Memorandum from AKRF%2C Inc. re%3A 1 Croton Point Avenue dated October 4%2C 2024
environmental
12 pages
Meeting: portal event 992 (no meeting page on file)
Agenda item: LWRP Consistency Review and EAF Part II Review for the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.
Environmental review, 12 pages. Attached to agenda item: “LWRP Consistency Review and EAF Part II Review for the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
DRAFT FEAF PART II - 1 Croton Point Ave Incomplete
Draft Phase II Environmental Site Assessment Report
Environmental Noise Study and Facade Glazing...
Insite Preliminary Wastewater Engineering Report dated...
Insite Preliminary Water Engineering Report dated July...
Insite Stormwater Pollution Prevention Plan dated July...
Insite engineering and landscape architecture plans...
LWRP Lot A - Last Revised 10.16.24
Letter from Kimley Horn dated September 16%2C 2024...
Letter from NYSDOT consenting to the Board of Trustees...
Letter from the Division for Historic Preservation...
Memorandum by Longman Lindsey dated September 10%2C 2024
Extracted text
34 South Broadway, Suite 300
White Plains, NY 10601
tel: 914.949.7336
www.akrf.com
Memorandum
To:
Bryan Healy, Village Manager, Village of Croton-on-Hudson
Mayor Brian Pugh, Village of Croton-on-Hudson
Village of Croton-on-Hudson Board of Trustees
From:
AKRF, Inc.
Date:
October 4, 2024
Re:
WBP Development LLC - 1 Croton Point (aka Lot A)
cc:
WBP Development LLC (Applicant)
Linda Whitehead (Village Attorney)
Dan O’Connor, P.E. (Village Engineer)
As requested, AKRF, Inc. has reviewed the following newly submitted documents and plans for the above
referenced application. This memorandum provides our comments on those materials.
•
Site Plan (10 sheets) prepared by Insite Engineering, Surveyning, and Landscape Architecture, P.C.,
dated September 24, 2024.
•
Response to Comments Letter prepared by Insite Engineering, Surveying, and Landscape Architecture,
P.C., dated September 24, 2024.
•
Fire Apparatus Access Study prepared by Insite Engineering, Surveying, and Landscape Architecture,
P.C., dated September 24, 2024.
•
Response to Planning Board Comments Letter prepared by Kimley Horn, dated September 24, 2024.
•
Traffic Impact Study prepared by Kimley Horn, dated September 25, 2024.
•
Memorandum on Public School-Aged children (PSAC) Analysis prepared by KSCJ Consulting, revised
September 27, 2024.
•
Memorandum on Fiscal Analysis prepared by KSCJ Consulting, revised September 27, 2024.
•
EAF Part 1 prepared by KSCJ Consulting, revised September 27, 2024.
A. BACKGROUND / PROJECT DESCRIPTION
The Applicant, WBP Development, LLC, is seeking special use permit approval from the Village of Croton-
on-Hudson (the “Village”) Board of Trustees to construct a proposed 5-story, 100-unit affordable
homeownership project with amenity space and on-site parking (the “proposed project”) at the intersection
of Croton Point Avenue and Veterans Plaza. The proposed project involves an assemblage of three existing
tax parcels totaling approximately 1.76 acres (the “project site”): 79-17-1-3 (aka Lot 3), 79-17-1-4 (aka Lot
4) and 79-17-1-5 (aka Lot 5). Village-owned Lot 5, fronting on Croton Point Avenue, was most recently
utilized as a parking lot for the Metro-North Railroad (MNR) Croton-Harmon station (commonly referred to
as the “parking lot A”). Lot 4 is currently owned by Croton Point Realty, Inc., has frontage along Croton
Point Avenue and contains portions of a two-story commercial building currently occupied by a law office.
Village-owned Lot 3 is located to the rear of Lot 4 and contains portions of the two-story commercial building
Village of Croton-on-Hudson Board of Trustees
10.4.24
noted above, and a parking lot. The owner of Lot 4, Croton Point Realty, Inc. has had a long-term land
lease with the Village for the uses on Village-owned Lot 3. The Applicant has been selected by the Village
as the purchaser of Lots 3 and 5 currently owned by the Village, and is in contract to purchase Lot 4 from
Croton Point Realty, Inc.
In November 2022, the Village adopted Local Law No. 14 of 2022 to amend the provisions of the Zoning
Code to allow for transit-oriented mixed-use and multifamily residential buildings in a specific portion of the
LI zoning district including the project site. Local Law No. 14 of 2022 permits the project site to be
redeveloped (through issuance of a special permit from the Village Board of Trustees) with transit-oriented
multifamily housing or multifamily housing over ground floor commercial uses at a maximum Floor Area
Ratio (FAR) of 1.2, a maximum height of up to 5-stories, and a parking ratio of 1 space per residential unit
and 1 space per 400 square feet of commercial floor area. Following the adoption of Local Law 14 of 2022,
the Village released a Request for Proposals (RFP) for Village-owned Lot 5, which in addition to requesting
mixed-use development proposals with affordable housing solely for Lot 5, indicated that the Village was
also willing to review alternative schemes that assume a larger land assemblage by incorporating adjacent
lots 3 and 4.
