DPW Q2 FY 2026
report
2 pages
From the meeting:
Board Of Trustees — 2025-12-17
· our coverage →
Agenda item: Consent Agenda — Departmental Quarterly Reports
Report / study, 2 pages. Attached to agenda item: “Consent Agenda — Departmental Quarterly Reports”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Clerk Q2 FY 2026
Court Q2 FY 2026
Eng Q2 FY 2026
Managers Q2 FY 2026
Parking Q2 FY 2026
Police Q2 FY 2026
Rec Q2 FY 2026
Treasurer Q2 FY 2026
Extracted text
Quarterly Report
PUBLIC WORKS QUARTERLY REPORT
Fiscal Year 2025/2026
Second Quarter: September 1, 2025 – November 30, 2025
Highway
•
Repaired 4 catch basins
•
Weekly asphalt maintenance (potholes and water patches)
•
Trimmed approximately 20 trees
•
Removed 15 trees (including grinding leftover stumps)
•
Planted 24 trees throughout the Village
•
Sewer Jetting throughout the Village
Sanitation:
•
Collected approximately 870 tons of refuse
•
Weekly collection of Village co-mingled, paper and metal recycling
•
Collected approximately 200 tons of organic waste
Building Maintenance:
•
Street light repairs and painted poles
•
Replaced various signage throughout Village
•
Assist in EMS addition
•
HVAC – Installed new mini split HVAC in Municipal Building Office
•
Installed new cross walk signs on Benedict Blvd
•
Supervised contractor that replaced railing on path to Ossining
Water Department:
•
Meter reading for water billing
•
Flushed hydrants
•
Maintenance to pumps and motors
•
Plumbing work at Firehouses
•
Responded to 128 code 53-mark outs
•
Submission of monthly reports to Westchester County
•
Assist DPW on low staff days
•
Completed monthly water sampling
•
Replaced 93 non-working water meters
•
Issues with service lines at Old Post Road No/Finney Farm Rd (map out and correct)
•
Helped with irrigation systems
•
Site visits for: FIOS – Georgia Lane, CON ED – Batten Road, PVC – Glen Place
•
Work on Upper North Highland tank rehab/replacement project
•
Maintenance/Repairs to Chlorine systems
•
Work on Lounsbury relining project
•
Shut down seasonal waters
•
Continue process of having schools and county update their meters
•
Service to generators
•
Work on lead service, line inventory list
Department of Public Works
Quarterly Report
•
Fixed 7 curb boxes
•
Issue with Well #4 – motor sent to shop for repair (motor rebuilt and put back in service)
•
Repairs to water main on Gerstein
Parks Department:
•
Continue removing debris and leaves from Village Parks and Playgrounds
•
Continued mowing of lawns/field in all Village parks
•
Litter removal in Village parks and fields
•
Maintenance of Village ballfields
Repair Facility:
•
Maintenance on all Village vehicles
•
Weekly inspection and maintenance of all police vehicles
•
Assist Fire Department with vehicle maintenance
Capital Projects:
•
Continued the design process for the Half Mon Bay Bridge project
•
Working towards approval for Cleveland resurfacing grant
•
Completed exterior walls and roof for new EMS building
•
Continued working on design of renovations/addition to the Gouveia property to accommodate
new Recreation Department
•
EMS – Sheetrock, tape, spackle interior. Exterior doors installed. Finishes started throughout
building
•
Began construction of new parking lot at Washington Engine
•
Added sidewalks at 61 Elmore Avenue and Darby Avenue
•
EMS – started concrete apron and sidewalk outside building