eSpire 280 Battery User Manual
site plan
53 pages
Meeting: portal event 990 (no meeting page on file)
Agenda item: Old Business — Fields, Maria, Sprocket Power - 1 Municipal Place (78.12-3-2) Amended Site Plan - Croton Auto Park for Battery Energy Storage System
Site plan, 53 pages. Attached to agenda item: “Old Business — Fields, Maria, Sprocket Power - 1 Municipal Place (78.12-3-2) Amended Site Plan - Croton Auto Park for Battery Energy Storage System”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Amended Site Plan Application Redacted
Auto Park PB Resolution 10.11.11
Auto Park PB Resolution 11.12.02
CROTON AUTO PARK 9-30-24
Installation Manual 280 V1.0
Material Safety Datasheet eSpire 280
SP Sprocket Special Permit
Stat-x
UL 1741 SB CRD certificate eSpire 280
eSpire 280 Datasheet 2.28.23
Extracted text
Fortress Power Confidential File
280 Ah Liquid Cooling Rack
User’s Manual
Fortress Power Confidential File
To protect your personal safety, please be sure to read carefully and follow the
safety requirements below:
Symbols in This Document
This manual uses the following symbols to highlight important information:
WARNING: Indicates a hazardous situation which, if not avoided, could result in injury or death.
CAUTION: Indicates a hazardous situation which, if not avoided, could result in minor injury
or damage to the equipment.
NOTE: Indicates an important step or tip that leads to best results, but is not safety or damage
related.
General Information
NOTE: The maintenance workers must be required to hold the Fortress Power maintenance
authorization certificate to carry out maintenance work.
WARNING: It is strictly forbidden to touch both pole terminals of ESS at the same time with both
hands.
WARNING: Be sure to disconnect the corresponding high and low voltage switches before
performing maintenance on the ESS.
Fortress Power Confidential File
WARNING: Wear safety helmets, insulated gloves, insulated shoes, and goggles when
operating or maintaining the ESS. Do not wear metal jewelry such as watches.
WARNING: When cleaning the ESS, it is forbidden to wash the HV/LV connectors directly.
WARNING: It is strictly forbidden to crush, pierce and burn artificially the batteries to damage
the ESS.
WARNING: The working environment of ESS should be free from corrosive, explosive,
uninsulated gas or conductive gas and away from heat sources
WARNING: Stepping on the top of the RACK is prohibited during use and maintenance.
WARNING: If you have any questions, please contact the ESS supplier, operate without
authorization is forbidden.
WARNING: Use in series or parallel with other types of battery products is prohibited.
Care and Maintenance
Environmental Requirements
RACK is capable of charging and discharging within the operating temperature range specified below. At the
extremes of the temperature range, RACK may limit charge or discharge power to improve battery lifespan.
Fortress Power Confidential File
For best performance, the average ambient temperature over the system's lifetime should fall within the
optimum temperature range specified below:
Operating Temperature
-30℃~55℃
Optimum Temperature
-25~45°C
Care and Cleaning
If it is installed outside, keep the sides of RACK clear of leaves and other debris to maintain optimal
airflow.
CAUTION: Do not lean on stack anything on top of, or hang anything from RACK or from wires or conduit
leading to RACK.
CAUTION: To clean RACK use a soft. lint-free cloth. If needed, the cloth can be dampened with mild soap
and water only.
CAUTION: Do not use cleaning solvents to clean RACK, or expose RACK to flammable or harsh chemicals
or vapors.
RACK and the Gateway do not require pre-scheduled preventative maintenance. The only maintenance
required by an owner is to keep the RACK unit free and clear of debris, especially around the air intake and
exhaust.
Fortress Power Confidential File
CONTENT
1. Product Overview ................................................................................................................................... 7
1.1 Applicable Scope .............................................................................................................. 7
1.2 Main Feature ...................................................................................................................... 7
2.
Transportation and Storage ..................................................................................................................8
2.1 Packaging ......................................................................................................................... 8
2.1.1 Rack Packing steps: .............................................................................................. 9
2.2 Transportation .................................................................................................................. 11
2.2.1 Requirements for Battery Transport Environment ................................................. 12
2.2.2 Requirements for Rack Transport ......................................................................... 12
2.3 Storage ............................................................................................................................ 13
3. Installation ................................................................................................................................................ 14
3.1 Main constituent parts for installation ............................................................................... 14
3.2 Preparation for installation ................................................................................................ 16
3.2.1 Unpacking ............................................................................................................... 16
3.2.2 Description of the installation process .................................................................... 17
3.3 Installation of the rack ....................................................................................................... 18
3.3.1 Installation Precautions .......................................................................................... 18
3.3.2 Site and environmental requirements ...................................................................... 20
3.3.3 Installation steps ..................................................................................................... 21
3.4 Electrical interface ............................................................................................................. 26
3.4.1 Wiring...................................................................................................................... 26
3.4.2 Precautions in wiring .............................................................................................. 31
4. commission check list ............................................................................................................................ 33
5. Operating Instructions .............................................................................................................................. 34
5.1 Rack Temperature Characteristics .................................................................................... 35
5.2 Cable Connection Confirmation ......................................................................................... 35
5.3 Status Checking of Equipment Switch .............................................................................. 36
5.4 Power up the Secondary Circuit ....................................................................................... 36
5.5 Power up of Primary Circuit of Battery Rack .................................................................... 37
5.6 Charging of Battery Rack. ................................................................................................. 38
5.7 Discharging of Battery Rack .............................................................................................. 38
5.8 Power Down of Primary Circuit of Battery Rack ................................................................ 39
5.9 Secondary Circuit Power Down ........................................................................................ 39
5.10 List of Rack Status .......................................................................................................... 40
6. Product Maintenance ............................................................................................................................ 42
6.1 Terms Explanation ........................................................................................................... 42
6.2 Operating Instructions for Normal Operating System ....................................................... 43
6.3 Operating Instructions for Intermittent Operating System ................................................. 43
6.4 Operating Instructions for Long-time Unused System ...................................................... 43
6.5 Function of Isolating Switch ............................................................................................... 44
6.6 Operating Method of Battery Maintenance ....................................................................... 44
6.7 Maintenance Requirements for Liquid Cooling System .................................................... 46
Fortress Power Confidential File
6.8 Fire Protection System Maintenance .............................................................................. 47
7. Diagnosis of common abnormal problems ................................................................................................ 48
7.1 The system alarm is divided into level alarm and non-level alarm. ....................................... 48
7.2 Countermeasures of system alarm .................................................................................. 50
7.3 Emergency Treatment Method ......................................................................................... 56
8.