The proposed project is a 5-story building with cellar level for parking below grade. It offers 100 residential
units consisting of 46 one-bedroom and 54 two-bedroom units; the proposed FAR is 1.10, where 1.20 is
the maximum allowed. The design includes 105 parking spaces (approx. 1 space per unit), provided via a
combination of surface and below-building parking. No ground floor commercial space is proposed.
Amenities within the building include a community room, fitness center, coworking lounge, bike storage
room, and a rooftop deck. According to the Applicant, the exterior façade combines brick and metal panels
for cladding. Sustainable building design features include full electrification, solar readiness, high efficiency
HVAC equipment (cold climate air source heat pumps) and appliances (Energy Star Multifamily New
Construction Program), Level 2 EV charging stations (1 per 20 parking spaces) and low-flow water fixtures.
In addition to approval of a special permit from the Village Board of Trustees, other local approvals for the
proposed project include site plan approval from the Village Planning Board, Local Waterfront Revitalization
Program (LWRP) consistency review by the Village Waterfront Advisory Committee, and visual/aesthetics
review and comment by the Village Advisory Board on Visual Environment (following a referral by the
Planning Board). The Village Board of Trustees is serving as the Lead Agency for the proposed project’s
environmental review pursuant to the State Environmental Quality Review Act (SEQRA).
B. COMMENTS
The newly submitted material was reviewed in the context of our August 19, 2024 and September 23, 2024
memoranda to the Village Board of Trustees. Comments shown in italicized text are recited from AKRF’s
8/19/24 and 9/23/24 memoranda. Any new or follow-up comments are presented in bold text with the
corresponding review date.
LWRP CONSISTENCY REVIEW
1. 8/19/24: The project site is located within the boundaries of the Village’s amended Local Waterfront
Revitalization Program (LWRP), adopted by the Village Board of Trustees on August 14, 2023 and
approved by the New York State Department of State on March 26, 2024.1 The Applicant completed
and submitted the Village’s Coastal Assessment Form (CAF) as an attachment to the FEAF Part 1.
The submitted CAF appears to be the CAF completed by AKRF for the 2022 rezoning (which had some
notations added that are not applicable to this action). The Applicant should download and complete a
clean version of the CAF and re-submit it to the Village.
9/23/24: Comment addressed.
2. 8/19/24: Attachment B to this memorandum contains the LWRP policy review worksheet utilized by
the Village’s Waterfront Advisory Committee (WAC). The Applicant should review the worksheet as a
guide to preparing a draft assessment of the project’s consistency with the applicable policies, utilizing
1 croton_on_hudson_lwrp_amdmt_and_app_a-e_sos_approved.pdf (crotononhudson-ny.gov)
10.4.24
information on the proposed project’s design and construction. The draft assessment should be
submitted for review by AKRF and Village staff. The draft assessment will assist the Village Board and
the WAC on reviewing the proposed project against the LWRP policies. AKRF defers to the Village
Board of Trustees for the final determination of consistency.
9/23/24: AKRF has reviewed the LWRP Consistency Assessment documentation submitted in
response to the above comment and offers the following comments:
Response 5A: The response notes that “the proposed building will connect to available public water
and sewer services.” Has the Applicant examined the existing infrastructure and confirmed capacity
through those public systems?
Response 18: Please identify the source of statement regarding consistency “with the State goals to
provide owner occupied affordable housing.”
Response 30: Will the project use pesticides or chemicals for landscaping purposes?
10/4/24: For Response 5A, comment partially addressed in the letter prepared by Insite
Engineering dated 9/24/24. In a subsequent submission, the Applicant should provide an
update on the referenced hydrant flow tests that are to be performed, and any updates from the
County and/or Village Engineer on the provision of sewer service to the project.
No response was provided to AKRF’s comments on Response 18 and Response 30.
PROJECT-SPECIFIC ENVIRONMENTAL REVIEW (SEQRA) CONSIDERATIONS
1. 8/19/24: FEAF Part 1 comments:
a. 8/19/24: In Section A, revise footnote to reflect that the owner of Tax Lot 3 is the Village;
Tax Lot 4 is owned by Croton Point Realty, Inc. AKRF understands that Croton Point
Realty, Inc. has had a long-term land lease with the Village for the uses on Village-owned
Lot 3.
9/23/24: Comment addressed.
b. 8/19/24: Section D.2.c.iii. It is noted that potential extension of the Wayne Street water
main to Croton Point Avenue could be completed to serve the project. Additional
information should be provided in the narrative accompanying FEAF Part I, based on
feedback from the Village Engineer.
