croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Saturday, August 15, 2026· Aug 15, 2026
Source-linkedCorrections welcomed
Documents

DPW Q4 FY2025 Report

report 2 pages
Meeting: portal event 1062 (no meeting page on file)
Agenda item: Consent Agenda — Quarterly Reports
Report / study, 2 pages. Attached to agenda item: “Consent Agenda — Quarterly Reports”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Clerk 4Q FY25 Report Court Q4 FY2025 Report Engineering Q4 FY2025 Report Finance Q4 FY2025 Report Manager's Office Q4 FY2025 Parking Q4 FY25 Report Police Q4 FY2025 Report Recreation Q4 FY2025 Report
Quarterly Report PUBLIC WORKS QUARTERLY REPORT Fiscal Year 2024/2025 Fourth Quarter: March 1, 2025 – May 31, 2025 Highway • Installed Veterans banners, summer banners and flags • Repaired 5 catch basins • Weekly asphalt maintenance (potholes and water patches) • Trimmed approximately 30 trees • Removed 8 trees (including grinding leftover stumps) • Cleaned approximately 50 catch basins Sanitation: • Collected approximately 578 tons of refuse • Weekly collection of Village co-mingled, paper and metal recycling • Collected approximately 122 tons of organic waste Building Maintenance: • Street light repairs • Replaced various signage throughout Village • Assist in EMS addition • Line striped MTA Parking Lot • Finished Silver Lake renovation Water Department: • Meter reading for water billing • Flushed hydrants • Maintenance to pumps and motors • Plumbing work at Municipal Place building • Responded to 161 code 53-mark outs • Submission of monthly reports to Westchester County • Assist DPW on low staff days • Completed monthly water sampling • Replaced 42 non-working water meters • Chemical deliveries • Repaired 5 leaks • Turned on seasonal waters • Analyzers serviced • Work on AWQR • Painted Hydrants • New insertion valves installed on OPRS for high school work • Helped with irrigation systems, fixed plumbing at Senasqua • NYSDEC Water Withdrawal Report • Cathodic Protection System turned on at unit above ground tank • Annual Water Leak Survey Department of Public Works Quarterly Report • Site visits for: FIOS – Beekman Ave, CON ED – Albany Post Road, CHHS - OPRS Parks Department: • Continue removing debris and leaves from Village Parks and Playgrounds • Continued mowing of lawns/field in all Village parks • Litter removal in Village parks and fields • Maintenance of Village ballfields Repair Facility: • Maintenance on all Village vehicles • Weekly inspection and maintenance of all police vehicles • Assist Fire Department with vehicle maintenance Capital Projects: • Continued the design process for the Half Mon Bay Bridge project • Working towards approval for Cleveland resurfacing grant • Completed exterior framing for new EMS building including set bar joists, poured second floor slab, roof bar joist and metal decking • Completed exterior walls and roof for new EMS building • Posted the Farrington steps project for public bid • Continued working on design of renovations/addition to the Gouveia property to accommodate new Recreation Department • Completed drainage improvements at Manes Field

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.