Requirements for Maintenance Personnel ........................................................................................ 59
9.
After-sales Service.............................................................................................................................. 59
. ................................................................................................................................................................ 63
Notice ...................................................................................................................................... 64
Fortress Power Confidential File
1. Product Overview
1.1 Applicable Scope
This manual is applicable to the battery racks of the following model:
O852280-E/ O852280-P
All references to “battery racks” in this manual, unless specifically indicated herein, refer to the
product series mentioned above.
Weight
3500kg
Dimension
1300mm(W)*1300mm(D)*2340mm(H)
Fortress Power Confidential File
1.2 Main Feature
The battery system can detect the battery operating status(Voltage, current, temperature, SOC/
SOH/SOP estimation, etc.),According to the current state of the battery and the actual
performance of the electrical components to adjust the battery charge and discharge and energy
storage
The battery system has functions such as insulation detection, high-voltage sampling, and status
check of safety devices such as MSD and fuse. When the battery fails, the system will report and
limit the charge or discharge current or power, delay the opening of the contactor, and protect the
safety of the power system.
The battery system can control the cooling, heating and temperature settings of the liquid cooling
unit
The cabinet body of the Rack meets the IP56 protection grade and supports use under outdoor
conditions.
Rack equipped with Stat-X aerosol fire extinguishing system, It can detect the temperature and
smoke status in the Rack in real time to prevent fire safety accidents such as accidental battery
fire
Fortress Power Confidential File
2. Transportation and Storage
2.1 Packaging
The system is packaged as a whole to ensure that the product is well protected from any harmful gases,
chemical contamination, static electricity, moisture and mechanical damage during handling, transport
and storage. The name of product, specification, production date, quantity and lot number have been
labeled on the packaging box.
2.1.1 Rack Packing steps:
1 Lay the tray flat, hang the Rack on the tray and fix it.
2 Fix the RACK with bolts.
M16_1
M16x110
M16 flat gasket
3 Put it into the packaging bag from one to the bottom, wrap the scotch tape around the mouth of
the bag, lay the top package flat on both sides, and fix it with scotch tape.
Fortress Power Confidential File
packing tape
6 Wrap the winding film from the bottom of the tray (sticking to the ground), the winding film should
be no less than 3 layers
2.2 Transportation
Trucks and shipping are preferred as means of transport while shelter and sun protection should
be guaranteed during transportation. Please load and unload in a civilized way. Packing boxes
with products inside can be transported by any means of transport. Batteries shall be handled with
care in the middle of loading and unloading. Be cautious of throwing, rolling over and heavy pressure.
Avoid direct contact with rain, snow and mechanical impacts.
Fortress Power Confidential File
2.2.1 Requirements for Battery Transport Environment
Based on battery features and with the purpose of maximizing the battery performance, the
transport and storage of battery packs should meet the following requirements:
Recommended storage temperature: ≤20℃; Allowable storage temperature: -40~60℃;
Humidity: <95% (no condensation).
2.2.2 Requirements for Rack Transport
(1) Check before loading of battery rack into container
1) Before loading into container, it is necessary to check the outside and inside of the container to ensure
the cleanliness of the inside, and the inside shall be equipped with hooks;
2) Before loading into container, check the package and external label of the cargo to ensure the integrity
of external package.
(2) Loading of battery rack into container
1) The forklift matched with the battery rack load shall be used in operation and shall pass the
annual inspection. The forklift shall not move during lifting;
2) The weight of a battery rack is high. The container shall be stuffed with filling material and the tie belt
shall be used to fix the battery rack in a container;
3) After being loaded into a container, the warehouse head shall recheck the tie belt and protection and
then notify to release after confirmation.
(3) Battery rack transport
1) The high-speed driving speed of the vehicle shall not exceed the speed specified by traffic laws, and
the bumpy road section shall be avoided as far as possible;
2) It is forbidden to brake and make sharp turns when the vehicle is driving;
3) Keep the car in good condition, check the carrying situation of the car frequently. If problems are
Fortress Power Confidential File
found, feedback and solve in time.
(4) Unloading of battery rack
1) Provide the packing list to the client for preparing proper unloading tools.
2.3 Storage
The system should be stored in a dry warehouse to avoid exposure and rain. No harmful
gases, flammable or explosive products and corrosive chemicals are allowed in the warehouse.
Keep away from mechanical impact, heavy pressure and strong magnetic field. Avoid direct
sunlight and the distance to heat source should be more than 2m away. The packaging box should
be at least 20cm high from floor, and at least 50cm away from the wall, windows or air inlets.
Recommended storage temperature: ≤20℃; Allowable storage temperature: -40~60℃;
Humidity: <95% (no condensation).
Under these conditions,
The product shall be supplemented to 50% SOC at least once within 6 months after leaving the
factory。 The capacity verification test and re-inspection are required every 12 months.
3. Installation
The battery system is a high-voltage energy storage device, which is regarded as dangerous goods;
operation and use by non-professional persons or improper operation and use of it might result in
severe consequences, e.g. electric shock, combustion and explosion. The battery system must be
installed and maintained by professional technicians and used in strict accordance with the relevant
safety provisions.
3.1 Main constituent parts for installation
Fortress Power Confidential File
Table 1. Main constituent parts for installation
Components
Diagram
Number
Unit
Remark
Rack
Pcs
Dimension :
W*D*H(mm)
1300*1300*2280
Weight :
3500kg
Voltage range :
1164.8~1497.6V DC
HV harness
Set
One for the positive pole
and one for the negative
pole on the control box.
