOCAL WATERFRONT REVITALIZATION PROGRAM ‐ POLICY REVIEW SHEET
□WATERFRONT ADVISORY COMMITTEE (date__________) Lead Agency: □VILLAGE BOARD/□PLANNING/□ZONING BOARD OF APPEALS (date__________)
Policy
LWRP POLICIES
WAC WAC Lead
Agency
Lead
Agency
COMMENTS
Applicable
Consistent
Applicable
Consistent
yes/no
yes/no yes/no
yes/no
Mining, excavation or dredging in coastal waters shall not significantly interfere with
the natural coastal processes which supply beach materials to land adjacent to such
waters and shall be undertaken in a manner which will not cause an increase in erosion
of such land.
Public funds shall only be used for erosion protective structures where necessary to
protect human life, and new development which requires a location within or adjacent
to an erosion hazard area to be able to function, or existing development; and only
where the public benefits outweigh the long term monetary and other costs including
the potential for increasing erosion and adverse effects on natural protective features.
Non-structural measures to minimize damage to natural resources and property from
flooding and erosion shall be used whenever possible.
17A
Efforts to control erosion along the rivers and on the steep slopes inland shall be of a
non-structural nature, wherever possible, to minimize the visual impact of structural
measures.
GENERAL POLICY
To safeguard the vital economic, social, and environmental interests of the State and of
its citizens, proposed major actions in the coastal area must give full consideration to
those interests, and to the safeguards which the State has established to protect
PUBLIC ACCESS POLICIES
Encourage the linkage of open space from upland areas to and along the Hudson and
Croton Rivers in the form of a trail or walkway system.
□WATERFRONT ADVISORY COMMITTEE (date__________) Lead Agency: □VILLAGE BOARD/□PLANNING/□ZONING BOARD OF APPEALS (date__________)
Policy
LWRP POLICIES
WAC WAC Lead
Agency
Lead
Agency
COMMENTS
Applicable
Consistent
Applicable
Consistent
yes/no
yes/no yes/no
yes/no
19A Encourage the linkage of open space from upland areas to and along the Hudson and
Croton Rivers in the form of a trail or walkway system.
19B Increase public access to areas that offer physical and visual connection to the Hudson
River or Croton River and Bay
19C Encourage the improvement of public transportation, when feasible, where water
dependent and water-enhanced recreation activities are located.
19D Improve and maintain access to Croton River and Bay at the Village-owned Echo Canoe
Launch south of the Village parking lots at the Croton-Harmon Station.
Access to the publicly owned foreshore and to lands immediately adjacent to
the foreshore or the water's edge that are publicly-owned shall be provided and
it should be provided in a manner compatible with adjoining uses.
Water dependent and water enhanced recreation will be encouraged and facilitated,
and will be given priority over non-water related uses along the coast.
21A
Boating and fishing activities should be encouraged provided that they do not restrict
other water-related recreational opportunities and are undertaken in a manner
compatible with existing water-dependent uses.
Development when located adjacent to the shore will provide for water-related
recreation whenever such use is compatible with reasonably anticipated demand for
such activities and is compatible with the primary purpose of the development.
HISTORIC AND SCENIC QUALITY POLICIES
Protect, enhance, and restore structures, districts, areas, or sites that are of
significance in the history, architecture, archaeology or culture of the State, its
communities, or the Nation.
□WATERFRONT ADVISORY COMMITTEE (date__________) Lead Agency: □VILLAGE BOARD/□PLANNING/□ZONING BOARD OF APPEALS (date__________)
Policy
LWRP POLICIES
WAC WAC Lead
Agency
Lead
Agency
COMMENTS
Applicable
Consistent
Applicable
Consistent
yes/no
yes/no yes/no
yes/no
Prevent impairment of scenic resources of statewide significance.
(The nearest scenic area of statewide significance (SASS) is the Bear Mountain Park
subunit of the Hudson Highlands SASS which is north of the Village)
Protect, restore, or enhance natural and man-made resources which are not identified
as being of statewide significance, but which contribute to the overall scenic quality of
the coastal area. (The following scenic areas were noted in the LWRP as having local
and regional significance: (1) Distinctive and scenic views of Croton Point, (2) Views of
the Hudson River from South Riverside Ave and Route 9 corridor, and (3) Vegetated
slopes and undisturbed ridgelines particularly those in the viewsheds in the Croton
Gorge, River, and Bay areas.)
25A
Establish and protect identified public viewsheds of the Hudson River, including but not
limited to the public views of the Hudson River from the western shoreline of the
Village, and of the Croton River and Gorge. (The following scenic areas were noted in
the LWRP as having local and regional significance: (1) Distinctive and scenic views of
Croton Point, (2) Views of the Hudson River from South Riverside Ave and Route 9
corridor, and (3) Vegetated slopes and undisturbed ridgelines particularly those in the
viewsheds in the Croton Gorge, River, and Bay areas.)