9/23/24: Comment partially addressed. The Applicant should provide additional detail
(based on feedback from the Village Engineer) on the “potential extension of the Wayne
Street water main to serve the project.”
10/4/24: Comment partially addressed. See “LWRP Consistency Review” section,
Comment 2, above. The Applicant should provide an update with its next
submission. The update should reference the results of any recent investigations
and any recommended next steps from the Village Engineer.
c. 8/19/24: Section E.1.d. Revise response to “Yes” and identify Happy Hearts Take Two,
365 S Riverside Ave, Croton-On-Hudson, NY 10520 (approximately 0.3-miles from the
project site).
9/23/24: Comment addressed.
2. 8/19/24: Noise: The project site is within close proximity to the MNR Croton-Harmon station and
associated rail yards. The Applicant should submit a noise study with readings taken over a 24-hour
weekday period to provide information on existing ambient noise conditions at the project site, in order
to determine the appropriate level of building facade (window-wall) attenuation necessary to maintain
an interior noise level of 45 A-weighted decibels (dBA). One on-site noise monitoring location should
be sufficient, ideally closer to the rail line. If the anticipated funding from NYSHCR will include HUD
Village of Croton-on-Hudson Board of Trustees
10.4.24
sources of funding, it is advisable that the noise study include information from HUD’s DNL calculator
in addition to noise readings, for comparative purposes.
9/23/24: AKRF’s acoustics team has reviewed the July 2024 Noise Study submitted by the Applicant,
and the backup prepared by TCCL, along with the TCCL letter dated September 10, 2024 responding
to comments raised during and after the August 21, 2024 meeting of the Village Board of Trustees.
In AKRF’s professional opinion, the Noise Study and supporting information meets the appropriate
standard for evaluation of potential noise impacts under SEQR for planned residential uses.
The Applicant’s commitment to designing the building’s façade construction to attenuate down to an
interior Ldn no greater than 40 dBA is more stringent than the industry standard (and HUD's criterion)
of interior Ldn of 45 dBA. If achieved, this level would avoid potential significant adverse noise impacts
to residents.
Based on the loudest Ldn of 70.8, the façade of the building would need to provide 31 dBA of composite
window-wall attenuation to result in an interior level of 40 dBA.
As part of the SEQR record, the Village Board may include the Applicant’s commitment to 31 dBA of
window-wall attenuation as a measure to be taken as part of the project to address potential noise
impacts to future building occupants, and require it be a condition of any future Site Plan review and
approval undertaken by the Planning Board. The Planning Board, as part of Site Plan review, can
request the documented sound transmission ratings of the proposed windows and façade materials,
as well as composite calculations by the architect of record to demonstrate that the 31 dBA attenuation
requirement will be met.
AKRF has also reviewed the concerns raised (and TCCL’s responses) regarding longer train idling
times at the MNR yard in winter months (as compared to June when the measurements occurred),
resulting in louder conditions at the site warranting higher attenuation requirements. As noted above,
the Applicant has already committed to attenuating down to 40 dBA for apartment interiors rather than
the standard 45 dBA. In AKRF’s professional opinion, a tripling of idling time would need to occur to
result in 5 dBA more than what was measured.
10/4/24: In furtherance of the above comments, it is noted that the plotted data provided in TCCL
Noise Study illustrates that during the 72-hour period of analysis, there are periods marked as
“trains idling and moving slowly” which lasted up to a maximum of 5 hours during the overnight
hours for each 24-hour period. A tripling of this period (15 hours over each 24-hour period)
would need to occur in order for the Ldn to increase by 5 dBA. While the Planning Board may
request additional information as part of Site Plan review, it is AKRF’s opinion that the Noise
Study’s conclusions should be adequate for purposes of the Village Board’s review under
SEQR.
3. 8/19/24: Hazardous Materials: Given the location of the project site within an industrially zoned area,
its land use history and surrounding uses, the Applicant should submit a recent Phase I Environmental
Site Assessment (ESA) and any additional Phase II subsurface sampling reports for review.
9/23/24: AKRF’s site assessment and remediation staff has reviewed the following reports provided by
the Applicant:
o
Draft Phase I Environmental Site Assessment - For: Proposed Mixed-Use Development,
79.17-1-4, Croton-on-Hudson, Westchester County, NY – Prepared by SESI Consulting
Engineers, July 2024;
o
Draft Phase I Environmental Site Assessment - For: Proposed Mixed-Use Development,
(79.17-1-3 and 79.17-1-5), Croton-on-Hudson, Westchester County, NY – Prepared by
SESI Consulting Engineers, July 2024;
o
Draft Phase II Environmental Site Assessment Report - For: Proposed Mixed-Use
Development, 79.17-1-3, 79.17-1-4 and 79.17-1-5, Croton-on-Hudson, Westchester
County, NY – Prepared by SESI Consulting Engineers, July 2024.