Auxiliary power
supply harness
Pcs
Including power supply
for chiller and power
supply for BMS.
Communication
harness
Set
Building the connection
between two adjoining
racks, one for input and
one for output.
Fortress Power Confidential File
3.2 Preparation for installation
3.2.1 Unpacking
Unpacking steps are as follow:
1. Remove the packing belt and winding film on box.
2. Remove the front and back panel from the front side and back side respectively.
Remove the right side and left side panels.
3. Unscrew four nuts on the wooden pallet, remove the bolt and washer.
4. Move the rack out of the tray.
5. Unpacking completed.
MSD
Pcs
Installation of MSD
should be conducted
after the fixation of racks
and harness.
Fortress Power Confidential File
3.2.2 Description of the installation process
The installation process is mainly divided into two stages: rack installation and wiring. The main content
and steps are as follows:
Fortress Power Confidential File
Table 2. Installation process
Installation steps
Specific implementation
Remark
Rack installation
A.
Transfer the rack to the
designated location by means of
forklift transfer or hoisting.
The tool should meet the
weight requirements, and the
tilt angle should be smaller
than 5°.
B.
Fix the bottom foot of the rack.
M16 bolt,required torque is
3.3 Installation of the rack
3.3.1 Installation Precautions
150~200N.M
C. Grounding of the rack.
M8 bolt,required torque is
10N.M, wire size ≥50mm2
(cooper)
The external casing of the
equipment should be well
grounded
Wiring
A.Power harness
Including positive and negative
poles, orange connector
connects to HV+, black
connector connects to HV-.
B. Auxiliary power supply harness
Including power supply for
chiller and control circuit.
C.Communication harness
One for input and one for
output.
D.MSD
Should be conducted after the
fixation and inspection of racks
and harness.
Fortress Power Confidential File
WARNING: The title angle should be smaller than 5°during the hoisting.
WARNING: Do not hit the staff during landing.
WARNING: Should set an isolation area for the operation of installation.
WARNING: Move and transfer the rack in a manner way during hoisting.
WARNING: RACK installation must be carried out only by Installers who have been trained in
dealing with high voltage electricity.
WARNING: Do not use or install the RACK if it is defective, appears cracked, broken, or otherwise
damaged.
WARNING:Do not attempt to open, disassemble, repair, tamper with, or modify RACK.
WARNING: Do not conduct the installation under worse weather, such as rainstorm and sandstorm.
WARNING:To protect RACK and its components from damage when transporting, Handle with
care. Do not impact, pull, drag, or step on RACK. Do not subject RACK to any strong force. To help
prevent damage, leave RACK in its shipping packaging until it is ready to be installed.
WARNING: Do not insert foreign objects into any part of RACK.
WARNING:Do not expose RACK or its components to direct flame.
WARNING: Do not install RACK near heating equipment.
WARNING: Do not immerse RACK or its components in water or other fluids.
Fortress Power Confidential File
CAUTION: Do not use cleaning solvents to clean RACK, or expose RACK to flammable or harsh
chemicals or vapors.
CAUTION: Do not use components without authority by Fortress Power.
CAUTION: The schematic diagram of transfer and hoisting as shown in the figure is for reference
only, the specific tools and equipment used in actual operation shall prevail.
CAUTION: The minimum clearance between the racks should be back to back 100mm (0.5P rack)
or 500mm (1P rack); 10 mm(side by side) The clearances above are for reference only, the actual
clearance should comply with the local standards and regulations.
WARNING: Please place the battery system on a level ground to ensure that it is placed stably
without shaking or tilting;
WARNING: Battery system installation should consider the load capacity of its installation ground
and floor (according to the requirements of architectural drawings).
3.3.2 Site and environmental requirements
Rack foundation requirements
Unspecified concrete grades are C30, the floor thickness is 200mm, each side protrudes 300mm
from the edge of the electrical cabinet, and is equipped with three-level steel symbol 12@150.
Reinforcement adopts HRB400 grade, after derusting treatment, anticorrosive treatment
should be carried out according to relevant specifications.
Floor board thickness 100mm, concrete strength class C15.
Fortress Power Confidential File
The foundation bearing layer shall be undisturbed soil, and the characteristic value of bearing
capacity shall not be less than 100Kpa. If the foundation support layer is weak soil, graded
sandstone should be used for replacement, and the replacement depth should not be less than
500mm.The replacement soil layer must be compacted and compacted in layers, Layer thickness
should not be greater than 300mm, The compaction coefficient is greater than 0.97. The edge of
the replacement layer needs to exceed the base edge by 300mm, The characteristic value of
bearing capacity after replacement is not less than 100Kpa, The content of particles with a particle
size of less than 0.75mm at the time of refilling shall not exceed 10%.
During the foundation construction, precipitation measures should be taken, soaking the foundation
pit is strictly prohibited; safe and reliable support measures should be taken for foundation pit
excavation
Ground flatness requirement: within 2m, the flatness deviation is less than ±4mm
3.3.3 Installation steps
Attention:
(1): Recommended transfer mode of the Rack: Top hoisting transfer
(2 ): If a forklift is used, pay attention to adding protection on the forklift arm to prevent the dirt on
the forklift arm from polluting the Rack or the forklift from scratching the bottom of the Rack.
A.Transfer the rack to the designated location by means of forklift transfer or hoisting. The lifting lug
should be repainted after the installation.
Fortress Power Confidential File
Figure 2. Lifting lug on the rack
The radius of the hole on the lifting lug is 11mm.
B.Fix the bottom foot of the rack
C. The bottom of each rack is fixed with M16 bolts. The torque of the torque wrenches is set to
150~200N.M.
