croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Saturday, August 15, 2026· Aug 15, 2026
Source-linkedCorrections welcomed
Documents

DPW Q4 FY 2024

report 2 pages
Meeting: portal event 967 (no meeting page on file)
Agenda item: Quarterly Reports
Report / study, 2 pages. Attached to agenda item: “Quarterly Reports”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Clerk Q4 FY 2024 Court Q4 FY 2024 Engineering Q4 FY 2024 Finance Q4 FY 2024 Managers Office Q4 FY 2024 Parking Q4 FY 2024 Police Q4 FY 2024 Recreation Q4 FY 2024
Quarterly Report PUBLIC WORKS QUARTERLY REPORT Fiscal Year 2023/2024 Fourth Quarter: March 1, 2024 – May 31, 2024 Highway • Installation of one new sidewalk in the Upper Village • Swept 160 miles of roadway • Started the yard waste removal program throughout the Village • Installed Veterans banners throughout the Village • Removed and replaced banners for various Village events • Installed summer banners and American flags throughout the Village • Cleaned out 64 catch basins • Repaired 5 catch basins • Weekly asphalt maintenance (potholes and water patches) • Trimmed approximately 30 trees • Removed 10 trees (including grinding leftover stumps) • Planted 4 trees during Arbor Day • Clean up of Village parks and riverfront during Earth Day • Prepared the upper village and organized the vendors for Summerfest • Train Station parking lot plantings • Installed pavers at the intersection of Mount Airy Road and Grand Street • Smoke testing in the sanitary sewer system connected to Nordica Pump Station Sanitation: • Collected approximately 590 tons of refuse • Weekly collection of Village co-mingled, paper and metal recycling • Collected approximately 215 tons of organic yard waste Building Maintenance: • Started renovations at Silver Lake. • Finished courtroom renovations • Renovated Washington Engine offices, and installed HAZMAT shower • Started the annual crosswalk and stop bar striping program throughout the Village Water Department: • Responded to 215 code 53 mark outs • Submission of monthly reports to Westchester County • Performed hydrant flushing throughout the Village • Preparation of Village water and sprinkler systems for seasonal use • Continued service line inventory • Performed all required sampling of the Village’s water system • Meter reading throughout the Village • Assisted with the 2023 Annual Water Quality Report • Repaired 6 water leaks on the Village system • Replaced broken meters Department of Public Works Quarterly Report Parks Department: • Litter removal in Village parks and fields • Prepared Village Fields and parks for seasonal use • Assist with DPW day-to-day operations (yard waste, spring field prep, garbage, etc.) Repair Facility: • Maintenance of Vehicle fleet during winter operations • Assist with preparing outdoor equipment for Spring/Summer season • Assisted with posting DPW vehicles/equipment for public auction • Weekly inspection and maintenance of all police vehicles • Assist Fire Department with vehicle maintenance and repair Capital Projects: • Prepared submissions for Cleveland Resurfacing grant • Continued working on the design phase of the Harmon Firehouse addition • Continued design for the Gouvea Park improvements • Working with design Engineer to finalize the Half Moon Bay Bridge rehabilitation project • Continued working on the Grand Street floor rehabilitation project • Completed the Nordica Pump Station rehabilitation project. • Preparing specifications for the demo of the old DPW garage

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.