Based on review of the above reports and laboratory data, AKRF has the following comments:
10.4.24
o
The results of the Phase II ESA did not identify a release of contamination or indicate the
potential for a possible contamination hot spot. Based on the data, AKRF agrees with the
Applicant’s assessment that it would be difficult for the Project Site to be accepted into the
NYSDEC Brownfield Cleanup Program (BCP). The contaminants identified during the
Phase II, including semi-volatile organic compounds (SVOCs) and metals, are consistent
with urban areas with historical industrial uses.
o
Due to the history of auto repair, the results of the Phase II ESA, including low level solvent
and petroleum volatile organic compounds (VOCs) in soil vapor, and the potential to
encounter unknown tanks or isolated contamination hot spots during site excavation, AKRF
recommends the following:
▪
The preparation of a soil management plan (SMP) to detail soil handling
requirements for on-Site reuse or off-Site soil disposal, and contingency plans to
address unknown tanks or areas of contamination encountered during Site
excavation activities. The measures to address soil handling, soil disposal, tank
closure, and contaminated soil removal should be consistent with all prevailing
local and state regulations, including the need for any NYSDEC Spill reporting.
▪
Either: 1) Inclusion of a vapor barrier as part of the foundation design to limit soil
vapor intrusion, or 2) Complete post construction soil vapor/indoor air sampling to
confirm site conditions meet New York State Department of Health (NYSDOH) soil
vapor intrusion guidance.
The Applicant should review the above recommendations and describe in the EAF the measures by
which the Project’s construction would avoid potential adverse impacts related to soil handling and
disposal, as well as soil vapor, including preparation of the recommended SMP. Should the Village
Board grant the requested special permit, it can include these measures as a condition of any future
site plan review and approval undertaken by the Planning Board.
10/4/24: No further comment. AKRF understands that the Applicant intends to include a vapor
barrier as part of the proposed foundation design.
4. 8/19/24: Visual/Aesthetics: The submitted Architecture Plan Set (Sheet T-001.00) includes a rendering
of the proposed building. The Village can request more detailed renderings of the proposed project
when viewed from Croton Point Avenue and Veterans Plaza. In addition to the proposed building,
renderings should include proposed landscaping, lighting, and parking areas, as well as existing
adjacent conditions expected to remain for context (e.g., other structures, street trees, utility wires,
etc.). Renderings should also include a key/legend identifying the vantage point of the rendering.
9/23/24: The Applicant has provided the requested renderings, and the Applicant’s architect has also
submitted leaf-on/leaf-off photo-simulations and visual cross sections of the Proposed Project from the
same publicly accessible vantage points that were studied as part of the Village Board’s SEQR
assessment of the 2022 rezoning.
When reviewing these documents, NYSDEC guidance states that an “aesthetic impact” is considered
the consequence of a visual impact on the public’s use and enjoyment of the appearance or qualities
of a listed resource. NYSDEC Program Policy DEP-00-2 is intended to address places or locations
that have been officially designated for their aesthetic qualities and that are accessible to the public at
large as opposed to places that may have individual or private importance only (i.e. views from private
residences cannot be considered, but views from parks or public roadways can be). Furthermore, the
NYSDEC guidance states that “mere visibility of a project should not be a threshold for decision
making. Instead, a project, by virtue of its visibility, must clearly interfere with or reduce the public’s
enjoyment or appreciation of the appearance of a significant place or structure.”
AKRF has reviewed the materials submitted in response to the above comment, within the context of
NYSDEC’s guidance and offers the following comments:
o
Similar to the more generic assessment undertaken for the rezoning, the Applicant’s refined
viewpoint simulations illustrate that, from the six publicly accessible vantage points studied,
which all look toward the direction of the Hudson River, introduction of the proposed 5-story
Village of Croton-on-Hudson Board of Trustees
10.4.24
building (as designed, including rooftop features) would not constitute a significant adverse
impact.
▪
The simulations for Viewpoints 4 and 5 show the Proposed Project would minimally
visible, if at all, from these areas.
▪
Viewpoints 1, 3 and 6 will have partial views of the Proposed Project above the
treetops when leaves are on the trees, with additional portions of the building
visible when the leaves are off the trees. Viewpoint 2, the view north from Veteran’s
Plaza, would be the only view of the Proposed Project that would not be screened
by buildings or vegetation. Changes to the views from these viewpoints, as well as
Viewpoint 5, are not considered significant adverse impacts, as there are no views
of significant places or structures that have the potential to be impacted.