Fortress Power Confidential File
Different layouts of racks are shown as following figures:
1) Before chemical bar planting, the brush layer of bar planting flour needs to be cleaned out, and then
the next step after cleaning
2) The concrete strength grade is C25, and the chemical planting reinforcement needs to do the pull-
out test
3) It is required that the tensile strength of the planted chemical anchor bolt is not less than twice the
design value of the bearing capacity
4) Chemical anchors are recommended to use Hilti HVA chemical anchors. For specific design values,
please refer to the table below
Chemical
anchor
Design value of tensile
bearing capacity(KN)
Design value of shear capacity
(KN)
L1
L2
L
R-M16
34.7
34.6
Fortress Power Confidential File
5) The construction of chemical anchors should comply with JGJ 145-2013《Technical specification
for anchorage behind concrete structure》
6) If there is welding, measures should be taken to avoid overheating of the anchoring area and lead
to the failure of the rebar glue
7) Adhesives for load-bearing structures must be tested for bond shear strength. During the inspection,
the standard value of the bonding strength shall be determined according to the requirements of the confidence level of
0.9 and the guaranteed rate of 95%
Fortress Power Confidential File
Figure 5. Grounding of the rack
3.4 Electrical interface
3.4.1 Wiring
1 Installation of communication harness
Install the corresponding communication harness on JX2 and JX3:
In the first rack, JX2 is connected to the JX3 of the next rack, and JX3 is connected to MBMU.
In the middle rack, JX2 is connected to the JX3 of the next rack, and JX3 is connected to JX2 of
the last rack.
In the terminal rack, JX3 is connected to JX2 of the last rack, and JX2 is connected to the
terminal resistor connector.
Figure 6. Communication harness
Fortress Power Confidential File
2 Installation of auxiliary power supply harness
Install the auxiliary power supply harness (including the harness for chiller and BMS power supply)
on JXH1.
Figure 7. Auxiliary power supply harness
3 Installation of power harness
Isolation switch QS1 and breakers QF1, QF2 should be in OFF state.
Orange connector connects to HV+, black connector connects to HV-.
Push the plug of the HV connector into the receptacle during installation. When you can feel obvious
resistance, press the secondary lock(the disassembly method is opposite);
If the second lock cannot be push in, it indicates that the HV connector is not be installed correctly.
Fortress Power Confidential File
Secondary
Lock
Figure 8. Power harness
4 The diagrams of installation and disassembly of HV connector are as follow:
Original state
Figure 9. Original state of HV connector
Diagram of installation and
disassembly
Fortress Power Confidential File
Figure 10. Installation of HV connector
Figure 11. Disassembly of HV connector
5 After confirming that the above installation is correct, install the MSD.
Isolation switch QS1 and breakers QF1, QF2 should be in OFF
state.
Open the battery compartment door.
Fortress Power Confidential File
Figure 12. Installation of MSD
6 Install eight MSD upper cover on the panel of each module box.
Put the handle in the vertical state and align the cover of the maintenance switch with the receptacle.
Figure 13. MSD diagram
Push it in and rotate the handle.
Fortress Power Confidential File
Figure 14. MSD diagram-state 1
When you can hear the “da da” sound, push in the secondary lock (the disassembly method
is opposite), and the installation is completed.
Figure 15. MSD diagram-state 2
Fortress Power Confidential File
3.4.2 Precautions in wiring
CAUTION: JX1 is a debugging interface, which needs to be kept in a sealed state.
CAUTION: The connector need to be tighten during the installation of JX2 and JX3.
WARNING: The power supply harness for the chiller is different from the BMS, and no errors are
allowed to occur during wiring. Besides, JXH1-1 and JXH1-2 need be connected to UPS.
WARNING: To ensure the high voltage connector is locked.
WARNING: To ensure the MSD is locked.
WARNING: The positive and negative poles on the DC combiner cabinet cannot be reversed during
wiring.
WARNING: Strictly prevent any form of short circuit during the connection process.
WARNING: It is strictly forbidden for the operator to operate without training.
WARNING: It is strictly forbidden for the operator to operate freehand without wearing protective
equipment.
WARNING: All connections must be made under explicit guidance, and any form of guessing and
vague trial operation methods are strictly prohibited.
WARNING: The key points of the connection are: ensure the connection is correct, reliable (will not
be loosened), good contact, no short circuit.
CAUTION: After the connection is completed, it must be measured and confirmed point by point.
Fortress Power Confidential File
WARNING: Before wiring, make sure the rack is in OFF state by setting QF1, QF2 and QS1 in off
state.
CAUTION: If there are other uncertain factors, need to be confirmed by professionals before
implementation.
4. Commission check list
NO.
Test items
Specific description
Consequent
Exterior
Flat shell, uniform color
OK■
NG□
Clear logo, complete and correct silk screen
OK■
NG□
Check the screws
Check whether the screws are loose, slippery, damaged, etc.
OK■
NG□
Confirm the high
voltage connection
circuit
Check whether the high-voltage positive and negative
poles of 1#1system junction cabinet and electric cabinet
are correct and whether they are connected reversely
Check whether the high-voltage positive and negative
poles of 1#2 system junction cabinet and electric cabinet
are correct and whether they are connected reversely
OK■
OK■
NG□
NG□
Start the system
Close the QF1 and QF2 switches of the main control box,
and see if the low-voltage indicator light is on or the water-
cooling unit is turned on.
1#1 system electric cabinet 1-1~1-6 RACK
1#2 system electric cabinet 2-1~2-6 RACK
OK■
OK■
NG□
NG□
System
parameter check
1#1
Maximum temperature value:
Minimum temperature value:
Whether≤5℃
Maximum voltage value:
Minimum voltage value:
Whether≤20mV
Whether the cell voltage, the number of temperature
OK■
OK■
OK■
NG□
NG□
NG□
Fortress Power Confidential File
5. Operating Instructions
In order to ensure the long-term safe and reliable operation of your energy storage system, please
read and follow the instructions below:
[Note] Fortress Power will not be liable for any damage caused by failure to use the
battery system in accordance with the specified requirements or beyond the specified
range and other losses arising out of such damage.
samples and the fan are running normally
1#2
Maximum temperature value:
Minimum temperature value:
Whether≤5℃
Maximum voltage value:
Minimum voltage value:
Whether≤20mV
Whether the cell voltage, the number of temperature
samples and the fan are running normally
OK■
OK■
OK■
NG□
NG□
NG□
System high
pressure closure
Close all high-voltage relays and corresponding circuit
breakers of the RACK. Measure whether the bus voltage is
normal.
