Home / Hill, William R. Modifications of the Plan of the New Croton Dam. Paper read before the American Water Works Association, St. Louis, Missouri, June 8, 1904. Pamphlet T 462, Cornell University Library. / Passage

Modifications of the Plan of the New Croton Dam

Hill, William R. Modifications of the Plan of the New Croton Dam. Paper read before the American Water Works Association, St. Louis, Missouri, June 8, 1904. Pamphlet T 462, Cornell University Library. 340 words

This section , would be not only about 40 per cent . higher than any heretofore built , but in comparison with other high embankments its base was narrow for its height . As an example , the Amawalk dam , which forms one of the upper Croton reservoirs , while only about half the height , 85 feet , yet has a base even wider than that of this embankment of unprecedented height . And further , this embankment was hazardous because of the unsta- ble nature of its foundation . It was founded over a great refilled pit , which was 360 feet wide at the top , 170 feet at the base and 70 feet deep ; this pit was a necessary ex- cavation for the foundation of the end of the stone dam , which was 164 feet wide at the base as before stated . It would be impossible to refill this pit as compactly as orig- inal ground , hence the safety of the reservoir was de- pendent not only on an embankment of a problematic section , but this problematic section , rested upon an un- staple foundation . The second of the objections , the core wall of this embankment was 200 feet high and with no lateral pro- tection or support from original ground whatsoever , as the artificially placed earth on each side of the wall had the height of the wall itself , 200 feet . Considering the height of the wall , and this in artificially placed earth , it could be but an experimental structure , inasmuch as it woud be about twice the height of any heretofore built . The third objection , the double means afforded the water to reach the core wall , this is another serious ob- jection , as the water by starting at the end of the em- bankment in the reservoir and following between the face of the stone dam and the embankment would inevitably reach the core wall .