▪
Of the six viewpoints analyzed, only Viewpoint 4 has a view of what can be
considered a local aesthetic resource, with a distant view of Croton Point Park. The
simulations provided show the view of Croton Point Park would not be impacted
by the Proposed Project.
o
The Applicant has provided a cross section that shows that potential viewpoints uphill, from
public rights of way, such as the Wayne Street and Young Avenue, would not be anticipated
to have views of the Proposed Project because they would be screened by vegetation,
existing buildings, and because the topography flattens out. Even though the established
NYSDEC guidance does not consider private views when making a final impact
determination, the cross section also shows that minimal views are anticipated from private
property due to vegetation and the topography.
o
The architectural renderings show the proposed building lighting; however, they lack
lighting fixture details, parking lot lighting, and a lighting plan, which are typically developed
during site plan review. These renderings indicate that building lighting would not result in
a significant adverse impact. The specific lighting plan, including fixture details, would be
reviewed and finalized during the Planning Board’s site plan approval in accordance with
Village regulations. The Village should consider requiring that fixtures be dark sky
compliant and that no lighting spill past the property lines.
10/4/24: No further comment.
5. 8/19/24: Historic Resources: The submitted FEAF Part 1, which was generated using the NYSDEC
EAF Mapper, indicates that the project site is in an area sensitive for archaeological resources. The
proposed project would result in disturbance of over 1 acre. Even though the site has been previously
disturbed and developed, the Applicant should consult with the New York State Office of Parks,
Recreation, and Historic Preservation (OPRHP) for an impact determination on the project to satisfy
the Village’s obligations under SEQRA. Consultations through OPRHP’s Cultural Resource
Information System (CRIS) take approximately 30 days for a response.
9/23/24: The Applicant has provided a letter from OPRHP dated September 3, 2024 indicating that “no
properties, including archaeological and/or historic resources, listed in or eligible for the New York
State and National Registers of Historic Places will be impacted by this project.” AKRF has no further
comments related to historic resources.
6. 8/19/24: Threatened/Endangered Species: The submitted FEAF Part 1, which was generated using
the NYSDEC EAF Mapper, indicates that habitat for the northern harrier, bald eagle, Atlantic sturgeon
and shortnose sturgeon may be present at the site. Since the project site is located inland from the
Hudson River shoreline, contains a paved parking lot, a commercial structure, sparse vegetation and
is framed on either side by active transportation and industrial uses, it is not considered suitable habitat
for these species and no further assessment is required.
9/23/24: No further comment.
10.4.24
7. 8/19/24: Traffic: To ensure appropriate signal timings are being developed as part of the signal timing
mitigation identified through the 2022 rezoning, AKRF recommends that updated traffic counts be
conducted for the two signalized intersections to be mitigated as part of this project, Croton Point
Avenue and Veterans Plaza and Croton Point Avenue and Route 9/9A Northbound Ramps, as well as
the Croton Point Avenue and Route 9/9A Southbound ramps given its proximity to the two other
signals. The counts should be collected during the fall while schools are in session.
In addition to the updated traffic counts, the following items should be updated in the submitted FEAF
Part 1 narrative: (1) the second bullet on page 5 should be changed to “Croton Point Avenue and Route
9/9A Northbound ramps”, (2) the ITE Land Use code and respective trip generation numbers should
be revised so they are based on the ITE data for ITE Land Use 221 “Multifamily Housing (Mid-Rise)”.
In order to improve vehicular, pedestrian, and bicycle safety, it is recommended that the Applicant
eliminate the eastern one-way site driveway along Croton Point Avenue. For internal vehicle circulation
safety, it is recommended that the Applicant consider relocating the proposed tree at the southeast
corner of the building to improve sight lines from the adjacent parking spaces. The location of the
surface parking lot space adjacent to the garage entrance (on the east side of the building) provides
limited sight distance between a vehicle backing out to leave that parking space and any vehicle
coming from under the building. It is recommended that this parking space is relocated to another
location on the site to maintain the total number of required parking spaces on site. A set of truck
turning path analysis (“AutoTURN”) drawings should be provided to demonstrate how the largest
anticipated fire, garbage, and delivery vehicles would enter, exit, and navigate the project site. The
drawings should also identify the proposed location of the trash receptacle(s) that would be accessed
by the garbage trucks. See Attachment A for additional references/depictions of the comments listed
above.
9/23/24: AKRF is reserving further comment on traffic and parking until the requested updated vehicle
counts and in-process traffic report are provided by the Applicant.
It should be noted that the recommended modifications to the site plan (last paragraph in comment
above) do not appear to have been addressed through the latest submission.
10/4/24: AKRF’s 8/19/24 comments have been partially addressed. See details below.