Multimeter measured voltage:XXX V
OK■
NG□
System high
pressure calibration
Close all high voltage relays of the electric cabinet, and the
upper computer calibrates the voltage of the electric cabinet
OK■
NG□
Software
version
confirmation
Confirm the system software version
OK■
NG□
RACK and PCS
communication
Can PCS control the power on and off of the product
OK■
NG□
Charge and
discharge check
Charge and discharge the product with low current through
PCS
OK■
NG□
Fortress Power Confidential File
5.1 Rack Temperature Characteristics
Operating ambient temperature:-20℃~55℃(discharge)/ 0℃~55℃(charge)
Safe storage ambient temperature:-30℃~60℃
Recommended storage environment temperature:
average temperature ≤25 ℃
Optimum operating ambient temperature:20℃~40℃
5.2 Cable Connection Confirmation
Before power on, check the connection cable of the whole system, and make sure that the cable
connection is reliable without aging fracture and insulation damage.
Check whether the positive and negative poles of the DC output power cable in the battery rack
are connected correctly;
Check whether the power connection of the battery cupboard is correct;
Check whether all communication wires and cables and sub connections at the connection end are
tight and reliable;
Fortress Power Confidential File
5.3 Status Checking of Equipment Switch
Close the QF1 and QF2 isolation switch on the battery rack (red frame in above figure).
5.4 Power up the Secondary Circuit
After connecting AC power supply, the indicator lights of every battery rack is as follows:
System status
Indicator light for the
secondary circuit●
Indicator Light for
the primary circuit●
Alarm indicator light ●
Power ON
Green light is ON
Red light is OFF
Yellow light is OFF
If the combination of the lights on and off is inconsistent with the above list, it means that the system
is not normally started up. Repeat the steps.
Fortress Power Confidential File
If the system fails to start up after repeating the steps for 5 times, please conduct preliminary
troubleshooting of system failure according to the “Failure and Alarm Handling and
Countermeasures in chapter 8”;
If the problem cannot be solved, please contact the manufacturer for system troubleshooting.
5.5 Power up of Primary Circuit of Battery Rack
After the secondary circuit is electrified, charge the primary circuit for the battery rack. At this
moment, the positive and negative output ends of the battery rack will generate about 1372.8V
(50%SOC) DC high voltage. After electrification, the light combination will correspond to the
following state:
System status
Indicator light for the
secondary circuit●
Indicator Light for
the primary circuit●
Alarm indicator light ●
Power ON
Green light is ON
Red light is ON
Yellow light is OFF
If the combination of the lights on and off is inconsistent with the above list, it means that the system
is not properly powered on. Repeat the steps.
If the system fails to be powered on after repeating the steps for 5 times, please conduct preliminary
troubleshooting of system failure according to the “Failure and Alarm Handling and
Countermeasures in chapter 8”; If the problem cannot be solved, please contact the
manufacturer for system troubleshooting.
5.6 Charging of Battery Rack
After powering on the primary circuit, if BMS detects the charging current, the battery rack will enter
the charging state for charging. At this time, corresponding states of indicator lights are as follows:
Fortress Power Confidential File
System state
Indicator light for the
secondary circuit●
Indicator Light for the
primary circuit●
Alarm indicator light ●
Power ON
Green light is ON
Red light is ON
Yellow light is OFF
5.7 Discharging of Battery Rack
After powering on the primary circuit, if BMS detects the discharging current, the battery rack will
enter the discharging state for discharging. At this time, corresponding states of indicator lights are
as follows:
System state
Indicator light for the
secondary circuit●
Indicator Light for
the primary circuit●
Alarm indicator light ●
Power ON
Green light is ON
Red light is on
Yellow light is OFF
5.8 Power Down of Primary Circuit of Battery Rack
During power down of primary circuit, the main circuit of the battery rack is disconnected and there
is no high voltage at both ends of the positive and negative output poles, and the combination of
lights on and off will correspond to the following state:
System state
Indicator light for the
secondary circuit●
Indicator Light for
the primary circuit●
Alarm indicator light ●
Power ON
Green light is ON
Red light is OFF
Yellow light is OFF
Note: When there is charging and discharging flow in the main circuit of the battery system,
the system will not be able to carry out the power down operation. Only when the charging
and discharging flow is less than 5A can the power down operation be carried out.
Fortress Power Confidential File
5.9 Secondary Circuit Power Down
The primary circuit indicator light is OFF. After disconnecting the AC power supply, corresponding
states of indicator lights are as follows:
If the combination of the lights on and off is inconsistent with the above list, it means that the system
is not shut down normally. Repeat the steps.
If the system fails to shut down after repeating the steps for 5 times, please conduct preliminary
troubleshooting of system failure according to the “Failure and Alarm Handling and
Countermeasures in chapter 8”; If the problem cannot be solved, please contact the
manufacturer for system troubleshooting.
5.10 List of Rack Status
System state
Indicator light for the
secondary circuit●
Indicator Light for the
primary circuit●
Alarm indicator light ●
Power OFF
Yellow light is OFF
Red light is OFF
Yellow light is OFF
Failure
Green light is ON
Red light is OFF
Yellow light is ON
Power ON
Green light is ON
Red light is OFF
Yellow light is OFF
Power up of Primary
Circuit
Green light is ON
Red light is ON
Yellow light is OFF
Charge/Discharge
Green light is ON
Red light is ON
Yellow light is OFF
System state
Indicator light for the
secondary circuit●
Indicator Light for the
primary circuit●
Alarm indicator light ●
Power OFF
Green light is OFF
Red light is OFF
Yellow light goes out
Fortress Power Confidential File
5.11 Flowchart for powering on the cabinet
correctly
connected
Is power supply
no
availdable?
yes
Decision Block
1、The auxiliary power supply delivers electricity
2、Set electric cabinets QF1 and QF2 in closed loop
Execution or Information Blo
Is the auxiliary
source is
No
powered on
properly?
