Amended Site Plan Application Redacted
site plan
2 pages
Scanned/OCR — text may contain errors
Meeting: portal event 990 (no meeting page on file)
Agenda item: Old Business — Fields, Maria, Sprocket Power - 1 Municipal Place (78.12-3-2) Amended Site Plan - Croton Auto Park for Battery Energy Storage System
Site plan, 2 pages. Attached to agenda item: “Old Business — Fields, Maria, Sprocket Power - 1 Municipal Place (78.12-3-2) Amended Site Plan - Croton Auto Park for Battery Energy Storage System” (Text recovered by OCR — may contain errors.)
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Auto Park PB Resolution 10.11.11
Auto Park PB Resolution 11.12.02
CROTON AUTO PARK 9-30-24
Installation Manual 280 V1.0
Material Safety Datasheet eSpire 280
SP Sprocket Special Permit
Stat-x
UL 1741 SB CRD certificate eSpire 280
eSpire 280 Battery User Manual
eSpire 280 Datasheet 2.28.23
Extracted text
Village of Croton-on-Hudson and
™ Engineering Department 7
Stanley H. Kellerhouse Municipal Building Villa € Boar d
1 Van Wyck Street - e
Croton-on-Hudson, NY 10520-2501 Application
Tel: 914-271-4783
engineering@crotononhudson-ny.gov Rev 11/17
Note: Prior to submitting this application, contact Planning Board Secretary at 914-271-4783
Application Date: 99/12/2024 Application #:
Property Information: Section: 78.12 Block: 3 Lot: 2
Property Location (street address): 1 Municiapal Place
Zoning District C-2 Commercial Lot: Yes ONo Vacant Lot! O Yes WNo
Applicant Information: Person or Company Doing Work: O Owner O Contractor O Other:
Last Name: Fields First Name: Maria MI:
Company: Sprocket Power
Address: 2 Depot Plaza
Address: Bedford Hills, NY 10507 7
Phone #: _ Cell #: E-mail: |
Property Owner: 0 Same As Above
Last Name: Giordano First Name; Lou MI:
Company: Croton Auto Park
Address: 1 Municipal Place
Address: Croton-on-Hudson, NY 10520
Phone #: Cell #: __ E-mail: |
Application Type: (Please check those that apply)
O Site Plan * Amended Site Plan* O Minor Site Plan
O Change of Use O Amended Site Plan Extension O Minor Site Plan Extension
O Building Envelope Modification
O Wetlands Permit* D Village Board Special Permit*
D Steep Slope Permit* D Village Board Special Permit Renewal*
| O Excavation & Fill Permit |
O Preliminary Subdivision
O Final Subdivision
*note: Public Hearing required for these permits |
| NOTE: The Planning Board also reviews applications (e.g., special permits, accessory apartments, zoning amendments, etc.) that |
have been referred to them by the Village Board for a recommendation. No public hearing before the Planning Board is required
| for referral applications.
Per §230-57, the submission should also include the following documentation:
A. A description of the proposed use, with reference to the appropriate use and regulations of this chapter, including
any supplementary regulations applying thereto.
B. A cost-benefit analysis or similar study to review the estimated municipal costs, services and prospective
revenues which would be generated by the proposed use.
C. Evidence that the proposed use is consistent with the goals of the Village Master Plan.
Planning Board and Village Board Application - Page 1 of 2
D. A traffic and circulation study projecting the effects of the proposed use of the existing and probable future traffic
and access in the vicinity of the proposed use.
E. Copies of environmental assessments or permit applications and supporting materials which may be required to
meet New York State or federal regulations.
F. A stormwater pollution prevention plan (SWPPP) consistent with the requirements of Chapter 196,
Article I, Stormwater Management and Erosion and Sediment Control, shall be required for any special
permit approval that qualifies as or authorizes a land development activity as defined in Chapter 196,
Article I. The SWPPP shall meet the performance and design criteria and standards in Chapter 196,
Article I. The approved special permit shall be consistent with the provisions of Chapter 196, Article I.
INSTRUCTIONS; Please submit eight (8) paper copies (Nine copies if a special permit from the Village Board is also
required) of supporting materials to the Planning Board Secretary and one (1) pdf file of all application materials to
engineering@crotononhudson-ny.gov
I certify that the above information is accurate, and I am the property owner or authorized by the owner to file this application
on their behalf and that I will indemnify and hold the Village harmless against any damage or injury that may be caused by
or arise out of any entry onto the property in connection with the processing of the application, during construction or
performance of the work or within one year after the completion of the work.
Applicant (if other than owner) certifies that he is authorized by the Owner of subject premises to conduct the project
described above
Maria Fields Maria Fields Date 202808 1307 sesz-oree 09/12/2024
Applicant’s Name (please print) Signature of Applicant or Agent Date
FOR VILLAGE USE ONLY: _ a . - 7 Th 7
Fee $ 4an 0 B) Fee Paid (date): a | 3 fe a Received by: _KS
TAXES PAID: LEASE AGREEMENT (If applicable):
HEARD BY THE VILLAGE BOARD ON: HEARD BY THE PLANNING BOARD ON:
PUBLIC HEARING HELD ON: PUBLIC HEARING HELD ON; 7
APPROVED: 0 DENIED: 0 APPROVED: 1] DENIED: 0
Planning Board and Village Board Application - Page 2 of 2
Machine-extracted for search and reference — the original PDF is the authoritative version.