DPW 2024-2025 3rd quarter report
report
2 pages
Meeting: portal event 1040 (no meeting page on file)
Agenda item: Consent Agenda — Quarterly Reports
Report / study, 2 pages. Attached to agenda item: “Consent Agenda — Quarterly Reports”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Clerk Q3 FY 2025
Engineering Quarterly Report Q32025
Finance FY2025 Q3 REPORT
Managers Office Q3 FY 2025
Parking Quarterly Report - 3Q FY25
Police Quarterly Report 3Q2025
Rec Quarterly report Dec Jan Feb 24-25
Village Justice Court 3Q Report
Extracted text
Quarterly Report
PUBLIC WORKS QUARTERLY REPORT
Fiscal Year 2024/2025
Third Quarter: December 1, 2024 – February 28, 2025
Highway
•
Finished leaf removal program throughout the Village
•
Installed holiday decor throughout the Village
•
Repaired 4 catch basins
•
Weekly asphalt maintenance (potholes and water patches)
•
Trimmed approximately 25 trees
•
Removed 12 trees (including grinding leftover stumps)
Sanitation:
•
Collected approximately 573 tons of refuse
•
Weekly collection of Village co-mingled, paper and metal recycling
•
Collected approximately 511 tons of organic waste
Building Maintenance:
•
Street light repairs
•
Replaced various signage throughout Village
•
Assist in EMS addition
Water Department:
•
Meter reading for water billing
•
Flushed hydrants
•
Maintenance to pumps and motors
•
Plumbing work at Wash Station
•
Responded to 86 code 53-mark outs
•
Submission of monthly reports to Westchester County
•
Assist DPW on low staff days
•
Completed monthly water sampling
•
Replaced 40 non-working water meters
•
Installed mag meter Well #3
•
Recalibrated Temp/Level Sensor Well #4
•
Generator replaced and put back in service Well #1
•
Chemical deliveries
•
Repaired 7 leaks
Department of Public Works
Quarterly Report
Parks Department:
•
Continue removing debris and leaves from Village Parks and Playgrounds
•
Continued mowing of lawns/field in all Village parks
•
Litter removal in Village parks and fields
•
Repair Facility:
•
Continued preparing all necessary vehicles and equipment for the upcoming leaf season and start
prep for snow
•
Weekly inspection and maintenance of all police vehicles
•
Assist Fire Department with vehicle maintenance
Capital Projects:
•
Continued the design process for the Half Mon Bay Bridge project
•
Working towards approval for Cleveland resurfacing grant
•
Completed exterior framing for new EMS building including set bar joists, poured second floor
slab, roof bar joist and metal decking
•
Installed dense glass on entire exterior of building
•
Initiated design of new Farrington steps
•
Initiated design of renovations/addition to the Gouveia property to accommodate new Recreation
Department
•
Completed granite curbing and topsoil at Gotwald Circle