Yes
1. Go to pg.7 in manual and
check error/fault
2. OR: contact Fortress support
1、Close the main
control box QS
disconnecter
2. Deliver high
voltage command
through BMS(EMS)
(precharge completed)
No
Is the power of
the main circuit
normal?
Yes
Fortress Power Confidential File
Was Primary
circuit
powered off?
charge
是否完成
Yes
1. Go to pg.7 in manual and
No
check error/fault
2. OR: contact Fortress
support
'HFLVLRQ %ORFN
1. Disconnect the electrical cabinet
QS
2. Disconnect electric cabinets
QF1 and QF2
3、Turn off the auxiliary
power switch
([HFXWLRQ RU ,QIRUPDWLRQ %R[
Did the
secondary
source is
powered off
Go to pg.7 in manual and
check error
1R
OR: contact Fortress
support
<HV
6. Product Maintenance
6.1 Terms Explanation
Normal operating:Refers to the system that works every day.
Intermittent operating:Refers to a system that does not have a fixed monthly running frequency
and cannot guarantee daily work.
Long-time unused:The battery system that has not started working for more than 3 months (the
battery system needs to be charged to 40% SOC before being suspended).
Fortress Power Confidential File
6.2 Operating Instructions for Normal
Operating System
Perform battery maintenance on the system every twelve months to prevent battery damage. Refer
to Section 6.6 for specific maintenance operating method.
Conduct an inspection of ESS every twelve months (refer to Appendix 1) and make inspection
record.
6.3 Operating Instructions for Intermittent Operating System
The operating instructions are the same as those of normal operating
system.
6.4 Operating Instructions for Long-time Unused System
SOC range of battery storage: 30%~50%., avoid long-term storage of batteries below 15% SOC. If
the battery is not used for a long time, it is necessary to cut off the power-consuming equipment in
time
Conduct an inspection of ESS every three months (refer to Appendix 1) and make inspection
record.
Perform battery maintenance on the system every three months to prevent battery damage. Refer
to Section 6.6 for specific maintenance operating method.
Before the first usage of long-time unused system, the battery system must be fully charged at least
once to activate the battery system in order to recover the battery performance to the best condition.
Fortress Power Confidential File
Tips
If the energy storage system is not used for a long time, it
will cause irreversible damage to the battery. Please perform
regular maintenance.
6.5 Function of Isolating Switch
a)
The isolating switch is an electrical component used to manually cut off
the high voltage circuit for safety protection (pictured, right).
b)
Before
the
maintenance
work
is
performed
on
the
system,
the relevant
personnel
must disconnect
the
isolating switch.
After
the maintenance work is completed,
ensure
that
the
isolating
switch
is
in
the
ON
state.
6.6 Operating Method of Battery Maintenance
In order to ensure the long-term safe and reliable operation of your energy storage system, please
read and follow the instructions below:
Maintenance process:
Plan 1 This plan is applicable when SOC of the battery system is low
1 Discharge the battery system to the cut-off condition (Average cell voltage< 3.1V or the
lowest voltage<2.8V), then stop discharging, standing for 1 hour.
2 Full charging automatically to the battery system (The highest voltage>3.65V), after charging,
standing for 1 hour.
3 Discharge the battery system to 40% and stop
Plan 2 This plan is applicable when SOC of the battery system is high
1 Full charging automatically to the battery system (The highest voltage>3.65V), after charging,
standing for 1 hour.
2 Discharge the battery system to the cut-off condition (Average cell voltage< 3.1V or the
lowest voltage<2.8V), then stop discharging, standing for 1 hour.
3 Charge the battery system to 40% and stop
Fortress Power Confidential File
6.7 Maintenance Requirements for Liquid Cooling System
In case of liquid leakage inside the electric cabinet, please stop the machine in time and contact
Fortress Power for maintenance.
The coolant shall be BASF GLYSANTIN G30 and Sinopec OEVC electric vehicle thermal-35
recommended by Fortress Power. Once every five years. If the coolant deteriorates to the
following level, it needs to be replaced.
PH value < 6.5 or PH value> 9.5
Chloride concentration > 60ppm
Appearance: turbid coolant with impurities
The energy storage water cooling pipeline uses a liquid level alarm. If the liquid level sensor
prompts an alarm, the liquid needs to be added.
If you purchase the coolant by yourself, you need to choose the coolant with the ice point lower
than the local minimum temperature. It is recommended that the concentration of 40% ~ 50%
glycol is good for aluminum corrosion resistance, and the maintenance should be carried out
according to the requirements of the coolant supplier. It is recommended to increase the
maintenance frequency. Any damage to the relevant parts of the electric cabinet caused by the
use of other coolants not recommended by Fortress Power is not covered by the warranty.
The water cooling pipeline is observed during annual maintenance, and if it is damaged, it needs
to be replace immediately. For the specific replacement operation method, see Appendix 2
For the maintenance of water cooling chiller , please refer to appendix the user manual of water
cooling chiller.
Tips
1 Check to ensure environmental safety, system safety, no alarm, no fault
before performing maintenance operations.
2 After the battery maintenance of ESS is completed, you can notify our
after-sales engineer to perform data analysis for free.
Fortress Power Confidential File
6.8 Fire Protection System Maintenance
The service life of the aerosol is 10 years, and replacement are required every 10 years.
Check the temperature sensor and smoke sensor every 12 months:
Open the rack door, the rack is powered by low voltage, and observe that the sensor indicator
flashes once every few seconds, which is the normal working state.
Dust regularly: to ensure the free circulation of air in the cabinet, clean the system every 6
months. Especially for dusty application scenarios,especially the air inlet and outlet of the
fan、Floor drain, and use a vacuum cleaner when necessary. Power must be cut off before
dust removal; do not rinse with water.