REVIEW OF RESPONSES TO 8/19/24 COMMENTS:
a) The Traffic Impact Study (“TIS”) prepared by Kimley Horn (“KH”), dated September 25,
2024 states that updated traffic counts were conducted in September 2024 for the
intersections of Croton Point Avenue & Veterans Plaza, Croton Point Avenue & Route 9/9A
Northbound Ramps, and Croton Point Avenue & Route 9/9A Southbound Ramps as
requested. However, the collected traffic count data should be included as part of the
appendix of TIS so that the peak hours and traffic volumes presented in the TIS can be
verified.
b) The requested changes have been made in the September 27, 2024 FEAF with regard to
(1) identifying the Croton Point Avenue and Route 9/9A Northbound ramps as an
intersection that could experience traffic impacts and (2) updating the ITE Land Use code
and respective trip generation numbers to be based on the ITE data for ITE Land Use 221
“Multifamily Housing (Mid-Rise)”.
c) The Applicant has not eliminated the eastern one-way site driveway along Croton Point
Avenue as recommended based on input from the Croton Harmon Union Free School
District Transportation Director. The School District indicated that they would like the
opportunity to have school buses come onto the site to pick up/drop off children and use
the traffic light at the main driveway to turn around. In addition, the Applicant would prefer
to maintain this driveway as an emergency access point. The fire truck turning movement
template drawing provided by the Applicant also shows fire trucks navigating entry to the
site utilizing this driveway. The TIS has conservatively assumed that all project-generated
traffic would only utilize the main central driveway (and not the eastern one-way site
driveway) to enter and exit the site. However, it is recommended that the Applicant develop
Village of Croton-on-Hudson Board of Trustees
10.4.24
a comprehensive plan to demonstrate how limiting access to just emergency and school
bus traffic at the eastern one-way driveway would function. While the Applicant has
indicated that they will discuss this further during site plan review, it is AKRF’s position that
the status of this driveway should be established prior to site plan review as it plays a
significant role in vehicular circulation on-site. For example, the August 13, 2024 Traffic
Impact Assessment (“TIA”) by KH shows this driveway being utilized by delivery vehicles
and auto (taxi) drop-offs/pick-ups (which do not qualify as school buses or emergency
vehicles).
e) The Applicant has indicated that the proposed tree at the southeast corner of the building
has not been relocated in order to remain compliant with the Village Code (230-52E(1(b)).
However, the Applicant has indicated that they will work with the Planning Board during site
plan review to ensure that a tree species for this location is selected that will leaf out above
line of sight to minimize its potential impact on motorists. This criteria for tree species
should apply to all trees on-site adjacent to any parking spaces and/or parking aisles where
sight lines may be impeded by trees.
f) The Applicant has relocated the surface parking space adjacent to the garage entrance to
the northern parking lot as requested.
g) The Applicant has provided a set of truck turning path analysis (“AutoTURN”) drawings
that demonstrate how the largest anticipated fire, garbage, and delivery vehicles would
enter, exit, and navigate the project site. The Applicant has indicated that the provided fire
truck turning path analysis drawing has been conservatively based on a 100-foot aerial
ladder truck but will be updated with the Village’s fire truck templates once received. As
trash would be picked up from the trash room (and not an outdoor dumpster) the turning
path analysis drawing for the garbage truck (Figure 1 of the TIA by KH) should be modified
to show how the garbage truck would maneuver to and from the loading dock/trash room
door so that the truck’s rear is facing the loading dock. Similarly, the turning path analysis
drawing for the SU-40 truck (Figure 2 of the TIA by KH) should show how the truck would
maneuver to and from the loading dock door so that the truck’s rear is facing the loading
dock. Figure 3 of the TIA by KH shows the turning paths of delivery vehicles and auto (taxi)
drop-off and pick-up maneuvers, which utilize the eastern driveway that is proposed to be
utilized for emergency and school bus traffic only. The revised plan set should include
updated versions of each of these drawings once completed.
NEW COMMENTS
Several separate submissions were received subsequent to AKRF’s previous comment
memos. AKRF’s comments on each of these submissions are presented below (please note
that some of the comments may overlap with comments already mentioned in the section
above).
August 13, 2024 Traffic Impact Analysis (TIA, aka Traffic and Delivery/Truck Circulation Letter,
prepared by Kimley Horn (KH)
1. The turning path analysis drawings for the garbage truck (Figure 1) and SU-40 truck
(Figure 2) should be modified to show how the garbage and SU-40 trucks would
maneuver to and from the loading dock/trash room door so that the truck’s rear is facing
the loading dock.
2. The turning path analysis drawing for the passenger car/delivery van (Figure 3) shows
these vehicles utilizing the eastern driveway, which is being proposed for school bus
and emergency vehicle use only. This drawing should be revised if the eastern driveway
is indeed for school bus and emergency vehicle use only.
Comments from Village Manager (Bryan Healy), 9/14/24
3. The Village Manager clarified that the current parking count in Lot A is 122 spaces, not
134. This number should be verified and the revised TIS should update any references
to the current capacity of Lot A accordingly.
10.4.24
September 16, 2024 (Revised September 24, 2024) Response to Village Planning Board
Comments Letter, prepared by Kimley Horn (KH)
4. (Comment C 3) The parking demand calculations presented in the response to
Comment C 3 show that the parking demand calculations were based on ITE data for
ITE Land Use 223 (“Affordable Housing”). These calculations should be revised to be
based on ITE Land Use 221 (“Multifamily Housing – Mid-Rise”) so that they are
consistent with the Land Use utilized to develop the trip generation traffic volumes.