Conserve and protect agricultural lands in the State’s coastal area.
Decisions on the siting and construction of major energy facilities in the coastal area
will be based on public energy needs, compatibility of such facilities with the
environment, and the facility's need for a shorefront location.
Ice management practices shall not interfere with the production of hydroelectric
power, damage significant coastal fish and wildlife and their habitats, or increase
shoreline erosion or flooding.
□WATERFRONT ADVISORY COMMITTEE (date__________) Lead Agency: □VILLAGE BOARD/□PLANNING/□ZONING BOARD OF APPEALS (date__________)
Policy
LWRP POLICIES
WAC WAC Lead
Agency
Lead
Agency
COMMENTS
Applicable
Consistent
Applicable
Consistent
yes/no
yes/no yes/no
yes/no
The development of offshore uses and resources, including renewable energy
resources, shall accommodate New York’s long-standing ocean and Great Lakes
industries, such as commercial and recreational fishing and maritime commerce, and
the ecological functions of habitats important to New York.
Municipal, industrial, and commercial discharge of pollutants, including but not limited
to, toxic and hazardous substances, into coastal waters will conform to State and
National water quality standards.
30A
Existing rail services and transportation-related facilities shall not dispose of any
regulated materials in coastal waters until all such regulated materials have been
tested by the State for conformance with water quality standards.
State coastal area policies and management objectives of approved local waterfront
revitalization programs will be considered while reviewing coastal water classifications
and while modifying water quality standards; however, those waters already
overburdened with contaminants will be recognized as being a development
constraint.
Encourage the use of alternative or innovative sanitary waste systems in small
communities where the costs of conventional facilities are unreasonably high, given the
size of the existing tax base of these communities.
Best Management Practices will be used to ensure the control of stormwater runoff
and combined sewer overflows draining into coastal waters.
33A The flow of stormwater discharge shall be controlled to limit the flow of pollutants
from street and parking areas, etc. directly into the rivers and water bodies.
□WATERFRONT ADVISORY COMMITTEE (date__________) Lead Agency: □VILLAGE BOARD/□PLANNING/□ZONING BOARD OF APPEALS (date__________)
Policy
LWRP POLICIES
WAC WAC Lead
Agency
Lead
Agency
COMMENTS
Applicable
Consistent
Applicable
Consistent
yes/no
yes/no yes/no
yes/no
Discharge of waste materials into coastal waters from vessels subject to State
jurisdiction will be limited so as to protect significant fish and wildlife habitats,
recreational areas and water supply areas.
34A Moored structures or marine vessels shall not discharge ballast water or other releases
into the waterway.
Dredging and filling in coastal waters and disposal of dredged material will be
undertaken in a manner that meets existing State permit requirements, and protects
significant fish and wildlife habitats, scenic resources, natural protective features,
important agricultural lands, and wetlands.
Activities related to the shipment and storage of petroleum and other hazardous
materials will be conducted in a manner that will prevent or at least minimize spills into
coastal waters; all practicable efforts will be undertaken to expedite the cleanup of
such discharges; and restitution for damages will be required when these spills occur.
Best management practices will be utilized to minimize the non-point discharge of
excess nutrients, organics and eroded soils into coastal waters.
37A Control of the development of hilltops, and steep slopes should be exerted in order to
prevent erosion and minimize runoff and flooding from new construction.
The quality and quantity of surface water and ground water supplies will be conserved
and protected, particularly where such waters constitute the primary or sole source of
water supply.
The transport, storage, treatment and disposal of solid wastes, particularly hazardous
wastes, within coastal areas will be conducted in such a manner so as to protect
groundwater and surface water supplies, significant fish and wildlife habitats,
recreation areas, important agricultural lands and scenic resources.
□WATERFRONT ADVISORY COMMITTEE (date__________) Lead Agency: □VILLAGE BOARD/□PLANNING/□ZONING BOARD OF APPEALS (date__________)
Policy
LWRP POLICIES
WAC WAC Lead
Agency
Lead
Agency
COMMENTS
Applicable
Consistent
Applicable
Consistent
yes/no
yes/no yes/no
yes/no
Effluent discharged from major steam electric generating and industrial facilities into
coastal waters will not be unduly injurious to fish and wildlife and shall conform to
State water quality standards.
Land use or development in the coastal area will not cause national or State air quality
standards to be violated.
Coastal management policies will be considered if the State reclassifies land areas
pursuant to the prevention of significant deterioration regulations of the Federal Clean
Air Act.