The catkins need to be maintained and cleaned at least once a week during the catkin
season to prevent the mesh from being blocked.
7. Diagnosis of common abnormal problems
7.1 The system alarm is divided into level alarm and non-level
alarm.
Non-level alarm means that when an alarm occurs, certain equipment has been damaged or malfunctioned.
There is no need to distinguish the severity with alarm level. 0 means normal, and 1 means that the
corresponding equipment has malfunctioned.
Treatment measures of failure at different levels:
Level alarm
Non-level alarm
Monomer over-voltage
Pre-charge timeout
Fortress Power Confidential File
Monomer under-voltage
Short circuit of pre-charge
load
Monomer over-temperature
Adhesion (main
positive, main negative)
Monomer low-temperature
Open circuit (main positive,
main negative)
Charging over-current
Coil abnormality (continuous
monitoring)
Discharge over-current
Larger temperature difference
Higher SOC
Over voltage of system
Lower SOC
Lower system voltage
Larger voltage difference
Voltage invalidation
Temperature invalidation
- module single-point
Temperature invalidation
- module double-point
Current invalidation
Equalization anomaly
Inner and cumulative sum
voltage difference
Open circuit of high voltage
circuit
CCAN communication
SCAN communication
CSC power supply
Fortress Power Confidential File
7.2 Countermeasures of system alarm
When you enable the battery rack, if it cannot work normally, please do not hastily determine that
the battery rack is out-of-order, please refer to Table 8-2 for possible reasons. At the same time,
pay attention to check whether it is caused by external environment, such as temperature,
noncompliant humidity or load overload. If the maintenance or replacement of spare parts is
involved, the after-sales user’s manual shall prevail. Meanwhile, the disassembly and installation
are not allowed without authorization.
This chapter contains only a few simple failure diagnosis procedures. If the answer to the diagnosis is
not very unequivocal, or the information obtained is not sufficient to settle the problem, please contact
the local office or distributor of the Fortress Power.
Precharged relay power
supply
Abnormal power supply
of SBMU
Power supply of current
sensor
Abnormal FUSE state of
main control cabinet
Abnormal MSD state of
battery rack
Higher relay cut-off current
Fortress Power Confidential File
S/N
Failure or alarm phenomena
Possible cause of failure
Troubleshooting scheme
The low voltage indicator light
of the battery rack is not on
1.Poor contact of wiring
harness
Check indicator light wiring harness
2.
SBMU
failure
Replacement of SBMU
3. Breakdown of indicator
Replacement of indicator light
The high voltage indicator light
of the battery rack is not on
1.
Poor contact of
wiring harness
Replacement of
relay
2. SBMU failure
Replacement of
SBMU
3. Breakdown of indicator
Replacement of indicator light
Precharged relay cannot
be closed
1. Poor connection of relay
wiring harness
Check wiring harness connection
2. Relay failure
Replacement of precharged relay
3. SBMU failure
Replacement of SBMU
Main positive relay cannot be
closed
1. Poor connection of main
positive relay wiring harness
Check wiring harness connection
2. Main relay failure
Replacement of main negative relay
3. SBMU failure
Replacement of SBMU
Main negative relay cannot be
closed
1. Poor connection of main
negative relay wiring harness
Check wiring harness connection
2. Main negative relay failure
Replacement of main negative relay
3. SBMU failure
Replacement of SBMU
Adhesion of main positive relay
1. Damage of main positive relay
Replacement of main positive relay
Adhesion of main negative relay
1.Damage of main negative relay
Replacement of main negative relay
Fortress Power Confidential File
Abnormal monomer
voltage detection
1.Poor connection of voltage
detection wiring harness
Check wiring harness connection
2. CSC failure
Replacement of CSC
Abnormal monomer
temperature detection
1. Poor connection of
temperature detection wiring
harness
Check wiring harness connection
2. Temperature sensor failure
Replacement of temperature sensor
3. CSC failure
Replacement of CSC
Abnormal total
voltage detection
1.Poor connection of total voltage
detection wiring harness
Check wiring harness connection
2. SBMU failure
Replacement of SBMU
Ferroelectric memory failure
1. SBMU ferroelectric memory
failure
Replacement of SBMU
Internal communication
abnormal
1. Poor
connection of internal CAN wire
Unplug and check CAN cable
System parameters are not
configured
1. The
battery system parameters are
not configured
Configure system parameters
Temperature
extreme
1. The battery temperature
exceeds the normal working
range
Stop charging and
discharging
Voltage
extreme
1.Single cell voltage exceeds
the normal allowable threshold
Stop charging and
discharging
CSU 5V power supply is
abnormal
1. Bad wiring of 5V power
supply harness
Check the wiring harness
2. SBMU
abnormal power generation
Replace SBMU
CSC 12V power supply
is abnormal
1.Poor wiring of 12V power
supply harness
Check the wiring harness
2. CSC power generation
abnormal
Replace CSC
SBMU automatic shutdown
1. MBMU wake-up signal wire is
Check the wiring harness
Fortress Power Confidential File
badly wired
2. MBMU wake-up signal output
failure
Replace SBMU
Smoke sensor is abnormal
1. Bad sensor wiring
Check the wiring harness
connection
2. Smoke sensor
malfunction
Replace the smoke sensor
Temperature sensor
abnormal
1. Bad sensor wiring
Check the wiring harness
connection
2. Temperature sensor failure
Replace temperature sensor
Monomer over-voltage alarm
1. Poor equalization
Stop charging and standby equalization
2. System over-discharge
Stop charging
Monomer under-voltage alarm
1. Poor equalization
Stop discharge and standby equalization
2. System over-discharge
Stop discharge
Monomer over-temperature
alarm
1. Excessive temperature of
individual cores
Check whether the air conditioner is
in operation
2.Excessive charging-
discharge current
Appropriately reduce charging and
discharge current
Monomer under-temperature
alarm
1. Lower temperature of
individual cores
Check whether the heating function is
on (if the equipment cabinet has
heating function)
2. Lower ambient temperature
No charging
Cabinet overpressure alarm
1. System overcharge
Stop charging
Cabinet under voltage alarm
1. System over discharge
Stop discharge
Cabinet over temperature
alarm
1. The RACK temperature is
too high
Check if the air conditioner is
running
2. Temperature sensor failure
Replace temperature sensor
RACK low temperature alarm
1. RACK temperature is
too low
Check whether the air conditioning
heating function is turned on
2. The ambient temperature
is too low
No charging
Fortress Power Confidential File
Charging over-current alarm
1. Excessive current of system
charging
Reduce charging power
Discharge over-current alarm
1. Excessive current of system
discharge
Reduce system load
The unit does not run without
display
The chiller is not powered on
Check if there is electricity at the
power input of the chiller
Suffered a lightning strike
and the fuse burned
Check whether the fuse of the water-
cooled unit is burned out, and replace
it after burning
External circulation fan does
not run
The power input of the air
conditioner is abnormal, such as
overvoltage or undervoltage.
