Modifications of the Plan of the New Croton Dam

Hill, William R. Modifications of the Plan of the New Croton Dam. Paper read before the American Water Works Association, St. Louis, Missouri, June 8, 1904. Pamphlet T 462, Cornell University Library. 331 words

They re- ported that the conditions were deserving of very serious considerations and that in certain locations the material was for nd to be so soft that in their own words it " runs with water like sand . " Under their advice this loose and disintegrated rock has been removed to the depth of 75 feet below the base of the core wall , for it is only at this great depth that a suitable foundation for extending the dam has been found . The removal of this soft rock and the replacing it with masonry has again materially in- creased the cost of the structure . The work of building this masonry is now in progress . Another important change of plan is that of the gate- house , above referred to . This gatehouse is located in the embankment outside of the core wall . It is well up on the slope of the valley , its base being about 100 feet higher than the bed of the river . The substructure of this gatehouse is described as follows : It has four water chambers , 74 feet deep and about 12 feet square . Two on the southerly side of the structure are to control the flow of the water in the old Croton aqueduct which passes through this gatehouse . The other two on the northerly side , are to control the flow of water direct from the res- ervoir to the old aqueduct below the dam . These two chambers are connected with the reservoir by three brick inlets , 10 feet in diameter . And thy are to hold water to a depth of 54 feet , yet the outer walls ( which are en- closed in an artificial embankment ) have a uniform thick- ness , from the base to top of but eight feet , while safe construction demands that they should be about four times that thickness at the base .