Land use or development in the coastal area must not cause the generation of
significant amounts of the acid rain precursors: nitrates and sulfates.
Preserve and protect tidal and freshwater wetlands and preserve the benefits derived
from these areas.
44A
Wetlands, water bodies and watercourses shall be protected by preventing damage
from erosion or siltation, minimizing disturbance, preserving natural habitats and
protecting against flood and pollution.
□WATERFRONT ADVISORY COMMITTEE (date__________) Lead Agency: □VILLAGE BOARD/□PLANNING/□ZONING BOARD OF APPEALS (date__________)
Policy
LWRP SECTION IV
PROPOSED LAND USES AND PROJECTS
Completed
Action
Required
As per section 225-6 (e): The lead agency which is making a determination of consistency
for direct actions must also review consistency with Section IV of the LWRP, in making
its consistency determination.
ENSURE MAINTENANCE OF NEW CROTON DAM CONSERVATION FLOW.
Maintaining natural river flows below water supply reservoirs is inherently complicated, and
requires a difficult balance between human demands and sustainable flows to conserve a river’s
ecological health.
ADDRESS DRAINAGE SYSTEMS THAT LEAD TO EROSION ON STEEP SLOPES.
The objective of this project is to promote activities that will control soil erosion and sedimentation
caused by stormwater runoff. These issues are most significant along the steep banks of the Croton
River Gorge.
FACILITATE UPGRADES TO CATCH BASINS AND OUTFALLS TO ADDRESS
FLOATABLES IN CROTON BAY.
The intent of this project is to control stormwater runoff discharges and other pollutants from
entering Croton Bay. Protecting the ecological health of Croton Bay and River is a priority for
the Village.
FACILITATE UPGRADES TO CROTON-HARMON PARKING LOT TO
ADDRESS FLOATABLES IN CROTON BAY.
The parking facility is currently overwhelmed by asphalt paving with rows of cars. There
is minimal landscaping or greenery, and in certain areas, parking directly abuts wetland
areas in the Croton Bay. The Village should consider implementing green infrastructure
within the parking lot in order to capture runoff onsite and reduce sewer overflows.
IMPROVE ECHO CANOE LAUNCH AND VILLAGE-OWNED LAND AT THE
SOUTHERN END OF THE TRAIN STATION PARKING LOT.
This project supports the continued improvement of this recreational area to enhance public access to
the Croton River and Bay and the Hudson River.
RELOCATE VILLAGE DPW FACILITY, SALT SHED AND MATERIAL STORAGE
AREA.
The DPW operates a salt storage shed at the southern end of the Croton-Harmon parking lot. There
is also an uncovered storage area near the salt shed for rocks and other construction materials
which can leach directly into Croton Bay from the facility.
□WATERFRONT ADVISORY COMMITTEE (date__________) Lead Agency: □VILLAGE BOARD/□PLANNING/□ZONING BOARD OF APPEALS (date__________)
FACILITATE ACCESS TO THE HUDSON RIVER WATERFRONT
A recurring comment from public input during this LWRP process and prior plans was the need to
improve access to the Hudson River waterfront for vehicles, pedestrians, and bicyclists. Although
there have been some improvements such as the Brook Street pedestrian bridge, in general, access
to the waterfront is limited, and difficult in some locations.
FACILITATE CROTON YACHT CLUB/CROTON LANDING IMPROVEMENTS.
The concept of a waterfront restaurant, or another use at the southern end of Croton Landing Park,
adjacent to the Croton Yacht Club, has been discussed by the Village for years.
Parking is also an issue as there is already insufficient on-site parking at Croton Landing Park to
satisfy demand during busy hours.
IMPLEMENT SEGMENT OF RIVERWALK TRAIL FROM CROTON LANDING PARK
TO OSCAWANA COUNTY PARK.
According to the Hudson River Trailway Plan (2003), Westchester County has proposed a 1-mile
trail along the Hudson River that would connect Croton Landing Park with Oscawana County Park
in Cortlandt. This trail would fill a gap between the RiverWalk trails at these two parks.
UNDERTAKE MANAGEMENT AND CAPITAL IMPROVEMENT PLAN FOR
VILLAGE PARKS, TRAILS, OPEN SPACES AND MEMORIALS.
This project supports the creation of a Parks Maintenance and Capital Improvement Plan
to address ongoing care and protection of existing parks, open spaces, and trails. The
goal would be to provide an action plan for regular maintenance and targeted capital
improvements when needed.
DEVELOP PLAN FOR FUTURE USE OF GOUVEIA PARK
The purpose of this project is for the Village to create a conceptual plan that will examine how to
best utilize the Gouveia Park, a 15.63-acre site acquired by the Village.