Check the unit display, determine
whether there is a corresponding
alarm in the chiller, and correct it
Air conditioner is on standby
Normal phenomenon, when the
chiller is powered on, it enters the
automatic control logic after 30s
standby
Fan stuck
Check if there are foreign objects
stuck in the fan
Loose terminal
Check whether the fan
docking terminal is loose
The compressor does not start
The external fan starts after
the compressor starts
Abnormal noise of
external circulation fan
Fan bearing wear
Replace the fan
Fan blades scrape other objects
Check if there are cables or other
interference with the fan blades
The compressor does not start
Power off (standby)
Check the main power switch, and
check whether the operation display
interface has been turned on
Loose circuit connection
Forbidden circuit connector
Fortress Power Confidential File
Compressor motor burned out
Check the motor and replace it
immediately if any defect is found
Compressor not working
No cooling requirements
Check the indoor return air
temperature display and the output
status of the compressor in the
operation interface
Stop delay
The compressor has the shortest
stop time under normal conditions. If
the temperature rises to the opening
point again during this period, the
compressor will still start with a delay
High exhaust pressure
Dirty condenser
Check if the condenser is dirty
and clean the condenser
External circulation fan does not
work
Refer to the description of
the external fan not running
The internal circulation pump
does not start
Power off (standby)
Check the main power switch, and
check whether the operation display
interface has been turned on
Loose circuit connection
Fasten the circuit connector
The pump body is burned out
Check the water pump, if it is found to
be burned out, replace it immediately
There is air or no cooling
medium in the cooling medium,
which causes the pump to
protect itself
Check whether there is air or no
cooling medium in the system. If there
is air or no cooling medium in the
system, it needs to be evacuated or
supplemented with cooling medium
Electric heating tube does not
work
No cooling requirements
Check whether the outlet water
Fortress Power Confidential File
7.3 Emergency Treatment Method
(Scenario 1)Fire
Step 1: Evacuate people to safe area, delimit the safety isolation zone and call the police
according to the situation.
Step 2: If possible, proceed as follows in the case of personal safety:
1) If the wiring harness is smoking or on fire, use carbon dioxide or dry powder fire extinguisher
to extinguish the fire.
2) If the batteries are on fire, use a high pressure water gun to extinguish the fire at a distance. 3
)If you accidentally inhale smoke, please transfer and seek medical attention as soon as possible.
Step 3: Notify the manufacturer to obtain further handling suggestions.
(Scenario 2)Flooding
Tips
If the fire is caused by abnormal charging or discharging, be sure to turn off
the power first and then extinguish the fire.
temperature and heating set point are
set properly
Loose circuit connection
Fasten the circuit connector
Electric heating tube burned out
Check the electric heating tube, if it
is found to be burned out, replace it
immediately
Fortress Power Confidential File
Step 1: Regardless of whether the system is powered on, evacuate people to safe area and
delimit the safety isolation zone.
Step 2: Notify the supplier to perform an overhaul after the flood faded.
Step 3: It is forbidden to start the system until the manufacturer provides the safety results of
the system.
8. Requirements for Maintenance Personnel
According to the after-sales user manual, the maintenance personnel shall be authorized by
Fortress Power before carrying out maintenance based on the maintenance document.
Authorization of specific maintainers will be discussed during the implementation phase of the
project, and Fortress Power will provide training and guidance accordingly.
Fortress Power Confidential File
Appendix 1
Inspection project
Method
Yes–√ No- × Not
applicable-O
Abnormal record
Is the fire extinguishing system
Visual inspection
Whether the fire extinguishing system
is within the validity period
Visual inspection
Is the cooling system complete
Visual inspection
Is the cooling system air duct blocked
Visual inspection
Whether the appearance of the
electric cabinet is deformed
Visual inspection
Whether the appearance of the
electric cabinet is rusted or damaged
Visual inspection
Is there water vapor inside the electric
cabinet
Visual inspection
Whether the LV harness is loose
or damaged
Visual inspection
Whether the HV harness is loose
or damaged
Visual inspection
Whether the wiring harness interferes
with the structural parts
Visual inspection
Whether the high voltage connection
is ablated
Visual inspection
Whether the fixing bolt of
structural parts is loose or missing
Visual inspection
Is MSD complete and reliable
Visual inspection
Fortress Power Confidential File
Whether the water cooling pipe is
damaged
Visual inspection
Is there a foul smell in the battery
compartment
Sniffing
Is there a pungent smell in the electric
cabinet
Sniffing
Whether HV connection part
has burnt smell
Sniffing
Is the summary data complete
Monitor master
computer
Is the cell voltage data complete
Monitor master
computer
Is the cell temperature data complete
Monitor master
computer
Whether there is an abnormal alarm
in the alarm bar
Monitor master
computer
Note: If any abnormalities are found during the inspection, please feedback in time, and contact the relevant
personnel for processing.