These changes should be incorporated into the revised TIS. The Village Manager noted
that the number of current parking spaces in Lot A are 122 spaces, not 134. This number
should be verified and the revised TIS should update any references to the current
capacity of Lot A accordingly.
September 24, 2024 Response to 9/23/24 AKRF Comment Letter, prepared by Insite
Engineering, Surveying, and Landscape Architecture, P.C. (“Insite”)
5. Please see “Review of Responses to 8/19/24 Comments” section above.
September 25, 2024 Traffic Impact Study, prepared by Kimley Horn (KH)
6. Please recheck the project-generated traffic volumes. Based on a review of the
development of the Build volumes, the project-generated volumes appear to have been
applied to the incorrect traffic movements at the Croton Point Avenue and Veterans
Plaza intersection.
7. The TIS should present the impact criteria utilized to identify traffic impacts.
8. For the PM peak hour, the change in level of service (LOS)/Delay from No Build to Build
Conditions for the following approaches should be identified as impacts and
improvements should be proposed; the southbound approach at the Croton Point
Avenue and Veteran’s Plaza intersection (decline in LOS from LOS A to LOS E) and the
northbound approach at the Croton Point Avenue and Route 9/9A Northbound On/Off
Ramps intersection (increase in delay greater than 10 percent within LOS F).
9. The details of the signal timing changes that are assumed by KH to address the levels
of service documented at the above locations should be presented in the text of the TIS,
specifically within the discussion that references Table 4.
10. The following data/information should be included in the TIS Appendix: Agency
(NYSDOT) traffic signal timing plan sheets for the signalized study area intersections,
the September 2024 traffic count data (e.g., turning movement counts).
11. The electronic Synchro (.syn) files should be provided to AKRF for further review.
12. The final revised TIS should incorporate the items listed above as well as the data and
findings presented in the August 13, 2024 TIA and KH’s 9/24/24 response memo. This
includes key discussions and data on parking, trip generation, and circulation. The
appropriate backup data from these documents should also be included as part of the
TIS appendix.
Site Plan (Revised September 24, 2024), prepared by Insite
13. Efforts should be made to improve sight lines for the parking spaces adjacent to the
northern garage entrance. Assuming both sides of the garage entrance are concrete
foundation walls, sight lines for the adjacent parking spaces on both sides of the walls
are limited. Options to be considered could include relocation of those parking spaces
to areas on-site with better sight lines, or providing columns (rather than solid concrete
walls) at this location so that vehicles exiting these spaces are easily visible to drivers
in the travel aisle from both inside and outside the garage.
10.4.24
8. 8/19/24: Fiscal / Economic Analysis: The Village should request a quantified assessment of the
project’s potential effects on the fiscal health of the Village, the Croton Harmon School District, and
other directly affected taxing jurisdictions. The assessment should include: 1) identification of all
applicable taxing jurisdictions; 2) quantification of property taxes generated from the project site in the
existing conditions; 3) estimated changes in tax revenue with the project, including new property tax
revenues generated by the project’s built improvements as well as any reduction in property tax
revenues associated with the displacement of the existing built improvement(s); 4) estimated number
of project residents and estimate per capita and total costs to the applicable taxing jurisdictions as a
result of the project. For the Croton-Harmon School District, estimate a per-pupil cost for existing
students, and apply that cost to projected school-aged children associated with the project (see #9
below). The assessment should describe the approach used to derive the project’s assessed value
and per-unit costs and note key assumptions.
9/23/24: AKRF has reviewed the Fiscal Analysis memorandum prepared by the Applicant (dated
September 17, 2024) and offers the following comments:
a. Existing Tax Revenue –Existing tax revenue tables incorrectly cite the 2023 equalization
rate of 1.22 equalization rate for town, county, county refuse, Ossining sanitary, school,
and library when the calculations in the tables are based on the correct 2024 equalization
rate of 1.18. While this change does not materially affect the analysis, the table should be
updated for the record.
10/4/24: The table has been corrected to reflect the 2024 equalization rate of 1.18 for
town, county, county refuse, Ossining sanitary, school, and library.
b. Existing Tax Revenue - The estimated market value used in “existing tax revenue – 79.17-
1-4” should be corrected to reflect the most recently assessed market value found in the
2024 tax rolls. This table should also be double checked to ensure calculations are correct
10/4/24: The table continues to present the estimated market value from the 2023 town
tax roll ($1,034,836); this should be updated to reflect the 2024 market value from the
town tax roll ($1,069,915) for the town, county, county refuse, Ossining sanitary, school,
and library columns. It appears that calculations in the table are using the 2023 market
value and equalization rate, please re-check the calculations, and their potential “ripple
effect” when presenting net tax revenue estimates with the project.
c. Anticipated Tax Revenue – The calculations throughout the anticipated revenue section
utilized the 2023 equalization rate of 1.22 and should be updated to reflect the 2024
equalization rate of 1.18. The anticipated tax revenue estimates will need to be recalculated
along with the net increase in tax revenue for both the ownership and rental scenarios.
While this change does not materially affect the analysis, the tables should be updated for
the record.
10:4/24: This has been updated using 2024 equalization and tax rates. No further
comment.
d. Fiscal Impact on CHUFSD - The Applicant should provide additional explanation as to why
the existing average instructional cost per pupil is higher than an incremental cost per pupil
associated with students of project families. For example, the Applicant could estimate the
marginal cost of project students and compare that estimate against school tax revenues
from the project. This could lend additional support to the Applicant’s statement that “the
added tax revenue generated by the project is expected to cover the projected increase in
[costs associated with] public school children of between 1-22 students.”
10/4/24: Comment addressed.
e. Fiscal Impacts on Village, Town, County – The Applicant states that “the proposed
development is not expected to result in a negative fiscal impact to any of the taxing
jurisdictions as municipal services to the development will be limited.” The Applicant
supports this statement by explaining that the development would include infrastructure
and utilities maintained by the Applicant at no cost to the Village, Town or County
Village of Croton-on-Hudson Board of Trustees
10.4.24
government. Does this statement include solid waste management? The assessment goes
on to state that all per capita cost evaluations are conservative because they are based on
100% project occupancy. The Applicant could also note that the per capita (resident) cost
estimate is conservative because its calculation includes costs associated with non-
residential uses, which also generate demand for Village, Town and County services.
10/4/24: Comment addressed.
f.
Property Values – The analysis should provide sourcing for the studies referenced and
provide a slightly more fulsome discussion of findings based on literature review. The A-
Mark Foundation has performed literature review on this issue and cites a number of
relevant
studies
in
the
following
document:
What_Impact_Low_Income_Housing_Property_Values.pdf (amarkfoundation.org)
10/4/24: Comment addressed.
g. The Applicant should provide an update to the Board on the outcome of any recent
correspondence and/or meetings held with emergency service providers (police, fire,
EMS). The Applicant had indicated after the 8/21/24 Village Board meeting that such
outreach was planned.
10/4/24: Comment remains outstanding.
9. 8/19/24: Public Schools: Based on the 0.22 public school-aged children (PSAC) per dwelling unit ratio
from Table 9 of the 2022 FEAF (based on Village apartment building-level data), the proposed project
would include households with an estimated 22 PSAC. The Applicant should supplement this estimate
using the 2018 Rutgers Study “Who Lives in New Jersey Housing,” to derive alternative estimates
under the following two scenarios: 1) 100% affordable home ownership; and 2) a rental scenario that
has 80% market rate units and 20% affordable units. For the rental scenario, provide assumptions
related to unit size (e.g., 1BR, 2BR) for both market rate and affordable units. The Applicant should
also estimate the per-pupil cost for existing Croton-Harmon School District students and apply that
cost to the estimated PSAC associated with the project. Finally, the Applicant should speak to regional
demographic trends and enrollment trends in the Croton-Harmon School District, to the extent the data
is available.
9/23/24: AKRF has reviewed the PSAC memorandum prepared by the Applicant (dated September
17, 2024) and offers the following comments:
a. The PSAC multiplier obtained from the 2023-2025 CHUFSD Local Multifamily Study
incorporates information from the Maple Commons development which AKRF understands
is not fully tenanted at this time. The incorporation of Maple Commons assuming full
tenancy results in an artificially low PSAC multiplier of 0.20. The Applicant should remove
the Maple Commons development from the study and recalculate the PSAC multiplier, as
Maple Commons cannot serve as a reliable comparative at this time. Based on AKRF’s
review, removing the 33 units of Maple Commons should result in a multiplier comparable
to the 0.22 multiplier developed from the data obtained in 2022 from the CHUFSD during
the SEQR process for the rezoning.
10/4/24: The PSAC memorandum now states on page 3 that the updated 2023-2025
CHUFSD local multifamily study resulted in a multiplier of 0.25 students per unit, but the
table on top of page 4 continues to present the 0.20 rate and resulting 20 students. This
table should be updated to match the text.
b. The Applicant should provide source information for the unit counts used in the study.
10/4/24: Comment addressed.
c. If possible, the Applicant should examine one of their previously completed multifamily
projects within a desirable school district and provide the number of school-aged children
residing in that building.
10/4/24: Comment remains outstanding.
10.4.24
C. RECOMMENDATIONS
At the October 9, 2024 Village Board meeting, AKRF recommends that the Village Board discuss the latest
materials submitted by the Applicant, the comments / requests for additional information contained in this
memorandum, and open the continued public hearing.